Amendment 0005 - South IDIQ RFP 693C73-25-R-000082.pdf
PDF 168 KB Posted
- Solicitation number
- 693C73-25-R-000082
About this file
This document is a Federal Highway Administration (FHWA) Amendment No. 0005 to a Request for Proposal (RFP) for a construction project at Bald Knob National Wildlife Refuge, with solicitation number 693C73-25-R-000082. The amendment provides responses to four key questions from potential offerors regarding project specifications, including confirmation that limestone aggregate should be used, clarification that Class 7 material is not acceptable for the aggregate surface course, and details about bypass pumping requirements for two culvert locations (96" steel pipe near STA 284 for Gum Creek and a 24" culvert).
The proposal due date remains unchanged at Tuesday, November 04, 2025, at 2:00 p.m. EST. The Eastern Federal Lands Highway Division (EFLHD) addressed technical questions about flow rates, noting that the calculated flow rates are conservative and alternate pumping methods may be proposed. Additionally, the agency explained that truck weight limits are restricted due to degraded aggregate surface and a failing low water crossing at the project site. The amendment serves to provide clarity and additional technical guidance to potential bidders for this South Region Construction Multiple Award Task Order Contract (MATOC) project.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7325R000082 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: Acquisitions
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1410/31/20250005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
10/01/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
South Region Construction MATOC:
The purpose of this Amendment is to provide a summary of responses to questions/clarifications asked by interested offerors.
The proposal due date of Tuesday, November 04, 2025, at 2:00 p.m. EST remains unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0005
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
AR FW BLD 11(1)
Bald Knob National Wildlife Refuge
Request for Proposal No: 693C73-25-R-000082
The purpose of this Amendment is to provide a summary of responses to questions/clarifications asked by interested offerors.
The proposal due date of Tuesday, November 04, 2025, at 2:00 p.m. EST remains unchanged.
Questions / Clarifications
The following questions and issues were submitted via email at eflhd.contracts@dot.gov. The
Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.
1. It appears there may be some circular logic within the project SCRs for this solicitation.
Could you please confirm whether the aggregate to be priced should be limestone? The local quarries primarily produce sandstone, and sourcing limestone would be significantly more expensive. To ensure we submit a competitive proposal, please clarify which stone type is intended for pricing.
Response: The aggregate to be priced should be limestone.
2. Line Item Number A0140 specifies 18,600 tons of Aggregate Surface Course. The quarries quoting the project report they do not make a product that strictly adheres to this spec. They say the spec is for Class 8 material and they make a similar product called
Class 7. Is Class 7 material acceptable?
Response: The Class 7 material is not acceptable for an aggregate surface course due to the larger aggregate gradation size which Class 7 allows.
3. We have a pair of questions concerning the bypass pumping required for this solicitation:
a. We would like clarification on the pump around situation at the proposed 96” steel pipe culvert near STA 284 for Gum Creek in the plan sheets. The FP-24
628.04 states that stream diversion must accommodate a 2-year peak flood event.
The Hydraulics Memo provided the following table for design flow rates at this location:
mailto:eflhd.contracts@dot.gov
This figure equates to more than 50,000 GPM for bypass pumping. The cost of the bypass pumping at this location is very excessive, particularly when taking into account how quickly this pipe culvert should be installed. Please clarify if bypass pumping is indeed required or if there is a more reasonable flow rate to assume for the bypass pumping.
Response: The calculated flow of approximately 117 cubic feet per second
(equating to just over 50,000 gallons per minute) represents the theoretical peak discharge capacity of the system under full-flow conditions. This value is highly conservative and may not accurately reflect the actual flow anticipated during the culvert replacement period. The use of spare pumps on site may be implemented in the event higher than expected flow rates.
Alternate methods may be proposed and deemed acceptable after evaluation and approval by the CO.
b. What flow rate is required for the proposed 24” culvert for bypass pumping?
Response: For the 24-inch culvert the estimated 2-year peak flood event to accommodate flow during construction.
4. The specific question is why are trucks restricted to a lower weight limit than highway standards?
Response: EFL proposed a lower weight limit due to the degraded aggregate surface and failing low water crossing on this project.