Attachment 5 - Drawings Civil.pdf

PDF 10 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Kansas City, MO (VA-23-00068037)
Solicitation number
36C77623B0066
Issued by

About this file

This document provides details on a federal contract opportunity for infrastructure upgrades at the Veterans Affairs Medical Center in Kansas City, Missouri. The Attachment 5 file contains civil engineering drawings related to Solicitation Number 36C77623B0066 issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The opportunity involves construction services for EHRM infrastructure upgrades at the Kansas City VA facility, with responses due by the date listed in the solicitation. Relevant details include the federal agency and location involved, as well as the type of construction and infrastructure work required.

View the file

Other files

File Type Posted
Copy of Attachment 1 - Technical Questions - Responses.xlsx XLSX spreadsheet
36C77623B0066 0002.docx DOCX document
Attachment 1 - Site Visit - Sign-In Sheet - 36C77623B0066 EHRM Infra Upgrade - KC.pdf PDF
36C77623B0066 0001.docx DOCX document
Attachment 11 - Drawings Electrical - 6 of 8.pdf PDF
Attachment 19 - Drawings Telecommunications - 2 of 3.pdf PDF
Attachment 1 - Specifications - DIV 1-13.pdf PDF
Attachment 18 - Drawings Telecommunications - 1 of 3.pdf PDF
Attachment 3 - Drawings Architectural - 1 of 2.pdf PDF
Attachment 16 - Drawings Structural.pdf PDF
Attachment 7 - Drawings Electrical - 2 of 8.pdf PDF
Attachment 13 - Drawings Electrical - 8 of 8.pdf PDF
Attachment 14 - Drawings Environmental.pdf PDF
Attachment 10 - Drawings Electrical - 5 of 8.pdf PDF
Attachment 12 - Drawings Electrical - 7 of 8.pdf PDF
Attachment 22 - Wage Rates - 6-30-23.pdf PDF
Attachment 21 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 9 - Drawings Electrical - 4 of 8.pdf PDF
Attachment 23 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 6 - Drawings Electrical - 1 of 8.pdf PDF
Attachment 17 - Drawings Technology.pdf PDF
Attachment 2 - Specifications - DIV 21-32.pdf PDF
Attachment 8 - Drawings Electrical - 3 of 8.pdf PDF
36C77623B0066_1.docx DOCX document
Attachment 20 - Drawings Telecommunications - 3 of 3.pdf PDF
Attachment 4 - Drawings Architectural - 2 of 2.pdf PDF
Attachment 15 - Drawings Mechanical.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

x x x x x x x

X

X

X

X x x x x x x x

X

X

X

X

M

35th STREET

LINWOOD BOULEVARD

IN

C

IN

E

R A

T O

R

B U

IL

D

IN

G

IN

C

IN

E

R A

T O

R

C O

VID

T

EN

T

FISHER

HOUSE

ARCHITECTURAL

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

DESIGN TEAM

FIRE PROTECTION

SPEES DESIGN BUILD

STRUCTURAL

IMEG

ELECTRICAL

SPEES DESIGN BUILD

PLUMBING

SPEES DESIGN BUILD

MECHANICAL

SPEES DESIGN BUILD

2882 106TH ST

DES MOINES, IA, 50322

PHONE: (515) 334-9906

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

CIVIL

IMEG

2882 106TH ST

DES MOINES, IA, 50322

PHONE: (515) 334-9906

PROJECT INFORMATION

STATE:

COUNTY:

JURISTICTION:

OWNER:

CODE ANALYSIS

PROJECT DESCRIPTION

APPLICABLE BUILDINGS:

1, 2, 4, 5, 6, 15, 26, 40, 55, ICRA CLASS REQUIREMENTS

REQUIREMENTS DEPENDENT ON

EACH INDIVIDUAL ROOM LOCATION.

THE PROPOSED DESIGN SHALL IMPROVE,

RECONFIGURE, EXPAND AND RENOVATE

EXISTING SPACES FOR NEW

TELECOMMUNICATION ROOMS.

MISSOURI

JACKSON

KANSAS CITY

GOV, VETERANS AFFAIRS

GENERAL NOTES

1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &

SPECIFICATIONS.

2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.

BRING TO THE AWARENESS OF AND VERIFY WITH VA COR PRIOR TO PROCEEDING.

3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE

TO VISIT THE SITE.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT

IMMEDIATELY TO THE ATTENTION OF THE COR.

5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.

6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK

THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.

7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE

WITH THE CONTRACT DOCUMENTS.

8. THE CONTRACTOR SHALL HAVE NO MORE THAN TWO TEAMS WORKING ON TWO TRS AT ANY

GIVEN TIME UNLESS WRITTEN APPROVAL IS PROVIDED BY THE COR.

9. THE CONTRACTOR SHALL ONLY WORK IN A SINGLE BUILDING AT ANY GIVEN TIME UNLESS WRITTEN

APPROVAL IS PROVIDED BY THE COR.

BLDG 55

BLDG 26

BLDG 1

BLDG 15

BLDG 6 BLDG 40

BLDG 56

BLDG 2

BLDG 5 BLDG 4

KANSAS CITY VA MEDICAL CENTER

KANSAS CITY, MO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128

589-21-700

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES G-001

COVER SHEET

MA/EM AJ/DD/ADSI

100% CONSTRUCTION

DOCUMENTS

06/19/2023

EHRM INFRASTRUCTURE UPGRADES

KANSAS CITY VA MEDICAL CENTER - 4801 LINWOOD BLVD, KANSAS CITY, MO 64128

PROJECT #: 589-21-700

1" = 160'-0"

VICINITY MAP

3" = 1'-0"

LOCATION MAP

TRUE

NORTH

TRUE

NORTH

Revisions: Date:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

1 of 512Page 1 of 518

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128

589-21-700

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES G-002

DRAWING INDEX

MA/EM DD/ADSI

100% CONSTRUCTION

DOCUMENTS

06/19/2023

Revisions: Date:

