Attachment 5 - Drawings Civil.pdf
PDF 10 MB Posted
- Solicitation number
- 36C77623B0066
About this file
This document provides details on a federal contract opportunity for infrastructure upgrades at the Veterans Affairs Medical Center in Kansas City, Missouri. The Attachment 5 file contains civil engineering drawings related to Solicitation Number 36C77623B0066 issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The opportunity involves construction services for EHRM infrastructure upgrades at the Kansas City VA facility, with responses due by the date listed in the solicitation. Relevant details include the federal agency and location involved, as well as the type of construction and infrastructure work required.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
x x x x x x x
X
X
X
X x x x x x x x
X
X
X
X
M
35th STREET
LINWOOD BOULEVARD
IN
C
IN
E
R A
T O
R
B U
IL
D
IN
G
IN
C
IN
E
R A
T O
R
C O
VID
T
EN
T
FISHER
HOUSE
ARCHITECTURAL
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
DESIGN TEAM
FIRE PROTECTION
SPEES DESIGN BUILD
STRUCTURAL
IMEG
ELECTRICAL
SPEES DESIGN BUILD
PLUMBING
SPEES DESIGN BUILD
MECHANICAL
SPEES DESIGN BUILD
2882 106TH ST
DES MOINES, IA, 50322
PHONE: (515) 334-9906
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
CIVIL
IMEG
2882 106TH ST
DES MOINES, IA, 50322
PHONE: (515) 334-9906
PROJECT INFORMATION
STATE:
COUNTY:
JURISTICTION:
OWNER:
CODE ANALYSIS
PROJECT DESCRIPTION
APPLICABLE BUILDINGS:
1, 2, 4, 5, 6, 15, 26, 40, 55, ICRA CLASS REQUIREMENTS
REQUIREMENTS DEPENDENT ON
EACH INDIVIDUAL ROOM LOCATION.
THE PROPOSED DESIGN SHALL IMPROVE,
RECONFIGURE, EXPAND AND RENOVATE
EXISTING SPACES FOR NEW
TELECOMMUNICATION ROOMS.
MISSOURI
JACKSON
KANSAS CITY
GOV, VETERANS AFFAIRS
GENERAL NOTES
1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &
SPECIFICATIONS.
2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.
BRING TO THE AWARENESS OF AND VERIFY WITH VA COR PRIOR TO PROCEEDING.
3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE
TO VISIT THE SITE.
4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT
IMMEDIATELY TO THE ATTENTION OF THE COR.
5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.
6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK
THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.
7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE
WITH THE CONTRACT DOCUMENTS.
8. THE CONTRACTOR SHALL HAVE NO MORE THAN TWO TEAMS WORKING ON TWO TRS AT ANY
GIVEN TIME UNLESS WRITTEN APPROVAL IS PROVIDED BY THE COR.
9. THE CONTRACTOR SHALL ONLY WORK IN A SINGLE BUILDING AT ANY GIVEN TIME UNLESS WRITTEN
APPROVAL IS PROVIDED BY THE COR.
BLDG 55
BLDG 26
BLDG 1
BLDG 15
BLDG 6 BLDG 40
BLDG 56
BLDG 2
BLDG 5 BLDG 4
KANSAS CITY VA MEDICAL CENTER
KANSAS CITY, MO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128
589-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES G-001
COVER SHEET
MA/EM AJ/DD/ADSI
100% CONSTRUCTION
DOCUMENTS
06/19/2023
EHRM INFRASTRUCTURE UPGRADES
KANSAS CITY VA MEDICAL CENTER - 4801 LINWOOD BLVD, KANSAS CITY, MO 64128
PROJECT #: 589-21-700
1" = 160'-0"
VICINITY MAP
3" = 1'-0"
LOCATION MAP
TRUE
NORTH
TRUE
NORTH
Revisions: Date:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
1 of 512Page 1 of 518
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128
589-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES G-002
DRAWING INDEX
MA/EM DD/ADSI
100% CONSTRUCTION
DOCUMENTS
06/19/2023
Revisions: Date:
DRAWING INDEX
PAGE # SHEET # SHEET NAME
GENERAL
1 of 518 G-001 COVER SHEET
2 of 518 G-002 DRAWING INDEX
3 of 518 G-003 DRAWING INDEX
CIVIL
4 of 518 CJ100 CIVIL NOTES AND LEGEND
5 of 518 CD100 EXISTING CONDITIONS AND DEMOLITION PLAN
6 of 518 CD101 DETAILED DEMOLITION PLAN
7 of 518 CD102 DETAILED DEMOLITION PLAN
8 of 518 CD103 DETAILED DEMOLITION PLAN
9 of 518 CU100 UTILITY PLAN
10 of 518 CU101 DETAILED UTILITY PLAN
11 of 518 CU102 DETAILED UTILITY PLAN
12 of 518 CU103 DETAILED UTILITY PLAN
13 of 518 CU104 FIBER PLAN AND PROFILE
14 of 518 CU105 FIBER PLAN AND PROFILE
15 of 518 CU106 FIBER PLAN AND PROFILE
16 of 518 CU107 FIBER PLAN AND PROFILE
17 of 518 CU108 FIBER PLAN AND PROFILE
18 of 518 CK100 CIVIL DETAILS
STRUCTURAL
19 of 518 S-000 STRUCTURAL COVER SHEET
20 of 518 S-001 GENERAL NOTES
21 of 518 01S-101 STRUCTURAL PLANS AND DETAILS
22 of 518 06S-101 STRUCTURAL PLANS AND DETAILS
23 of 518 15S-101 ADDITION FOUNDATION AND FRAMING PLANS
24 of 518 15S-200 FOUNDATION DETAILS
25 of 518 15S-300 STEEL DETAILS
ARCHITECTURAL
26 of 518 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS
27 of 518 AS101a ICRA DETAILS
28 of 518 AS101b ICRA DETAILS
29 of 518 01A-100 BLDG 01 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS
30 of 518 01A-101 BLDG 01 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
31 of 518 01A-102 BLDG 01 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
32 of 518 01A-103 BLDG 01 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS
33 of 518 01A-104 BLDG 01 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS
34 of 518 01A-105 BLDG 01 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS
35 of 518 01A-106 BLDG 01 -LEVEL 06 -DEMO, FLOOR PLANS & RCPS
36 of 518 01A-107 BLDG 01 -LEVEL 07 -DEMO, FLOOR PLANS & RCPS
37 of 518 01A-108 BLDG 01 -LEVEL 08 -DEMO, FLOOR PLANS & RCPS
38 of 518 01A-109 BLDG 01 -LEVEL 09 -DEMO, FLOOR PLANS & RCPS
39 of 518 01A-110 BLDG 01 -LEVEL 10 -DEMO, FLOOR PLANS & RCPS
40 of 518 01A-111 BLDG 01 -LEVEL 11 -DEMO, FLOOR PLANS & RCPS
41 of 518 01AS100 BUILDING 01 -LEVEL 00 -PHASING PLAN
42 of 518 01AS101 BUILDING 01 -LEVEL 01 -PHASING PLAN
43 of 518 01AS102 BUILDING 01 -LEVEL 02 -PHASING PLAN
44 of 518 01AS103 BUILDING 01 -LEVEL 03 -PHASING PLAN
45 of 518 01AS104 BUILDING 01 -LEVEL 04 -PHASING PLAN
46 of 518 01AS105 BUILDING 01 -LEVEL 05 -PHASING PLAN
47 of 518 01AS106 BUILDING 01 -LEVEL 06 -PHASING PLAN
48 of 518 01AS107 BUILDING 01 -LEVEL 07 -PHASING PLAN
49 of 518 01AS108 BUILDING 01 -LEVEL 08 -PHASING PLAN
50 of 518 01AS109 BUILDING 01 -LEVEL 09 -PHASING PLAN
51 of 518 01AS110 BUILDING 01 -LEVEL 10 -PHASING PLAN
52 of 518 01AS111 BUILDING 01 -LEVEL 11 -PHASING PLAN
53 of 518 01AS112 BUILDING 01 -LEVEL 12 -PHASING PLAN
54 of 518 01AS113 BUILDING 01 -LEVEL 13 -PHASING PLAN
55 of 518 02A-101 BLDG 02 -LEVEL 01 -DEMO, FLOORS PLAN & RCPS
56 of 518 02A-102 BLDG 02 -LEVEL 02 -DEMO, FLOOR PLAN & RCPS
57 of 518 02AS100 BUILDING 02 -LEVEL 00 -PHASING PLAN
58 of 518 02AS101 BUILDING 02 -LEVEL 01 -PHASING PLAN
59 of 518 02AS102 BUILDING 02 -LEVEL 02 -PHASING PLAN
60 of 518 04A-101 BLDG 04 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
61 of 518 04AS100 BUILDING 04 -LEVEL 00 -PHASING PLAN
62 of 518 04AS101 BUILDING 04 -LEVEL 01 -PHASING PLAN
63 of 518 04AS102 BUILDING 04 -LEVEL 02 -PHASING PLAN
64 of 518 04AS103 BUILDING 04 -LEVEL 03 LOWER -PHASING PLAN
65 of 518 04AS104 BUILDING 04 -LEVEL 03 UPPER -PHASING PLAN
66 of 518 05A-101 BLDG 05 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
67 of 518 05AS101 BUILDING 05 -LEVEL 01 -PHASING PLAN
68 of 518 05AS102 BUILDING 05 -LEVEL 02 -PHASING PLAN
69 of 518 06A-101 BLDG 06 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
70 of 518 06A-102 BLDG 06 -LEVEL 02 -DEMO, FLOOR PLAN & RCPS
71 of 518 06AS101 BUILDING 06 -LEVEL 01 -PHASING PLAN
72 of 518 06AS102 BUILDING 6 -LEVEL 02 -PHASING PLAN
73 of 518 15A-101 BLDG 15 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
74 of 518 15A-102 BLDG 15 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
75 of 518 15A-103 BLDG 15 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS
76 of 518 15A-104 BLDG 15 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS
77 of 518 15A-105 BLDG 15 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS
78 of 518 15A-106 BLDG 15 -LEVEL 06 -DEMO, FLOOR PLANS & RCPS
79 of 518 15A-107 BLDG 15 -LEVEL 07 -DEMO, FLOOR PLANS & RCPS
80 of 518 15A-108 BLDG 15 -LEVEL 08 -DEMO, FLOOR PLANS & RCPS
81 of 518 15AE-100 BLDG 15 TOWER -ROOF PLAN
82 of 518 15AE-101 BLDG 15 TOWER -ELEVATION -EXISTING CON
83 of 518 15AE-102 BLDG 15 TOWER -ELEVATION
84 of 518 15AE-103 BLDG 15 TOWER -SECTIONS
85 of 518 15AE-104 BLDG 15 TOWER -SECTIONS
86 of 518 15AS100 BUILDING 15 -LEVEL 00 -PHASING PLAN
87 of 518 15AS101 BUILDING 15 -LEVEL 01 -PHASING PLAN
88 of 518 15AS102 BUILDING 15 -LEVEL 02 -PHASING PLAN
89 of 518 15AS103 BUILDING 15 -LEVEL 03 -PHASING PLAN
90 of 518 15AS104 BUILDING 15 -LEVEL 04 -PHASING PLAN
91 of 518 15AS105 BUILDING 15 -LEVEL 05 -PHASING PLAN
92 of 518 15AS106 BUILDING 15 -LEVEL 06 -PHASING PLAN
93 of 518 15AS107 BUILDING 15 -LEVEL 07 -PHASING PLAN
94 of 518 15AS108 BUILDING 15 -LEVEL 08 -PHASING PLAN
95 of 518 15AS109 BUILDING 15 -LEVEL 09 -PHASING PLAN
96 of 518 26A-100 BLDG 26 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS
97 of 518 26A-101 BLDG 26 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
98 of 518 26A-102 BLDG 26 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
99 of 518 26A-103 BLDG 26 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS
100 of 518 26A-105 BLDG 26 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS
101 of 518 26AS100 BUILDING 26 -LEVEL 00 -PHASING PLAN
102 of 518 26AS101 BUILDING 26 -LEVEL 01 -PHASING PLAN
103 of 518 26AS102 BUILDING 26 -LEVEL 02 -PHASING PLAN
104 of 518 26AS103 BUILDING 26 -LEVEL 03 -PHASING PLAN
105 of 518 26AS104 BUILDING 26 -LEVEL 04 -PHASING PLAN
106 of 518 26AS105 BUILDING 26 -LEVEL 05 -PHASING PLAN
107 of 518 26AS106 BUILDING 26 -LEVEL 06 -PHASING PLAN
108 of 518 40A-101 BLDG 40 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
109 of 518 40AS101 BUILDING 40 -LEVEL 01 -PHASING PLAN
110 of 518 55A-101 BLDG 55 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
111 of 518 55A-102 BLDG 55 -LEVEL 02 -DEMO, FLOOR PLAN & RCPS
112 of 518 55AS101 BUILDING 55 -LEVEL 01 -PHASING PLAN
113 of 518 55AS102 BUILDING 55 -LEVEL 02 -PHASING PLAN
114 of 518 56A-100 BLDG 56 -LEVEL 00 -DEMO, FLOOR PLAN & RCPS
115 of 518 56A-101 BLDG 56 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
116 of 518 56AS100 BUILDING 56 -LEVEL 00 -PHASING PLAN
117 of 518 56AS101 BUILDING 56 -LEVEL 01 -PHASING PLAN
118 of 518 A-601 ROOM FINISH SCHEDULE & WALL TYPES
119 of 518 A-602 DOOR DETAILS
120 of 518 A-603 ARCHITECTURAL DETAILS
121 of 518 A-604 EXTERIOR DETAILS
122 of 518 A-604A EXTERIOR DETAILS -ENLARGED PLANS
123 of 518 A-604B EXTERIOR DETAILS
124 of 518 A-604C EXTERIOR DETAILS
125 of 518 AE421 INTERIOR ELEVATIONS
126 of 518 AW001 IN-03.01 -ROOM NUMBER SIGN & SIGNAGE SCHEDULES
MECHANICAL
127 of 518 M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
128 of 518 01M-100a BLDG 01 -LEVEL 00 -FLOOR PLAN
129 of 518 01M-100b BLDG 01 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS
130 of 518 01M-101 BLDG 01 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
131 of 518 01M-102 BLDG 01 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
132 of 518 01M-103 BLDG 01 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS
133 of 518 01M-104 BLDG 01 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS
134 of 518 01M-105 BLDG 01 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS
135 of 518 01M-106 BLDG 01 -LEVEL 06 -DEMO, FLOOR PLANS & RCPS
136 of 518 01M-107 BLDG 01 -LEVEL 07 -DEMO, FLOOR PLANS & RCPS
137 of 518 01M-108 BLDG 01 -LEVEL 08 -DEMO, FLOOR PLANS & RCPS
138 of 518 01M-109 BLDG 01 -LEVEL 09 -DEMO, FLOOR PLANS & RCPS
139 of 518 01M-110 BLDG 01 -LEVEL 10 -DEMO, FLOOR PLANS & RCPS
140 of 518 01M-111 BLDG 01 -LEVEL 11 -DEMO, FLOOR PLANS & RCPS
141 of 518 01M-112 BLDG 01-LEVEL 12 -ROOF PLAN
142 of 518 02M-101 BLDG 2 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
143 of 518 02M-102 BLDG 2 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
144 of 518 02M-103 BLDG 2 -ROOF PLAN
145 of 518 04M-101 BLDG 04 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
146 of 518 05M-101 BLDG 05 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
147 of 518 06M-101 BLDG 06 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
148 of 518 06M-102 BLDG 06 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
149 of 518 15M-100 BLDG 15 -BASEMENT -AHU FLOOR PLANS
150 of 518 15M-101 BLDG 15 -LEVEL 01 -FLOOR PLANS & RCPS
151 of 518 15M-102 BLDG 15 -LEVEL 02 -FLOOR PLAN & RCPS
152 of 518 15M-103 BLDG 15 -LEVEL 03 -FLOOR PLAN & RCPS
153 of 518 15M-104 BLDG 15 -LEVEL 04 -FLOOR PLAN & RCP
154 of 518 15M-105 BLDG 15 -LEVEL 05 -FLOOR PLANS & RCPS
155 of 518 15M-106 BLDG 15 -LEVEL 06 -FLOOR PLANS & RCPS
156 of 518 15M-107 BLDG 15 -LEVEL 07 -FLOOR PLAN & RCPS
157 of 518 15M-108 BLDG 15 -LEVEL 08 -FLOOR PLAN & RCPS
158 of 518 26M-100 BLDG 26 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS
159 of 518 26M-101 BLDG 26 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
160 of 518 26M-102a BLDG 26 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
161 of 518 26M-102b BLDG 26 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
162 of 518 26M-103 BLDG 26 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS
163 of 518 26M-104 BLDG 26 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS
164 of 518 26M-105 BLDG 26 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS
165 of 518 40M-101 BLDG 40 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
166 of 518 55M-101 BLDG 55 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
167 of 518 55M-102 BLDG 55 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
168 of 518 55M-103 BLDG 55 -ROOF PLAN
169 of 518 56M-100 BLDG 56 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS
170 of 518 56M-101 BLDG 56 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
171 of 518 56M-102 BLDG 56 -ROOF PLAN
172 of 518 M-501 MECHANICAL DETAILS AND CONTROLS
173 of 518 M-502 MECHANICAL DETAILS
174 of 518 M-601 MECHANICAL SCHEDULES
175 of 518 M-602 MECHANICAL AND PLUMBING SCHEDULES
176 of 518 M-701 MECHANICAL CONTROLS AND VALVE SYMBOLS
177 of 518 M-702
FAN COIL UNIT AND CHILLED WATER PUMP SEQUENCE OF OPERATIONS, POINTS
LISTS, AND CONTROL DIAGRAMS
178 of 518 M-703
AIR HANDLING UNIT SEQUENCE OF OPERATION, POINTS LIST, AND CONTROL
DIAGRAM
ELECTRICAL
179 of 518 EPG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
180 of 518 EPG002 ELECTRICAL LEGENDS
181 of 518 01EP100 BLDG 01 -LEVEL 00 -ELECTRICAL PLAN
182 of 518 02EP100 BLDG 02 -LEVEL 00 -ELECTRICAL PLAN
183 of 518 04EP101 BLDG 04 -LEVEL 01 -ELECTRICAL PLAN
184 of 518 05EP101 BLDG 05 -LEVEL 01 -ELECTRICAL PLAN
185 of 518 06EP101 BLDG 06 -LEVEL 01 -ELECTRICAL PLAN
186 of 518 15EP100 BLDG 15 -LEVEL 00 -ELECTRICAL PLAN
187 of 518 15EP101 BLDG 15 -LEVEL 01 -ELECTRICAL PLAN
188 of 518 26EP100 BLDG 26 -LEVEL 00 -ELECTRICAL PLAN
189 of 518 26EP101 BLDG 26 -LEVEL 01 -ELECTRICAL PLAN
190 of 518 26EP102 BLDG 26 -LEVEL 02 -ELECTRICAL PLAN
191 of 518 26EP103 BLDG 26 -LEVEL 03 -ELECTRICAL PLAN
192 of 518 26EP104 BLDG 26 -LEVEL 04 -ELECTRICAL PLAN
193 of 518 40EP101 BLDG 40 -LEVEL 01 -ELECTRICAL PLAN
194 of 518 55EP101 BLDG 55 -LEVEL 01 -ELECTRICAL PLAN
195 of 518 56EP100 BLDG 56 -LEVEL 00 -ELECTRICAL PLAN
196 of 518 01EP400 BLDG 01 -LEVEL 00 -ENLARGED ELECTRICAL PLANS
197 of 518 01EP401 BLDG 01 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
198 of 518 01EP402 BLDG 01 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
199 of 518 01EP403 BLDG 01 -LEVEL 03 -ENLARGED ELECTRICAL PLANS
200 of 518 01EP404 BLDG 01 -LEVEL 04 -ENLARGED ELECTRICAL PLANS
201 of 518 01EP405 BLDG 01 -LEVEL 05 -ENLARGED ELECTRICAL PLANS
202 of 518 01EP406 BLDG 01 -LEVEL 06 -ENLARGED ELECTRICAL PLANS
203 of 518 01EP407 BLDG 01 -LEVEL 07 -ENLARGED ELECTRICAL PLANS
204 of 518 01EP408 BLDG 01 -LEVEL 08 -ENLARGED ELECTRICAL PLANS
205 of 518 01EP409 BLDG 01 -LEVEL 09 -ENLARGED ELECTRICAL PLANS
206 of 518 01EP410 BLDG 01 -LEVEL 10 -ENLARGED ELECTRICAL PLANS
207 of 518 01EP411 BLDG 01 -LEVEL 11 -ENLARGED ELECTRICAL PLANS
208 of 518 01EP412 BLDG 01 -ENLARGED ROOF PLAN
209 of 518 02EP401 BLDG 02 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
210 of 518 02EP402 BLDG 02 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
211 of 518 02EP403 BLDG 02 -ENLARGED ROOF PLAN
212 of 518 04EP401 BLDG 04 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
213 of 518 05EP401 BLDG 05 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
214 of 518 06EP401 BLDG 06 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
215 of 518 06EP402 BLDG 06 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
216 of 518 15EP401 BLDG 15 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
217 of 518 15EP402 BLDG 15 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
218 of 518 15EP403 BLDG 15 -LEVEL 03 -ENLARGED ELECTRICAL PLANS
219 of 518 15EP404 BLDG 15 -LEVEL 04 -ENLARGED ELECTRICAL PLANS
220 of 518 15EP405 BLDG 15 -LEVEL 05 -ENLARGED ELECTRICAL PLANS
221 of 518 15EP406 BLDG 15 -LEVEL 06 -ENLARGED ELECTRICAL PLANS
222 of 518 15EP407 BLDG 15 -LEVEL 07 -ENLARGED ELECTRICAL PLANS
223 of 518 15EP408 BLDG 15 -LEVEL 08 -ENLARGED ELECTRICAL PLANS
224 of 518 15EP409 BLDG 15 -ENLARGED ROOF PLAN
225 of 518 26EP400 BLDG 26 -LEVEL 00 -ENLARGED ELECTRICAL PLANS
226 of 518 26EP401 BLDG 26 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
227 of 518 26EP402 BLDG 26 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
228 of 518 26EP403 BLDG 26 -LEVEL 03 -ENLARGED ELECTRICAL PLANS
229 of 518 26EP405 BLDG 26 -LEVEL 05 -ENLARGED ELECTRICAL PLANS
230 of 518 26EP406 BLDG 26 -ENLARGED ROOF PLAN
231 of 518 40EP401 BLDG 40 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
232 of 518 55EP401 BLDG 55 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
233 of 518 55EP402 BLDG 55 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
234 of 518 55EP403 BLDG 55 -ENLARGED ROOF PLAN
235 of 518 56EP400 BLDG 56 -LEVEL 00 -ENLARGED ELECTRICAL PLANS
236 of 518 56EP401 BLDG 56 -LEVEL 01-ENLARGED ELECTRICAL PLANS
237 of 518 56EP402 BLDG 56 -ENLARGED ROOF PLAN
238 of 518 EP501 ELECTRICAL DETAILS
239 of 518 EP502 ELECTRICAL DETAILS
240 of 518 EP503 ELECTRICAL DETAILS
241 of 518 EP504 ELECTRICAL DETAILS
242 of 518 EP505 ELECTRICAL DETAILS
243 of 518 EP506 ELECTRICAL DETAILS
244 of 518 EP507 TELECOMMUNICATION BONDING RISER DIAGRAM (1 OF 2)
245 of 518 EP508 TELECOMMUNICATION BONDING RISER DIAGRAM (2 OF 2)
246 of 518 01EP601 BLDG 01 -ONE-LINE DIAGRAM -PART 1 OF 9 -EXISTING
247 of 518 01EP602 BLDG 01 -ONE-LINE DIAGRAM -PART 2 OF 9 -EXISTING
248 of 518 01EP603 BLDG 01 -ONE-LINE DIAGRAM -PART 3 OF 9 -EXISTING
249 of 518 01EP604 BLDG 01 -ONE-LINE DIAGRAM -PART 4 OF 9 -EXISTING
250 of 518 01EP605 BLDG 01 -ONE-LINE DIAGRAM -PART 5 OF 9 -EXISTING
251 of 518 01EP606 BLDG 01 -ONE-LINE DIAGRAM -PART 6 OF 9 -EXISTING
252 of 518 01EP607 BLDG 01 -ONE-LINE DIAGRAM -PART 7 OF 9 -EXISTING
253 of 518 01EP608 BLDG 01 -ONE-LINE DIAGRAM -PART 8 OF 9 -EXISTING
254 of 518 01EP609 BLDG 01 -ONE-LINE DIAGRAM -PART 9 OF 9 -EXISTING
255 of 518 01EP611 BLDG 01 -ONE-LINE DIAGRAM -PART 1 OF 9 -REVISED
256 of 518 01EP612 BLDG 01 -ONE-LINE DIAGRAM -PART 2 OF 9 -REVISED
257 of 518 01EP613 BLDG 01 -ONE-LINE DIAGRAM -PART 3 OF 9 -REVISED
258 of 518 01EP614 BLDG 01 -ONE-LINE DIAGRAM -PART 4 OF 9 -REVISED
259 of 518 01EP615 BLDG 01 -ONE-LINE DIAGRAM -PART 5 OF 9 -REVISED
260 of 518 01EP616 BLDG 01 -ONE-LINE DIAGRAM -PART 6 OF 9 -REVISED
261 of 518 01EP617 BLDG 01 -ONE-LINE DIAGRAM -PART 7 OF 9 -REVISED
262 of 518 01EP618 BLDG 01 -ONE-LINE DIAGRAM -PART 8 OF 9 -REVISED
263 of 518 01EP619 BLDG 01 -ONE-LINE DIAGRAM -PART 9 OF 9 -REVISED
264 of 518 02EP601 BLDG 02 -ONE-LINE DIAGRAM -EXISTING
265 of 518 02EP611 BLDG 02 -ONE-LINE DIAGRAM -REVISED
266 of 518 04EP601 BLDG 04 -ONE-LINE DIAGRAM -EXISTING
267 of 518 04EP611 BLDG 04 -ONE-LINE DIAGRAM -REVISED
268 of 518 05EP601 BLDG 05 -ONE-LINE DIAGRAM -EXISTING
269 of 518 05EP611 BLDG 05 -ONE-LINE DIAGRAM -REVISED
270 of 518 06EP601 BLDG 06 -ONE-LINE DIAGRAM -EXISTING
271 of 518 06EP611 BLDG 06 -ONE-LINE DIAGRAM -REVISED
272 of 518 15EP601 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -EXISTING
273 of 518 15EP602 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -EXISTING
274 of 518 15EP603 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -EXISTING
275 of 518 15EP611 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -REVISED
276 of 518 15EP612 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -REVISED
277 of 518 15EP613 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -REVISED
278 of 518 26EP601 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -EXISTING
279 of 518 26EP602 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -EXISTING
280 of 518 26EP603 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -EXISTING
281 of 518 26EP604 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -EXISTING
282 of 518 26EP605 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -EXISTING
283 of 518 26EP611 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -REVISED
284 of 518 26EP612 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -REVISED
285 of 518 26EP613 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -REVISED
286 of 518 26EP614 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -REVISED
287 of 518 26EP615 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -REVISED
288 of 518 40EP600 BLDG 40 -MEDIUM VOLTAGE ONE-LINE DIAGRAM -EXISTING
289 of 518 40EP601 BLDG 40 -ONE-LINE DIAGRAM -EXISTING
290 of 518 40EP611 BLDG 40 -ONE-LINE DIAGRAM -REVISED
291 of 518 55EP601 BLDG 55 -ONE-LINE DIAGRAM -EXISTING
292 of 518 55EP611 BLDG 55 -ONE-LINE DIAGRAM -REVISED
293 of 518 56EP601 BLDG 56 -ONE-LINE DIAGRAM -EXISTING
294 of 518 56EP611 BLDG 56 -ONE-LINE DIAGRAM -REVISED
295 of 518 01EP701 BLDG 01 -ELECTRICAL SCHEDULES
296 of 518 01EP702 BLDG 01 - ELECTRICAL SCHEDULES BLDG 01 - ELECTRICAL SCHEDULES
297 of 518 01EP703 BLDG 01 -ELECTRICAL SCHEDULES BLDG 01 -ELECTRICAL SCHEDULES
298 of 518 01EP704 BLDG 01 -ELECTRICAL SCHEDULES
299 of 518 01EP705 BLDG 01 -ELECTRICAL SCHEDULES
300 of 518 02EP701 BLDG 02 -ELECTRICAL SCHEDULES
301 of 518 04EP701 BLDG 04 -ELECTRICAL SCHEDULES
302 of 518 05EP701 BLDG 05 -ELECTRICAL SCHEDULES
303 of 518 06EP701 BLDG 06 -ELECTRICAL SCHEDULES
304 of 518 15EP701 BLDG 15 -ELECTRICAL SCHEDULES
305 of 518 15EP702 BLDG 15 -ELECTRICAL SCHEDULES
306 of 518 15EP703 BLDG 15 -ELECTRICAL SCHEDULES
307 of 518 26EP701 BLDG 26 -ELECTRICAL SCHEDULES
308 of 518 26EP702 BLDG 26 -ELECTRICAL SCHEDULES
309 of 518 40EP701 BLDG 40 -ELECTRICAL SCHEDULES
310 of 518 55EP701 BLDG 55 -ELECTRICAL SCHEDULES
311 of 518 56EP701 BLDG 56 -ELECTRICAL SCHEDULES
312 of 518 EP701 ELECTRICAL SCHEDULES
313 of 518 EP702 ELECTRICAL SCHEDULES
TELECOMMUNICATIONS
314 of 518 ETG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
315 of 518 ETG002 TELECOMMUNICATIONS LEGENDS
316 of 518 01ET1000 BLDG 01 -SUB BASEMENT -TELECOMMUNICATIONS PLAN
317 of 518 01ET100 BLDG 01 -LEVEL 00 -TELECOMMUNICATIONS PLAN
318 of 518 01ET101 BLDG 01 -LEVEL 01 -TELECOMMUNICATIONS PLAN
319 of 518 01ET102 BLDG 01 -LEVEL 02 -TELECOMMUNICATIONS PLAN
320 of 518 01ET103 BLDG 01 -LEVEL 03 -TELECOMMUNICATIONS PLAN
321 of 518 01ET104 BLDG 01 -LEVEL 04 -TELECOMMUNICATIONS PLAN
322 of 518 01ET105 BLDG 01 -LEVEL 05 -TELECOMMUNICATIONS PLAN
323 of 518 01ET106 BLDG 01 -LEVEL 06 -TELECOMMUNICATIONS PLAN
324 of 518 01ET107 BLDG 01 -LEVEL 07 -TELECOMMUNICATIONS PLAN
325 of 518 01ET108 BLDG 01 -LEVEL 08 -TELECOMMUNICATIONS PLAN
326 of 518 01ET109 BLDG 01 -LEVEL 09 -TELECOMMUNICATIONS PLAN
327 of 518 01ET110 BLDG 01 -LEVEL 10 -TELECOMMUNICATIONS PLAN
328 of 518 01ET111 BLDG 01 -LEVEL 11 -TELECOMMUNICATIONS PLAN
329 of 518 01ET112 BLDG 01 -LEVEL 12 -TELECOMMUNICATIONS PLAN
330 of 518 01ET113 BLDG 01 -LEVEL 13 -TELECOMMUNICATIONS PLAN
331 of 518 02ET100 BLDG 02 -LEVEL 00 -TELECOMMUNICATIONS PLAN
332 of 518 02ET101 BLDG 02 -LEVEL 01 -TELECOMMUNICATIONS PLAN
333 of 518 02ET102 BLDG 02 -LEVEL 02 -TELECOMMUNICATIONS PLAN
334 of 518 04ET101 BLDG 04 -LEVEL 01 -TELECOMMUNICATIONS PLAN
335 of 518 05ET101 BLDG 05 -LEVEL 01 -TELECOMMUNICATIONS PLAN
336 of 518 05ET102 BLDG 05 -LEVEL 02 -TELECOMMUNICATIONS PLAN
337 of 518 06ET101 BLDG 06 -LEVEL 01 -TELECOMMUNICATIONS PLAN
338 of 518 06ET102 BLDG 06 -LEVEL 02 -TELECOMMUNICATIONS PLAN
339 of 518 15ET100 BLDG 15 -LEVEL 00 -TELECOMMUNICATIONS PLAN
340 of 518 15ET101 BLDG 15 -LEVEL 01 -TELECOMMUNICATIONS PLAN
341 of 518 15ET102 BLDG 15 -LEVEL 02 -TELECOMMUNICATIONS PLAN
342 of 518 15ET103 BLDG 15 -LEVEL 03 -TELECOMMUNICATIONS PLAN
343 of 518 15ET104 BLDG 15 -LEVEL 04 -TELECOMMUNICATIONS PLAN
344 of 518 15ET105 BLDG 15 -LEVEL 05 -TELECOMMUNICATIONS PLAN
345 of 518 15ET106 BLDG 15-LEVEL 06 -TELECOMMUNICATIONS PLAN
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128
589-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES G-003
DRAWING INDEX
MA/EM DD/ADSI
100% CONSTRUCTION
DOCUMENTS
06/19/2023
Revisions: Date:
258 of 518 01EP614 BLDG 01 -ONE-LINE DIAGRAM -PART 4 OF 9 -REVISED
259 of 518 01EP615 BLDG 01 -ONE-LINE DIAGRAM -PART 5 OF 9 -REVISED
260 of 518 01EP616 BLDG 01 -ONE-LINE DIAGRAM -PART 6 OF 9 -REVISED
261 of 518 01EP617 BLDG 01 -ONE-LINE DIAGRAM -PART 7 OF 9 -REVISED
262 of 518 01EP618 BLDG 01 -ONE-LINE DIAGRAM -PART 8 OF 9 -REVISED
263 of 518 01EP619 BLDG 01 -ONE-LINE DIAGRAM -PART 9 OF 9 -REVISED
264 of 518 02EP601 BLDG 02 -ONE-LINE DIAGRAM -EXISTING
265 of 518 02EP611 BLDG 02 -ONE-LINE DIAGRAM -REVISED
266 of 518 04EP601 BLDG 04 -ONE-LINE DIAGRAM -EXISTING
267 of 518 04EP611 BLDG 04 -ONE-LINE DIAGRAM -REVISED
268 of 518 05EP601 BLDG 05 -ONE-LINE DIAGRAM -EXISTING
269 of 518 05EP611 BLDG 05 -ONE-LINE DIAGRAM -REVISED
270 of 518 06EP601 BLDG 06 -ONE-LINE DIAGRAM -EXISTING
271 of 518 06EP611 BLDG 06 -ONE-LINE DIAGRAM -REVISED
272 of 518 15EP601 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -EXISTING
273 of 518 15EP602 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -EXISTING
274 of 518 15EP603 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -EXISTING
275 of 518 15EP611 BLDG 15 -ONE-LINE DIAGRAM -PART 1 OF 3 -REVISED
276 of 518 15EP612 BLDG 15 -ONE-LINE DIAGRAM -PART 2 OF 3 -REVISED
277 of 518 15EP613 BLDG 15 -ONE-LINE DIAGRAM -PART 3 OF 3 -REVISED
278 of 518 26EP601 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -EXISTING
279 of 518 26EP602 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -EXISTING
280 of 518 26EP603 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -EXISTING
281 of 518 26EP604 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -EXISTING
282 of 518 26EP605 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -EXISTING
283 of 518 26EP611 BLDG 26 -ONE-LINE DIAGRAM -PART 1 OF 5 -REVISED
284 of 518 26EP612 BLDG 26 -ONE-LINE DIAGRAM -PART 2 OF 5 -REVISED
285 of 518 26EP613 BLDG 26 -ONE-LINE DIAGRAM -PART 3 OF 5 -REVISED
286 of 518 26EP614 BLDG 26 -ONE-LINE DIAGRAM -PART 4 OF 5 -REVISED
287 of 518 26EP615 BLDG 26 -ONE-LINE DIAGRAM -PART 5 OF 5 -REVISED
288 of 518 40EP600 BLDG 40 -MEDIUM VOLTAGE ONE-LINE DIAGRAM -EXISTING
289 of 518 40EP601 BLDG 40 -ONE-LINE DIAGRAM -EXISTING
290 of 518 40EP611 BLDG 40 -ONE-LINE DIAGRAM -REVISED
291 of 518 55EP601 BLDG 55 -ONE-LINE DIAGRAM -EXISTING
292 of 518 55EP611 BLDG 55 -ONE-LINE DIAGRAM -REVISED
293 of 518 56EP601 BLDG 56 -ONE-LINE DIAGRAM -EXISTING
294 of 518 56EP611 BLDG 56 -ONE-LINE DIAGRAM -REVISED
295 of 518 01EP701 BLDG 01 -ELECTRICAL SCHEDULES
296 of 518 01EP702 BLDG 01 - ELECTRICAL SCHEDULES BLDG 01 - ELECTRICAL SCHEDULES
297 of 518 01EP703 BLDG 01 -ELECTRICAL SCHEDULES BLDG 01 -ELECTRICAL SCHEDULES
298 of 518 01EP704 BLDG 01 -ELECTRICAL SCHEDULES
299 of 518 01EP705 BLDG 01 -ELECTRICAL SCHEDULES
300 of 518 02EP701 BLDG 02 -ELECTRICAL SCHEDULES
301 of 518 04EP701 BLDG 04 -ELECTRICAL SCHEDULES
302 of 518 05EP701 BLDG 05 -ELECTRICAL SCHEDULES
303 of 518 06EP701 BLDG 06 -ELECTRICAL SCHEDULES
304 of 518 15EP701 BLDG 15 -ELECTRICAL SCHEDULES
305 of 518 15EP702 BLDG 15 -ELECTRICAL SCHEDULES
306 of 518 15EP703 BLDG 15 -ELECTRICAL SCHEDULES
307 of 518 26EP701 BLDG 26 -ELECTRICAL SCHEDULES
308 of 518 26EP702 BLDG 26 -ELECTRICAL SCHEDULES
309 of 518 40EP701 BLDG 40 -ELECTRICAL SCHEDULES
310 of 518 55EP701 BLDG 55 -ELECTRICAL SCHEDULES
311 of 518 56EP701 BLDG 56 -ELECTRICAL SCHEDULES
312 of 518 EP701 ELECTRICAL SCHEDULES
313 of 518 EP702 ELECTRICAL SCHEDULES
TELECOMMUNICATIONS
314 of 518 ETG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
315 of 518 ETG002 TELECOMMUNICATIONS LEGENDS
316 of 518 01ET1000 BLDG 01 -SUB BASEMENT -TELECOMMUNICATIONS PLAN
317 of 518 01ET100 BLDG 01 -LEVEL 00 -TELECOMMUNICATIONS PLAN
318 of 518 01ET101 BLDG 01 -LEVEL 01 -TELECOMMUNICATIONS PLAN
319 of 518 01ET102 BLDG 01 -LEVEL 02 -TELECOMMUNICATIONS PLAN
320 of 518 01ET103 BLDG 01 -LEVEL 03 -TELECOMMUNICATIONS PLAN
321 of 518 01ET104 BLDG 01 -LEVEL 04 -TELECOMMUNICATIONS PLAN
322 of 518 01ET105 BLDG 01 -LEVEL 05 -TELECOMMUNICATIONS PLAN
323 of 518 01ET106 BLDG 01 -LEVEL 06 -TELECOMMUNICATIONS PLAN
324 of 518 01ET107 BLDG 01 -LEVEL 07 -TELECOMMUNICATIONS PLAN
325 of 518 01ET108 BLDG 01 -LEVEL 08 -TELECOMMUNICATIONS PLAN
326 of 518 01ET109 BLDG 01 -LEVEL 09 -TELECOMMUNICATIONS PLAN
327 of 518 01ET110 BLDG 01 -LEVEL 10 -TELECOMMUNICATIONS PLAN
328 of 518 01ET111 BLDG 01 -LEVEL 11 -TELECOMMUNICATIONS PLAN
329 of 518 01ET112 BLDG 01 -LEVEL 12 -TELECOMMUNICATIONS PLAN
330 of 518 01ET113 BLDG 01 -LEVEL 13 -TELECOMMUNICATIONS PLAN
331 of 518 02ET100 BLDG 02 -LEVEL 00 -TELECOMMUNICATIONS PLAN
332 of 518 02ET101 BLDG 02 -LEVEL 01 -TELECOMMUNICATIONS PLAN
333 of 518 02ET102 BLDG 02 -LEVEL 02 -TELECOMMUNICATIONS PLAN
334 of 518 04ET101 BLDG 04 -LEVEL 01 -TELECOMMUNICATIONS PLAN
335 of 518 05ET101 BLDG 05 -LEVEL 01 -TELECOMMUNICATIONS PLAN
336 of 518 05ET102 BLDG 05 -LEVEL 02 -TELECOMMUNICATIONS PLAN
337 of 518 06ET101 BLDG 06 -LEVEL 01 -TELECOMMUNICATIONS PLAN
338 of 518 06ET102 BLDG 06 -LEVEL 02 -TELECOMMUNICATIONS PLAN
339 of 518 15ET100 BLDG 15 -LEVEL 00 -TELECOMMUNICATIONS PLAN
340 of 518 15ET101 BLDG 15 -LEVEL 01 -TELECOMMUNICATIONS PLAN
341 of 518 15ET102 BLDG 15 -LEVEL 02 -TELECOMMUNICATIONS PLAN
342 of 518 15ET103 BLDG 15 -LEVEL 03 -TELECOMMUNICATIONS PLAN
343 of 518 15ET104 BLDG 15 -LEVEL 04 -TELECOMMUNICATIONS PLAN
344 of 518 15ET105 BLDG 15 -LEVEL 05 -TELECOMMUNICATIONS PLAN
345 of 518 15ET106 BLDG 15-LEVEL 06 -TELECOMMUNICATIONS PLAN
346 of 518 15ET107 BLDG 15 -LEVEL 07 -TELECOMMUNICATIONS PLAN
347 of 518 15ET108 BLDG 15 -LEVEL 08 -TELECOMMUNICATIONS PLAN
348 of 518 15ET109 BLDG 15 -LEVEL 09 -TELECOMMUNICATIONS PLAN
349 of 518 26ET100 BLDG 26 -LEVEL 00 -TELECOMMUNICATIONS PLAN
350 of 518 26ET101 BLDG 26 -LEVEL 01 -TELECOMMUNICATIONS PLAN
351 of 518 26ET102 BLDG 26 -LEVEL 02 -TELECOMMUNICATIONS PLAN
352 of 518 26ET103 BLDG 26 -LEVEL 03 -TELECOMMUNICATIONS PLAN
353 of 518 26ET104 BLDG 26 -LEVEL 04 -TELECOMMUNICATIONS PLAN
354 of 518 26ET105 BLDG 26 -LEVEL 05 -TELECOMMUNICATIONS PLAN
355 of 518 26ET106 BLDG 26 -LEVEL 06 -TELECOMMUNICATIONS PLAN
356 of 518 40ET101 BLDG 40 -LEVEL 01 -TELECOMMUNICATIONS PLAN
357 of 518 55ET101 BLDG 55 -LEVEL 01 -TELECOMMUNICATIONS PLAN
358 of 518 55ET102 BLDG 55 -LEVEL 02 -TELECOMMUNICATIONS PLAN
359 of 518 56ET100 BLDG 56 -LEVEL 00 -TELECOMMUNICATIONS PLAN
360 of 518 56ET101 BLDG 56 -LEVEL 01 -TELECOMMUNICATIONS PLAN
361 of 518 01ET400 BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS
362 of 518 01ET401 BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
363 of 518 01ET402 BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
364 of 518 01ET403 BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS
365 of 518 01ET404 BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS
366 of 518 01ET405 BLDG 01 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS
367 of 518 01ET406 BLDG 01 -LEVEL 06 -ENLARGED TELECOMMUNICATIONS PLANS
368 of 518 01ET407 BLDG 01 -LEVEL 07 -ENLARGED TELECOMMUNICATIONS PLANS
369 of 518 01ET408 BLDG 01 -LEVEL 08 -ENLARGED TELECOMMUNICATIONS PLANS
370 of 518 01ET409 BLDG 01 -LEVEL 09 -ENLARGED TELECOMMUNICATIONS PLANS
371 of 518 01ET410 BLDG 01 -LEVEL 10 -ENLARGED TELECOMMUNICATIONS PLANS
372 of 518 01ET411 BLDG 01 -LEVEL 11 -ENLARGED TELECOMMUNICATIONS PLANS
373 of 518 02ET401a BLDG 02 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
374 of 518 02ET401b BLDG 02 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
375 of 518 02ET402 BLDG 02 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
376 of 518 04ET401 BLDG 04 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
377 of 518 05ET401 BLDG 05 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
378 of 518 06ET401 BLDG 06 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
379 of 518 06ET402a BLDG 06 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
380 of 518 06ET402b BLDG 06 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
381 of 518 15ET401a BLDG 15 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
382 of 518 15ET401b BLDG 15 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
383 of 518 15ET402a BLDG 15 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
384 of 518 15ET402b BLDG 15 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
385 of 518 15ET403a BLDG 15 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS
386 of 518 15ET403b BLDG 15 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS
387 of 518 15ET404 BLDG 15 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS
388 of 518 15ET405a BLDG 15 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS
389 of 518 15ET405b BLDG 15 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS
390 of 518 15ET406 BLDG 15 -LEVEL 06 -ENLARGED TELECOMMUNICATIONS PLANS
391 of 518 15ET407a BLDG 15 -LEVEL 07 -ENLARGED TELECOMMUNICATIONS PLANS
392 of 518 15ET407b BLDG 15 -LEVEL 07 -ENLARGED TELECOMMUNICATIONS PLANS
393 of 518 15ET408 BLDG 15 -LEVEL 08 -ENLARGED TELECOMMUNICATIONS PLANS
394 of 518 26ET400 BLDG 26 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS
395 of 518 26ET401a BLDG 26 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLAN
396 of 518 26ET401b BLDG 26 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
397 of 518 26ET401c BLDG 26 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLAN
398 of 518 26ET402a BLDG 26 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
399 of 518 26ET402b BLDG 26 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
400 of 518 26ET402c BLDG 26 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
401 of 518 26ET403 BLDG 26 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS
402 of 518 26ET405 BLDG 26 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS
403 of 518 40ET401 BLDG 40 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
404 of 518 55ET401 BLDG 55 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
405 of 518 55ET402 BLDG 55 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
406 of 518 56ET400 BLDG 56 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS
407 of 518 56ET401 BLDG 56 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
408 of 518 ET501 TELECOMMUNICATIONS DETAILS
409 of 518 ET502 TELECOMMUNICATIONS DETAILS
410 of 518 ET503 TELECOMMUNICATIONS DETAILS
411 of 518 ET504 TELECOMMUNICATIONS DETAILS
412 of 518 ET701 TELECOMMUNICATIONS SCHEDULES
TECHNOLOGY
413 of 518 0-TN000 TECHNOLOGY COVERSHEET
414 of 518 0-TN003 TECHNOLOGY SITE PLAN & DETAILS
415 of 518 0-TN601 TECHNOLOGY DIAGRAMS
416 of 518 1-TN10S-NE BLDG 1 NE -SUB-BASEMENT 01 PLAN -TECHNOLOGY
417 of 518 1-TN10S-SE BLDG 1 SE -SUB-BASEMENT 01 PLAN -TECHNOLOGY
418 of 518 1-TN100-NE BLDG 1 NE -BASEMENT PLAN -TECHNOLOGY
419 of 518 1-TN100-NW BLDG 1 NW -BASEMENT PLAN -TECHNOLOGY
420 of 518 1-TN100-SE BLDG 1 SE -BASEMENT PLAN -TECHNOLOGY
421 of 518 1-TN101-NE BLDG 1 NE -LEVEL 01 PLAN -TECHNOLOGY
422 of 518 1-TN101-SE BLDG 1 SE -LEVEL 01 PLAN -TECHNOLOGY
423 of 518 1-TN102-NE BLDG 1 NE -LEVEL 02 PLAN -TECHNOLOGY
424 of 518 1-TN103-NE BLDG 1 NE -LEVEL 03 PLAN -TECHNOLOGY
425 of 518 1-TN104-NE BLDG 1 NE -LEVEL 04 PLAN -TECHNOLOGY
426 of 518 1-TN105-NE BLDG 1 NE -LEVEL 05 PLAN -TECHNOLOGY
427 of 518 1-TN106-NE BLDG 1 NE -LEVEL 06 PLAN -TECHNOLOGY
428 of 518 1-TN107-NE BLDG 1 NE -LEVEL 07 PLAN -TECHNOLOGY
429 of 518 1-TN108-NE BLDG 1 NE -LEVEL 08 PLAN -TECHNOLOGY
430 of 518 1-TN109-NE BLDG 1 NE -LEVEL 09 PLAN -TECHNOLOGY
431 of 518 1-TN110-NE BLDG 1 NE -LEVEL 10 PLAN -TECHNOLOGY
432 of 518 1-TN111-NE BLDG 1 NE -LEVEL 11 PLAN -TECHNOLOGY
433 of 518 1-TN401 TECHNOLOGY ENLARGED PLANS
434 of 518 1-TN402 TECHNOLOGY ENLARGED PLANS
435 of 518 1-TN403 TECHNOLOGY ENLARGED PLANS
436 of 518 1-TN601 TECHNOLOGY DIAGRAMS
437 of 518 2-TN200 BLDG 02 -BASEMENT PLAN -TECHNOLOGY
438 of 518 2-TN201 BLDG 02 -LEVEL 01 PLAN -TECHNOLOGY
439 of 518 2-TN202 BLDG 02 -LEVEL 02 PLAN -TECHNOLOGY
440 of 518 2-TN401 BLDG 02 -TECHNOLOGY ENLARGED PLANS & DIAGRAMS
441 of 518 4-TN100 BLDG 4 -BASEMENT PLAN -TECHNOLOGY
442 of 518 4-TN101 BLDG 4 -LEVEL 01 PLAN -TECHNOLOGY
443 of 518 4-TN401 TECHNOLOGY ENLARGED PLANS & DIAGRAMS
444 of 518 5-TN101 BLDG 5 -LEVEL 01 PLAN -TECHNOLOGY
445 of 518 6-TN101 BLDG 06 -LEVEL 01 PLAN -TECHNOLOGY
446 of 518 6-TN102 BLDG 06 -LEVEL 02 PLAN -TECHNOLOGY
447 of 518 6-TN401 BLDG 06 -TECHNOLOGY ENLARGED PLANS & DIAGRAMS
448 of 518 15-TN100 BLDG 15 -BASEMENT PLAN -TECHNOLOGY
449 of 518 15-TN101 BLDG 15 -LEVEL 01 PLAN -TECHNOLOGY
450 of 518 15-TN102 BLDG 15 -LEVEL 02 PLAN -TECHNOLOGY
451 of 518 15-TN103 BLDG 15 -LEVEL 03 PLAN -TECHNOLOGY
452 of 518 15-TN104 BLDG 15 -LEVEL 04 PLAN -TECHNOLOGY
453 of 518 15-TN105 BLDG 15 -LEVEL 05 PLAN -TECHNOLOGY
454 of 518 15-TN106 BLDG 15 -LEVEL 06 PLAN -TECHNOLOGY
455 of 518 15-TN107 BLDG 15 -LEVEL 07 PLAN -TECHNOLOGY
456 of 518 15-TN108 BLDG 15 -LEVEL 08 PLAN -TECHNOLOGY
457 of 518 15-TN401 TECHNOLOGY ENLARGED PLANS
458 of 518 15-TN402 TECHNOLOGY ENLARGED PLANS
459 of 518 26-TN100 BLDG 26 -BASEMENT PLAN -TECHNOLOGY
460 of 518 26-TN101 BLDG 26 -LEVEL 01 PLAN -TECHNOLOGY
461 of 518 26-TN102 BLDG 26 -LEVEL 02 PLAN -TECHNOLOGY
462 of 518 26-TN103 BLDG 26 -LEVEL 03 PLAN -TECHNOLOGY
463 of 518 26-TN104 BLDG 26 -LEVEL 04 PLAN -TECHNOLOGY
464 of 518 26-TN105 BLDG 26 -LEVEL 05 PLAN -TECHNOLOGY
465 of 518 26-TN401 TECHNOLOGY ENLARGED PLANS
466 of 518 40-TD101 BLDG 40 -LEVEL 01 DEMOLITION PLAN -TECHNOLOGY
467 of 518 40-TN101 BLDG 40 -LEVEL 01 PLAN -TECHNOLOGY & DIAGRAMS
468 of 518 55-TN101 BLDG 55 -LEVEL 01 PLAN -TECHNOLOGY
469 of 518 55-TN102 BLDG 55 -LEVEL 02 PLAN -TECHNOLOGY
470 of 518 55-TN401 TECHNOLOGY ENLARGED PLANS & DIAGRAMS
471 of 518 56-TN100 BLDG 56 -BASEMENT PLAN -TECHNOLOGY
472 of 518 56-TN101 BLDG 56 -LEVEL 01 PLAN -TECHNOLOGY
473 of 518 56-TN401 TECHNOLOGY ENLARGED PLANS & DIAGRAMS
ENVIRONMENTAL
474 of 518 H0000 ENVIRONMENTAL GENERAL NOTES
475 of 518 H1000 BUILDING 1 - BASEMENT -NVIRONMENTAL HAZARDS
476 of 518 H1001 BUILDING 1 - FLOOR 1 -ENVIRONMENTAL HAZARDS
477 of 518 H1002 BUILDING 1 - FLOOR 2 -ENVIRONMENTAL HAZARDS
478 of 518 H1003 BUILDING 1 - FLOOR 3 -ENVIRONMENTAL HAZARDS
479 of 518 H1004 BUILDING 1 - FLOOR 4 -ENVIRONMENTAL HAZARDS
480 of 518 H1005 BUILDING 1 - FLOOR 5 -ENVIRONMENTAL HAZARDS
481 of 518 H1006 BUILDING 1 - FLOOR 6 -ENVIRONMENTAL HAZARDS
482 of 518 H1007 BUILDING 1 - FLOOR 7 -ENVIRONMENTAL HAZARDS
483 of 518 H1008 BUILDING 1 - FLOOR 8 -ENVIRONMENTAL HAZARDS
484 of 518 H1009 BUILDING 1 - FLOOR 9 -ENVIRONMENTAL HAZARDS
485 of 518 H1010 BUILDING 1 - FLOOR 10 -ENVIRONMENTAL HAZARDS
486 of 518 H1011 BUILDING 1 - FLOOR 11 -ENVIRONMENTAL HAZARDS
487 of 518 H1012 BUILDING 1 - TR ROOMS BASEMENT & FLOOR 1 - ENVIRONMENTAL HAZARDS
488 of 518 H1013 BUILDING 1 - TR ROOMS FLOOR 2 & FLOOR 3 - ENVIRONMENTAL HAZARDS
489 of 518 H1014 BUILDING 1 - TR ROOMS FLOOR 4 & FLOOR 5 - ENVIRONMENTAL HAZARDS
490 of 518 H1015 BUILDING 1 - TR ROOMS FLOOR 6 & FLOOR 7 - ENVIRONMENTAL HAZARDS
491 of 518 H1016 BUILDING 1 - TR ROOMS FLOOR 8 & FLOOR 9 - ENVIRONMENTAL HAZARDS
492 of 518 H1017 BUILDING 1 - TR ROOMS FLOOR 10 & FLOOR 11 - ENVIRONMENTAL HAZARDS
493 of 518 H2001 BUILDING 2 - ROOF - ENVIRONMENTAL HAZARDS
494 of 518 H4001 BUILDING 4 - BASEMENT-ENVIRONMENTAL HAZARDS
495 of 518 H4002 BUILDING 4 - ROOM 4-106-ENVIRONMENTAL HAZARDS
496 of 518 H5001 BUILDING 5 - FLOOR 1-ENVIRONMENTAL HAZARDS
497 of 518 H6001 BUILDING 6 - FLOOR 1 -ENVIRONMENTAL HAZARDS
498 of 518 H6002 BUILDING 6 - FLOOR 2 -ENVIRONMENTAL HAZARDS
499 of 518 H1500 BUILDING 15 - BASEMENT -ENVIRONMENTAL HAZARDS
500 of 518 H1501 BUILDING 15 - FLOOR 1 -ENVIRONMENTAL HAZARDS
501 of 518 H1502 BUILDING 15 - FLOOR 2 -ENVIRONMENTAL HAZARDS
502 of 518 H1503 BUILDING 15 - FLOOR 3 -ENVIRONMENTAL HAZARDS
503 of 518 H1504 BUILDING 15 - FLOOR 4 -ENVIRONMENTAL HAZARDS
504 of 518 H1505 BUILDING 15 - FLOOR 5 -ENVIRONMENTAL HAZARDS
505 of 518 H1506 BUILDING 15 - FLOOR 6 -ENVIRONMENTAL HAZARDS
506 of 518 H1507 BUILDING 15 - FLOOR 7 -ENVIRONMENTAL HAZARDS
507 of 518 H1508 BUILDING 15 - FLOOR 8 -ENVIRONMENTAL HAZARDS
508 of 518 H1509 BUILDING 15 - FLOOR 9 -ENVIRONMENTAL HAZARDS
509 of 518 H2600 BUILDING 26 - BASEMENT -ENVIRONMENTAL HAZARDS
510 of 518 H2601 BUILDING 26 - FLOOR 1 -ENVIRONMENTAL HAZARDS
511 of 518 H2602 BUILDING 26 - FLOOR 2 -ENVIRONMENTAL HAZARDS
512 of 518 H2603 BUILDING 26 - FLOOR 3 -ENVIRONMENTAL HAZARDS
513 of 518 H2604 BUILDING 26 - ROOF -ENVIRONMENTAL HAZARDS
514 of 518 H2605 BUILDING 26 - ROOM V1-684 -ENVIRONMENTAL HAZARDS
515 of 518 H2606 BUILDING 26 - ROOM V2-751A -ENVIRONMENTAL HAZARDS
516 of 518 H4000 BUILDING 40 - FLOOR 1 -ENVIRONMENTAL HAZARDS
517 of 518 H5500 BUILDING 55 - ROOF -ENVIRONMENTAL HAZARDS
518 of 518 H5600 BUILDING 56 - ROOF -ENVIRONMENTAL HAZARDS
345 of 518 15ET106 BLDG 15 -LEVEL 06 -TELECOMMUNICATIONS PLAN 433 of 518 1-TN401 TECHNOLOGY ENLARGED PLANS
Know what's below.
before you dig.Call
R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CIVIL:
IMEG CORP
1717 STATE ST SUITE 201
BETTENDORF, IA 52722
563-344-0260
JASON HOLDORF, PE
JLH LKS
Revisions: Date:
EHRM INFRASTRUCTURE
UPGRADES - KANSAS CITY, MO
KANSAS CITY VAMC 4801 LINWOOD BLVD KANSAS CITY, MO 64128
589-21-700
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
06/19/2023
100% CONSTRUCTION
DOCUMENTS
LINNEA K.
SHAW
062-074863
6/14/2023
CJ100
CIVIL NOTES
AND LEGEND
RAILROAD SPIKE, FOUND
SURVEY BOUNDARY
HANDHOLE
POWER POLE
STORM MANHOLE
HYDRANT
WATER VALVE
GAS VALVE
STORM INLET
LIGHT POLE
SIGN
STORM DOUBLE INLET
SPOT ELEVATION
MEASURED DIMENSION
RECORDED DIMENSION
R.O.W. MARKER, FOUND
ELECTRIC PEDESTAL/TRANSFORMER
TELEPHONE PEDESTAL
TELEPHONE POLE
SOIL BORING HOLE
FLARED END SECTION
SECTION LINE
EASEMENT LINE
CHAIN LINK FENCE
OVERHEAD ELECTRIC
GAS LINE
UNDERGROUND ELECTRIC
GUARD RAIL
SANITARY/STORM CLEANOUT
TELEPHONE LINE
R.O.W. LINE
ELECTRIC MANHOLE
TELEPHONE MANHOLE
UTILITY MANHOLE
LIGHT JUNCTION BOX
CONIFER TREE
DECIDUOUS TREE
TREE STUMP
BUSH/SHRUB
VAPOR LIGHT
CONTROL POINT
UNKNOWN MANHOLE
WELL
GUY WIRE
FLAGPOLE
POST/BOLLARD
TREE LINE
HISTORICAL LINE - AS NOTED
PROPERTY LINE
DOWNSPOUT
BENCHMARK
ELECTRIC METER
WATER METER
FORCE MAIN
SANITARY SEWER
STORM SEWER
PIPE UNDERDRAIN
WATER LINE
SETBACK LINE
UTILITY LINE
GUY POLE
GRADE LABEL
POWER POLE W/ LIGHT
POWER POLE W/ METER
DRAINAGE SLOPE
LINE CONTINUATION
CONTOUR
CENTERLINE
SANITARY MANHOLE
FLOOD PLAIN
FLOODWAY
PROPOSED EXISTING
SILT FENCE
CONCRETE MONUMENT, FOUND
CONSTRUCTION LIMITS
PIPE, FOUND
STORM INLET
SPRINKLER BOX
WATER SERVICE
EDGE OF WATER LINE/DITCH FLOWLINE
PROJECT
LOCATION
GENERAL NOTES
1. ALL IMPROVEMENTS SHOWN ON THESE ENGINEERING PLANS SHALL COMPLY
WITH THE KANSAS CITY STANDARD SPECIFICATIONS AND DESIGN CRITERIA,
LATEST EDITION, AND THE STANDARDS OF THE MISSOURI DEPARTMENT OF
NATURAL RESOURCES, LATEST EDITION.
2. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED
FROM AVAILABLE SURVEYS, RECORDS, AND FIELD INVESTIGATION. THEIR
LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. IT IS POSSIBLE THERE
MAY BE OTHERS, THE EXISTENCE OF WHICH PRESENTLY NOT KNOWN OR
SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR
EXISTENCE AND EXACT LOCATION AND TO AVOID DAMAGE THERETO.
3. ALL DEBRIS RESULTING FROM CONSTRUCTION OPERATIONS SHALL BE
PROPERLY DISPOSED OF OFF-SITE UNLESS NOTED.
4. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE
EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REPAIRING ANY DAMAGE.
5. PORTLAND CEMENT CONCRETE. CONCRETE SHALL HAVE THE FOLLOWING
PROPERTIES. COMPRESSING STRENGTH SHALL BE 4000PSI IN 28 DAYS, AIR
ENTRAINMENT SHALL BE BETWEEN 5 % AND 8% AND SLUMP SHALL BE 4 INCHES
OR LESS ALL AS MEASURED BY THE APPROPRIATE ASTM METHODS.
REINFORCING STEEL SHALL BE ASTM CERTIFIED 60KSI TENSILE STRENGTH.
REINFORCING STEEL SHALL BE #4 SIZE UNLESS OTHERWISE SPECIFIED.
HANDRAILS, BOLLARDS, AND OTHER APPURTENANCES SHALL BE INSTALLED PER
PLAN AND MEET JURISDICTIONAL REQUIREMENTS.
6. CLEANUP AND FINAL INSPECTION. WORK BROKEN OR DAMAGED BY CONTRACTOR
ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.
ALL WASTE MATERIAL, CONCRETE WASHOUT, LANDSCAPE WASTE AND BUILDING
MATERIAL SHALL BE REMOVED. SOIL SHALL BE REMOVED FROM PAVED AREAS
AND THE PROJECT SHALL BE LEFT IN A CLEAN AND WORKMANLIKE MANNER.
7. ALL EXISTING CONDITIONS WERE TAKEN FROM A SURVEY PROVIDED BY THE VA.
NO NEW UTILITY OR TOPOGRAPHIC SURVEY WAS CONDUCTED AS PART OF THIS
PROJECT. CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS
PRIOR TO CONSTRUCTION.
GRADING NOTES
1. ALL EARTHWORK OPERATIONS SHALL BE IN ACCORDANCE WITH THE
GEOTECHNICAL REPORT.
2. ALL ELEVATIONS SHOWN ARE TO FLOWLINE FINISHED GRADE OR TOP OF
PAVEMENT UNLESS OTHERWISE STATED.
3. PROVIDE POSITIVE DRAINAGE AT ALL TIMES WITHIN THE CONSTRUCTION AREAS.
DO NOT ALLOW WATER TO POND ON PROPERTY.
4. PRIOR TO PLACEMENT OF ANY FILL, THE STRIPPED SITE SHALL BE SCARIFIED TO
A DEPTH OF 9 INCHES AND RE-COMPACTED TO 95% DENSITY. ANY UNSUITABLE
SOILS FOUND AT THIS TIME SHALL BE DRIED AND RECOMPACTED OR REMOVED IF
REQUIRED COMPACTION CANNOT BE OBTAINED. CUT AREAS SHALL ALSO BE
SCARIFIED TO A DEPTH OF 9 INCHES AND RE-COMPACTED TO 95% DENSITY.
5. ALL FILL MATERIAL SHALL CONSIST OF APPROVED, SUITABLE SOILS PLACED IN
LOOSE LIFTS OF 9 INCHES OR LESS AND COMPACTED TO AT LEAST 95% OF THE
MATERIAL'S MAXIMUM STANDARD PROCTOR DRY DENSITY (ASTM D-698) IN ALL
PAVEMENT, BUILDING ADDITION AND ATHLETIC FIELD AREAS. THE COMPACTION
WILL BE FIELD TESTED BY A SOILS ENGINEERING CONSULTANT REPRESENTING
THE OWNER.
6. PROJECT WILL BE COVERED BY A GENERAL PERMIT REGULATING RUNOFF FROM
CONSTRUCTION SITES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM
THE REQUIRED MONITORING, INSPECTION AND MAINTENANCE AS REQUIRED BY
THE PERMIT.
7. ALL DISTURBED EMBANKMENTS GREATER THAN 3:1 SLOPES SHALL BE SEEDED
ACCORDING TO A RECOMMENDED SEEDING MIX BY THE LANDSCAPER AND
COVERED WITH EROSION CONTROL BLANKETS OR AS DIRECTED BY PLAN
DOCUMENTS.
8. CONTRACTOR SHALL ADHERE TO THE KANSAS CITY SITE WORK AND EROSION
AND SEDIMENT DESIGN SPECFICATIONS AND THE STATE OF MISSOURI
PROTECTING WATER QUALITY FIELD GUIDE.
9. ALL AREAS TO BE GREENSPACE AT PROJECT COMPLETION SHALL BE LEFT WITH 6
INCHES OF TOPSOIL WHEN MASS GRADING ACTIVITIES ARE COMPLETE.
EROSION CONTROL NOTES
1. EROSION CONTROL SHALL BE INSTALLED PRIOR TO ANY GRADING
OPERATIONS WHERE POSSIBLE.
2. CONSTRUCTION ENTRANCE SHALL BE MAINTAINED TO PREVENT OFF-SITE
TRACKING OF SEDIMENT ONTO PUBLIC ROADWAYS. ANY SEDIMENT
DEPOSITED ON PUBLIC ROADS SHALL BE REMOVED BY SHOVELING OR
STREET CLEANING BEFORE THE END OF EACH WORKING DAY.
3. SHOWN LOCATION OF SILTATION CONTROL IS APPROXIMATE. ACTUAL
LOCATIONS TO BE DETERMINED IN THE FIELD AT THE TIME OF
CONSTRUCTION.
4. WATER PUMPED DURING CONSTRUCTION OPERATIONS SHALL BE FILTERED.
5. ONCE CONSTRUCTION HAS BEEN COMPLETED, OR TEMPORARILY SUSPENDED
FOR LONGER THAN 28 DAYS (SUCH AS WINTER SHUTDOWN), THE
CONTRACTOR SHALL INITIATE SEEDING ON ALL AREAS DISTURBED
IMMEDIATELY OF THE LAST DISTURBANCE. EROSION CONTROL DEVICES
SHALL REMAIN IN PLACE AND BE MAINTAINED UNTIL THE CONTRACTOR
ESTABLISHES A GOOD STAND OF GRASS OF UNIFORM COLOR AND DENSITY
TO THE SATISFACTION OF THE ENGINEER.
6. CONTRACTOR SHALL ADHERE TO THE MISSOURI PROTECTING WATER
QUALITY FIELD GUIDE.
7. ALL EROSION CONTROL MEASURES MUST BE INSTALLED ( WHERE POSSIBLE )
PRIOR TO THE COMMENCEMENT OF ANY EARTH DISTURBING OPERATIONS.
THE REMAINING EROSION CONTROL MEASURES SHALL BE INSTALLED AS
SOON AS REASONABLY POSSIBLE AFTER GRADING OPERATIONS BEGIN.
WHERE THE PRESENCE OF SILT FENCE WILL INTERFERE WITH ACTIVITIES,
DIVERSION DITCHES AND SMALL TEMPORARY SEDIMENT TRAPS SHALL BE
UTILIZED UNTIL SILT FENCE OR OTHER MEASURES MAY BE INSTALLED AND
VEGETATION ESTABLISHED.
8. EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER
EACH PRECIPITATION EVENT AND REPLACED OR REPAIRED AS NECESSARY.
9. SILT FENCE AND SEDIMENT BASIN SHALL BE CLEANED OR REPLACED WHEN
SILT BUILDS UP TO WITHIN ONE FOOT OF THE TOP OF THE SILT FENCE.
10. PROJECT WILL BE COVERED BY A GENERAL PERMIT REGULATING RUNOFF
FROM CONSTRUCTION SITES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
PERFORM THE REQUIRED MONITORING, INSPECTION AND MAINTENANCE AS
REQUIRED BY THE PERMIT.
11. CONCRETE WASHOUT DEBRIS SHOULD BE HAULED OFF-SITE. WASHOUT
SHOULD BE FILLED IN AND SEEDED.
12. ALL AREAS DISTURBED BEYOND LIMITS SHOWN SHOULD BE SEEDED WITH
ADJACENT SEED MIXTURE OR IN-KIND.
13. THERE ARE NO EXPECTED DOWNSTREAM IMPACTS OTHER THAN THOSE
ALLOWED PER ORDINANCE (2 YEAR, PRE-DEVELOPED RATE OF RELEASE)
UTILITY NOTES
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL
EXISTING UTILITIES AND PAVED STREETS, INCLUDING ANY NOT SHOWN ON
THESE DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES
PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER IF ANY CONFLICTS WITH
THE DRAWINGS OCCUR. ANY DAMAGE TO EXISTING UTILITIES AND/OR PAVED
STREETS CAUSED BY TRENCHING AND GRADING OPERATIONS SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE. EXISTING UTILITY LOCATIONS
SHOWN ON THE DRAWINGS ARE APPROXIMATE.
2. ALL EXISTING UNDERGROUND UTILITIES SHOWN WERE LOCATED PARTIALLY IN
THE FIELD AND PARTIALLY FROM REVIEW OF EXISTING PUBLIC RECORDS. IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT EACH UTILITY
COMPANY FOR THE FIELD LOCATION OF THEIR EXISTING LINES IN OR NEARBY
THE CONSTRUCTION AREA PRIOR TO BEGINNING ANY CONSTRUCTION.
3. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE
EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REPAIRING ANY DAMAGE.
4. THE LOCATIONS OF THOSE BURIED AND ABOVE GROUND UTILITIES SHOWN ARE
APPROXIMATE, ARE SHOWN FOR CONTRACTOR INFORMATIONAL USE ONLY, AND
ARE NOT TO BE REFERENCED FOR CONSTRUCTION PURPOSES. THE IMPLIED
PRESENCE OR ABSENCE OF UTILITIES IS NOT TO BE CONSTRUED BY THE
OWNER, ENGINEER, CONTRACTOR, OR SUBCONTRACTORS TO BE AN ACCURATE
AND COMPLETE REPRESENTATION OF UTILITIES THAT MAY OR MAY NOT EXIST
ON THE CONSTRUCTION SITE. BURIED AND ABOVE GROUND UTILITY LOCATION,
IDENTIFICATION, AND MARKING ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR. REROUTING, DISCONNECTION, PROTECTION, ETC. OF ANY
UTILITY MUST BE COORDINATED BETWEEN THE CONTRACTOR, UTILITY
COMPANY AND OWNER. SITE SAFETY, INCLUDING THE AVOIDANCE OF HAZARDS
ASSOCIATED WITH BURIED AND ABOVEGROUND UTILITIES, REMAINS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
FIBER OPTIC CABLE
BORE PIT
REMOVAL (SF/SY)
PCC PAVEMENT
REMOVAL (LF)
OF
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
4 of 512Page…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .