Attachment_4_-_BEPA_Phase_II_Renovation_Collections_to_Protect.pdf

PDF 2 MB Posted

Attached to
National Park Service (NPS) - National Capital Are
Solicitation number
140P3021R0024
Issued by

About this file

This document outlines the scope of work for a construction rehabilitation project at the Belmont-Paul Women's Equality National Monument located in Washington, D.C. The National Park Service seeks to complete interior and exterior repairs, structural upgrades, mechanical and electrical system replacements, hazardous material abatement, and site work. Key aspects of the scope of work include plaster and paint repair; restoration of windows, doors, wood trim, and dormer elements; installation of concrete footings and structural supports; upgrades to the fire suppression and HVAC systems; replacement of the storm sewer drain and underground utility lines; and abatement of asbestos, lead paint, and mercury hazards. Bidders must attend a pre-bid meeting on July 30, 2021 and obtain the full solicitation package from SAM.gov on or after July 27, 2021 to be eligible to respond for this opportunity with the National Park Service.

View the file

Other files

File Type Posted
Amendment_0001_-_Questions_and_Answers_0001.pdf PDF
Attachment_15_-_Amendment_0001_-_BEPA_Phase_2_Final_Calculations_0001.pdf PDF
Attachment_16_-_Amendment_0001_-_BEPA_Phase_2_Final_Product_Data_0001.pdf PDF
Amendment_0001_-_photos_0001.docx DOCX document
Sol_140P3021R0024_Amd_0001.pdf PDF
Attachment_3_-_BEPA_Phase_2_Final_Submittal_Log.pdf PDF
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part_3_49-56.pdf PDF
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part1_1-40.pdf PDF
Attachment_11_-_DB_Wage_Determinations_-_Heavy_-_DC20210001_-_7022021.pdf PDF
Attachment_5_-_BEPA_Pre-alt_Hazardous_Materials_Survey_Report.pdf PDF
Attachment_1_-_BEPA_Phase_2_Final_Specifications_120720_KB.pdf PDF
Attachment_8_-_DCRA_Permit_BCIV2000025-EXT-3__06-02-2021.pdf PDF
Attachment_12_-_DB_Wage_Determinations_-_Building_-_DC20210002_-_6182021.pdf PDF
Attachment_7_-_DCRA_Permit_BCIV1800159_APPROVED_PLAN_SET_BEPA_E_S_Plan.pdf PDF
Attachment_13_-_Proposal_Submission_Package.docx DOCX document
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part_4_57-103.pdf PDF
Attachment_6_-_BEPA_CCTV_Report_FINAL.pdf PDF
Attachment_9_-_Updated_Roofing_Specifactions__-_final_7_27_2021.pdf PDF
Sol_140P3021R0024.pdf PDF
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part_2_41_48.pdf PDF
Attachment_14_-_Pre-Proposal_Site_Visit_Agenda.doc DOC document
Attachment_10_-_BEPA_Roof_Replacement_Drawings_REV.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BELMONT-PAUL COLLECTIONS

January 13, 2021

Room 100 – Lobby Room

Object Phase II Plan Large Mirror Fine Art Movers – Protect in Place Mantel Contractor – Protect in Place Wall-Mounted Exhibit Cases Contractor – Protect in Place

Room 101 – Front Hallway (Foyer)

Mirrors (2) Fine Art Movers – Protect in Place Joan of Arc Statue Fine Art Movers – Protect in Place or Moved Stained Glass Windows Contractor or Fine Art Movers – Protect in Place

Room 102 – ERA Gallery (International Room)

Mirrors (3) Fine Art Movers – Protect in Place Wall-Mounted Exhibit Cases Contractor – Protect in Place

Room 103 – Eastern National Shop (Paul’s Office)

Room 104 – Origins Gallery (Dining Room)

Wall-Mounted Exhibit Case Contractor – Protect in Place

Room 109 – Library

Library Tables (2) Fine Art Movers – Removed or Protect in Place

BELMONT-PAUL COLLECTIONS PHOTOS

ERA Gallery (Rm 102)

Center Hallway (Rm 101)

Origins Gallery (Rm 104)

Third Floor Dormer