Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part1_1-40.pdf

PDF 14 MB Posted

Attached to
National Park Service (NPS) - National Capital Are
Solicitation number
140P3021R0024
Issued by

About this file

This solicitation is for construction rehabilitation services at the Belmont-Paul Women's Equality National Monument located in Washington, D.C. The work includes interior repairs such as plaster repair, painting, and lighting fixture replacement. Exterior repairs include painting doors, wood trim, window restoration, and dormer element restoration. Structural upgrades involve installing footings, hangers, and framing. Fire suppression, mechanical, electrical, and plumbing systems will be upgraded. Hazardous material abatement is required for asbestos, lead paint, and mercury. Site work includes storm sewer replacement and underground utility work. Optional items may include chilled water piping replacement and fan coil unit replacement. The pre-bid meeting is July 30, 2021 and bids are due through SAM.gov. The National Park Service is the contracting agency.

View the file

Other files

File Type Posted
Amendment_0001_-_Questions_and_Answers_0001.pdf PDF
Attachment_15_-_Amendment_0001_-_BEPA_Phase_2_Final_Calculations_0001.pdf PDF
Attachment_16_-_Amendment_0001_-_BEPA_Phase_2_Final_Product_Data_0001.pdf PDF
Amendment_0001_-_photos_0001.docx DOCX document
Sol_140P3021R0024_Amd_0001.pdf PDF
Attachment_3_-_BEPA_Phase_2_Final_Submittal_Log.pdf PDF
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part_3_49-56.pdf PDF
Attachment_11_-_DB_Wage_Determinations_-_Heavy_-_DC20210001_-_7022021.pdf PDF
Attachment_5_-_BEPA_Pre-alt_Hazardous_Materials_Survey_Report.pdf PDF
Attachment_1_-_BEPA_Phase_2_Final_Specifications_120720_KB.pdf PDF
Attachment_8_-_DCRA_Permit_BCIV2000025-EXT-3__06-02-2021.pdf PDF
Attachment_12_-_DB_Wage_Determinations_-_Building_-_DC20210002_-_6182021.pdf PDF
Attachment_7_-_DCRA_Permit_BCIV1800159_APPROVED_PLAN_SET_BEPA_E_S_Plan.pdf PDF
Attachment_13_-_Proposal_Submission_Package.docx DOCX document
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part_4_57-103.pdf PDF
Attachment_4_-_BEPA_Phase_II_Renovation_Collections_to_Protect.pdf PDF
Attachment_6_-_BEPA_CCTV_Report_FINAL.pdf PDF
Attachment_9_-_Updated_Roofing_Specifactions__-_final_7_27_2021.pdf PDF
Sol_140P3021R0024.pdf PDF
Attachment_2_-_BEPA_Phase_2_Final_Drawing_-_Part_2_41_48.pdf PDF
Attachment_14_-_Pre-Proposal_Site_Visit_Agenda.doc DOC document
Attachment_10_-_BEPA_Roof_Replacement_Drawings_REV.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION

SPECIFICATIONS

PLAN/CUT AWAY VIEW CROSS SECTION

SECTION VIEW

N/A* 436 LB/Ac

2/15-4/30 8/15-11/3

1/25/1-8/14

SPECIES

50MILLET

1/2

NO

APPLICATION

RATE (LB/Ac)

N/A*

SEEDING

DEPTHS (IN)

FERTILIZER RATE

(10-10-10)

ANNUAL

RYEGRASS 2 T/Ac

LIME

RATE

SEEDING

DATES

SEED MIXTURE FOR HARDINESS ZONE 7a

File details come from the government source that posted it. Updated .