This document provides details for a federal contract opportunity for infrastructure upgrades at the Veterans Affairs Medical Center in Kansas City, Missouri. The solicitation number is 36C77623B0066 and is being conducted by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas. The opportunity involves upgrading the EHRM infrastructure at the Kansas City VA facility, as outlined in Attachment 8 of the solicitation documents which provides electrical drawings for the project. Responses to the solicitation are due by the date listed. The selected contractor will be responsible for completing infrastructure upgrade work at the Kansas City VA Medical Center as defined in the solicitation documents.

View the file

Other files

File Type Posted
Copy of Attachment 1 - Technical Questions - Responses.xlsx XLSX spreadsheet
36C77623B0066 0002.docx DOCX document
Attachment 1 - Site Visit - Sign-In Sheet - 36C77623B0066 EHRM Infra Upgrade - KC.pdf PDF
36C77623B0066 0001.docx DOCX document
Attachment 11 - Drawings Electrical - 6 of 8.pdf PDF
Attachment 19 - Drawings Telecommunications - 2 of 3.pdf PDF
Attachment 1 - Specifications - DIV 1-13.pdf PDF
Attachment 18 - Drawings Telecommunications - 1 of 3.pdf PDF
Attachment 3 - Drawings Architectural - 1 of 2.pdf PDF
Attachment 16 - Drawings Structural.pdf PDF
Attachment 7 - Drawings Electrical - 2 of 8.pdf PDF
Attachment 13 - Drawings Electrical - 8 of 8.pdf PDF
Attachment 14 - Drawings Environmental.pdf PDF
Attachment 10 - Drawings Electrical - 5 of 8.pdf PDF
Attachment 12 - Drawings Electrical - 7 of 8.pdf PDF
Attachment 22 - Wage Rates - 6-30-23.pdf PDF
Attachment 21 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 9 - Drawings Electrical - 4 of 8.pdf PDF
Attachment 23 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 6 - Drawings Electrical - 1 of 8.pdf PDF
Attachment 17 - Drawings Technology.pdf PDF
Attachment 2 - Specifications - DIV 21-32.pdf PDF
36C77623B0066_1.docx DOCX document
Attachment 20 - Drawings Telecommunications - 3 of 3.pdf PDF
Attachment 5 - Drawings Civil.pdf PDF
Attachment 4 - Drawings Architectural - 2 of 2.pdf PDF
Attachment 15 - Drawings Mechanical.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mo a

Mo b

4 5 5.1

A

420 SF

WORK AREA

(TE)

40-16

WALL MOUNTED

DATA EQUIPMENT

EMERGENCY

PANEL

EXISTING

HEATER

EXISTING

HEATER

4 5 5.1

A

WORK AREA

(TE)

40-16

420 SF

ICRA CLASS II

TELECOMMUNICATIONS

ENCLOSURE

EMERGENCY

PANEL

NEW PANEL GRP

EP502

40-16A

EXISTING

HEATER

EXISTING

HEATER

40-AC-01-16

EP5044

CONTINUE TO

SHEET 40EP101

40-16A-12

40-16A-12

40-16A-12

40-16A-12

40-16A-2

40-P-06

CONTINUE TO 40-CU-01-16

REFERENCE SHEET 40EP101

40-P-09

40-P-08

40-16

AREA OF WORK

4 5 5.1

A

WORK AREA

(TE)

40-16

420 SF

ICRA CLASS II

TYP.

4 5 5.1

A

WORK AREA

(TE)

40-16

420 SF

ICRA CLASS II

TELECOMMUNICATIONS

ENCLOSURE

L1 b

40-40-16B-6

L1E a

40-40-16A-6

L1E a

40-40-16A-6

L1E a

40-40-16A-6

L1 b

40-40-16B-6

L1 b

40-40-16B-6

40-16A

A SIDE POWER

B SIDE POWER

SHEET SHALL PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

589-21-700

40EP401

BLDG 40 - LEVEL 01 - ENLARGED

ELECTRICAL PLANS

SJM/WNM RDC/LLT

100% CONSTRUCTION

DOCUMENTS

06/19/2023

KEY PLAN

KEY NOTES

GENERAL NOTES

3/8" = 1'-0"40EP101

1 RM 40-16 - DEMOLITION ELECTRICAL PLAN

3/8" = 1'-0"40EP101

2 RM 40-16 - ELECTRICAL PLAN2'0 4' 6' 2'0 4' 6'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

3/8" = 1'-0"40EP101

3 RM 40-16 - DEMOLITION LIGHTING PLAN 2'0 4' 6'

PROJECT

NORTH

1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

SECONDARY BONDING BUSBAR.

TE SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".

REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

3/8" = 1'-0"40EP101

4 RM 40-16 - LIGHTING PLAN 2'0 4' 6'

PROJECT

NORTH

Revisions: Date: 225 of 512Page 231 of 518

M o b

M o a

H1-173

AREA OF WORK

D

BB

R1

ELUPS

FIRE ALARM

PANELS

TYP.

ACCESS POWER

CONTROLLER PANEL

ACCESS DOOR

CONTROLLER

FIBER OPTIC

CABINETS

DATA RACK

DISC. UPS ELA 1 & 3

D

BB

R1

TR

H1-173

229 SF

ACCESS POWER

CONTROLLER PANEL

ACCESS DOOR

CONTROLLER

55-H1-173B

55-H1-173A2

DATA RACK

EP502

55-H1-173B-2

55-H1-173A-2

55-H1-173B-2

55-H1-173B-2

55-H1-173B-2

55-H1-173A-2

55-H1-173A-2

55-H1-173A-2

ELUPS

FIRE ALARM

PANEL

FIBER OPTIC

CABINETS

655-AC-01-H1-173

DISC. UPS ELA 1 & 3

CONTINUATION TO 55-CU-01-ROOF

REFERENCE SHEET 55EP403

EP504

CONTINUE TO

SHEET 55EP402

CONTINUE TO

SHEET 55EP101

55-P-05

55-P-06

55-P-08

55-P-07

P-TR-2A

P-TR-2B

D

BB

R1

TYP

D

BB

R1

TR

H1-173

229 SF

DATA RACK,

TYP.

55-H1-173B

55-H1-173A L1 b

55-H1-173B-4

L1 b

55-H1-173B-4

L1E a

55-H1-173A-4

L1 b

55-H1-173B-4

L1E a

55-H1-173A-4

TELECOM.

H1-173

229 SF

TELECOM.

H1-173

229 SF

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

589-21-700

55EP401

BLDG 55 - LEVEL 01 - ENLARGED

ELECTRICAL PLANS

SJM/WNM RDC/LLT

100% CONSTRUCTION

DOCUMENTS

06/19/2023

KEY NOTES

GENERAL NOTES

KEY PLAN

2'0 4' 6'

PROJECT

NORTH

PROJECT

NORTH

3/8" = 1'-0"55EP101

1 RM H1-173 - DEMOLITION ELECTRICAL PLAN

3/8" = 1'-0"55EP101

2 RM H1-173 - ELECTRICAL PLAN

3/8" = 1'-0"55EP101

3 RM H1-173 - DEMOLITION LIGHTING PLAN

3/8" = 1'-0"55EP101

4 RM H1-173 - LIGHTING PLAN2'0 4' 6'

PROJECT

NORTH

2'0 4' 6'

PROJECT

NORTH

2'0 4' 6'

PROJECT

NORTH

1 EXISTING DATA RACKS TO BE SLAVAGED TO VA.

SOURCE A POWER PANELBOARD "55-H1-173A".

SOURCE B POWER PANELBOARD "55-H1-173B".

SECONDARY BONDING BUSBAR.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

55-AC-1-H1-173 AND 55-AC-2-H1-173 POWERED FROM 55-CU-01-ROOF, PROVIDE

CONDUCTORS AND WIRE PER MANUFACTURER'S REQUIREMENTS. COORDINATE

WITH MECHANICAL CONTRACTOR AS REQUIRED.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".

REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

Revisions: Date: 226 of 512Page 232 of 518

M oa

M o b

H2-155

D

R2

R1

TYP.

BUSBAR

ACCESS DOOR

CONTROLLER

D

R2

R1

55-H2-155A-2

55-H2-155A-2

55-H2-155A-2

55-H2-155B-2

55-H2-155B-2

55-H2-155B-2

55-H2-155B-2

55-H2-155A-2

55-H2-155B

55-H2-155A

DATA RACK,

TYP.

EP502

ACCESS DOOR

CONTROLLER

6 55-AC-02-H2-155

TR

H2-155

78 SF

55-AC-03-H2-1556

CONTINUATION TO 55-CU-01-ROOF

REFERENCE SHEET 55EP403

EP504

55-P-06

55-P-08

P-TR-2A

P-TR-2B

R3

R2

R1

55-H2-155B

DATA RACK,

TYP.

TR

H2-155

78 SF

55-H2-155AL1

b

-H 2-

5B

-4

L1 E a

-H 2-

5A

-4

R3

R2

R1

TYP.

AREA OF WORK

IT

H2-155

78 SF

IT

H2-155

78 SF

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

589-21-700

55EP402

BLDG 55 - LEVEL 02 - ENLARGED

ELECTRICAL PLANS

SJM/WNM RDC/LLT

100% CONSTRUCTION

DOCUMENTS

06/19/2023

GENERAL NOTES

KEY PLANS

- 1/2" = 1'-0"

1 RM H2-155 - DEMOLITION ELECTRICAL PLAN

- 1/2" = 1'-0"

2 RM H2-155 - ELECTRICAL PLAN

- 1/2" = 1'-0"

4 RM H2-155 - LIGHTING PLAN

- 1/2" = 1'-0"

3 RM H2-155 - DEMOLITION LIGHTING PLAN

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING

SHALL BE DEMOLISHED BACK TO SOURCE.

SOURCE A POWER PANELBOARD "55-H2-155A".

SOURCE B POWER PANELBOARD "55-H2-155B".

SECONDARY BONDING BUSBAR.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

56-AC-02-H2-155 AND 56-AC-03-H2-155 POWERED FROM 55-CU-01-ROOF, PROVIDE

CONDUCTORS AND WIRE PER MANUFACTURER'S REQUIREMENTS. COORDINATE

WITH MECHANICAL CONTRACTOR AS REQUIRED.

TRUE

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".

REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

KEY NOTES

Revisions: Date: 227 of 512Page 233 of 518

55-CU-01-ROOF

AA

R8R7R6R5

R4

R3

R2

R1

55-CU-01-ROOF1

EP503

55-DP-TRA-12,14

CONTINUATION TO 55-AC-01-H1-173,

55-AC-02-H2-155 &, 55-AC-03-H2-155

REFERENCE SHEET 55EP401 & 55EP402.

55-P-09

AREA OF WORK

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

589-21-700

55EP403

BLDG 55 - ENLARGED ROOF PLAN

SJM/WNM RDC/LLT

100% CONSTRUCTION

DOCUMENTS

06/19/2023

KEY NOTES

GENERAL NOTES

KEY PLAN

1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS

REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

- 1/4" = 1'-0"

1 BLDG 55 - ENLARGED ROOF PLAN 2'0 4' 8'

PROJECT

NORTH

NOT USED

TRUE

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".

Revisions: Date: 228 of 512Page 234 of 518

J b

Mo a

AREA OF WORK

H

99 SF

DATA CLOSET

LG-38

TYP.

DATA RACK

H

DATA RACK

56-LG-38A-2

56-LG-38A-2

56-LG-38A-2

56-LG-38A-2 56-LG-38B-2

56-LG-38B-2

56-LG-38B-2

EP502

56-LG-38B-2

56-LG-38B

56-LG-38A

56-AC-01-LG-38

TR

LG-38

99 SF

ICRA II

CONTINUE TO 56-CU-01-ROOF

REFERENCE SHEET 56EP402

EP504

CONTINUE TO

SHEET 56EP100

56-P-07

56-P-06

56-P-05

56-P-08

P-TR-1A P-TR-1B

LG-38

H

DATA CLOSET

LG-38

1 TYP.

H

56-LG-38B56-LG-38A

TR

LG-38

99 SF

ICRA II

L1E a

56-LG-38A-4

DATA RACK

L1E a

56-LG-38A-4

L1 b

56-LG-38B-4

L1 b

56-LG-38B-4

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

589-21-700

56EP400

BLDG 56 - LEVEL 00 - ENLARGED

ELECTRICAL PLANS

SJM/WNM RDC/LLT

100% CONSTRUCTION

DOCUMENTS

06/19/2023

GENERAL NOTES

KEY PLAN

KEY NOTES

1/2" = 1'-0"56EP100

1 RM LG-38 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"56EP100

2 RM LG-38 - ELECTRICAL PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1'0 2' 4' 1'0 2' 4'

1/2" = 1'-0"56EP100

3 RM LG-38 - DEMOLITION LIGHTING PLAN

PROJECT

NORTH

1'0 2' 4'

1/2" = 1'-0"56EP100

4 RM LG-38 - LIGHTING PLAN

PROJECT

NORTH

1'0 2' 4'

1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING

SHALL BE DEMOLISHED BACK TO SOURCE.

SOURCE A POWER PANELBOARD "56-LG-38A".

SOURCE B POWER PANELBOARD "56-LG-38B".

SECONDARY BONDING BUSBAR.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

56-AC-01-LG-38 POWERED FROM 56-CU-01-ROOF, PROVIDE CONDUCTORS AND WIRE

PER MANUFACTURER'S REQUIREMENTS. COORDINATE WITH THE MECHANICAL

CONTRACTOR AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".

REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

Revisions: Date: 229 of 512Page 235 of 518 b

Mo a

L1-56

H

92 SF

DATA CLOSET

L1-561

TYP.

H

56-L1-56A

56-L1-56B

DATA RACK

L2E a

56-L1-56A-4

TR

L1-56

92 SF

ICRA II

L2E a

56-L1-56A-4

L2 b

56-L1-56B-4

AREA OF WORK

H

TYP.

DATA RACK, TYP.

EXISTING

VERTICAL

SLEEVES

ACCESS

CONTROL

PANEL

FIRE ALARM

REMOTE POWER

SUPPLY

ACCESS CONTROL

PANEL

92 SF

DATA CLOSET

L1-56

H

DATA RACK

56-L1-56B-2

56-L1-56A

56-L1-56B

56-L1-56A-2

56-L1-56B-2 56-L1-56B-2

56-L1-56B-2

56-L1-56A-2

ACCESS CONTROL

PANELS

56-L1-56A-2

ACCESS

CONTROL

PANEL

FIRE ALARM

REMOTE POWER

SUPPLY

EXISTING

VERTICAL

SLEEVES

56-L1-56A-2

56-AC-02-L1-56

EXISTING AC

56-AC-2-L1-56

CONTINUE TO 56-CU-02-ROOF

REFERENCE SHEET 56EP402

EP502

EP504

CONTINUE TO

SHEET 56EP402

56-P-06

56-P-08

TR

L1-56

92 SF

ICRA II

P-TR-2A

P-TR-2B

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

589-21-700

56EP401

BLDG 56 - LEVEL 01- ENLARGED

ELECTRICAL PLANS

SJM/WNM RDC/LLT

100% CONSTRUCTION

DOCUMENTS

06/19/2023

GENERAL NOTES

KEY PLAN

KEY NOTES

PROJECT

NORTH

PROJECT

NORTH

1'0 2' 4' 1'0 2' 4'

- 1/2" = 1'-0"

3 RM L1-56 - DEMOLITION LIGHTING PLAN

PROJECT

NORTH

1'0 2' 4'

- 1/2" = 1'-0"

4 RM L1-56 - LIGHTING PLAN

PROJECT

NORTH

1'0 2' 4'

1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING

SHALL BE DEMOLISHED BACK TO SOURCE.

SOURCE A POWER PANELBOARD "56-L1-56A".

SOURCE B POWER PANELBOARD "56-L1-56B".

SECONDARY BONDING BUSBAR.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

56-AC-02-L1-56 POWERED FROM 56-CU-02-ROOF, PROVIDE CONDUCTORS AND WIRE

PER MANUFACTURER'S REQUIREMENTS. COORDINATE WITH THE MECHANICAL

CONTRACTOR AS REQUIRED.

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".

REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

- 1/2" = 1'-0"

1 RM L1-56 - DEMOLITION ELECTRICAL PLAN

- 1/2" = 1'-0"

2 RM L1-56 - ELECTRICAL PLAN

Revisions: Date: 230 of 512Page 236 of 518

A B C C1 D E F H I J

156-CU-02-ROOF

56-L1-56A-10,12

56-CU-01-ROOF

CONTINUE TO

56-AC-02-L1-56

REFERENCE

SHEET 56EP401

CONTINUE TO 56-AC-01-LG-38

REFERENCE SHEET 56EP400

EP504

56-LG-38A-10,12

56-P-10

56-P-09

56-CU-01-ROOF

AREA OF WORK

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

589-21-700

56EP402

BLDG 56 - ENLARGED ROOF PLAN

SJM/WNM RDC/LLT

100% CONSTRUCTION

DOCUMENTS

06/19/2023

GENERAL NOTES

KEY PLAN

KEY NOTES

- 1/4" = 1'-0"

1 BLDG 56 - ENLARGED ROOF PLAN

PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS

REQUIRED PER MANUFACTURER'S INSTRUCTURES. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

2'0 4' 8'

PROJECT

NORTH

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE:"P4-1", PANEL "4", CIRCUIT "1".

Revisions: Date: 231 of 512Page 237 of 518

LEG 1 LEG 2 LEG 1 LEG 2

OX

OZ

OY

A GROUP

A

LEG 1 LEG 2

B

OZ

OY

OX

GROUP

B

OY

OX

OZ

GROUP

A

OX

OZ

OY

GROUP

B

OY

OX

OZ

GROUP

A

OX

OZ

OY

GROUP

B

L21-20R

ENERGIZES

FIRST

TR RACK

PDU A

L21-20R

ENERGIZES

FIRST

TR RACK

PDU B

L21-20R

ENERGIZES

SECOND

TR RACK

PDU A

L21-20R

ENERGIZES

SECOND

TR RACK

PDU B

L21-20R

ENERGIZES

THIRD

TR RACK

PDU A

L21-20R

ENERGIZES

THIRD

TR RACK

PDU B

NOTE: WHEN ONLY ONE ENCLOSURE IS

POWERED AT STANDARD

DENSITY, ONE A/B PAIR OF

L21-20 RECEPTACLES WILL

REMAIN UNUSED

DETAIL NOTES

1. EQUIPMENT PROVIDED AND

INSTALLED BY OTHERS.

J

J

SOURCE A 60A

JUNCTION BOX

SOURCE B 60A

JUNCTION BOX

L21-20R

ENERGIZES

FIRST

TR RACK

PDU A

L21-20R

ENERGIZES

FIRST

TR RACK

PDU B

L21-20R

ENERGIZES

SECOND

TR RACK

PDU A

L21-20R

ENERGIZES

SECOND

TR RACK

PDU B

NOTE: WHEN ONLY ONE ENCLOSURE IS

POWERED AT STANDARD

DENSITY, ONE A/B PAIR OF

L21-20 RECEPTACLES WILL

REMAIN UNUSED

GROUP

A

GROUP

B

GROUP

A

GROUP

B

OX OY

OZ

LEG 1 LEG 2 LEG 1 LEG 2

OZ OX

OY

OY OZ

OX

OX OY

OZ

PHASE Z PHASE Y PHASE X

LEG 2

LEG 1

GRP A

GRP B

LEG 2

LEG 1

GRP A

GRP B

LEG 2

LEG 1

GRP A

GRP B

L21-30P

ZONE PDU

INPUT A

L21-30R

FIXED

POWER

SOURCE A

L21-30P

ZONE PDU

INPUT B

L21-30R

FIXED

POWER

SOURCE B

A

B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

589-21-700

EP501

ELECTRICAL DETAILS

SJM/WNM RDC/LLT

100% CONSTRUCTION

DOCUMENTS

06/19/2023

- NTS

CONNECTION DETAIL FOR 60A ZONE PDU UNIT SUPPLYING THREE-PHASE 20A (L21-20P) RACK

PDUs IN STANDARD DENSITY ENCLOSURES

- NTS

CONNECTION DETAIL FOR 30A ZONE PDU UNIT SUPPLYING THREE-PHASE 20A (L21-20P) RACK

PDUs IN STANDARD DENSITY ENCLOSURES

1. EQUIPMENT PROVIDED AND

INSTALLED BY OTHERS.

DETAIL NOTES

- NTS

2 NOT USED

- NTS

4 NOT USED

Revisions: Date:

INSTALL RED PLASTIC IDENTIFICATION STRIP AT 12" DEEP

THE FULL LENGTH, WITH METALLIC TRACER WIRE THE

FULL LENGTH, LABELED "DANGER BURIED ELECTRICAL"

FINISHED GRADE

24" MIN

1.5"

3.5"

MIN,

TYP

3.5"

MIN,

TYP 1.5"

1.5"

3.5"

MIN,

TYP

3"

1.5" 1.5"

1.5"

6" MIN

CONCRETE ENCASEMENT,

3500 PSI CONCRETE

PROVIDE #4 REBAR EVERY

24" TOP, BOTTOM, AND

SIDES, TYPICAL

PROVIDE #4 REBAR STIRRUPS

EVERY 12", TYPICAL

CONDUIT SPACERS, TYPICAL

PVC CONDUIT SIZE AND QUANTITY

AS SPECIFIED, TYPICAL

COMMUNICATIONS

BACKFILL 95%

COMPACTION

RESURFACE IN ACCORDANCE WITHFINAL

REQUIREMENTS - SOD IN LAWN

AREAS, ASPHALT IN PAVED AREAS. SEE

CIVIL DRAWINGS FOR PATCHING

IN ASPHALT AREAS.

POWER

3"

12"

REBAR STAND, TYPICAL.

SPACE AS REQUIRED.

DUCT BANK GROUND WIRE.

REFERENCE PLANS FOR

SIZE (MINIMUM SIZE SHALL

BE 6 AWG).

DETAIL NOTES:

1. THIS IS A TYPICAL DETAIL. NOT ALL DUCT BANKS WILL HAVE

POWER AND COMMUNICATIONS. CONTRACTOR SHALL DIMENSION

LAYOUT PER SPECIFIC CONDUIT REQUIREMENTS.

2. MINIMUM COVER FOR CONCRETE DUCT BANK IS 24"

3"

3"

REBAR TIE,

TYPICAL

- 3/4" = 1'-0"

1 TYPICAL CONCRETE ENCASED DUCT BANK SECTION

ES102b E-401

NOTE: WHEN ONLY ONE ENCLOSURE IS

POWERED AT STANDARD

DENSITY, ONE A/B PAIR OF

L21-20 RECEPTACLES WILL

REMAIN UNUSED

RESURFACE IN

ACCORDANCE WITH FINAL

REQUIREMENTS-SOD IN

LAWN AREAS, ASPHALT IN

PAVED AREAS. SEE CIVIL

DRAWINGS FOR PATCHING

IN ASPHALT AREAS.

INSTALL RED PLASTIC IDENTIFICATION STRIP

AT 12" DEEP THE FULL LENGTH, WITH

METALLIC TRACER WIRE THE FULL LENGTH,

LABLED "DANGER BURIED ELECTRICAL"

6" OR MORE OF CLEAN SAND

OR APPROVED EXCAVATED

MATERIAL

36" MINIMUM BURIAL DEPTH

FOR UTILITIES

INCLUDING POWER,

DATA AND

TELEPHONE OR AS

AMENDED BY THE

SERVING UTILITY. 24"

MINIMUM

BURIAL DEPTH FOR SITE

LIGHTING/POWER

BACKFILL 95%

COMPACTION

CONDUIT TYPE, SIZE, AND

QUANTITY AS SPECIFIED

7-1/2" 7-1/2"

FINISHED GRADE

- NTS

2 TYPICAL TRENCHING SECTION

ES102b

ES102b E-401

232 of 512Page 238 of 518

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

LEG 1 LEG 2 LEG 1 LEG 2

AGROUPA

B

BGROUP AGROUP BGROUP

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

L21-30P SIDE B

REQUIRES A 208V, 30A, THREE-PHASE

CIRCUIT, TERMINATING IN A NEMA L21-30R

LOCKING RECEPTACLE.

L21-30P SIDE A

REQUIRES A 208V, 30A, THREE-PHASE

CIRCUIT, TERMINATING IN A NEMA

L21-30R LOCKING RECEPTACLE.

30A 3-PHASE ZONE PDU BASE

UNIT - REQUIRES TWO 30A 3-

PHASE (WYE) CIRCUITS WITH

L21-30R RECEPTACLES

PHASE Z PHASE Y PHASE X

RACK-MOUNTED 5KW, 208V UNINTERRUPTIBLE

POWER SUPPLY (UPS) WITH NEMA 20A L21-20P

INPUT AND L21-20R OUTPUT

RACK-MOUNT

UPS

RACKED

EQUIPMENT

RACKED

EQUIPMENT

PDU

A

PDU

B

PDU

A

PDU

BPSA PSB PSA PSB

LEG A LEG B

ZONE PDU

RACK-MOUNT

UPS

RACK/ENCLOSURE RACK/ENCLOSURE

SOURCE A 30A

RECEPTACLE

SOURCE B 30A

RECEPTACLE

REFERENCE

ET DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

REFERENCE

ET DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

EP501

EP502

TYP

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

LEG 1 LEG 2 LEG 1 LEG 2 LEG 1 LEG 2

AGROUPA

B

BGROUP AGROUP BGROUP AGROUP BGROUP

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

JJ

RACK/ENCLOSURE

RACK-MOUNT

UPS

RACK-MOUNT

UPS

RACKED

EQUIPMENT

RACKED

EQUIPMENT

RACKED

EQUIPMENT

PDU

A

PDU

B

PDU

A

PDU

B

PDU

A

PDU

BPSA PSB PSA PSB PSA PSB

LEG A LEG B

ZONE PDU

SOURCE A

JUNCTION

BOX

SOURCE B

JUNCTION

BOX

60A 3-PHASE ZONE PDU

BASE UNIT - REQUIRES

TWO 60A 3-PHASE (WYE)

CIRCUITS HARD-WIRED

IN JUNCTION BOX

RACKED-MOUNTED 5 KW, 208V

UNINTERRUPTIBLE POWER SUPPLY

(UPS) WITH NEMA 20A L21-20P

INPUT AND L21-20R OUTPUT

RACK-MOUNT

UPS

RACK/ENCLOSURE RACK/ENCLOSURE

SOURCE A

REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT,

TERMINATING IN A HARD-WIRED JUNCTION BOX.

SOURCE B

REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT,

TERMINATING IN A HARD-WIRED JUNCTION BOX.

REFERENCE

ET DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

REFERENCE

ET DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

REFERENCE

ET DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

L21-20P SIDE B

REQUIRES A 208V, 20A,

THREE-PHASE CIRCUIT,

TERMINATING IN A NEMA

L21-20R LOCKING

RECEPTACLE.

L21-20P SIDE A

REQUIRES A 208V, 20A,

THREE-PHASE CIRCUIT,

TERMINATING IN A NEMA

L21-20R LOCKING

RECEPTACLE.

RACK-MOUNTED 5 KW, 208V UNINTERRUPTIBLE

POWER SUPPLY (UPS) WITH NEMA 20A L21-20P

INPUT AND L21-20R OUTPUT

RACK/ENCLOSURE

RACK-MOUNT

UPS

RACKED

EQUIPMENT

PSA PSB

PDU

A

PDU

B

SOURCE A 20A

RECEPTACLE

SOURCE B 20A

RECEPTACLE

REFERENCE

ET DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

REQUIRES ONE (1) L21-20R

20A 120/208V 3øY

APC AP8861 RPDU OR EQUIVALENT; RACK

PDU 2G, METERED; L21-20 PLUG; THREE

PHASE; 120/208V INPUT; 20A; ZERO U, 5.7 KW,

208V, (36) C13 & (6) C19 & (2) 5-20 OUTLETS;

FOR USE IN TELECOMMUNICATION ROOMS

AND LOCATIONS WITH LEGACY 110V ONLY

EQUIPMENT

NOTE: USED IN TELECOMMUNICATIONS

ROOMS WHERE 110V DISTRIBUTION

USING NEMA 5-15 OR NEMA 5-20

RECEPTACLES ARE REQUIRED IN

ADDITION TO THE STANDARD 208V

FIGURE 1: IEC 60320 C14 PLUG CONNECTOR.

SOURCE: CISCO SYSTEMS INC. ILLUSTRATION

#113165

FIGURE 2: IEC 60320 C15 PLUG.

SOURCE: CISCO SYSTEMS INC. ILLUSTRATION

#113165

FOR INFORMATIONAL REFERENCE ONLY:

208V PDU TO BE COMPATIBLE WITH CISCO IEC C14-C15 CABINET JUMPER POWER CORD,

DEVICE CORDSET PART NUMBER CAB-C15-CBN.

RACK PDU END DEVICE END

CAB-C15-CBN DETAILS:

1. CORDSET RATED FOR 250VAC, 13A, 60 HZ, 120° C (248° F) AT COUPLER PINS.

2. MAXIMUM OVERALL LENGTH OF 4 FT.

3. VERIFY CORDSET COMPATIBILITY WITH 208VAC SOURCE POWER BEFORE CONNECTING

4. VERIFY DEVICE COMPATIBILITY WITH 208VAC INPUT POWER BEFORE CONNECTING.

DEVICE CORDSET

RACK MOUNT PDU. L5- 30 INPUT. NEMA 5-20

OUTPUT. 1 RU. TWO PER ENCLOSURE. ONE ENERGIZED

BY UPS. ONE ENERGIZED BY WALL OUTLET. (SHOWN

HERE FRONT FACING, BUT ARE TO BE INSTALLED ON

THE BACK RAIL.)

RACK MOUNT UPS. L5-30 INPUT.

L5-30 OUTPUT. CAPACITY NTE 2880 VA. 2 RU.

METERED. (APC SMX3000RMLV2U OR EQUIVALENT)

O U

T

IN

O

CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TELECOMMUNICATIONS

BONDING BUSBAR

QUAD OUTLET (5-20) FOR

BACKBOARD MOUNTED

EQUIPMENT

TE SOURCE A AND B POWER

RECEPTACLES (LOCKING, 120V, 30A,

L5-30) MOUNTED IN JUNCTION BOX SIZED

TO FIT TE POWER CUTOUT LOCATION.

JUNCTION BOX SHALL BE RECESSED IN

WALL BEHIND TE. SOURCE A

RECEPTACLE SHALL FEED TE UPS.

SOURCE B RECEPTACLE SHALL FEED TE

PDU. EACH RECEPTACLE ENERGIZED BY

SEPARATE ONE-POLE 30 AMP

BREAKERS; REFERENCE PLANS FOR

ADDITIONAL CIRCUITING INFORMATION.

<6"

<6"

WALL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

589-21-700

EP502

ELECTRICAL DETAILS

SJM/WNM RDC/LLT

100% CONSTRUCTION

DOCUMENTS

06/19/2023

- 1 : 30

3 POWER ELEVATION AND SCHEMATIC FOR A TWO RACK TR

- NTS

1 POWER ELEVATION AND SCHEMATIC FOR A THREE RACK TR

EP501

EP502

TYP

- NTS

4 POWER ELEVATION AND SCHEMATIC FOR ONE RACK TR

- NTS

2 208V RACK PDU FOR TRs

EP502

TYP

- NTS

5 TELECOMMUNICATION ENCLOSURE ELEVATION DETAIL

Revisions: Date: 233 of 512Page 239 of 518

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

LEG 1 LEG 2 LEG 1 LEG 2 LEG 1 LEG 2

AGROUPA

B

BGROUP AGROUP BGROUP AGROUP BGROUP

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

JJ

RACK/ENCLOSURE

RACK-MOUNT

UPS

RACK-MOUNT

UPS

RACKED

EQUIPMENT

RACKED

EQUIPMENT

RACKED

EQUIPMENT

PDU

B

PDU

A

PDU

B

PDU

A

PDU

BPSA PSB PSA PSB PSA PSB

LEG A LEG B

ZONE PDU

SOURCE A

JUNCTION

BOX

SOURCE B

JUNCTION

BOX

60A 3-PHASE ZONE PDU

BASE UNIT - REQUIRES

TWO 60A 3-PHASE (WYE)

CIRCUITS HARD-WIRED

IN JUNCTION BOX

RACKED-MOUNTED 5 KW, 208V

UNINTERRUPTIBLE POWER SUPPLY

(UPS) WITH NEMA 20A L21-20P

INPUT AND L21-20R OUTPUT

RACK-MOUNT

UPS

RACK/ENCLOSURE RACK/ENCLOSURE

SOURCE A

REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT,

TERMINATING IN A HARD-WIRED JUNCTION BOX.

SOURCE B

REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT,

TERMINATING IN A HARD-WIRED JUNCTION BOX.

REFERENCE

ET DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

REFERENCE

ET DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

REFERENCE

ET DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

PDU

A

REFERENCE

ET DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

L21-20P SIDE B

REQUIRES A 208V, 20A,

THREE-PHASE CIRCUIT,

TERMINATING IN A NEMA

L21-20R LOCKING

RECEPTACLE.

L21-20P SIDE A

REQUIRES A 208V, 20A,

THREE-PHASE CIRCUIT,

TERMINATING IN A NEMA

L21-20R LOCKING

RECEPTACLE.

RACK/ENCLOSURE

RACK-MOUNT

UPS

RACKED

EQUIPMENT

PSA PSB

PDU

A

PDU

B

SOURCE A 20A

RECEPTACLE

SOURCE B 20A

RECEPTACLE

12" TYP

REFERENCE PLANS

FOR QUANTITY AND

SIZE OF CONDUITS

64"

39"

TOP VIEW

GROUND

GROUND SLEEVE

6"..

M A

X

CAST IN PLACE CONCRETE PAD.

HIGH VOLTAGE SIDE LOW VOLTAGE SIDE

50"

FRONT VIEW

DETAIL NOTES

1. CONCRETE PAD SHALL EXTEND 12" FROM ALL SIDES

OF TRANSFORMER UNLESS SHOWN OTHERWISE.

4"

12" TYP

POWER PACK

LIGHTING

LOAD

DAYLIGHT / OCCUPANCY SENSOR

(WHERE INDICATED ON PLANS)

OCCUPANCY SENSOR

(WHERE INDICATED ON PLANS)

LOW VOLTAGE SWITCH

N

L

120VAC

24V CONTROL

DS

OS

PP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

589-21-700

EP503

ELECTRICAL DETAILS

SJM/WNM RDC/LLT

100% CONSTRUCTION

DOCUMENTS

06/19/2023

- NTS

1 POWER ELEVATION AND SCHEMATIC FOR A FOUR RACK TR

Revisions: Date:

ADDENDUM #1 7/19/2023

1 1/2" = 1'-0"40EP101

2 TYPICAL OIL FILLED TRANSFORMER PAD MOUNT DETAIL

EP501

- NTS

3 LIGHTING WIRING DIAGRAM

(ES)

(S)

Load

Blue

Occupancy sensor switch

Black Black

White Bare

Ground

GENERAL NOTES:

1. MAINTAIN A MINIMUM CLEARANCE OF 305mm (12") ON ALL SIDES OF ROOF PENETRATION FROM WALLS, CURBS, AND OTHER PROJECTIONS TO FACILITATE PROPER

FLASHING.

2. FLANGES OF ADJACENT FLASHINGS SHALL NOT BE CUT OR OVERLAPPED.

3. VERIFY ROOF & STRUCTURAL SYSTEM WITH ARCHITECT.

4. COORDINATE FLASHING INSTALLATION WITH ROOFING CONTRACTOR TO ENSURE PROPER METHODS & MATERIALS ARE USED TO MAINTAIN ROOF WARRANTY.

9.52mm (3/8")

MIN GALVANIZED

THREADED ROD,

TYP.

CONDUIT CLAMP.

SIZE AS REQUIRED

LOCKING SQUARE

WASHER &

LOCKNUT

STEEL

EXPANSION

ANCHOR

INTEGRAL GALVANIZED

LIPPED STEEL MOUNTING

CHANNEL

PREFABRICATED RUBBER BOOT

CAP WITH GRADUATED STEPS &

WEATHER-PROOF PRESSURE SEAL

TO COLLAR

SEALANT AT PENETRATION

TO MEMBRANE JUNCTURE

BY ROOFING CONTRACTOR

MULTIPLE MEMBRANE STRIPPING PLIES

FEATHERED AT FIELD OF ROOF BY

ROOFING CONTRACTOR. PRIME FLANGE

BEFORE STRIPPING.

PREFABRICATED FORMED 1.52mm

(0.06") THICK ALUMINUM FLASHING

ROUND COLLAR WITH MIN. 76mm (3")

WIDE FLANGE. ATTACH TO ROOF PER

MANUFACTURER'S INSTRUCTIONS

CONDUIT CLAMP.

SIZE AS REQUIRED

BATT INSULATION

ROOF MEMBRANE

WATER CUT-OFF MASTIC

COMPATIBLE WITH ROOF

MEMBRANE

STAINLESS

CLAMP, TYP.

SEAL-OFF

FITTING, TYP.

CONCRETE DECKING

STEEL EXPANSION

ANCHOR

INTEGRAL GALVANIZED

LIPPED STEEL

MOUNTING CHANNEL

CONDUIT,

TYP.

FIELD OF VIEW

FOR DETAIL

TYPICAL

DATA

RACK

FIN. FLOOR

HORIZONTAL CAT6A

DISTRIBUTION AND

FIBER-OPTIC BACKBONE

CABLE TRAY, TYPICAL.

F L O

O R

T O

U N

D E

R S

ID

E

S T

R U

C T

U R

E

84"

6" MIN

BOTTOM OF FLOOR OR ROOF ABOVE

LIGHT FIXTURE: REFERENCE TR ROOM

LUMINAIRE MOUNTING SCHEDULE. LIGHT

MOUNTING LOCATION IS DIAGRAMMATIC;

CONTRACTOR SHALL COORDINATE EXACT

MOUNTING HEIGHT AND PLACEMENT WITH ALL

OBSTRUCTIONS INCLUDING CABLE TRAY, RACKS

AND ARCHITECTURAL FEATURES.

FINISHED SURFACE

(OR ROOF)

PROVIDE RMC OR

LTFMC AS

REQUIRED TO

CONNECT TO

LOAD

ALL FASTENING

HARDWARE SHALL

BE STAINLESS

STEEL, TYP.

GENERAL DETAIL NOTES:

1. ALL CHANNEL STRUT, POST BASES AND ACCESSORIES SHALL BE HOT-

DIPPED GALVANIZED, UNLESS SPECIFICALLY NOTED OTHERWISE.

2. THIS IS A GENERAL DETAIL INDICATING GENERAL LAYOUT

REQUIREMENTS. CONTRACTOR SHALL SIZE RACK ACCORDINGLY TO

MOUNT ALL REQUIRED EQUIPMENT AS SHOWN ON PLANS; ADDITIONAL

HORIZONTAL AND/OR VERTICAL STRUCTURAL MEMBERS MAY BE

REQUIRED.

ID PLACARD, PROVIDE PER SPECIFICATIONS.

ALL FASTENING

HARDWARE SHALL

BE STAINLESS

STEEL, TYP.

CHANNEL STRUT, 1-5/8" X 1-5/8", LENGTH AS

REQUIRED, TYP.

MYERS HUB, TYP

48" MIN.

ROOF MOUNTED DISCONNECT

FINISHED GROUND/

EARTH

PROVIDE RMC OR

LTFMC AS

REQUIRED TO

CONNECT TO

LOAD

ANCHOR BOLTS,

1/4"-DIA x 12" L (MIN.), STAINLESS STEEL

ID PLACARD, PROVIDE PER SPECIFICATIONS.

ALL FASTENING

HARDWARE SHALL

BE STAINLESS

STEEL, TYP.

CHANNEL STRUT, 1-5/8" X 1-5/8", LENGTH

AS REQUIRED, TYP.

MYERS HUB, TYP

48" MIN.

GROUND MOUNTED DISCONNECT

CONCRETE FOOTING WITH

CHAMFERED EDGE,

3000-PSI,12"-DIA x 30" L (MIN)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

589-21-700

EP504

ELECTRICAL DETAILS

SJM/WNM RDC/LLT

100% CONSTRUCTION

DOCUMENTS

06/19/2023

- 12" = 1'-0"

1 CONDUIT ROOF PENETRATION DETAIL

- 3/4" = 1'-0"

3 TYPICAL TELECOM ROOM ELEVATION

- 1" = 0'-8"

2 TYPICAL UNISTRUT RACK MOUNTED DISCONNECT SWITCH

- 1" = 1'-0"

4 WALL SWITCH OCCUPANCY SENSOR

BARE

BLACK

BLUE

WHITE WIRE WITH

GREEN SLEEVE

BLUE

BLACKBLACK

BARE

OCCUPANCY

SENSOR SWITCH

LOAD

WHITE

GROUND

HOT/LIVE

120 V~ 50/60 Hz

NEUTRAL

WHEN USING CONTROLS IN

SINGLE LOCATION

INSTALLATIONS, TIGHTEN

THE BLUE TERMINAL OR CAP

BLUE WIRE. DO NOT

CONNECT THE BLUE

TERMINAL/WIRE TO ANY

OTHER WIRE OR TO

GROUND.

1 1/2" = 1'-0"

Revisions: Date: 235 of 512Page 241 of 518

TELECOMMUNICATIONS

EQUIPMENT BONDING

CONDUCTOR (TEBC) AWG

IRREVERSIBLE CRIMP

CONNECTOR, TYP.

CABLE TRAY BONDING

CONDUCTOR. TYPICAL AT

EACH SECTION

CONNECTION POINT

TO PRIMARY OR SECONDARY

BONDING BUSBAR

IRREVERSIBBLE

COMPRESSION

CONNECTION

RACK BONDING

CONDUCTOR

(6 AWG)

TEBC

(TELECOMMUNICATIONS

EQUIPMENT BONDING

CONDUCTOR - 4 AWG)

RACK BONDING CONDUCTOR (6 AWG)

UNIT BONDING CONDUCTOR (6 AWG)

TOP-MOUNTED

RACK BONDING

BUSBAR

IRREVERSIBLE CRIMP

CONNECTOR, TYP.

GROUND TO PRIMARY

BONDING BUSBAR.

COORDINATE WITH VA

FOR EXACT

CONDUCTOR ROUTING

TWO-HOLE COMPRESSION LUGS (RACKS SHALL NOT

BE MODIFIED IF ONLY ONE-HOLE IS PROVIDED; USE

ONE-HOLE COMPRESSION LUGS IN THIS CASE)

TWO-HOLE

COMPRESSION LUGS (RACKS

SHALL NOT BE MODIFIED IF

ONLY ONE-HOLE IS PROVIDED;

USE ONE-HOLE COMPRESSION

LUGS IN THIS CASE)

RACK ISOLATION PADS

BONDING CONDUCTOR TO

PANEL BOARD GROUND LUG (ACEG)

USE TWO-HOLE LUGS FOR

BONDING CONNECTOR

TELECOMMUNICATIONS

BONDING BUSBAR

BOND RBB TO CABINET LUG. AWG #6

BOND RBB TO EACH SWITCH

AND ROUTER CHASIS

BOND RBB TO TELECOMMUNICATIONS BONDING BUSBAR. AWG #6

RACK BONDING BUSBAR (RBB)

OTHER CONNECTIONS

AS REQUIRED

(BONDING CONDUIT,

CABLE TRAYS,

BUILDING STEEL, TO

THE PBB OR SBB,

ETC.)

CHATSWORTH PRODUCTS

#40158-012, OR APPROVED

EQUAL

MOUNTING BRACKETS

1/4" THICK

L= 12"

D

INSULATOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

589-21-700

EP505

ELECTRICAL DETAILS

SJM/WNM RDC/LLT

100% CONSTRUCTION

DOCUMENTS

06/19/2023

- NTS

2 CABLE TRAY GROUNDING/BONDING REQUIREMENTS

- NTS

1 TELECOMMUNICATION RACK BONDING DETAIL

- NTS

4 TELECOMMUNICATION ENCLOSURE GROUNDING DETAIL

- NTS

5 TELECOMMUNICATIONS SECONDARY BONDING BUSBAR

- NTS

3 TELECOMMUNICATIONS ROOM BONDING DETAIL

SECONDARY

BONDING BUSBAR

ALL CONNECTIONS TO

BUSBAR SHALL BE (2) BOLT

MECHANICAL LUGS, TYP.

BONDING CONDUCTOR TO

BUILDING STEEL, #3/0 AWG

GREEN INSULATION W/YELLOW

TRACER

BONDING CONDUCTOR TO

RACEWAYS, CONDUITS,

WIREWAYS, CABLE TRAYS, #6

AWG GREEN INSULATION W/

YELLOW TRACER

BONDING CONDUCTOR TO

PANELBOARD(S) IN ROOM

PRESENT, #6 AWG GREEN

INSULATION W/ YELLOW TRACER

BONDING CONDUCTOR FROM

TELECOMMUNICATIONS

SECONDARY BONDING

BUSBAR TO

TELECOMMUNICATIONS

BONDING BACKBONE (IF NOT

PRESENT, BOND TO PRIMARY

SERVICE ENTRY MAIN

BUSBAR), #3/0 AWG GREEN

INSULATION W/YELLOW

TRACER

TELECOMMUNICATIONS BONDING

BACKBONE CONDUCTOR. PROVIDE WITH

GREEN INSULATION AND YELLOW

TRACER, SIZE PER TIA/ANSI STANDARDS

AS REQUIRED. WHERE EXISTING, EXTEND

AND REROUTE BACKBONE TO AND FROM

RELOCATED/EXPANDED

TELECOMMUNICATIONS…