Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part1_1-40.pdf
PDF 14 MB Posted
- Solicitation number
- 140P3021R0024
About this file
This solicitation is for construction rehabilitation services at the Belmont-Paul Women's Equality National Monument located in Washington, D.C. The work includes interior repairs such as plaster repair, painting, and lighting fixture replacement. Exterior repairs include painting doors, wood trim, window restoration, and dormer element restoration. Structural upgrades involve installing footings, hangers, and framing. Fire suppression, mechanical, electrical, and plumbing systems will be upgraded. Hazardous material abatement is required for asbestos, lead paint, and mercury. Site work includes storm sewer replacement and underground utility work. Optional items may include chilled water piping replacement and fan coil unit replacement. The pre-bid meeting is July 30, 2021 and bids are due through SAM.gov. The National Park Service is the contracting agency.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION
SPECIFICATIONS
PLAN/CUT AWAY VIEW CROSS SECTION
SECTION VIEW
N/A* 436 LB/Ac
2/15-4/30 8/15-11/3
1/25/1-8/14
SPECIES
50MILLET
1/2
NO
APPLICATION
RATE (LB/Ac)
N/A*
SEEDING
DEPTHS (IN)
FERTILIZER RATE
(10-10-10)
ANNUAL
RYEGRASS 2 T/Ac
LIME
RATE
SEEDING
DATES
SEED MIXTURE FOR HARDINESS ZONE 7a
File details come from the government source that posted it. Updated .