This document provides details for a federal contract solicitation to expand and renovate a building for urgent and primary care services. The solicitation number is 36C77621B0009 issued by the Department of Veterans Affairs Technology Acquisition Center Austin. Contractors are sought to completely prepare the site for building operations, including demolition and removal of existing structures, and furnish all labor, materials, and work required by the attached drawings and specifications to expand and renovate building B400 for urgent and primary care at the Tomah VA facility. Responses are due by the date specified in the solicitation document. The selected contractor will be expected to perform all tasks necessary as outlined in the drawings and specifications to ready the expanded and renovated facility space for its urgent and primary care purposes by dates set in the award documentation.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AMBIENT
AMERICAN NATIONAL STANDARDS
APPROXIMATE
BACKFLOW PREVENTER (TYPE AS INDICATED)
BOTTOM OF PIPE
BRITISH THERMAL UNIT PER HOUR
BALL VALVE
CUBIC FEET PER MINUTE
CAST IRON
COMPRESSOR
CONDENSATE
CONTINUATION
CHECK VALVE
DOWN
DRAWING
EACH
EFFICIENCY
ELEVATION
EXPANSION TANK
ENTERING WATER TEMPERATURE
EXPANSION
EXTERNAL
EXISTING MATERIAL OR EQUIPMENT
NIC NOT IN CONTRACT
NO. NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
ACCESS PANEL
AMERICANS WITH DISABILITIES ACT
ABBREVIATION
BRAKE HORSEPOWER
CAPACITY
DIAMETER
EQUIVALENT
N.C. NORMALLY CLOSED
NA NOT APPLICABLE
N.O. NORMALLY OPEN
DOMESTIC
OS&Y OUTSIDE SCREW AND YOKE
AFF
AFG
AMB
ANSI
APPROX
BFP
BOP
BTU/H
BV
CFM
CI
COMP
COND
CONT
CV
DN
DWG
EA
EFF
EL
ET
EWT
EXP
EXT
(E)
AP
ADA
ABBR
BHP
CAP.
DIA
EQ
DOM
FIRE
FAN COIL UNIT
FLOOR
FEET PER MINUTE
FEET OR FOOT
GALLON
GALLONS PER MINUTE
GATE VALVE
HEIGHT
HORSE POWER
HIGH PRESSURE STEAM
HOUR
DEGREES IN FAHRENHEIT
FEET PER SECOND
GALLONS PER HOUR
GALLONS PER DAY
MERCURY
FIRE HOSE VALVE
FLOW SWITCH
HYDRAULIC GRADE LINE
F
FCU
FL
FPM
FT
GAL
GPM
GV
HGT
HP
HPS
HR
°F
FPS
GPH
GPD
HG
FHV
FS
HGL
INSIDE DIAMETER
INVERT ELEVATION
IN. INCHES
KW KILOWATTS
LGT LENGTH
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH 1000 BTU/HR
MECH MECHANICAL
MIN MINIMUM
MISC MISCELLANEOUS
MTG MOUNTING
IE
ID
A
B
C
D
E
F
G
H
I
K
L
M
N
P
PRESS. PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH - GAUGE
REF REFERENCE
RL RELOCATED MATERIAL OR EQUIPMENT
RPM REVOLUTIONS PER MINUTE
SCFM STANDARD CUBIC FEET PER MINUTE
SE SEWAGE EJECTOR
SF SQUARE FEET
SG SPECIFIC GRAVITY
SS STAINLESS STEEL
STM STEAM
TEMP TEMPERATURE
TYP TYPICAL
VEL VELOCITY
W/ WITH
WG WATER GAUGE
W/0 WITHOUT
PH PHASE (ELECTRICAL)
PPM PARTS PER MILLION
SPEC SPECIFICATION
SQ. FT. SQUARE FEET
STD STANDARD
UON UNLESS OTHERWISE NOTED
V VOLT
YD YARD
SPRINKLER/ STANDPIPE
SPRINKLERSPR
SPR/STP
TAMPER SWITCHTS
O
R
S
T
U
V
W
Y
TS
FS
NS
FIRE PROTECTION PIPING
FIRE HOSE VALVE
FIRE HOSE VALVE IN CABINET
THROUGH THE WALL, FIRE DEPARTMENT CONNECTION
FREE STANDING, FIRE DEPARTMENT CONNECTION
(SIAMESE)
FIRE PUMP TEST HEADER
VALVE SUPERVISORY SWITCH, TAMPER
ALARM CHECK VALVE
DRY PIPE VALVE
DELUGE VALVE
PRE-ACTION VALVE
FLOW SWITCH
(SIAMESE)
BACKFLOW PREVENTER
OS&Y VALVE
CHECK VALVE
INSPECTOR'S TEST CONNECTION
POST INDICATING VALVE
POINT OF DISCONNECT
POINT OF CONNECTION
ELBOW - TURNED DOWN
CAP OR PLUG
LH LIGHT HAZARD SPRINKLER DENSITY CLASSIFICATION
OH-1 ORDINARY HAZARD 1 SPRINKLER DENSITY CLASSIFICATION
EXISTING ROOM/AREA SPRINKLER SYSTEM TO
REMAIN. NO NEW WORK.
1. FIRE HYDRANT FLOW TEST DATA:
a. DATE TEST WAS PERFORMED: FALL 2012
b. TEST PERFORMED BY: FIRELINE
c. PRESSURE HYDRANT:
i. LOCATION: TOMAH, WI
ii. OUTLET ELEVATION: UNKNOWN
iii. STATIC PRESSURE (PSI): 72 PSI
iv. RESIDUAL PRESSURE (PSI): 60 PSI
d. FLOW HYDRANT:
i. LOCATION: B400 & 4TH ST.
ii. FLOW (GPM): 1012
2. SPRINKLER SYSTEM DESIGN CRITERIA:
a. LIGHT HAZARD OCCUPANCY -
ADMINISTRATIVE AREAS, COMPUTER ROOMS, ETC.
b. ORDINARY HAZARD OCCUPANCY - PARKING GARAGE, LOADING DOCK, STORAGE AREAS, MECHANICAL AND ELECTRIC ROOMS AND SIMILAR AREAS WHERE STOCKPILES OF COMBUSTIBLE MATERIALS DO NOT EXCEED 8'-0".
3. SYSTEM PROTECTION AREA LIMITATIONS:
a. THE MAXIMUM FLOOR AREA ON ANY ONE FLOOR TO BE PROTECTED BY SPRINKLERS SUPPLIED BY ANY ONE SPRINKLER RISER OR COMBINED SYSTEM SHALL BE 52,000 SQ FT FOR LIGHT AND ORDINARY HAZARD.
b. THERE IS NO LIMIT TO THE NUMBER OF FLOORS THAT CAN BE PROTECTED BY A SINGLE RISER, BECAUSE EACH FLOOR IS CONSIDERED A SEPERATE FIRE AREA.
4. SPRINKLER DESIGN DENSITIES/DEMAND CRITERIA:
a. LIGHT HAZARD - 0.10 GPM PER SQ FT OVER THE HYDRAULICLLY MOST REMOTE 1500 SQ FT.
b. ORDINARY HAZARD - 0.15 GPM PER SQ FT OVER THE HYDRAULICLLY MOST REMOTE 1500 SQ FT.
SPRINKLER HEAD
SPRINKLER HEAD SCHEDULE AND LEGEND
SYMBOL LOCATION MANUFACTURER SIN K-FACTOR SR/QR TYPE TEMP. FINISH
THREAD
SIZE
COMMENTS
ALL RENOVATED
AREAS.
VIKING VK302 5.6 QR SSP 150° BRASS 1/2" SEMI-RECESSED IN CEILINGS AND
EXPOSED FOR NO CEILINGS. SEE
ARCHITECTURAL PLAN REFLECTED
CEILINGS FOR REFERENCE.
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
1. Deduct Alternate #1: Remove B407 North Swing Space.
a. Remove 60 days from schedule.
2. Deduct Alternate #2: Remove B407 South Swing Space, Bathroom refresh and IT closet infrastructure from project.
a. Remove 90 days from schedule.
3. Deduct Alternate #3: Remove sealed bubble wall fountain in Waiting Room 1082 from project.
a. Remove 14 days from schedule.
4. Deduct Alternate #4: Rebuild (E) AHU rather than install new one.
a. Remove 90 calendar days from schedule.
5. Deduct Alternate #5: Remove exterior entrance canopy at staff lounge 1102.
a. Remove 14 calendar days from schedule.
DEDUCTIVE ALTERNATE:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:5
A
M
F000
FIRE PROTECTION ABBREVIATIONS
AND SYMBOLS
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
1 DESIGN, FABRICATE, INSTALL AND TEST THE FIRE SPRINKLER SYSTEM(S) IN ACCORANCE WITH THE FOLLOWING CRITERIA: A. AUTHORITY HAVING JURSIDICITION, B. OWNERS INSURANCE CARRIER, C. NFPA 13.
2 ALL WORK INDICATED ON THE CONTRACTOR DOCUMENTS IS INTENDED AS A GUIDE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR PRODUCING THE NECESSARY DOCUMENTS SIGNED AND SEALED BY A PROFESSIONAL FIRE PROTECTION ENGINEER TO BE SUBMITTED TO THE AHJ FOR APPROVAL.
3 BRING TO THE ATTENTION OF THE ARECHITECT/ENGINEER ANY DISCREPANCIES BETWEEN THE DRAWINGS AND SPECIFICATIONS.
4 PROVIDE SUPERVISORY SWITCHES AT LOCATIONS REQUIRED BY AHJ AND NFPA.
5 INSTALL PIPING SO THAT IT DRAINS BACK TO DRAIN VALVES AS REQUIRED BY NFPA.
6 MAINTAIN A MINIMUM OF 7' HEAD ROOM CLEARANCE.
7 ALL SPRINKLERS SHALL BE INSTALLED IN THE CENTER OF CEILING TILES.
8 SEE ARCHITECURAL DRAWINGS FOR HEAD LOCATINS IN SENSITIVE AREAS.
9 THE CONTRACTOR SHALL PERFORM ALL REQUIRED ACCEPTANCE TESTS AS INDICATED IN THE NFPA 13. A RECORD OF THE TEST SHALL BE SUBMITTED TO THE
FIRE DEPARTMENT ON THE APPROPRIATE NFPA FORM.
FIRE PROTECTION SHEET INDEX
F000 FIRE PROTECTION ABBREVIATIONS AND SYMBOLS
FD101 B400 - LEVEL 1 - FIRE PROTECTION DEMOLITION PLAN
FD102 B400 - LEVEL 2 - FIRE PROTECTION DEMOLITION PLAN
FD103-407 B407 - LEVEL 3 - FIRE PROTECTION DEMOLITION PLAN
FP101 B400 - LEVEL 1 - FIRE PROTECTION PLAN
FP102 B400 - LEVEL 2 - FIRE PROTECTION PLAN
FP103-407 B407 - LEVEL 3 - FIRE PROTECTION PLAN
FIRE PROTECTION GENERAL NOTES:SYMBOLS:ABBREVIATIONS:
FIRE HYDRANT DATA:
FIRE PROTECTION DETAILS:
Pending Totals: NEW Plumbing systems in crawl space and 1st floor are original. Provide complete new plumbing piping systems, basement, crawl space, 1st floor. Replace all cold water, hot water, drain, waste, and vent piping throughout.
Fixtures / Piping 111175 [ Field Engineer Review Completed on 07/29/2014 by VHATOMBueniM.] [ Auto Generated Project Pending on 07/29/2014 for Project Number 676-14- 122 created by VHATOMBueniM.] Project 676-14-122 replaced the sanitary and storm sewer piping under the west wing.
Replace piping in the basement and in the 1st and 2nd floors, which exceed maximum life expectancy.
Fire Sprinkler / Pump 90803 Sprinkler piping is in good condition.
Pending Totals: NEW Ambulance Bay exhaust fan Square inline May have a control issue. Fan was running continuously when no source of CO contamination was present. (2010 vintage
Ventil (O.A. & Exh) 111174 Ventilation is in good condition.
Room Air Dist/Term 111173 VAV boxes and reheating coils in good condition.
Heating System 277776 2nd floor steam piping and convectors removed, replaced by hot water heaters or air-side heating.
Heating System 111168 The original steam piping and convectors on the 1st floor has exceeded their life expectancy and should be replaced.
Engr. Control syst. 111167 METASYS controls on the 1st and 2nd floors installed in 2005 and are in good condition.
Ducts & Water Dist 111166 Ducts and piping in good condition.
Pending Totals: NEW Air Handler (2004) serving the current dental in good condition, Air Handler is Mixed Air, Pre-Filter, Air Blender, Hot Water Pumped Heating Coil, CW Cooling Coil, Diffuser, Supply Fan with ABB VFD, Filter, Steam Humidifier on discharge *AHU-8 Trane MN: MCCB025UAODOUA SN:K04M65739A
Mechanical Rec No Description
Building 400 FCA Report
Disclaimer: These items have been determined to have reached their end of life usefulnes. This scope of work contract did not allocate funding for the below mentioned deficiencies. The following information was received from the owner's assessment report dated 1/6/2017.
FCA Report:
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
43886
05/20/2021 KAEKO LEITCH
1 2 3 4 5 6 6.1 7 7.8 8 9 9.1 9.9 10 11 11.2 12 13 14 18171615
M.3
M
L
K.3
K
J.3
J
I.5
I
H.1
H
G
F.1
F
E
D
C
B
A
(E) 6" FIRE SERVICE
IN BASEMENT
EXISTING TO
REMAIN FDC
(E )6
F
(E)2 1/2" F
(E)6" F
(E )6
F
EXISTING 2-1/2"
TO RISER REMAIN
EXISTING 6"
STANDPIPE
TO REMAIN
(E)2 1/2" F
(E)2 1/2" F
EXISTING FIRE SPRINKLER SYSTEM
TO BE RECONFIGURED TO
ACCOMMODATE RENOVATION AND
ADDITION. NO EXISTING FIRE
SPRINKLER PLANS FOR THE
AFFECTED AREAS ARE PROVIDED.
FIELD VERIFICATION BY FIRE
SPRINKLER CONTRACTOR IS
REQUIRED.
EXISTING FIRE SPRINKLER SYSTEM
TO BE RECONFIGURED TO
ACCOMMODATE RENOVATION AND
ADDITION. NO EXISTING FIRE
SPRINKLER PLANS FOR THE
AFFECTED AREAS ARE PROVIDED.
FIELD VERIFICATION BY FIRE
SPRINKLER CONTRACTOR IS
REQUIRED.
EXISTING 2-1/2" FIRE
SPRINKLER MAIN AND
BRANCH PIPES TO BE
MODIFIED TO ACCOMMODATE
RENOVATION.
FIRE SPRINKLER AREA
EXISTING TO REMAIN.
EXISTING 2-1/2" FIRE
SPRINKLER MAIN AND
BRANCH PIPES TO BE
MODIFIED TO ACCOMMODATE
RENOVATION.
FIRE SPRINKLER AREA
EXISTING TO REMAIN.
LIGHT HAZARD AREA
FIRE PROTECTION ZONING LINE
FIRE PROTECTION LEGEND:
EXAM
1027 EXAM
EXAM
OFFICE
OFFICE
OFFICE
OFFICE
EXAM
OFFICE
OFFICE
DIRTY UTILTIY
OFFICE
WAITING
NURSE STATION
OFFICE
EXAM
CONFERENCE
EXAM
EXAM
EXAM
OFFICE
OFFICE
WOMEN
VISITOR
TOILET
TLT
MECH
IT
1005 OFFICE
OFFICE
OFFICE
EXAM
STAIR
WAITING / CIRCULATION
EXAM
EXAM
EXAM
NURSE STATION
1085 EXAM
EXAM
WOMEN TLT
EXAM
EXAM
OFFICE
STORAGE
1096A
STAFF TOILET
STAFF TOILET
AMBULANCE GARAGE
IT
1051B
ELECT
1051A
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:0
A
M
FD101
B400 - LEVEL 1 - FIRE PROTECTION
DEMOLITION PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 1 - FIRE PROTECTION DEMOLITION PLAN
A. FIRE PROTECTION CONTRACTOR TO PROVIDE COMPLETE PLANS,
APPROVALS AND INSTALLATION PER NFPA STANDARDS, LOCAL CODES
AND VA STANDARDS.
B. PROVIDE COMPLETE FIRE PROTECTION SYSTEM INCLUDING, BUT NOT
LIMITED TO, ALL NECESSARY PIPING, VALVES, FITTING, TAMPER
SWITCHES & FLOW SWITCHES.
C. ALL WORK TO BE COORDINATED WITH OTHER TRADES BEFORE
INSTALLATION. REMOVAL OF ANY PENETRATIONS THRU EXISTING WALLS
OR FLOORS TO BE PROPERLY SEALED.
D. PERFORM FLOW TEST FROM NEAREST HYDRANTS AND VERIFY SEASONAL
VARIATIONS WITH WATER UTILITIES.
E. COORDINATE TEMPORARY FIRE COVERAGE DURING CONSTRUCTION GRC
AND FACILITIES.
F. SPRINKLER HEADS HAVE BEEN LOCATED BY LIDAR SURVEY. SPRINKLER
MAINS HAVE BEEN PROVIDED BY VA PROVIDED INFORMATION.
1. NOT USED.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
M
L
K.3
K
J.4
J
I.5
I
H.1
H
G
F.1
F
E
D
C
B
A
(E)2 1/2" F
(E )2
/2
F
EXISTING FIRE SPRINKLER SYSTEM
TO BE RECONFIGURED TO
ACCOMMODATE RENOVATION AND
ADDITION. NO EXISTING FIRE
SPRINKLER PLANS FOR THE
AFFECTED AREAS ARE PROVIDED.
FIELD VERIFICATION BY FIRE
SPRINKLER CONTRACTOR IS
REQUIRED.
EXISTING 2-1/2" FIRE
SPRINKLER MAIN AND
BRANCH PIPES TO BE
MODIFIED TO ACCOMMODATE
RENOVATION.
EXISTING 6"
STANDPIPE TO
REMAIN
LIGHT HAZARD AREA
FIRE PROTECTION ZONING LINE
FIRE PROTECTION LEGEND:
OFFICE
UNOCCUPIED
CLEAN UTILITY
LAB
MECHANICAL
OFFICE
2015A
TOILET, STAFF
2030A
UTILITY ROOM, SOILED
TOILET
LOCKER ROOM
LAB
TREATMENT ROOM
EXAM/ TREATMENT ROOM
EXAM/ TREATMENT ROOM
TREATMENT ROOM
EXAM/TREATMENT ROOM
TREATMENT ROOM
STAIR
S9
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:0
A
M
FD102
B400 - LEVEL 2 - FIRE PROTECTION
DEMOLITION PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 2 - FIRE PROTECTION DEMOLITION PLAN
A. FIRE PROTECTION CONTRACTOR TO PROVIDE COMPLETE PLANS,
APPROVALS AND INSTALLATION PER NFPA STANDARDS, LOCAL CODES
AND VA STANDARDS.
B. PROVIDE COMPLETE FIRE PROTECTION SYSTEM INCLUDING, BUT NOT
LIMITED TO, ALL NECESSARY PIPING, VALVES, FITTING, TAMPER
SWITCHES & FLOW SWITCHES.
C. ALL WORK TO BE COORDINATED WITH OTHER TRADES BEFORE
INSTALLATION. REMOVAL OF ANY PENETRATIONS THRU EXISTING WALLS
OR FLOORS TO BE PROPERLY SEALED.
D. PERFORM FLOW TEST FROM NEAREST HYDRANTS AND VERIFY SEASONAL
VARIATIONS WITH WATER UTILITIES.
E. COORDINATE TEMPORARY FIRE COVERAGE DURING CONSTRUCTION GRC
AND FACILITIES.
F. SPRINKLER HEADS HAVE BEEN LOCATED BY LIDAR SURVEY. SPRINKLER
MAINS HAVE BEEN PROVIDED BY VA PROVIDED INFORMATION.
1. NOT USED.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
407.A
407.B1
407.C1
407.D1
407.E
407.F
407.G1
407.H
407.I
407.J
407.K
407.L
407.M
407.N
407.14407.11 407.12.1407.12
407.9407.7
407.41407.4407.3407.21
J.39
J.40
J.41
407.H2
407.H1
407.13.1
OPEN OFFICE
RESTROOM
OPEN OFFICE
MECH / ELEC
RESTROOM
EXISTING FIRE SPRINKLER SYSTEM
TO BE RECONFIGURED TO
ACCOMMODATE RENOVATION AND
ADDITION. NO EXISTING FIRE
SPRINKLER PLANS FOR THE
AFFECTED AREAS ARE PROVIDED
AND LIMITED INFORMATION IS
AVAILABLE FROM FIELD VISITS. FIELD
VERIFICATION BY FIRE SPRINKLER
CONTRACTOR IS REQUIRED.
EXISTING FIRE SPRINKLER SYSTEM
TO BE RECONFIGURED TO
ACCOMMODATE RENOVATION AND
ADDITION. NO EXISTING FIRE
SPRINKLER PLANS FOR THE
AFFECTED AREAS ARE PROVIDED
AND LIMITED INFORMATION IS
AVAILABLE FROM FIELD VISITS. FIELD
VERIFICATION BY FIRE SPRINKLER
CONTRACTOR IS REQUIRED.
DEDUCT ALT 1:
REMOVE WORK
ASSOCIATED WITH
B407 NORTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
MECH / ELECT
3790C
OFFICE
3790B
BEDROOM
BEDROOM
MECHANICAL ROOM
3780A
MECHANICAL ROOM
BEDROOM
MEDS
3711A
BEDROOM
STORAGE
DINING
3749A
BREAK
3765 BEDROOM
WARD
READING
BEDROOM
TREATMENT
CT CLINIC
TOILET
3744A
CLOSET
SHOWERS
3784A
DRESSING
DRESSING
SHOWERS
3715A
Room
DAY ROOM
TOILET
CLOSET
3750A
CORRIDOR
7C36
CORRIDOR
7C31
DATA CLOSET
3772A
ELECTRICAL
CORRIDOR
7C38
CORRIDOR
7C39
OFFICE
STAIR
S4
CORRIDOR
7C37
CORRIDOR
7C32
HAC
3736A
NURSES
BEDROOM
BEDROOM
READING
UTILITY
WARD
STAIR
S6
DINING
LOCKERS
WARD
BEDROOM
BEDROOM
CLEAN LINENS
Room
CLOSET
ELEVATOR LOBBY
7C35
ELEVATOR
CORRIDOR
CORRIDOR
7C33
BEDROOM
LAUNDRY
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
EXISTING SIDEWALL
SPRINKLER HEADS TO REMAIN
IN AREA
EXISTING SIDEWALL
SPRINKLER HEADS
TO REMAIN IN AREA
LIGHT HAZARD AREA
FIRE PROTECTION ZONING LINE
FIRE PROTECTION LEGEND:
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
B407 KEY PLAN
AREA A
KEY PLAN
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:0
A
M
FD103-407
B407 - LEVEL 3 - FIRE PROTECTION
DEMOLITION PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH G.RHODEN
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
B407 - LEVEL 3 - FIRE PROTECTION DEMOLITION PLAN
A. FIRE PROTECTION CONTRACTOR TO PROVIDE COMPLETE PLANS,
APPROVALS AND INSTALLATION PER NFPA STANDARDS, LOCAL CODES
AND VA STANDARDS.
B. PROVIDE COMPLETE FIRE PROTECTION SYSTEM INCLUDING, BUT NOT
LIMITED TO, ALL NECESSARY PIPING, VALVES, FITTING, TAMPER
SWITCHES & FLOW SWITCHES.
C. ALL WORK TO BE COORDINATED WITH OTHER TRADES BEFORE
INSTALLATION. REMOVAL OF ANY PENETRATIONS THRU EXISTING WALLS
OR FLOORS TO BE PROPERLY SEALED.
D. PERFORM FLOW TEST FROM NEAREST HYDRANTS AND VERIFY SEASONAL
VARIATIONS WITH WATER UTILITIES.
E. COORDINATE TEMPORARY FIRE COVERAGE DURING CONSTRUCTION GRC
AND FACILITIES.
F. SPRINKLER HEADS HAVE BEEN LOCATED BY LIDAR SURVEY. SPRINKLER
MAINS HAVE BEEN PROVIDED BY VA PROVIDED INFORMATION.
1. NOT USED.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
M
L
K.3
K
J.4
J
I.5
I
H.1
H
G
F.1
F
E
D
C
B
A
EXISTING SIAMESE
FIRE DEPARTMENT
CONNECTION
(E)2 1/2" F (E)2 1/2" F
EXISTING
2-1/2" RISER
TO REMAIN
EXISTING 6"
STANDPIPE TO
REMAIN
(E)2 1/2" F
(E)2 1/2" F
AREA TO SHOW EXISTING FIRE
SPRINKLER MAIN ONLY. NEW
BRANCH MAIN TO CLINICAL
AREA MAY BE NECESSARY PER
FIRE SPRINKLER CONTRACTORS
HYDRAULIC CALCULATIONS.
AREA TO SHOW EXISTING FIRE
SPRINKLER MAIN ONLY. NEW
BRANCH MAIN TO URGENT CARE
AREA MAY BE NECESSARY PER
FIRE SPRINKLER CONTRACTORS
HYDRAULIC CALCULATIONS.
FIRE SPRINKLER AREA
EXISTING TO REMAIN.
CONF
CONSULT ROOM 2
CONSULT ROOM 1
CLEAN UTILITY
EXAM 10
CHAIR EXAM
1085b
EXAM 6
ANTE ROOM
1108A
OFFICE
EXAM 8
ALCOVE
WHEELCHAIR ALCOVE
EQ. ALCOVE
EXAM 13 / CONSULT RM 3
EXAM 2
TEAM WORK STATIONS
WAITING
1032B
TEAM AREA
1101A
TEAM AREA
1086A
PATIENT TLT
TLT
1022B
STAFF TLT
1019B
MECH
STAFF TOILET
BARIATRIC/ WOMENS HEALTH TLT
1100B
TLT
1104B
TLT/SHWR
EXAM 2 - NEGATIVE PRESS
1104A
MEDS
EXAM 4
EXAM 5 BARIATRIC/ WOMENS HEALTH
1100A
RECEPT CHECK IN/OUT
1032A
WEIGH AREA
MEDS
CORRIDOR
OC11
EXAM 12
FAMILY TLT
NURSE MANAGER OFFICE
OFFICE
CLEAN SUPPLY
EXAM 7
SOILED UTILITY / SPD
CORRIDOR
OC13
EXAM 1
TLT
1108C
LOGISTICS STORAGE
AMBULANCE BAY
TELEHEALTH
TRIAGE
RECEPTION
1080C
TELEHEALTH
STOR
EXAM 7
CLEAN UTLITY
VESTIBULE
EXAM 9
STAFF LOUNGE
EXAM 1- NEGATIVE PRESS
1108B
WAITING
CORRIDOR
OC20
SOILED UTILITY
CORRIDOR
OC21
CORRIDOR
OC19
CORRIDOR
OC22
HALLWAY
OC14
EXAM 8
EXAM 11
LACTATION
IT
1051B
ELECT
1051A
HAC
TLT MENTAL HEALTH
1099B
MAIN ELEC A
1104C MAIN ELEC B
1104D
MENTAL HEALTH
1099A
FIRE SPRINKLER AREA
EXISTING TO REMAIN.
LIGHT HAZARD AREA
FIRE PROTECTION ZONING LINE
FIRE PROTECTION LEGEND:
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:1
A
M
FP101
B400 - LEVEL 1 - FIRE PROTECTION
PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 1 - FIRE PROTECTION PLAN
1 IN THIS SHADED AREA CENTER NEW
RECESSED SPRINKLER HEADS IN NEW
CEILING TILE AND MODIFY EXISTING
BRANCH PIPING AS REQUIRED TO
ACCOMMODATE NEW LOCATION.
A. FIRE PROTECTION CONTRACTOR TO PROVIDE COMPLETE PLANS,
APPROVALS AND INSTALLATION PER NFPA STANDARDS, LOCAL CODES
AND VA STANDARDS.
B. PROVIDE COMPLETE FIRE PROTECTION SYSTEM INCLUDING, BUT NOT
LIMITED TO, ALL NECESSARY PIPING, VALVES, FITTING, TAMPER
SWITCHES & FLOW SWITCHES.
C. ALL WORK TO BE COORDINATED WITH OTHER TRADES BEFORE
INSTALLATION. REMOVAL OF ANY PENETRATIONS THRU EXISTING WALLS
OR FLOORS TO BE PROPERLY SEALED.
D. PERFORM FLOW TEST FROM NEAREST HYDRANTS AND VERIFY SEASONAL
VARIATIONS WITH WATER UTILITIES.
E. COORDINATE TEMPORARY FIRE COVERAGE DURING CONSTRUCTION GRC
AND FACILITIES.
F. FINAL LAYOUT AND SPRINKLER COUNT TO BE BY SPRINKLER
CONTRACTOR.
G. FIRE CAULK PIPE PENTERATIONS AT RATED WALLS, CEILING, AND
FLOORS. REFER THE ARCHITECTURE SHEET GI101, GI102, AND GI104 FOR
FIRE RATINGS.
H. CONCEALED SPRINKLER HEADS NOT ALLOWED, PROVIDE FAST ACTING
SEMI-RECESSED HEADS.
I. FINAL LAYOUT AND SPRINKLER COUNT TO BE BY SPRINKLER
CONTRACTOR.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
M
L
K.3
K
J.4
J
I.5
I
H.1
H
G
F.1
F
E
D
C
B
A
(E)2 1/2" F (E)2 1/2" F
(E )2
/2
F
EXISTING 6"
STANDPIPE TO
REMAIN
AREA TO SHOW EXISTING FIRE SPRINKLER
MAIN ONLY. NEW BRANCH MAIN TO CLINICAL
AREA MAY BE NECESSARY PER FIRE
SPRINKLER CONTRACTORS HYDRAULIC
CALCULATIONS.
MECH
INFUSION ROOM
MECH
EXAM 1
CLEAN UTILITY - LOGISTICS
TLT
TEAM WORK AREA
MED EQUIPMENT STORAGE
EXAM 5
EXAM 3
EXAM 2
EXAM 4
CORRIDOR
OC22
CLEAN LINENS
SOILED UTILITY
SOILED UTILITY
LIGHT HAZARD AREA
FIRE PROTECTION ZONING LINE
FIRE PROTECTION LEGEND:
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:2
A
M
FP102
B400 - LEVEL 2 - FIRE PROTECTION
PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 2- FIRE PROTECTION PLAN
1 IN THIS SHADED AREA CENTER NEW
RECESSED SPRINKLER HEADS IN NEW
CEILING TILE AND MODIFY EXISTING
BRANCH PIPING AS REQUIRED TO
ACCOMMODATE NEW LOCATION.
A. FIRE PROTECTION CONTRACTOR TO PROVIDE COMPLETE PLANS,
APPROVALS AND INSTALLATION PER NFPA STANDARDS, LOCAL CODES
AND VA STANDARDS.
B. PROVIDE COMPLETE FIRE PROTECTION SYSTEM INCLUDING, BUT NOT
LIMITED TO, ALL NECESSARY PIPING, VALVES, FITTING, TAMPER
SWITCHES & FLOW SWITCHES.
C. ALL WORK TO BE COORDINATED WITH OTHER TRADES BEFORE
INSTALLATION. REMOVAL OF ANY PENETRATIONS THRU EXISTING WALLS
OR FLOORS TO BE PROPERLY SEALED.
D. PERFORM FLOW TEST FROM NEAREST HYDRANTS AND VERIFY SEASONAL
VARIATIONS WITH WATER UTILITIES.
E. COORDINATE TEMPORARY FIRE COVERAGE DURING CONSTRUCTION GRC
AND FACILITIES.
F. FINAL LAYOUT AND SPRINKLER COUNT TO BE BY SPRINKLER
CONTRACTOR.
G. FIRE CAULK PIPE PENTERATIONS AT RATED WALLS, CEILING, AND
FLOORS. REFER THE ARCHITECTURE SHEET GI101, GI102, AND GI104 FOR
FIRE RATINGS.
H. CONCEALED SPRINKLER HEADS NOT ALLOWED, PROVIDE FAST ACTING
SEMI-RECESSED HEADS.
I. FINAL LAYOUT AND SPRINKLER COUNT TO BE BY SPRINKLER
CONTRACTOR.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
407.A
407.B1
407.C1
407.D1
407.E
407.F
407.G1
407.H
407.I
407.J
407.K
407.L
407.M
407.N
407.14407.11 407.12.1407.12
407.9407.7
407.41407.4407.3407.21
J.39
J.40
J.41
407.H2
407.H1
407.13.1
OFFICE
3790A MECH / ELECT
3790C
OFFICE
3775B
OPEN OFFICE
OFFICE
3790B
MECH / ELEC
OPEN OFFICE
DEDUCT ALT 1:
REMOVE WORK
ASSOCIATED WITH
B407 NORTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
EXISTING SIDEWALL
SPRINKLER HEADS TO REMAIN
IN AREA
EXISTING SIDEWALL
SPRINKLER HEADS
TO REMAIN IN AREA
EXISTING
SPRINKLER HEADS
TO REMAIN IN AREA
LIGHT HAZARD AREA
FIRE PROTECTION ZONING LINE
FIRE PROTECTION LEGEND:
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
B407 KEY PLAN
AREA A
KEY PLAN
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:2
A
M
FP103-407
B407 - LEVEL 3 - FIRE PROTECTION
PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B407 - LEVEL 3 - FIRE PROTECTION PLAN
1 IN THIS SHADED AREA CENTER NEW
RECESSED SPRINKLER HEADS IN NEW
CEILING TILE AND MODIFY EXISTING
BRANCH PIPING AS REQUIRED TO
ACCOMMODATE NEW LOCATION.
A. FIRE PROTECTION CONTRACTOR TO PROVIDE COMPLETE PLANS,
APPROVALS AND INSTALLATION PER NFPA STANDARDS, LOCAL CODES
AND VA STANDARDS.
B. PROVIDE COMPLETE FIRE PROTECTION SYSTEM INCLUDING, BUT NOT
LIMITED TO, ALL NECESSARY PIPING, VALVES, FITTING, TAMPER
SWITCHES & FLOW SWITCHES.
C. ALL WORK TO BE COORDINATED WITH OTHER TRADES BEFORE
INSTALLATION. REMOVAL OF ANY PENETRATIONS THRU EXISTING WALLS
OR FLOORS TO BE PROPERLY SEALED.
D. PERFORM FLOW TEST FROM NEAREST HYDRANTS AND VERIFY SEASONAL
VARIATIONS WITH WATER UTILITIES.
E. COORDINATE TEMPORARY FIRE COVERAGE DURING CONSTRUCTION GRC
AND FACILITIES.
F. FINAL LAYOUT AND SPRINKLER COUNT TO BE BY SPRINKLER
CONTRACTOR.
G. FIRE CAULK PIPE PENTERATIONS AT RATED WALLS, CEILING, AND
FLOORS. REFER THE ARCHITECTURE SHEET GI101, GI102, AND GI104 FOR
FIRE RATINGS.
H. CONCEALED SPRINKLER HEADS NOT ALLOWED, PROVIDE FAST ACTING
SEMI-RECESSED HEADS.
I. FINAL LAYOUT AND SPRINKLER COUNT TO BE BY SPRINKLER
CONTRACTOR.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
| GI000-COVER SHEET |
| GI001-PROJECT SHEET INDEX |
| GI050-GENERAL NOTES |
| GI101-B400 -LEVEL 1 -FIRE AND LIFE SAFETY PLAN & CODE DATA |
| GI102-B400 -LEVEL 2 -FIRE AND LIFE SAFETY PLAN & CODE DATA |
| GI104-B407 -LEVEL 3 -FIRE AND LIFE SAFETY PLAN & CODE DATA -DEDUCT ALT #1 & #2 |
| GI201-INFECTION CONTROL PLAN & INTERIM LIFE |
| GC101-PROJECT PHASING |
| GC102-PHASING PLANS |
| H101-B400 -LEVEL 1 -HAZARDOUS MATERIAL ABATEMENT |
| H102-B400 -LEVEL 2 -HAZARDOUS MATERIAL ABATEMENT |
| H103-407-B407 -LEVEL 3 -HAZARDOUS MATERIAL ABATEMENT |
| HC101-B400 -LEVEL 1 -HAZARDOUS MATERIAL ABATEMENT -PIPING |
| VF100-CONTROL POINT SITE PLAN |
| VF101-viuvTiiig i iuvCIVIL SURVEY PLAN |
| CD101-CIVIL DEMOLITION PLAN |
| CS101-CIVIL SITE PLAN |
| COo-CIVIL SITE PLAN STAGING AREA |
| CG101-CIVIL GRADING PLAN |
| CG501-CIVIL DETAIL SHEET 1 |
| CG502-CIVIL DETAIL SHEET 2 |
| CU101-CIVIL UTILITY PLAN |
| SJ001-GENERAL STRUCTURAL NOTES |
| SJ002-GENERAL STRUCTURAL NOTES CONTINUED |
| SJ003-SPECIAL INSPECTIONS |
| SB100-B400 -LEVEL 1 -FOUNDATION PLAN -OVERALL |
| SB101-B400 -LEVEL 1 - FOUNDATION PLAN -AREA A |
| SF102-B400 -LEVEL 2 - FRAMING PLAN -OVERALL |
| SF103-B400 -LEVEL 2 -ROOF FRAMING PLAN -AREA A |
| SF201-FRAMING ELEVATIONS |
| SF202-FRAMING ELEVATIONS |
| SF203-FRAMING ELEVATIONS |
| SF501-TYPICAL DETAILS |
| SF502-TYPICAL DETAILS |
| SF503-TYPICAL DETAILS |
| SF504-TYPICAL DETAILS |
| SF505-TYPICAL DETAILS |
| SB510-FOUNDATION DETAILS |
| SF520-FRAMING DETAILS |
| SF521-FRAMING DETAILS |
| SF530-COLD-FORMED STEEL FRAMING |
| SF601-GRAPHICAL COLUMN SCHEDULE |
| AE000-SYMBOLS, & GENERAL NOTES |
| AS101-ARCHITECTURAL SITE PLAN |
| AG100-FLOOR PLAN -LEVEL 1, URGENT CARE CENTER PROGRAM PLAN |
| AG103-FLOOR PLAN -LEVEL 1, CLINICAL SPACE PROGRAM PLAN |
| AG200-FLOOR PLAN -LEVEL 2, SPECIALTY CARE PROGRAM PLAN |
| AG201A-FLOOR PLAN -LEVEL 3 -SWING SPACE LAYOUT B407-DEDUCT ALT #1 & #2 |
| AD101-B400 -LEVEL 1 -DEMOLITION PLAN |
| AD102-B400 -LEVEL 2 -DEMOLITION PLAN |
| AD103-407-B407 -LEVEL 3 -DEMOLITION PLAN -DEDUCT AL #1 & #2 |
| AD121-B400 -LEVEL 1 -DEMOLITION RCP |
| AD122-B400 -LEVEL 2 -DEMOLITION RCP |
| AD123-407-B407 -LEVEL 3 -DEMOLITION RCP -DEDUCT ALT #1 & #2 |
| AE101-B400 -LEVEL 1 -FLOOR PLAN -OVERALL |
| AE102-B400 -LEVEL 2 -FLOOR PLAN -OVERALL |
| AE103-407-B407 -LEVEL 3 -FLOOR PLAN -DEDUCT ALT #1& #2 |
| AE104-B400 -ROOF PLAN -OVERALL |
| AC101-B400 -LEVEL 1 -REFLECTED CEILING PLAN |
| AC102-B400 -LEVEL 2 -REFLECTED CEILING PLAN |
| AC103-407-B407 -LEVEL 3 -REFLECTED CEILING PLAN -DEDUCT ALT #1 & #2 |
| AE201-B400 EXTERIOR ELEVATIONS |
| AE201-407-B407 EXTERIOR ELEVATIONS -DEDUCT ALT #1 & #2 |
| AE202-B400 EXTERIOR ELEVATIONS |
| AE301-BUILDING SECTIONS |
| AE320-WALL SECTIONS |
| AE321-WALL SECTIONS |
| AE322-WALL SECTIONS |
| AE401-B400 -LEVEL 1 -ENLARGED FLOOR PLANS |
| AE401A-B400 -LEVEL 1 -ENLARGED FLOOR PLANS |
| AE401B-B400 -LEVEL 1 -ENLARGED FLOOR PLANS |
| AE401C-B400 -LEVEL 1 -ENLARGED FLOOR PLANS |
| AE401D-B400 -LEVEL 1 -ENLARGED FLOOR PLANS |
| AE402-B400 -LEVEL 2 -ENLARGED FLOOR PLANS |
| AE500-EXTERIOR WALL AND ROOF ASSEMBLIES |
| AE520-EXTERIOR SECTION DETAILS |
| AE521-EXTERIOR SECTION DETAILS |
| AE551-DETAILS -INTERIOR |
| AE552-DETAILS -INTERIOR |
| AE560-DOOR DETAILS |
| AE561-DOOR AND LOUVER DETAILS |
| AE601-DOOR WINDOW & LOUVER SCHEDULES |
| AE710-ARCHITECTURAL DOOR, WINDOW & FRAME TYPES |
| AE720-STANDARD PARTITION TYPES |
| AE721-PARTITION HEAD DETAILS |
| AE722-PARTITION FRAMING DETAILS |
| AE730-TYPICAL MOUNTING HEIGHTS |
| AG900-B400 RENDERINGS |
| AG901-B400 RENDERINGS |
| AG902-B400/ B407 RENDERINGS |
| AW001-SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES & DETAILS |
| AW101-B400 -LEVEL 1 -SIGNAGE PLAN |
| AW102-B400 -LEVEL 2 -SIGNAGE PLAN |
| AW103-B407 -LEVEL 3 -SIGNAGE PLAN -DEDUCT ALT #1 & #2 |
| IN001-NTERIOR FINISH ABBREVIATIONS, SYMBOLS, GENERAL NOTES & FINISH BOARDS |
| IN101-B400 -LEVEL 1 -INTERIOR FINISH PLAN -OVERALL |
| IN101A-B400 -LEVEL 1 -INTERIOR FINISH PLANS -AREA & A1 |
| IN101B-B400 -LEVEL 1 -INTERIOR FINISH PLANS -AREA |
| IN102C-B400 -LEVEL 2 -INTERIOR FINISH PLANS -AREA C |
| IN103D-B407 -LEVEL 3 -INTERIOR FINISH PLANS -AREA A, B & C -DEDUCT ALT #1& #2 |
| IN501-INTERIOR FINISH DETAILS |
| IN601-INTERIOR FINISH LEGEND AND SCHEDULES |
| IF101AB-B400 -LEVEL 1 -INTERIOR FURNITURE PLAN -FOR REFERENCE ONLY |
| IF102C-B400 -LEVEL 2 -INTERIOR FURNITURE PLAN -FOR REFERENE ONLY |
| IF103D-B407 -LEVEL 3 -INTERIOR FURNITURE PLAN -FOR REFERENCE ONLY -DEDUCT ALT #1 & #2 |
| IF104-FURNITURE PLAN -FOR REFERENCE ONLY |
| IF105-FURNITURE PLAN -FOR REFERENCE ONLY |
| IF106-FURNITURE PLAN -FOR REFERENCE ONLY |
| Q001-EQUIPMENT SCHEDULE |
| Q101AB-B400 -LEVEL 1 -EQUIPMENT PLANS |
| Q101C-B400 -LEVEL 2 -EQUIPMENT PLAN |
| F000-FIRE PROTECTION ABBREVIATIONS AND SYMBOLS |
| FD101-B400 -LEVEL 1 - FIRE PROTECTION DEMOLITION PLAN |
| FD102-B400 -LEVEL 2 - FIRE PROTECTION DEMOLITION PLAN |
| FD103-407-B407 -LEVEL 3 - FIRE PROTECTION DEMOLITION PLAN |
| FP101-B400 -LEVEL 1 - FIRE PROTECTION PLAN |
| FP102-B400 -LEVEL 2 - FIRE PROTECTION PLAN |
| FP103-407-B407 -LEVEL 3 - FIRE PROTECTION PLAN |
| P-000-PLUMBING ABBREVIATIONS AND SYMBOLS |
| PD100-B400 -FOUNDATION -PLUMBING DEMOLITION PLAN |
| PD101-B400 -LEVEL 1 -PLUMBING DEMOLITION PLAN |
| PD102-B400 -LEVEL 2 -PLUMBING DEMOLITION PLAN |
| PD201-B400 -LEVEL 1 -MED GAS DEMOLITION PLAN |
| P-100-B400 -FOUNDATION -PLUMBING PLAN |
| P-101-B400 -LEVEL 1 -PLUMBING PLAN |
| P-102-B400 -LEVEL 2 -PLUMBING PLAN |
| P103-407-B407 -LEVEL 3 -PLUMBING PLAN |
| P-201-B400 -LEVEL 1 -MED GAS PLAN |
| P-300-B400 -PLUMBING ENLARGED PLANS |
| P-301-B400 -PLUMBING ENLARGED PLANS |
| P-302-B400 -PLUMBING ENLARGED PLANS |
| P-303-B400 -PLUMBING ENLARGED PLANS |
| P-304-B400 -PLUMBING ENLARGED PLANS |
| P-305-B400 -PLUMBING ENLARGED PLANS |
| P-400-PLUMBING RISERS |
| P-401-PLUMBING RISERS |
| P-402-PLUMBING RISERS |
| P-403-PLUMBING RISERS |
| P-404-PLUMBING RISERS |
| P-500-PLUMBING DETAILS |
| P-700-PLUMBING SCHEDULES |
| M-000-MECHANICAL ABBREVIATIONS AND SYMBOLS |
| MD101-B400 -LEVEL 1 -HVAC DEMOLITION PLAN |
| MD101A-B400 -LEVEL 1 -HVAC DEMO PLAN -DEDUCT ALT. #4 |
| MD102-B400 -LEVEL 2 -HVAC DEMOLITION PLAN |
| MD103-407-B407 -LEVEL 3 -HVAC DEMOLITION PLAN |
| MD200-B400 -FOUNDATION -HVAC PIPING DEMOLITION PLAN |
| MD201-B400 -LEVEL 1 -HVAC PIPING DEMOLITION PLAN |
| MD202-B400 -LEVEL 2 -HVAC PIPING DEMOLITION PLAN |
| M-100-B400 -LEVEL 1 -HVAC TEMPORARY PLAN |
| M-101-B400 -LEVEL 1 - HVAC PLAN |
| M-101A-B400 -LEVEL 1 - HVAC PLAN -DEDUCT ALT. #4 |
| M-102-B400 -LEVEL 2 - HVAC PLAN |
| M-103-407-B407 -LEVEL 3 - HVAC PLAN |
| MP200-B400 -FOUNDATION -HVAC PIPING PLAN |
| MP201-B400 -LEVEL 1 -HVAC PIPING PLAN |
| MP202-B400 -LEVEL 2 -HVAC PIPING PLAN |
| MP203-407-B407 -LEVEL 3 -HVAC PIPING PLAN |
| M-400-ENLARGED MECHANICAL PLANS |
| M-401-ENLARGED MECHANICAL PLANS |
| M-402-ENLARGED MECHANICAL PLANS -DEDUCT ALT. #4 |
| M-500-MECHANICAL DETAILS |
| M-501-MECHANICAL DETAILS |
| M-502-MECHANICAL DETAILS |
| M-600-MECHANICAL SECTIONS |
| M-700-MECHANICAL SCHEDULES |
| M-800-MECHANICAL CONTROLS |
| M-801-MECHANICAL CONTROLS |
| M-802-MECHANICAL CONTROLS |
| E-000-ELECTRICAL ABBREVIATIONS AND SYMBOLS |
| ED101-B400 -LEVEL 1 - ELECTRICAL DEMOLITION PLAN |
| ED102-B400 -LEVEL 2 - ELECTRICAL DEMOLITION PLAN |
| ED103-407-B407 -LEVEL 3 - ELECTRICAL DEMOLITION PLAN |
| EL101-B400 -LEVEL 1 - LIGHTING PLAN |
| EL102-B400 -LEVEL 2 - LIGHTING PLAN |
| EL103-407-B407 -LEVEL 3 - LIGHTING PLAN |
| EL111-B400 -LEVEL 1 -LIGHTING CALCS |
| EL112-B400 -LEVEL 2 -LIGHTING CALCS |
| EL113-407-B407 -LEVEL 3 -LIGHTING CALCS |
| EP101-B400 -LEVEL 1 - POWER PLAN |
| EP102-B400 -LEVEL 2 - POWER PLAN |
| EP103-407-B407 -LEVEL 3 - POWER PLAN |
| EY101-B400 -LEVEL 1 - SPECIAL SYSTEMS PLAN |
| EY102-B400 -LEVEL 2 - SPECIAL SYSTEMS PLAN |
| EY103-407-B407 -LEVEL 3 - SPECIAL SYSTEMS PLAN |
| E-501-ELECTRICAL DETAILS |
| E-601-B400 ELECTRICAL DIAGRAMS |
| E-602-B400 ELECTRICAL DIAGRAMS |
| E-700-ELECTRICAL SCHEDULES |
| EF101-B400 -LEVEL 1 - FIRE ALARM DEMOLITION PLAN |
| EF102-B400 -LEVEL 2 - FIRE ALARM DEMOLITION PLAN |
| EF103-407-B407 -LEVEL 3 - FIRE ALARM DEMOLITION PLAN |
| EF201-B400 -LEVEL 1 - FIRE ALARM PLAN |
| EF202-B400 -LEVEL 2 - FIRE ALARM PLAN |
| EF203-407-B407 -LEVEL 3 - FIRE ALARM PLAN |