This document is a Federal Highway Administration (FHWA) minute memo detailing a hydraulic and hydrology analysis for a culvert replacement project at Milepost 3.4 on Granary South Road within the Bald Knob National Wildlife Refuge in Searcy, Arkansas. The existing 72-inch culvert was identified as a frequent flooding point, and the analysis recommends replacing it with an 8-foot (96-inch) diameter corrugated steel pipe culvert 50 feet in length.
The hydraulic design was performed using HY-8 version 7.7 software, based on the Hydraulic Design of Highway Culvert guidelines, and analyzed flow rates for 2, 10, 25, 50, and 100-year return periods. The project is located in a FEMA Zone A flood hazard area with a total contributing drainage area of 323 acres. Recommended scour countermeasures include installing a Class 3 Riprap (D50=12") at the outfall, 20 feet long, 50 feet wide at the apron end, and 2.5 feet thick, following the bank contours. The design aims to prevent road erosion and improve drainage capacity during storm events.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FHWA: S. Jurek:3549:JS: 05/20/24: RF: M:\PROJECTS\_FWS\BAKN\100(1)\Techserv\Hydra\Reports CC: Hydraulics, Geotech, Env, HD Engineer, TS Engineer, Bridge
Form FHWA-201 U.S. DEPARTMENT OF TRANSPORTATION (Rev. 11-87) FEDERAL HIGHWAY ADMINISTRATION
MINUTE - MEMO
Use this form in lieu of transmittal slips within Dept. of Trans. when message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA-121 for informal correspondence.
SUBJECT: AR FW BLD 11(1) Culvert Memo
TO MESSAGE/COMMENT FROM/DATE
Yanina
Kirtley
Project
Manager
Rachel
Wright
Highway
Design
Manager
We have completed the hydrology and hydraulics for the AR FW BLD 11(1) project. The project involved the replacement of major culvert on MP 3.4 on
Granary South Road (Route 011) within the Bald Knob National Wildlife
Refuge in Searcy, Arkansas. The existing crossing had been identified by the
FWS as a point with frequent overtopping and flooding. The hydraulic analysis was performed using HY-8 version 7.7, which is based on the HDS-
5 (Hydraulic Design of Highway Culvert, Third Edition).
The project is located within a FEMA flood hazard area categorized as Zone
A, which indicates that there are no base flood elevations determined by a detailed study at this location. The area has been designated as a high-risk area with a high incidence of floods by FEMA in their Flood Insurance Rate
Map (FIRM). The FIRM for the site is panel # 05145C0500E.
The flow rates calculated for various return periods are shown in Table 1.
The total contributing drainage area at the site is 323 acres. The drainage area was delineated using Open Road Designer with geo-referenced the
USGS quad maps into the software for the project site. Hydrology is based on the U.S. Geological Survey (USGS) National Streamflow Statistics application, using regression equations developed by USGS. The hydraulic design for the culvert was based on the 25-year design storm according to
Chapter 7 of the Project Development and Design Manual (PDDM). HY-8 version 7.80.0.2 software, which is based on the HDS-5 (Hydraulic Design of Highway Culvert, Third Edition) was used to design the culvert. Scour countermeasure were designed using the Riprap Analysis Hydraulic
Toolbox (V4.4), which is based on HEC-14 (Hydraulic Design of Energy
Dissipators for Culverts and Channels, Third Edition).
Table 1. Design Flow Rates
Station 2-year
(cfs)
10-year
(cfs)
25-year
(cfs)
50-year
(cfs)
100-year
(cfs)
MP 3.4 117 345 496 626 761
Sam Jurek
Hydraulics
Engineer
THROUGH
Wendy Hiciano
Hydraulics Team
Leader
05/20/24
Culvert at MP 3.4 (35°12'35.8"N, 91°34'22.2"W)
Based on the hydraulics analysis and site visit observations, the existing 72 inch culvert does not meet the required capacity during the design storm event. During the site visit on 06/16/2021, there was flood debris found on the road and the subgrade of the road was eroding, both of which are caused by overtopping and frequent flooding.
Recommendations:
We recommend replacing the existing structure with a 8 ft (96”) diameter steel pipe culvert. We also recommend the pipe be lengthened to 50 feet to prevent further erosion and allow for a proper shoulder on the road.
Based on the hydraulic analysis results, the proposed pipe outlet velocity is higher than the downstream channel velocity. Therefore, outlet protection is needed. We recommend installing a
Class 3 Riprap (D50=12”) at the outfall as scour countermeasure with a length of 20 ft, a width of
50 ft at apron end, and a minimum thickness of 2.5 ft. The rirprap apron should follow the bank contours.
Please refer to Attachment 2 for the proposed culvert profile and Attachment 3 for the riprap layout. For a summary of the culvert data, please refer to Table 2.
Table 2. Culvert Parameters
Size Material Inlet El. (ft) Outlet El. (ft) Length (ft)
96” Corrugated Steel Pipe 185.36 184.76 50
The slopes of the banks should be 1V:4H. The required cover for the pipe is 2 feet, which is met with the proposed inlet/outlet elevations. At the shallowest point on the inlet side, the cover between the pipe and the bottom of the road subgrade should be 2 feet.
If you should have any questions or comments, please feel free to contact us.
Attachments
The following attachments can be found in the following folder path:
M:\PROJECTS\_FWS\BAKN\11(1)\Techserv\Hydra\Reports\Culvert Memo Attachments
Attachment 1: Water Surface Profile
Attachment 2: Proposed Culvert Profile
Attachment 3: Riprap Layout
Attachment 4: HYD Toolbox Riprap Analysis file://///fhfl15fileserve.flhd.fhwa.dot.gov/data/PROJECTS/_FWS/BAKN/11(1)/Techserv/Hydra/Reports/Culvert%20Memo%20Attachments
Offset = 25'
Ele. = 184.76'
Proposed invert outlet Offset = 25'
Ele. = 185.36'
Proposed invert inlet
1.19%
Skew =13.68°
Length = 50.00' aluminum pipe culvert
Install 96" x 50' Approx. 20'
Grade to drain
Existing ground
LC
30" Depth
20' Length
Class III
Riprap Apron
Grade to drain
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PIPE CULVERT CROSS SECTION
SCHEDULE A
SCALE IN FEET
0 5 10
1:4 1:4
284+34.89
-50 -40 -30 -20 -10 0 10 20 30 40 50 60
140 140
150 150
160 160
170 170
180 180
190 190
200 200
210 210
220 220
1:4
196.12 Des Grade =
195.62 Subgrade =
-4%+4%
-50 -40 -30 -20 -10 0 10 20 30 40 50 60
140 140
150 150
160 160
170 170
180 180
190 190
200 200
210 210
220 220
1:4 .1
.4
.2
.3
.7
.4
.2
.3
.7
:0
P
M
M a y
K
R o u te
S h e e t] fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \B
A K
N \1
(1
T e c h s e rv
\H y d ra
\C A
D D
\S J \K
-A
R F
W B
L D
(1 d ra g .d g n
DRAINAGE CROSS SECTION
PROJECT
NUMBER
SHEET
K06
NPS Drwg No. XXX/XXXX NPS PMIS No. 000000
Not To Scale
ELE
V
5.
E L E
V . 1
.7
'AR FW BLD 11(1)
Attachment: Riprap Layout
96" x 50' Pipe Culvert Corrugated Steel
30" Depth 20' Length 55' Width at apron end Class III Riprap Riprap Apron
Hydraulic Analysis Report
Project Data Project Title:
Designer:
Project Date: Monday, May 20, 2024
Project Units: U.S. Customary Units
Notes:
Riprap Analysis: Pipe Outlet - 8ft - USE Notes:
Input Parameters
Riprap Type: Culvert Outlet Protection
Flow: 496 cfs
Culvert Diameter: 8 ft
Normal Depth in Culvert: 7.92 ft
Tailwater Depth: 2.9 ft
If tailwater is unknown, use 0.4D flow is supercritical
Result Parameters
Tailwater Depth Used in Computations: 3.184 ft
Culvert Diameter Used in Computations: 7.96 ft
Computed D50: 288.144 mm
Riprap Class
Riprap shape should be angular
Riprap Class Name:CLASS III
Riprap Class Order:3
The following values are an 'average' of the size fraction range for the selected riprap class.
D100: 609.60 mm
D85: 431.80 mm
D50: 317.50 mm
D15: 228.60 mm
Layout Recommendations
Apron Length: 40 ft
Apron Depth: 2.5 ft
Apron Width (at end): 50.5467 ft
Report for channel
Channel Analysis: Channel Analysis
Notes:
Input Parameters
Channel Type: Custom Cross Section
Cross Section Data
Station (ft Elevation (ft) Manning's n
0.00 190.20 0.0330
12.10 190.00 0.0330
16.79 189.00 0.0330
20.10 188.00 0.0330
33.33 187.00 0.0330
44.38 185.66 0.0330
52.72 185.66 0.0330
57.33 185.66 0.0330
62.91 187.00 0.0330
67.62 188.00 0.0330
69.91 189.00 0.0330
71.30 190.00 0.0330
72.60 191.00 -----
Longitudinal Slope: 0.0060 ft/ft
Flow 496.0000 cfs
Result Parameters
Depth 2.8998 ft
Area of Flow 94.5337 ft^2
Wetted Perimeter 51.2407 ft
Hydraulic Radius 1.8449 ft
Average Velocity 5.2468 ft/s
Top Width 50.6586 ft
Froude Number: 0.6769
Critical Depth 2.4353 ft
Critical Velocity 6.9267 ft/s
Critical Slope: 0.0141 ft/ft
Critical Top Width 48.06 ft
Calculated Max Shear Stress 1.0857 lb/ft^2
Calculated Avg Shear Stress 0.6907 lb/ft^2
Composite Manning's n Equation: Lotter method
Manning's n: 0.0330
| AR FW BLD 11(1)_Memo_Culvert MP 3.4 |
| 01 - Water Surface Profile |
| 02 - Proposed Culvert Profile |
| 03 - Riprap Layout |
| 04 - MP 2.4 Culvert Riprap Analysis |
| 2024-05-30T15:31:40-0400 | |
| SAMANTHA CAROL JUREK |
| 2024-05-30T15:40:23-0400 | |
| WENDY MERCEDES HICIANO |
File details come from the government source that posted it. Updated .