Attachment 14 - Drawings Environmental.pdf

PDF 8 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Kansas City, MO (VA-23-00068037)
Solicitation number
36C77623B0066
Issued by

About this file

This document package includes construction drawings and environmental hazard plans for infrastructure upgrades at the Kansas City VA Medical Center. The drawings depict proposed demolition, new construction, and renovation work at multiple buildings on the campus. Hazardous material abatement and mitigation notes call out locations of asbestos, lead paint, and other regulated materials throughout affected areas. Contractors will be required to follow safety protocols and obtain any necessary certifications when working in the vicinity of identified hazards.

View the file

Other files

File Type Posted
Copy of Attachment 1 - Technical Questions - Responses.xlsx XLSX spreadsheet
36C77623B0066 0002.docx DOCX document
Attachment 1 - Site Visit - Sign-In Sheet - 36C77623B0066 EHRM Infra Upgrade - KC.pdf PDF
36C77623B0066 0001.docx DOCX document
Attachment 11 - Drawings Electrical - 6 of 8.pdf PDF
Attachment 19 - Drawings Telecommunications - 2 of 3.pdf PDF
Attachment 1 - Specifications - DIV 1-13.pdf PDF
Attachment 18 - Drawings Telecommunications - 1 of 3.pdf PDF
Attachment 3 - Drawings Architectural - 1 of 2.pdf PDF
Attachment 16 - Drawings Structural.pdf PDF
Attachment 7 - Drawings Electrical - 2 of 8.pdf PDF
Attachment 13 - Drawings Electrical - 8 of 8.pdf PDF
Attachment 10 - Drawings Electrical - 5 of 8.pdf PDF
Attachment 12 - Drawings Electrical - 7 of 8.pdf PDF
Attachment 22 - Wage Rates - 6-30-23.pdf PDF
Attachment 21 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 9 - Drawings Electrical - 4 of 8.pdf PDF
Attachment 23 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 6 - Drawings Electrical - 1 of 8.pdf PDF
Attachment 17 - Drawings Technology.pdf PDF
Attachment 2 - Specifications - DIV 21-32.pdf PDF
Attachment 8 - Drawings Electrical - 3 of 8.pdf PDF
36C77623B0066_1.docx DOCX document
Attachment 20 - Drawings Telecommunications - 3 of 3.pdf PDF
Attachment 5 - Drawings Civil.pdf PDF
Attachment 4 - Drawings Architectural - 2 of 2.pdf PDF
Attachment 15 - Drawings Mechanical.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

x x x x x x x

X

X

X

X x x x x x x x

X

X

X

X

M

35th STREET

LINWOOD BOULEVARD

IN

C

IN

E

R A

T O

R

B U

IL

D

IN

G

IN

C

IN

E

R A

T O

R

C O

VID

T

EN

T

FISHER

HOUSE

ARCHITECTURAL

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

DESIGN TEAM

FIRE PROTECTION

SPEES DESIGN BUILD

STRUCTURAL

IMEG

ELECTRICAL

SPEES DESIGN BUILD

PLUMBING

SPEES DESIGN BUILD

MECHANICAL

SPEES DESIGN BUILD

2882 106TH ST

DES MOINES, IA, 50322

PHONE: (515) 334-9906

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

CIVIL

IMEG

2882 106TH ST

DES MOINES, IA, 50322

PHONE: (515) 334-9906

PROJECT INFORMATION

STATE:

COUNTY:

JURISTICTION:

OWNER:

CODE ANALYSIS

PROJECT DESCRIPTION

APPLICABLE BUILDINGS:

1, 2, 4, 5, 6, 15, 26, 40, 55, ICRA CLASS REQUIREMENTS

REQUIREMENTS DEPENDENT ON

EACH INDIVIDUAL ROOM LOCATION.

THE PROPOSED DESIGN SHALL IMPROVE,

RECONFIGURE, EXPAND AND RENOVATE

EXISTING SPACES FOR NEW

TELECOMMUNICATION ROOMS.

MISSOURI

JACKSON

KANSAS CITY

GOV, VETERANS AFFAIRS

GENERAL NOTES

1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &

SPECIFICATIONS.

2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.

BRING TO THE AWARENESS OF AND VERIFY WITH VA COR PRIOR TO PROCEEDING.

3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE

TO VISIT THE SITE.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT

IMMEDIATELY TO THE ATTENTION OF THE COR.

5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.

6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK

THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.

7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE

WITH THE CONTRACT DOCUMENTS.

8. THE CONTRACTOR SHALL HAVE NO MORE THAN TWO TEAMS WORKING ON TWO TRS AT ANY

GIVEN TIME UNLESS WRITTEN APPROVAL IS PROVIDED BY THE COR.

9. THE CONTRACTOR SHALL ONLY WORK IN A SINGLE BUILDING AT ANY GIVEN TIME UNLESS WRITTEN

APPROVAL IS PROVIDED BY THE COR.

BLDG 55

BLDG 26

BLDG 1

BLDG 15

BLDG 6 BLDG 40

BLDG 56

BLDG 2

BLDG 5 BLDG 4

KANSAS CITY VA MEDICAL CENTER

KANSAS CITY, MO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128

589-21-700

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES G-001

COVER SHEET

MA/EM AJ/DD/ADSI

100% CONSTRUCTION

DOCUMENTS

06/19/2023

EHRM INFRASTRUCTURE UPGRADES

KANSAS CITY VA MEDICAL CENTER - 4801 LINWOOD BLVD, KANSAS CITY, MO 64128

PROJECT #: 589-21-700

1" = 160'-0"

VICINITY MAP

3" = 1'-0"

LOCATION MAP

TRUE

NORTH

TRUE

NORTH

Revisions: Date:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

1 of 512Page 1 of 518

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128

589-21-700

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES G-002

DRAWING INDEX

MA/EM DD/ADSI

100% CONSTRUCTION

DOCUMENTS

06/19/2023

Revisions: Date:

DRAWING INDEX

PAGE # SHEET # SHEET NAME

GENERAL

1 of 518 G-001 COVER SHEET

2 of 518 G-002 DRAWING INDEX

3 of 518 G-003 DRAWING INDEX

CIVIL

4 of 518 CJ100 CIVIL NOTES AND LEGEND

5 of 518 CD100 EXISTING CONDITIONS AND DEMOLITION PLAN

6 of 518 CD101 DETAILED DEMOLITION PLAN

7 of 518 CD102 DETAILED DEMOLITION PLAN

8 of 518 CD103 DETAILED DEMOLITION PLAN

9 of 518 CU100 UTILITY PLAN

10 of 518 CU101 DETAILED UTILITY PLAN

11 of 518 CU102 DETAILED UTILITY PLAN

12 of 518 CU103 DETAILED UTILITY PLAN

13 of 518 CU104 FIBER PLAN AND PROFILE

14 of 518 CU105 FIBER PLAN AND PROFILE

15 of 518 CU106 FIBER PLAN AND PROFILE

16 of 518 CU107 FIBER PLAN AND PROFILE

17 of 518 CU108 FIBER PLAN AND PROFILE

18 of 518 CK100 CIVIL DETAILS

STRUCTURAL

19 of 518 S-000 STRUCTURAL COVER SHEET

20 of 518 S-001 GENERAL NOTES

21 of 518 01S-101 STRUCTURAL PLANS AND DETAILS

22 of 518 06S-101 STRUCTURAL PLANS AND DETAILS

23 of 518 15S-101 ADDITION FOUNDATION AND FRAMING PLANS

24 of 518 15S-200 FOUNDATION DETAILS

25 of 518 15S-300 STEEL DETAILS

ARCHITECTURAL

26 of 518 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS

27 of 518 AS101a ICRA DETAILS

28 of 518 AS101b ICRA DETAILS

29 of 518 01A-100 BLDG 01 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS

30 of 518 01A-101 BLDG 01 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

31 of 518 01A-102 BLDG 01 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

32 of 518 01A-103 BLDG 01 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS

33 of 518 01A-104 BLDG 01 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS

34 of 518 01A-105 BLDG 01 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS

35 of 518 01A-106 BLDG 01 -LEVEL 06 -DEMO, FLOOR PLANS & RCPS

36 of 518 01A-107 BLDG 01 -LEVEL 07 -DEMO, FLOOR PLANS & RCPS

37 of 518 01A-108 BLDG 01 -LEVEL 08 -DEMO, FLOOR PLANS & RCPS

38 of 518 01A-109 BLDG 01 -LEVEL 09 -DEMO, FLOOR PLANS & RCPS

39 of 518 01A-110 BLDG 01 -LEVEL 10 -DEMO, FLOOR PLANS & RCPS

40 of 518 01A-111 BLDG 01 -LEVEL 11 -DEMO, FLOOR PLANS & RCPS

41 of 518 01AS100 BUILDING 01 -LEVEL 00 -PHASING PLAN

42 of 518 01AS101 BUILDING 01 -LEVEL 01 -PHASING PLAN

43 of 518 01AS102 BUILDING 01 -LEVEL 02 -PHASING PLAN

44 of 518 01AS103 BUILDING 01 -LEVEL 03 -PHASING PLAN

45 of 518 01AS104 BUILDING 01 -LEVEL 04 -PHASING PLAN

46 of 518 01AS105 BUILDING 01 -LEVEL 05 -PHASING PLAN

47 of 518 01AS106 BUILDING 01 -LEVEL 06 -PHASING PLAN

48 of 518 01AS107 BUILDING 01 -LEVEL 07 -PHASING PLAN

49 of 518 01AS108 BUILDING 01 -LEVEL 08 -PHASING PLAN

50 of 518 01AS109 BUILDING 01 -LEVEL 09 -PHASING PLAN

51 of 518 01AS110 BUILDING 01 -LEVEL 10 -PHASING PLAN

52 of 518 01AS111 BUILDING 01 -LEVEL 11 -PHASING PLAN

53 of 518 01AS112 BUILDING 01 -LEVEL 12 -PHASING PLAN

54 of 518 01AS113 BUILDING 01 -LEVEL 13 -PHASING PLAN

55 of 518 02A-101 BLDG 02 -LEVEL 01 -DEMO, FLOORS PLAN & RCPS

56 of 518 02A-102 BLDG 02 -LEVEL 02 -DEMO, FLOOR PLAN & RCPS

57 of 518 02AS100 BUILDING 02 -LEVEL 00 -PHASING PLAN

58 of 518 02AS101 BUILDING 02 -LEVEL 01 -PHASING PLAN

59 of 518 02AS102 BUILDING 02 -LEVEL 02 -PHASING PLAN

60 of 518 04A-101 BLDG 04 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS

61 of 518 04AS100 BUILDING 04 -LEVEL 00 -PHASING PLAN

62 of 518 04AS101 BUILDING 04 -LEVEL 01 -PHASING PLAN

63 of 518 04AS102 BUILDING 04 -LEVEL 02 -PHASING PLAN

64 of 518 04AS103 BUILDING 04 -LEVEL 03 LOWER -PHASING PLAN

65 of 518 04AS104 BUILDING 04 -LEVEL 03 UPPER -PHASING PLAN

66 of 518 05A-101 BLDG 05 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS

67 of 518 05AS101 BUILDING 05 -LEVEL 01 -PHASING PLAN

68 of 518 05AS102 BUILDING 05 -LEVEL 02 -PHASING PLAN

69 of 518 06A-101 BLDG 06 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS

70 of 518 06A-102 BLDG 06 -LEVEL 02 -DEMO, FLOOR PLAN & RCPS

71 of 518 06AS101 BUILDING 06 -LEVEL 01 -PHASING PLAN

72 of 518 06AS102 BUILDING 6 -LEVEL 02 -PHASING PLAN

73 of 518 15A-101 BLDG 15 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

74 of 518 15A-102 BLDG 15 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

75 of 518 15A-103 BLDG 15 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS

76 of 518 15A-104 BLDG 15 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS

77 of 518 15A-105 BLDG 15 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS

78 of 518 15A-106 BLDG 15 -LEVEL 06 -DEMO, FLOOR PLANS & RCPS

79 of 518 15A-107 BLDG 15 -LEVEL 07 -DEMO, FLOOR PLANS & RCPS

80 of 518 15A-108 BLDG 15 -LEVEL 08 -DEMO, FLOOR PLANS & RCPS

81 of 518 15AE-100 BLDG 15 TOWER -ROOF PLAN

82 of 518 15AE-101 BLDG 15 TOWER -ELEVATION -EXISTING CON

83 of 518 15AE-102 BLDG 15 TOWER -ELEVATION

84 of 518 15AE-103 BLDG 15 TOWER -SECTIONS

85 of 518 15AE-104 BLDG 15 TOWER -SECTIONS

86 of 518 15AS100 BUILDING 15 -LEVEL 00 -PHASING PLAN

87 of 518 15AS101 BUILDING 15 -LEVEL 01 -PHASING PLAN

88 of 518 15AS102 BUILDING 15 -LEVEL 02 -PHASING PLAN

89 of 518 15AS103 BUILDING 15 -LEVEL 03 -PHASING PLAN

90 of 518 15AS104 BUILDING 15 -LEVEL 04 -PHASING PLAN

91 of 518 15AS105 BUILDING 15 -LEVEL 05 -PHASING PLAN

92 of 518 15AS106 BUILDING 15 -LEVEL 06 -PHASING PLAN

93 of 518 15AS107 BUILDING 15 -LEVEL 07 -PHASING PLAN

94 of 518 15AS108 BUILDING 15 -LEVEL 08 -PHASING PLAN

95 of 518 15AS109 BUILDING 15 -LEVEL 09 -PHASING PLAN

96 of 518 26A-100 BLDG 26 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS

97 of 518 26A-101 BLDG 26 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

98 of 518 26A-102 BLDG 26 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

99 of 518 26A-103 BLDG 26 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS

100 of 518 26A-105 BLDG 26 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS

101 of 518 26AS100 BUILDING 26 -LEVEL 00 -PHASING PLAN

102 of 518 26AS101 BUILDING 26 -LEVEL 01 -PHASING PLAN

103 of 518 26AS102 BUILDING 26 -LEVEL 02 -PHASING PLAN

104 of 518 26AS103 BUILDING 26 -LEVEL 03 -PHASING PLAN

105 of 518 26AS104 BUILDING 26 -LEVEL 04 -PHASING PLAN

106 of 518 26AS105 BUILDING 26 -LEVEL 05 -PHASING PLAN

107 of 518 26AS106 BUILDING 26 -LEVEL 06 -PHASING PLAN

108 of 518 40A-101 BLDG 40 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS

109 of 518 40AS101 BUILDING 40 -LEVEL 01 -PHASING PLAN

110 of 518 55A-101 BLDG 55 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS

111 of 518 55A-102 BLDG 55 -LEVEL 02 -DEMO, FLOOR PLAN & RCPS

112 of 518 55AS101 BUILDING 55 -LEVEL 01 -PHASING PLAN

113 of 518 55AS102 BUILDING 55 -LEVEL 02 -PHASING PLAN

114 of 518 56A-100 BLDG 56 -LEVEL 00 -DEMO, FLOOR PLAN & RCPS

115 of 518 56A-101 BLDG 56 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS

116 of 518 56AS100 BUILDING 56 -LEVEL 00 -PHASING PLAN

117 of 518 56AS101 BUILDING 56 -LEVEL 01 -PHASING PLAN

118 of 518 A-601 ROOM FINISH SCHEDULE & WALL TYPES

119 of 518 A-602 DOOR DETAILS

120 of 518 A-603 ARCHITECTURAL DETAILS

121 of 518 A-604 EXTERIOR DETAILS

122 of 518 A-604A EXTERIOR DETAILS -ENLARGED PLANS

123 of 518 A-604B EXTERIOR DETAILS

124 of 518 A-604C EXTERIOR DETAILS

125 of 518 AE421 INTERIOR ELEVATIONS

126 of 518 AW001 IN-03.01 -ROOM NUMBER SIGN & SIGNAGE SCHEDULES

MECHANICAL

127 of 518 M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

128 of 518 01M-100a BLDG 01 -LEVEL 00 -FLOOR PLAN

129 of 518 01M-100b BLDG 01 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS

130 of 518 01M-101 BLDG 01 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

131 of 518 01M-102 BLDG 01 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

132 of 518 01M-103 BLDG 01 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS

133 of 518 01M-104 BLDG 01 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS

134 of 518 01M-105 BLDG 01 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS

135 of 518 01M-106 BLDG 01 -LEVEL 06 -DEMO, FLOOR PLANS & RCPS

136 of 518 01M-107 BLDG 01 -LEVEL 07 -DEMO, FLOOR PLANS & RCPS

137 of 518 01M-108 BLDG 01 -LEVEL 08 -DEMO, FLOOR PLANS & RCPS

138 of 518 01M-109 BLDG 01 -LEVEL 09 -DEMO, FLOOR PLANS & RCPS

139 of 518 01M-110 BLDG 01 -LEVEL 10 -DEMO, FLOOR PLANS & RCPS

140 of 518 01M-111 BLDG 01 -LEVEL 11 -DEMO, FLOOR PLANS & RCPS

141 of 518 01M-112 BLDG 01-LEVEL 12 -ROOF PLAN

142 of 518 02M-101 BLDG 2 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

143 of 518 02M-102 BLDG 2 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

144 of 518 02M-103 BLDG 2 -ROOF PLAN

145 of 518 04M-101 BLDG 04 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

146 of 518 05M-101 BLDG 05 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

147 of 518 06M-101 BLDG 06 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

148 of 518 06M-102 BLDG 06 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

149 of 518 15M-100 BLDG 15 -BASEMENT -AHU FLOOR PLANS

150 of 518 15M-101 BLDG 15 -LEVEL 01 -FLOOR PLANS & RCPS

151 of 518 15M-102 BLDG 15 -LEVEL 02 -FLOOR PLAN & RCPS

152 of 518 15M-103 BLDG 15 -LEVEL 03 -FLOOR PLAN & RCPS

153 of 518 15M-104 BLDG 15 -LEVEL 04 -FLOOR PLAN & RCP

154 of 518 15M-105 BLDG 15 -LEVEL 05 -FLOOR PLANS & RCPS

155 of 518 15M-106 BLDG 15 -LEVEL 06 -FLOOR PLANS & RCPS

156 of 518 15M-107 BLDG 15 -LEVEL 07 -FLOOR PLAN & RCPS

157 of 518 15M-108 BLDG 15 -LEVEL 08 -FLOOR PLAN & RCPS

158 of 518 26M-100 BLDG 26 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS

159 of 518 26M-101 BLDG 26 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

160 of 518 26M-102a BLDG 26 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

161 of 518 26M-102b BLDG 26 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

162 of 518 26M-103 BLDG 26 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS

163 of 518 26M-104 BLDG 26 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS

164 of 518 26M-105 BLDG 26 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS

165 of 518 40M-101 BLDG 40 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

166 of 518 55M-101 BLDG 55 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

167 of 518 55M-102 BLDG 55 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

168 of 518 55M-103 BLDG 55 -ROOF PLAN

169 of 518 56M-100 BLDG 56 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS

170 of 518 56M-101 BLDG 56 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

171 of 518 56M-102 BLDG 56 -ROOF PLAN

172 of 518 M-501 MECHANICAL DETAILS AND CONTROLS

173 of 518 M-502 MECHANICAL DETAILS

174 of 518 M-601 MECHANICAL SCHEDULES

175 of 518 M-602 MECHANICAL AND PLUMBING SCHEDULES

176 of 518 M-701 MECHANICAL CONTROLS AND VALVE SYMBOLS

177 of 518 M-702

FAN COIL UNIT AND CHILLED WATER PUMP SEQUENCE OF OPERATIONS, POINTS

LISTS, AND CONTROL DIAGRAMS

178 of 518 M-703

AIR HANDLING UNIT SEQUENCE OF OPERATION, POINTS LIST, AND CONTROL

DIAGRAM

ELECTRICAL

179 of 518 EPG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX

180 of 518 EPG002 ELECTRICAL LEGENDS

181 of 518 01EP100 BLDG 01 -LEVEL 00 -ELECTRICAL PLAN

182 of 518 02EP100 BLDG 02 -LEVEL 00 -ELECTRICAL PLAN

183 of 518 04EP101 BLDG 04 -LEVEL 01 -ELECTRICAL PLAN

184 of 518 05EP101 BLDG 05 -LEVEL 01 -ELECTRICAL PLAN

185 of 518 06EP101 BLDG 06 -LEVEL 01 -ELECTRICAL PLAN

186 of 518 15EP100 BLDG 15 -LEVEL 00 -ELECTRICAL PLAN

187 of 518 15EP101 BLDG 15 -LEVEL 01 -ELECTRICAL PLAN

188 of 518 26EP100 BLDG 26 -LEVEL 00 -ELECTRICAL PLAN

189 of 518 26EP101 BLDG 26 -LEVEL 01 -ELECTRICAL PLAN

190 of 518 26EP102 BLDG 26 -LEVEL 02 -ELECTRICAL PLAN

191 of 518 26EP103 BLDG 26 -LEVEL 03 -ELECTRICAL PLAN

192 of 518 26EP104 BLDG 26 -LEVEL 04 -ELECTRICAL PLAN

193 of 518 40EP101 BLDG 40 -LEVEL 01 -ELECTRICAL PLAN

194 of 518 55EP101 BLDG 55 -LEVEL 01 -ELECTRICAL PLAN

195 of 518 56EP100 BLDG 56 -LEVEL 00 -ELECTRICAL PLAN

196 of 518 01EP400 BLDG 01 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

197 of 518 01EP401 BLDG 01 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

198 of 518 01EP402 BLDG 01 -LEVEL 02 -ENLARGED ELECTRICAL PLANS

199 of 518 01EP403 BLDG 01 -LEVEL 03 -ENLARGED ELECTRICAL PLANS

200 of 518 01EP404 BLDG 01 -LEVEL 04 -ENLARGED ELECTRICAL PLANS

201 of 518 01EP405 BLDG 01 -LEVEL 05 -ENLARGED ELECTRICAL PLANS

202 of 518 01EP406 BLDG 01 -LEVEL 06 -ENLARGED ELECTRICAL PLANS

203 of 518 01EP407 BLDG 01 -LEVEL 07 -ENLARGED ELECTRICAL PLANS

204 of 518 01EP408 BLDG 01 -LEVEL 08 -ENLARGED ELECTRICAL PLANS

205 of 518 01EP409 BLDG 01 -LEVEL 09 -ENLARGED ELECTRICAL PLANS

206 of 518 01EP410 BLDG 01 -LEVEL 10 -ENLARGED ELECTRICAL PLANS

207 of 518 01EP411 BLDG 01 -LEVEL 11 -ENLARGED ELECTRICAL PLANS

208 of 518 01EP412 BLDG 01 -ENLARGED ROOF PLAN

209 of 518 02EP401 BLDG 02 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

210 of 518 02EP402 BLDG 02 -LEVEL 02 -ENLARGED ELECTRICAL PLANS

211 of 518 02EP403 BLDG 02 -ENLARGED ROOF PLAN

212 of 518 04EP401 BLDG 04 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

213 of 518 05EP401 BLDG 05 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

214 of 518 06EP401 BLDG 06 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

215 of 518 06EP402 BLDG 06 -LEVEL 02 -ENLARGED ELECTRICAL PLANS

216 of 518 15EP401 BLDG 15 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

217 of 518 15EP402 BLDG 15 -LEVEL 02 -ENLARGED ELECTRICAL PLANS

218 of 518 15EP403 BLDG 15 -LEVEL 03 -ENLARGED ELECTRICAL PLANS

219 of 518 15EP404 BLDG 15 -LEVEL 04 -ENLARGED ELECTRICAL PLANS

220 of 518 15EP405 BLDG 15 -LEVEL 05 -ENLARGED ELECTRICAL PLANS

221 of 518 15EP406 BLDG 15 -LEVEL 06 -ENLARGED ELECTRICAL PLANS

222 of 518 15EP407 BLDG 15 -LEVEL 07 -ENLARGED ELECTRICAL PLANS

223 of 518 15EP408 BLDG 15 -LEVEL 08 -ENLARGED ELECTRICAL PLANS

224 of 518 15EP409 BLDG 15 -ENLARGED ROOF PLAN

225 of 518 26EP400 BLDG 26 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

226 of 518 26EP401 BLDG 26 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

227 of 518 26EP402 BLDG 26 -LEVEL 02 -ENLARGED ELECTRICAL PLANS

228 of 518 26EP403 BLDG 26 -LEVEL 03 -ENLARGED ELECTRICAL PLANS

229 of 518 26EP405 BLDG 26 -LEVEL 05 -ENLARGED ELECTRICAL PLANS

230 of 518 26EP406 BLDG 26 -ENLARGED ROOF PLAN

231 of 518 40EP401 BLDG 40 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

232 of 518 55EP401 BLDG 55 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

233 of 518 55EP402 BLDG 55 -LEVEL 02 -ENLARGED ELECTRICAL PLANS

234 of 518 55EP403 BLDG 55 -ENLARGED ROOF PLAN

235 of 518 56EP400 BLDG 56 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

236 of 518 56EP401 BLDG 56 -LEVEL 01-ENLARGED ELECTRICAL PLANS

237 of 518 56EP402 BLDG 56 -ENLARGED ROOF PLAN

238 of 518 EP501 ELECTRICAL DETAILS

239 of 518 EP502 ELECTRICAL DETAILS

240 of 518 EP503 ELECTRICAL DETAILS

241 of 518 EP504 ELECTRICAL DETAILS

242 of 518 EP505 ELECTRICAL DETAILS

243 of 518 EP506 ELECTRICAL DETAILS

244 of 518 EP507 TELECOMMUNICATION BONDING RISER DIAGRAM (1 OF 2)

245 of 518 EP508 TELECOMMUNICATION BONDING RISER DIAGRAM (2 OF 2)

246 of 518 01EP601 BLDG 01 -ONE-LINE DIAGRAM -PART 1 OF 9 -EXISTING

247 of 518 01EP602 BLDG 01 -ONE-LINE DIAGRAM -PART 2 OF 9 -EXISTING

248 of 518 01EP603 BLDG 01 -ONE-LINE DIAGRAM -PART 3 OF 9 -EXISTING

249 of 518 01EP604 BLDG 01 -ONE-LINE DIAGRAM -PART 4 OF 9 -EXISTING

250 of 518 01EP605 BLDG 01 -ONE-LINE DIAGRAM -PART 5 OF 9 -EXISTING

251 of 518 01EP606 BLDG 01 -ONE-LINE DIAGRAM -PART 6 OF 9 -EXISTING

252 of 518 01EP607 BLDG 01 -ONE-LINE DIAGRAM -PART 7 OF 9 -EXISTING

253 of 518 01EP608 BLDG 01 -ONE-LINE DIAGRAM -PART 8 OF 9 -EXISTING

254 of 518 01EP609 BLDG 01 -ONE-LINE DIAGRAM -PART 9 OF 9 -EXISTING

255 of 518 01EP611 BLDG 01 -ONE-LINE DIAGRAM -PART 1 OF 9 -REVISED

256 of 518 01EP612 BLDG 01 -ONE-LINE DIAGRAM -PART 2 OF 9 -REVISED

257 of 518 01EP613 BLDG 01 -ONE-LINE DIAGRAM -PART 3 OF 9 -REVISED

258 of 518 01EP614 BLDG 01 -ONE-LINE DIAGRAM -PART 4 OF 9 -REVISED

259 of 518 01EP615 BLDG 01 -ONE-LINE DIAGRAM -PART 5 OF 9 -REVISED

260 of 518 01EP616 BLDG 01 -ONE-LINE DIAGRAM -PART 6 OF 9 -REVISED

261 of 518 01EP617 BLDG 01 -ONE-LINE DIAGRAM -PART 7 OF 9 -REVISED

262 of 518 01EP618 BLDG 01 -ONE-LINE DIAGRAM -PART 8 OF 9 -REVISED

263 of 518 01EP619 BLDG 01 -ONE-LINE DIAGRAM -PART 9 OF 9 -REVISED

264 of 518 02EP601 BLDG 02 -ONE-LINE DIAGRAM -EXISTING

265 of 518 02EP611 BLDG 02 -ONE-LINE DIAGRAM -REVISED

266 of 518 04EP601 BLDG 04 -ONE-LINE DIAGRAM -EXISTING

267 of 518 04EP611 BLDG 04 -ONE-LINE DIAGRAM -REVISED

268 of 518 05EP601 BLDG 05 -ONE-LINE DIAGRAM -EXISTING

269 of 518 05EP611 BLDG 05 -ONE-LINE DIAGRAM -REVISED

270 of 518 06EP601 BLDG 06 -ONE-LINE DIAGRAM -EXISTING

271 of 518 06EP611 BLDG 06 -ONE-LINE DIAGRAM -REVISED

272 of 518 15EP601 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -EXISTING

273 of 518 15EP602 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -EXISTING

274 of 518 15EP603 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -EXISTING

275 of 518 15EP611 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -REVISED

276 of 518 15EP612 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -REVISED

277 of 518 15EP613 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -REVISED

278 of 518 26EP601 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -EXISTING

279 of 518 26EP602 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -EXISTING

280 of 518 26EP603 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -EXISTING

281 of 518 26EP604 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -EXISTING

282 of 518 26EP605 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -EXISTING

283 of 518 26EP611 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -REVISED

284 of 518 26EP612 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -REVISED

285 of 518 26EP613 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -REVISED

286 of 518 26EP614 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -REVISED

287 of 518 26EP615 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -REVISED

288 of 518 40EP600 BLDG 40 -MEDIUM VOLTAGE ONE-LINE DIAGRAM -EXISTING

289 of 518 40EP601 BLDG 40 -ONE-LINE DIAGRAM -EXISTING

290 of 518 40EP611 BLDG 40 -ONE-LINE DIAGRAM -REVISED

291 of 518 55EP601 BLDG 55 -ONE-LINE DIAGRAM -EXISTING

292 of 518 55EP611 BLDG 55 -ONE-LINE DIAGRAM -REVISED

293 of 518 56EP601 BLDG 56 -ONE-LINE DIAGRAM -EXISTING

294 of 518 56EP611 BLDG 56 -ONE-LINE DIAGRAM -REVISED

295 of 518 01EP701 BLDG 01 -ELECTRICAL SCHEDULES

296 of 518 01EP702 BLDG 01 - ELECTRICAL SCHEDULES BLDG 01 - ELECTRICAL SCHEDULES

297 of 518 01EP703 BLDG 01 -ELECTRICAL SCHEDULES BLDG 01 -ELECTRICAL SCHEDULES

298 of 518 01EP704 BLDG 01 -ELECTRICAL SCHEDULES

299 of 518 01EP705 BLDG 01 -ELECTRICAL SCHEDULES

300 of 518 02EP701 BLDG 02 -ELECTRICAL SCHEDULES

301 of 518 04EP701 BLDG 04 -ELECTRICAL SCHEDULES

302 of 518 05EP701 BLDG 05 -ELECTRICAL SCHEDULES

303 of 518 06EP701 BLDG 06 -ELECTRICAL SCHEDULES

304 of 518 15EP701 BLDG 15 -ELECTRICAL SCHEDULES

305 of 518 15EP702 BLDG 15 -ELECTRICAL SCHEDULES

306 of 518 15EP703 BLDG 15 -ELECTRICAL SCHEDULES

307 of 518 26EP701 BLDG 26 -ELECTRICAL SCHEDULES

308 of 518 26EP702 BLDG 26 -ELECTRICAL SCHEDULES

309 of 518 40EP701 BLDG 40 -ELECTRICAL SCHEDULES

310 of 518 55EP701 BLDG 55 -ELECTRICAL SCHEDULES

311 of 518 56EP701 BLDG 56 -ELECTRICAL SCHEDULES

312 of 518 EP701 ELECTRICAL SCHEDULES

313 of 518 EP702 ELECTRICAL SCHEDULES

TELECOMMUNICATIONS

314 of 518 ETG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX

315 of 518 ETG002 TELECOMMUNICATIONS LEGENDS

316 of 518 01ET1000 BLDG 01 -SUB BASEMENT -TELECOMMUNICATIONS PLAN

317 of 518 01ET100 BLDG 01 -LEVEL 00 -TELECOMMUNICATIONS PLAN

318 of 518 01ET101 BLDG 01 -LEVEL 01 -TELECOMMUNICATIONS PLAN

319 of 518 01ET102 BLDG 01 -LEVEL 02 -TELECOMMUNICATIONS PLAN

320 of 518 01ET103 BLDG 01 -LEVEL 03 -TELECOMMUNICATIONS PLAN

321 of 518 01ET104 BLDG 01 -LEVEL 04 -TELECOMMUNICATIONS PLAN

322 of 518 01ET105 BLDG 01 -LEVEL 05 -TELECOMMUNICATIONS PLAN

323 of 518 01ET106 BLDG 01 -LEVEL 06 -TELECOMMUNICATIONS PLAN

324 of 518 01ET107 BLDG 01 -LEVEL 07 -TELECOMMUNICATIONS PLAN

325 of 518 01ET108 BLDG 01 -LEVEL 08 -TELECOMMUNICATIONS PLAN

326 of 518 01ET109 BLDG 01 -LEVEL 09 -TELECOMMUNICATIONS PLAN

327 of 518 01ET110 BLDG 01 -LEVEL 10 -TELECOMMUNICATIONS PLAN

328 of 518 01ET111 BLDG 01 -LEVEL 11 -TELECOMMUNICATIONS PLAN

329 of 518 01ET112 BLDG 01 -LEVEL 12 -TELECOMMUNICATIONS PLAN

330 of 518 01ET113 BLDG 01 -LEVEL 13 -TELECOMMUNICATIONS PLAN

331 of 518 02ET100 BLDG 02 -LEVEL 00 -TELECOMMUNICATIONS PLAN

332 of 518 02ET101 BLDG 02 -LEVEL 01 -TELECOMMUNICATIONS PLAN

333 of 518 02ET102 BLDG 02 -LEVEL 02 -TELECOMMUNICATIONS PLAN

334 of 518 04ET101 BLDG 04 -LEVEL 01 -TELECOMMUNICATIONS PLAN

335 of 518 05ET101 BLDG 05 -LEVEL 01 -TELECOMMUNICATIONS PLAN

336 of 518 05ET102 BLDG 05 -LEVEL 02 -TELECOMMUNICATIONS PLAN

337 of 518 06ET101 BLDG 06 -LEVEL 01 -TELECOMMUNICATIONS PLAN

338 of 518 06ET102 BLDG 06 -LEVEL 02 -TELECOMMUNICATIONS PLAN

339 of 518 15ET100 BLDG 15 -LEVEL 00 -TELECOMMUNICATIONS PLAN

340 of 518 15ET101 BLDG 15 -LEVEL 01 -TELECOMMUNICATIONS PLAN

341 of 518 15ET102 BLDG 15 -LEVEL 02 -TELECOMMUNICATIONS PLAN

342 of 518 15ET103 BLDG 15 -LEVEL 03 -TELECOMMUNICATIONS PLAN

343 of 518 15ET104 BLDG 15 -LEVEL 04 -TELECOMMUNICATIONS PLAN

344 of 518 15ET105 BLDG 15 -LEVEL 05 -TELECOMMUNICATIONS PLAN

345 of 518 15ET106 BLDG 15-LEVEL 06 -TELECOMMUNICATIONS PLAN

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128

589-21-700

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES G-003

DRAWING INDEX

MA/EM DD/ADSI

100% CONSTRUCTION

DOCUMENTS

06/19/2023

Revisions: Date:

258 of 518 01EP614 BLDG 01 -ONE-LINE DIAGRAM -PART 4 OF 9 -REVISED

259 of 518 01EP615 BLDG 01 -ONE-LINE DIAGRAM -PART 5 OF 9 -REVISED

260 of 518 01EP616 BLDG 01 -ONE-LINE DIAGRAM -PART 6 OF 9 -REVISED

261 of 518 01EP617 BLDG 01 -ONE-LINE DIAGRAM -PART 7 OF 9 -REVISED

262 of 518 01EP618 BLDG 01 -ONE-LINE DIAGRAM -PART 8 OF 9 -REVISED

263 of 518 01EP619 BLDG 01 -ONE-LINE DIAGRAM -PART 9 OF 9 -REVISED

264 of 518 02EP601 BLDG 02 -ONE-LINE DIAGRAM -EXISTING

265 of 518 02EP611 BLDG 02 -ONE-LINE DIAGRAM -REVISED

266 of 518 04EP601 BLDG 04 -ONE-LINE DIAGRAM -EXISTING

267 of 518 04EP611 BLDG 04 -ONE-LINE DIAGRAM -REVISED

268 of 518 05EP601 BLDG 05 -ONE-LINE DIAGRAM -EXISTING

269 of 518 05EP611 BLDG 05 -ONE-LINE DIAGRAM -REVISED

270 of 518 06EP601 BLDG 06 -ONE-LINE DIAGRAM -EXISTING

271 of 518 06EP611 BLDG 06 -ONE-LINE DIAGRAM -REVISED

272 of 518 15EP601 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -EXISTING

273 of 518 15EP602 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -EXISTING

274 of 518 15EP603 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -EXISTING

275 of 518 15EP611 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -REVISED

276 of 518 15EP612 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -REVISED

277 of 518 15EP613 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -REVISED

278 of 518 26EP601 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -EXISTING

279 of 518 26EP602 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -EXISTING

280 of 518 26EP603 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -EXISTING

281 of 518 26EP604 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -EXISTING

282 of 518 26EP605 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -EXISTING

283 of 518 26EP611 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -REVISED

284 of 518 26EP612 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -REVISED

285 of 518 26EP613 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -REVISED

286 of 518 26EP614 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -REVISED

287 of 518 26EP615 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -REVISED

288 of 518 40EP600 BLDG 40 -MEDIUM VOLTAGE ONE-LINE DIAGRAM -EXISTING

289 of 518 40EP601 BLDG 40 -ONE-LINE DIAGRAM -EXISTING

290 of 518 40EP611 BLDG 40 -ONE-LINE DIAGRAM -REVISED

291 of 518 55EP601 BLDG 55 -ONE-LINE DIAGRAM -EXISTING

292 of 518 55EP611 BLDG 55 -ONE-LINE DIAGRAM -REVISED

293 of 518 56EP601 BLDG 56 -ONE-LINE DIAGRAM -EXISTING

294 of 518 56EP611 BLDG 56 -ONE-LINE DIAGRAM -REVISED

295 of 518 01EP701 BLDG 01 -ELECTRICAL SCHEDULES

296 of 518 01EP702 BLDG 01 - ELECTRICAL SCHEDULES BLDG 01 - ELECTRICAL SCHEDULES

297 of 518 01EP703 BLDG 01 -ELECTRICAL SCHEDULES BLDG 01 -ELECTRICAL SCHEDULES

298 of 518 01EP704 BLDG 01 -ELECTRICAL SCHEDULES

299 of 518 01EP705 BLDG 01 -ELECTRICAL SCHEDULES

300 of 518 02EP701 BLDG 02 -ELECTRICAL SCHEDULES

301 of 518 04EP701 BLDG 04 -ELECTRICAL SCHEDULES

302 of 518 05EP701 BLDG 05 -ELECTRICAL SCHEDULES

303 of 518 06EP701 BLDG 06 -ELECTRICAL SCHEDULES

304 of 518 15EP701 BLDG 15 -ELECTRICAL SCHEDULES

305 of 518 15EP702 BLDG 15 -ELECTRICAL SCHEDULES

306 of 518 15EP703 BLDG 15 -ELECTRICAL SCHEDULES

307 of 518 26EP701 BLDG 26 -ELECTRICAL SCHEDULES

308 of 518 26EP702 BLDG 26 -ELECTRICAL SCHEDULES

309 of 518 40EP701 BLDG 40 -ELECTRICAL SCHEDULES

310 of 518 55EP701 BLDG 55 -ELECTRICAL SCHEDULES

311 of 518 56EP701 BLDG 56 -ELECTRICAL SCHEDULES

312 of 518 EP701 ELECTRICAL SCHEDULES

313 of 518 EP702 ELECTRICAL SCHEDULES

TELECOMMUNICATIONS

314 of 518 ETG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX

315 of 518 ETG002 TELECOMMUNICATIONS LEGENDS

316 of 518 01ET1000 BLDG 01 -SUB BASEMENT -TELECOMMUNICATIONS PLAN

317 of 518 01ET100 BLDG 01 -LEVEL 00 -TELECOMMUNICATIONS PLAN

318 of 518 01ET101 BLDG 01 -LEVEL 01 -TELECOMMUNICATIONS PLAN

319 of 518 01ET102 BLDG 01 -LEVEL 02 -TELECOMMUNICATIONS PLAN

320 of 518 01ET103 BLDG 01 -LEVEL 03 -TELECOMMUNICATIONS PLAN

321 of 518 01ET104 BLDG 01 -LEVEL 04 -TELECOMMUNICATIONS PLAN

322 of 518 01ET105 BLDG 01 -LEVEL 05 -TELECOMMUNICATIONS PLAN

323 of 518 01ET106 BLDG 01 -LEVEL 06 -TELECOMMUNICATIONS PLAN

324 of 518 01ET107 BLDG 01 -LEVEL 07 -TELECOMMUNICATIONS PLAN

325 of 518 01ET108 BLDG 01 -LEVEL 08 -TELECOMMUNICATIONS PLAN

326 of 518 01ET109 BLDG 01 -LEVEL 09 -TELECOMMUNICATIONS PLAN

327 of 518 01ET110 BLDG 01 -LEVEL 10 -TELECOMMUNICATIONS PLAN

328 of 518 01ET111 BLDG 01 -LEVEL 11 -TELECOMMUNICATIONS PLAN

329 of 518 01ET112 BLDG 01 -LEVEL 12 -TELECOMMUNICATIONS PLAN

330 of 518 01ET113 BLDG 01 -LEVEL 13 -TELECOMMUNICATIONS PLAN

331 of 518 02ET100 BLDG 02 -LEVEL 00 -TELECOMMUNICATIONS PLAN

332 of 518 02ET101 BLDG 02 -LEVEL 01 -TELECOMMUNICATIONS PLAN

333 of 518 02ET102 BLDG 02 -LEVEL 02 -TELECOMMUNICATIONS PLAN

334 of 518 04ET101 BLDG 04 -LEVEL 01 -TELECOMMUNICATIONS PLAN

335 of 518 05ET101 BLDG 05 -LEVEL 01 -TELECOMMUNICATIONS PLAN

336 of 518 05ET102 BLDG 05 -LEVEL 02 -TELECOMMUNICATIONS PLAN

337 of 518 06ET101 BLDG 06 -LEVEL 01 -TELECOMMUNICATIONS PLAN

338 of 518 06ET102 BLDG 06 -LEVEL 02 -TELECOMMUNICATIONS PLAN

339 of 518 15ET100 BLDG 15 -LEVEL 00 -TELECOMMUNICATIONS PLAN

340 of 518 15ET101 BLDG 15 -LEVEL 01 -TELECOMMUNICATIONS PLAN

341 of 518 15ET102 BLDG 15 -LEVEL 02 -TELECOMMUNICATIONS PLAN

342 of 518 15ET103 BLDG 15 -LEVEL 03 -TELECOMMUNICATIONS PLAN

343 of 518 15ET104 BLDG 15 -LEVEL 04 -TELECOMMUNICATIONS PLAN

344 of 518 15ET105 BLDG 15 -LEVEL 05 -TELECOMMUNICATIONS PLAN

345 of 518 15ET106 BLDG 15-LEVEL 06 -TELECOMMUNICATIONS PLAN

346 of 518 15ET107 BLDG 15 -LEVEL 07 -TELECOMMUNICATIONS PLAN

347 of 518 15ET108 BLDG 15 -LEVEL 08 -TELECOMMUNICATIONS PLAN

348 of 518 15ET109 BLDG 15 -LEVEL 09 -TELECOMMUNICATIONS PLAN

349 of 518 26ET100 BLDG 26 -LEVEL 00 -TELECOMMUNICATIONS PLAN

350 of 518 26ET101 BLDG 26 -LEVEL 01 -TELECOMMUNICATIONS PLAN

351 of 518 26ET102 BLDG 26 -LEVEL 02 -TELECOMMUNICATIONS PLAN

352 of 518 26ET103 BLDG 26 -LEVEL 03 -TELECOMMUNICATIONS PLAN

353 of 518 26ET104 BLDG 26 -LEVEL 04 -TELECOMMUNICATIONS PLAN

354 of 518 26ET105 BLDG 26 -LEVEL 05 -TELECOMMUNICATIONS PLAN

355 of 518 26ET106 BLDG 26 -LEVEL 06 -TELECOMMUNICATIONS PLAN

356 of 518 40ET101 BLDG 40 -LEVEL 01 -TELECOMMUNICATIONS PLAN

357 of 518 55ET101 BLDG 55 -LEVEL 01 -TELECOMMUNICATIONS PLAN

358 of 518 55ET102 BLDG 55 -LEVEL 02 -TELECOMMUNICATIONS PLAN

359 of 518 56ET100 BLDG 56 -LEVEL 00 -TELECOMMUNICATIONS PLAN

360 of 518 56ET101 BLDG 56 -LEVEL 01 -TELECOMMUNICATIONS PLAN

361 of 518 01ET400 BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

362 of 518 01ET401 BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

363 of 518 01ET402 BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

364 of 518 01ET403 BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

365 of 518 01ET404 BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS

366 of 518 01ET405 BLDG 01 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS

367 of 518 01ET406 BLDG 01 -LEVEL 06 -ENLARGED TELECOMMUNICATIONS PLANS

368 of 518 01ET407 BLDG 01 -LEVEL 07 -ENLARGED TELECOMMUNICATIONS PLANS

369 of 518 01ET408 BLDG 01 -LEVEL 08 -ENLARGED TELECOMMUNICATIONS PLANS

370 of 518 01ET409 BLDG 01 -LEVEL 09 -ENLARGED TELECOMMUNICATIONS PLANS

371 of 518 01ET410 BLDG 01 -LEVEL 10 -ENLARGED TELECOMMUNICATIONS PLANS

372 of 518 01ET411 BLDG 01 -LEVEL 11 -ENLARGED TELECOMMUNICATIONS PLANS

373 of 518 02ET401a BLDG 02 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

374 of 518 02ET401b BLDG 02 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

375 of 518 02ET402 BLDG 02 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

376 of 518 04ET401 BLDG 04 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

377 of 518 05ET401 BLDG 05 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

378 of 518 06ET401 BLDG 06 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

379 of 518 06ET402a BLDG 06 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

380 of 518 06ET402b BLDG 06 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

381 of 518 15ET401a BLDG 15 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

382 of 518 15ET401b BLDG 15 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

383 of 518 15ET402a BLDG 15 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

384 of 518 15ET402b BLDG 15 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

385 of 518 15ET403a BLDG 15 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

386 of 518 15ET403b BLDG 15 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

387 of 518 15ET404 BLDG 15 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS

388 of 518 15ET405a BLDG 15 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS

389 of 518 15ET405b BLDG 15 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS

390 of 518 15ET406 BLDG 15 -LEVEL 06 -ENLARGED TELECOMMUNICATIONS PLANS

391 of 518 15ET407a BLDG 15 -LEVEL 07 -ENLARGED TELECOMMUNICATIONS PLANS

392 of 518 15ET407b BLDG 15 -LEVEL 07 -ENLARGED TELECOMMUNICATIONS PLANS

393 of 518 15ET408 BLDG 15 -LEVEL 08 -ENLARGED TELECOMMUNICATIONS PLANS

394 of 518 26ET400 BLDG 26 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

395 of 518 26ET401a BLDG 26 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLAN

396 of 518 26ET401b BLDG 26 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

397 of 518 26ET401c BLDG 26 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLAN

398 of 518 26ET402a BLDG 26 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

399 of 518 26ET402b BLDG 26 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

400 of 518 26ET402c BLDG 26 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

401 of 518 26ET403 BLDG 26 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

402 of 518 26ET405 BLDG 26 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS

403 of 518 40ET401 BLDG 40 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

404 of 518 55ET401 BLDG 55 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

405 of 518 55ET402 BLDG 55 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

406 of 518 56ET400 BLDG 56 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

407 of 518 56ET401 BLDG 56 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

408 of 518 ET501 TELECOMMUNICATIONS DETAILS

409 of 518 ET502 TELECOMMUNICATIONS DETAILS

410 of 518 ET503 TELECOMMUNICATIONS DETAILS

411 of 518 ET504 TELECOMMUNICATIONS DETAILS

412 of 518 ET701 TELECOMMUNICATIONS SCHEDULES

TECHNOLOGY

413 of 518 0-TN000 TECHNOLOGY COVERSHEET

414 of 518 0-TN003 TECHNOLOGY SITE PLAN & DETAILS

415 of 518 0-TN601 TECHNOLOGY DIAGRAMS

416 of 518 1-TN10S-NE BLDG 1 NE -SUB-BASEMENT 01 PLAN -TECHNOLOGY

417 of 518 1-TN10S-SE BLDG 1 SE -SUB-BASEMENT 01 PLAN -TECHNOLOGY

418 of 518 1-TN100-NE BLDG 1 NE -BASEMENT PLAN -TECHNOLOGY

419 of 518 1-TN100-NW BLDG 1 NW -BASEMENT PLAN -TECHNOLOGY

420 of 518 1-TN100-SE BLDG 1 SE -BASEMENT PLAN -TECHNOLOGY

421 of 518 1-TN101-NE BLDG 1 NE -LEVEL 01 PLAN -TECHNOLOGY

422 of 518 1-TN101-SE BLDG 1 SE -LEVEL 01 PLAN -TECHNOLOGY

423 of 518 1-TN102-NE BLDG 1 NE -LEVEL 02 PLAN -TECHNOLOGY

424 of 518 1-TN103-NE BLDG 1 NE -LEVEL 03 PLAN -TECHNOLOGY

425 of 518 1-TN104-NE BLDG 1 NE -LEVEL 04 PLAN -TECHNOLOGY

426 of 518 1-TN105-NE BLDG 1 NE -LEVEL 05 PLAN -TECHNOLOGY

427 of 518 1-TN106-NE BLDG 1 NE -LEVEL 06 PLAN -TECHNOLOGY

428 of 518 1-TN107-NE BLDG 1 NE -LEVEL 07 PLAN -TECHNOLOGY

429 of 518 1-TN108-NE BLDG 1 NE -LEVEL 08 PLAN -TECHNOLOGY

430 of 518 1-TN109-NE BLDG 1 NE -LEVEL 09 PLAN -TECHNOLOGY

431 of 518 1-TN110-NE BLDG 1 NE -LEVEL 10 PLAN -TECHNOLOGY

432 of 518 1-TN111-NE BLDG 1 NE -LEVEL 11 PLAN -TECHNOLOGY

433 of 518 1-TN401 TECHNOLOGY ENLARGED PLANS

434 of 518 1-TN402 TECHNOLOGY ENLARGED PLANS

435 of 518 1-TN403 TECHNOLOGY ENLARGED PLANS

436 of 518 1-TN601 TECHNOLOGY DIAGRAMS

437 of 518 2-TN200 BLDG 02 -BASEMENT PLAN -TECHNOLOGY

438 of 518 2-TN201 BLDG 02 -LEVEL 01 PLAN -TECHNOLOGY

439 of 518 2-TN202 BLDG 02 -LEVEL 02 PLAN -TECHNOLOGY

440 of 518 2-TN401 BLDG 02 -TECHNOLOGY ENLARGED PLANS & DIAGRAMS

441 of 518 4-TN100 BLDG 4 -BASEMENT PLAN -TECHNOLOGY

442 of 518 4-TN101 BLDG 4 -LEVEL 01 PLAN -TECHNOLOGY

443 of 518 4-TN401 TECHNOLOGY ENLARGED PLANS & DIAGRAMS

444 of 518 5-TN101 BLDG 5 -LEVEL 01 PLAN -TECHNOLOGY

445 of 518 6-TN101 BLDG 06 -LEVEL 01 PLAN -TECHNOLOGY

446 of 518 6-TN102 BLDG 06 -LEVEL 02 PLAN -TECHNOLOGY

447 of 518 6-TN401 BLDG 06 -TECHNOLOGY ENLARGED PLANS & DIAGRAMS

448 of 518 15-TN100 BLDG 15 -BASEMENT PLAN -TECHNOLOGY

449 of 518 15-TN101 BLDG 15 -LEVEL 01 PLAN -TECHNOLOGY

450 of 518 15-TN102 BLDG 15 -LEVEL 02 PLAN -TECHNOLOGY

451 of 518 15-TN103 BLDG 15 -LEVEL 03 PLAN -TECHNOLOGY

452 of 518 15-TN104 BLDG 15 -LEVEL 04 PLAN -TECHNOLOGY

453 of 518 15-TN105 BLDG 15 -LEVEL 05 PLAN -TECHNOLOGY

454 of 518 15-TN106 BLDG 15 -LEVEL 06 PLAN -TECHNOLOGY

455 of 518 15-TN107 BLDG 15 -LEVEL 07 PLAN -TECHNOLOGY

456 of 518 15-TN108 BLDG 15 -LEVEL 08 PLAN -TECHNOLOGY

457 of 518 15-TN401 TECHNOLOGY ENLARGED PLANS

458 of 518 15-TN402 TECHNOLOGY ENLARGED PLANS

459 of 518 26-TN100 BLDG 26 -BASEMENT PLAN -TECHNOLOGY

460 of 518 26-TN101 BLDG 26 -LEVEL 01 PLAN -TECHNOLOGY

461 of 518 26-TN102 BLDG 26 -LEVEL 02 PLAN -TECHNOLOGY

462 of 518 26-TN103 BLDG 26 -LEVEL 03 PLAN -TECHNOLOGY

463 of 518 26-TN104 BLDG 26 -LEVEL 04 PLAN -TECHNOLOGY

464 of 518 26-TN105 BLDG 26 -LEVEL 05 PLAN -TECHNOLOGY

465 of 518 26-TN401 TECHNOLOGY ENLARGED PLANS

466 of 518 40-TD101 BLDG 40 -LEVEL 01 DEMOLITION PLAN -TECHNOLOGY

467 of 518 40-TN101 BLDG 40 -LEVEL 01 PLAN -TECHNOLOGY & DIAGRAMS

468 of 518 55-TN101 BLDG 55 -LEVEL 01 PLAN -TECHNOLOGY

469 of 518 55-TN102 BLDG 55 -LEVEL 02 PLAN -TECHNOLOGY

470 of 518 55-TN401 TECHNOLOGY ENLARGED PLANS & DIAGRAMS

471 of 518 56-TN100 BLDG 56 -BASEMENT PLAN -TECHNOLOGY

472 of 518 56-TN101 BLDG 56 -LEVEL 01 PLAN -TECHNOLOGY

473 of 518 56-TN401 TECHNOLOGY ENLARGED PLANS & DIAGRAMS

ENVIRONMENTAL

474 of 518 H0000 ENVIRONMENTAL GENERAL NOTES

475 of 518 H1000 BUILDING 1 - BASEMENT -NVIRONMENTAL HAZARDS

476 of 518 H1001 BUILDING 1 - FLOOR 1 -ENVIRONMENTAL HAZARDS

477 of 518 H1002 BUILDING 1 - FLOOR 2 -ENVIRONMENTAL HAZARDS

478 of 518 H1003 BUILDING 1 - FLOOR 3 -ENVIRONMENTAL HAZARDS

479 of 518 H1004 BUILDING 1 - FLOOR 4 -ENVIRONMENTAL HAZARDS

480 of 518 H1005 BUILDING 1 - FLOOR 5 -ENVIRONMENTAL HAZARDS

481 of 518 H1006 BUILDING 1 - FLOOR 6 -ENVIRONMENTAL HAZARDS

482 of 518 H1007 BUILDING 1 - FLOOR 7 -ENVIRONMENTAL HAZARDS

483 of 518 H1008 BUILDING 1 - FLOOR 8 -ENVIRONMENTAL HAZARDS

484 of 518 H1009 BUILDING 1 - FLOOR 9 -ENVIRONMENTAL HAZARDS

485 of 518 H1010 BUILDING 1 - FLOOR 10 -ENVIRONMENTAL HAZARDS

486 of 518 H1011 BUILDING 1 - FLOOR 11 -ENVIRONMENTAL HAZARDS

487 of 518 H1012 BUILDING 1 - TR ROOMS BASEMENT & FLOOR 1 - ENVIRONMENTAL HAZARDS

488 of 518 H1013 BUILDING 1 - TR ROOMS FLOOR 2 & FLOOR 3 - ENVIRONMENTAL HAZARDS

489 of 518 H1014 BUILDING 1 - TR ROOMS FLOOR 4 & FLOOR 5 - ENVIRONMENTAL HAZARDS

490 of 518 H1015 BUILDING 1 - TR ROOMS FLOOR 6 & FLOOR 7 - ENVIRONMENTAL HAZARDS

491 of 518 H1016 BUILDING 1 - TR ROOMS FLOOR 8 & FLOOR 9 - ENVIRONMENTAL HAZARDS

492 of 518 H1017 BUILDING 1 - TR ROOMS FLOOR 10 & FLOOR 11 - ENVIRONMENTAL HAZARDS

493 of 518 H2001 BUILDING 2 - ROOF - ENVIRONMENTAL HAZARDS

494 of 518 H4001 BUILDING 4 - BASEMENT-ENVIRONMENTAL HAZARDS

495 of 518 H4002 BUILDING 4 - ROOM 4-106-ENVIRONMENTAL HAZARDS

496 of 518 H5001 BUILDING 5 - FLOOR 1-ENVIRONMENTAL HAZARDS

497 of 518 H6001 BUILDING 6 - FLOOR 1 -ENVIRONMENTAL HAZARDS

498 of 518 H6002 BUILDING 6 - FLOOR 2 -ENVIRONMENTAL HAZARDS

499 of 518 H1500 BUILDING 15 - BASEMENT -ENVIRONMENTAL HAZARDS

500 of 518 H1501 BUILDING 15 - FLOOR 1 -ENVIRONMENTAL HAZARDS

501 of 518 H1502 BUILDING 15 - FLOOR 2 -ENVIRONMENTAL HAZARDS

502 of 518 H1503 BUILDING 15 - FLOOR 3 -ENVIRONMENTAL HAZARDS

503 of 518 H1504 BUILDING 15 - FLOOR 4 -ENVIRONMENTAL HAZARDS

504 of 518 H1505 BUILDING 15 - FLOOR 5 -ENVIRONMENTAL HAZARDS

505 of 518 H1506 BUILDING 15 - FLOOR 6 -ENVIRONMENTAL HAZARDS

506 of 518 H1507 BUILDING 15 - FLOOR 7 -ENVIRONMENTAL HAZARDS

507 of 518 H1508 BUILDING 15 - FLOOR 8 -ENVIRONMENTAL HAZARDS

508 of 518 H1509 BUILDING 15 - FLOOR 9 -ENVIRONMENTAL HAZARDS

509 of 518 H2600 BUILDING 26 - BASEMENT -ENVIRONMENTAL HAZARDS

510 of 518 H2601 BUILDING 26 - FLOOR 1 -ENVIRONMENTAL HAZARDS

511 of 518 H2602 BUILDING 26 - FLOOR 2 -ENVIRONMENTAL HAZARDS

512 of 518 H2603 BUILDING 26 - FLOOR 3 -ENVIRONMENTAL HAZARDS

513 of 518 H2604 BUILDING 26 - ROOF -ENVIRONMENTAL HAZARDS

514 of 518 H2605 BUILDING 26 - ROOM V1-684 -ENVIRONMENTAL HAZARDS

515 of 518 H2606 BUILDING 26 - ROOM V2-751A -ENVIRONMENTAL HAZARDS

516 of 518 H4000 BUILDING 40 - FLOOR 1 -ENVIRONMENTAL HAZARDS

517 of 518 H5500 BUILDING 55 - ROOF -ENVIRONMENTAL HAZARDS

518 of 518 H5600 BUILDING 56 - ROOF -ENVIRONMENTAL HAZARDS

345 of 518 15ET106 BLDG 15 -LEVEL 06 -TELECOMMUNICATIONS PLAN 433 of 518 1-TN401 TECHNOLOGY ENLARGED PLANS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128

589-21-700

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

H0000

ENVIRONMENTAL GENERAL NOTES

JR CD

100% CONSTRUCTION

DOCUMENTS

06/19/2023

Date:

ABATEMENT NOTES

HAZARDOUS MATERIAL ABATEMENT SCOPE OF WORK IS LIMITED TO THAT WHICH IS SPECIFIED IN

CONSTRUCTION DOCUMENTS TO ALLOW FOR WORK BY OTHERS IN A SAFE MANNER. ADDITIONAL HAZARDOUS

MATERIALS ARE KNOWN TO BE PRESENT WITHIN TARGET BUILDINGS/AREAS BUT ARE NOT ANTICIPATED TO

IMPACT PROJECT SCOPE OF WORK. CONTRACTOR CONCERNS REGARDING ENCOUNTER OF SUSPECTED

HAZARDOUS MATERIALS NOT OTHERWISE SCHEDULED FOR ABATEMENT SHOULD BE BROUGHT TO THE

ATTENTION OF VA COR IMMEDIATELY.

ABATEMENT WORK WILL REQUIRE SEVERAL MOBILIZATIONS TO FACILITATE PROJECT SCHEDULE.

CONTRACTOR IS TO BE LICENSED TO ENGAGE IN ASBESTOS AND LEAD RELATED PROJECT WORK AND USE

LICENSED/TRAINED PERSONNEL.

WITHIN AN NPE, HVAC AIR FLOW SHALL BE SHUTDOWN AND DUCT OPENINGS COVERED WITH CRITICAL

BARRIERS THROUGHOUT ABATEMENT. SCHEDULE SHUTDOWNS WITH THE VACOR TO ACCOMMODATE FACILITY

AND CONSTRUCTION REQUIREMENTS.

ALL AUTHORIZED PERSONNEL WITHIN AN NPE SHALL DON, AT MINIMUM, HALF FACE AIR PURIFYING RESPIRATORS

WITH P100 FILTERS, DISPOSABLE DUST SUITS (WITH BOOT AND HEAD COVERS) AND GLOVES. RESPIRATORY

PROTECTION MAY REQUIRE USE OF POWERED AIR PURIFYING RESPIRATORS.

REGULATED AREA NEGATIVE PRESSURE ENCLOSURES SHALL BE PREPARED IN ACCORDANCE WITH THE

FOLLOWING:A) ALL FLOORS, CEILINGS AND WALLS SHALL BE ISOLATED USING APPROPRIATE LAYERS OF 6-MIL &

4-MIL POLY SHEETING; B) OSHA ASBESTOS SIGNAGE AT ENTRANCE TO REGULATED AREAS; C)SINGLE-POINT OF

ENTRY WITH 3-STAGE WET DECONTAMINATION STATION TO ALLOW WORKERS TO REMOVE PPE, WASH AND

VACUUM THEMSELVES OFF PRIOR TO EXITING THE REGULATED WORK AREA; D) MAINTAINED UNDER NEGATIVE

PRESSURE (-0.02 IN WG OR BETTER) USING HEPA FILTERED AIR MACHINES WITH EXHAUST ROUTED TO

OUTDOORS; E) MINIMUM OF 4 AIR CHANGES PER HOUR; F) CLEAN/CHANGE ROOM SUFFICIENT FOR WORKERS TO

CHANGE INTO STREET CLOTHES (OPAQUE POLY REQUIRED AS NEEDED FOR PRIVACY); G) RENEWABLE

ADHESIVE MATS IMMEDIATELY OUTSIDE OF REGULATED WORK AREA TO ENSURE FOOT TRAFFIC DOES NOT

SPREAD DUST/DEBRIS TO OTHER AREAS OF FACILITY.

PERFORM ABATEMENT USING THE FOLLOWING CONTROLS: A) HEPA FILTERED VACUUM FOR CONTINUOUS AND

FINAL CLEANUP; B) ONLY MANUAL REMOVAL MEANS/TOOLS ARE ALLOWED TO DISTURB ACM (MECHANICAL

TOOLS PROHIBITED FOR ACM REMOVAL).

CLEANING OF REGULATED WORK AREAS IS TO INCLUDE HEPA VACUUMING & WET WIPING METHODS. REGULATED

AREAS ARE TO PASS A SUCCESSFUL VISUAL INSPECTION BY THE VPIH PRIOR TO COLLECTION OF CLEARANCE

SAMPLES.

VPIH WILL PERFORM PERIMETER AIR MONITORING, VISUAL INSPECTIONS AND FINAL AIR CLEARANCE SAMPLING.

CONTRACTOR TO PERFORM OSHA EMPLOYEE EXPOSURE MONITORING.

WASTE PRODUCED DURING REMEDIATION SHALL BE COLLECTED, CONTAINERIZED, LABELED, CHARACTERIZED

AND DISPOSED IN ACCORDANCE WITH ASBESTOS AND LEAD SPECIFICATIONS 02.82.11 AND 02.83.33.13.

WASTE CONTAINERS, TOOLS, EQUIPMENT, ETC. SHALL BE WET WIPED PRIOR TO LEAVING REGULATED WORK

AREA.

WHERE THE COMBINED AREA OF THE NPE INCLUDING , DECONTAMINATION, LOADOUT, AND WORK CHAMBERS

DOES NOT FIT WITHIN A ROOM, THE DECON/LOADOUT CONFIGURATION MAY EXTEND INTO NO MORE THAN 1/2

WIDTH OF THE HALLWAY AS REQUIRED TO ALLOW PASSAGE IN CORRIDOR BY STANDARD HOSPITAL BED.

NIGHT WORK IS TO BE PERFORMED DURING OFF HOURS FROM 5:00 PM - 7:00 AM MONDAY THROUGH FRIDAY AND

WEEKEND WORK FRIDAY 6 PM THROUGH SUNDAY. WORK IS PROHIBITED ON FEDERAL HOLIDAYS.

ANY NECESSARY WALL PENETRATION OF LEAD CONTAINING GLAZED BLOCK OR CERAMIC TILE TO BE

PERFORMED BY ABATEMENT CONTRACTOR USING MANUAL MEANS W/IN NPE. USE OF POWER TOOLS IS

ALLOWED ONLY IF SAID TOOLS ARE EQUIPPED WITH AN ATTACHED HEPA LEV TO ENSURE LEAD DUST IS NOT

ESCAPING THE WORK AREA.COORDINATE & VERIFY LOCATIONS AND DIMENSIONS WITH AFFECTED TRADES.

CONSIDER SURFACE MOUNTING WITH APPLICABLE ADHESIVES WHERE SYSTEM DOESN'T NEED DEMOLISHED IN

ITS ENTIRETY.

A/E:

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

468 of 512Page 474 of 518Page 474 of 518

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128

589-21-700

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

H1000

BUILDING 1 - BASEMENT -

ENVIRONMENTAL HAZARDS

JR CD

100% CONSTRUCTION

DOCUMENTS

06/19/2023

Revisions: Date:

BUILDING 1

BUILDING 26

ELEVATOR ELEVATOR

ELEVATOR

ELEVATOR

STAIRWELL

ELEVATOR

STAIRWELL

STAIRWELL

STAIRWELL

CAFETERIA

CORRIDOR

C O

R R

I D

O R

CORRIDOR

OFFICE

OFFICE

OFFICE

MECHANICAL ROOM

OFFICE

ELECTRICAL CLOSET

TELEPHONE ROOM

OFFICE

CANTEEN STORAGE

STORAGE

WOMEN'S LOCKER

ROOM

MEN'S LOCKER ROOM

STORAGE

OFFICE

OFFICE

OFFICE

STORAGE

BARREL STORAGE

EQUIPMENT

CHARGING

STORAGE

S T

O R

A G

E

R E

F R

I G

E R

A T

O R

S T

O R

A G

E

SUPPLY UNIT

STORAGE

OFFICE

MAIL ROOM

STORAGE

MECHANICAL ROOM

REPRODUCTION

TOTAL SUPPLY

SUPPORT

MECHANICAL ROOM

CLOSET

CLOSET

SURGICAL PACK

ROOM

ELECTRICAL

OFFICE

OFFICE, CHIEF

RESTROOM

OFFICE

OFFICE

ORTHOTIC LAB

OFFICE

ORTHOTIC LAB

OFFICE

OFFICE

OFFICE

OFFICE LOUNGE

OFFICE

OFFICE

MECH

MECH

OFFICE

SERVER ROOM

STORAGE

HAC

FIRE EXT.

ELEC

REFRIGERATOR

MECHANICAL ROOM

AUTOPSY ROOM

STORAGE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

MECHANICAL RM

STORAGE

STORAGE

IT / DATA

CLOSET

CLOSET

IT / DATA

DOCK AREA

OFFICE

OFFICE

MAIN KITCHEN

EMS

FIRE EXT.

ELECTRICAL CLOSET

WAITING ROOM

WAREHOUSE

LINEN ROOM

STORAGE

ELEC

STORAGE

OFFICE

STORAGE

MECHANICAL ROOM

DATA CLOSET

MAIL ROOM

H A

C

STORAGE

HAC

NUTRITION OFFICE

STORAGE

MECHANICAL ROOM

ELEC

MORGUE

SOILED LINEN

OFFICE

CLOSET

STORAGE

OFFICE

OFFICE

OFFICE

OPTICAL

OFFICE

LEATHER ROOM

ORTHOTIC LAB MAIN

SHOP

STORAGE

ELEC. PANEL

MACHINE ROOM

FIRE EXT.

CLOSET

OFFICE

TLT, FEMALE

TLT, FEMALE

STAIRWELL

STAIRWELL

STAIRWELL

HAC

OFFICE

E L E

C

CORRIDOR

CORRIDOR

STAIRWELL

MAIN KITCHEN?

MAIN KITCHEN?

EMS

CAFETERIA

TLT

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

ELEV LOBBY

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

OFFICE

CORRIDOR

S6

S5

E5

E1 E2 E3 E4

E16

E17

S1

S16

S8

S4

VB-600

MB-598

MB-597

MB-245

MB-244

MB-240

M B

MB-236

MB-257

MB-258

MB-258A

MB-231

MB-230

MB-209

MB-207

MB-203

MB-201

MB-202

MB-210

MB-204

MB-212

MB-214

MB-216

MB-218

MB-220

MB-223

MB-222

MB-224

MB-447

MB-448

MB-449

MB-450

MB-450A

MB-446

MB-445

MB-445A

MB-444

MB-443

MB-442

MB-441

MB-438

MB-435

M B

M B

M B

MB-432

MB-434

MB-427

MB-429

MB-431

MB-420

MB-437

MB-436

MB-418

MB-415

MB-416

MB-405

MB-405A

MB-439

MB-440

MB-407

MB-406

MB-404

MB-303

MB-251

MB-250

MB-301

MB-300

MB-304

MB-255

MB-454

MB-451

MB-457

MB-456

MB-425

MB-423

MB-417

MB-495

MB-496

MB-494

MB-492

MB-401

MB-503

MB-507

MB-509

MB-505

MB-501

MB-561

MB-563

MB-565

MB-567

MB-570

MB-574

MB-575

M B

MB-576

MB-596

MB-590

MB-594

MB-591

MB-592

MB-593

MB-584

MB-588

MB-589

MB-587

MB-585

MB-518

MB-517

MB-516

MB-515

MB-514 MB-513 MB-512

MB-511

MB-510

MB-480

MB-480A

MB-480B

MB-479

MB-479A

MB-478

MB-477

MB-475

MB-476

MB-484

MB-482

MB-486

MB-490

MB-473

MB-470

MB-474 MB-485

MB-487

MB-495A

MB-470A

MB-466 MB-460

MB-465

MB-463

MB-473A

MB-452

CB-20

CB-21

CB-23

CB-22

MB-259

EB-M

CB-30

CB-24

CB-40

CB-40

CB-41

CB-42

CB-43

CB-50

CB-51

CB-52

CB-53

CB-54

MB-232

S21

MB-402

MB-402

MECHANICAL

MB-243

C O

R R

I D

O R

C B

TRANSFER DUCT

MB-243A

MB-572

MB-479

MB-305

MB-???

R A

M P

U

P

DN

UP

DN

UP

UP

UP

UP

DN

UP

UP

UP

UP

UP

UP

UP

S I N

K

UP

UP

DN

UP

BUILDING 1 - BASEMENT

NOT TO SCALE

KEY NOTES

AREA OF KNOWN SIGNIFICANTLY DAMAGED ACM PIPE INSULATION AND/OR

FITTINGS ABOVE CEILING. ON NIGHTS AND WEEKENDS AND WITHIN A

NEGATIVE PRESSURE MINI-ENCLOSURE, REMOVE ASSUMED ASBESTOS

CONTAMINATED CEILING TILES, PRE-CLEAN, AND REMOVE DAMAGED SECTION

OF PIPE INSULATION AND ONE FOOT OF ADJACENT INSULATION EITHER SIDE

OF DEFECT AND DOUBLE WRAP ENDS. APPLY LOCKDOWN ENCAPSULANT

AFTER SUCCESSFUL VISUAL CLEARANCE, 5 MINI-ENCLOSURES, 500 SF

CONTAMINATED CEILING TILES, 10 DEFECTS AND 30 LF OF GLOVEBAG TOTAL.

PRE-CLEANING AND FINAL CLEANING INCLUDES DISPOSAL OF CEILING TILES

AND HEPA VACUUM OF PIPING, DUCTWORK, AND/OR ANY OTHER FIXED

OBJECTS IN A TEN (10) FOOT RADIUS FROM THE DAMAGED AREA. ASBESTOS

PIPE INSULATION INCLUDES, TAR AND CORK, AIR CELL AND CAL-MAG

SYSTEMS AND MUDDED FITTINGS.

AREA OF KNOWN DAMAGED ACM PIPE INSULATION AND/OR FITTINGS ABOVE

CEILING. ON NIGHTS AND WEEKENDS AND WITHIN A NEGATIVE PRESSURE

MINI-ENCLOSURE, REMOVE NON-ASBESTOS CEILING TILES, PRE-CLEAN, AND

REMOVE DAMAGED SECTION OF PIPE INSULATION AND ONE FOOT OF

ADJACENT INSULATION EITHER SIDE OF DEFECT AND/OR DOUBLE WRAP

ENDS. APPLY LOCKDOWN ENCAPSULANT AFTER SUCCESSFUL VISUAL

CLEARANCE, 1 MINI-ENCLOSURE, 100 SF CEILING TILES, 3 DEFECTS AND 9 LF

OF GLOVEBAG TOTAL. PRE-CLEANING AND FINAL CLEANING INCLUDES HEPA

VACUUM OF CEILING TILES, PIPING, DUCTWORK, AND/OR ANY OTHER FIXED

OBJECTS IN A TEN (10) FOOT RADIUS FROM THE DAMAGED LOCATION. STORE

CEILING TILES FOR REPLACEMENT.

ON NIGHTS AND WEEKENDS, PROVIDE PENETRATION FOR NEW CABLE TRAY

INSTALLATION OR OTHER THROUGH WALL PENETRATIONS. PROVIDE

PENETRATION THROUGH WALL WITH ASBESTOS BLACK TAR WALL VOID USING

MANUAL MEANS AND CHEMICAL METHODS WITHIN A NEGATIVE PRESSURE

ENCLOSURE, 3 SF OF WALL MATRIX AND 3 SF ASBESTOS BLACK TAR AND 1

NEGATIVE PRESSURE MINI-ENCLOSURE AT EACH OF 8 LOCATIONS.

COORDINATE PENETRATION LOCATION AND EXTENTS. REMOVE INCIDENTAL

N…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .