This document provides details for a federal construction contract opportunity for the Department of Veterans Affairs. The solicitation seeks bids for infrastructure upgrades at the VA medical center in Kansas City, Missouri, as outlined in the attached architectural drawings file. The opportunity was posted as solicitation number 36C77623B0066 through the VA Technology Acquisition Center in Austin, with bids due by the date specified. The construction work involves upgrades and renovations at the Kansas City facility as depicted in the large file of technical drawings.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
x x x x x x x
X
X
X
X x x x x x x x
X
X
X
X
M
35th STREET
LINWOOD BOULEVARD
IN
C
IN
E
R A
T O
R
B U
IL
D
IN
G
IN
C
IN
E
R A
T O
R
C O
VID
T
EN
T
FISHER
HOUSE
ARCHITECTURAL
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
DESIGN TEAM
FIRE PROTECTION
SPEES DESIGN BUILD
STRUCTURAL
IMEG
ELECTRICAL
SPEES DESIGN BUILD
PLUMBING
SPEES DESIGN BUILD
MECHANICAL
SPEES DESIGN BUILD
2882 106TH ST
DES MOINES, IA, 50322
PHONE: (515) 334-9906
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
CIVIL
IMEG
2882 106TH ST
DES MOINES, IA, 50322
PHONE: (515) 334-9906
PROJECT INFORMATION
STATE:
COUNTY:
JURISTICTION:
OWNER:
CODE ANALYSIS
PROJECT DESCRIPTION
APPLICABLE BUILDINGS:
1, 2, 4, 5, 6, 15, 26, 40, 55, ICRA CLASS REQUIREMENTS
REQUIREMENTS DEPENDENT ON
EACH INDIVIDUAL ROOM LOCATION.
THE PROPOSED DESIGN SHALL IMPROVE,
RECONFIGURE, EXPAND AND RENOVATE
EXISTING SPACES FOR NEW
TELECOMMUNICATION ROOMS.
MISSOURI
JACKSON
KANSAS CITY
GOV, VETERANS AFFAIRS
GENERAL NOTES
1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &
SPECIFICATIONS.
2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.
BRING TO THE AWARENESS OF AND VERIFY WITH VA COR PRIOR TO PROCEEDING.
3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE
TO VISIT THE SITE.
4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT
IMMEDIATELY TO THE ATTENTION OF THE COR.
5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.
6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK
THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.
7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE
WITH THE CONTRACT DOCUMENTS.
8. THE CONTRACTOR SHALL HAVE NO MORE THAN TWO TEAMS WORKING ON TWO TRS AT ANY
GIVEN TIME UNLESS WRITTEN APPROVAL IS PROVIDED BY THE COR.
9. THE CONTRACTOR SHALL ONLY WORK IN A SINGLE BUILDING AT ANY GIVEN TIME UNLESS WRITTEN
APPROVAL IS PROVIDED BY THE COR.
BLDG 55
BLDG 26
BLDG 1
BLDG 15
BLDG 6 BLDG 40
BLDG 56
BLDG 2
BLDG 5 BLDG 4
KANSAS CITY VA MEDICAL CENTER
KANSAS CITY, MO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128
589-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES G-001
COVER SHEET
MA/EM AJ/DD/ADSI
100% CONSTRUCTION
DOCUMENTS
06/19/2023
EHRM INFRASTRUCTURE UPGRADES
KANSAS CITY VA MEDICAL CENTER - 4801 LINWOOD BLVD, KANSAS CITY, MO 64128
PROJECT #: 589-21-700
1" = 160'-0"
VICINITY MAP
3" = 1'-0"
LOCATION MAP
TRUE
NORTH
TRUE
NORTH
Revisions: Date:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
1 of 512Page 1 of 518
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128
589-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES G-002
DRAWING INDEX
MA/EM DD/ADSI
100% CONSTRUCTION
DOCUMENTS
06/19/2023
Revisions: Date:
DRAWING INDEX
PAGE # SHEET # SHEET NAME
GENERAL
1 of 518 G-001 COVER SHEET
2 of 518 G-002 DRAWING INDEX
3 of 518 G-003 DRAWING INDEX
CIVIL
4 of 518 CJ100 CIVIL NOTES AND LEGEND
5 of 518 CD100 EXISTING CONDITIONS AND DEMOLITION PLAN
6 of 518 CD101 DETAILED DEMOLITION PLAN
7 of 518 CD102 DETAILED DEMOLITION PLAN
8 of 518 CD103 DETAILED DEMOLITION PLAN
9 of 518 CU100 UTILITY PLAN
10 of 518 CU101 DETAILED UTILITY PLAN
11 of 518 CU102 DETAILED UTILITY PLAN
12 of 518 CU103 DETAILED UTILITY PLAN
13 of 518 CU104 FIBER PLAN AND PROFILE
14 of 518 CU105 FIBER PLAN AND PROFILE
15 of 518 CU106 FIBER PLAN AND PROFILE
16 of 518 CU107 FIBER PLAN AND PROFILE
17 of 518 CU108 FIBER PLAN AND PROFILE
18 of 518 CK100 CIVIL DETAILS
STRUCTURAL
19 of 518 S-000 STRUCTURAL COVER SHEET
20 of 518 S-001 GENERAL NOTES
21 of 518 01S-101 STRUCTURAL PLANS AND DETAILS
22 of 518 06S-101 STRUCTURAL PLANS AND DETAILS
23 of 518 15S-101 ADDITION FOUNDATION AND FRAMING PLANS
24 of 518 15S-200 FOUNDATION DETAILS
25 of 518 15S-300 STEEL DETAILS
ARCHITECTURAL
26 of 518 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS
27 of 518 AS101a ICRA DETAILS
28 of 518 AS101b ICRA DETAILS
29 of 518 01A-100 BLDG 01 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS
30 of 518 01A-101 BLDG 01 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
31 of 518 01A-102 BLDG 01 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
32 of 518 01A-103 BLDG 01 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS
33 of 518 01A-104 BLDG 01 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS
34 of 518 01A-105 BLDG 01 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS
35 of 518 01A-106 BLDG 01 -LEVEL 06 -DEMO, FLOOR PLANS & RCPS
36 of 518 01A-107 BLDG 01 -LEVEL 07 -DEMO, FLOOR PLANS & RCPS
37 of 518 01A-108 BLDG 01 -LEVEL 08 -DEMO, FLOOR PLANS & RCPS
38 of 518 01A-109 BLDG 01 -LEVEL 09 -DEMO, FLOOR PLANS & RCPS
39 of 518 01A-110 BLDG 01 -LEVEL 10 -DEMO, FLOOR PLANS & RCPS
40 of 518 01A-111 BLDG 01 -LEVEL 11 -DEMO, FLOOR PLANS & RCPS
41 of 518 01AS100 BUILDING 01 -LEVEL 00 -PHASING PLAN
42 of 518 01AS101 BUILDING 01 -LEVEL 01 -PHASING PLAN
43 of 518 01AS102 BUILDING 01 -LEVEL 02 -PHASING PLAN
44 of 518 01AS103 BUILDING 01 -LEVEL 03 -PHASING PLAN
45 of 518 01AS104 BUILDING 01 -LEVEL 04 -PHASING PLAN
46 of 518 01AS105 BUILDING 01 -LEVEL 05 -PHASING PLAN
47 of 518 01AS106 BUILDING 01 -LEVEL 06 -PHASING PLAN
48 of 518 01AS107 BUILDING 01 -LEVEL 07 -PHASING PLAN
49 of 518 01AS108 BUILDING 01 -LEVEL 08 -PHASING PLAN
50 of 518 01AS109 BUILDING 01 -LEVEL 09 -PHASING PLAN
51 of 518 01AS110 BUILDING 01 -LEVEL 10 -PHASING PLAN
52 of 518 01AS111 BUILDING 01 -LEVEL 11 -PHASING PLAN
53 of 518 01AS112 BUILDING 01 -LEVEL 12 -PHASING PLAN
54 of 518 01AS113 BUILDING 01 -LEVEL 13 -PHASING PLAN
55 of 518 02A-101 BLDG 02 -LEVEL 01 -DEMO, FLOORS PLAN & RCPS
56 of 518 02A-102 BLDG 02 -LEVEL 02 -DEMO, FLOOR PLAN & RCPS
57 of 518 02AS100 BUILDING 02 -LEVEL 00 -PHASING PLAN
58 of 518 02AS101 BUILDING 02 -LEVEL 01 -PHASING PLAN
59 of 518 02AS102 BUILDING 02 -LEVEL 02 -PHASING PLAN
60 of 518 04A-101 BLDG 04 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
61 of 518 04AS100 BUILDING 04 -LEVEL 00 -PHASING PLAN
62 of 518 04AS101 BUILDING 04 -LEVEL 01 -PHASING PLAN
63 of 518 04AS102 BUILDING 04 -LEVEL 02 -PHASING PLAN
64 of 518 04AS103 BUILDING 04 -LEVEL 03 LOWER -PHASING PLAN
65 of 518 04AS104 BUILDING 04 -LEVEL 03 UPPER -PHASING PLAN
66 of 518 05A-101 BLDG 05 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
67 of 518 05AS101 BUILDING 05 -LEVEL 01 -PHASING PLAN
68 of 518 05AS102 BUILDING 05 -LEVEL 02 -PHASING PLAN
69 of 518 06A-101 BLDG 06 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
70 of 518 06A-102 BLDG 06 -LEVEL 02 -DEMO, FLOOR PLAN & RCPS
71 of 518 06AS101 BUILDING 06 -LEVEL 01 -PHASING PLAN
72 of 518 06AS102 BUILDING 6 -LEVEL 02 -PHASING PLAN
73 of 518 15A-101 BLDG 15 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
74 of 518 15A-102 BLDG 15 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
75 of 518 15A-103 BLDG 15 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS
76 of 518 15A-104 BLDG 15 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS
77 of 518 15A-105 BLDG 15 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS
78 of 518 15A-106 BLDG 15 -LEVEL 06 -DEMO, FLOOR PLANS & RCPS
79 of 518 15A-107 BLDG 15 -LEVEL 07 -DEMO, FLOOR PLANS & RCPS
80 of 518 15A-108 BLDG 15 -LEVEL 08 -DEMO, FLOOR PLANS & RCPS
81 of 518 15AE-100 BLDG 15 TOWER -ROOF PLAN
82 of 518 15AE-101 BLDG 15 TOWER -ELEVATION -EXISTING CON
83 of 518 15AE-102 BLDG 15 TOWER -ELEVATION
84 of 518 15AE-103 BLDG 15 TOWER -SECTIONS
85 of 518 15AE-104 BLDG 15 TOWER -SECTIONS
86 of 518 15AS100 BUILDING 15 -LEVEL 00 -PHASING PLAN
87 of 518 15AS101 BUILDING 15 -LEVEL 01 -PHASING PLAN
88 of 518 15AS102 BUILDING 15 -LEVEL 02 -PHASING PLAN
89 of 518 15AS103 BUILDING 15 -LEVEL 03 -PHASING PLAN
90 of 518 15AS104 BUILDING 15 -LEVEL 04 -PHASING PLAN
91 of 518 15AS105 BUILDING 15 -LEVEL 05 -PHASING PLAN
92 of 518 15AS106 BUILDING 15 -LEVEL 06 -PHASING PLAN
93 of 518 15AS107 BUILDING 15 -LEVEL 07 -PHASING PLAN
94 of 518 15AS108 BUILDING 15 -LEVEL 08 -PHASING PLAN
95 of 518 15AS109 BUILDING 15 -LEVEL 09 -PHASING PLAN
96 of 518 26A-100 BLDG 26 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS
97 of 518 26A-101 BLDG 26 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
98 of 518 26A-102 BLDG 26 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
99 of 518 26A-103 BLDG 26 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS
100 of 518 26A-105 BLDG 26 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS
101 of 518 26AS100 BUILDING 26 -LEVEL 00 -PHASING PLAN
102 of 518 26AS101 BUILDING 26 -LEVEL 01 -PHASING PLAN
103 of 518 26AS102 BUILDING 26 -LEVEL 02 -PHASING PLAN
104 of 518 26AS103 BUILDING 26 -LEVEL 03 -PHASING PLAN
105 of 518 26AS104 BUILDING 26 -LEVEL 04 -PHASING PLAN
106 of 518 26AS105 BUILDING 26 -LEVEL 05 -PHASING PLAN
107 of 518 26AS106 BUILDING 26 -LEVEL 06 -PHASING PLAN
108 of 518 40A-101 BLDG 40 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
109 of 518 40AS101 BUILDING 40 -LEVEL 01 -PHASING PLAN
110 of 518 55A-101 BLDG 55 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
111 of 518 55A-102 BLDG 55 -LEVEL 02 -DEMO, FLOOR PLAN & RCPS
112 of 518 55AS101 BUILDING 55 -LEVEL 01 -PHASING PLAN
113 of 518 55AS102 BUILDING 55 -LEVEL 02 -PHASING PLAN
114 of 518 56A-100 BLDG 56 -LEVEL 00 -DEMO, FLOOR PLAN & RCPS
115 of 518 56A-101 BLDG 56 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
116 of 518 56AS100 BUILDING 56 -LEVEL 00 -PHASING PLAN
117 of 518 56AS101 BUILDING 56 -LEVEL 01 -PHASING PLAN
118 of 518 A-601 ROOM FINISH SCHEDULE & WALL TYPES
119 of 518 A-602 DOOR DETAILS
120 of 518 A-603 ARCHITECTURAL DETAILS
121 of 518 A-604 EXTERIOR DETAILS
122 of 518 A-604A EXTERIOR DETAILS -ENLARGED PLANS
123 of 518 A-604B EXTERIOR DETAILS
124 of 518 A-604C EXTERIOR DETAILS
125 of 518 AE421 INTERIOR ELEVATIONS
126 of 518 AW001 IN-03.01 -ROOM NUMBER SIGN & SIGNAGE SCHEDULES
MECHANICAL
127 of 518 M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
128 of 518 01M-100a BLDG 01 -LEVEL 00 -FLOOR PLAN
129 of 518 01M-100b BLDG 01 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS
130 of 518 01M-101 BLDG 01 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
131 of 518 01M-102 BLDG 01 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
132 of 518 01M-103 BLDG 01 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS
133 of 518 01M-104 BLDG 01 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS
134 of 518 01M-105 BLDG 01 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS
135 of 518 01M-106 BLDG 01 -LEVEL 06 -DEMO, FLOOR PLANS & RCPS
136 of 518 01M-107 BLDG 01 -LEVEL 07 -DEMO, FLOOR PLANS & RCPS
137 of 518 01M-108 BLDG 01 -LEVEL 08 -DEMO, FLOOR PLANS & RCPS
138 of 518 01M-109 BLDG 01 -LEVEL 09 -DEMO, FLOOR PLANS & RCPS
139 of 518 01M-110 BLDG 01 -LEVEL 10 -DEMO, FLOOR PLANS & RCPS
140 of 518 01M-111 BLDG 01 -LEVEL 11 -DEMO, FLOOR PLANS & RCPS
141 of 518 01M-112 BLDG 01-LEVEL 12 -ROOF PLAN
142 of 518 02M-101 BLDG 2 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
143 of 518 02M-102 BLDG 2 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
144 of 518 02M-103 BLDG 2 -ROOF PLAN
145 of 518 04M-101 BLDG 04 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
146 of 518 05M-101 BLDG 05 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
147 of 518 06M-101 BLDG 06 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
148 of 518 06M-102 BLDG 06 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
149 of 518 15M-100 BLDG 15 -BASEMENT -AHU FLOOR PLANS
150 of 518 15M-101 BLDG 15 -LEVEL 01 -FLOOR PLANS & RCPS
151 of 518 15M-102 BLDG 15 -LEVEL 02 -FLOOR PLAN & RCPS
152 of 518 15M-103 BLDG 15 -LEVEL 03 -FLOOR PLAN & RCPS
153 of 518 15M-104 BLDG 15 -LEVEL 04 -FLOOR PLAN & RCP
