Attachment 8 - Drawings Electrical - 3 of 8.pdf
PDF 20 MB Posted
- Solicitation number
- 36C77623B0066
About this file
This document provides details for a federal contract opportunity for infrastructure upgrades at the Veterans Affairs Medical Center in Kansas City, Missouri. The solicitation number is 36C77623B0066 and is being conducted by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas. The opportunity involves upgrading the EHRM infrastructure at the Kansas City VA facility, as outlined in Attachment 8 of the solicitation documents which provides electrical drawings for the project. Responses to the solicitation are due by the date listed. The selected contractor will be responsible for completing infrastructure upgrade work at the Kansas City VA Medical Center as defined in the solicitation documents.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mo a
Mo b
4 5 5.1
A
420 SF
WORK AREA
(TE)
40-16
WALL MOUNTED
DATA EQUIPMENT
EMERGENCY
PANEL
EXISTING
HEATER
EXISTING
HEATER
4 5 5.1
A
WORK AREA
(TE)
40-16
420 SF
ICRA CLASS II
TELECOMMUNICATIONS
ENCLOSURE
EMERGENCY
PANEL
NEW PANEL GRP
EP502
40-16A
EXISTING
HEATER
EXISTING
HEATER
40-AC-01-16
EP5044
CONTINUE TO
SHEET 40EP101
40-16A-12
40-16A-12
40-16A-12
40-16A-12
40-16A-2
40-P-06
CONTINUE TO 40-CU-01-16
REFERENCE SHEET 40EP101
40-P-09
40-P-08
40-16
AREA OF WORK
4 5 5.1
A
WORK AREA
(TE)
40-16
420 SF
ICRA CLASS II
TYP.
4 5 5.1
A
WORK AREA
(TE)
40-16
420 SF
ICRA CLASS II
TELECOMMUNICATIONS
ENCLOSURE
L1 b
40-40-16B-6
L1E a
40-40-16A-6
L1E a
40-40-16A-6
L1E a
40-40-16A-6
L1 b
40-40-16B-6
L1 b
40-40-16B-6
40-16A
A SIDE POWER
B SIDE POWER
SHEET SHALL PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
589-21-700
40EP401
BLDG 40 - LEVEL 01 - ENLARGED
ELECTRICAL PLANS
SJM/WNM RDC/LLT
100% CONSTRUCTION
DOCUMENTS
06/19/2023
KEY PLAN
KEY NOTES
GENERAL NOTES
3/8" = 1'-0"40EP101
1 RM 40-16 - DEMOLITION ELECTRICAL PLAN
3/8" = 1'-0"40EP101
2 RM 40-16 - ELECTRICAL PLAN2'0 4' 6' 2'0 4' 6'
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
3/8" = 1'-0"40EP101
3 RM 40-16 - DEMOLITION LIGHTING PLAN 2'0 4' 6'
PROJECT
NORTH
1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
SECONDARY BONDING BUSBAR.
TE SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT
LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".
REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
3/8" = 1'-0"40EP101
4 RM 40-16 - LIGHTING PLAN 2'0 4' 6'
PROJECT
NORTH
Revisions: Date: 225 of 512Page 231 of 518
M o b
M o a
H1-173
AREA OF WORK
D
BB
R1
ELUPS
FIRE ALARM
PANELS
TYP.
ACCESS POWER
CONTROLLER PANEL
ACCESS DOOR
CONTROLLER
FIBER OPTIC
CABINETS
DATA RACK
DISC. UPS ELA 1 & 3
D
BB
R1
TR
H1-173
229 SF
ACCESS POWER
CONTROLLER PANEL
ACCESS DOOR
CONTROLLER
55-H1-173B
55-H1-173A2
DATA RACK
EP502
55-H1-173B-2
55-H1-173A-2
55-H1-173B-2
55-H1-173B-2
55-H1-173B-2
55-H1-173A-2
55-H1-173A-2
55-H1-173A-2
ELUPS
FIRE ALARM
PANEL
FIBER OPTIC
CABINETS
655-AC-01-H1-173
DISC. UPS ELA 1 & 3
CONTINUATION TO 55-CU-01-ROOF
REFERENCE SHEET 55EP403
EP504
CONTINUE TO
SHEET 55EP402
CONTINUE TO
SHEET 55EP101
55-P-05
55-P-06
55-P-08
55-P-07
P-TR-2A
P-TR-2B
D
BB
R1
TYP
D
BB
R1
TR
H1-173
229 SF
DATA RACK,
TYP.
55-H1-173B
55-H1-173A L1 b
55-H1-173B-4
L1 b
55-H1-173B-4
L1E a
55-H1-173A-4
L1 b
55-H1-173B-4
L1E a
55-H1-173A-4
TELECOM.
H1-173
229 SF
TELECOM.
H1-173
229 SF
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
589-21-700
55EP401
BLDG 55 - LEVEL 01 - ENLARGED
ELECTRICAL PLANS
SJM/WNM RDC/LLT
100% CONSTRUCTION
DOCUMENTS
06/19/2023
KEY NOTES
GENERAL NOTES
KEY PLAN
2'0 4' 6'
PROJECT
NORTH
PROJECT
NORTH
3/8" = 1'-0"55EP101
1 RM H1-173 - DEMOLITION ELECTRICAL PLAN
3/8" = 1'-0"55EP101
2 RM H1-173 - ELECTRICAL PLAN
3/8" = 1'-0"55EP101
3 RM H1-173 - DEMOLITION LIGHTING PLAN
3/8" = 1'-0"55EP101
4 RM H1-173 - LIGHTING PLAN2'0 4' 6'
PROJECT
NORTH
2'0 4' 6'
PROJECT
NORTH
2'0 4' 6'
PROJECT
NORTH
1 EXISTING DATA RACKS TO BE SLAVAGED TO VA.
SOURCE A POWER PANELBOARD "55-H1-173A".
SOURCE B POWER PANELBOARD "55-H1-173B".
SECONDARY BONDING BUSBAR.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
55-AC-1-H1-173 AND 55-AC-2-H1-173 POWERED FROM 55-CU-01-ROOF, PROVIDE
CONDUCTORS AND WIRE PER MANUFACTURER'S REQUIREMENTS. COORDINATE
WITH MECHANICAL CONTRACTOR AS REQUIRED.
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT
LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".
REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
Revisions: Date: 226 of 512Page 232 of 518
M oa
M o b
H2-155
D
R2
R1
TYP.
BUSBAR
ACCESS DOOR
CONTROLLER
D
R2
R1
55-H2-155A-2
55-H2-155A-2
55-H2-155A-2
55-H2-155B-2
55-H2-155B-2
55-H2-155B-2
55-H2-155B-2
55-H2-155A-2
55-H2-155B
55-H2-155A
DATA RACK,
TYP.
EP502
ACCESS DOOR
CONTROLLER
6 55-AC-02-H2-155
TR
H2-155
78 SF
55-AC-03-H2-1556
CONTINUATION TO 55-CU-01-ROOF
REFERENCE SHEET 55EP403
EP504
55-P-06
55-P-08
P-TR-2A
P-TR-2B
R3
R2
R1
55-H2-155B
DATA RACK,
TYP.
TR
H2-155
78 SF
55-H2-155AL1
b
-H 2-
5B
-4
L1 E a
-H 2-
5A
-4
R3
R2
R1
TYP.
AREA OF WORK
IT
H2-155
78 SF
IT
H2-155
78 SF
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
589-21-700
55EP402
BLDG 55 - LEVEL 02 - ENLARGED
ELECTRICAL PLANS
SJM/WNM RDC/LLT
100% CONSTRUCTION
DOCUMENTS
06/19/2023
GENERAL NOTES
KEY PLANS
- 1/2" = 1'-0"
1 RM H2-155 - DEMOLITION ELECTRICAL PLAN
- 1/2" = 1'-0"
2 RM H2-155 - ELECTRICAL PLAN
- 1/2" = 1'-0"
4 RM H2-155 - LIGHTING PLAN
- 1/2" = 1'-0"
3 RM H2-155 - DEMOLITION LIGHTING PLAN
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
SOURCE A POWER PANELBOARD "55-H2-155A".
SOURCE B POWER PANELBOARD "55-H2-155B".
SECONDARY BONDING BUSBAR.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
56-AC-02-H2-155 AND 56-AC-03-H2-155 POWERED FROM 55-CU-01-ROOF, PROVIDE
CONDUCTORS AND WIRE PER MANUFACTURER'S REQUIREMENTS. COORDINATE
WITH MECHANICAL CONTRACTOR AS REQUIRED.
TRUE
NORTH
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT
LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".
REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
KEY NOTES
Revisions: Date: 227 of 512Page 233 of 518
55-CU-01-ROOF
AA
R8R7R6R5
R4
R3
R2
R1
55-CU-01-ROOF1
EP503
55-DP-TRA-12,14
CONTINUATION TO 55-AC-01-H1-173,
55-AC-02-H2-155 &, 55-AC-03-H2-155
REFERENCE SHEET 55EP401 & 55EP402.
55-P-09
AREA OF WORK
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
589-21-700
55EP403
BLDG 55 - ENLARGED ROOF PLAN
SJM/WNM RDC/LLT
100% CONSTRUCTION
DOCUMENTS
06/19/2023
KEY NOTES
GENERAL NOTES
KEY PLAN
1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS
REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
- 1/4" = 1'-0"
1 BLDG 55 - ENLARGED ROOF PLAN 2'0 4' 8'
PROJECT
NORTH
NOT USED
TRUE
NORTH
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT
LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".
Revisions: Date: 228 of 512Page 234 of 518
J b
Mo a
AREA OF WORK
H
99 SF
DATA CLOSET
LG-38
TYP.
DATA RACK
H
DATA RACK
56-LG-38A-2
56-LG-38A-2
56-LG-38A-2
56-LG-38A-2 56-LG-38B-2
56-LG-38B-2
56-LG-38B-2
EP502
56-LG-38B-2
56-LG-38B
56-LG-38A
56-AC-01-LG-38
TR
LG-38
99 SF
ICRA II
CONTINUE TO 56-CU-01-ROOF
REFERENCE SHEET 56EP402
EP504
CONTINUE TO
SHEET 56EP100
56-P-07
56-P-06
56-P-05
56-P-08
P-TR-1A P-TR-1B
LG-38
H
DATA CLOSET
LG-38
1 TYP.
H
56-LG-38B56-LG-38A
TR
LG-38
99 SF
ICRA II
L1E a
56-LG-38A-4
DATA RACK
L1E a
56-LG-38A-4
L1 b
56-LG-38B-4
L1 b
56-LG-38B-4
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
589-21-700
56EP400
BLDG 56 - LEVEL 00 - ENLARGED
ELECTRICAL PLANS
SJM/WNM RDC/LLT
100% CONSTRUCTION
DOCUMENTS
06/19/2023
GENERAL NOTES
KEY PLAN
KEY NOTES
1/2" = 1'-0"56EP100
1 RM LG-38 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"56EP100
2 RM LG-38 - ELECTRICAL PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1'0 2' 4' 1'0 2' 4'
1/2" = 1'-0"56EP100
3 RM LG-38 - DEMOLITION LIGHTING PLAN
PROJECT
NORTH
1'0 2' 4'
1/2" = 1'-0"56EP100
4 RM LG-38 - LIGHTING PLAN
PROJECT
NORTH
1'0 2' 4'
1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
SOURCE A POWER PANELBOARD "56-LG-38A".
SOURCE B POWER PANELBOARD "56-LG-38B".
SECONDARY BONDING BUSBAR.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
56-AC-01-LG-38 POWERED FROM 56-CU-01-ROOF, PROVIDE CONDUCTORS AND WIRE
PER MANUFACTURER'S REQUIREMENTS. COORDINATE WITH THE MECHANICAL
CONTRACTOR AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT
LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".
REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
Revisions: Date: 229 of 512Page 235 of 518 b
Mo a
L1-56
H
92 SF
DATA CLOSET
L1-561
TYP.
H
56-L1-56A
56-L1-56B
DATA RACK
L2E a
56-L1-56A-4
TR
L1-56
92 SF
ICRA II
L2E a
56-L1-56A-4
L2 b
56-L1-56B-4
AREA OF WORK
H
TYP.
DATA RACK, TYP.
EXISTING
VERTICAL
SLEEVES
ACCESS
CONTROL
PANEL
FIRE ALARM
REMOTE POWER
SUPPLY
ACCESS CONTROL
PANEL
92 SF
DATA CLOSET
L1-56
H
DATA RACK
56-L1-56B-2
56-L1-56A
56-L1-56B
56-L1-56A-2
56-L1-56B-2 56-L1-56B-2
56-L1-56B-2
56-L1-56A-2
ACCESS CONTROL
PANELS
56-L1-56A-2
ACCESS
CONTROL
PANEL
FIRE ALARM
REMOTE POWER
SUPPLY
EXISTING
VERTICAL
SLEEVES
56-L1-56A-2
56-AC-02-L1-56
EXISTING AC
56-AC-2-L1-56
CONTINUE TO 56-CU-02-ROOF
REFERENCE SHEET 56EP402
EP502
EP504
CONTINUE TO
SHEET 56EP402
56-P-06
56-P-08
TR
L1-56
92 SF
ICRA II
P-TR-2A
P-TR-2B
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
589-21-700
56EP401
BLDG 56 - LEVEL 01- ENLARGED
ELECTRICAL PLANS
SJM/WNM RDC/LLT
100% CONSTRUCTION
DOCUMENTS
06/19/2023
GENERAL NOTES
KEY PLAN
KEY NOTES
PROJECT
NORTH
PROJECT
NORTH
1'0 2' 4' 1'0 2' 4'
- 1/2" = 1'-0"
3 RM L1-56 - DEMOLITION LIGHTING PLAN
PROJECT
NORTH
1'0 2' 4'
- 1/2" = 1'-0"
4 RM L1-56 - LIGHTING PLAN
PROJECT
NORTH
1'0 2' 4'
1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
SOURCE A POWER PANELBOARD "56-L1-56A".
SOURCE B POWER PANELBOARD "56-L1-56B".
SECONDARY BONDING BUSBAR.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
56-AC-02-L1-56 POWERED FROM 56-CU-02-ROOF, PROVIDE CONDUCTORS AND WIRE
PER MANUFACTURER'S REQUIREMENTS. COORDINATE WITH THE MECHANICAL
CONTRACTOR AS REQUIRED.
PROJECT
NORTH
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT
LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".
REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
- 1/2" = 1'-0"
1 RM L1-56 - DEMOLITION ELECTRICAL PLAN
- 1/2" = 1'-0"
2 RM L1-56 - ELECTRICAL PLAN
Revisions: Date: 230 of 512Page 236 of 518
A B C C1 D E F H I J
156-CU-02-ROOF
56-L1-56A-10,12
56-CU-01-ROOF
CONTINUE TO
56-AC-02-L1-56
REFERENCE
SHEET 56EP401
CONTINUE TO 56-AC-01-LG-38
REFERENCE SHEET 56EP400
EP504
56-LG-38A-10,12
56-P-10
56-P-09
56-CU-01-ROOF
AREA OF WORK
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
589-21-700
56EP402
BLDG 56 - ENLARGED ROOF PLAN
SJM/WNM RDC/LLT
100% CONSTRUCTION
DOCUMENTS
06/19/2023
GENERAL NOTES
KEY PLAN
KEY NOTES
- 1/4" = 1'-0"
1 BLDG 56 - ENLARGED ROOF PLAN
PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS
REQUIRED PER MANUFACTURER'S INSTRUCTURES. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
2'0 4' 8'
PROJECT
NORTH
PROJECT
NORTH
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT
LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".
Revisions: Date: 231 of 512Page 237 of 518
LEG 1 LEG 2 LEG 1 LEG 2
OX
OZ
OY
A GROUP
A
LEG 1 LEG 2
B
OZ
OY
OX
GROUP
B
OY
OX
OZ
GROUP
A
OX
OZ
OY
GROUP
B
OY
OX
OZ
GROUP
A
OX
OZ
OY
GROUP
B
L21-20R
ENERGIZES
FIRST
TR RACK
PDU A
L21-20R
ENERGIZES
FIRST
TR RACK
PDU B
L21-20R
ENERGIZES
SECOND
TR RACK
PDU A
L21-20R
ENERGIZES
SECOND
TR RACK
PDU B
L21-20R
ENERGIZES
THIRD
TR RACK
PDU A
L21-20R
ENERGIZES
THIRD
TR RACK
PDU B
NOTE: WHEN ONLY ONE ENCLOSURE IS
POWERED AT STANDARD
DENSITY, ONE A/B PAIR OF
L21-20 RECEPTACLES WILL
REMAIN UNUSED
DETAIL NOTES
1. EQUIPMENT PROVIDED AND
INSTALLED BY OTHERS.
J
J
SOURCE A 60A
JUNCTION BOX
SOURCE B 60A
JUNCTION BOX
L21-20R
ENERGIZES
FIRST
TR RACK
PDU A
L21-20R
ENERGIZES
FIRST
TR RACK
PDU B
L21-20R
ENERGIZES
SECOND
TR RACK
PDU A
L21-20R
ENERGIZES
SECOND
TR RACK
PDU B
NOTE: WHEN ONLY ONE ENCLOSURE IS
POWERED AT STANDARD
DENSITY, ONE A/B PAIR OF
L21-20 RECEPTACLES WILL
REMAIN UNUSED
GROUP
A
GROUP
B
GROUP
A
GROUP
B
OX OY
OZ
LEG 1 LEG 2 LEG 1 LEG 2
OZ OX
OY
OY OZ
OX
OX OY
OZ
PHASE Z PHASE Y PHASE X
LEG 2
LEG 1
GRP A
GRP B
LEG 2
LEG 1
GRP A
GRP B
LEG 2
LEG 1
GRP A
GRP B
L21-30P
ZONE PDU
INPUT A
L21-30R
FIXED
POWER
SOURCE A
L21-30P
ZONE PDU
INPUT B
L21-30R
FIXED
POWER
SOURCE B
A
B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
589-21-700
EP501
ELECTRICAL DETAILS
SJM/WNM RDC/LLT
100% CONSTRUCTION
DOCUMENTS
06/19/2023
- NTS
CONNECTION DETAIL FOR 60A ZONE PDU UNIT SUPPLYING THREE-PHASE 20A (L21-20P) RACK
PDUs IN STANDARD DENSITY ENCLOSURES
- NTS
CONNECTION DETAIL FOR 30A ZONE PDU UNIT SUPPLYING THREE-PHASE 20A (L21-20P) RACK
PDUs IN STANDARD DENSITY ENCLOSURES
1. EQUIPMENT PROVIDED AND
INSTALLED BY OTHERS.
DETAIL NOTES
- NTS
2 NOT USED
- NTS
4 NOT USED
Revisions: Date:
INSTALL RED PLASTIC IDENTIFICATION STRIP AT 12" DEEP
THE FULL LENGTH, WITH METALLIC TRACER WIRE THE
FULL LENGTH, LABELED "DANGER BURIED ELECTRICAL"
FINISHED GRADE
24" MIN
1.5"
3.5"
MIN,
TYP
3.5"
MIN,
TYP 1.5"
1.5"
3.5"
MIN,
TYP
3"
1.5" 1.5"
1.5"
6" MIN
CONCRETE ENCASEMENT,
3500 PSI CONCRETE
PROVIDE #4 REBAR EVERY
24" TOP, BOTTOM, AND
SIDES, TYPICAL
PROVIDE #4 REBAR STIRRUPS
EVERY 12", TYPICAL
CONDUIT SPACERS, TYPICAL
PVC CONDUIT SIZE AND QUANTITY
AS SPECIFIED, TYPICAL
COMMUNICATIONS
BACKFILL 95%
COMPACTION
RESURFACE IN ACCORDANCE WITHFINAL
REQUIREMENTS - SOD IN LAWN
AREAS, ASPHALT IN PAVED AREAS. SEE
CIVIL DRAWINGS FOR PATCHING
IN ASPHALT AREAS.
POWER
3"
12"
REBAR STAND, TYPICAL.
SPACE AS REQUIRED.
DUCT BANK GROUND WIRE.
REFERENCE PLANS FOR
SIZE (MINIMUM SIZE SHALL
BE 6 AWG).
DETAIL NOTES:
1. THIS IS A TYPICAL DETAIL. NOT ALL DUCT BANKS WILL HAVE
POWER AND COMMUNICATIONS. CONTRACTOR SHALL DIMENSION
LAYOUT PER SPECIFIC CONDUIT REQUIREMENTS.
2. MINIMUM COVER FOR CONCRETE DUCT BANK IS 24"
3"
3"
REBAR TIE,
TYPICAL
- 3/4" = 1'-0"
1 TYPICAL CONCRETE ENCASED DUCT BANK SECTION
ES102b E-401
NOTE: WHEN ONLY ONE ENCLOSURE IS
POWERED AT STANDARD
DENSITY, ONE A/B PAIR OF
L21-20 RECEPTACLES WILL
REMAIN UNUSED
RESURFACE IN
ACCORDANCE WITH FINAL
REQUIREMENTS-SOD IN
LAWN AREAS, ASPHALT IN
PAVED AREAS. SEE CIVIL
DRAWINGS FOR PATCHING
IN ASPHALT AREAS.
INSTALL RED PLASTIC IDENTIFICATION STRIP
AT 12" DEEP THE FULL LENGTH, WITH
METALLIC TRACER WIRE THE FULL LENGTH,
LABLED "DANGER BURIED ELECTRICAL"
6" OR MORE OF CLEAN SAND
OR APPROVED EXCAVATED
MATERIAL
36" MINIMUM BURIAL DEPTH
FOR UTILITIES
INCLUDING POWER,
DATA AND
TELEPHONE OR AS
AMENDED BY THE
SERVING UTILITY. 24"
MINIMUM
BURIAL DEPTH FOR SITE
LIGHTING/POWER
BACKFILL 95%
COMPACTION
CONDUIT TYPE, SIZE, AND
QUANTITY AS SPECIFIED
7-1/2" 7-1/2"
FINISHED GRADE
- NTS
2 TYPICAL TRENCHING SECTION
ES102b
ES102b E-401
232 of 512Page 238 of 518
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T
O N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T O
N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
LEG 1 LEG 2 LEG 1 LEG 2
AGROUPA
B
BGROUP AGROUP BGROUP
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T
O N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T
O N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
L21-30P SIDE B
REQUIRES A 208V, 30A, THREE-PHASE
CIRCUIT, TERMINATING IN A NEMA L21-30R
LOCKING RECEPTACLE.
L21-30P SIDE A
REQUIRES A 208V, 30A, THREE-PHASE
CIRCUIT, TERMINATING IN A NEMA
L21-30R LOCKING RECEPTACLE.
30A 3-PHASE ZONE PDU BASE
UNIT - REQUIRES TWO 30A 3-
PHASE (WYE) CIRCUITS WITH
L21-30R RECEPTACLES
PHASE Z PHASE Y PHASE X
RACK-MOUNTED 5KW, 208V UNINTERRUPTIBLE
POWER SUPPLY (UPS) WITH NEMA 20A L21-20P
INPUT AND L21-20R OUTPUT
RACK-MOUNT
UPS
RACKED
EQUIPMENT
RACKED
EQUIPMENT
PDU
A
PDU
B
PDU
A
PDU
BPSA PSB PSA PSB
LEG A LEG B
ZONE PDU
RACK-MOUNT
UPS
RACK/ENCLOSURE RACK/ENCLOSURE
SOURCE A 30A
RECEPTACLE
SOURCE B 30A
RECEPTACLE
REFERENCE
ET DRAWINGS
FOR RACK
MOUNTED
NETWORK
EQUIPMENT
REFERENCE
ET DRAWINGS
FOR RACK
MOUNTED
NETWORK
EQUIPMENT
EP501
EP502
TYP
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T
O N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T
O N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
LEG 1 LEG 2 LEG 1 LEG 2 LEG 1 LEG 2
AGROUPA
B
BGROUP AGROUP BGROUP AGROUP BGROUP
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T O
N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T O
N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T O
N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T O
N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
JJ
RACK/ENCLOSURE
RACK-MOUNT
UPS
RACK-MOUNT
UPS
RACKED
EQUIPMENT
RACKED
EQUIPMENT
RACKED
EQUIPMENT
PDU
A
PDU
B
PDU
A
PDU
B
PDU
A
PDU
BPSA PSB PSA PSB PSA PSB
LEG A LEG B
ZONE PDU
SOURCE A
JUNCTION
BOX
SOURCE B
JUNCTION
BOX
60A 3-PHASE ZONE PDU
BASE UNIT - REQUIRES
TWO 60A 3-PHASE (WYE)
CIRCUITS HARD-WIRED
IN JUNCTION BOX
RACKED-MOUNTED 5 KW, 208V
UNINTERRUPTIBLE POWER SUPPLY
(UPS) WITH NEMA 20A L21-20P
INPUT AND L21-20R OUTPUT
RACK-MOUNT
UPS
RACK/ENCLOSURE RACK/ENCLOSURE
SOURCE A
REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT,
TERMINATING IN A HARD-WIRED JUNCTION BOX.
SOURCE B
REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT,
TERMINATING IN A HARD-WIRED JUNCTION BOX.
REFERENCE
ET DRAWINGS
FOR RACK
MOUNTED
NETWORK
EQUIPMENT
REFERENCE
ET DRAWINGS
FOR RACK
MOUNTED
NETWORK
EQUIPMENT
REFERENCE
ET DRAWINGS
FOR RACK
MOUNTED
NETWORK
EQUIPMENT
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T
O N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T
O N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
L21-20P SIDE B
REQUIRES A 208V, 20A,
THREE-PHASE CIRCUIT,
TERMINATING IN A NEMA
L21-20R LOCKING
RECEPTACLE.
L21-20P SIDE A
REQUIRES A 208V, 20A,
THREE-PHASE CIRCUIT,
TERMINATING IN A NEMA
L21-20R LOCKING
RECEPTACLE.
RACK-MOUNTED 5 KW, 208V UNINTERRUPTIBLE
POWER SUPPLY (UPS) WITH NEMA 20A L21-20P
INPUT AND L21-20R OUTPUT
RACK/ENCLOSURE
RACK-MOUNT
UPS
RACKED
EQUIPMENT
PSA PSB
PDU
A
PDU
B
SOURCE A 20A
RECEPTACLE
SOURCE B 20A
RECEPTACLE
REFERENCE
ET DRAWINGS
FOR RACK
MOUNTED
NETWORK
EQUIPMENT
REQUIRES ONE (1) L21-20R
20A 120/208V 3øY
APC AP8861 RPDU OR EQUIVALENT; RACK
PDU 2G, METERED; L21-20 PLUG; THREE
PHASE; 120/208V INPUT; 20A; ZERO U, 5.7 KW,
208V, (36) C13 & (6) C19 & (2) 5-20 OUTLETS;
FOR USE IN TELECOMMUNICATION ROOMS
AND LOCATIONS WITH LEGACY 110V ONLY
EQUIPMENT
NOTE: USED IN TELECOMMUNICATIONS
ROOMS WHERE 110V DISTRIBUTION
USING NEMA 5-15 OR NEMA 5-20
RECEPTACLES ARE REQUIRED IN
ADDITION TO THE STANDARD 208V
FIGURE 1: IEC 60320 C14 PLUG CONNECTOR.
SOURCE: CISCO SYSTEMS INC. ILLUSTRATION
#113165
FIGURE 2: IEC 60320 C15 PLUG.
SOURCE: CISCO SYSTEMS INC. ILLUSTRATION
#113165
FOR INFORMATIONAL REFERENCE ONLY:
208V PDU TO BE COMPATIBLE WITH CISCO IEC C14-C15 CABINET JUMPER POWER CORD,
DEVICE CORDSET PART NUMBER CAB-C15-CBN.
RACK PDU END DEVICE END
CAB-C15-CBN DETAILS:
1. CORDSET RATED FOR 250VAC, 13A, 60 HZ, 120° C (248° F) AT COUPLER PINS.
2. MAXIMUM OVERALL LENGTH OF 4 FT.
3. VERIFY CORDSET COMPATIBILITY WITH 208VAC SOURCE POWER BEFORE CONNECTING
4. VERIFY DEVICE COMPATIBILITY WITH 208VAC INPUT POWER BEFORE CONNECTING.
DEVICE CORDSET
RACK MOUNT PDU. L5- 30 INPUT. NEMA 5-20
OUTPUT. 1 RU. TWO PER ENCLOSURE. ONE ENERGIZED
BY UPS. ONE ENERGIZED BY WALL OUTLET. (SHOWN
HERE FRONT FACING, BUT ARE TO BE INSTALLED ON
THE BACK RAIL.)
RACK MOUNT UPS. L5-30 INPUT.
L5-30 OUTPUT. CAPACITY NTE 2880 VA. 2 RU.
METERED. (APC SMX3000RMLV2U OR EQUIVALENT)
O U
T
IN
O
CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
TELECOMMUNICATIONS
BONDING BUSBAR
QUAD OUTLET (5-20) FOR
BACKBOARD MOUNTED
EQUIPMENT
TE SOURCE A AND B POWER
RECEPTACLES (LOCKING, 120V, 30A,
L5-30) MOUNTED IN JUNCTION BOX SIZED
TO FIT TE POWER CUTOUT LOCATION.
JUNCTION BOX SHALL BE RECESSED IN
WALL BEHIND TE. SOURCE A
RECEPTACLE SHALL FEED TE UPS.
SOURCE B RECEPTACLE SHALL FEED TE
PDU. EACH RECEPTACLE ENERGIZED BY
SEPARATE ONE-POLE 30 AMP
BREAKERS; REFERENCE PLANS FOR
ADDITIONAL CIRCUITING INFORMATION.
<6"
<6"
WALL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
589-21-700
EP502
ELECTRICAL DETAILS
SJM/WNM RDC/LLT
100% CONSTRUCTION
DOCUMENTS
06/19/2023
- 1 : 30
3 POWER ELEVATION AND SCHEMATIC FOR A TWO RACK TR
- NTS
1 POWER ELEVATION AND SCHEMATIC FOR A THREE RACK TR
EP501
EP502
TYP
- NTS
4 POWER ELEVATION AND SCHEMATIC FOR ONE RACK TR
- NTS
2 208V RACK PDU FOR TRs
EP502
TYP
- NTS
5 TELECOMMUNICATION ENCLOSURE ELEVATION DETAIL
Revisions: Date: 233 of 512Page 239 of 518
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T
O N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T
O N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
LEG 1 LEG 2 LEG 1 LEG 2 LEG 1 LEG 2
AGROUPA
B
BGROUP AGROUP BGROUP AGROUP BGROUP
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T O
N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T O
N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T O
N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T O
N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
JJ
RACK/ENCLOSURE
RACK-MOUNT
UPS
RACK-MOUNT
UPS
RACKED
EQUIPMENT
RACKED
EQUIPMENT
RACKED
EQUIPMENT
PDU
B
PDU
A
PDU
B
PDU
A
PDU
BPSA PSB PSA PSB PSA PSB
LEG A LEG B
ZONE PDU
SOURCE A
JUNCTION
BOX
SOURCE B
JUNCTION
BOX
60A 3-PHASE ZONE PDU
BASE UNIT - REQUIRES
TWO 60A 3-PHASE (WYE)
CIRCUITS HARD-WIRED
IN JUNCTION BOX
RACKED-MOUNTED 5 KW, 208V
UNINTERRUPTIBLE POWER SUPPLY
(UPS) WITH NEMA 20A L21-20P
INPUT AND L21-20R OUTPUT
RACK-MOUNT
UPS
RACK/ENCLOSURE RACK/ENCLOSURE
SOURCE A
REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT,
TERMINATING IN A HARD-WIRED JUNCTION BOX.
SOURCE B
REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT,
TERMINATING IN A HARD-WIRED JUNCTION BOX.
REFERENCE
ET DRAWINGS
FOR RACK
MOUNTED
NETWORK
EQUIPMENT
REFERENCE
ET DRAWINGS
FOR RACK
MOUNTED
NETWORK
EQUIPMENT
REFERENCE
ET DRAWINGS
FOR RACK
MOUNTED
NETWORK
EQUIPMENT
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T O
N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T O
N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
PDU
A
REFERENCE
ET DRAWINGS
FOR RACK
MOUNTED
NETWORK
EQUIPMENT
L21-20P SIDE B
REQUIRES A 208V, 20A,
THREE-PHASE CIRCUIT,
TERMINATING IN A NEMA
L21-20R LOCKING
RECEPTACLE.
L21-20P SIDE A
REQUIRES A 208V, 20A,
THREE-PHASE CIRCUIT,
TERMINATING IN A NEMA
L21-20R LOCKING
RECEPTACLE.
RACK/ENCLOSURE
RACK-MOUNT
UPS
RACKED
EQUIPMENT
PSA PSB
PDU
A
PDU
B
SOURCE A 20A
RECEPTACLE
SOURCE B 20A
RECEPTACLE
12" TYP
REFERENCE PLANS
FOR QUANTITY AND
SIZE OF CONDUITS
64"
39"
TOP VIEW
GROUND
GROUND SLEEVE
6"..
M A
X
CAST IN PLACE CONCRETE PAD.
HIGH VOLTAGE SIDE LOW VOLTAGE SIDE
50"
FRONT VIEW
DETAIL NOTES
1. CONCRETE PAD SHALL EXTEND 12" FROM ALL SIDES
OF TRANSFORMER UNLESS SHOWN OTHERWISE.
4"
12" TYP
POWER PACK
LIGHTING
LOAD
DAYLIGHT / OCCUPANCY SENSOR
(WHERE INDICATED ON PLANS)
OCCUPANCY SENSOR
(WHERE INDICATED ON PLANS)
LOW VOLTAGE SWITCH
N
L
120VAC
24V CONTROL
DS
OS
PP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
589-21-700
EP503
ELECTRICAL DETAILS
SJM/WNM RDC/LLT
100% CONSTRUCTION
DOCUMENTS
06/19/2023
- NTS
1 POWER ELEVATION AND SCHEMATIC FOR A FOUR RACK TR
Revisions: Date:
ADDENDUM #1 7/19/2023
1 1/2" = 1'-0"40EP101
2 TYPICAL OIL FILLED TRANSFORMER PAD MOUNT DETAIL
EP501
- NTS
3 LIGHTING WIRING DIAGRAM
(ES)
(S)
Load
Blue
Occupancy sensor switch
Black Black
White Bare
Ground
GENERAL NOTES:
1. MAINTAIN A MINIMUM CLEARANCE OF 305mm (12") ON ALL SIDES OF ROOF PENETRATION FROM WALLS, CURBS, AND OTHER PROJECTIONS TO FACILITATE PROPER
FLASHING.
2. FLANGES OF ADJACENT FLASHINGS SHALL NOT BE CUT OR OVERLAPPED.
3. VERIFY ROOF & STRUCTURAL SYSTEM WITH ARCHITECT.
4. COORDINATE FLASHING INSTALLATION WITH ROOFING CONTRACTOR TO ENSURE PROPER METHODS & MATERIALS ARE USED TO MAINTAIN ROOF WARRANTY.
9.52mm (3/8")
MIN GALVANIZED
THREADED ROD,
TYP.
CONDUIT CLAMP.
SIZE AS REQUIRED
LOCKING SQUARE
WASHER &
LOCKNUT
STEEL
EXPANSION
ANCHOR
INTEGRAL GALVANIZED
LIPPED STEEL MOUNTING
CHANNEL
PREFABRICATED RUBBER BOOT
CAP WITH GRADUATED STEPS &
WEATHER-PROOF PRESSURE SEAL
TO COLLAR
SEALANT AT PENETRATION
TO MEMBRANE JUNCTURE
BY ROOFING CONTRACTOR
MULTIPLE MEMBRANE STRIPPING PLIES
FEATHERED AT FIELD OF ROOF BY
ROOFING CONTRACTOR. PRIME FLANGE
BEFORE STRIPPING.
PREFABRICATED FORMED 1.52mm
(0.06") THICK ALUMINUM FLASHING
ROUND COLLAR WITH MIN. 76mm (3")
WIDE FLANGE. ATTACH TO ROOF PER
MANUFACTURER'S INSTRUCTIONS
CONDUIT CLAMP.
SIZE AS REQUIRED
BATT INSULATION
ROOF MEMBRANE
WATER CUT-OFF MASTIC
COMPATIBLE WITH ROOF
MEMBRANE
STAINLESS
CLAMP, TYP.
SEAL-OFF
FITTING, TYP.
CONCRETE DECKING
STEEL EXPANSION
ANCHOR
INTEGRAL GALVANIZED
LIPPED STEEL
MOUNTING CHANNEL
CONDUIT,
TYP.
FIELD OF VIEW
FOR DETAIL
TYPICAL
DATA
RACK
FIN. FLOOR
HORIZONTAL CAT6A
DISTRIBUTION AND
FIBER-OPTIC BACKBONE
CABLE TRAY, TYPICAL.
F L O
O R
T O
U N
D E
R S
ID
E
S T
R U
C T
U R
E
84"
6" MIN
BOTTOM OF FLOOR OR ROOF ABOVE
LIGHT FIXTURE: REFERENCE TR ROOM
LUMINAIRE MOUNTING SCHEDULE. LIGHT
MOUNTING LOCATION IS DIAGRAMMATIC;
CONTRACTOR SHALL COORDINATE EXACT
MOUNTING HEIGHT AND PLACEMENT WITH ALL
OBSTRUCTIONS INCLUDING CABLE TRAY, RACKS
AND ARCHITECTURAL FEATURES.
FINISHED SURFACE
(OR ROOF)
PROVIDE RMC OR
LTFMC AS
REQUIRED TO
CONNECT TO
LOAD
ALL FASTENING
HARDWARE SHALL
BE STAINLESS
STEEL, TYP.
GENERAL DETAIL NOTES:
1. ALL CHANNEL STRUT, POST BASES AND ACCESSORIES SHALL BE HOT-
DIPPED GALVANIZED, UNLESS SPECIFICALLY NOTED OTHERWISE.
2. THIS IS A GENERAL DETAIL INDICATING GENERAL LAYOUT
REQUIREMENTS. CONTRACTOR SHALL SIZE RACK ACCORDINGLY TO
MOUNT ALL REQUIRED EQUIPMENT AS SHOWN ON PLANS; ADDITIONAL
HORIZONTAL AND/OR VERTICAL STRUCTURAL MEMBERS MAY BE
REQUIRED.
ID PLACARD, PROVIDE PER SPECIFICATIONS.
ALL FASTENING
HARDWARE SHALL
BE STAINLESS
STEEL, TYP.
CHANNEL STRUT, 1-5/8" X 1-5/8", LENGTH AS
REQUIRED, TYP.
MYERS HUB, TYP
48" MIN.
ROOF MOUNTED DISCONNECT
FINISHED GROUND/
EARTH
PROVIDE RMC OR
LTFMC AS
REQUIRED TO
CONNECT TO
LOAD
ANCHOR BOLTS,
1/4"-DIA x 12" L (MIN.), STAINLESS STEEL
ID PLACARD, PROVIDE PER SPECIFICATIONS.
ALL FASTENING
HARDWARE SHALL
BE STAINLESS
STEEL, TYP.
CHANNEL STRUT, 1-5/8" X 1-5/8", LENGTH
AS REQUIRED, TYP.
MYERS HUB, TYP
48" MIN.
GROUND MOUNTED DISCONNECT
CONCRETE FOOTING WITH
CHAMFERED EDGE,
3000-PSI,12"-DIA x 30" L (MIN)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
589-21-700
EP504
ELECTRICAL DETAILS
SJM/WNM RDC/LLT
100% CONSTRUCTION
DOCUMENTS
06/19/2023
- 12" = 1'-0"
1 CONDUIT ROOF PENETRATION DETAIL
- 3/4" = 1'-0"
3 TYPICAL TELECOM ROOM ELEVATION
- 1" = 0'-8"
2 TYPICAL UNISTRUT RACK MOUNTED DISCONNECT SWITCH
- 1" = 1'-0"
4 WALL SWITCH OCCUPANCY SENSOR
BARE
BLACK
BLUE
WHITE WIRE WITH
GREEN SLEEVE
BLUE
BLACKBLACK
BARE
OCCUPANCY
SENSOR SWITCH
LOAD
WHITE
GROUND
HOT/LIVE
120 V~ 50/60 Hz
NEUTRAL
WHEN USING CONTROLS IN
SINGLE LOCATION
INSTALLATIONS, TIGHTEN
THE BLUE TERMINAL OR CAP
BLUE WIRE. DO NOT
CONNECT THE BLUE
TERMINAL/WIRE TO ANY
OTHER WIRE OR TO
GROUND.
1 1/2" = 1'-0"
Revisions: Date: 235 of 512Page 241 of 518
TELECOMMUNICATIONS
EQUIPMENT BONDING
CONDUCTOR (TEBC) AWG
IRREVERSIBLE CRIMP
CONNECTOR, TYP.
CABLE TRAY BONDING
CONDUCTOR. TYPICAL AT
EACH SECTION
CONNECTION POINT
TO PRIMARY OR SECONDARY
BONDING BUSBAR
IRREVERSIBBLE
COMPRESSION
CONNECTION
RACK BONDING
CONDUCTOR
(6 AWG)
TEBC
(TELECOMMUNICATIONS
EQUIPMENT BONDING
CONDUCTOR - 4 AWG)
RACK BONDING CONDUCTOR (6 AWG)
UNIT BONDING CONDUCTOR (6 AWG)
TOP-MOUNTED
RACK BONDING
BUSBAR
IRREVERSIBLE CRIMP
CONNECTOR, TYP.
GROUND TO PRIMARY
BONDING BUSBAR.
COORDINATE WITH VA
FOR EXACT
CONDUCTOR ROUTING
TWO-HOLE COMPRESSION LUGS (RACKS SHALL NOT
BE MODIFIED IF ONLY ONE-HOLE IS PROVIDED; USE
ONE-HOLE COMPRESSION LUGS IN THIS CASE)
TWO-HOLE
COMPRESSION LUGS (RACKS
SHALL NOT BE MODIFIED IF
ONLY ONE-HOLE IS PROVIDED;
USE ONE-HOLE COMPRESSION
LUGS IN THIS CASE)
RACK ISOLATION PADS
BONDING CONDUCTOR TO
PANEL BOARD GROUND LUG (ACEG)
USE TWO-HOLE LUGS FOR
BONDING CONNECTOR
TELECOMMUNICATIONS
BONDING BUSBAR
BOND RBB TO CABINET LUG. AWG #6
BOND RBB TO EACH SWITCH
AND ROUTER CHASIS
BOND RBB TO TELECOMMUNICATIONS BONDING BUSBAR. AWG #6
RACK BONDING BUSBAR (RBB)
OTHER CONNECTIONS
AS REQUIRED
(BONDING CONDUIT,
CABLE TRAYS,
BUILDING STEEL, TO
THE PBB OR SBB,
ETC.)
CHATSWORTH PRODUCTS
#40158-012, OR APPROVED
EQUAL
MOUNTING BRACKETS
1/4" THICK
L= 12"
D
INSULATOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
589-21-700
EP505
ELECTRICAL DETAILS
SJM/WNM RDC/LLT
100% CONSTRUCTION
DOCUMENTS
06/19/2023
- NTS
2 CABLE TRAY GROUNDING/BONDING REQUIREMENTS
- NTS
1 TELECOMMUNICATION RACK BONDING DETAIL
- NTS
4 TELECOMMUNICATION ENCLOSURE GROUNDING DETAIL
- NTS
5 TELECOMMUNICATIONS SECONDARY BONDING BUSBAR
- NTS
3 TELECOMMUNICATIONS ROOM BONDING DETAIL
SECONDARY
BONDING BUSBAR
ALL CONNECTIONS TO
BUSBAR SHALL BE (2) BOLT
MECHANICAL LUGS, TYP.
BONDING CONDUCTOR TO
BUILDING STEEL, #3/0 AWG
GREEN INSULATION W/YELLOW
TRACER
BONDING CONDUCTOR TO
RACEWAYS, CONDUITS,
WIREWAYS, CABLE TRAYS, #6
AWG GREEN INSULATION W/
YELLOW TRACER
BONDING CONDUCTOR TO
PANELBOARD(S) IN ROOM
PRESENT, #6 AWG GREEN
INSULATION W/ YELLOW TRACER
BONDING CONDUCTOR FROM
TELECOMMUNICATIONS
SECONDARY BONDING
BUSBAR TO
TELECOMMUNICATIONS
BONDING BACKBONE (IF NOT
PRESENT, BOND TO PRIMARY
SERVICE ENTRY MAIN
BUSBAR), #3/0 AWG GREEN
INSULATION W/YELLOW
TRACER
TELECOMMUNICATIONS BONDING
BACKBONE CONDUCTOR. PROVIDE WITH
GREEN INSULATION AND YELLOW
TRACER, SIZE PER TIA/ANSI STANDARDS
AS REQUIRED. WHERE EXISTING, EXTEND
AND REROUTE BACKBONE TO AND FROM
RELOCATED/EXPANDED
TELECOMMUNICATIONS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .