This document is an Amendment (No. 0002) to a Request for Proposal (RFP) for a construction project at Bald Knob National Wildlife Refuge, issued by the Federal Highway Administration's Eastern Federal Lands Highway Division. The amendment addresses two primary purposes: 1) revising Section 602 of Attachment 5 to clarify pipe wall thickness specifications for a seed project, specifically for a 96-inch smooth steel pipe with a minimum 14-gauge wall thickness, and 2) providing responses to contractor questions regarding project requirements.

Key details include the project's continued proposal due date of Tuesday, November 4, 2025, at 2:00 p.m. EST, and clarifications on several technical aspects such as tree cutting restrictions, clearing and grubbing procedures, excavation material disposal, and liquidated damages. The amendment provides specific guidance on pipe installation, confirming that corrugated metal is not an acceptable alternative to the specified smooth steel pipe, and directs contractors to follow existing specifications in the FP-24 document for various project requirements.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7325R000082 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN: Acquisitions

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

See Block 1410/22/20250002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/01/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

South Region Construction MATOC:

The purpose of this Amendment is to:

1) Revise Section 602 of Attachment 5 - J-Pages - SCRs for Seed Project to clarify the pipe wall thickness for the seed project.

2) Provide a summary of responses to questions/clarifications asked by interested offerors.

The proposal due date of Tuesday, November 4, 2025, at 2:00 pm EST remains unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0002

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

AR FW BLD 11(1)

Bald Knob National Wildlife Refuge

Request for Proposal No: 693C73-25-R-000082

The purpose of this Amendment is to:

1) Revise Section 602 of Attachment 5 - J-Pages - SCRs for Seed Project to clarify the pipe wall thickness for the seed project.

2) Provide a summary of responses to questions/clarifications asked by interested offerors.

The proposal due date of Tuesday, November 4, 2025, at 2:00 p.m. EST remains unchanged.

Special Contract Requirement changes

Delete the last two sentences of Subsection 602.03 of the Special Contract Requirements, page J-

15, and substitute the following:

At least 30 days before their intended use, submit documents and drawings for approval showing the proposed installation methods and construction details for a smooth steel pipe according to

Subsection 104.06.

Questions / Clarifications

The following questions and issues were submitted via email at eflhd.contracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.

1. Section 108 of the special specs states “(c) No cutting of trees will be permitted between March 16 and November 14” and that no work is permitted “November 15 to May 31.” Given these restrictions, when and how will clearing and grubbing be accomplished?

Response: Subsection 202.03 of the FP-24 states “Clear and grub according to Section 201.

Clear, grub, and dispose of trees, snags, brush, downed timber, stumps, roots, buried logs, moss, turf, grass, and other vegetation designated to be removed.” and “Cut trees to within 4 inches of the existing ground. Remove and dispose of designated trees or stumps according to Subsections 203.05 and 203.07.” Additionally, Subsection 203.02(b) defines selective clearing and grubbing as “Clearing and grubbing where some trees and vegetation are designated to remain”.

The plans do not designate any trees for removal and tree cutting is not anticipated for this project. Therefore, the selective clearing and grubbing work outlined in the contract can still be accomplished in the designated work period and is not expected to be impacted by the tree cutting restriction period.

2. Regarding the 96” Steel Pipe to be installed, the specs call for a minimum 14 gauge. This is very thin for a smooth steel that size. Given that this is a minimum, we assume we can go thicker. Is corrugated metal also an option for this pipe?

Response: Subsection 602.03 of the Special Contract Requirements (SCR’s) states “For steel pipes, use a minimum pipe wall thickness of 14-gage. At least 30 days before starting the pipe culvert replacement work, submit drawings showing the proposed installation methods and construction details for smooth steel pipe.” The design for the 96” steel pipe is intended to be a smooth steel, and corrugated metal will not be an option. The thickness provided is a minimum and a larger gage may be submitted for approval. An Amendment has been issued to revise the SCR’s.

3. The RFP states that liquidated damages will be specified in each task order, however we cannot find where the liquidated damages are called out for the seed contract. Could the government provide clarity, or point us to where to find that information?

Response: No changes were made regarding liquidated damages in the Special Contract Requirements; therefore, this project will follow Subsection 108.05 of the FP-24 for liquidated damages guidance.

mailto:eflhd.contracts@dot.gov

4. Is there a designated location on the jobsite where we can waste the excavation material.

I would think the Refuge would want to save excavated material for fill somewhere in the park.

Response: Dispose of roadway excavation considered as unsuitable or excess material according to Subsection 203.07 of FP-24. Please refer to Subsection 204.14 of FP-24.

File details come from the government source that posted it. Updated .