154 of 518 15M-105 BLDG 15 -LEVEL 05 -FLOOR PLANS & RCPS
155 of 518 15M-106 BLDG 15 -LEVEL 06 -FLOOR PLANS & RCPS
156 of 518 15M-107 BLDG 15 -LEVEL 07 -FLOOR PLAN & RCPS
157 of 518 15M-108 BLDG 15 -LEVEL 08 -FLOOR PLAN & RCPS
158 of 518 26M-100 BLDG 26 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS
159 of 518 26M-101 BLDG 26 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
160 of 518 26M-102a BLDG 26 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
161 of 518 26M-102b BLDG 26 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
162 of 518 26M-103 BLDG 26 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS
163 of 518 26M-104 BLDG 26 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS
164 of 518 26M-105 BLDG 26 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS
165 of 518 40M-101 BLDG 40 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
166 of 518 55M-101 BLDG 55 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
167 of 518 55M-102 BLDG 55 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
168 of 518 55M-103 BLDG 55 -ROOF PLAN
169 of 518 56M-100 BLDG 56 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS
170 of 518 56M-101 BLDG 56 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
171 of 518 56M-102 BLDG 56 -ROOF PLAN
172 of 518 M-501 MECHANICAL DETAILS AND CONTROLS
173 of 518 M-502 MECHANICAL DETAILS
174 of 518 M-601 MECHANICAL SCHEDULES
175 of 518 M-602 MECHANICAL AND PLUMBING SCHEDULES
176 of 518 M-701 MECHANICAL CONTROLS AND VALVE SYMBOLS
177 of 518 M-702
FAN COIL UNIT AND CHILLED WATER PUMP SEQUENCE OF OPERATIONS, POINTS
LISTS, AND CONTROL DIAGRAMS
178 of 518 M-703
AIR HANDLING UNIT SEQUENCE OF OPERATION, POINTS LIST, AND CONTROL
DIAGRAM
ELECTRICAL
179 of 518 EPG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
180 of 518 EPG002 ELECTRICAL LEGENDS
181 of 518 01EP100 BLDG 01 -LEVEL 00 -ELECTRICAL PLAN
182 of 518 02EP100 BLDG 02 -LEVEL 00 -ELECTRICAL PLAN
183 of 518 04EP101 BLDG 04 -LEVEL 01 -ELECTRICAL PLAN
184 of 518 05EP101 BLDG 05 -LEVEL 01 -ELECTRICAL PLAN
185 of 518 06EP101 BLDG 06 -LEVEL 01 -ELECTRICAL PLAN
186 of 518 15EP100 BLDG 15 -LEVEL 00 -ELECTRICAL PLAN
187 of 518 15EP101 BLDG 15 -LEVEL 01 -ELECTRICAL PLAN
188 of 518 26EP100 BLDG 26 -LEVEL 00 -ELECTRICAL PLAN
189 of 518 26EP101 BLDG 26 -LEVEL 01 -ELECTRICAL PLAN
190 of 518 26EP102 BLDG 26 -LEVEL 02 -ELECTRICAL PLAN
191 of 518 26EP103 BLDG 26 -LEVEL 03 -ELECTRICAL PLAN
192 of 518 26EP104 BLDG 26 -LEVEL 04 -ELECTRICAL PLAN
193 of 518 40EP101 BLDG 40 -LEVEL 01 -ELECTRICAL PLAN
194 of 518 55EP101 BLDG 55 -LEVEL 01 -ELECTRICAL PLAN
195 of 518 56EP100 BLDG 56 -LEVEL 00 -ELECTRICAL PLAN
196 of 518 01EP400 BLDG 01 -LEVEL 00 -ENLARGED ELECTRICAL PLANS
197 of 518 01EP401 BLDG 01 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
198 of 518 01EP402 BLDG 01 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
199 of 518 01EP403 BLDG 01 -LEVEL 03 -ENLARGED ELECTRICAL PLANS
200 of 518 01EP404 BLDG 01 -LEVEL 04 -ENLARGED ELECTRICAL PLANS
201 of 518 01EP405 BLDG 01 -LEVEL 05 -ENLARGED ELECTRICAL PLANS
202 of 518 01EP406 BLDG 01 -LEVEL 06 -ENLARGED ELECTRICAL PLANS
203 of 518 01EP407 BLDG 01 -LEVEL 07 -ENLARGED ELECTRICAL PLANS
204 of 518 01EP408 BLDG 01 -LEVEL 08 -ENLARGED ELECTRICAL PLANS
205 of 518 01EP409 BLDG 01 -LEVEL 09 -ENLARGED ELECTRICAL PLANS
206 of 518 01EP410 BLDG 01 -LEVEL 10 -ENLARGED ELECTRICAL PLANS
207 of 518 01EP411 BLDG 01 -LEVEL 11 -ENLARGED ELECTRICAL PLANS
208 of 518 01EP412 BLDG 01 -ENLARGED ROOF PLAN
209 of 518 02EP401 BLDG 02 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
210 of 518 02EP402 BLDG 02 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
211 of 518 02EP403 BLDG 02 -ENLARGED ROOF PLAN
212 of 518 04EP401 BLDG 04 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
213 of 518 05EP401 BLDG 05 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
214 of 518 06EP401 BLDG 06 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
215 of 518 06EP402 BLDG 06 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
216 of 518 15EP401 BLDG 15 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
217 of 518 15EP402 BLDG 15 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
218 of 518 15EP403 BLDG 15 -LEVEL 03 -ENLARGED ELECTRICAL PLANS
219 of 518 15EP404 BLDG 15 -LEVEL 04 -ENLARGED ELECTRICAL PLANS
220 of 518 15EP405 BLDG 15 -LEVEL 05 -ENLARGED ELECTRICAL PLANS
221 of 518 15EP406 BLDG 15 -LEVEL 06 -ENLARGED ELECTRICAL PLANS
222 of 518 15EP407 BLDG 15 -LEVEL 07 -ENLARGED ELECTRICAL PLANS
223 of 518 15EP408 BLDG 15 -LEVEL 08 -ENLARGED ELECTRICAL PLANS
224 of 518 15EP409 BLDG 15 -ENLARGED ROOF PLAN
225 of 518 26EP400 BLDG 26 -LEVEL 00 -ENLARGED ELECTRICAL PLANS
226 of 518 26EP401 BLDG 26 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
227 of 518 26EP402 BLDG 26 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
228 of 518 26EP403 BLDG 26 -LEVEL 03 -ENLARGED ELECTRICAL PLANS
229 of 518 26EP405 BLDG 26 -LEVEL 05 -ENLARGED ELECTRICAL PLANS
230 of 518 26EP406 BLDG 26 -ENLARGED ROOF PLAN
231 of 518 40EP401 BLDG 40 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
232 of 518 55EP401 BLDG 55 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
233 of 518 55EP402 BLDG 55 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
234 of 518 55EP403 BLDG 55 -ENLARGED ROOF PLAN
235 of 518 56EP400 BLDG 56 -LEVEL 00 -ENLARGED ELECTRICAL PLANS
236 of 518 56EP401 BLDG 56 -LEVEL 01-ENLARGED ELECTRICAL PLANS
237 of 518 56EP402 BLDG 56 -ENLARGED ROOF PLAN
238 of 518 EP501 ELECTRICAL DETAILS
239 of 518 EP502 ELECTRICAL DETAILS
240 of 518 EP503 ELECTRICAL DETAILS
241 of 518 EP504 ELECTRICAL DETAILS
242 of 518 EP505 ELECTRICAL DETAILS
243 of 518 EP506 ELECTRICAL DETAILS
244 of 518 EP507 TELECOMMUNICATION BONDING RISER DIAGRAM (1 OF 2)
245 of 518 EP508 TELECOMMUNICATION BONDING RISER DIAGRAM (2 OF 2)
246 of 518 01EP601 BLDG 01 -ONE-LINE DIAGRAM -PART 1 OF 9 -EXISTING
247 of 518 01EP602 BLDG 01 -ONE-LINE DIAGRAM -PART 2 OF 9 -EXISTING
248 of 518 01EP603 BLDG 01 -ONE-LINE DIAGRAM -PART 3 OF 9 -EXISTING
249 of 518 01EP604 BLDG 01 -ONE-LINE DIAGRAM -PART 4 OF 9 -EXISTING
250 of 518 01EP605 BLDG 01 -ONE-LINE DIAGRAM -PART 5 OF 9 -EXISTING
251 of 518 01EP606 BLDG 01 -ONE-LINE DIAGRAM -PART 6 OF 9 -EXISTING
252 of 518 01EP607 BLDG 01 -ONE-LINE DIAGRAM -PART 7 OF 9 -EXISTING
253 of 518 01EP608 BLDG 01 -ONE-LINE DIAGRAM -PART 8 OF 9 -EXISTING
254 of 518 01EP609 BLDG 01 -ONE-LINE DIAGRAM -PART 9 OF 9 -EXISTING
255 of 518 01EP611 BLDG 01 -ONE-LINE DIAGRAM -PART 1 OF 9 -REVISED
256 of 518 01EP612 BLDG 01 -ONE-LINE DIAGRAM -PART 2 OF 9 -REVISED
257 of 518 01EP613 BLDG 01 -ONE-LINE DIAGRAM -PART 3 OF 9 -REVISED
258 of 518 01EP614 BLDG 01 -ONE-LINE DIAGRAM -PART 4 OF 9 -REVISED
259 of 518 01EP615 BLDG 01 -ONE-LINE DIAGRAM -PART 5 OF 9 -REVISED
260 of 518 01EP616 BLDG 01 -ONE-LINE DIAGRAM -PART 6 OF 9 -REVISED
261 of 518 01EP617 BLDG 01 -ONE-LINE DIAGRAM -PART 7 OF 9 -REVISED
262 of 518 01EP618 BLDG 01 -ONE-LINE DIAGRAM -PART 8 OF 9 -REVISED
263 of 518 01EP619 BLDG 01 -ONE-LINE DIAGRAM -PART 9 OF 9 -REVISED
264 of 518 02EP601 BLDG 02 -ONE-LINE DIAGRAM -EXISTING
265 of 518 02EP611 BLDG 02 -ONE-LINE DIAGRAM -REVISED
266 of 518 04EP601 BLDG 04 -ONE-LINE DIAGRAM -EXISTING
267 of 518 04EP611 BLDG 04 -ONE-LINE DIAGRAM -REVISED
268 of 518 05EP601 BLDG 05 -ONE-LINE DIAGRAM -EXISTING
269 of 518 05EP611 BLDG 05 -ONE-LINE DIAGRAM -REVISED
270 of 518 06EP601 BLDG 06 -ONE-LINE DIAGRAM -EXISTING
271 of 518 06EP611 BLDG 06 -ONE-LINE DIAGRAM -REVISED
272 of 518 15EP601 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -EXISTING
273 of 518 15EP602 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -EXISTING
274 of 518 15EP603 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -EXISTING
275 of 518 15EP611 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -REVISED
276 of 518 15EP612 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -REVISED
277 of 518 15EP613 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -REVISED
278 of 518 26EP601 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -EXISTING
279 of 518 26EP602 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -EXISTING
280 of 518 26EP603 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -EXISTING
281 of 518 26EP604 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -EXISTING
282 of 518 26EP605 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -EXISTING
283 of 518 26EP611 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -REVISED
284 of 518 26EP612 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -REVISED
285 of 518 26EP613 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -REVISED
286 of 518 26EP614 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -REVISED
287 of 518 26EP615 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -REVISED
288 of 518 40EP600 BLDG 40 -MEDIUM VOLTAGE ONE-LINE DIAGRAM -EXISTING
289 of 518 40EP601 BLDG 40 -ONE-LINE DIAGRAM -EXISTING
290 of 518 40EP611 BLDG 40 -ONE-LINE DIAGRAM -REVISED
291 of 518 55EP601 BLDG 55 -ONE-LINE DIAGRAM -EXISTING
292 of 518 55EP611 BLDG 55 -ONE-LINE DIAGRAM -REVISED
293 of 518 56EP601 BLDG 56 -ONE-LINE DIAGRAM -EXISTING
294 of 518 56EP611 BLDG 56 -ONE-LINE DIAGRAM -REVISED
295 of 518 01EP701 BLDG 01 -ELECTRICAL SCHEDULES
296 of 518 01EP702 BLDG 01 - ELECTRICAL SCHEDULES BLDG 01 - ELECTRICAL SCHEDULES
297 of 518 01EP703 BLDG 01 -ELECTRICAL SCHEDULES BLDG 01 -ELECTRICAL SCHEDULES
298 of 518 01EP704 BLDG 01 -ELECTRICAL SCHEDULES
299 of 518 01EP705 BLDG 01 -ELECTRICAL SCHEDULES
300 of 518 02EP701 BLDG 02 -ELECTRICAL SCHEDULES
301 of 518 04EP701 BLDG 04 -ELECTRICAL SCHEDULES
302 of 518 05EP701 BLDG 05 -ELECTRICAL SCHEDULES
303 of 518 06EP701 BLDG 06 -ELECTRICAL SCHEDULES
304 of 518 15EP701 BLDG 15 -ELECTRICAL SCHEDULES
305 of 518 15EP702 BLDG 15 -ELECTRICAL SCHEDULES
306 of 518 15EP703 BLDG 15 -ELECTRICAL SCHEDULES
307 of 518 26EP701 BLDG 26 -ELECTRICAL SCHEDULES
308 of 518 26EP702 BLDG 26 -ELECTRICAL SCHEDULES
309 of 518 40EP701 BLDG 40 -ELECTRICAL SCHEDULES
310 of 518 55EP701 BLDG 55 -ELECTRICAL SCHEDULES
311 of 518 56EP701 BLDG 56 -ELECTRICAL SCHEDULES
312 of 518 EP701 ELECTRICAL SCHEDULES
313 of 518 EP702 ELECTRICAL SCHEDULES
TELECOMMUNICATIONS
314 of 518 ETG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
315 of 518 ETG002 TELECOMMUNICATIONS LEGENDS
316 of 518 01ET1000 BLDG 01 -SUB BASEMENT -TELECOMMUNICATIONS PLAN
317 of 518 01ET100 BLDG 01 -LEVEL 00 -TELECOMMUNICATIONS PLAN
318 of 518 01ET101 BLDG 01 -LEVEL 01 -TELECOMMUNICATIONS PLAN
319 of 518 01ET102 BLDG 01 -LEVEL 02 -TELECOMMUNICATIONS PLAN
320 of 518 01ET103 BLDG 01 -LEVEL 03 -TELECOMMUNICATIONS PLAN
321 of 518 01ET104 BLDG 01 -LEVEL 04 -TELECOMMUNICATIONS PLAN
322 of 518 01ET105 BLDG 01 -LEVEL 05 -TELECOMMUNICATIONS PLAN
323 of 518 01ET106 BLDG 01 -LEVEL 06 -TELECOMMUNICATIONS PLAN
324 of 518 01ET107 BLDG 01 -LEVEL 07 -TELECOMMUNICATIONS PLAN
325 of 518 01ET108 BLDG 01 -LEVEL 08 -TELECOMMUNICATIONS PLAN
326 of 518 01ET109 BLDG 01 -LEVEL 09 -TELECOMMUNICATIONS PLAN
327 of 518 01ET110 BLDG 01 -LEVEL 10 -TELECOMMUNICATIONS PLAN
328 of 518 01ET111 BLDG 01 -LEVEL 11 -TELECOMMUNICATIONS PLAN
329 of 518 01ET112 BLDG 01 -LEVEL 12 -TELECOMMUNICATIONS PLAN
330 of 518 01ET113 BLDG 01 -LEVEL 13 -TELECOMMUNICATIONS PLAN
331 of 518 02ET100 BLDG 02 -LEVEL 00 -TELECOMMUNICATIONS PLAN
332 of 518 02ET101 BLDG 02 -LEVEL 01 -TELECOMMUNICATIONS PLAN
333 of 518 02ET102 BLDG 02 -LEVEL 02 -TELECOMMUNICATIONS PLAN
334 of 518 04ET101 BLDG 04 -LEVEL 01 -TELECOMMUNICATIONS PLAN
335 of 518 05ET101 BLDG 05 -LEVEL 01 -TELECOMMUNICATIONS PLAN
336 of 518 05ET102 BLDG 05 -LEVEL 02 -TELECOMMUNICATIONS PLAN
337 of 518 06ET101 BLDG 06 -LEVEL 01 -TELECOMMUNICATIONS PLAN
338 of 518 06ET102 BLDG 06 -LEVEL 02 -TELECOMMUNICATIONS PLAN
339 of 518 15ET100 BLDG 15 -LEVEL 00 -TELECOMMUNICATIONS PLAN
340 of 518 15ET101 BLDG 15 -LEVEL 01 -TELECOMMUNICATIONS PLAN
341 of 518 15ET102 BLDG 15 -LEVEL 02 -TELECOMMUNICATIONS PLAN
342 of 518 15ET103 BLDG 15 -LEVEL 03 -TELECOMMUNICATIONS PLAN
343 of 518 15ET104 BLDG 15 -LEVEL 04 -TELECOMMUNICATIONS PLAN
344 of 518 15ET105 BLDG 15 -LEVEL 05 -TELECOMMUNICATIONS PLAN
345 of 518 15ET106 BLDG 15-LEVEL 06 -TELECOMMUNICATIONS PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128
589-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES G-003
DRAWING INDEX
MA/EM DD/ADSI
100% CONSTRUCTION
DOCUMENTS
06/19/2023
Revisions: Date:
258 of 518 01EP614 BLDG 01 -ONE-LINE DIAGRAM -PART 4 OF 9 -REVISED
259 of 518 01EP615 BLDG 01 -ONE-LINE DIAGRAM -PART 5 OF 9 -REVISED
260 of 518 01EP616 BLDG 01 -ONE-LINE DIAGRAM -PART 6 OF 9 -REVISED
261 of 518 01EP617 BLDG 01 -ONE-LINE DIAGRAM -PART 7 OF 9 -REVISED
262 of 518 01EP618 BLDG 01 -ONE-LINE DIAGRAM -PART 8 OF 9 -REVISED
263 of 518 01EP619 BLDG 01 -ONE-LINE DIAGRAM -PART 9 OF 9 -REVISED
264 of 518 02EP601 BLDG 02 -ONE-LINE DIAGRAM -EXISTING
265 of 518 02EP611 BLDG 02 -ONE-LINE DIAGRAM -REVISED
266 of 518 04EP601 BLDG 04 -ONE-LINE DIAGRAM -EXISTING
267 of 518 04EP611 BLDG 04 -ONE-LINE DIAGRAM -REVISED
268 of 518 05EP601 BLDG 05 -ONE-LINE DIAGRAM -EXISTING
269 of 518 05EP611 BLDG 05 -ONE-LINE DIAGRAM -REVISED
270 of 518 06EP601 BLDG 06 -ONE-LINE DIAGRAM -EXISTING
271 of 518 06EP611 BLDG 06 -ONE-LINE DIAGRAM -REVISED
272 of 518 15EP601 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -EXISTING
273 of 518 15EP602 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -EXISTING
274 of 518 15EP603 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -EXISTING
275 of 518 15EP611 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -REVISED
276 of 518 15EP612 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -REVISED
277 of 518 15EP613 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -REVISED
278 of 518 26EP601 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -EXISTING
279 of 518 26EP602 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -EXISTING
280 of 518 26EP603 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -EXISTING
281 of 518 26EP604 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -EXISTING
282 of 518 26EP605 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -EXISTING
283 of 518 26EP611 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -REVISED
284 of 518 26EP612 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -REVISED
285 of 518 26EP613 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -REVISED
286 of 518 26EP614 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -REVISED
287 of 518 26EP615 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -REVISED
288 of 518 40EP600 BLDG 40 -MEDIUM VOLTAGE ONE-LINE DIAGRAM -EXISTING
289 of 518 40EP601 BLDG 40 -ONE-LINE DIAGRAM -EXISTING
290 of 518 40EP611 BLDG 40 -ONE-LINE DIAGRAM -REVISED
291 of 518 55EP601 BLDG 55 -ONE-LINE DIAGRAM -EXISTING
292 of 518 55EP611 BLDG 55 -ONE-LINE DIAGRAM -REVISED
293 of 518 56EP601 BLDG 56 -ONE-LINE DIAGRAM -EXISTING
294 of 518 56EP611 BLDG 56 -ONE-LINE DIAGRAM -REVISED
295 of 518 01EP701 BLDG 01 -ELECTRICAL SCHEDULES
296 of 518 01EP702 BLDG 01 - ELECTRICAL SCHEDULES BLDG 01 - ELECTRICAL SCHEDULES
297 of 518 01EP703 BLDG 01 -ELECTRICAL SCHEDULES BLDG 01 -ELECTRICAL SCHEDULES
298 of 518 01EP704 BLDG 01 -ELECTRICAL SCHEDULES
299 of 518 01EP705 BLDG 01 -ELECTRICAL SCHEDULES
300 of 518 02EP701 BLDG 02 -ELECTRICAL SCHEDULES
301 of 518 04EP701 BLDG 04 -ELECTRICAL SCHEDULES
302 of 518 05EP701 BLDG 05 -ELECTRICAL SCHEDULES
303 of 518 06EP701 BLDG 06 -ELECTRICAL SCHEDULES
304 of 518 15EP701 BLDG 15 -ELECTRICAL SCHEDULES
305 of 518 15EP702 BLDG 15 -ELECTRICAL SCHEDULES
306 of 518 15EP703 BLDG 15 -ELECTRICAL SCHEDULES
307 of 518 26EP701 BLDG 26 -ELECTRICAL SCHEDULES
308 of 518 26EP702 BLDG 26 -ELECTRICAL SCHEDULES
309 of 518 40EP701 BLDG 40 -ELECTRICAL SCHEDULES
310 of 518 55EP701 BLDG 55 -ELECTRICAL SCHEDULES
311 of 518 56EP701 BLDG 56 -ELECTRICAL SCHEDULES
312 of 518 EP701 ELECTRICAL SCHEDULES
313 of 518 EP702 ELECTRICAL SCHEDULES
TELECOMMUNICATIONS
314 of 518 ETG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
315 of 518 ETG002 TELECOMMUNICATIONS LEGENDS
316 of 518 01ET1000 BLDG 01 -SUB BASEMENT -TELECOMMUNICATIONS PLAN
317 of 518 01ET100 BLDG 01 -LEVEL 00 -TELECOMMUNICATIONS PLAN
318 of 518 01ET101 BLDG 01 -LEVEL 01 -TELECOMMUNICATIONS PLAN
319 of 518 01ET102 BLDG 01 -LEVEL 02 -TELECOMMUNICATIONS PLAN
320 of 518 01ET103 BLDG 01 -LEVEL 03 -TELECOMMUNICATIONS PLAN
321 of 518 01ET104 BLDG 01 -LEVEL 04 -TELECOMMUNICATIONS PLAN
322 of 518 01ET105 BLDG 01 -LEVEL 05 -TELECOMMUNICATIONS PLAN
323 of 518 01ET106 BLDG 01 -LEVEL 06 -TELECOMMUNICATIONS PLAN
324 of 518 01ET107 BLDG 01 -LEVEL 07 -TELECOMMUNICATIONS PLAN
325 of 518 01ET108 BLDG 01 -LEVEL 08 -TELECOMMUNICATIONS PLAN
326 of 518 01ET109 BLDG 01 -LEVEL 09 -TELECOMMUNICATIONS PLAN
327 of 518 01ET110 BLDG 01 -LEVEL 10 -TELECOMMUNICATIONS PLAN
328 of 518 01ET111 BLDG 01 -LEVEL 11 -TELECOMMUNICATIONS PLAN
329 of 518 01ET112 BLDG 01 -LEVEL 12 -TELECOMMUNICATIONS PLAN
330 of 518 01ET113 BLDG 01 -LEVEL 13 -TELECOMMUNICATIONS PLAN
331 of 518 02ET100 BLDG 02 -LEVEL 00 -TELECOMMUNICATIONS PLAN
332 of 518 02ET101 BLDG 02 -LEVEL 01 -TELECOMMUNICATIONS PLAN
333 of 518 02ET102 BLDG 02 -LEVEL 02 -TELECOMMUNICATIONS PLAN
334 of 518 04ET101 BLDG 04 -LEVEL 01 -TELECOMMUNICATIONS PLAN
335 of 518 05ET101 BLDG 05 -LEVEL 01 -TELECOMMUNICATIONS PLAN
336 of 518 05ET102 BLDG 05 -LEVEL 02 -TELECOMMUNICATIONS PLAN
337 of 518 06ET101 BLDG 06 -LEVEL 01 -TELECOMMUNICATIONS PLAN
338 of 518 06ET102 BLDG 06 -LEVEL 02 -TELECOMMUNICATIONS PLAN
339 of 518 15ET100 BLDG 15 -LEVEL 00 -TELECOMMUNICATIONS PLAN
340 of 518 15ET101 BLDG 15 -LEVEL 01 -TELECOMMUNICATIONS PLAN
341 of 518 15ET102 BLDG 15 -LEVEL 02 -TELECOMMUNICATIONS PLAN
342 of 518 15ET103 BLDG 15 -LEVEL 03 -TELECOMMUNICATIONS PLAN
343 of 518 15ET104 BLDG 15 -LEVEL 04 -TELECOMMUNICATIONS PLAN
344 of 518 15ET105 BLDG 15 -LEVEL 05 -TELECOMMUNICATIONS PLAN
345 of 518 15ET106 BLDG 15-LEVEL 06 -TELECOMMUNICATIONS PLAN
346 of 518 15ET107 BLDG 15 -LEVEL 07 -TELECOMMUNICATIONS PLAN
347 of 518 15ET108 BLDG 15 -LEVEL 08 -TELECOMMUNICATIONS PLAN
348 of 518 15ET109 BLDG 15 -LEVEL 09 -TELECOMMUNICATIONS PLAN
349 of 518 26ET100 BLDG 26 -LEVEL 00 -TELECOMMUNICATIONS PLAN
350 of 518 26ET101 BLDG 26 -LEVEL 01 -TELECOMMUNICATIONS PLAN
351 of 518 26ET102 BLDG 26 -LEVEL 02 -TELECOMMUNICATIONS PLAN
352 of 518 26ET103 BLDG 26 -LEVEL 03 -TELECOMMUNICATIONS PLAN
353 of 518 26ET104 BLDG 26 -LEVEL 04 -TELECOMMUNICATIONS PLAN
354 of 518 26ET105 BLDG 26 -LEVEL 05 -TELECOMMUNICATIONS PLAN
355 of 518 26ET106 BLDG 26 -LEVEL 06 -TELECOMMUNICATIONS PLAN
356 of 518 40ET101 BLDG 40 -LEVEL 01 -TELECOMMUNICATIONS PLAN
357 of 518 55ET101 BLDG 55 -LEVEL 01 -TELECOMMUNICATIONS PLAN
358 of 518 55ET102 BLDG 55 -LEVEL 02 -TELECOMMUNICATIONS PLAN
359 of 518 56ET100 BLDG 56 -LEVEL 00 -TELECOMMUNICATIONS PLAN
360 of 518 56ET101 BLDG 56 -LEVEL 01 -TELECOMMUNICATIONS PLAN
361 of 518 01ET400 BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS
362 of 518 01ET401 BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
363 of 518 01ET402 BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
364 of 518 01ET403 BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS
365 of 518 01ET404 BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS
366 of 518 01ET405 BLDG 01 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS
367 of 518 01ET406 BLDG 01 -LEVEL 06 -ENLARGED TELECOMMUNICATIONS PLANS
368 of 518 01ET407 BLDG 01 -LEVEL 07 -ENLARGED TELECOMMUNICATIONS PLANS
369 of 518 01ET408 BLDG 01 -LEVEL 08 -ENLARGED TELECOMMUNICATIONS PLANS
370 of 518 01ET409 BLDG 01 -LEVEL 09 -ENLARGED TELECOMMUNICATIONS PLANS
371 of 518 01ET410 BLDG 01 -LEVEL 10 -ENLARGED TELECOMMUNICATIONS PLANS
372 of 518 01ET411 BLDG 01 -LEVEL 11 -ENLARGED TELECOMMUNICATIONS PLANS
373 of 518 02ET401a BLDG 02 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
374 of 518 02ET401b BLDG 02 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
375 of 518 02ET402 BLDG 02 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
376 of 518 04ET401 BLDG 04 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
377 of 518 05ET401 BLDG 05 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
378 of 518 06ET401 BLDG 06 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
379 of 518 06ET402a BLDG 06 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
380 of 518 06ET402b BLDG 06 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
381 of 518 15ET401a BLDG 15 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
382 of 518 15ET401b BLDG 15 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
383 of 518 15ET402a BLDG 15 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
384 of 518 15ET402b BLDG 15 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
385 of 518 15ET403a BLDG 15 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS
386 of 518 15ET403b BLDG 15 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS
387 of 518 15ET404 BLDG 15 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS
388 of 518 15ET405a BLDG 15 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS
389 of 518 15ET405b BLDG 15 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS
390 of 518 15ET406 BLDG 15 -LEVEL 06 -ENLARGED TELECOMMUNICATIONS PLANS
391 of 518 15ET407a BLDG 15 -LEVEL 07 -ENLARGED TELECOMMUNICATIONS PLANS
392 of 518 15ET407b BLDG 15 -LEVEL 07 -ENLARGED TELECOMMUNICATIONS PLANS
393 of 518 15ET408 BLDG 15 -LEVEL 08 -ENLARGED TELECOMMUNICATIONS PLANS
394 of 518 26ET400 BLDG 26 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS
395 of 518 26ET401a BLDG 26 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLAN
396 of 518 26ET401b BLDG 26 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
397 of 518 26ET401c BLDG 26 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLAN
398 of 518 26ET402a BLDG 26 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
399 of 518 26ET402b BLDG 26 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
400 of 518 26ET402c BLDG 26 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
401 of 518 26ET403 BLDG 26 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS
402 of 518 26ET405 BLDG 26 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS
403 of 518 40ET401 BLDG 40 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
404 of 518 55ET401 BLDG 55 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
405 of 518 55ET402 BLDG 55 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
406 of 518 56ET400 BLDG 56 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS
407 of 518 56ET401 BLDG 56 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
408 of 518 ET501 TELECOMMUNICATIONS DETAILS
409 of 518 ET502 TELECOMMUNICATIONS DETAILS
410 of 518 ET503 TELECOMMUNICATIONS DETAILS
411 of 518 ET504 TELECOMMUNICATIONS DETAILS
412 of 518 ET701 TELECOMMUNICATIONS SCHEDULES
TECHNOLOGY
413 of 518 0-TN000 TECHNOLOGY COVERSHEET
414 of 518 0-TN003 TECHNOLOGY SITE PLAN & DETAILS
415 of 518 0-TN601 TECHNOLOGY DIAGRAMS
416 of 518 1-TN10S-NE BLDG 1 NE -SUB-BASEMENT 01 PLAN -TECHNOLOGY
417 of 518 1-TN10S-SE BLDG 1 SE -SUB-BASEMENT 01 PLAN -TECHNOLOGY
418 of 518 1-TN100-NE BLDG 1 NE -BASEMENT PLAN -TECHNOLOGY
419 of 518 1-TN100-NW BLDG 1 NW -BASEMENT PLAN -TECHNOLOGY
420 of 518 1-TN100-SE BLDG 1 SE -BASEMENT PLAN -TECHNOLOGY
421 of 518 1-TN101-NE BLDG 1 NE -LEVEL 01 PLAN -TECHNOLOGY
422 of 518 1-TN101-SE BLDG 1 SE -LEVEL 01 PLAN -TECHNOLOGY
423 of 518 1-TN102-NE BLDG 1 NE -LEVEL 02 PLAN -TECHNOLOGY
424 of 518 1-TN103-NE BLDG 1 NE -LEVEL 03 PLAN -TECHNOLOGY
425 of 518 1-TN104-NE BLDG 1 NE -LEVEL 04 PLAN -TECHNOLOGY
426 of 518 1-TN105-NE BLDG 1 NE -LEVEL 05 PLAN -TECHNOLOGY
427 of 518 1-TN106-NE BLDG 1 NE -LEVEL 06 PLAN -TECHNOLOGY
428 of 518 1-TN107-NE BLDG 1 NE -LEVEL 07 PLAN -TECHNOLOGY
429 of 518 1-TN108-NE BLDG 1 NE -LEVEL 08 PLAN -TECHNOLOGY
430 of 518 1-TN109-NE BLDG 1 NE -LEVEL 09 PLAN -TECHNOLOGY
431 of 518 1-TN110-NE BLDG 1 NE -LEVEL 10 PLAN -TECHNOLOGY
432 of 518 1-TN111-NE BLDG 1 NE -LEVEL 11 PLAN -TECHNOLOGY
433 of 518 1-TN401 TECHNOLOGY ENLARGED PLANS
434 of 518 1-TN402 TECHNOLOGY ENLARGED PLANS
435 of 518 1-TN403 TECHNOLOGY ENLARGED PLANS
436 of 518 1-TN601 TECHNOLOGY DIAGRAMS
437 of 518 2-TN200 BLDG 02 -BASEMENT PLAN -TECHNOLOGY
438 of 518 2-TN201 BLDG 02 -LEVEL 01 PLAN -TECHNOLOGY
439 of 518 2-TN202 BLDG 02 -LEVEL 02 PLAN -TECHNOLOGY
440 of 518 2-TN401 BLDG 02 -TECHNOLOGY ENLARGED PLANS & DIAGRAMS
441 of 518 4-TN100 BLDG 4 -BASEMENT PLAN -TECHNOLOGY
442 of 518 4-TN101 BLDG 4 -LEVEL 01 PLAN -TECHNOLOGY
443 of 518 4-TN401 TECHNOLOGY ENLARGED PLANS & DIAGRAMS
444 of 518 5-TN101 BLDG 5 -LEVEL 01 PLAN -TECHNOLOGY
445 of 518 6-TN101 BLDG 06 -LEVEL 01 PLAN -TECHNOLOGY
446 of 518 6-TN102 BLDG 06 -LEVEL 02 PLAN -TECHNOLOGY
447 of 518 6-TN401 BLDG 06 -TECHNOLOGY ENLARGED PLANS & DIAGRAMS
448 of 518 15-TN100 BLDG 15 -BASEMENT PLAN -TECHNOLOGY
449 of 518 15-TN101 BLDG 15 -LEVEL 01 PLAN -TECHNOLOGY
450 of 518 15-TN102 BLDG 15 -LEVEL 02 PLAN -TECHNOLOGY
451 of 518 15-TN103 BLDG 15 -LEVEL 03 PLAN -TECHNOLOGY
452 of 518 15-TN104 BLDG 15 -LEVEL 04 PLAN -TECHNOLOGY
453 of 518 15-TN105 BLDG 15 -LEVEL 05 PLAN -TECHNOLOGY
454 of 518 15-TN106 BLDG 15 -LEVEL 06 PLAN -TECHNOLOGY
455 of 518 15-TN107 BLDG 15 -LEVEL 07 PLAN -TECHNOLOGY
456 of 518 15-TN108 BLDG 15 -LEVEL 08 PLAN -TECHNOLOGY
457 of 518 15-TN401 TECHNOLOGY ENLARGED PLANS
458 of 518 15-TN402 TECHNOLOGY ENLARGED PLANS
459 of 518 26-TN100 BLDG 26 -BASEMENT PLAN -TECHNOLOGY
460 of 518 26-TN101 BLDG 26 -LEVEL 01 PLAN -TECHNOLOGY
461 of 518 26-TN102 BLDG 26 -LEVEL 02 PLAN -TECHNOLOGY
462 of 518 26-TN103 BLDG 26 -LEVEL 03 PLAN -TECHNOLOGY
463 of 518 26-TN104 BLDG 26 -LEVEL 04 PLAN -TECHNOLOGY
464 of 518 26-TN105 BLDG 26 -LEVEL 05 PLAN -TECHNOLOGY
465 of 518 26-TN401 TECHNOLOGY ENLARGED PLANS
466 of 518 40-TD101 BLDG 40 -LEVEL 01 DEMOLITION PLAN -TECHNOLOGY
467 of 518 40-TN101 BLDG 40 -LEVEL 01 PLAN -TECHNOLOGY & DIAGRAMS
468 of 518 55-TN101 BLDG 55 -LEVEL 01 PLAN -TECHNOLOGY
469 of 518 55-TN102 BLDG 55 -LEVEL 02 PLAN -TECHNOLOGY
470 of 518 55-TN401 TECHNOLOGY ENLARGED PLANS & DIAGRAMS
471 of 518 56-TN100 BLDG 56 -BASEMENT PLAN -TECHNOLOGY
472 of 518 56-TN101 BLDG 56 -LEVEL 01 PLAN -TECHNOLOGY
473 of 518 56-TN401 TECHNOLOGY ENLARGED PLANS & DIAGRAMS
ENVIRONMENTAL
474 of 518 H0000 ENVIRONMENTAL GENERAL NOTES
475 of 518 H1000 BUILDING 1 - BASEMENT -NVIRONMENTAL HAZARDS
476 of 518 H1001 BUILDING 1 - FLOOR 1 -ENVIRONMENTAL HAZARDS
477 of 518 H1002 BUILDING 1 - FLOOR 2 -ENVIRONMENTAL HAZARDS
478 of 518 H1003 BUILDING 1 - FLOOR 3 -ENVIRONMENTAL HAZARDS
479 of 518 H1004 BUILDING 1 - FLOOR 4 -ENVIRONMENTAL HAZARDS
480 of 518 H1005 BUILDING 1 - FLOOR 5 -ENVIRONMENTAL HAZARDS
481 of 518 H1006 BUILDING 1 - FLOOR 6 -ENVIRONMENTAL HAZARDS
482 of 518 H1007 BUILDING 1 - FLOOR 7 -ENVIRONMENTAL HAZARDS
483 of 518 H1008 BUILDING 1 - FLOOR 8 -ENVIRONMENTAL HAZARDS
484 of 518 H1009 BUILDING 1 - FLOOR 9 -ENVIRONMENTAL HAZARDS
485 of 518 H1010 BUILDING 1 - FLOOR 10 -ENVIRONMENTAL HAZARDS
486 of 518 H1011 BUILDING 1 - FLOOR 11 -ENVIRONMENTAL HAZARDS
487 of 518 H1012 BUILDING 1 - TR ROOMS BASEMENT & FLOOR 1 - ENVIRONMENTAL HAZARDS
488 of 518 H1013 BUILDING 1 - TR ROOMS FLOOR 2 & FLOOR 3 - ENVIRONMENTAL HAZARDS
489 of 518 H1014 BUILDING 1 - TR ROOMS FLOOR 4 & FLOOR 5 - ENVIRONMENTAL HAZARDS
490 of 518 H1015 BUILDING 1 - TR ROOMS FLOOR 6 & FLOOR 7 - ENVIRONMENTAL HAZARDS
491 of 518 H1016 BUILDING 1 - TR ROOMS FLOOR 8 & FLOOR 9 - ENVIRONMENTAL HAZARDS
492 of 518 H1017 BUILDING 1 - TR ROOMS FLOOR 10 & FLOOR 11 - ENVIRONMENTAL HAZARDS
493 of 518 H2001 BUILDING 2 - ROOF - ENVIRONMENTAL HAZARDS
494 of 518 H4001 BUILDING 4 - BASEMENT-ENVIRONMENTAL HAZARDS
495 of 518 H4002 BUILDING 4 - ROOM 4-106-ENVIRONMENTAL HAZARDS
496 of 518 H5001 BUILDING 5 - FLOOR 1-ENVIRONMENTAL HAZARDS
497 of 518 H6001 BUILDING 6 - FLOOR 1 -ENVIRONMENTAL HAZARDS
498 of 518 H6002 BUILDING 6 - FLOOR 2 -ENVIRONMENTAL HAZARDS
499 of 518 H1500 BUILDING 15 - BASEMENT -ENVIRONMENTAL HAZARDS
500 of 518 H1501 BUILDING 15 - FLOOR 1 -ENVIRONMENTAL HAZARDS
501 of 518 H1502 BUILDING 15 - FLOOR 2 -ENVIRONMENTAL HAZARDS
502 of 518 H1503 BUILDING 15 - FLOOR 3 -ENVIRONMENTAL HAZARDS
503 of 518 H1504 BUILDING 15 - FLOOR 4 -ENVIRONMENTAL HAZARDS
504 of 518 H1505 BUILDING 15 - FLOOR 5 -ENVIRONMENTAL HAZARDS
505 of 518 H1506 BUILDING 15 - FLOOR 6 -ENVIRONMENTAL HAZARDS
506 of 518 H1507 BUILDING 15 - FLOOR 7 -ENVIRONMENTAL HAZARDS
507 of 518 H1508 BUILDING 15 - FLOOR 8 -ENVIRONMENTAL HAZARDS
508 of 518 H1509 BUILDING 15 - FLOOR 9 -ENVIRONMENTAL HAZARDS
509 of 518 H2600 BUILDING 26 - BASEMENT -ENVIRONMENTAL HAZARDS
510 of 518 H2601 BUILDING 26 - FLOOR 1 -ENVIRONMENTAL HAZARDS
511 of 518 H2602 BUILDING 26 - FLOOR 2 -ENVIRONMENTAL HAZARDS
512 of 518 H2603 BUILDING 26 - FLOOR 3 -ENVIRONMENTAL HAZARDS
513 of 518 H2604 BUILDING 26 - ROOF -ENVIRONMENTAL HAZARDS
514 of 518 H2605 BUILDING 26 - ROOM V1-684 -ENVIRONMENTAL HAZARDS
515 of 518 H2606 BUILDING 26 - ROOM V2-751A -ENVIRONMENTAL HAZARDS
516 of 518 H4000 BUILDING 40 - FLOOR 1 -ENVIRONMENTAL HAZARDS
517 of 518 H5500 BUILDING 55 - ROOF -ENVIRONMENTAL HAZARDS
518 of 518 H5600 BUILDING 56 - ROOF -ENVIRONMENTAL HAZARDS
345 of 518 15ET106 BLDG 15 -LEVEL 06 -TELECOMMUNICATIONS PLAN 433 of 518 1-TN401 TECHNOLOGY ENLARGED PLANS
AB
ABA
AC(T)
ACM
ACW
ADA
ADJ
A/E
AF
AFF
AGG
ALT
ALUM
APPROX
ARCH
ASPH
A/V
BARR
BATH
BB
BLDG
BLK
BLKG
BLW
BM
BMTU
BO
BOC
BOS
BRC
BRKT
BRNG
BTM
BTWN
CAB
CC
CD
CJ
CLG
CLR
CMU
CO
COL
COMP
CONC
CONN
CONST
CONT
COORD
COR
CORR
CS
CT
CTR
CV
AND
ANGLE
AT
CENTERLINE
DEGREES
NUMBER
ANCHOR BOLT
ARCHITECTURAL BARRIERS ACT
ACOUSTICAL CEILING (TILE)
ASBESTOS CONTAINING MATERIAL
ACOUSTICAL WALL
AMERICANS W/ DISABILITIES ACT
ADJACENT
ARCHITECT/ENGINEER
ACCESS FLOOR
ABOVE FINISH FLOOR
AGGREGATE
ALTERNATE
ALUMINUM
APPROXIMATELY
ARCHITECT(URAL)
ASPHALT
AUDIO / VIDEO
BARRIER
BATHROOM
BACKER BOARD
BUILDING
BLOCK
BLOCKING
BELOW
BEAM
BONE MARROW TRANSPLANT UNIT
BOTTOM OF
BOTTOM OF CURB
BOTTOM OF SLAB
BRACE, BRACING
BRACKET
BEARING
BOTTOM
BETWEEN
CABINET
CONTRACTOR FURN, CONTRACTOR INST
CONSTRUCTION/CONTRACT DOCUMENTS
CONTROL JOINT
CEILING
CLEAR(ANCE)
CONCRETE MASONRY UNIT
CONTRACTING OFFICER
COLUMN
COMPOSITION
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS
COORDINATE
CONTRACTING OFFICER REPRESENTATIVE
CORRIDOR
CONCRETE SEALER
CERAMIC TILE
CENTER
CONTRACTOR FURNISHED, VA INSTALLED
HDR
HDWE
HM
HORZ
HPDL
HR
HT
HVAC
ICRA
ID
ILSM
INCL
INST
INSUL
INT
JT
KV
LAM
LAV
LCM
LT
MAT
MAX
MDF
MECH
MEP
MFR
MIN
MISC
MOD
MTL
N N/A
NEG
NO.
NOM
NTS
O.C.
OPNG
OPP
OPT
OVHD
P
PCONC
PCRA
PL
PLAM
PLY(WD)
PNL
PR
PRFB
PS
PT
PTN(S)
PVMT
QTY
HEADER
HARDWARE
HOLLOW METAL
HORIZONTAL
HIGH PRESSURE DECORATIVE LAM
HOUR
HEIGHT
HEATING, VENTILATION & AIR CONDITIONING
INFECTIOUS CONTROL RISK ASSESSMENT
INSIDE DIAMETER OR DIM
INTERIM LIFE SAFETY MEASURES
INCLUDE(D,ING)
INSTALL
INSULATION
INTERIOR
JOINT
KILOVOLT
LAMINATE(D)
LAVATORY
LEAD CONTAINING MATERIAL(S)
LIGHT
MATERIAL(S)
MAXIMUM
MEDIUM-DENSITY FIBREBOARD
MECHANIC(AL)
MECHANICAL, ELECTRICAL, PLUMBING
MANUFACTURE(R)
MINIMUM
MISCELLANEOUS
MODIFIED
METAL
NORTH
NOT APPLICABLE
NEGATIVE
NUMBER
NOMINAL
NOT TO SCALE
ON CENTER(S)
OPENING
OPPOSITE
OPTION(AL)
OVERHEAD
PAINT
PRECAST CONCRETE
PRE-CONSTRUCTION RISK ASSESSMENT
PLATE
PLASTIC LAMINATE
PLYWOOD
PANEL
PAIR
PREFABRICATED
PLASTIC
PRESSURE TREATED
PARTITION(S)
PAVEMENT
QUANTITY
RAD
RCP
REF
REINF
REP
REQ(s,(')D)
RESIL
REV
RF
RM
RMV
RO
S
SCHED
SD
SECT
SF
SFRM
SHG
SHT(G)
SIM
SM
SOW
SPEC
SQ
SS
ST
STDG
STL
STOR
STRUCT
SUSP
SV
SYS
TEMP
T&G
THK
THRESH
TOC
TOS
TPH
TRANS
TS
TYP
UON
VA
VAR
VB
VC
VERT
VIF
VV
W W/
WD
WDW
WGHT
W/O
WP
WR
RADIUS
REFLECTED CEILING PLAN
REFERENCE
REINFORCE(D,ING)
REPRESENTATIVE
REQUIRE(D,S,MENT(S))
RESILIENT
REVERSE
RADIO FREQUENCY / ROOF
ROOM
REMOVE
ROUGH OPENING
SOUTH
SCHEDULE
SCHEMATIC DESIGN
SECTION
SQUARE FEET
SPRAY APPLIED FIRE-RESISTIVE MATERIAL
SHINGLES
SHEET (SHEATHING)
SIMILAR
SEAM
SCOPE OF WORK
SPECIFICATION
SQUARE
STAINLESS STEEL
STAIN
STANDING
STEEL
STORAGE
STRUCTURAL
SUSPENDED
SHEET VINYL
SYSTEM
TEMPORARY
TONGUE AND GROOVE
THICK(NESS)
THRESHOLD
TABLE OF CONTENTS
TOP OF SLAB
TOILET PAPER HOLDER
TRANSITION
TUBE STEEL
TYPICAL
UNLESS OTHERWISE NOTED
VETERANS AFFAIRS
VARIES
VAPOR BARRIER
VA FURNISHED, CONTRACTOR INSTALLED
VERTICAL
VERIFY IN FIELD
VA FURNISHED, VA INSTALLED
WEST
WITH
WOOD
WINDOW
WEIGHT
WITHOUT
WATERPROOF(ING)
WATER RESISTANT
DBL
DC
DD
DEMO
DEPT
DG
DIA
DIM
DWN
DR
DTL
DWG
E
EA
EJ
ELEC
ELEV
ENG
EOC
EOP
EPDM
EQ
EQUIP
ES
ETS
EX(IST)
EXP
EXT
FA
FD
FE(C)
FF
FFB
FFL
FIN
FLASH
FLR
FLRSNT
FNDN
FOC
FOF
FOS
FP
FR
FRM
FT
FTG
FUR
FURN
GA
GALV
GE
G(W)B
GC
GL
GLB
GMU
GOV(T)
GYP
DOUBLE
DIRECT CURRENT
DESIGN DEVELOPMENT
DEMOLISH(ION)
DEPARTMENT
DESIGN GUIDE
DIAMETER
DIMENSION
DOWN
DOOR
DETAIL
DRAWING(S)
EAST
EACH
EXPANSION JOINT
ELECTRIC(AL)
ELEVATION OR ELEVATOR
ENGINEER(ING)
EDGE OF CURB
EDGE OF PAVEMENT
ETHYLENE PROPYLENE DIENE TERPOLYMER
EQUAL
EQUIPMENT
EACH SIDE
EXPOSED TO STRUCTURE
EXISTING
EXPANSION
EXTERIOR
FIRE ALARM
FLOOR DRAIN
FIRE EXTINGUISHER (CABINET)
FACTORY FINISH
FINISH FLOOR BREAK
FINISH FLOOR LINE
FINISH(ED)
FLASHING
FLOOR(ING)
FLORESCENT
FOUNDATION
FACE OF CONCRETE
FACE OF FINISH
FACE OF STUDS
FIRE PROOF
FIRE RATED
FRAME
FOOT, FEET
FOOTING
FURRING
FURNISHED
GAGE, GAUGE
GALVANIZED
GENERAL ELECTRIC
GYPSUM (WALL) BOARD
GENERAL CONTRACTOR
GRID LINE
GLUE LAMINATED BEAM
GLASS MASONRY UNIT
GOVERNMENT
GYPSUM BOARD
A101
1 TYP
101.1
A-101
SIM
EXTERIOR ELEVATION
INTERIOR ELEVATION
BUILDING SECTION FLAG
WALL SECTION FLAG
CALLOUT FLAG
VERTICAL GRID LINE
HORIZONTAL GRID LINE
TRUE NORTH ARROW
PROJECT NORTH ARROW
(TRUE NORTH DASHED)
ELEVATION MARKER
KEY NOTE
ROOM TAG (SF OPTIONAL)
CEILING HEIGHT TAG
ROOM NAME
150 SF
A
A-101
SIM
01A
TRUE
NORTH
W1
A-101
PROJECT
NORTH
WALL TAG
FLOOR TAG
ROOF TAG
DOOR TAG
WINDOW TAG
SPECIALTY EQUIPMENT TAG
SIGNAGE TAG
SIGNAGE KEY NOTE
(AW SHEETS ONLY)
SIGNAGE MATERIAL TAG
(AW SHEETS ONLY)
EXISTING TO REMAIN
NEW CONSTRUCTION
TO DEMOLISH
HIDDEN ABOVE OR BELOW
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
SMOKE ZONE
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
SMOKE RATED WALL
SMOKE & 1 HR FIRE RATED WALL
FIRE EXTINGUISHER CABINET
AREA OF WORK / AREA SHOWN
CONSTRUCTION ZONE, ( - - )
PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
PATH OF TRAVEL
EMERGENCY EGRESS PATHWAY
SEISMIC JOINT
BATT INSULATION
RIGID INSULATION
GYPSUM BOARD, TYPE X
ACOUSTICAL CEILING TILE, 2' x 2'
CONCRETE
STEEL
PLYWOOD, FIRE RATED
EARTH
SUPPLY GRILLE PER MECHANICAL
(SIZE & PROPORTIONS MAY VARY)
RETURN GRILLE PER MECHANICAL
(SIZE & PROPORTIONS MAY VARY)
LIGHTING PER ELECTRICAL
(SIZE & PROPORTIONS MAY VARY)
A-101
A01
D88
A5175SOAP DISH
IN-04.02-01
AFF
GYP ON MTL STUD
9' - 0"
FEC
F-1
R-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128
589-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES A-001
ARCHITECTURAL SYMBOLS &
ABBREVIATIONS -
MA/EM DD/ADSI
100% CONSTRUCTION
DOCUMENTS
06/19/2023
SYMBOLS ABBREVIATIONS
GENERAL NOTES
APPLICABLE PUBLICATIONS
1. ALL WORK DONE BY THE CONTRACTOR OR SUB-CONTRACTORS SHALL BE PERFORMED WITH
A HIGH LEVEL OF WORKMANSHIP.
2. MAINTAIN A SAFE, CLEAN CONSTRUCTION ZONE AT ALL TIMES.
3. DO NOT SCALE DRAWINGS.
4. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A +/- SYMBOL. ONLY NORMAL
INDUSTRY STANDARD TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM DIMENSIONS
INDICATED.
5. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE FULL SPACE INDICATED WITHOUT
ENCROACHMENTS.
6. FURNISH ALL MATERIALS & PRODUCTS TO COMPLY WITH THE CONTRACT DOCUMENTS.
7. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH FLOOR ELEVATION, UNLESS OTHER
WISE NOTED.
8. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE BLOCKING IN WALL BEHIND, THIS
INCLUDES BACKING FOR WALL MOUNTED DOOR STOPS. ENSURE THAT ALL REQUIRED
BACKING IS INSTALLED IN WALLS PRIOR TO INSTALLING DRYWALL.
9. IN TOILET ROOMS PROVIDE STAINLESS STEEL FILLER BEHIND ANY MIRRORS AND OTHER
WALL MOUNTED ACCESSORIES WHEN ITEM IS INSTALLED PARTIALLY OVER CERAMIC TILE.
10. OBTAIN THE SERVICES OF TREMCO TO OBSERVE AND CERTIFY ALL ROOF WORK.
APPLICABLE PUBLICATIONS ARCHITECTURAL NOTES
AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS
OF CODE ENFORCEMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS,
FEES, ETC). THE VA SHALL FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ).
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD
APPLICATION GUIDE AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL).
INTERNATIONAL BUILDING CODE (IBC) 2021.
INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021.
NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES
PRECEDENCE OVER IBC.
NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8.
NATIONAL ELECTRICAL CODE (NEC).
INTERNATIONAL PLUMBING CODE (IPC) 2021.
SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL
ENGINEERS (ASME) A 17.1.
ASME BOILER AND PRESSURE VESSEL CODE.
ASME CODE FOR PRESSURE PIPING.
ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT
BARRIER FREE DESIGN GUIDE (PG-18-3) .
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE
AND COMMENTARY (ACI 318).
MANUAL OF STEEL CONSTRUCTION , LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC).
ENERGY POLICY ACT OF 2005 (EPACT).
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL
AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435.
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU).
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND
TRANSPORTATION MANAGEMENT.
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL
REQUIREMENTS SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2004.
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE STANDARD 15 - 2007.
VAMC APPROVED HARDWARE LOCKING STANDARDS.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI).
AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM).
FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND
STANDARDS FOR TWO-WAY RADIO EQUIPMENT, SYSTEMS AND OPERATION.
ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA).
INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE).
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS AND
INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI).
JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),
ENVIRONMENT OF CARE GUIDELINES AND STANDARDS.
FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR THE
DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES.
THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL
ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .