Attachment_8_-_DCRA_Permit_BCIV2000025-EXT-3__06-02-2021.pdf

PDF 108 KB Posted

Attached to
National Park Service (NPS) - National Capital Are
Solicitation number
140P3021R0024
Issued by

About this file

This document provides details for a federal construction contract opportunity with the National Park Service. The project involves rehabilitation of the Belmont-Paul Women's Equality National Monument in Washington, D.C., including interior repairs, exterior repairs, structural work, site work, mechanical, electrical and plumbing upgrades, hazardous material abatement, and optional items. Bidders must attend a pre-bid meeting on July 30, 2021 and obtain the full solicitation package from SAM.gov on or after July 27, 2021. The contract award is subject to availability of funds. Biobased products must comply with applicable specifications.

View the file

Other files

File Type Posted
Amendment_0001_-_Questions_and_Answers_0001.pdf PDF
Attachment_15_-_Amendment_0001_-_BEPA_Phase_2_Final_Calculations_0001.pdf PDF
Attachment_16_-_Amendment_0001_-_BEPA_Phase_2_Final_Product_Data_0001.pdf PDF
Amendment_0001_-_photos_0001.docx DOCX document
Sol_140P3021R0024_Amd_0001.pdf PDF
Attachment_3_-_BEPA_Phase_2_Final_Submittal_Log.pdf PDF
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part_3_49-56.pdf PDF
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part1_1-40.pdf PDF
Attachment_11_-_DB_Wage_Determinations_-_Heavy_-_DC20210001_-_7022021.pdf PDF
Attachment_5_-_BEPA_Pre-alt_Hazardous_Materials_Survey_Report.pdf PDF
Attachment_1_-_BEPA_Phase_2_Final_Specifications_120720_KB.pdf PDF
Attachment_12_-_DB_Wage_Determinations_-_Building_-_DC20210002_-_6182021.pdf PDF
Attachment_7_-_DCRA_Permit_BCIV1800159_APPROVED_PLAN_SET_BEPA_E_S_Plan.pdf PDF
Attachment_13_-_Proposal_Submission_Package.docx DOCX document
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part_4_57-103.pdf PDF
Attachment_4_-_BEPA_Phase_II_Renovation_Collections_to_Protect.pdf PDF
Attachment_6_-_BEPA_CCTV_Report_FINAL.pdf PDF
Attachment_9_-_Updated_Roofing_Specifactions__-_final_7_27_2021.pdf PDF
Sol_140P3021R0024.pdf PDF
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part_2_41_48.pdf PDF
Attachment_14_-_Pre-Proposal_Site_Visit_Agenda.doc DOC document
Attachment_10_-_BEPA_Roof_Replacement_Drawings_REV.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARENT PERMIT: BCIV2000025

PERMIT NO.

BUILDING CIVIL PERMIT

THIS PERMIT MUST ALWAYS BE CONSPICUOUSLY DISPLAYED AT THE

ADDRESS OF WORK UNTIL WORK IS COMPLETED AND APPROVED

Issue Date: 06/02/2021

Ward:

Description Of Work:

Address of Project: Zone: Square: Lot: Suffix:

0725 0885

Bciv

11/28/2021 Expiration Date:

Department of Consumer and Regulatory Affairs Permit Operations Division

1100 4th Street SW Washington DC 20024

Tel. (202) 442 - 4589 Fax (202) 442 - 4862

First Extension to BCIV1800159, to Expire on 05/28/2020. Original Scope: Removal & replacement of portions of existing storm sewer & CCTV of portions of the existing storm sewer. Removal & reinstallation of existing brick plaza & walkway areas disturbed for utility work.

Clean-out of underground roof drain connections at specified locations. Removal & replacement of existing chiller on concrete pad in conjunction with portions of existing fence. Project also includes a bid-option including abandonment of existing buried chilled water piping from the exterior chiller to the building & replacement with new piping which will require additional site disturbance in grass areas.

144 CONSTITUTION AVE NE RA-7

BCIV2000025-EXT-3

Agent Name:

Agent Address:

Permit Type:

Permission Is Hereby Granted To: Owner Address: PERMIT FEE:

$36.30

Agent Phone #:

Contractor Name:

Contractor Address: Contractor Phone #:

United States Of America

NATIONAL PARK SERVICE

1100 OHIO DRIVE SW

WASHINGTON, DC 20024

Conditions/ Restrictions:

As a condition precedent to the issuance of this permit, the owner agrees to conform with all conditions set forth herein, and to perform the work authorized hereby in accordance with the approved application and plans on file with the District Government and in accordance with all applicable laws and regulations of the District of Columbia. The District of Columbia has the right to enter upon the property and to inspect all work authorized by this permit and to require any change in construction which may be necessary to ensure compliance with the permit and with all the applicable regulations of the District of Columbia. Work authorized under this Permit must start within one(1) year of the date appearing on this permit or the permit is automatically void. If work is started, any application for partial refund must be made within six months of the date appearing on this permit.

All Construction Done According To The Current Building Codes And Zoning Regulations;

This Permit Expires if no Construction is Started Within 1 Year or if the Inspection is Over 1 Year.

If this permit was issued to a building built before 1978, it is subject to full compliance with the Lead-Hazard Prevention and Elimination Act, its associated regulations, and the EPA Lead Renovation, Repair and Painting Rule. To determine how to comply, submit a Lead-Activity Notification form at

Permit Clerk

PUBLICUSER32584

Director:

Ernest Chrappah

TO REPORT WASTE, FRAUD OR ABUSE BY ANY DC GOVERNMENT OFFICIAL, CALL THE DC INSPECTOR GENERAL AT 1-800-521-1639

Call Miss Utility at 811 or 1-800-257-7777 at least 48 Hours prior to excavation to obtain a ticket. //www.missutility.net/wshingtondc/dcstatelaw.asp

To schedule a CONSTRUCTION INSPECTION or for INQUIRIES CALL (202) 442-9557

File details come from the government source that posted it. Updated .