This solicitation is for a minor construction project to expand and renovate space in Building B400 at the Tomah VA Medical Center for urgent and primary care. The contractor will demolish existing structures, prepare the site, and perform construction work as outlined in the attached drawings and specifications. Key aspects of the project include expanding the urgent care area by 2,200 square feet, renovating 4,000 square feet of space for common areas, and refreshing 5,185 square feet for primary care teams. An additional 3,100 square feet will be renovated for specialty clinics, and 3,100 square feet of temporary administrative and swing space will be provided in Building 407. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOMAH VA
I-94
E. VETERANS ST.
T
H A
V E
FOLEY AVE.
FLINT RD.
N G
L E
N D
A L E
A V
E
MEDICAL CENTER COUNTY HIGHWAY ET
LAKE TOMAH
E. VETERANS ST.
E STREET
T
H S
T R
E E
T
T
H S
T R
E E
T
T
H S
T R
E E
T
PARKING
PARKING
N
G L E
N D
A L E
A V
E
PROJECT LOCATION /
AREAS OF WORK
COUNTY HIGHWAY ET
T
H S
T R
E E
T
G STREET
R
D S
T
R
D S
T R
E E
T
N
D S
T R
E E
T
CONTRACTORS
STAGING AREA
DATE: APPROVED:
DATE: APPROVED:
DATE: APPROVED:
DATE: APPROVED:
DATE: APPROVED:
DATE: APPROVED:
DATE: APPROVED:
DATE: APPROVED:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: 612-249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t C a re
A n d
R e n o v a te s t F lo o r
P a ti e n t C a re
/6
-3
.B
.A
.r v t
/1
/2
:5
:5
A
M
GI000
COVER SHEET
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
676-19-327
400 & 407
05/20/2021 M.PERKINS J.AMOS
ISSUED FOR
CONSTRUCTION
Expand and Renovate B400 for Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
ISSUED FOR CONSTRUCTION
05/20/2021
Contract No. 36C25219C0230 Solicitation No. 36C25219Q0616
676-19-327 Expand and Renovate B400 for Urgent and Primary Care 400 & 407
Tomah VA Medical Center
400 & 407
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
SECTION 01 00 00
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, Expand and Renovate B400 for Urgent and Primary Care: Work includes general construction, abatement, alterations, walks, grading, drainage, in phases to construct and renovate the Urgent Care Center, Swing Space, and Renovate Clinical Exam Spaces as necessary removal of existing structures and construction and certain other items.
1. Total project schedule of 730 days
2. A summary of the spaces affected by this project are as follows:
a. New addition is approximately 2,200 SF for Urgent Care expansion.
1) Construction on this addition shall take 300 calendar days.
b. Space #1 is approximately 4,000 SF of existing Urgent Care space in B400 level 1 that shall be renovated/refreshed for Urgent Care.
1) Construction on this renovation shall take 300 calendar days.
c. Space #2 is approximately 5,185 SF of existing Clinical space in B400 level 1 that shall be renovated/refreshed for Clinical Space.
1) Construction on this renovation shall take 300 calendar days.
d. Space #3 is approximately 1,800 SF of Common space in B400 level 1 to include but not limited to the relocation of the main corridor on the west side of the building to align it with the main corridor on the east side of the building to improve patient flow and way-finding issues.
1) Construction on this renovation shall take 150 calendar days.
e. Space #4 is approximately 2,864 SF of existing dental space in B400 level 2 that shall be renovated/refreshed for Specialty Care.
1) Construction on this renovation shall take 150 calendar days.
f. Space #5 is approximately 3,639 SF of existing Administrative space in B407 level 3 that shall be renovated/refreshed for Administrative space as needed for swing space or relocation.
1) Construction on this renovation shall take 150 calendar days.
B. Alternates:
1. Deduct Alternate #1: Remove B407 North Swing Space.
a. Remove 60 calendar days from schedule.
2. Deduct Alternate #2: Remove B407 South Swing Space, Bathroom refresh and IT closet infrastructure from project.
a. Remove 90 calendar days from schedule.
3. Deduct Alternate #3: Remove sealed bubble wall fountain in Waiting Room 1082 from project.
a. Remove 14 calendar days from schedule.
4. Deduct Alternate #4: Rebuild (E) AHU rather than install new one.
a. Remove 90 calendar days from schedule.
5. Deduct Alternate #5: Remove exterior entrance canopy at staff lounge 1102.
a. Remove 14 calendar days from schedule.
CO: Kristi Kluck Contracting Officer Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee, WI 53214 Email: kristi.kluck@va.gov
COR: Jason Erdman Contracting Officer's Representative Department of Veterans Affairs 500 E. Veterans Street Tomah, WI 54660 Phone: (608) 372-3971 x67752 Email: jason.erdman@va.gov
VICINITY MAP
LOCATION MAP (BLDG 400 & BLDG 407)
PROJECT REVIEW
DEDUCTIVE ALTERNATE:
1. Deduct Alternate #1: Remove B407 North Swing Space.
a. Remove 60 calendar days from schedule.
2. Deduct Alternate #2: Remove B407 South Swing Space, Bathroom refresh and IT closet infrastructure from project.
a. Remove 90 calendar days from schedule.
3. Deduct Alternate #3: Remove sealed bubble wall fountain in Waiting Room 1082 from project.
a. Remove 14 calendar days from schedule.
4. Deduct Alternate #4: Rebuild (E) AHU rather than install a new one.
a. Remove 90 calendar days from schedule.
5. Deduct Alternate #5: Remove exterior entrance canopy at staff lounge 1102.
a. Remove 14 calendar days from schedule.
SIGNATURE :
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
DATE 05/20/2021
THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY INSPECTIONS,
TESTING AND WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE
GENERAL CONTRACTOR). CONTRACTOR SHALL EMPLOY THIRD PARTY
INSPECTION CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY
THIS CONTRACT. THE VA HAS NO INSPECTION CAPABILITY. ANY
REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY INSPECTOR
QUALIFIED TO PERFORM THE WORK. CREDENTIALS SHALL BE SUPPLIED TO
THE VA/AE AS REQUIRED BY THIS CONTRACT. ALL INSPECTIONS, TESTING,
CERTIFICATIONS, AND PERMITS ARE TO BE PAID FOR BY THE GENERAL
CONTRACTOR. THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED
INSPECTIONS. VA INSPECTIONS ARE FOR VA USE ONLY, WHEN
PERFORMED, AND DO NOT REDUCE THE INSPECTION BURDEN ON THE
CONTRACTOR.
AS A MINOR PROJECT, THIS PROJECT MUST BE “STAND ALONE”. THAT IS, THE
PROJECT CANNOT DEPEND ON ANOTHER PROJECT OR OTHER FUNDING SOURCE TO
MAKE THE FINAL RESULT COMPLETE AND USABLE.
Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: 612-249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t C a re
A n d
R e n o v a te s t F lo o r
P a ti e n t C a re
/6
-3
.B
.A
.r v t
/1
/2
:5
:5
A
M
GI001
PROJECT SHEET INDEX
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
676-19-327
400/407
05/20/2021 M.PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
Expand and Renovate B400 for Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
- DRAWING INDEX -
SHEET NUMBER SHEET NAME
INCLUDED IN
35% SD
INCLUDED IN
65% DD
INCLUDED IN
95% CD
ISSUED FOR
CONSTRUCTION
M-501 MECHANICAL DETAILS Yes Yes Yes Yes
M-502 MECHANICAL DETAILS Yes Yes Yes Yes
M-600 MECHANICAL SECTIONS Yes Yes Yes Yes
M-700 MECHANICAL SCHEDULES Yes Yes Yes Yes
M-800 MECHANICAL CONTROLS Yes Yes Yes Yes
M-801 MECHANICAL CONTROLS Yes Yes Yes Yes
M-802 MECHANICAL CONTROLS Yes Yes Yes Yes
ELECTRICAL
E-000 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes
ED101 B400 - LEVEL 1 - ELECTRICAL DEMOLITION PLAN Yes Yes Yes Yes
ED102 B400 - LEVEL 2 - ELECTRICAL DEMOLITION PLAN Yes Yes Yes Yes
ED103-407 B407 - LEVEL 3 - ELECTRICAL DEMOLITION PLAN Yes Yes Yes Yes
EL101 B400 - LEVEL 1 - LIGHTING PLAN Yes Yes Yes Yes
EL102 B400 - LEVEL 2 - LIGHTING PLAN Yes Yes Yes Yes
EL103-407 B407 - LEVEL 3 - LIGHTING PLAN Yes Yes Yes Yes
EL111 B400 - LEVEL 1 - LIGHTING CALCS No Yes Yes Yes
EL112 B400 - LEVEL 2 - LIGHTING CALCS No Yes Yes Yes
EL113-407 B407 - LEVEL 3 - LIGHTING CALCS No Yes Yes Yes
EP101 B400 - LEVEL 1 - POWER PLAN Yes Yes Yes Yes
EP102 B400 - LEVEL 2 - POWER PLAN Yes Yes Yes Yes
EP103-407 B407 - LEVEL 3 - POWER PLAN Yes Yes Yes Yes
EY101 B400 - LEVEL 1 - SPECIAL SYSTEMS PLAN Yes Yes Yes Yes
EY102 B400 - LEVEL 2 - SPECIAL SYSTEMS PLAN Yes Yes Yes Yes
EY103-407 B407 - LEVEL 3 - SPECIAL SYSTEMS PLAN Yes Yes Yes Yes
E-501 ELECTRICAL DETAILS Yes Yes Yes Yes
E-601 B400 ELECTRICAL DIAGRAMS Yes Yes Yes Yes
E-602 B400 ELECTRICAL DIAGRAMS Yes Yes Yes Yes
E-700 ELECTRICAL SCHEDULES Yes Yes Yes Yes
FIRE ALARM
EF101 B400 - LEVEL 1 - FIRE ALARM DEMOLITION PLAN Yes Yes Yes Yes
EF102 B400 - LEVEL 2 - FIRE ALARM DEMOLITION PLAN Yes Yes Yes Yes
EF103-407 B407 - LEVEL 3 - FIRE ALARM DEMOLITION PLAN Yes Yes Yes Yes
EF201 B400 - LEVEL 1 - FIRE ALARM PLAN Yes Yes Yes Yes
EF202 B400 - LEVEL 2 - FIRE ALARM PLAN Yes Yes Yes Yes
EF203-407 B407 - LEVEL 3 - FIRE ALARM PLAN Yes Yes Yes Yes
Grand total: 195
- DRAWING INDEX -
SHEET NUMBER SHEET NAME
INCLUDED IN
35% SD
INCLUDED IN
65% DD
INCLUDED IN
95% CD
ISSUED FOR
CONSTRUCTION
AE721 PARTITION HEAD DETAILS Yes Yes Yes Yes
AE722 PARTITION FRAMING DETAILS Yes Yes Yes Yes
AE730 TYPICAL MOUNTING HEIGHTS Yes Yes Yes Yes
AG900 B400 RENDERINGS No Yes Yes Yes
AG901 B400 RENDERINGS Yes Yes Yes Yes
AG902 B400/ B407 RENDERINGS No Yes Yes Yes
SIGNAGE
AW001 SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES &
DETAILS
Yes Yes Yes Yes
AW101 B400 - LEVEL 1 - SIGNAGE PLAN Yes Yes Yes Yes
AW102 B400 - LEVEL 2 - SIGNAGE PLAN Yes Yes Yes Yes
AW103 B407 - LEVEL 3 - SIGNAGE PLAN - DEDUCT ALT #1 & #2 Yes Yes Yes Yes
INTERIORS
IN001 INTERIOR FINISH ABBREVIATIONS, SYMBOLS, GENERAL
NOTES & FINISH BOARDS
No Yes Yes Yes
IN101 B400 - LEVEL 1 - INTERIOR FINISH PLAN - OVERALL Yes Yes Yes Yes
IN101A B400 - LEVEL 1 - INTERIOR FINISH PLANS - AREA A & A1 Yes Yes Yes Yes
IN101B B400 - LEVEL 1 - INTERIOR FINISH PLANS - AREA B Yes Yes Yes Yes
IN102C B400 - LEVEL 2 - INTERIOR FINISH PLANS - AREA C Yes Yes Yes Yes
IN103D B407 - LEVEL 3 - INTERIOR FINISH PLANS - AREA A, B & C -
DEDUCT ALT #1& #2
Yes Yes Yes Yes
IN501 INTERIOR FINISH DETAILS Yes Yes Yes Yes
IN601 INTERIOR FINISH LEGEND AND SCHEDULES Yes Yes Yes Yes
FURNITURE
IF101AB B400 - LEVEL 1 - INTERIOR FURNITURE PLAN - FOR
REFERENCE ONLY
Yes Yes Yes Yes
IF102C B400 - LEVEL 2 - INTERIOR FURNITURE PLAN - FOR
REFERENE ONLY
Yes Yes Yes Yes
IF103D B407 - LEVEL 3 - INTERIOR FURNITURE PLAN - FOR
REFERENCE ONLY - DEDUCT ALT #1 & #2
Yes Yes Yes Yes
IF104 FURNITURE PLAN - FOR REFERENCE ONLY No Yes Yes Yes
IF105 FURNITURE PLAN - FOR REFERENCE ONLY No Yes Yes Yes
IF106 FURNITURE PLAN - FOR REFERENCE ONLY No Yes Yes Yes
EQUIPMENT
Q001 EQUIPMENT SCHEDULE No Yes Yes Yes
Q101AB B400 - LEVEL 1 - EQUIPMENT PLANS No Yes Yes Yes
Q101C B400 - LEVEL 2 - EQUIPMENT PLAN No Yes Yes Yes
FIRE PROTECTION
F000 FIRE PROTECTION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes
FD101 B400 - LEVEL 1 - FIRE PROTECTION DEMOLITION PLAN Yes Yes Yes Yes
FD102 B400 - LEVEL 2 - FIRE PROTECTION DEMOLITION PLAN Yes Yes Yes Yes
FD103-407 B407 - LEVEL 3 - FIRE PROTECTION DEMOLITION PLAN Yes Yes Yes Yes
FP101 B400 - LEVEL 1 - FIRE PROTECTION PLAN Yes Yes Yes Yes
FP102 B400 - LEVEL 2 - FIRE PROTECTION PLAN Yes Yes Yes Yes
FP103-407 B407 - LEVEL 3 - FIRE PROTECTION PLAN Yes Yes Yes Yes
PLUMBING
P-000 PLUMBING ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes
PD100 B400 - FOUNDATION - PLUMBING DEMOLITION PLAN Yes Yes Yes Yes
PD101 B400 - LEVEL 1 - PLUMBING DEMOLITION PLAN Yes Yes Yes Yes
PD102 B400 - LEVEL 2 - PLUMBING DEMOLITION PLAN Yes Yes Yes Yes
PD201 B400 - LEVEL 1 - MED GAS DEMOLITION PLAN Yes Yes Yes Yes
P-100 B400 - FOUNDATION - PLUMBING PLAN Yes Yes Yes Yes
P-101 B400 - LEVEL 1 - PLUMBING PLAN Yes Yes Yes Yes
P-102 B400 - LEVEL 2 - PLUMBING PLAN Yes Yes Yes Yes
P103-407 B407 - LEVEL 3 - PLUMBING PLAN Yes Yes Yes Yes
P-201 B400 - LEVEL 1 - MED GAS PLAN Yes Yes Yes Yes
P-300 B400 - PLUMBING ENLARGED PLANS Yes Yes Yes Yes
P-301 B400 - PLUMBING ENLARGED PLANS Yes Yes Yes Yes
P-302 B400 - PLUMBING ENLARGED PLANS Yes Yes Yes Yes
P-303 B400 - PLUMBING ENLARGED PLANS Yes Yes Yes Yes
P-304 B400 - PLUMBING ENLARGED PLANS Yes Yes Yes Yes
P-305 B400 - PLUMBING ENLARGED PLANS Yes Yes Yes Yes
P-400 PLUMBING RISERS Yes Yes Yes Yes
P-401 PLUMBING RISERS Yes Yes Yes Yes
P-402 PLUMBING RISERS Yes Yes Yes Yes
P-403 PLUMBING RISERS Yes Yes Yes Yes
P-404 PLUMBING RISERS Yes Yes Yes Yes
P-500 PLUMBING DETAILS Yes Yes Yes Yes
P-700 PLUMBING SCHEDULES Yes Yes Yes Yes
MECHANICAL
M-000 MECHANICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes
MD101 B400 - LEVEL 1 - HVAC DEMOLITION PLAN Yes Yes Yes Yes
MD101A B400 - LEVEL 1 - HVAC DEMOLITION PLAN - DEDUCT ALT. #4 No No No Yes
MD102 B400 - LEVEL 2 - HVAC DEMOLITION PLAN Yes Yes Yes Yes
MD103-407 B407 - LEVEL 3 - HVAC DEMOLITION PLAN Yes Yes Yes Yes
MD200 B400 - FOUNDATION - HVAC PIPING DEMOLITION PLAN Yes Yes Yes Yes
MD201 B400 - LEVEL 1 - HVAC PIPING DEMOLITION PLAN Yes Yes Yes Yes
MD202 B400 - LEVEL 2 - HVAC PIPING DEMOLITION PLAN Yes Yes Yes Yes
M-100 B400 - LEVEL 1 - HVAC TEMPORARY PLAN Yes Yes Yes Yes
M-101 B400 - LEVEL 1 - HVAC PLAN Yes Yes Yes Yes
M-101A B400 - LEVEL 1 - HVAC PLAN - DEDUCT ALT. #4 No No No Yes
M-102 B400 - LEVEL 2 - HVAC PLAN Yes Yes Yes Yes
M-103-407 B407 - LEVEL 3 - HVAC PLAN Yes Yes Yes Yes
MP200 B400 - FOUNDATION - HVAC PIPING PLAN Yes Yes Yes Yes
MP201 B400 - LEVEL 1 - HVAC PIPING PLAN Yes Yes Yes Yes
MP202 B400 - LEVEL 2 - HVAC PIPING PLAN Yes Yes Yes Yes
MP203-407 B407 - LEVEL 3 - HVAC PIPING PLAN Yes Yes Yes Yes
M-400 ENLARGED MECHANICAL PLANS Yes Yes Yes Yes
M-401 ENLARGED MECHANICAL PLANS Yes Yes Yes Yes
M-402 ENLARGED MECHANICAL PLANS - DEDUCT ALT. #4 No No No Yes
M-500 MECHANICAL DETAILS Yes Yes Yes Yes
- DRAWING INDEX -
SHEET NUMBER SHEET NAME
INCLUDED IN
35% SD
INCLUDED IN
65% DD
INCLUDED IN
95% CD
ISSUED FOR
CONSTRUCTION
GENERAL
GI000 COVER SHEET Yes Yes Yes Yes
GI001 PROJECT SHEET INDEX Yes Yes Yes Yes
GI050 GENERAL NOTES Yes Yes Yes Yes
GI101 B400 - LEVEL 1 - FIRE AND LIFE SAFETY PLAN & CODE DATA Yes Yes Yes Yes
GI102 B400 - LEVEL 2 - FIRE AND LIFE SAFETY PLAN & CODE DATA Yes Yes Yes Yes
GI104 B407 - LEVEL 3 - FIRE AND LIFE SAFETY PLAN & CODE DATA -
DEDUCT ALT #1 & #2
Yes Yes Yes Yes
GI201 INFECTION CONTROL PLAN & INTERIM LIFE No Yes Yes Yes
GC101 PROJECT PHASING Yes Yes Yes Yes
GC102 PHASING PLANS Yes Yes Yes Yes
HAZARDOUS
H101 B400 - LEVEL 1 - HAZARDOUS MATERIAL ABATEMENT No No No Yes
H102 B400 - LEVEL 2 - HAZARDOUS MATERIAL ABATEMENT No No No Yes
H103-407 B407 - LEVEL 3 - HAZARDOUS MATERIAL ABATEMENT No No No Yes
HC101 B400 - LEVEL 1 - HAZARDOUS MATERIAL ABATEMENT -
PIPING
No No No Yes
CIVIL
VF100 CONTROL POINT SITE PLAN Yes Yes Yes Yes
VF101 CIVIL SURVEY PLAN Yes Yes Yes Yes
CD101 CIVIL DEMOLITION PLAN Yes Yes Yes Yes
CS101 CIVIL SITE PLAN Yes Yes Yes Yes
CS102 CIVIL SITE PLAN STAGING AREA No No No Yes
CG101 CIVIL GRADING PLAN Yes Yes Yes Yes
CG501 CIVIL DETAIL SHEET 1 Yes Yes Yes Yes
CG502 CIVIL DETAIL SHEET 2 No No No Yes
CU101 CIVIL UTILITY PLAN Yes Yes Yes Yes
STRUCTURAL
SJ001 GENERAL STRUCTURAL NOTES Yes Yes Yes Yes
SJ002 GENERAL STRUCTURAL NOTES CONTINUED Yes Yes Yes Yes
SJ003 SPECIAL INSPECTIONS Yes Yes Yes Yes
SB100 B400 - LEVEL 1 - FOUNDATION PLAN - OVERALL Yes Yes Yes Yes
SB101 B400 - LEVEL 1 - FOUNDATION PLAN - AREA A Yes Yes Yes Yes
SF102 B400 - LEVEL 2 - FRAMING PLAN - OVERALL Yes Yes Yes Yes
SF103 B400 - LEVEL 2 - ROOF FRAMING PLAN - AREA A Yes Yes Yes Yes
SF201 FRAMING ELEVATIONS Yes Yes Yes Yes
SF202 FRAMING ELEVATIONS No No Yes Yes
SF203 FRAMING ELEVATIONS No No No Yes
SF501 TYPICAL DETAILS Yes Yes Yes Yes
SF502 TYPICAL DETAILS Yes Yes Yes Yes
SF503 TYPICAL DETAILS Yes Yes Yes Yes
SF504 TYPICAL DETAILS Yes Yes Yes Yes
SF505 TYPICAL DETAILS No Yes Yes Yes
SB510 FOUNDATION DETAILS Yes Yes Yes Yes
SF520 FRAMING DETAILS Yes Yes Yes Yes
SF521 FRAMING DETAILS No No No Yes
SF530 COLD-FORMED STEEL FRAMING No No No Yes
SF601 GRAPHICAL COLUMN SCHEDULE No Yes Yes Yes
ARCHITECTURAL
AE000 SYMBOLS, & GENERAL NOTES Yes Yes Yes Yes
AS101 ARCHITECTURAL SITE PLAN Yes Yes Yes Yes
AG100 FLOOR PLAN - LEVEL 1, URGENT CARE CENTER PROGRAM
PLAN
No Yes Yes Yes
AG103 FLOOR PLAN - LEVEL 1, CLINICAL SPACE PROGRAM PLAN No Yes Yes Yes
AG200 FLOOR PLAN - LEVEL 2, SPECIALTY CARE PROGRAM PLAN No Yes Yes Yes
AG201A FLOOR PLAN - LEVEL 3 - SWING SPACE LAYOUT B407-
DEDUCT ALT #1 & #2
No Yes Yes Yes
AD101 B400 - LEVEL 1 - DEMOLITION PLAN Yes Yes Yes Yes
AD102 B400 - LEVEL 2 - DEMOLITION PLAN Yes Yes Yes Yes
AD103-407 B407 - LEVEL 3 - DEMOLITION PLAN - DEDUCT ALT #1 & #2 Yes Yes Yes Yes
AD121 B400 - LEVEL 1 - DEMOLITION RCP Yes Yes Yes Yes
AD122 B400 - LEVEL 2 - DEMOLITION RCP Yes Yes Yes Yes
AD123-407 B407 - LEVEL 3 - DEMOLITION RCP - DEDUCT ALT #1 & #2 Yes Yes Yes Yes
AE101 B400 - LEVEL 1 - FLOOR PLAN - OVERALL Yes Yes Yes Yes
AE102 B400 - LEVEL 2 - FLOOR PLAN - OVERALL Yes Yes Yes Yes
AE103-407 B407 - LEVEL 3 - FLOOR PLAN - DEDUCT ALT #1& #2 Yes Yes Yes Yes
AE104 B400 - ROOF PLAN - OVERALL Yes Yes Yes Yes
AC101 B400 - LEVEL 1 - REFLECTED CEILING PLAN Yes Yes Yes Yes
AC102 B400 - LEVEL 2 - REFLECTED CEILING PLAN Yes Yes Yes Yes
AC103-407 B407 - LEVEL 3 - REFLECTED CEILING PLAN - DEDUCT ALT #1
& #2
Yes Yes Yes Yes
AE201 B400 EXTERIOR ELEVATIONS Yes Yes Yes Yes
AE201-407 B407 EXTERIOR ELEVATIONS - DEDUCT ALT #1 & #2 Yes Yes Yes Yes
AE202 B400 EXTERIOR ELEVATIONS Yes Yes Yes Yes
AE301 BUILDING SECTIONS Yes Yes Yes Yes
AE320 WALL SECTIONS Yes Yes Yes Yes
AE321 WALL SECTIONS Yes Yes Yes Yes
AE322 WALL SECTIONS No No Yes Yes
AE401 B400 - LEVEL 1 - ENLARGED FLOOR PLANS Yes Yes Yes Yes
AE401A B400 - LEVEL 1 - ENLARGED FLOOR PLANS Yes Yes Yes Yes
AE401B B400 - LEVEL 1 - ENLARGED FLOOR PLANS Yes Yes Yes Yes
AE401C B400 - LEVEL 1 - ENLARGED FLOOR PLANS Yes Yes Yes Yes
AE401D B400 - LEVEL 1 - ENLARGED FLOOR PLANS No Yes Yes Yes
AE402 B400 - LEVEL 2 - ENLARGED FLOOR PLANS Yes Yes Yes Yes
AE500 EXTERIOR WALL AND ROOF ASSEMBLIES Yes Yes Yes Yes
AE520 EXTERIOR SECTION DETAILS Yes Yes Yes Yes
AE521 EXTERIOR SECTION DETAILS No No Yes Yes
AE551 DETAILS - INTERIOR Yes Yes Yes Yes
AE552 DETAILS - INTERIOR No No Yes Yes
AE560 DOOR DETAILS No Yes Yes Yes
AE561 DOOR AND LOUVER DETAILS No No Yes Yes
AE601 DOOR WINDOW & LOUVER SCHEDULES Yes Yes Yes Yes
AE710 ARCHITECTURAL DOOR, WINDOW & FRAME TYPES No Yes Yes Yes
AE720 STANDARD PARTITION TYPES Yes Yes Yes Yes
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: 612-249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t C a re
A n d
R e n o v a te s t F lo o r
P a ti e n t C a re
/6
-3
.B
.A
.r v t
/1
/2
:5
:5
A
M
GI050
GENERAL NOTES
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
676-19-327
400/407
05/20/2021 M.PERKINS J.AMOS
ISSUED FOR
CONSTRUCTION
Expand and Renovate B400 for Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR
THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL
AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING
SPECIFICATION MANUAL FOR NEW WORK AND THE MPI
MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR
REPAINTING WORK.
2. PAINTING WORK: INCLUDES TAPING, SURFACE
PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD
PAINTING AND FINISHING AS REQUIRED BY STANDARD
PRACTICE, MANUFACTURER OR SPECIFICATION. REQUIRED
COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP
PRIMING, SURFACE TREATMENT AND FINISHING. THE WORK
ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF
OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS
MAY REQUIRE OTHER TYPES OF PAINTING, INCLUDING, BUT
NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND
FACTORY PRIMING.
3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED
OTHERWISE, CONTRACTOR IS TO FIELD PAINT INTERIOR
AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES,
WHETHER OR NOT PREVIOUSLY PAINTED, AND ALL NEW
ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED
TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL
AND EXPOSED PIPING AND FITTINGS (INCLUDING IRON AND
PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE
SHALL BE SEALED, UNLESS NOTED OTHERWISE OR NOT
RECOMMENDED BY MANUFACTURER. PAINTING SCOPE
ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS,
SPECIFICATIONS AND PAINTING GENERAL NOTES. THESE
SOURCES ARE COMPLEMENTARY, NOT MUTUALLY
EXCLUSIVE.
4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD
PAINTING OF INTERIOR AND EXTERIOR EXPOSED PIPES,
DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND
PRIMED METAL SURFACES OF EQUIPMENT IN EXPOSED
AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL
WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF
ELECTRICAL AND MECHANICAL WORK IN ELECTRICAL AND
MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED
OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF
PIPING FOR MECHANICAL AND PLUMBING WORK IS
COVERED IN THE MECHANICAL OR PLUMBING
SPECIFICATIONS.
5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT
AN EDGE, CORNER, CHANGE OF MATERIALS OR CHANGE
OF PAINT COLOR. COMPLETED PAINTING SHALL NOT
IMPEDE THE INTENDED OPERATION OF ANY ITEM, SUCH AS
WINDOWS, DRAWERS, HINGES, DOORS, ETC.
6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE
REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND
COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA
ON ONE SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF
TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE
ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING
EDGES OR CORNERS.
7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT
PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR
INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE
INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC
MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND
EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL
EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS,
LIGHTING FIXTURES, SWITCHGEAR, MOTORS,
DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR
SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO
PAINT AN ITEM OR SURFACE, FOLLOW PROCEDURES
LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION
(RFI).
8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE
INDICATED, DO NOT PAINT METAL SURFACES OF ANODIZED
ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE,
COPPER, BRASS, BRONZE AND SIMILAR FINISHED
MATERIALS.
9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED,
DO NOT PAINT SURFACES SUCH AS WALLS AND CEILINGS
IN CONCEALED AND GENERALLY INACCESSIBLE AREAS,
INCLUDING FURRED AREAS, UTILITY TUNNELS, PIPE
SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL
CONCRETE IN PIPE SPACE.
10. OPERATING PARTS AND SENSING DEVICES: UNLESS
OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF
OPERATING UNITS SUCH AS VALVES, DAMPER
OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT
SENSING OR EMITTING DEVICES THAT MIGHT NOT
FUNCTION PROPERLY IF PAINTED.
11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-
REQUIRED LABELS.
12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT
COMPLETION OF WORK. NO EPOXY PAINT.
13. ALL INTERIOR SURFACES, WALLS, FRAMES, ETC.,
REQUIRED TO HAVE NEW FINISHES APPLIED, SHALL HAVE
ALL EXISTING AND CONTRACTOR CAUSED HOLES, CRACKS,
AND OTHER IMPERFECTIONS FILLED WITH APPROVED
PATCHING MATERIAL. PATCH TO BE FINISHED FLUSH WITH
ADJACENT SURFACE, WITH TEXTURE TO MATCH TEXTURE
OF ADJACENT SURFACE. SEE SPECIFICATIONS FOR
PATCHING REQUIREMENTS.
14. PAINT EXPOSED TOP EDGE OF ALL TERRAZZO FLOOR BASE
TO MATCH WALL PAINT. CLEAN TERRAZZO FACE OF ANY
OLD PAINT.
15. PAINT EXISTING MECHANICAL HEATING UNIT COVER AND
ACCESSORIES, INCLUDING ALL SUPPORT BRACKETS.
PAINT THE HEATING WATER PIPING THAT IS EXPOSED TO
VIEW BELOW THE UNIT. PAINT ALL WALL SURFACES THAT
ARE VISIBLE BEHIND HEATING UNIT WHEN COVER IS IN
PLACE.
16. THE CONTRACTOR SHALL FIELD VERIFY EXISTING PAINT
MATERIALS AND FINISHES. APPLY THE APPROPRIATE
SEPARATION COAT (PRIMER/BONDING COAT) BETWEEN ALL
NON-COMPATIBLE COATINGS (I.E. WHERE NEW WATER-
BORNE ACRYLIC IS TO BE INSTALLED OVER EXISTING OIL
BASE PAINT).
GENERAL PAINTING NOTES:
1. THE PRIMARY OBJECT OF APPLYING SEALANT IS TO
FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR
BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR
WET\DAMP LOCATIONS. PROPER PRIMING MUST BE USED
WITH SEALANTS.
2. THE PRIMARY OBJECT OF APPLYING CAULKING IS TO
ENHANCE APPEARANCE AND FINISH AT INTERIOR
APPLICATIONS AND IN SOME SITUATIONS TO REDUCE
AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE
EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER
PENETRATIONS (FIRE CAULKING) AND TO DECREASE
SOUND TRANSMISSION THROUGH WALLS AND CEILINGS.
OTHER USES MAY BE NOTED IN THE SPECIFICATIONS
AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS
ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING
SHOULD BE USED, FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED)
SHALL BE USED AT HORIZONTAL AND VERTICAL CONCRETE
JOINTS AND AS NOTED.
4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION
JOINT MATERIAL, AS REQUIRED, SHALL BE USED AT
MASONRY AND CONCRETE CONTROL JOINTS.
5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF
SEALANT BETWEEN PERIMETER SOLE PLATES AND
FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR
THRESHOLDS IN SEALANT UNLESS NOTED OTHERWISE.
6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND BOTH SIDES OF DOOR FRAMES.
7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND INTERIOR WALL MOUNTED EQUIPMENT FRAMES
AND EXPOSED SUPPORTS.
8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS
BETWEEN DIFFERENT WALL MATERIALS (TILE TO BRICK,
CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL
TO P-LAM, ETC).
9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL
GAPS OR 1/16TH INCH OR MORE.
10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS
THROUGH, FLOORS AND WALLS.
11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND
CEILING PIPE PENETRATIONS. WHERE ESCUTCHEONS ARE
SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A
BED OF SEALANT.
12. USE SPECIFIED CAULK OR SEALANT AROUND
PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH
AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE
ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS,
LIGHTING, VENTS, ETC.
GENERAL SEALANT / CAULKING
NOTES:
PHASE 1:
PHASING NOTES:
1. BUILDING 407: SWING SPACE THIRD FLOOR (DEDUCT #1 & #2)
2. BUILDING 400: NEW URGENT CARE ADDITION.
3. BUILDING 400: RENOVATE SECOND FLOOR NORTHWEST
WING.
4. END OF PHASE 1.
PHASE 2:
1. COORDINATE WITH COR ALL SHUT DOWNS PER SECTION 01
00 00. ALLOW THREE WEEKS FOR THE VA TO MOVE BETWEEN
PHASES.
AT ALL TIMES MAINTAIN VEHICLE ACCESS, ESPECIALLY FOR
AMBULANCE ACCESS TO AND FROM AMBULANCE ENTRANCE,
AND MAIN DROP OFF AREA.
1. BUILDING 400: RENOVATE WEST WING OF FIRST FLOOR.
2. BUILDING 400: RENOVATE COMMON SPACE.
3. END OF PHASE 2.
AT ALL TIMES MAINTAIN VEHICLE ACCESS, ESPECIALLY FOR
AMBULANCE ACCESS TO AND FROM AMBULANCE ENTRANCE,
AND MAIN DROP OFF AREA.
• ALLOW 21 DAYS BETWEEN PHASES FOR THE VA TO MOVE.
• PERFORM ALL WORK WITHIN PHASE 1 PRIOR TO THE
RELEASE OF PHASE 2.
PRECONSTRUCTION PHASE:
PROJECT SUBMITTALS
PHASING NOTES:
• ALLOW 21 DAYS BETWEEN PHASES FOR THE VA TO MOVE.
• PERFORM ALL WORK WITHIN PHASE 2 PRIOR TO THE
RELEASE OF PHASE 3.
PHASE 3:
AT ALL TIMES MAINTAIN VEHICLE ACCESS, ESPECIALLY FOR
AMBULANCE ACCESS TO AND FROM AMBULANCE ENTRANCE,
AND MAIN DROP OFF AREA.
1. BUILDING 400: RENOVATE EXISTING URGENT CARE SPACE.
2. END OF PHASE 3 AND CONSTRUCTION.
• ALLOW 21 DAYS BETWEEN PHASES FOR THE VA TO MOVE.
WARRANTY PHASE:
1. 4-MONTH WARRANTY WALK THROUGH
2. 9-MONTH WARRANTY WALK THROUGH
PROJECT COMPLETE
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND
REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK
MUST BE INSPECTED AND APPROVED BY LOCAL
AUTHORITIES.
3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE
VERIFIED BY THE CONTRACTOR(S) PRIOR TO FABRICATION
AND CONSTRUCTION. IF INCONSISTENCIES,
CONTRADICTIONS OR OMISSIONS ARE DISCOVERED
FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI).
4. GENERAL CONTRACTOR SHALL COORDINATE ALL
MECHANICAL AND ELECTRICAL DUCT SIZES AND
LOCATIONS.
5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT
THE USE OF A KEY OR SPECIAL KNOWLEDGE.
6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE
INSTALLED LEVEL WITH EACH OTHER AND PLUMB.
7. THE WORK INDICATED IN THE NOTES DESCRIBES THE
GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED
TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE
FULL SCOPE OF WORK.
8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE
FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS
REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
9. FIELD VERIFICATION: BEFORE BIDDING AND DURING
CONSTRUCTION, CONTRACTOR SHALL VERIFY THAT
ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE
CONTRACT DOCUMENTS. REPORT DISCREPANCIES TO
ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING
WORK RELATED TO ANY DISCREPANCIES. SEE
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES,
SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT
BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION
PRIOR TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO
HAVE ELECTED THE MORE COSTLY TIME, METHOD,
SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.
11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS
AS "NIC" IS NOT IN THE CONTRACT. HOWEVER, THE
CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK
INDICATED AS NIC.
12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS
WITH COR, INCLUDING STAGING AREAS, MATERIAL
STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY
OPERATIONS, INTERRUPTION OF UTILITIES. SEE
SPECIFICATIONS.
13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE
THE PLACEMENT OF EACH TRADE'S WORK SO THAT THERE
ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR
FUNCTION IS IMPAIRED. IT IS ESPECIALLY IMPORTANT TO
COORDINATE PENETRATIONS THROUGH FOUNDATIONS,
FLOORS, WALLS AND CEILING SPACES. SEE
SPECIFICATIONS.
14. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN
DISSIMILAR METALS. SEE SPECIFICATIONS.
15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY
SHALL BE FIRE TREATED. SEE SPECIFICATIONS. ALL
SURFACE ATTACHED METAL SHALL BE SEPARATED FROM
CONCRETE OR MASONRY BY NON-METALLIC MATERIAL
SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL
AS APPROVED BY ARCHITECT AND COR.
16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL
EQUIPMENT, FIXTURES, DEVICES, MECHANICAL, PLUMBING
OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR,
MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL
ELEVATION COORDINATION.
17. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK
PERMITS TO BE COORDINATED WITH COR. SUBMIT
CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
GENERAL NOTES: GENERAL FIRE & LIFE SAFETY
NOTES:
FIRE ALARM
1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN
ACCORDANCE WITH CLASS "a" PROTECTION OF NFPA 101
LIFE SAFETY CODE.
2. SUBMIT PER SECTION 01 33 23 SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES; AND SECTION 28 31 00 FIRE
DETECTION AND ALARM FOR APPROVAL PRIOR TO THE
INSTALLATION.
3. THE TOMAH VAMC HAS A FULL SERVICE MAINTENANCE
CONTRACT FOR MAINTENANCE AND TESTING OF THE FIRE
ALARM SYSTEM. IN ACCORDANCE WITH THIS CONTRACT
THE FIRE ALARM MAINTENANCE CONTRACTOR
(CURRENTLY FIRE SENTRY) MUST CERTIFY ALL
PROGRAMMING DONE TO THE FIRE ALARM SYSTEM.
UNDER THIS CONTRACT, THE CONSTRUCTION
CONTRACTOR MUST EITHER HIRE THE CURRENT FIRE
ALARM MAINTENANCE CONTRACTOR TO PERFORM ALL
FIRE ALARM PROGRAMMING WORK OR IF THE
PROGRAMMING IS COMPLETED BY ANOTHER FIRE ALARM
CONTRACTOR, THE CONSTRUCTION CONTRACTOR MUST
HIRE THE CURRENT FIRE ALARM MAINTENANCE
CONTRACTOR TO FULLY INSPECT, TEST, AND CERTIFY THE
PROGRAMMING WORK DONE BY ANOTHER CONTRACTOR.
4. WHENEVER FIRE ALARM WORK TAKES PLACE IN AN AREA
THAT IS BEING REMODELED, AT THE CONCLUSION OF THE
WORK, THE FIRE ALARM CONTRACTOR IS TO TEST ALL
FIRE ALARM DEVICES WITHIN THE AREA OF THE REMODEL
AREA WHETHER OR NOT THEY WERE MODIFIED AS PART
OF THE PROJECT.
FIRE EXTINGUISHERS
1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE
WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND
SHALL MAINTAIN THEM DURING THE COURSE OF
CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb.
CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C
FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND
SHALL BE DRY CHEMICAL TYPE.
EXIT & EMERGENCY LIGHTING
1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING
TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT
REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR
INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY;
CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A
SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE
WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY
LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE
POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE
DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2"
BELOW THE THRESHOLD.
2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH
THE LOCAL AND CURRENT NEC GUIDELINES.
FIRE SPRINKLER SYSTEM
1. EXISTING FIRE SPRIKLER MAIN PIPES AND BRANCH LINES
TO BE RETAINED AND REUSED. CONTRACTOR TO VERIFY
THE EXACT SIZE AND LOCATION IN FIELD.
2. ALL NEW SPRINKLER HEADS, HANGERS AND RESTRAINTS
TO BE INSTALLED IN ACCORDANCE WITH 2019 NFPA 13.