DRAWING INDEX

PAGE # SHEET # SHEET NAME

GENERAL

1 of 518 G-001 COVER SHEET

2 of 518 G-002 DRAWING INDEX

3 of 518 G-003 DRAWING INDEX

CIVIL

4 of 518 CJ100 CIVIL NOTES AND LEGEND

5 of 518 CD100 EXISTING CONDITIONS AND DEMOLITION PLAN

6 of 518 CD101 DETAILED DEMOLITION PLAN

7 of 518 CD102 DETAILED DEMOLITION PLAN

8 of 518 CD103 DETAILED DEMOLITION PLAN

9 of 518 CU100 UTILITY PLAN

10 of 518 CU101 DETAILED UTILITY PLAN

11 of 518 CU102 DETAILED UTILITY PLAN

12 of 518 CU103 DETAILED UTILITY PLAN

13 of 518 CU104 FIBER PLAN AND PROFILE

14 of 518 CU105 FIBER PLAN AND PROFILE

15 of 518 CU106 FIBER PLAN AND PROFILE

16 of 518 CU107 FIBER PLAN AND PROFILE

17 of 518 CU108 FIBER PLAN AND PROFILE

18 of 518 CK100 CIVIL DETAILS

STRUCTURAL

19 of 518 S-000 STRUCTURAL COVER SHEET

20 of 518 S-001 GENERAL NOTES

21 of 518 01S-101 STRUCTURAL PLANS AND DETAILS

22 of 518 06S-101 STRUCTURAL PLANS AND DETAILS

23 of 518 15S-101 ADDITION FOUNDATION AND FRAMING PLANS

24 of 518 15S-200 FOUNDATION DETAILS

25 of 518 15S-300 STEEL DETAILS

ARCHITECTURAL

26 of 518 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS

27 of 518 AS101a ICRA DETAILS

28 of 518 AS101b ICRA DETAILS

29 of 518 01A-100 BLDG 01 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS

30 of 518 01A-101 BLDG 01 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

31 of 518 01A-102 BLDG 01 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

32 of 518 01A-103 BLDG 01 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS

33 of 518 01A-104 BLDG 01 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS

34 of 518 01A-105 BLDG 01 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS

35 of 518 01A-106 BLDG 01 -LEVEL 06 -DEMO, FLOOR PLANS & RCPS

36 of 518 01A-107 BLDG 01 -LEVEL 07 -DEMO, FLOOR PLANS & RCPS

37 of 518 01A-108 BLDG 01 -LEVEL 08 -DEMO, FLOOR PLANS & RCPS

38 of 518 01A-109 BLDG 01 -LEVEL 09 -DEMO, FLOOR PLANS & RCPS

39 of 518 01A-110 BLDG 01 -LEVEL 10 -DEMO, FLOOR PLANS & RCPS

40 of 518 01A-111 BLDG 01 -LEVEL 11 -DEMO, FLOOR PLANS & RCPS

41 of 518 01AS100 BUILDING 01 -LEVEL 00 -PHASING PLAN

42 of 518 01AS101 BUILDING 01 -LEVEL 01 -PHASING PLAN

43 of 518 01AS102 BUILDING 01 -LEVEL 02 -PHASING PLAN

44 of 518 01AS103 BUILDING 01 -LEVEL 03 -PHASING PLAN

45 of 518 01AS104 BUILDING 01 -LEVEL 04 -PHASING PLAN

46 of 518 01AS105 BUILDING 01 -LEVEL 05 -PHASING PLAN

47 of 518 01AS106 BUILDING 01 -LEVEL 06 -PHASING PLAN

48 of 518 01AS107 BUILDING 01 -LEVEL 07 -PHASING PLAN

49 of 518 01AS108 BUILDING 01 -LEVEL 08 -PHASING PLAN

50 of 518 01AS109 BUILDING 01 -LEVEL 09 -PHASING PLAN

51 of 518 01AS110 BUILDING 01 -LEVEL 10 -PHASING PLAN

52 of 518 01AS111 BUILDING 01 -LEVEL 11 -PHASING PLAN

53 of 518 01AS112 BUILDING 01 -LEVEL 12 -PHASING PLAN

54 of 518 01AS113 BUILDING 01 -LEVEL 13 -PHASING PLAN

55 of 518 02A-101 BLDG 02 -LEVEL 01 -DEMO, FLOORS PLAN & RCPS

56 of 518 02A-102 BLDG 02 -LEVEL 02 -DEMO, FLOOR PLAN & RCPS

57 of 518 02AS100 BUILDING 02 -LEVEL 00 -PHASING PLAN

58 of 518 02AS101 BUILDING 02 -LEVEL 01 -PHASING PLAN

59 of 518 02AS102 BUILDING 02 -LEVEL 02 -PHASING PLAN

60 of 518 04A-101 BLDG 04 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS

61 of 518 04AS100 BUILDING 04 -LEVEL 00 -PHASING PLAN

62 of 518 04AS101 BUILDING 04 -LEVEL 01 -PHASING PLAN

63 of 518 04AS102 BUILDING 04 -LEVEL 02 -PHASING PLAN

64 of 518 04AS103 BUILDING 04 -LEVEL 03 LOWER -PHASING PLAN

65 of 518 04AS104 BUILDING 04 -LEVEL 03 UPPER -PHASING PLAN

66 of 518 05A-101 BLDG 05 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS

67 of 518 05AS101 BUILDING 05 -LEVEL 01 -PHASING PLAN

68 of 518 05AS102 BUILDING 05 -LEVEL 02 -PHASING PLAN

69 of 518 06A-101 BLDG 06 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS

70 of 518 06A-102 BLDG 06 -LEVEL 02 -DEMO, FLOOR PLAN & RCPS

71 of 518 06AS101 BUILDING 06 -LEVEL 01 -PHASING PLAN

72 of 518 06AS102 BUILDING 6 -LEVEL 02 -PHASING PLAN

73 of 518 15A-101 BLDG 15 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

74 of 518 15A-102 BLDG 15 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

75 of 518 15A-103 BLDG 15 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS

76 of 518 15A-104 BLDG 15 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS

77 of 518 15A-105 BLDG 15 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS

78 of 518 15A-106 BLDG 15 -LEVEL 06 -DEMO, FLOOR PLANS & RCPS

79 of 518 15A-107 BLDG 15 -LEVEL 07 -DEMO, FLOOR PLANS & RCPS

80 of 518 15A-108 BLDG 15 -LEVEL 08 -DEMO, FLOOR PLANS & RCPS

81 of 518 15AE-100 BLDG 15 TOWER -ROOF PLAN

82 of 518 15AE-101 BLDG 15 TOWER -ELEVATION -EXISTING CON

83 of 518 15AE-102 BLDG 15 TOWER -ELEVATION

84 of 518 15AE-103 BLDG 15 TOWER -SECTIONS

85 of 518 15AE-104 BLDG 15 TOWER -SECTIONS

86 of 518 15AS100 BUILDING 15 -LEVEL 00 -PHASING PLAN

87 of 518 15AS101 BUILDING 15 -LEVEL 01 -PHASING PLAN

88 of 518 15AS102 BUILDING 15 -LEVEL 02 -PHASING PLAN

89 of 518 15AS103 BUILDING 15 -LEVEL 03 -PHASING PLAN

90 of 518 15AS104 BUILDING 15 -LEVEL 04 -PHASING PLAN

91 of 518 15AS105 BUILDING 15 -LEVEL 05 -PHASING PLAN

92 of 518 15AS106 BUILDING 15 -LEVEL 06 -PHASING PLAN

93 of 518 15AS107 BUILDING 15 -LEVEL 07 -PHASING PLAN

94 of 518 15AS108 BUILDING 15 -LEVEL 08 -PHASING PLAN

95 of 518 15AS109 BUILDING 15 -LEVEL 09 -PHASING PLAN

96 of 518 26A-100 BLDG 26 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS

97 of 518 26A-101 BLDG 26 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

98 of 518 26A-102 BLDG 26 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

99 of 518 26A-103 BLDG 26 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS

100 of 518 26A-105 BLDG 26 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS

101 of 518 26AS100 BUILDING 26 -LEVEL 00 -PHASING PLAN

102 of 518 26AS101 BUILDING 26 -LEVEL 01 -PHASING PLAN

103 of 518 26AS102 BUILDING 26 -LEVEL 02 -PHASING PLAN

104 of 518 26AS103 BUILDING 26 -LEVEL 03 -PHASING PLAN

105 of 518 26AS104 BUILDING 26 -LEVEL 04 -PHASING PLAN

106 of 518 26AS105 BUILDING 26 -LEVEL 05 -PHASING PLAN

107 of 518 26AS106 BUILDING 26 -LEVEL 06 -PHASING PLAN

108 of 518 40A-101 BLDG 40 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS

109 of 518 40AS101 BUILDING 40 -LEVEL 01 -PHASING PLAN

110 of 518 55A-101 BLDG 55 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS

111 of 518 55A-102 BLDG 55 -LEVEL 02 -DEMO, FLOOR PLAN & RCPS

112 of 518 55AS101 BUILDING 55 -LEVEL 01 -PHASING PLAN

113 of 518 55AS102 BUILDING 55 -LEVEL 02 -PHASING PLAN

114 of 518 56A-100 BLDG 56 -LEVEL 00 -DEMO, FLOOR PLAN & RCPS

115 of 518 56A-101 BLDG 56 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS

116 of 518 56AS100 BUILDING 56 -LEVEL 00 -PHASING PLAN

117 of 518 56AS101 BUILDING 56 -LEVEL 01 -PHASING PLAN

118 of 518 A-601 ROOM FINISH SCHEDULE & WALL TYPES

119 of 518 A-602 DOOR DETAILS

120 of 518 A-603 ARCHITECTURAL DETAILS

121 of 518 A-604 EXTERIOR DETAILS

122 of 518 A-604A EXTERIOR DETAILS -ENLARGED PLANS

123 of 518 A-604B EXTERIOR DETAILS

124 of 518 A-604C EXTERIOR DETAILS

125 of 518 AE421 INTERIOR ELEVATIONS

126 of 518 AW001 IN-03.01 -ROOM NUMBER SIGN & SIGNAGE SCHEDULES

MECHANICAL

127 of 518 M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

128 of 518 01M-100a BLDG 01 -LEVEL 00 -FLOOR PLAN

129 of 518 01M-100b BLDG 01 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS

130 of 518 01M-101 BLDG 01 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

131 of 518 01M-102 BLDG 01 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

132 of 518 01M-103 BLDG 01 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS

133 of 518 01M-104 BLDG 01 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS

134 of 518 01M-105 BLDG 01 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS

135 of 518 01M-106 BLDG 01 -LEVEL 06 -DEMO, FLOOR PLANS & RCPS

136 of 518 01M-107 BLDG 01 -LEVEL 07 -DEMO, FLOOR PLANS & RCPS

137 of 518 01M-108 BLDG 01 -LEVEL 08 -DEMO, FLOOR PLANS & RCPS

138 of 518 01M-109 BLDG 01 -LEVEL 09 -DEMO, FLOOR PLANS & RCPS

139 of 518 01M-110 BLDG 01 -LEVEL 10 -DEMO, FLOOR PLANS & RCPS

140 of 518 01M-111 BLDG 01 -LEVEL 11 -DEMO, FLOOR PLANS & RCPS

141 of 518 01M-112 BLDG 01-LEVEL 12 -ROOF PLAN

142 of 518 02M-101 BLDG 2 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

143 of 518 02M-102 BLDG 2 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

144 of 518 02M-103 BLDG 2 -ROOF PLAN

145 of 518 04M-101 BLDG 04 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

146 of 518 05M-101 BLDG 05 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

147 of 518 06M-101 BLDG 06 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

148 of 518 06M-102 BLDG 06 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

149 of 518 15M-100 BLDG 15 -BASEMENT -AHU FLOOR PLANS

150 of 518 15M-101 BLDG 15 -LEVEL 01 -FLOOR PLANS & RCPS

151 of 518 15M-102 BLDG 15 -LEVEL 02 -FLOOR PLAN & RCPS

152 of 518 15M-103 BLDG 15 -LEVEL 03 -FLOOR PLAN & RCPS

153 of 518 15M-104 BLDG 15 -LEVEL 04 -FLOOR PLAN & RCP

154 of 518 15M-105 BLDG 15 -LEVEL 05 -FLOOR PLANS & RCPS

155 of 518 15M-106 BLDG 15 -LEVEL 06 -FLOOR PLANS & RCPS

156 of 518 15M-107 BLDG 15 -LEVEL 07 -FLOOR PLAN & RCPS

157 of 518 15M-108 BLDG 15 -LEVEL 08 -FLOOR PLAN & RCPS

158 of 518 26M-100 BLDG 26 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS

159 of 518 26M-101 BLDG 26 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

160 of 518 26M-102a BLDG 26 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

161 of 518 26M-102b BLDG 26 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

162 of 518 26M-103 BLDG 26 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS

163 of 518 26M-104 BLDG 26 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS

164 of 518 26M-105 BLDG 26 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS

165 of 518 40M-101 BLDG 40 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

166 of 518 55M-101 BLDG 55 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

167 of 518 55M-102 BLDG 55 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS

168 of 518 55M-103 BLDG 55 -ROOF PLAN

169 of 518 56M-100 BLDG 56 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS

170 of 518 56M-101 BLDG 56 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS

171 of 518 56M-102 BLDG 56 -ROOF PLAN

172 of 518 M-501 MECHANICAL DETAILS AND CONTROLS

173 of 518 M-502 MECHANICAL DETAILS

174 of 518 M-601 MECHANICAL SCHEDULES

175 of 518 M-602 MECHANICAL AND PLUMBING SCHEDULES

176 of 518 M-701 MECHANICAL CONTROLS AND VALVE SYMBOLS

177 of 518 M-702

FAN COIL UNIT AND CHILLED WATER PUMP SEQUENCE OF OPERATIONS, POINTS

LISTS, AND CONTROL DIAGRAMS

178 of 518 M-703

AIR HANDLING UNIT SEQUENCE OF OPERATION, POINTS LIST, AND CONTROL

DIAGRAM

ELECTRICAL

179 of 518 EPG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX

180 of 518 EPG002 ELECTRICAL LEGENDS

181 of 518 01EP100 BLDG 01 -LEVEL 00 -ELECTRICAL PLAN

182 of 518 02EP100 BLDG 02 -LEVEL 00 -ELECTRICAL PLAN

183 of 518 04EP101 BLDG 04 -LEVEL 01 -ELECTRICAL PLAN

184 of 518 05EP101 BLDG 05 -LEVEL 01 -ELECTRICAL PLAN

185 of 518 06EP101 BLDG 06 -LEVEL 01 -ELECTRICAL PLAN

186 of 518 15EP100 BLDG 15 -LEVEL 00 -ELECTRICAL PLAN

187 of 518 15EP101 BLDG 15 -LEVEL 01 -ELECTRICAL PLAN

188 of 518 26EP100 BLDG 26 -LEVEL 00 -ELECTRICAL PLAN

189 of 518 26EP101 BLDG 26 -LEVEL 01 -ELECTRICAL PLAN

190 of 518 26EP102 BLDG 26 -LEVEL 02 -ELECTRICAL PLAN

191 of 518 26EP103 BLDG 26 -LEVEL 03 -ELECTRICAL PLAN

192 of 518 26EP104 BLDG 26 -LEVEL 04 -ELECTRICAL PLAN

193 of 518 40EP101 BLDG 40 -LEVEL 01 -ELECTRICAL PLAN

194 of 518 55EP101 BLDG 55 -LEVEL 01 -ELECTRICAL PLAN

195 of 518 56EP100 BLDG 56 -LEVEL 00 -ELECTRICAL PLAN

196 of 518 01EP400 BLDG 01 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

197 of 518 01EP401 BLDG 01 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

198 of 518 01EP402 BLDG 01 -LEVEL 02 -ENLARGED ELECTRICAL PLANS

199 of 518 01EP403 BLDG 01 -LEVEL 03 -ENLARGED ELECTRICAL PLANS

200 of 518 01EP404 BLDG 01 -LEVEL 04 -ENLARGED ELECTRICAL PLANS

201 of 518 01EP405 BLDG 01 -LEVEL 05 -ENLARGED ELECTRICAL PLANS

202 of 518 01EP406 BLDG 01 -LEVEL 06 -ENLARGED ELECTRICAL PLANS

203 of 518 01EP407 BLDG 01 -LEVEL 07 -ENLARGED ELECTRICAL PLANS

204 of 518 01EP408 BLDG 01 -LEVEL 08 -ENLARGED ELECTRICAL PLANS

205 of 518 01EP409 BLDG 01 -LEVEL 09 -ENLARGED ELECTRICAL PLANS

206 of 518 01EP410 BLDG 01 -LEVEL 10 -ENLARGED ELECTRICAL PLANS

207 of 518 01EP411 BLDG 01 -LEVEL 11 -ENLARGED ELECTRICAL PLANS

208 of 518 01EP412 BLDG 01 -ENLARGED ROOF PLAN

209 of 518 02EP401 BLDG 02 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

210 of 518 02EP402 BLDG 02 -LEVEL 02 -ENLARGED ELECTRICAL PLANS

211 of 518 02EP403 BLDG 02 -ENLARGED ROOF PLAN

212 of 518 04EP401 BLDG 04 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

213 of 518 05EP401 BLDG 05 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

214 of 518 06EP401 BLDG 06 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

215 of 518 06EP402 BLDG 06 -LEVEL 02 -ENLARGED ELECTRICAL PLANS

216 of 518 15EP401 BLDG 15 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

217 of 518 15EP402 BLDG 15 -LEVEL 02 -ENLARGED ELECTRICAL PLANS

218 of 518 15EP403 BLDG 15 -LEVEL 03 -ENLARGED ELECTRICAL PLANS

219 of 518 15EP404 BLDG 15 -LEVEL 04 -ENLARGED ELECTRICAL PLANS

220 of 518 15EP405 BLDG 15 -LEVEL 05 -ENLARGED ELECTRICAL PLANS

221 of 518 15EP406 BLDG 15 -LEVEL 06 -ENLARGED ELECTRICAL PLANS

222 of 518 15EP407 BLDG 15 -LEVEL 07 -ENLARGED ELECTRICAL PLANS

223 of 518 15EP408 BLDG 15 -LEVEL 08 -ENLARGED ELECTRICAL PLANS

224 of 518 15EP409 BLDG 15 -ENLARGED ROOF PLAN

225 of 518 26EP400 BLDG 26 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

226 of 518 26EP401 BLDG 26 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

227 of 518 26EP402 BLDG 26 -LEVEL 02 -ENLARGED ELECTRICAL PLANS

228 of 518 26EP403 BLDG 26 -LEVEL 03 -ENLARGED ELECTRICAL PLANS

229 of 518 26EP405 BLDG 26 -LEVEL 05 -ENLARGED ELECTRICAL PLANS

230 of 518 26EP406 BLDG 26 -ENLARGED ROOF PLAN

231 of 518 40EP401 BLDG 40 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

232 of 518 55EP401 BLDG 55 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

233 of 518 55EP402 BLDG 55 -LEVEL 02 -ENLARGED ELECTRICAL PLANS

234 of 518 55EP403 BLDG 55 -ENLARGED ROOF PLAN

235 of 518 56EP400 BLDG 56 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

236 of 518 56EP401 BLDG 56 -LEVEL 01-ENLARGED ELECTRICAL PLANS

237 of 518 56EP402 BLDG 56 -ENLARGED ROOF PLAN

238 of 518 EP501 ELECTRICAL DETAILS

239 of 518 EP502 ELECTRICAL DETAILS

240 of 518 EP503 ELECTRICAL DETAILS

241 of 518 EP504 ELECTRICAL DETAILS

242 of 518 EP505 ELECTRICAL DETAILS

243 of 518 EP506 ELECTRICAL DETAILS

244 of 518 EP507 TELECOMMUNICATION BONDING RISER DIAGRAM (1 OF 2)

245 of 518 EP508 TELECOMMUNICATION BONDING RISER DIAGRAM (2 OF 2)

246 of 518 01EP601 BLDG 01 -ONE-LINE DIAGRAM -PART 1 OF 9 -EXISTING

247 of 518 01EP602 BLDG 01 -ONE-LINE DIAGRAM -PART 2 OF 9 -EXISTING

248 of 518 01EP603 BLDG 01 -ONE-LINE DIAGRAM -PART 3 OF 9 -EXISTING

249 of 518 01EP604 BLDG 01 -ONE-LINE DIAGRAM -PART 4 OF 9 -EXISTING

250 of 518 01EP605 BLDG 01 -ONE-LINE DIAGRAM -PART 5 OF 9 -EXISTING

251 of 518 01EP606 BLDG 01 -ONE-LINE DIAGRAM -PART 6 OF 9 -EXISTING

252 of 518 01EP607 BLDG 01 -ONE-LINE DIAGRAM -PART 7 OF 9 -EXISTING

253 of 518 01EP608 BLDG 01 -ONE-LINE DIAGRAM -PART 8 OF 9 -EXISTING

254 of 518 01EP609 BLDG 01 -ONE-LINE DIAGRAM -PART 9 OF 9 -EXISTING

255 of 518 01EP611 BLDG 01 -ONE-LINE DIAGRAM -PART 1 OF 9 -REVISED

256 of 518 01EP612 BLDG 01 -ONE-LINE DIAGRAM -PART 2 OF 9 -REVISED

257 of 518 01EP613 BLDG 01 -ONE-LINE DIAGRAM -PART 3 OF 9 -REVISED

258 of 518 01EP614 BLDG 01 -ONE-LINE DIAGRAM -PART 4 OF 9 -REVISED

259 of 518 01EP615 BLDG 01 -ONE-LINE DIAGRAM -PART 5 OF 9 -REVISED

260 of 518 01EP616 BLDG 01 -ONE-LINE DIAGRAM -PART 6 OF 9 -REVISED

261 of 518 01EP617 BLDG 01 -ONE-LINE DIAGRAM -PART 7 OF 9 -REVISED

262 of 518 01EP618 BLDG 01 -ONE-LINE DIAGRAM -PART 8 OF 9 -REVISED

263 of 518 01EP619 BLDG 01 -ONE-LINE DIAGRAM -PART 9 OF 9 -REVISED

264 of 518 02EP601 BLDG 02 -ONE-LINE DIAGRAM -EXISTING

265 of 518 02EP611 BLDG 02 -ONE-LINE DIAGRAM -REVISED

266 of 518 04EP601 BLDG 04 -ONE-LINE DIAGRAM -EXISTING

267 of 518 04EP611 BLDG 04 -ONE-LINE DIAGRAM -REVISED

268 of 518 05EP601 BLDG 05 -ONE-LINE DIAGRAM -EXISTING

269 of 518 05EP611 BLDG 05 -ONE-LINE DIAGRAM -REVISED

270 of 518 06EP601 BLDG 06 -ONE-LINE DIAGRAM -EXISTING

271 of 518 06EP611 BLDG 06 -ONE-LINE DIAGRAM -REVISED

272 of 518 15EP601 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -EXISTING

273 of 518 15EP602 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -EXISTING

274 of 518 15EP603 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -EXISTING

275 of 518 15EP611 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -REVISED

276 of 518 15EP612 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -REVISED

277 of 518 15EP613 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -REVISED

278 of 518 26EP601 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -EXISTING

279 of 518 26EP602 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -EXISTING

280 of 518 26EP603 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -EXISTING

281 of 518 26EP604 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -EXISTING

282 of 518 26EP605 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -EXISTING

283 of 518 26EP611 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -REVISED

284 of 518 26EP612 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -REVISED

285 of 518 26EP613 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -REVISED

286 of 518 26EP614 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -REVISED

287 of 518 26EP615 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -REVISED

288 of 518 40EP600 BLDG 40 -MEDIUM VOLTAGE ONE-LINE DIAGRAM -EXISTING

289 of 518 40EP601 BLDG 40 -ONE-LINE DIAGRAM -EXISTING

290 of 518 40EP611 BLDG 40 -ONE-LINE DIAGRAM -REVISED

291 of 518 55EP601 BLDG 55 -ONE-LINE DIAGRAM -EXISTING

292 of 518 55EP611 BLDG 55 -ONE-LINE DIAGRAM -REVISED

293 of 518 56EP601 BLDG 56 -ONE-LINE DIAGRAM -EXISTING

294 of 518 56EP611 BLDG 56 -ONE-LINE DIAGRAM -REVISED

295 of 518 01EP701 BLDG 01 -ELECTRICAL SCHEDULES

296 of 518 01EP702 BLDG 01 - ELECTRICAL SCHEDULES BLDG 01 - ELECTRICAL SCHEDULES

297 of 518 01EP703 BLDG 01 -ELECTRICAL SCHEDULES BLDG 01 -ELECTRICAL SCHEDULES

298 of 518 01EP704 BLDG 01 -ELECTRICAL SCHEDULES

299 of 518 01EP705 BLDG 01 -ELECTRICAL SCHEDULES

300 of 518 02EP701 BLDG 02 -ELECTRICAL SCHEDULES

301 of 518 04EP701 BLDG 04 -ELECTRICAL SCHEDULES

302 of 518 05EP701 BLDG 05 -ELECTRICAL SCHEDULES

303 of 518 06EP701 BLDG 06 -ELECTRICAL SCHEDULES

304 of 518 15EP701 BLDG 15 -ELECTRICAL SCHEDULES

305 of 518 15EP702 BLDG 15 -ELECTRICAL SCHEDULES

306 of 518 15EP703 BLDG 15 -ELECTRICAL SCHEDULES

307 of 518 26EP701 BLDG 26 -ELECTRICAL SCHEDULES

308 of 518 26EP702 BLDG 26 -ELECTRICAL SCHEDULES

309 of 518 40EP701 BLDG 40 -ELECTRICAL SCHEDULES

310 of 518 55EP701 BLDG 55 -ELECTRICAL SCHEDULES

311 of 518 56EP701 BLDG 56 -ELECTRICAL SCHEDULES

312 of 518 EP701 ELECTRICAL SCHEDULES

313 of 518 EP702 ELECTRICAL SCHEDULES

TELECOMMUNICATIONS

314 of 518 ETG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX

315 of 518 ETG002 TELECOMMUNICATIONS LEGENDS

316 of 518 01ET1000 BLDG 01 -SUB BASEMENT -TELECOMMUNICATIONS PLAN

317 of 518 01ET100 BLDG 01 -LEVEL 00 -TELECOMMUNICATIONS PLAN

318 of 518 01ET101 BLDG 01 -LEVEL 01 -TELECOMMUNICATIONS PLAN

319 of 518 01ET102 BLDG 01 -LEVEL 02 -TELECOMMUNICATIONS PLAN

320 of 518 01ET103 BLDG 01 -LEVEL 03 -TELECOMMUNICATIONS PLAN

321 of 518 01ET104 BLDG 01 -LEVEL 04 -TELECOMMUNICATIONS PLAN

322 of 518 01ET105 BLDG 01 -LEVEL 05 -TELECOMMUNICATIONS PLAN

323 of 518 01ET106 BLDG 01 -LEVEL 06 -TELECOMMUNICATIONS PLAN

324 of 518 01ET107 BLDG 01 -LEVEL 07 -TELECOMMUNICATIONS PLAN

325 of 518 01ET108 BLDG 01 -LEVEL 08 -TELECOMMUNICATIONS PLAN

326 of 518 01ET109 BLDG 01 -LEVEL 09 -TELECOMMUNICATIONS PLAN

327 of 518 01ET110 BLDG 01 -LEVEL 10 -TELECOMMUNICATIONS PLAN

328 of 518 01ET111 BLDG 01 -LEVEL 11 -TELECOMMUNICATIONS PLAN

329 of 518 01ET112 BLDG 01 -LEVEL 12 -TELECOMMUNICATIONS PLAN

330 of 518 01ET113 BLDG 01 -LEVEL 13 -TELECOMMUNICATIONS PLAN

331 of 518 02ET100 BLDG 02 -LEVEL 00 -TELECOMMUNICATIONS PLAN

332 of 518 02ET101 BLDG 02 -LEVEL 01 -TELECOMMUNICATIONS PLAN

333 of 518 02ET102 BLDG 02 -LEVEL 02 -TELECOMMUNICATIONS PLAN

334 of 518 04ET101 BLDG 04 -LEVEL 01 -TELECOMMUNICATIONS PLAN

335 of 518 05ET101 BLDG 05 -LEVEL 01 -TELECOMMUNICATIONS PLAN

336 of 518 05ET102 BLDG 05 -LEVEL 02 -TELECOMMUNICATIONS PLAN

337 of 518 06ET101 BLDG 06 -LEVEL 01 -TELECOMMUNICATIONS PLAN

338 of 518 06ET102 BLDG 06 -LEVEL 02 -TELECOMMUNICATIONS PLAN

339 of 518 15ET100 BLDG 15 -LEVEL 00 -TELECOMMUNICATIONS PLAN

340 of 518 15ET101 BLDG 15 -LEVEL 01 -TELECOMMUNICATIONS PLAN

341 of 518 15ET102 BLDG 15 -LEVEL 02 -TELECOMMUNICATIONS PLAN

342 of 518 15ET103 BLDG 15 -LEVEL 03 -TELECOMMUNICATIONS PLAN

343 of 518 15ET104 BLDG 15 -LEVEL 04 -TELECOMMUNICATIONS PLAN

344 of 518 15ET105 BLDG 15 -LEVEL 05 -TELECOMMUNICATIONS PLAN

345 of 518 15ET106 BLDG 15-LEVEL 06 -TELECOMMUNICATIONS PLAN

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128

589-21-700

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES G-003

DRAWING INDEX

MA/EM DD/ADSI

100% CONSTRUCTION

DOCUMENTS

06/19/2023

Revisions: Date:

258 of 518 01EP614 BLDG 01 -ONE-LINE DIAGRAM -PART 4 OF 9 -REVISED

259 of 518 01EP615 BLDG 01 -ONE-LINE DIAGRAM -PART 5 OF 9 -REVISED

260 of 518 01EP616 BLDG 01 -ONE-LINE DIAGRAM -PART 6 OF 9 -REVISED

261 of 518 01EP617 BLDG 01 -ONE-LINE DIAGRAM -PART 7 OF 9 -REVISED

262 of 518 01EP618 BLDG 01 -ONE-LINE DIAGRAM -PART 8 OF 9 -REVISED

263 of 518 01EP619 BLDG 01 -ONE-LINE DIAGRAM -PART 9 OF 9 -REVISED

264 of 518 02EP601 BLDG 02 -ONE-LINE DIAGRAM -EXISTING

265 of 518 02EP611 BLDG 02 -ONE-LINE DIAGRAM -REVISED

266 of 518 04EP601 BLDG 04 -ONE-LINE DIAGRAM -EXISTING

267 of 518 04EP611 BLDG 04 -ONE-LINE DIAGRAM -REVISED

268 of 518 05EP601 BLDG 05 -ONE-LINE DIAGRAM -EXISTING

269 of 518 05EP611 BLDG 05 -ONE-LINE DIAGRAM -REVISED

270 of 518 06EP601 BLDG 06 -ONE-LINE DIAGRAM -EXISTING

271 of 518 06EP611 BLDG 06 -ONE-LINE DIAGRAM -REVISED

272 of 518 15EP601 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -EXISTING

273 of 518 15EP602 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -EXISTING

274 of 518 15EP603 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -EXISTING

275 of 518 15EP611 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -REVISED

276 of 518 15EP612 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -REVISED

277 of 518 15EP613 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -REVISED

278 of 518 26EP601 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -EXISTING

279 of 518 26EP602 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -EXISTING

280 of 518 26EP603 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -EXISTING

281 of 518 26EP604 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -EXISTING

282 of 518 26EP605 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -EXISTING

283 of 518 26EP611 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -REVISED

284 of 518 26EP612 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -REVISED

285 of 518 26EP613 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -REVISED

286 of 518 26EP614 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -REVISED

287 of 518 26EP615 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -REVISED

288 of 518 40EP600 BLDG 40 -MEDIUM VOLTAGE ONE-LINE DIAGRAM -EXISTING

289 of 518 40EP601 BLDG 40 -ONE-LINE DIAGRAM -EXISTING

290 of 518 40EP611 BLDG 40 -ONE-LINE DIAGRAM -REVISED

291 of 518 55EP601 BLDG 55 -ONE-LINE DIAGRAM -EXISTING

292 of 518 55EP611 BLDG 55 -ONE-LINE DIAGRAM -REVISED

293 of 518 56EP601 BLDG 56 -ONE-LINE DIAGRAM -EXISTING

294 of 518 56EP611 BLDG 56 -ONE-LINE DIAGRAM -REVISED

295 of 518 01EP701 BLDG 01 -ELECTRICAL SCHEDULES

296 of 518 01EP702 BLDG 01 - ELECTRICAL SCHEDULES BLDG 01 - ELECTRICAL SCHEDULES

297 of 518 01EP703 BLDG 01 -ELECTRICAL SCHEDULES BLDG 01 -ELECTRICAL SCHEDULES

298 of 518 01EP704 BLDG 01 -ELECTRICAL SCHEDULES

299 of 518 01EP705 BLDG 01 -ELECTRICAL SCHEDULES

300 of 518 02EP701 BLDG 02 -ELECTRICAL SCHEDULES

301 of 518 04EP701 BLDG 04 -ELECTRICAL SCHEDULES

302 of 518 05EP701 BLDG 05 -ELECTRICAL SCHEDULES

303 of 518 06EP701 BLDG 06 -ELECTRICAL SCHEDULES

304 of 518 15EP701 BLDG 15 -ELECTRICAL SCHEDULES

305 of 518 15EP702 BLDG 15 -ELECTRICAL SCHEDULES

306 of 518 15EP703 BLDG 15 -ELECTRICAL SCHEDULES

307 of 518 26EP701 BLDG 26 -ELECTRICAL SCHEDULES

308 of 518 26EP702 BLDG 26 -ELECTRICAL SCHEDULES

309 of 518 40EP701 BLDG 40 -ELECTRICAL SCHEDULES

310 of 518 55EP701 BLDG 55 -ELECTRICAL SCHEDULES

311 of 518 56EP701 BLDG 56 -ELECTRICAL SCHEDULES

312 of 518 EP701 ELECTRICAL SCHEDULES

313 of 518 EP702 ELECTRICAL SCHEDULES

TELECOMMUNICATIONS

314 of 518 ETG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX

315 of 518 ETG002 TELECOMMUNICATIONS LEGENDS

316 of 518 01ET1000 BLDG 01 -SUB BASEMENT -TELECOMMUNICATIONS PLAN

317 of 518 01ET100 BLDG 01 -LEVEL 00 -TELECOMMUNICATIONS PLAN

318 of 518 01ET101 BLDG 01 -LEVEL 01 -TELECOMMUNICATIONS PLAN

319 of 518 01ET102 BLDG 01 -LEVEL 02 -TELECOMMUNICATIONS PLAN

320 of 518 01ET103 BLDG 01 -LEVEL 03 -TELECOMMUNICATIONS PLAN

321 of 518 01ET104 BLDG 01 -LEVEL 04 -TELECOMMUNICATIONS PLAN

322 of 518 01ET105 BLDG 01 -LEVEL 05 -TELECOMMUNICATIONS PLAN

323 of 518 01ET106 BLDG 01 -LEVEL 06 -TELECOMMUNICATIONS PLAN

324 of 518 01ET107 BLDG 01 -LEVEL 07 -TELECOMMUNICATIONS PLAN

325 of 518 01ET108 BLDG 01 -LEVEL 08 -TELECOMMUNICATIONS PLAN

326 of 518 01ET109 BLDG 01 -LEVEL 09 -TELECOMMUNICATIONS PLAN

327 of 518 01ET110 BLDG 01 -LEVEL 10 -TELECOMMUNICATIONS PLAN

328 of 518 01ET111 BLDG 01 -LEVEL 11 -TELECOMMUNICATIONS PLAN

329 of 518 01ET112 BLDG 01 -LEVEL 12 -TELECOMMUNICATIONS PLAN

330 of 518 01ET113 BLDG 01 -LEVEL 13 -TELECOMMUNICATIONS PLAN

331 of 518 02ET100 BLDG 02 -LEVEL 00 -TELECOMMUNICATIONS PLAN

332 of 518 02ET101 BLDG 02 -LEVEL 01 -TELECOMMUNICATIONS PLAN

333 of 518 02ET102 BLDG 02 -LEVEL 02 -TELECOMMUNICATIONS PLAN

334 of 518 04ET101 BLDG 04 -LEVEL 01 -TELECOMMUNICATIONS PLAN

335 of 518 05ET101 BLDG 05 -LEVEL 01 -TELECOMMUNICATIONS PLAN

336 of 518 05ET102 BLDG 05 -LEVEL 02 -TELECOMMUNICATIONS PLAN

337 of 518 06ET101 BLDG 06 -LEVEL 01 -TELECOMMUNICATIONS PLAN

338 of 518 06ET102 BLDG 06 -LEVEL 02 -TELECOMMUNICATIONS PLAN

339 of 518 15ET100 BLDG 15 -LEVEL 00 -TELECOMMUNICATIONS PLAN

340 of 518 15ET101 BLDG 15 -LEVEL 01 -TELECOMMUNICATIONS PLAN

341 of 518 15ET102 BLDG 15 -LEVEL 02 -TELECOMMUNICATIONS PLAN

342 of 518 15ET103 BLDG 15 -LEVEL 03 -TELECOMMUNICATIONS PLAN

343 of 518 15ET104 BLDG 15 -LEVEL 04 -TELECOMMUNICATIONS PLAN

344 of 518 15ET105 BLDG 15 -LEVEL 05 -TELECOMMUNICATIONS PLAN

345 of 518 15ET106 BLDG 15-LEVEL 06 -TELECOMMUNICATIONS PLAN

346 of 518 15ET107 BLDG 15 -LEVEL 07 -TELECOMMUNICATIONS PLAN

347 of 518 15ET108 BLDG 15 -LEVEL 08 -TELECOMMUNICATIONS PLAN

348 of 518 15ET109 BLDG 15 -LEVEL 09 -TELECOMMUNICATIONS PLAN

349 of 518 26ET100 BLDG 26 -LEVEL 00 -TELECOMMUNICATIONS PLAN

350 of 518 26ET101 BLDG 26 -LEVEL 01 -TELECOMMUNICATIONS PLAN

351 of 518 26ET102 BLDG 26 -LEVEL 02 -TELECOMMUNICATIONS PLAN

352 of 518 26ET103 BLDG 26 -LEVEL 03 -TELECOMMUNICATIONS PLAN

353 of 518 26ET104 BLDG 26 -LEVEL 04 -TELECOMMUNICATIONS PLAN

354 of 518 26ET105 BLDG 26 -LEVEL 05 -TELECOMMUNICATIONS PLAN

355 of 518 26ET106 BLDG 26 -LEVEL 06 -TELECOMMUNICATIONS PLAN

356 of 518 40ET101 BLDG 40 -LEVEL 01 -TELECOMMUNICATIONS PLAN

357 of 518 55ET101 BLDG 55 -LEVEL 01 -TELECOMMUNICATIONS PLAN

358 of 518 55ET102 BLDG 55 -LEVEL 02 -TELECOMMUNICATIONS PLAN

359 of 518 56ET100 BLDG 56 -LEVEL 00 -TELECOMMUNICATIONS PLAN

360 of 518 56ET101 BLDG 56 -LEVEL 01 -TELECOMMUNICATIONS PLAN

361 of 518 01ET400 BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

362 of 518 01ET401 BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

363 of 518 01ET402 BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

364 of 518 01ET403 BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

365 of 518 01ET404 BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS

366 of 518 01ET405 BLDG 01 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS

367 of 518 01ET406 BLDG 01 -LEVEL 06 -ENLARGED TELECOMMUNICATIONS PLANS

368 of 518 01ET407 BLDG 01 -LEVEL 07 -ENLARGED TELECOMMUNICATIONS PLANS

369 of 518 01ET408 BLDG 01 -LEVEL 08 -ENLARGED TELECOMMUNICATIONS PLANS

370 of 518 01ET409 BLDG 01 -LEVEL 09 -ENLARGED TELECOMMUNICATIONS PLANS

371 of 518 01ET410 BLDG 01 -LEVEL 10 -ENLARGED TELECOMMUNICATIONS PLANS

372 of 518 01ET411 BLDG 01 -LEVEL 11 -ENLARGED TELECOMMUNICATIONS PLANS

373 of 518 02ET401a BLDG 02 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

374 of 518 02ET401b BLDG 02 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

375 of 518 02ET402 BLDG 02 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

376 of 518 04ET401 BLDG 04 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

377 of 518 05ET401 BLDG 05 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

378 of 518 06ET401 BLDG 06 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

379 of 518 06ET402a BLDG 06 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

380 of 518 06ET402b BLDG 06 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

381 of 518 15ET401a BLDG 15 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

382 of 518 15ET401b BLDG 15 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

383 of 518 15ET402a BLDG 15 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

384 of 518 15ET402b BLDG 15 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

385 of 518 15ET403a BLDG 15 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

386 of 518 15ET403b BLDG 15 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

387 of 518 15ET404 BLDG 15 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS

388 of 518 15ET405a BLDG 15 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS

389 of 518 15ET405b BLDG 15 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS

390 of 518 15ET406 BLDG 15 -LEVEL 06 -ENLARGED TELECOMMUNICATIONS PLANS

391 of 518 15ET407a BLDG 15 -LEVEL 07 -ENLARGED TELECOMMUNICATIONS PLANS

392 of 518 15ET407b BLDG 15 -LEVEL 07 -ENLARGED TELECOMMUNICATIONS PLANS

393 of 518 15ET408 BLDG 15 -LEVEL 08 -ENLARGED TELECOMMUNICATIONS PLANS

394 of 518 26ET400 BLDG 26 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

395 of 518 26ET401a BLDG 26 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLAN

396 of 518 26ET401b BLDG 26 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

397 of 518 26ET401c BLDG 26 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLAN

398 of 518 26ET402a BLDG 26 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

399 of 518 26ET402b BLDG 26 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

400 of 518 26ET402c BLDG 26 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

401 of 518 26ET403 BLDG 26 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

402 of 518 26ET405 BLDG 26 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS

403 of 518 40ET401 BLDG 40 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

404 of 518 55ET401 BLDG 55 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

405 of 518 55ET402 BLDG 55 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

406 of 518 56ET400 BLDG 56 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

407 of 518 56ET401 BLDG 56 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

408 of 518 ET501 TELECOMMUNICATIONS DETAILS

409 of 518 ET502 TELECOMMUNICATIONS DETAILS

410 of 518 ET503 TELECOMMUNICATIONS DETAILS

411 of 518 ET504 TELECOMMUNICATIONS DETAILS

412 of 518 ET701 TELECOMMUNICATIONS SCHEDULES

TECHNOLOGY

413 of 518 0-TN000 TECHNOLOGY COVERSHEET

414 of 518 0-TN003 TECHNOLOGY SITE PLAN & DETAILS

415 of 518 0-TN601 TECHNOLOGY DIAGRAMS

416 of 518 1-TN10S-NE BLDG 1 NE -SUB-BASEMENT 01 PLAN -TECHNOLOGY

417 of 518 1-TN10S-SE BLDG 1 SE -SUB-BASEMENT 01 PLAN -TECHNOLOGY

418 of 518 1-TN100-NE BLDG 1 NE -BASEMENT PLAN -TECHNOLOGY

419 of 518 1-TN100-NW BLDG 1 NW -BASEMENT PLAN -TECHNOLOGY

420 of 518 1-TN100-SE BLDG 1 SE -BASEMENT PLAN -TECHNOLOGY

421 of 518 1-TN101-NE BLDG 1 NE -LEVEL 01 PLAN -TECHNOLOGY

422 of 518 1-TN101-SE BLDG 1 SE -LEVEL 01 PLAN -TECHNOLOGY

423 of 518 1-TN102-NE BLDG 1 NE -LEVEL 02 PLAN -TECHNOLOGY

424 of 518 1-TN103-NE BLDG 1 NE -LEVEL 03 PLAN -TECHNOLOGY

425 of 518 1-TN104-NE BLDG 1 NE -LEVEL 04 PLAN -TECHNOLOGY

426 of 518 1-TN105-NE BLDG 1 NE -LEVEL 05 PLAN -TECHNOLOGY

427 of 518 1-TN106-NE BLDG 1 NE -LEVEL 06 PLAN -TECHNOLOGY

428 of 518 1-TN107-NE BLDG 1 NE -LEVEL 07 PLAN -TECHNOLOGY

429 of 518 1-TN108-NE BLDG 1 NE -LEVEL 08 PLAN -TECHNOLOGY

430 of 518 1-TN109-NE BLDG 1 NE -LEVEL 09 PLAN -TECHNOLOGY

431 of 518 1-TN110-NE BLDG 1 NE -LEVEL 10 PLAN -TECHNOLOGY

432 of 518 1-TN111-NE BLDG 1 NE -LEVEL 11 PLAN -TECHNOLOGY

433 of 518 1-TN401 TECHNOLOGY ENLARGED PLANS

434 of 518 1-TN402 TECHNOLOGY ENLARGED PLANS

435 of 518 1-TN403 TECHNOLOGY ENLARGED PLANS

436 of 518 1-TN601 TECHNOLOGY DIAGRAMS

437 of 518 2-TN200 BLDG 02 -BASEMENT PLAN -TECHNOLOGY

438 of 518 2-TN201 BLDG 02 -LEVEL 01 PLAN -TECHNOLOGY

439 of 518 2-TN202 BLDG 02 -LEVEL 02 PLAN -TECHNOLOGY

440 of 518 2-TN401 BLDG 02 -TECHNOLOGY ENLARGED PLANS & DIAGRAMS

441 of 518 4-TN100 BLDG 4 -BASEMENT PLAN -TECHNOLOGY

442 of 518 4-TN101 BLDG 4 -LEVEL 01 PLAN -TECHNOLOGY

443 of 518 4-TN401 TECHNOLOGY ENLARGED PLANS & DIAGRAMS

444 of 518 5-TN101 BLDG 5 -LEVEL 01 PLAN -TECHNOLOGY

445 of 518 6-TN101 BLDG 06 -LEVEL 01 PLAN -TECHNOLOGY

446 of 518 6-TN102 BLDG 06 -LEVEL 02 PLAN -TECHNOLOGY

447 of 518 6-TN401 BLDG 06 -TECHNOLOGY ENLARGED PLANS & DIAGRAMS

448 of 518 15-TN100 BLDG 15 -BASEMENT PLAN -TECHNOLOGY

449 of 518 15-TN101 BLDG 15 -LEVEL 01 PLAN -TECHNOLOGY

450 of 518 15-TN102 BLDG 15 -LEVEL 02 PLAN -TECHNOLOGY

451 of 518 15-TN103 BLDG 15 -LEVEL 03 PLAN -TECHNOLOGY

452 of 518 15-TN104 BLDG 15 -LEVEL 04 PLAN -TECHNOLOGY

453 of 518 15-TN105 BLDG 15 -LEVEL 05 PLAN -TECHNOLOGY

454 of 518 15-TN106 BLDG 15 -LEVEL 06 PLAN -TECHNOLOGY

455 of 518 15-TN107 BLDG 15 -LEVEL 07 PLAN -TECHNOLOGY

456 of 518 15-TN108 BLDG 15 -LEVEL 08 PLAN -TECHNOLOGY

457 of 518 15-TN401 TECHNOLOGY ENLARGED PLANS

458 of 518 15-TN402 TECHNOLOGY ENLARGED PLANS

459 of 518 26-TN100 BLDG 26 -BASEMENT PLAN -TECHNOLOGY

460 of 518 26-TN101 BLDG 26 -LEVEL 01 PLAN -TECHNOLOGY

461 of 518 26-TN102 BLDG 26 -LEVEL 02 PLAN -TECHNOLOGY

462 of 518 26-TN103 BLDG 26 -LEVEL 03 PLAN -TECHNOLOGY

463 of 518 26-TN104 BLDG 26 -LEVEL 04 PLAN -TECHNOLOGY

464 of 518 26-TN105 BLDG 26 -LEVEL 05 PLAN -TECHNOLOGY

465 of 518 26-TN401 TECHNOLOGY ENLARGED PLANS

466 of 518 40-TD101 BLDG 40 -LEVEL 01 DEMOLITION PLAN -TECHNOLOGY

467 of 518 40-TN101 BLDG 40 -LEVEL 01 PLAN -TECHNOLOGY & DIAGRAMS

468 of 518 55-TN101 BLDG 55 -LEVEL 01 PLAN -TECHNOLOGY

469 of 518 55-TN102 BLDG 55 -LEVEL 02 PLAN -TECHNOLOGY

470 of 518 55-TN401 TECHNOLOGY ENLARGED PLANS & DIAGRAMS

471 of 518 56-TN100 BLDG 56 -BASEMENT PLAN -TECHNOLOGY

472 of 518 56-TN101 BLDG 56 -LEVEL 01 PLAN -TECHNOLOGY

473 of 518 56-TN401 TECHNOLOGY ENLARGED PLANS & DIAGRAMS

ENVIRONMENTAL

474 of 518 H0000 ENVIRONMENTAL GENERAL NOTES

475 of 518 H1000 BUILDING 1 - BASEMENT -NVIRONMENTAL HAZARDS

476 of 518 H1001 BUILDING 1 - FLOOR 1 -ENVIRONMENTAL HAZARDS

477 of 518 H1002 BUILDING 1 - FLOOR 2 -ENVIRONMENTAL HAZARDS

478 of 518 H1003 BUILDING 1 - FLOOR 3 -ENVIRONMENTAL HAZARDS

479 of 518 H1004 BUILDING 1 - FLOOR 4 -ENVIRONMENTAL HAZARDS

480 of 518 H1005 BUILDING 1 - FLOOR 5 -ENVIRONMENTAL HAZARDS

481 of 518 H1006 BUILDING 1 - FLOOR 6 -ENVIRONMENTAL HAZARDS

482 of 518 H1007 BUILDING 1 - FLOOR 7 -ENVIRONMENTAL HAZARDS

483 of 518 H1008 BUILDING 1 - FLOOR 8 -ENVIRONMENTAL HAZARDS

484 of 518 H1009 BUILDING 1 - FLOOR 9 -ENVIRONMENTAL HAZARDS

485 of 518 H1010 BUILDING 1 - FLOOR 10 -ENVIRONMENTAL HAZARDS

486 of 518 H1011 BUILDING 1 - FLOOR 11 -ENVIRONMENTAL HAZARDS

487 of 518 H1012 BUILDING 1 - TR ROOMS BASEMENT & FLOOR 1 - ENVIRONMENTAL HAZARDS

488 of 518 H1013 BUILDING 1 - TR ROOMS FLOOR 2 & FLOOR 3 - ENVIRONMENTAL HAZARDS

489 of 518 H1014 BUILDING 1 - TR ROOMS FLOOR 4 & FLOOR 5 - ENVIRONMENTAL HAZARDS

490 of 518 H1015 BUILDING 1 - TR ROOMS FLOOR 6 & FLOOR 7 - ENVIRONMENTAL HAZARDS

491 of 518 H1016 BUILDING 1 - TR ROOMS FLOOR 8 & FLOOR 9 - ENVIRONMENTAL HAZARDS

492 of 518 H1017 BUILDING 1 - TR ROOMS FLOOR 10 & FLOOR 11 - ENVIRONMENTAL HAZARDS

493 of 518 H2001 BUILDING 2 - ROOF - ENVIRONMENTAL HAZARDS

494 of 518 H4001 BUILDING 4 - BASEMENT-ENVIRONMENTAL HAZARDS

495 of 518 H4002 BUILDING 4 - ROOM 4-106-ENVIRONMENTAL HAZARDS

496 of 518 H5001 BUILDING 5 - FLOOR 1-ENVIRONMENTAL HAZARDS

497 of 518 H6001 BUILDING 6 - FLOOR 1 -ENVIRONMENTAL HAZARDS

498 of 518 H6002 BUILDING 6 - FLOOR 2 -ENVIRONMENTAL HAZARDS

499 of 518 H1500 BUILDING 15 - BASEMENT -ENVIRONMENTAL HAZARDS

500 of 518 H1501 BUILDING 15 - FLOOR 1 -ENVIRONMENTAL HAZARDS

501 of 518 H1502 BUILDING 15 - FLOOR 2 -ENVIRONMENTAL HAZARDS

502 of 518 H1503 BUILDING 15 - FLOOR 3 -ENVIRONMENTAL HAZARDS

503 of 518 H1504 BUILDING 15 - FLOOR 4 -ENVIRONMENTAL HAZARDS

504 of 518 H1505 BUILDING 15 - FLOOR 5 -ENVIRONMENTAL HAZARDS

505 of 518 H1506 BUILDING 15 - FLOOR 6 -ENVIRONMENTAL HAZARDS

506 of 518 H1507 BUILDING 15 - FLOOR 7 -ENVIRONMENTAL HAZARDS

507 of 518 H1508 BUILDING 15 - FLOOR 8 -ENVIRONMENTAL HAZARDS

508 of 518 H1509 BUILDING 15 - FLOOR 9 -ENVIRONMENTAL HAZARDS

509 of 518 H2600 BUILDING 26 - BASEMENT -ENVIRONMENTAL HAZARDS

510 of 518 H2601 BUILDING 26 - FLOOR 1 -ENVIRONMENTAL HAZARDS

511 of 518 H2602 BUILDING 26 - FLOOR 2 -ENVIRONMENTAL HAZARDS

512 of 518 H2603 BUILDING 26 - FLOOR 3 -ENVIRONMENTAL HAZARDS

513 of 518 H2604 BUILDING 26 - ROOF -ENVIRONMENTAL HAZARDS

514 of 518 H2605 BUILDING 26 - ROOM V1-684 -ENVIRONMENTAL HAZARDS

515 of 518 H2606 BUILDING 26 - ROOM V2-751A -ENVIRONMENTAL HAZARDS

516 of 518 H4000 BUILDING 40 - FLOOR 1 -ENVIRONMENTAL HAZARDS

517 of 518 H5500 BUILDING 55 - ROOF -ENVIRONMENTAL HAZARDS

518 of 518 H5600 BUILDING 56 - ROOF -ENVIRONMENTAL HAZARDS

345 of 518 15ET106 BLDG 15 -LEVEL 06 -TELECOMMUNICATIONS PLAN 433 of 518 1-TN401 TECHNOLOGY ENLARGED PLANS

Know what's below.

before you dig.Call

R

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CIVIL:

IMEG CORP

1717 STATE ST SUITE 201

BETTENDORF, IA 52722

563-344-0260

JASON HOLDORF, PE

JLH LKS

Revisions: Date:

EHRM INFRASTRUCTURE

UPGRADES - KANSAS CITY, MO

KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128

589-21-700

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

06/19/2023

100% CONSTRUCTION

DOCUMENTS

LINNEA K.

SHAW

062-074863

6/14/2023

CJ100

CIVIL NOTES

AND LEGEND

RAILROAD SPIKE, FOUND

SURVEY BOUNDARY

HANDHOLE

POWER POLE

STORM MANHOLE

HYDRANT

WATER VALVE

GAS VALVE

STORM INLET

LIGHT POLE

SIGN

STORM DOUBLE INLET

SPOT ELEVATION

MEASURED DIMENSION

RECORDED DIMENSION

R.O.W. MARKER, FOUND

ELECTRIC PEDESTAL/TRANSFORMER

TELEPHONE PEDESTAL

TELEPHONE POLE

SOIL BORING HOLE

FLARED END SECTION

SECTION LINE

EASEMENT LINE

CHAIN LINK FENCE

OVERHEAD ELECTRIC

GAS LINE

UNDERGROUND ELECTRIC

GUARD RAIL

SANITARY/STORM CLEANOUT

TELEPHONE LINE

R.O.W. LINE

ELECTRIC MANHOLE

TELEPHONE MANHOLE

UTILITY MANHOLE

LIGHT JUNCTION BOX

CONIFER TREE

DECIDUOUS TREE

TREE STUMP

BUSH/SHRUB

VAPOR LIGHT

CONTROL POINT

UNKNOWN MANHOLE

WELL

GUY WIRE

FLAGPOLE

POST/BOLLARD

TREE LINE

HISTORICAL LINE - AS NOTED

PROPERTY LINE

DOWNSPOUT

BENCHMARK

ELECTRIC METER

WATER METER

FORCE MAIN

SANITARY SEWER

STORM SEWER

PIPE UNDERDRAIN

WATER LINE

SETBACK LINE

UTILITY LINE

GUY POLE

GRADE LABEL

POWER POLE W/ LIGHT

POWER POLE W/ METER

DRAINAGE SLOPE

LINE CONTINUATION

CONTOUR

CENTERLINE

SANITARY MANHOLE

FLOOD PLAIN

FLOODWAY

PROPOSED EXISTING

SILT FENCE

CONCRETE MONUMENT, FOUND

CONSTRUCTION LIMITS

PIPE, FOUND

STORM INLET

SPRINKLER BOX

WATER SERVICE

EDGE OF WATER LINE/DITCH FLOWLINE

PROJECT

LOCATION

GENERAL NOTES

1. ALL IMPROVEMENTS SHOWN ON THESE ENGINEERING PLANS SHALL COMPLY

WITH THE KANSAS CITY STANDARD SPECIFICATIONS AND DESIGN CRITERIA,

LATEST EDITION, AND THE STANDARDS OF THE MISSOURI DEPARTMENT OF

NATURAL RESOURCES, LATEST EDITION.

2. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED

FROM AVAILABLE SURVEYS, RECORDS, AND FIELD INVESTIGATION. THEIR

LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. IT IS POSSIBLE THERE

MAY BE OTHERS, THE EXISTENCE OF WHICH PRESENTLY NOT KNOWN OR

SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR

EXISTENCE AND EXACT LOCATION AND TO AVOID DAMAGE THERETO.

3. ALL DEBRIS RESULTING FROM CONSTRUCTION OPERATIONS SHALL BE

PROPERLY DISPOSED OF OFF-SITE UNLESS NOTED.

4. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE

EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

REPAIRING ANY DAMAGE.

5. PORTLAND CEMENT CONCRETE. CONCRETE SHALL HAVE THE FOLLOWING

PROPERTIES. COMPRESSING STRENGTH SHALL BE 4000PSI IN 28 DAYS, AIR

ENTRAINMENT SHALL BE BETWEEN 5 % AND 8% AND SLUMP SHALL BE 4 INCHES

OR LESS ALL AS MEASURED BY THE APPROPRIATE ASTM METHODS.

REINFORCING STEEL SHALL BE ASTM CERTIFIED 60KSI TENSILE STRENGTH.

REINFORCING STEEL SHALL BE #4 SIZE UNLESS OTHERWISE SPECIFIED.

HANDRAILS, BOLLARDS, AND OTHER APPURTENANCES SHALL BE INSTALLED PER

PLAN AND MEET JURISDICTIONAL REQUIREMENTS.

6. CLEANUP AND FINAL INSPECTION. WORK BROKEN OR DAMAGED BY CONTRACTOR

ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.

ALL WASTE MATERIAL, CONCRETE WASHOUT, LANDSCAPE WASTE AND BUILDING

MATERIAL SHALL BE REMOVED. SOIL SHALL BE REMOVED FROM PAVED AREAS

AND THE PROJECT SHALL BE LEFT IN A CLEAN AND WORKMANLIKE MANNER.

7. ALL EXISTING CONDITIONS WERE TAKEN FROM A SURVEY PROVIDED BY THE VA.

NO NEW UTILITY OR TOPOGRAPHIC SURVEY WAS CONDUCTED AS PART OF THIS

PROJECT. CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS

PRIOR TO CONSTRUCTION.

GRADING NOTES

1. ALL EARTHWORK OPERATIONS SHALL BE IN ACCORDANCE WITH THE

GEOTECHNICAL REPORT.

2. ALL ELEVATIONS SHOWN ARE TO FLOWLINE FINISHED GRADE OR TOP OF

PAVEMENT UNLESS OTHERWISE STATED.

3. PROVIDE POSITIVE DRAINAGE AT ALL TIMES WITHIN THE CONSTRUCTION AREAS.

DO NOT ALLOW WATER TO POND ON PROPERTY.

4. PRIOR TO PLACEMENT OF ANY FILL, THE STRIPPED SITE SHALL BE SCARIFIED TO

A DEPTH OF 9 INCHES AND RE-COMPACTED TO 95% DENSITY. ANY UNSUITABLE

SOILS FOUND AT THIS TIME SHALL BE DRIED AND RECOMPACTED OR REMOVED IF

REQUIRED COMPACTION CANNOT BE OBTAINED. CUT AREAS SHALL ALSO BE

SCARIFIED TO A DEPTH OF 9 INCHES AND RE-COMPACTED TO 95% DENSITY.

5. ALL FILL MATERIAL SHALL CONSIST OF APPROVED, SUITABLE SOILS PLACED IN

LOOSE LIFTS OF 9 INCHES OR LESS AND COMPACTED TO AT LEAST 95% OF THE

MATERIAL'S MAXIMUM STANDARD PROCTOR DRY DENSITY (ASTM D-698) IN ALL

PAVEMENT, BUILDING ADDITION AND ATHLETIC FIELD AREAS. THE COMPACTION

WILL BE FIELD TESTED BY A SOILS ENGINEERING CONSULTANT REPRESENTING

THE OWNER.

6. PROJECT WILL BE COVERED BY A GENERAL PERMIT REGULATING RUNOFF FROM

CONSTRUCTION SITES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM

THE REQUIRED MONITORING, INSPECTION AND MAINTENANCE AS REQUIRED BY

THE PERMIT.

7. ALL DISTURBED EMBANKMENTS GREATER THAN 3:1 SLOPES SHALL BE SEEDED

ACCORDING TO A RECOMMENDED SEEDING MIX BY THE LANDSCAPER AND

COVERED WITH EROSION CONTROL BLANKETS OR AS DIRECTED BY PLAN

DOCUMENTS.

8. CONTRACTOR SHALL ADHERE TO THE KANSAS CITY SITE WORK AND EROSION

AND SEDIMENT DESIGN SPECFICATIONS AND THE STATE OF MISSOURI

PROTECTING WATER QUALITY FIELD GUIDE.

9. ALL AREAS TO BE GREENSPACE AT PROJECT COMPLETION SHALL BE LEFT WITH 6

INCHES OF TOPSOIL WHEN MASS GRADING ACTIVITIES ARE COMPLETE.

EROSION CONTROL NOTES

1. EROSION CONTROL SHALL BE INSTALLED PRIOR TO ANY GRADING

OPERATIONS WHERE POSSIBLE.

2. CONSTRUCTION ENTRANCE SHALL BE MAINTAINED TO PREVENT OFF-SITE

TRACKING OF SEDIMENT ONTO PUBLIC ROADWAYS. ANY SEDIMENT

DEPOSITED ON PUBLIC ROADS SHALL BE REMOVED BY SHOVELING OR

STREET CLEANING BEFORE THE END OF EACH WORKING DAY.

3. SHOWN LOCATION OF SILTATION CONTROL IS APPROXIMATE. ACTUAL

LOCATIONS TO BE DETERMINED IN THE FIELD AT THE TIME OF

CONSTRUCTION.

4. WATER PUMPED DURING CONSTRUCTION OPERATIONS SHALL BE FILTERED.

5. ONCE CONSTRUCTION HAS BEEN COMPLETED, OR TEMPORARILY SUSPENDED

FOR LONGER THAN 28 DAYS (SUCH AS WINTER SHUTDOWN), THE

CONTRACTOR SHALL INITIATE SEEDING ON ALL AREAS DISTURBED

IMMEDIATELY OF THE LAST DISTURBANCE. EROSION CONTROL DEVICES

SHALL REMAIN IN PLACE AND BE MAINTAINED UNTIL THE CONTRACTOR

ESTABLISHES A GOOD STAND OF GRASS OF UNIFORM COLOR AND DENSITY

TO THE SATISFACTION OF THE ENGINEER.

6. CONTRACTOR SHALL ADHERE TO THE MISSOURI PROTECTING WATER

QUALITY FIELD GUIDE.

7. ALL EROSION CONTROL MEASURES MUST BE INSTALLED ( WHERE POSSIBLE )

PRIOR TO THE COMMENCEMENT OF ANY EARTH DISTURBING OPERATIONS.

THE REMAINING EROSION CONTROL MEASURES SHALL BE INSTALLED AS

SOON AS REASONABLY POSSIBLE AFTER GRADING OPERATIONS BEGIN.

WHERE THE PRESENCE OF SILT FENCE WILL INTERFERE WITH ACTIVITIES,

DIVERSION DITCHES AND SMALL TEMPORARY SEDIMENT TRAPS SHALL BE

UTILIZED UNTIL SILT FENCE OR OTHER MEASURES MAY BE INSTALLED AND

VEGETATION ESTABLISHED.

8. EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER

EACH PRECIPITATION EVENT AND REPLACED OR REPAIRED AS NECESSARY.

9. SILT FENCE AND SEDIMENT BASIN SHALL BE CLEANED OR REPLACED WHEN

SILT BUILDS UP TO WITHIN ONE FOOT OF THE TOP OF THE SILT FENCE.

10. PROJECT WILL BE COVERED BY A GENERAL PERMIT REGULATING RUNOFF

FROM CONSTRUCTION SITES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO

PERFORM THE REQUIRED MONITORING, INSPECTION AND MAINTENANCE AS

REQUIRED BY THE PERMIT.

11. CONCRETE WASHOUT DEBRIS SHOULD BE HAULED OFF-SITE. WASHOUT

SHOULD BE FILLED IN AND SEEDED.

12. ALL AREAS DISTURBED BEYOND LIMITS SHOWN SHOULD BE SEEDED WITH

ADJACENT SEED MIXTURE OR IN-KIND.

13. THERE ARE NO EXPECTED DOWNSTREAM IMPACTS OTHER THAN THOSE

ALLOWED PER ORDINANCE (2 YEAR, PRE-DEVELOPED RATE OF RELEASE)

UTILITY NOTES

1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL

EXISTING UTILITIES AND PAVED STREETS, INCLUDING ANY NOT SHOWN ON

THESE DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES

PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER IF ANY CONFLICTS WITH

THE DRAWINGS OCCUR. ANY DAMAGE TO EXISTING UTILITIES AND/OR PAVED

STREETS CAUSED BY TRENCHING AND GRADING OPERATIONS SHALL BE

REPAIRED AT THE CONTRACTOR'S EXPENSE. EXISTING UTILITY LOCATIONS

SHOWN ON THE DRAWINGS ARE APPROXIMATE.

2. ALL EXISTING UNDERGROUND UTILITIES SHOWN WERE LOCATED PARTIALLY IN

THE FIELD AND PARTIALLY FROM REVIEW OF EXISTING PUBLIC RECORDS. IT IS

THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT EACH UTILITY

COMPANY FOR THE FIELD LOCATION OF THEIR EXISTING LINES IN OR NEARBY

THE CONSTRUCTION AREA PRIOR TO BEGINNING ANY CONSTRUCTION.

3. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE

EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

REPAIRING ANY DAMAGE.

4. THE LOCATIONS OF THOSE BURIED AND ABOVE GROUND UTILITIES SHOWN ARE

APPROXIMATE, ARE SHOWN FOR CONTRACTOR INFORMATIONAL USE ONLY, AND

ARE NOT TO BE REFERENCED FOR CONSTRUCTION PURPOSES. THE IMPLIED

PRESENCE OR ABSENCE OF UTILITIES IS NOT TO BE CONSTRUED BY THE

OWNER, ENGINEER, CONTRACTOR, OR SUBCONTRACTORS TO BE AN ACCURATE

AND COMPLETE REPRESENTATION OF UTILITIES THAT MAY OR MAY NOT EXIST

ON THE CONSTRUCTION SITE. BURIED AND ABOVE GROUND UTILITY LOCATION,

IDENTIFICATION, AND MARKING ARE THE SOLE RESPONSIBILITY OF THE

CONTRACTOR. REROUTING, DISCONNECTION, PROTECTION, ETC. OF ANY

UTILITY MUST BE COORDINATED BETWEEN THE CONTRACTOR, UTILITY

COMPANY AND OWNER. SITE SAFETY, INCLUDING THE AVOIDANCE OF HAZARDS

ASSOCIATED WITH BURIED AND ABOVEGROUND UTILITIES, REMAINS THE SOLE

RESPONSIBILITY OF THE CONTRACTOR.

FIBER OPTIC CABLE

BORE PIT

REMOVAL (SF/SY)

PCC PAVEMENT

REMOVAL (LF)

OF

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

4 of 512Page…

This is the start of the file's text. The full file is on GovTribe.