Attachment_3_-_BEPA_Phase_2_Final_Submittal_Log.pdf

PDF 183 KB Posted

Attached to
National Park Service (NPS) - National Capital Are
Solicitation number
140P3021R0024
Issued by

About this file

This solicitation is for construction rehabilitation work at the Belmont-Paul Women's Equality National Monument located in Washington, D.C. The scope of work includes interior repairs such as plaster repair, painting, and finishes replacement; exterior repairs like painting, window restoration, and dormer element restoration; structural upgrades including installation of footings and hangers; fire suppression system upgrades; site work including storm sewer replacement and paver restoration; and mechanical, electrical and plumbing upgrades such as new HVAC equipment, electrical service upgrade, and chilled water piping replacement. Hazardous material abatement is also required. There is an optional scope for chilled water system and fan coil unit replacement subject to funding availability. The pre-bid meeting is scheduled for July 30, 2021 and interested contractors must register in SAM.gov to obtain the full solicitation package posted as of July 27, 2021. The anticipated award date is not provided.

View the file

Other files

File Type Posted
Amendment_0001_-_Questions_and_Answers_0001.pdf PDF
Attachment_15_-_Amendment_0001_-_BEPA_Phase_2_Final_Calculations_0001.pdf PDF
Attachment_16_-_Amendment_0001_-_BEPA_Phase_2_Final_Product_Data_0001.pdf PDF
Amendment_0001_-_photos_0001.docx DOCX document
Sol_140P3021R0024_Amd_0001.pdf PDF
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part_3_49-56.pdf PDF
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part1_1-40.pdf PDF
Attachment_11_-_DB_Wage_Determinations_-_Heavy_-_DC20210001_-_7022021.pdf PDF
Attachment_5_-_BEPA_Pre-alt_Hazardous_Materials_Survey_Report.pdf PDF
Attachment_1_-_BEPA_Phase_2_Final_Specifications_120720_KB.pdf PDF
Attachment_8_-_DCRA_Permit_BCIV2000025-EXT-3__06-02-2021.pdf PDF
Attachment_12_-_DB_Wage_Determinations_-_Building_-_DC20210002_-_6182021.pdf PDF
Attachment_7_-_DCRA_Permit_BCIV1800159_APPROVED_PLAN_SET_BEPA_E_S_Plan.pdf PDF
Attachment_13_-_Proposal_Submission_Package.docx DOCX document
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part_4_57-103.pdf PDF
Attachment_4_-_BEPA_Phase_II_Renovation_Collections_to_Protect.pdf PDF
Attachment_6_-_BEPA_CCTV_Report_FINAL.pdf PDF
Attachment_9_-_Updated_Roofing_Specifactions__-_final_7_27_2021.pdf PDF
Sol_140P3021R0024.pdf PDF
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part_2_41_48.pdf PDF
Attachment_14_-_Pre-Proposal_Site_Visit_Agenda.doc DOC document
Attachment_10_-_BEPA_Roof_Replacement_Drawings_REV.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project:

Rehabilitation of the Belmont-Paul Women's Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm itt al

In fo rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er ic an

Ac t R eq

A lte rn at e M at er ia ls

Pr op os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d w ith

N ot at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

X 011100 1.8B Qualification Data

X 011100 1.8B Delegated Design Submittal

X 011100 1.8B Reports

X 013591 1.5A Preconstruction Documentation

X 013591 1.5B Historic Treatment Program

X 013591 1.5C Fire-Prevention Plan

X 015639 1.5A Product Data

X 015639 1.6A Qualification Data

X 015639 1.6B Work Plan from Arborist

X 015639 1.6C Pedestrian/Property Safety Plan

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 015639 1.6D Maintenance Prescription

X 015639 1.6E Site Documentation

X 015639 1.6F Certification

X 015639 1.6G Existing Conditions Documentation

X 024119 1.6A Qualification Data

X 024119 1.6B Engineering Survey

X 024119 1.6C Proposed Protection Measures

X 024119 1.6D Schedule of Selective Demolition Activities

X 024119 1.6E Statement of Refrigerant Recovery

X 024119 1.6F Warranties

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 024119 1.7A Inventory

X 028100 1.3 Product Data

X 028100 1.3 Test Reports

X 028100 1.3 Certificates

X 028213 1.5 Shop Drawings

X 028213 1.5 Detailed Drawings

X 028213 1.5 Product Data

X 028213 1.5 Asbestos Waste Shipment Records

X 028213 1.5 Test Reports

X 028216 1.4 Product Data

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 028216 1.4 Certificates

X 028216 1.4 Closeout Submittals

X 028233 1.3.1 State or local license for waste handler

X 028233 1.3.1 Landfill Information for asbestos disposal

X 028233 1.3.2 Manifests and Disposal Site Receipts

X 028313 1.4 Preconstruction Submittals

X 028313 1.4 Certificates

X 028313 1.4 Closeout Submittals

X 028416 1.5 Certificates of Qualification

X 028416 1.5 Closeout Submittals

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 033000 1.5A Product Data

X 033000 1.5B Design Mixtures

X 033000 1.5C Steel Reinforcement Shop Drawings

X 033000 1.6A Material Certifications

X 033000 1.6B Material Test Reports

X 033000 1.6C Floor surface flatness and levelness measurements

X 033000 1.6D Field quality-control reports

X 033000 1.6E Minutes of Preinstallation Meeting

X 061000 1.4A Product Data

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 061000 1.4B Fastener Patterns

X 061000 1.5A Material Certifications

X 061000 1.5B Evaluation Reports

X 064013 1.5A Shop Drawings

X 064013 1.5B Samples

X 064023 1.5A Product Data

X 064023 1.5B Shop Drawings

X 064023 1.6A Product Data

X 064023 1.6B Qualification Data

X 064023 1.6C Product Certificates

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 079200 1.4A Product Data

X 079200 1.4B Samples for Initial Selection

X 079200 1.4C Samples for Verification

X 080352 1.6A Product Data

X 080352 1.6B Shop Drawings

X 080352 1.6C Samples for Initial Selection

X 080352 1.6D Samples for Verification

X 080352 1.7A Qualification Data

X 080352 1.7B Wood Window Historic Treatment Program

X 081416 1.4A Product Data

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 081416 1.4B Shop Drawings

X 081416 1.4C Samples for Initial Selection

X 081416 1.5A Sample Warranty

X 081416 1.6A Special Warranties

X 087100 1.4A Product Data

X 087100 1.4B Samples

X 087100 1.4C Samples for Initial Selection

X 087100 1.5A Qualification Data

X 087100 1.6A Maintenance Data

X 092216 1.3A Product Data

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 092216 1.4A Product Certificates

X 092216 1.4B Evaluation Reports

X 092300 1.5A Product Data

X 092300 1.5B Shop Drawings

X 092300 1.6A Qualification Data

X 092300 1.6B Plasterwork Historic Treatment Program

X 092900 1.3A Product Data

X 092900 1.3B Samples

X 092900 1.3C Samples for Initial Selection

X 092900 1.3D Samples for Verification

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 099123 1.4A Product Data

X 099123 1.4B Samples for Initial Selection

X 099123 1.4C Samples for Verification

X 099123 1.4D Product List

X 099123 1.5 Maintenance Material Submittal

X 211316 1.6A Copy of Latest Edition of NFPA 25

X 211316 1.6B Product Data

X 211316 1.6C Shop Drawings

X 211316 1.6D Delegated Design Submittal

X 211316 1.6E Coordination Drawings

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 211316 1.6F Qualification Data

X 211316 1.6H Welding Certificates

X 211316 1.6I Fire-Hydrant Flow Test Report

X 211316 1.6J Field Test Reports and Certificates

X 211316 1.6K Field quality-control reports

X 211316 1.6L Operation and Maintenance Data

X 211316 1.6M As-Built Drawings

X 221005 1.3B Product Data

X 224000 1.3B Product Data

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 230553 1.3B List of wording, symbols, letter size, and color coding for Mechanical Identification

X 230553 1.3C Product Data

X 230553 1.3D Project Record Documents

X 230593 1.3B Installer Qualifications

X 230593 1.3C TAB Plan

X 230593 1.3D Field Logs

X 230593 1.3E Control System Coordination Reports

X 230593 1.3F Progress Reports

X 230593 1.3G Final Report

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 230593 1.3H Project Record Documents

X 230713 1.4B Product Data

X 230719 1.4B Product Data

X 230800 1.3A Updated Submittals

X 230800 1.3B Draft Prefunctional Checklists and Functional Test Procedures for Control System

X 230800 1.3C Startup Reports, Prefunctional Checklists, and Trend Logs

X 230800 1.3D HVAC Control System O&M Manual Requirements

X 230800 1.3E Project Record Documents

X 230800 1.3F Draft Training Plan

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 230800 1.3G Training Manuals

X 230913 1.4B Product Data

X 230913 1.4C Shop Drawings

X 230913 1.4D Operation and Maintenance Data

X 230913 1.4E Project Record Documents

X 230913 1.4F Warranties

X 230923 1.3B Product Data

X 230923 1.3C Shop Drawings

X 230923 1.3D Manufacturer's Instructions

X 230923 1.3E Project Record Documents

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 230923 1.3F Operation and Maintenance Data

X 230923 1.3G Warranty

X 232113 1.3B Manufacturer's Installation Instructions

X 232113 1.3C Project Record Documents

X 232113 1.3D Maintenance Data

X 232114 1.4B Product Data

X 232114 1.4C Manufacturer's Installation Instructions

X 232114 1.4D Project Record Documents

X 232123 1.4B Product Data

X 233100 1.3B Product Data

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 233100 1.3C Shop Drawings

X 233100 1.3D Test Reports

X 233300 1.3B Product Data

X 233300 1.3C Shop Drawings

X 233300 1.3D Project Record Drawings

X 233700 1.4B Product Data

X 233700 1.4C Shop Drawings and Floor Plan Markup

X 235223 1.3B Product Data

X 235223 1.3C Operation and Maintenance Data

X 236423 1.4B Product Data

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 236423 1.4C Shop Drawings

X 236423 1.4D Manufacturer's Certificate

X 236423 1.4E Operation and Maintenance Data

X 238200 1.4B Product Data

X 238200 1.4C Shop Drawings

X 238200 1.4D Certificates

X 238200 1.4E Operation and Maintenance Data

X 238200 1.4F Warranty

X 238200 1.4G Maintenance Materials

X 238413 1.3B Product Data

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 260519 1.5B Product Data

X 260526 1.5B Product Data

X 260573 1.5B Study Preparer's Qualifications

X 260573 1.5C Field Testing Agency's Qualifications

X 260573 1.5D Study Reports

X 260573 1.5E Product Data

X 260573 1.5F Arc Flash Hazard Warning Label Samples

X 260573 1.5G Field quality-control reports

X 260573 1.5H Certification for Field Adjustable Protective Devices

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 260573 1.5I Project Record Documents

X 262100 1.6B Utility Company Letter of Availability

X 262100 1.6C Project Record Documents

X 262416 1.5B Product Data

X 262416 1.5C Shop Drawings

X 262416 1.5D Field Quality-Control Test Reports

X 262416 1.5E Manufacturer's Installation Instructions

X 262416 1.5F Project Record Documents

X 262416 1.5G Maintenance Data

X 262416 1.5H Maintenance Materials

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 262816.16 1.5B Product Data

X 262816.16 1.5C Manufacturer's Installation Instructions

X 262913 1.5B Product Data

X 262913 1.5C Shop Drawings

X 262913 1.5D Manufacturer's Installation Instructions

X 262913 1.5E Field Quality Control Test Reports

X 262913 1.5F Project Record Documents

X 262913 1.5G Maintenance Materials

X 264300 1.6B Product Data

X 264300 1.6C Shop Drawings

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 264300 1.6D Manufacturer's Installation Instructions

X 264300 1.6E Operation and Maintenance Data

X 264300 1.6F Warranty

X 264300 1.6G Project Record Documents

X 265100 1.5B Shop Drawings

X 265100 1.5C Product Data

X 283111 1.7A Schedule

X 283111 1.7B Shop Drawings

X 283111 1.7C Product Submittals (Cutsheets)

X 283111 1.7D Record (As-Built) Drawings

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 283111 1.7E Operation and Maintenance (O&M) Manuals

X 283111 1.7F System Software

X 283111 1.7G Excavation

X 311000 1.6A Existing Conditions

X 311000 1.6B Record Drawings

X 312000 1.5A Product Data

X 312000 1.5B Samples for Verification

X 312000 1.5C Qualification Data

X 312000 1.5D Material Test Reports

X 312000 1.5E Preexcavation Photographs or Videotape

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 321400 1.4A Product Data

X 321400 1.4C Samples for Initial Selection

X 321400 1.4D Mock-Ups

X 329200 1.4A Qualification Data

X 329200 1.4B Certification of each seed mixture

X 329200 1.4C Product Certificates

X 329200 1.4D Pesticides and Herbicides

X 329200 1.5A Maintenance Data

X 334200 1.4A Product Data

X 334200 1.4B Shop Drawings

Equality National Monument, Phase 2

Date To Contractor: NCR r6/13

A ct io n

Su bm rm at io na l S ub m itt al

It em

N o.

Specification Section No.

P ar ag ra ph N

o. Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

N o.

o f C op ie s Su bm itt ed C on tri bu te s to m ee tin g

LE

ED

a nd

/o r F ed S us t.

R eq

M ee ts

B uy

A m er eq

A lte rn at e M at er os ed

N o.

o f C op ie s R et ur ne d

A pp ro ve d

A pp ro ve d at io ns D is ap pr ov ed

R es ub m it

A cc ep t

R ej ec t

Action Submittal

NPS ACTION

Informational

Submittal

Recommended by:

Contractor: Subcontractor / Supplier:

Contractor's Signature:

Review Comments:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Title: Date:

SUBMITTAL FORM - NATIONAL PARK SERVICE

Park: PMIS No.:

NAMA 236219

Contract No.:

P14C00248

Date:

12/10/2018

Date Received: Distribution: 1 copy each: COR, PM, PARK, CONTRACTOR. DSC TEMPLATE

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the government is not responsible for errors or omissions

Action by:

Title: Date:

X 334200 1.5A Profile Drawings

X 334200 1.5B Product Certificates

X 334200 1.5C Field Quality-Control Reports

File details come from the government source that posted it. Updated .