Attachment 3 - Statement of Work for Seed Project.pdf
PDF 52 KB Posted
- Attached to
- South Region Construction Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- 693C73-25-R-000082
About this file
This Statement of Work (SOW) details a seed project for roadway reconstruction at the Bald Knob Wildlife Refuge in White County, Arkansas. The project is specifically for Granary South Road (Route 011) and is restricted to certified Small Business Concerns, with an estimated contract value between $1,000,000 and $2,000,000. The scope of work includes bank stabilization, aggregate base and surface course installation (using limestone), pipe culvert replacement, riprap installation, and other miscellaneous road improvement tasks.
The project has a defined performance period of 150 calendar days from the issuance of the Notice to Proceed. The work involves comprehensive road infrastructure improvements within a wildlife refuge setting, focusing on road reconstruction and resurfacing using specific materials and techniques to enhance the roadway's durability and environmental integration.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Seed Project No. AR FW BLD 11(1)
Statement of Work
Proposals from certified Small Business Concerns will be accepted for the Bald Knob Wildlife
Refuge project AR FW BLD 11(1), located in White County, Arkansas. The project consists of roadway reconstruction and resurfacing of Granary South Road (Route 011). The work includes bank stabilization, aggregate base (limestone), aggregate surface course (limestone), pipe culvert replacement, riprap installation, and other miscellaneous work.
The estimated price of the seed project is expected to fall within the price range of $1,000,000 to
$2,000,000.
The performance period to complete all seed project task order work will 150 calendar days after the issuance of the Notice to Proceed.
File details come from the government source that posted it. Updated .