3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD
PIPED, NO FLEXIBLE CONNECTIONS ARE PERMISSIBLE.
4. WHENEVER EXISTING FIRE SPRINKLER PIPING IS
REMOVED, THE FIRE SPRINKLER CONTRACTOR IS TO
ANALYZE THE PIPING FOR OBSTRUCTIONS AND PROVIDE
WRITTEN OBSTRUCTION DOCUMENTATION IN
ACCORDANCE WITH NFPA REQUIREMENTS TO THE VA.
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE
STOPPING.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE
OR FLAME-PROOFED IN AN APPROVED MANNER.
2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS
LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF
NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF
NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE
INSTALLATION, INCLUDING INSULATION, FACING
MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.
3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-
CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS
SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25
AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED
IN ACCORDANCE WITH ASTM E 84.
4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE
CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR.
LATCHING AND LOCKING DOORS THAT ARE HAND-
ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL
BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE
HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT
REQUIRING THE ABILITY TO GRASP THE OPENING
HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS
ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT
FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM
AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE
AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE
LATCH, MEASURED FROM THE LEADING EDGE OF THE
DOOR.
5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT
EXCEED:
A. INTERIOR DOORS - 5 lbs.
B. EXTERIOR DOORS - 8.5 lbs.
C. FIRE DOORS - 15 lbs.
6. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR
PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A
UL APPROVED METHOD AND MATERIAL.
FIRE & SMOKE DAMPERS
1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED
AND REUSED.
2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM.
THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER AND
FIRE ALARM SYSTEM.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO
COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES
AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE COR
FOR ADDITIONAL INFORMATION. IF DIMENSIONAL
INFORMATION IS REQUIRED & NOT FOUND, FOLLOW
PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR
INFORMATION (RFI). IF DISCREPANCIES ARE DISCOVERED
AFTER THE BID FOLLOW PROCEDURES LISTED IN SECTION
01 26 13 REQUESTS FOR INFORMATION (RFI) PRIOR TO
CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL
AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED
BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND
SHOP DRAWINGS CONTRACTOR SHALL VERIFY
DIMENSIONS AND RECOMMEND DIMENSIONAL
MODIFICATIONS AS REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR
PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS,
SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR
ELEVATIONS AND EXTERIOR ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON
STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.
MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES
MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED
TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X
4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT
NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT
ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT
BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE.
(FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE
SHOWN IN THE 16THS OF AN INCH, BUT STANDARD
MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
6. FLOOR PLAN DIMENSIONS
A. THE LOWEST FLOOR OVERALL BUILDING
DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE
FOUNDATION WALL TO THE OPPOSITE OUTSIDE
FACE OF THE FOUNDATION WALL (OR, FROM
OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS
SHOWN.
B. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE
TO ONE FACE OF FINISH, BOTH FACES OF
MASONRY WALLS, OR BOTH FACES OF CONCRETE
WALLS, ETC, UNLESS NOTED OTHERWISE.
C. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL
(UNLESS NOTED AS "NOM").
D. DOOR OPENING DIMENSIONS IN FRAME
CONSTRUCTION (WOOD OR STEEL STUDS) ARE
TYPICALLY SHOWN AT THEIR CENTERLINES.
HOWEVER, WHEN THE EDGE OF THE DOOR IS
IMPORTANT, OR MAKES THE PLACEMENT CLEARER,
THE DIMENSION MAY BE TO THE ACTUAL FRAME
EDGE.
E. DOOR DIMENSIONS IN LOAD-BEARING MASONRY
AND CONCRETE WALLS ARE TO "ROUGH"
OPENINGS (FACES OF MASONRY OR CONCRETE).
TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE
THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE
EACH SIDE) AND PLUS 1/2" TOTAL FOR THE
HEAD/SILL DIMENSIONS.
F. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS
TO ADJACENT WALLS: BETWEEN FRAME FACES
AND FACES OF STUDS, OR FACES OF MASONRY OR
CONCRETE, AT NEARBY PERPENDICULAR WALLS
ARE TYPICALLY 4", DEPENDING ON HARDWARE
CLEARANCES AND FRAME REQUIREMENTS (2.5"-
DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=
4.0")
G. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH
AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR
PREFABRICATED STAIR ENCLOSURES, ARE NOTED
"CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES
OF FINISHES.
H. DIMENSIONS DESIGNATED WITH "MIN" INDICATE
THE MINIMUM CLEARANCE OR SEPARATION
REQUIRED.
7. ROOF PLAN DIMENSIONS
A. UN-DIMENSIONED LOCATIONS OF ROOFTOP
EQUIPMENT AND CONSTRUCTION OFTEN MAY BE
DETERMINED BY THE FLOOR PLAN BELOW, SUCH
AS ROOF HATCH DETERMINED BY REFERENCE TO A
FIXED WALL AND LADDER, OR MECHANICAL
EQUIPMENT DETERMINED BY DUCT PENETRATIONS
BETWEEN JOISTS.
B. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT
RAILS, HVAC EQUIPMENT, SCREEN WALLS,
ANTENNAS, WALK PADS, LADDERS, SCUPPER
LOCATIONS, ETC., MAY BE LOCATED FROM
MECHANICAL AND ELECTRICAL DRAWINGS OR
LOCATED BY SCALING. CONFIRM ALL ROOF ITEM
DIMENSIONS WITH THE ARCHITECT AND COR PRIOR
TO CONSTRUCTION.
8. VERTICAL DIMENSIONS
A. UNLESS NOTED OTHERWISE, THE FIRST FLOOR
REFERENCE ELEVATION IS 100'-0". THIS IS
REFERENCED TO A GROUND ELEVATION ABOVE
MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR
STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0"
ARE "-" (PREFIXED WITH A MINUS SIGN).
B. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON
ARCHITECTURAL DRAWINGS ARE TO TOP OF
DECKING OR SHEATING, BUT DO NOT INCLUDE
FINISHES OR ROOFING MATERIAL.
C. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE
TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD-
BEARING MASONRY OR CONCRETE WALLS, WHERE
THEY ARE TO ROUGH OPENINGS). HEIGHT
REFERENCES SHOULD BE TO THE NEXT LOWER
FINISH FLOOR ELEVATION
D. LIGHTING HEIGHTS ON WALLS ARE TO
CENTERLINES OF THE ELECTRICAL BOXES, UNO.
EQUIPMENT, VENT, PLUMBING AND FIXTURE
ELEVATIONS ARE TO CENTERLINES OF THE WALL
PENETRATIONS, UNO.
E. SOME VERTICAL DIMENSIONS ARE SHOWN ON
PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND
ELEVATION CHANGES. A PLAN ELEVATION CHANGE
SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND
INDICATES THE + OR - ELEVATION CHANGE IN
INCHES FROM THE FINISHED FLOOR ELEVATION
(FFE) NEXT TO IT.
GENERAL DIMENSIONING
NOTES:
1. HALF-TONED OR LIGHT LINES INDICATE EXISTING
CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE
EXTENT OF DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY,
AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES
TO MEET APPROVAL OF CODE AGENCIES. COORDINATE
DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR
SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE
COR RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS
FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING
THE PRE-CONSTRUCTION WALK THROUGH.
4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS,
VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR
CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO
MAINTAIN THE INTEGRITY OF THE WALL, FLOOR, AND/OR
ROOF ASSEMBLY.
5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-
WAY OF THE PROJECT SITE WILL BE IMPACTED BY
CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES
PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE
INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND
DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE
WITH THE LATEST OSHA REQUIREMENTS. COORDINATE
CONTRACTOR STAGING AREA AND PUBLIC ACCESS WITH
COR PRIOR TO CONSTRUCTION. PROTECT SIGNAGE WITHIN
PROJECT AREA.
6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND
DEMOLITION FOR RELATED DEMOLITION WORK.
7. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED
UTILITY & DEMOLITION WORK AND PROJECT PHASING
NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH
COR.
GENERAL DEMOLITION AND
PHASING NOTES:
F
A
F
LIFE SAFETY SYMBOLS
XX PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (EEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
50'-0" AGGREGATE DISTANCE
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
APPLICABLE BUILDING CODES
• 2018 NFPA 101 LIFE SAFETY CODE & 2016 NFPA 72
NATIONAL FIRE ALARM AND SIGNALING CODE & 2016 NFPA
13 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS.
EXCEPTION OF NFPA 5000 AND NFPA 900
• 2018 INTERNATIONAL MECHANICAL CODE (IMC)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2017 NATIONAL ELECTRICAL CODE (NEC)
• 2018 INTERNATIONAL PLUMBING CODE (IPC)
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT,
BARRIER FREE DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND
RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF
STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00
00 AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2016; MEDICAL SPACES - ASHRAE
170-2013, NON-MEDICAL SPACES - ASHRAE 62.1-2016
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS –
ASHRAE STANDARD 15–2013
• 2018 INTERNATIONAL BUILDING CODE (IBC) WHERE
DIRECTED BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF
APPLICABLE STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
• VA FIRE PROTECTION DESIGN GUIDE, 7TH EDITION (2015)
BUILDING CODE: BUILDING 400
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: RECONSTRUCTION, CHAPTER
43.
ON FILE EQUIVALENCIES:
• 5/1997 - FLOOR CONSTRUCTION NOT MEETING 2 HOUR REQ.
• 1996 - DEAD END CORRIDORS.
• YYYY - PATIENT ROOMS IN EXCESS OF 1,000 SQ FT WITH 1 EXIT.
• 9/10/1991 - DOOR FRAMES AT VERTICAL OPENINGS AND
HAZARDOUS ROOMS NOT RATED ASSEMBLIES.
• 4/21/95 - PROTECTIVE PLATES.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS: (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS: 1/2 HOUR
SOILED UTILITY ROOMS: 1 HOUR
VERTICAL SHAFTS / STAIRS: 2 HOURS
MEDICAL GAS / HAZARDOUS
STORAGE: 1 HOURS
CLASSIFICATION OF OCCUPANCY:
NEW: BUSINESS Occupancy per Chapter 38.
EXISTING: BUSINESS Occupancy per Chapter 39
43.2.2.1.4 RECONSTRUCTION: THE RECONFIGURATION OF A SPACE
THAT AFFECTS AN EXIT OR A CORRIDOR SHARED BY MORE THAN
ONE OCCUPANT SPACE; OR THE RECONFIGURATION OF A SPACE
SUCH THAT THE REHABILITATION WORK AREA IS NOT PERMITTED
TO BE OCCUPIED BECAUSE EXISTING MEANS OF EGRESS AND
FIRE PROTECTION SYSTEMS OR THEIR EQUIVALENT, ARE NOT IN
PLACE OR CONTINUOUSLY MAINTAINED.
MIXED BUILDING OCCUPANCY TYPE:
PRIMARY - BUSINESS (FLRS 1-3) HEALTH CARE (FLRS 4)
SECONDARY - INDUSTRIAL, or STORAGE USE
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) BUSINESS, INDUSTRIAL, or STORAGE USE
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
38/39.2.6.2.1 The travel distance between any point in a room and an exit shall not exceed 200 ft.
38/39.2.6.2.2 The maximum travel distance...shall be permitted to be increased by 100 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
BUSINESS OCCUPANCY; PROTECTED = 300'-0"
OCCUPANT LOAD:
38/39.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
CALCULATED OCCUPANT LOADS
PROJECT AREA = 287 TOTAL OCCUPANTS
ADJACENT AREA = 185 TOTAL OCCUPANTS
MEANS OF EGRESS:
38/39.2.3 Capacity of Means of Egress.
38/39.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
38/39.2.3.2 The clear width of any corridor or passageway required for exit access shall not be less than 44 in. (1120 mm).
38/39.2.4 Number of Means of Egress.
38/39.2.4.3 Not Less than two exits of the types described in 18.2.2 shall be accessible from each smoke compartment.
38/39.2.4.4 Egress from smoke compartments addressed in 18.2.4.3 shall be permitted through adjacent compartments provided that the two required egress paths are arranged so that both do not pass through the same adjacent smoke compartment.
PROTECTION OF VERTICAL OPENINGS:
38/39.3.1 Protection of Vertical Openings.
38/39.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
38/39.3.2 Protection from Hazards.
38/39.3.2.1 Hazardous Areas 38/39.3.2.1.1 Any hazardous areas shall be protected in accordance with Section 8.7, and the areas addressed in 38/39.3.2.1.2 and 38/39.3.2.1.3 shall be protected as indicated.
38/39.3.2.1.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:
(1) Boiler and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material 38/39.3.2.1.3The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50ft2 but not exceeding 100 ft2 and storing combustible material.
38/39.3.2.4 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
38/39.3.5.12 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED OR LOST.
EXAM 2
10191019
CONSULT
ROOM 2
10281028
CONSULT
ROOM 1
10261026
LOGISTICS
STORAGE
10231023
NURSE
MANAGER
OFFICE
10241024
CLEAN
UTILITY
10211021
EXAM 7
10221022
STAFF
TLT
1019B1019B
TLT
1022B1022B
SOILED
UTILITY /
SPD
10161016
PATIENT
TLT
10331033TEAM
WORK
STATIONS
10151015
MEDS
10141014
MECH
10321032
LACTATION
10361036
FAMILY
TLT
10341034
WAITING
1032B1032B
HALLWAY
OC14OC14
WEIGH
AREA
10121012
EXAM 8
11981198
STOR
10001000
EXAM 13 /
CONSULT
RM 3
10111011
EXAM 9
10171017
EXAM 10
10041004
C O
R R
ID
O
R O
C
O C
EXAM 12
10051005
EXAM 11
10031003
RECEPTION
1080C1080C
WAITING
10821082
HAC
11051105
EXAM 1-
NEGATIVE
PRESS
1108B1108B
MEDS
11061106 TLT
1108C1108C
EXAM 4
11031103
TRIAGE
10841084
EXAM 6
10831083
CHAIR
EXAM
1085b1085b
TLT/SHWR
1087…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .