ATTACHMENT 6 - Plumbing.pdf

PDF 13 MB Posted

Attached to
Y1DZ--Expand and Renovate B400 for Urgent and Primary Care (Minor) - Tomah
Solicitation number
36C77621B0009
Issued by

About this file

This document provides details for a federal contract solicitation to expand and renovate a medical facility. The solicitation number is 36C77621B0009 issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The contractor will be responsible for demolishing existing structures, site preparation, and furnishing all labor, materials, and work to expand and renovate the B400 building for urgent and primary care services at the Tomah medical center as outlined in the attached drawings and specifications. The response due date and contract award date are not stated.

View the file

Other files

File Type Posted
31 23 19 DEWATERING.pdf PDF
36C77621B0009 0003.pdf PDF
Drawings VF100 - VF101.pdf PDF
Technical Questions - FINAL - Tomah 8-2-21.pdf PDF
36C77621B0009 0002.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Monroe County - 7-9-21.pdf PDF
Site Visit Sign-in Sheet - Tomah - 9 AM - 7-12-21.pdf PDF
36C77621B0009 0001.pdf PDF
Site Visit Sign-in Sheet - Tomah - 10 AM - 7-13-21.pdf PDF
ATTACHMENT 20 - Site Visit Registration - Map.pdf PDF
36C77621B0009 - 6-29-21.pdf PDF
ATTACHMENT 15 - Fire Alarm.pdf PDF
ATTACHMENT 7 - Fire Protection.pdf PDF
ATTACHMENT 16 - Contractor Core Work Hours.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Monroe County - 5-14-21.pdf PDF
ATTACHMENT 12 - Furniture.pdf PDF
ATTACHMENT 4 - Electrical.pdf PDF
ATTACHMENT 13 - Civil.pdf PDF
ATTACHMENT 11 - Architectual.pdf PDF
ATTACHMENT 8 - Equipment.pdf PDF
ATTACHMENT 1 - Specifications Final 6-21-21.pdf PDF
ATTACHMENT 2 - General.pdf PDF
ATTACHMENT 19 - Contractor Safety - Environmental Form.docx DOCX document
ATTACHMENT 10 - Signage.pdf PDF
ATTACHMENT 18 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 5 - Mechanical.pdf PDF
ATTACHMENT 9 - Interiors.pdf PDF
ATTACHMENT 3 - Structural.pdf PDF
ATTACHMENT 14 - Hazard.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWR

DWS

SSD

GV

FD

ST

ST

V

AV

SAN

SAN

PD

AW

W

CA

G

LPG

HWR

LPHWR

HPHWR

140 HWR

HW

LPHW

HPHW

SHW

140 HW

CW

LPCW

HPCW

SCW

TW

PW PROCESS WATER

UNDER SLAB SANITARY DRAIN

UNDER SLAB STORM DRAIN

FOUNDATION DRAIN

PUMP DISCHARGE (TYPE AS INDICATED)

UTILITY COMPRESSED AIR

(PRESSURE AS INDICATED)

SANITARY OR WASTE DRAIN

SANITARY VENT

NATURAL GAS (PRESSURE AS INDICATED)

STORM (RAINWATER) DRAIN

SOFTENED HOT WATER

HIGH PRESSURE DOM HOT WATER RETURN

TEMPERED WATER

DOM HOT WATER RETURN

LOW PRESSURE DOM HOT WATER RETURN

SOFTENED COLD WATER

LOW PRESSURE DOM HOT WATER

HIGH PRESSURE DOM HOT WATER

HIGH PRESSURE DOM COLD WATER

LOW PRESSURE DOM COLD WATER

DOM COLD WATER

DOM HOT WATER

(CHILLED) DRINKING WATER RETURN

SUBSOIL DRAINAGE

(CHILLED) DRINKING WATER SUPPLY

(TEMP 110° OR AS INDICATED)

(TEMP 110° OR AS INDICATED)

(TEMP. 110° OR AS INDICATED)

(TEMP 110° OR AS INDICATED)

(TEMP 110° OR AS INDICATED)

(TEMP 110° OR AS INDICATED)

NATURAL GAS VENT

HIGH TEMP DOM HOT WATER RETURN

HIGH TEMP DOM HOT WATER

WASTE

ACID RESISTANT WASTE

ACID RESISTANT VENT

LIQUID PETROLEUM GAS

DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL

AIR VENT WITH VALVE

WATER HAMMER ARRESTOR

ELBOW - TURNED UP

FLOW INDICATING BALANCE VALVE

PLUG VALVE or GAS COCK

BALL VALVE

BUTTERFLY VALVE

PRESSURE GAUGE WITH COCK

DIRECTION OF FLOW

BRANCH TOP CONNECTION

TEE OUTLET - DOWN

ELBOW - TURNED DOWN

QUICK COUPLING

FLOW METER

DROP OR RISE

CAP OR PLUG

THERMOMETER

PIPE ALIGNMENT GUIDE

REDUCER - ECCENTRIC

REDUCER - CONCENTRIC

FLOOR DRAIN (ROUND)

ROOF DRAIN

FLOOR CLEANOUT or EXTERIOR CLEANOUT

PIPE UNION

PIPE ANCHOR

HOSE BIBB

WALL HYDRANT

CLEANOUT

PRESSURE REGULATOR VALVE FLANGED

FLEXIBLE CONNECTION

MECHANICAL EXPANSION JOINT

BASKET STRAINER

PRESSURE RELIEF VALVE or

STRAINER

SOLENOID VALVE

BALANCING VALVE

ISOLATION VALVE or GATE VALVE

CHECK VALVE

ANGLE VALVE

POINT OF DISCONNECT

POINT OF CONNECTION

DESCRIPTIONDESCRIPTIONSYMBOL SYMBOL

BACKFLOW PREVENTER (TYPE AS

INDICATED BY ASSE STANDARD)

TEMP PRESSURE RELIEF VALVE

FLOOR DRAIN (RECTANGULAR)

HEAT TRACED PIPE

(SYSTEM AS INDICATED)

A

L

M

B

C

N

OD

E

P

Q

R

S

F

G

TH

U

V

W

I

K

ABBR ABBREVIATION

ADA AMERICANS WITH DISABILITIES ACT

AFF ABOVE FINISHED FLOOR

AG ABOVE GRADE

AMB AMBIENT

ANSI AMERICAN NATIONAL STANDARDS

INSTITUTE

AP ACCESS PANEL

APPROX APPROXIMATE

LAV LAVATORY

LGT LENGTH

LPG LIQUID PETROLEUM GAS

LWT LEAVING WATER TEMPERATURE

BFP BACKFLOW PREVENTER

BFV BUTTERFLY VALVE

BHP BRAKE HORSEPOWER

BLV BALANCING VALVE

BTU/H BRITISH THERMAL UNIT PER HOUR

MAX MAXIMUM

MBH 1000 BTU/HR

MIN MINIMUM

MISC MISCELLANEOUS

MTG MOUNTING

NA NOT APPLICABLE

N.C. NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NITROUS OXIDE

N.O. NORMALLY OPEN

NO. NUMBER

NOM NOMINAL

NTS NOT TO SCALE

CAP. CAPACITY

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CO CLEANOUT

COMP COMPRESSOR

COND CONDENSATE

CONT CONTINUATION

CV CHECK VALVE

CW COLD WATER

DF DRINKING FOUNTAIN

DIA DIAMETER

DN DOWN

DOM DOMESTIC

DWH DOMESTIC WATER HEATER

DWG DRAWING

DWS (CHILLED) DRINKING WATER SUPPLY

DWR (CHILLED) DRINKING WATER RETURN

OD OUTSIDE DIAMETER

OFL OVERFLOW

ORD OVERFLOW ROOF DRAIN

OSD OPEN SITE DRAIN

PC PUMPED CONDENSATE

PD

PUMPED DISCHARGE (TYPE AS

INDICATED)

PDI PLUMBING DRAINAGE INSTITUTE

PH PHASE (ELECTRICAL)

PPM PARTS PER MILLION

QTY QUANTITY

REF REFERENCE

RD ROOF DRAIN

RL RELOCATED MATERIAL OR EQUIPMENT

RV PRESSURE RELIEF VALVE

RPM REVOLUTIONS PER MINUTE

RO REVERSE OSMOSIS SUPPLY

SAN SANITARY OR WASTE

SCFM STANDARD CUBIC FEET PER MINUTE

SCW SOFTENED COLD WATER

SE SEWAGE EJECTOR

SG SPECIFIC GRAVITY

SK SINK

SH SHOWER

SHW SOFTENED HOT WATER

SP SUMP PUMP

SPEC SPECIFICATION

SQ. FT. SQUARE FEET

SS STAINLESS STEEL

SSD SUB-SOIL DRAINAGE

ST STORM (RAINWATER)

STD STANDARD

STM STEAM

SV SOLENOID VALVE

TEMP TEMPERATURE

TP TRAP PRIMER

TPU TRAP PRIMER UNIT

TPV TEMPERATURE AND PRESSURE

UON UNLESS OTHERWISE NOTED

V SANITARY VENT

VEL VELOCITY

VTR VENT THRU ROOF

W/ WITH

WC WATER CLOSET

WG WATER GAGE

WHA WATER HAMMER ARRESTOR

WH WALL HYDRANT

W/0 WITHOUT

EA EACH

ECO EXTERIOR CLEANOUT

EEW EMERGENCY EYE WASH

EEW/ESH COMBINATION EMERGENCY EYE WASH/

EEW/EFW COMBINATION EMERGENCY EYE WASH/

EFF EFFICIENCY

EFW EMERGENCY FACE WASH

EL ELEVATION

EQ EQUIVALENT

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

EXP EXPANSION

EXT EXTERNAL

(E) EXISTING MATERIAL OR EQUIPMENT

_°F DEGREES FAHRENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FL FLOOR

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOOR SINK

FT FOOT OR FEET

FTD FOOTER DRAINAGE

G NATURAL GAS (PRESSURE AS

INDICATED)

GAL GALLON

GS GAS COCK

HB HOSE BIBB

HG MERCURY

HGT HEIGHT

HP HORSE POWER

HPCW HIGH PRESSURE DOM. COLD WATER

HPHW HIGH PRESSURE DOM. HOT WATER

(TEMP. 110° OR AS INDICATED)

ID INSIDE DIAMETER

IE INVERT ELEVATION

IN. INCHES

KW KILOWATTS

SEE MECHANICAL SYMBOLS, LEGENDS AND EQUIPMENT SCHEDULES FOR ADDITIONAL ABBREVIATIONS. ALL ABBREVIATIONS, SYMBOLS, AND LEGENDS SHOWN ON THIS DRAWINGS ARE NOT NECESSARILY USED.

BV BALL VALVE

(PRESSURE AS INDICATED)

CA UTILITY COMPRESSED AIR

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GV GATE VALVE

HPHWR HIGH PRESSURE DOM. HOT WATER

RETURN (TEMP. 110° OR AS INDICATED)

HR HOUR

MSB MOP SERVICE BASIN

PRESS. PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH - GAUGE

PV PLUG VALVE

PW PROCESS WATER

TW TEMPERED WATER

TYP TYPICAL

UR URINAL

Y

YD YARD

(TYPE AS INDICATED)

EMERGENCY SHOWER

EMERGENCY FACE WASH

RELIEF VALVE

PRESSURE REGULATOR VALVE THREADED

SUB-METER FOR COLD WATER, HOT WATER, GAS

BCW BOOSTED COLD WATER

M

RD

FD

FD

CO

CO

S

HB

RISER DESIGNATION (TYPE AS INDICATED)

SECTION NUMBER

DETAIL NUMBER

DRAWING NUMBER WHERE DRAWN

DRAWING NUMBER WHERE DRAWN

E1-1.0

E1-1.0

KEY NOTE

1. (E) PLUMBING SHOWN ON DRAWINGS IS BASED ON AVAILABLE DRAWINGS. INSTALLING CONTRACTOR IS

RESPONSIBLE FOR FIELD VERIFICATION OF (E) CONDITIONS

2. REMOVED WATER PIPING TO BE CAPPED & VALVED AT MAIN - NO DEADLEGS GREATER THAN 2.5D TO REMAIN

3. COORDINATE SYSTEM SHUT-DOWNS WITH FACILITIES

4. COORDINATE HOT/FREEZE TAPS WITH FACILITIES

5. ANY FIXTURES DESIGNATED BY FACILITIES TO BE RETAINED SHALL BE REMOVED AND TURNED OVER DAMAGE FREE

6. PIPING SHALL BE LABELED PER VA STANDARDS

7. AS-BUILT MARK-UPS WITH VALVE LOCATIONS & LIST SHALL BE TURNED OVER TO FACILITIES

8. ALL PENETRATIONS SHALL BE PROPERLY SEALED AND FIRE STOPPED

GENERAL NOTES:

PLUMBING PIPING SYMBOLS:

PLUMBING VALVES AND ACCESSORIES SYMBOLS:

DRAWING SYMBOLS:

ABBREVIATIONS:

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

FMD FLOW MEASURING DEVICE

DEDUCTIVE ALTERNATE:

1. Deduct Alternate #1: Remove B407 North Swing Space.

a. Remove 60 days from schedule.

2. Deduct Alternate #2: Remove B407 South Swing Space, Bathroom refresh and IT closet infrastructure from project.

a. Remove 90 days from schedule.

3. Deduct Alternate #3: Remove sealed bubble wall fountain in Waiting Room 1082 from project.

a. Remove 14 days from schedule.

4. Deduct Alternate #4: Rebuild (E) AHU rather than install new one.

a. Remove 90 calendar days from schedule.

5. Deduct Alternate #5: Remove exterior entrance canopy at staff lounge 1102.

a. Remove 14 calendar days from schedule.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t

C a re A n d

R e n o v a te s t F lo o r P a ti e n t C a re

/6

-3

.4

.M

E P

.r v t

/2

/2

:0

:1

A

M

P-000

PLUMBING ABBREVIATIONS AND

SYMBOLS

Expand and Renovate B400 for

Urgent and Primary Care

500 E Veterans St, Tomah, WI 54660

676-19-327

400/407

05/20/2021 K.LEITCH P.KOTTA

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

ISSUED FOR

CONSTRUCTION

PLUMBING SHEET INDEX

P-000 PLUMBING ABBREVIATIONS AND SYMBOLS

PD100 B400 - FOUNDATION - PLUMBING DEMOLITION PLAN

PD101 B400 - LEVEL 1 - PLUMBING DEMOLITION PLAN

PD102 B400 - LEVEL 2 - PLUMBING DEMOLITION PLAN

PD201 B400 - LEVEL 1 - MED GAS DEMOLITION PLAN

P-100 B400 - FOUNDATION - PLUMBING PLAN

P-101 B400 - LEVEL 1 - PLUMBING PLAN

P-102 B400 - LEVEL 2 - PLUMBING PLAN

P103-407 B407 - LEVEL 3 - PLUMBING PLAN

P-201 B400 - LEVEL 1 - MED GAS PLAN

P-300 B400 - PLUMBING ENLARGED PLANS

P-301 B400 - PLUMBING ENLARGED PLANS

P-302 B400 - PLUMBING ENLARGED PLANS

P-303 B400 - PLUMBING ENLARGED PLANS

P-304 B400 - PLUMBING ENLARGED PLANS

P-305 B400 - PLUMBING ENLARGED PLANS

P-400 PLUMBING RISERS

P-401 PLUMBING RISERS

P-402 PLUMBING RISERS

P-403 PLUMBING RISERS

P-404 PLUMBING RISERS

P-500 PLUMBING DETAILS

P-700 PLUMBING SCHEDULES

Pending Totals: NEW Plumbing systems in crawl space and 1st floor are original. Provide complete new plumbing piping systems, basement, crawl space, 1st floor. Replace all cold water, hot water, drain, waste, and vent piping throughout.

Fixtures / Piping 111175 [ Field Engineer Review Completed on 07/29/2014 by VHATOMBueniM.] [ Auto Generated Project Pending on 07/29/2014 for Project Number 676-14- 122 created by VHATOMBueniM.] Project 676-14-122 replaced the sanitary and storm sewer piping under the west wing.

Replace piping in the basement and in the 1st and 2nd floors, which exceed maximum life expectancy.

Fire Sprinkler / Pump 90803 Sprinkler piping is in good condition.

Pending Totals: NEW Ambulance Bay exhaust fan Square inline May have a control issue. Fan was running continuously when no source of CO contamination was present. (2010 vintage

Ventil (O.A. & Exh) 111174 Ventilation is in good condition.

Room Air Dist/Term 111173 VAV boxes and reheating coils in good condition.

Heating System 277776 2nd floor steam piping and convectors removed, replaced by hot water heaters or air-side heating.

Heating System 111168 The original steam piping and convectors on the 1st floor has exceeded their life expectancy and should be replaced.

Engr. Control syst. 111167 METASYS controls on the 1st and 2nd floors installed in 2005 and are in good condition.

Ducts & Water Dist 111166 Ducts and piping in good condition.

Pending Totals: NEW Air Handler (2004) serving the current dental in good condition, Air Handler is Mixed Air, Pre-Filter, Air Blender, Hot Water Pumped Heating Coil, CW Cooling Coil, Diffuser, Supply Fan with ABB VFD, Filter, Steam Humidifier on discharge *AHU-8 Trane MN: MCCB025UAODOUA SN:K04M65739A

Mechanical Rec No Description

Building 400 FCA Report

Disclaimer: These items have been determined to have reached their end of life usefulnes. This scope of work contract did not allocate funding for the below mentioned deficiencies. The following information was received from the owner's assessment report dated 1/6/2017.

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

43886

05/20/2021 KAEKO LEITCH

1 2 3 4 5 6 6.1 7 7.8 8 9 9.1 9.9 10 11 11.2 12 13 14 18171615

M.3

M

L

K.3

K

J.4

J.3

J

I.5

I.2

I

H.1

H

G

F.1

F

E

D

C

B

A

(E)1 1/2" CW

(E)1 1/2" HW

(E)3/4" HWR

(E)2 1/2" CW

(E)2" HW

(E)1 1/4" HWR

(E)1 1/4" CW

(E)1 1/2" HW

(E)1/2" HWR

(E)1" HW

(E)2" CW

(E)1/2"

(E)1/2"

(E)3/4" HWR

(E)1 1/2" HW

(E)2 1/2" CW

(E )2

C

W (E

)1

/4

H W

(E )1

/2

H W

R

(E )4

W

(E)4" W

UP

(E)2"

(E)4"

(E)4" W

(E)6" W

(E)2" V

(E)4" W

(E)4" W

(E)2"

(E)4"

(E)3"

(E)2" V

(E)2" V

UP

UP

UP

UP

UP

UP

UP

UP

UP

(E)4" W

UP

(E)4" W

UP

(E)1 1/2"

UP

(E)2"

UP

(E)1"

UP

UP

(E)1" CW

(E)3/4" HW

(E)1/2" HWR

UP

UP

UP

(E)1/2" HW

(E)1/2" CW

(E)4" W

UP

(E)2" W

UP

(E)6" ST

UP

(E)3/4" CW

(E)3/4"

(E)4" W

(E)3/4"

(E)2 1/2" CW

(E)4" ST

UP

(E)1 1/2" HW

(E)1 1/4" HWR

(E )6

S

T

(E )4

W

(E)4" ST

UP

(E)2" W

(E)3/4" HW

(E)3/4" HWR

(E)2" CW

(E)3" W

UP

UP

UP

UP

(E)4" W

(E)4" W

(E)4" W

UP

(E)4" ST

UP

(E)4" W

UP

(E)6" ST

(E)4" W

(E)5" W

(E)6" ST

(E)2" W

(E)2" W

UP

(E)4" W

UP

(E)4" W

UP

(E)6" ST

(E)1/2"

(E)3/4" HW

(E)3/4" CW

(E)4" ST

UP

(E)1/2" HWR

UP

(E)1/2" HW

UP

(E)1/2" CW

UP

(E)3" W

UP

(E)3" W

(E)3/4" HWR

(E)2 1/2" CW

(E)1 1/2" HW

(E)4" W

(E )4

W

(E)4" W

(E )4

W

(E)12" W

(E)6" W

(E)8" ST

(E)8" ST

(E)4" W

(E)4" W (E)4" W

(E)4" W

(E)2" V

(E)2" V(E)2" V (E)2" V

(E)2" V

(E)2" V

(E)1 1/4" CW

(E)1 1/4" CW

1 1/4"

3/4" 1/2"

(E)3/4" CW

(E)2" CW

(E)1 1/4" HW

(E)4" W

(E)4" W

(E)4" W

(E)4" W

(E)4" W

(E)4" ST

(E)2" W

(E)2" W

UP

(E)4" W

(E)2" W

UP

(E)2" W

(E)2" W

(E)1/2" HWR

(E)2" W

(E)1/2"

(E)1/2"

(E)2"

(E)3/4"

(E)3/4"

(E)3/4"

(E)2 1/2" CW

(E)1 1/2" HW

(E)3/4" HWR

(E)4" W (E)2" W

UP

4"

UP(E)4" W

(E)6" ST

(E)3/4"

13 14

(E)2" W

UP

(E)2" W

(E)4" W

(E)4" ST

UP

UP

(E)4" ST

(E)4" ST

(E)2"

UP

(E)1/2" CW

UP

11 11

1212 1414

(E)1 1/4" HWR

(E)2" HW

(E)2 1/2" CW

(E )5

W

(E)2" W

UP

1/2" CW

(E)4" W

(E)1/2" CW

UP

UP

UP

(E)1/2" HWR

(E)1/2" HW

(E)1/2" CW

(E)4" W

(E)1/2" HW

(E)1/2" CW

(E)1/2" CW

(E)3"

(E)3"

(E)1/2"

(E)1/2"

(E )3

(E)1"

(E)2"

(E)1" CW

(E)3" W

(E)1/2" CW

(E)1/2" HW

(E)1/2" CW

(E)1/2" HW

(E )4

W

(E )6

S

T

(E )2

/2

C

W

(E )1

/2

H

W

(E)1/2" HWR

(E)1 1/4" HW

(E)1 1/2" CW

(E)4" W

(E)1/2"

(E)3/4"

(E)1/2"

(E)1/2"

(E )1

/2

(E )1

/2

(E )1

/2

(E)4" W

(E)4" ST

(E)1/2" CW

(E)4" W

(E)1/2" HW

UP

UP

UP

UP

(E)2"

(E)1/2"

(E)1/2"

(E)1/2" CW

(E)3/4" CW

(E)3/4" CW

(E)3/4" HW

(E)3/4" HWR

(E)2" W

(E )1

/4

H

W R

(E)3" W

(E)1/2" HW

(E)4" ST

(E)4" ST

(E)2" V

(E)2" W

(E)4" ST

(E)3" W

UP

UP

UP

UP

(E)2" W

(E)2" W

(E)2" W

UP

(E)2" W

UP

(E)3/4" CW

(E)3/4" HW

UP

UP

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK

AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-

BUILT" CONDITIONS AND THESE DRAWINGS.

B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,

VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS

HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO

KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET

PLUMBING PIPING TO AVOID BEAMS.

C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES,

HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING

PIPING, EQUIPMENT, ETC.

D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF EXISTING

CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE INSTALLATION

OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL PLANS

FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY CEILING TILE OR GRID

DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH NEW BY THIS

CONTRACTOR.

E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR

INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH

WALLS AND/OR CEILINGS TO MATCH EXISTING.

F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS

PANELS FOR ACCESSIBILITY.

G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

AREA A

B400 KEY PLAN

AREA B

AREA

A1

AREA C

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t

C a re A n d

R e n o v a te s t F lo o r P a ti e n t C a re

/6

-3

.4

.M

E P

.r v t

/2

/2

:0

:0

A

M

PD100

B400 - FOUNDATION - PLUMBING

DEMOLITION PLAN

Expand and Renovate B400 for

Urgent and Primary Care

500 E Veterans St, Tomah, WI 54660

676-19-327

400/407

05/20/2021 K.LEITCH P. KOTTA

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

ISSUED FOR

CONSTRUCTION

SCALE: 1/8" = 1'-0"

F1

B400 - FOUNDATION - PLUMBING DEMOLITION PLAN

1 REROUTE EXISTING EXTERIOR DRAIN SPOUTS IN

AREA OF NEW CONSTRUCTION. DRAIN SPOUTS

TO SPILL ONTO NEW ROOF.

2 REMOVE PIPING BACK TO POINT INDICATED ON

PLAN. CAP AND SEAL PIPING WATER-TIGHT.

3 REMOVE EXISTING WASTE AND WATER RISERS

BACK TO POINT INDICATED ON PLAN AND

PREPARE FOR FUTURE CONNECTION.

4 EXISTING FLOOR CLEANOUT TO REMAIN.

MAINTAIN EXISTING OPENING.

5 REMOVE WASTE SERVING SINK ABOVE BACK TO

POINT INDICATED ON PLAN.

6 REMOVE WASTE SERVING LAVATORY ABOVE

BACK TO POINT INDICATED ON PLAN.

7 REMOVE EXISTING WATER RISER BACK TO POINT

INDICATED ON PLAN AND PREPARE FOR FUTURE

CONNECTION.

8 EXISTING 2" VENT SERVING DECONTAM TANK TO

REMAIN.

9 TO EXISTING DECONTAM TANK LOCATED UNDER

AMBULANCE BAY.

10 TO EXISTING CATCH BASIN LOCATED UNDER

AMBULANCE BAY.

11 REMOVE WASTE AND WATER SERVING SINK

ABOVE TO POINT INDICATED ON PLAN.

12 REMOVE WASTE ANDW ATER SERVING LAVATORY

ABOVE TO POINT INDICATED ON PLAN.

13 REMOVE WASTE SERVING FLOOR DRAIN ABOVE

TO POINT INDICATED ON PLAN

14 REMOVE WASTE AND WATER SERVING WATER

CLOSET ABOVE BACK TO POINT INDICATED ON

PLAN.

15 REMOVE PIPING BACK TO POINT INDICATED ON

PLAN AND PREPARE FOR FUTURE CONNECTION.

16 REMOVE WASTE SERVING WATER CLOSET

ABOVE BACK TO POINT INDICATED ON PLAN.

17 REMOVE EXISTING WASTE RISER BACK TO POINT

INDICATED FOUNDATION PLAN AND PREPARE

FOR FUTURE LOCATION.

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

M

L

K.3

K

J.4

J.3

J

I.5

I.2

I

H.1

H

G

F.1

F

E

D

C

B

A

(E)2" (E)2"

(E)2" V

(E)2"

(E)1 1/2"

(E)2" V

(E)2" V

(E)2" V

(E)2" V

(E)2" V

(E)2" V

1 1

(E) 2" CW

(E) 1/2" RHW

(E) 3/4" HW

(E)2" CW

(E)1 1/4" HW

(E)2" W UP

(E)1/2" CW

(E)1/2" HW

(E)1/2" HWR

(E)3" W

(E)3/4" UP

(E)1" UP

(E)2" UP

(E)1 1/2" UP

(E)1 1/4" CW

(E)3/4"

(E)3/4"

(E)1 1/4"

(E)3/4" CW

(E)1/2" HW

(E)1 1/2"

(E)2"

(E)2"

(E)2"

(E)2" W

(E)1/2" HW

(E)1/2" CW

(E)6" ST

(E)2" W (E)4" W

(E)1 1/2"

(E)2"

(E)1/2" CW UP & DN

(E)3/4" CW UP & DN

(E)3/4" HW UP & DN

(E)1 1/2"

(E)1 1/2"

(E)1 1/2"

(E)1/2"

(E)1/2"

(E)2" V

(E)2" V (E)1 1/2"

(E)4" ST UP

(E)1 1/2"

(E)1 1/2" (E)1 1/2"

(E)2" (E)2"

(E)2"

(E)2" W UP

(E)1 1/2"

(E)1/2" HWR UP

(E)1" HW UP

(E)1" CW UP

(E)3" (E)1 1/2" V

(E)2" V

(E)1 1/2"

(E)3"

(E)2"

(E)2"

(E)1 1/2" (E)1 1/2"

(E)4" W

(E)1 1/2"

(E)1 1/2"

(E)4"

(E)1 1/2" V

(E)1 1/2" V

(E)1 1/2" V

(E)1 1/2"

(E)1 1/2" V

(E)1/2" CW

(E)1/2" HW

(E)1/2" CW

UP & DN

UP & DN

UP & DN

UP & DN

(E)2" V

(E)2" W

UP & DN

UP & DN

UP

(E)4" ST

(E)1/2" CW

(E)4" W

(E)1/2" HW

UP & DN

UP & DN

UP & DN

UP & DN

(E)1 1/2" W

UP & DN

(E)2" V

(E)2" V

(E)2" V

UP

UP

UP

(E)1/2" HWR

(E)4" W

UP

(E)3" W

(E)2" W

(E)2" V

(E)3" W

DN

UP

UP

UP

(E)4" W

(E)4" ST

(E)4" W

UP & DN

UP & DN

UP & DN

(E)1 1/2"

(E)1 1/2"

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK

AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-

BUILT" CONDITIONS AND THESE DRAWINGS.

B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,

VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS

HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO

KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET

PLUMBING PIPING TO AVOID BEAMS.

C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES,

HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING

PIPING, EQUIPMENT, ETC.

D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF EXISTING

CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE INSTALLATION

OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL PLANS

FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY CEILING TILE OR GRID

DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH NEW BY THIS

CONTRACTOR.

E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR

INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH

WALLS AND/OR CEILINGS TO MATCH EXISTING.

F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS

PANELS FOR ACCESSIBILITY.

G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.

EXAM

EXAM

EXAM

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

OFFICE

OFFICE

DIRTY UTILTIY

OFFICE

WAITING

NURSE STATION

OFFICE

EXAM

CONFERENCE

EXAM

EXAM

EXAM

1002OFFICE

OFFICE

WOMEN VISITOR TOILET

TLT

MECH

IT

OFFICE

OFFICE

OFFICE

EXAM

STAIR

WAITING / CIRCULATION

EXAM

EXAM

EXAM

NURSE STATION

1085 EXAM

EXAM

WOMEN TLT

EXAM

EXAM

OFFICE

STORAGE

1096A

STAFF TOILET

STAFF TOILET

AMBULANCE GARAGE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

AREA A

B400 KEY PLAN

AREA B

AREA

A1

AREA C

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t

C a re A n d

R e n o v a te s t F lo o r P a ti e n t C a re

/6

-3

.4

.M

E P

.r v t

/2

/2

:0

:0

A

M

PD101

B400 - LEVEL 1 - PLUMBING

DEMOLITION PLAN

Expand and Renovate B400 for

Urgent and Primary Care

500 E Veterans St, Tomah, WI 54660

676-19-327

400/407

05/20/2021 K.LEITCH P.KOTTA

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

ISSUED FOR

CONSTRUCTION

1 REMOVE FIXTURE, WASTE, WATER AND VENT BACK

TO POINTS INDICATED ON PLAN.

2 REROUTE WATER RISERS FROM BASEMENT TO

OVERHEAD.

3 REMOVE PLUMBING FIXTURE AND PIPING BACK TO

MAIN. CAP AND SEAL WATER TIGHT AT MAIN.

4 REMOVE EXISTING WASTE RISER BACK TO POINT

INDICATED FOUNDATION PLAN AND PREPARE FOR

FUTURE LOCATION.

5 REMOVE FLOOR DRAIN AND ASSOCIATED WASTE

AND VENT BACK TO POINT INDICATED ON PLAN. SEE

PD100 FOR UNDERGROUND DEMO.

6 REMOVE 1/2" HWR BACK TO POINT INDICATED ON PL

AND PREPARE FOR FUTURE CONNECTION. SEE

P-302 FOR CONTINUATION.

SCALE: 1/8" = 1'-0"

F1

B400 - LEVEL 1 - PLUMBING DEMOLITION PLAN

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

M

L

K.3

K

J.4

J.3

J

I.5

I.2

I

H.1

H

G

F.1

F

E

D

C

B

A

1 1

(E)2"

(E)2"

(E)2"

(E)2"

(E)2" (E)2"

(E)2"

(E)2" UP

(E)2"

(E)2"

(E)2"

(E)2"

(E)2" DN

(E)2"

(E)2"

(E)2"

(E)2" DN

(E)2" DN

(E)2"

(E)2"

(E)2"

(E)2" DN

(E)2" V

(E)2" V (E)2" V

(E)2" V UP

(E)2" W UP

(E)2" DN

(E)2"

(E)2" DN

(E)2"

(E)2" DN

(E)2" (E)2" DN

(E)2" V

(E)2" V

(E)2" V

(E)2" V

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING

WORK AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN

THE "AS-BUILT" CONDITIONS AND THESE DRAWINGS.

B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,

VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS

HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO

KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET

PLUMBING PIPING TO AVOID BEAMS.

C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING

TYPES, HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW

PLUMBING PIPING, EQUIPMENT, ETC.

D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF

EXISTING CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE

INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH

ARCHITECTURAL PLANS FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY

CEILING TILE OR GRID DAMAGED DURING CONSTRUCTION SHALL BE REPLACED

WITH NEW BY THIS CONTRACTOR.

E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR

INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH

WALLS AND/OR CEILINGS TO MATCH EXISTING.

F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS

PANELS FOR ACCESSIBILITY.

G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.

OFFICE

UNOCCUPIED

CLEAN UTILITY

LAB

MECHANICAL

OFFICE

2015A

TOILET, STAFF

2030A

UTILITY ROOM, SOILED

TOILET

LOCKER ROOM

LAB

TREATMENT ROOM

EXAM/ TREATMENT ROOM

EXAM/ TREATMENT ROOM

2022TREATMENT ROOM

EXAM/TREATMENT ROOM

TREATMENT ROOM

STAIR

S9

OFFICE

2007A

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

AREA A

B400 KEY PLAN

AREA B

AREA

A1

AREA C

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t

C a re A n d

R e n o v a te s t F lo o r P a ti e n t C a re

/6

-3

.4

.M

E P

.r v t

/2

/2

:0

:0

A

M

PD102

B400 - LEVEL 2 - PLUMBING

DEMOLITION PLAN

Expand and Renovate B400 for

Urgent and Primary Care

500 E Veterans St, Tomah, WI 54660

676-19-327

400/407

05/20/2021 K.LEITCH P.KOTTA

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

ISSUED FOR

CONSTRUCTION

SCALE: 1/8" = 1'-0"

F1

B400 - LEVEL 2 - PLUMBING DEMOLITION PLAN

1 REMOVE FIXTURE, WASTE, WATER AND VENT BACK TO

POINTS INDICATED ON PLAN.

2 REMOVE ALL EXISTING DRAIN SPOUTS SERVING

CANOPY AND PROVIDE NEW ROUTING FOR SPILLOVER

ON NEW ROOF.

3 REMOVE EXISTING RO WATER SYSTEM AND

ASSOCIATED PIPING. NOT ABLE TO ABTAIN EXISTING

DRAWINGS OF ROUTING. CONTRACTOR TO FIELD

VERIFY ROUTING AND PROVIDE COORDINATED

DRAWINGS PER SPECIFICATION SECTION 22 05 11,

PARAGRAPH 1.4.1.

4 REMOVE EXISTING VENT PIPE TO THIS PINT AND

PREPARE TO RECONNECT TO NEW FIXTURE.

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

BUILDING 400 MEDICAL VACUUM VALVE SCHEDULE

BUILDING 400 MEDICAL OXYGEN VALVE SCHEDULE

BUILDING 400 DENTAL AIR VALVE SCHEDULE

BUILDING 400 MEDICAL AIR VALVE SCHEDULE

BUILDING 400 DENTAL VACUUM VALVE SCHEDULE

BUILDING 400 EXISTING MEDICAL GAS VALVE SCHEDULE

TYPEFLOOR NO.MARK

MV-OC19-09 EAST ZONE SHUT OFF

LOCATION

OC19 CORRIDOR1ST FLOOR

TYPEFLOOR NO.MARK

O2-OC15-03 SHUT OFF FOR FUTURE USE

O2-OC19-12

LOCATION

1ST FLOOR OC15 CORRIDOR

1ST FLOOR OC19 CORRIDOR EMERGENCY SHUT OFF

DA-1041A-01

TYPEFLOOR NO.

MAIN SHUT OFF1ST FLOOR

MARK LOCATION

ROOM 1041A

O2-OC15-04 1ST FLOOR OC15 CORRIDOR EAST ZONE SHUT OFF

MA-OC19-09

TYPEFLOOR NO.

EMERGENCY SHUT OFF1ST FLOOR

MARK LOCATION

OC19 CORRIDOR

TYPEFLOOR NO.MARK LOCATION

DV-1017-01 MAIN SHUT OFF NORTH WEST CORRIDORROOM 10171ST FLOOR

1 2 3 4 5 6 6.1 7 7.8 8 9 9.1 9.9 10 11 11.2 12 13 14 18171615

M.3

M

L

K.3

K

J.4

J.3

J

I.5

I.2

I

H.1

H

G

F.1

F

E

D

C

B

A

DUE TO LIMITED LIMITED INFORMATION AND

ACCESS CONTRACTOR TO FIELD VERIFY AND

REMOVE ALL ABANDONED

DENTAL GAS PIPING IN FIRST

FLOOR CEILING SERVING

SECOND FLOOR. PROVIDE COORDINATION

DRAWINGS PER SPECIFICATION 22 0511,

PARAGRAPH 1.4.I. AND COORDINATE WITH

PROJECT ENGINEER PRIOR TO ANY

DEMOLITION.

(E)3/4" O2

(E)1" MV

(E)3/4" MA

(E)3/4" O2

(E)3/4" MA

(E)1" MV

EXAM

1027 EXAM

EXAM

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

OFFICE

OFFICE

DIRTY UTILTIY

OFFICE

WAITING

NURSE STATION

OFFICE

EXAM

CONFERENCE

EXAM

EXAM

EXAM

OFFICE

OFFICE

WOMEN

VISITOR

TOILET

TLT

MECH

IT

1005 OFFICE

OFFICE

OFFICE

EXAM

STAIR

WAITING / CIRCULATION

EXAM

EXAM

EXAM

NURSE STATION

EXAM

EXAM

WOMEN TLT

EXAM

EXAM

OFFICE

STORAGE

1096A

STAFF TOILET

STAFF TOILET

AMBULANCE GARAGE

A. DEMOLITION DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE BASED ON

FIELD OBSERVATION AND EXISTING RECORD DRAWINGS. CONTRACTOR

SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK AND

NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN

"AS-BUILT" CONDITIONS AND THESE DRAWINGS. PROVIDE ADDITIONAL

DEMOLITION AS REQUIRED BASED ON FIELD CONDITIONS.

B. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF

EXISTING CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR

THE DEMOLITION OF EXISTING MEDICAL GAS PIPING, EQUIPMENT, ETC.

VERIFY WITH ARCHITECTURAL PLANS FOR CEILING WORK BY THE GENERAL

CONTRACTOR. ANY CEILING TILE OR GRID DAMAGED DURING

CONSTRUCTION SHALL BE REPLACED WITH NEW BY THIS CONTRACTOR.

C. THIS CONTRACTOR SHALL OPEN ALL WALLS AND/ OR CEILINGS FOR

DEMOLITION OF EXISTING MEDICAL GAS PIPING, EQUIPMENT, ETC. AS

REQUIRED.

D. THIS CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL HOLE/WALLS AND/

OR CEILINGS FROM DEMOLISHED MEDICAL GAS PIPING, EQUIPMENT, ETC. IN

FLOORS, WALLS, AND CEILINGS TO MATCH EXISTING.

E. REFER TO ARCHITECTURAL SHEET GI101 FOR PARTITION RATINGS.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

AREA A

B400 KEY PLAN

AREA B

AREA

A1

AREA C

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t

C a re A n d

R e n o v a te s t F lo o r P a ti e n t C a re

/6

-3

.4

.M

E P

.r v t

/2

/2

:0

:0

A

M

PD201

B400 - LEVEL 1 - MED GAS

DEMOLITION PLAN

Expand and Renovate B400 for

Urgent and Primary Care

500 E Veterans St, Tomah, WI 54660

676-19-327

400/407

05/20/2021 K.LEITCH P.KOTTA

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

ISSUED FOR

CONSTRUCTION

SCALE: 1/8" = 1'-0"

F1

B400 - LEVEL 1 - MED GAS DEMOLITION PLAN

1 REMOVE ZONE VALVE BOX.

2 LOCATION OF EXISTING MED GAS RISERS. DUE TO

LIMITED INFORMATION OF EXISTING MED GAS

DRAWINGS, CONTRACTOR TO VERIFY LOCATION OF

EXISTING SHUTOFF VALVES.

3 REMOVE MED GAS PIPING BACK TO POINT

INDICATED ON PLAN AND PREPARE PIPING FOR

FUTURE CONNECTION. SEE NEW WORK FOR

DETAILS.

4 REMOVE EXISTING MED GAS DROPS AND

ASSOCIATED OUTLETS AT HEADWALLS AS

INDICATED ON PLAN.

5 REMOVE EXISTING AREA ALARM PANEL, MED GAS

PIPING, AND ASSOCIATED ACCESSORIES.

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

M

L

K.3

K

J.4

J.3

J

I.5

I.2

I

H.1

H

G

F.1

F

E

D

C

B

A

P-301

F1

P-301

F4

P-300

F5

P-300

C1

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK

AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE

"AS-BUILT" CONDITIONS AND THESE DRAWINGS.

B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,

VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS

HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO

KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE.

OFFSET PLUMBING PIPING TO AVOID BEAMS.

C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING

TYPES, HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW

PLUMBING PIPING, EQUIPMENT, ETC.

D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF

EXISTING CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE

INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH

ARCHITECTURAL PLANS FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY

CEILING TILE OR GRID DAMAGED DURING CONSTRUCTION SHALL BE REPLACED

WITH NEW BY THIS CONTRACTOR.

E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR

INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH

WALLS AND/OR CEILINGS TO MATCH EXISTING.

F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS

PANELS FOR ACCESSIBILITY.

G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.

H. PROVIDE NEPCO MIXING VALVE TO ALL NEW EYEWASH STATIONS, LAVATORIES,

SHOWERS, AND SINKS.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

AREA A

B400 KEY PLAN

AREA B

AREA

A1

AREA C

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t

C a re A n d

R e n o v a te s t F lo o r P a ti e n t C a re

/6

-3

.4

.M

E P

.r v t

/2

/2

:0

:1

A

M

P-100

B400 - FOUNDATION - PLUMBING

PLAN

Expand and Renovate B400 for

Urgent and Primary Care

500 E Veterans St, Tomah, WI 54660

676-19-327

400/407

05/20/2021 K.LEITCH P.KOTTA

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

ISSUED FOR

CONSTRUCTION

SCALE: 1/8" = 1'-0"

F1

B400 - FOUNDATION - PLUMBING PLAN

1. NO KEYNOTES ON THIS SHEET.

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

M

L

K.3

K

J.4

J.3

J

I.5

I.2

I

H.1

H

G

F.1

F

E

D

C

B

A

CONF

MEDS

EXAM 7

EXAM 4

ANTE ROOM

1108A

P-302

F5

P-302

C1

P-303

F1

P-303

F4

HAC

TLT

1104B

CONSULT ROOM 2

CONSULT ROOM 1

CLEAN UTILITY

EXAM 10

CHAIR EXAM

1085b

EXAM 6

OFFICE

EXAM 8

ALCOVE

WHEELCHAIR ALCOVE

EQ. ALCOVE

EXAM 13 / CONSULT RM 3

EXAM 2

TEAM WORK STATIONS

WAITING

1032B

TEAM AREA

1101A

TEAM AREA

1086A

PATIENT TLT

TLT

1022B

STAFF TLT

1019B

MECH

STAFF TOILET

BARIATRIC/ WOMENS HEALTH TLT

1100B

TLT/SHWR

EXAM 2 - NEGATIVE PRESS

1104A

EXAM 5 BARIATRIC/ WOMENS HEALTH

1100A

RECEPT CHECK IN/OUT

1032A

WEIGH AREA

MEDS

CORRIDOR

OC11EXAM 12

FAMILY TLT

NURSE MANAGER OFFICE

OFFICE

CLEAN SUPPLY

EXAM 7

SOILED UTILITY / SPD

CORRIDOR

OC13

EXAM 1

TLT

1108C

LOGISTICS STORAGE

AMBULANCE BAY

TELEHEALTH

TRIAGE

RECEPTION

1080C

TELEHEALTH

STOR

CLEAN UTLITY

VESTIBULE

EXAM 9

STAFF LOUNGE

EXAM 1- NEGATIVE PRESS

1108B

WAITING

CORRIDOR

OC20

SOILED UTILITY

MENTAL HEALTH

1099A

CORRIDOR

OC21

CORRIDOR

OC19

CORRIDOR

OC22

HALLWAY

OC14

EXAM 8

EXAM 11

LACTATION

IT

1051B

ELECT

1051A

TLT MENTAL HEALTH

1099B

MAIN ELEC A

1104C MAIN ELEC B

1104D

P-912 P-114

P-103

P-103

P-103

P-502

PLUMBING FIXTURE ROUGH-IN

CONNECTION SCHEDULE

FIXTURE WASTE VENT CW HW

LAVATORY

WATER CLOSET (FV)

SINK

CLINICAL SINK

MOP BASIN

NOTES:

1. SIZES SHALL BE AS SCHEDULED UNLESS OTHERWISE NOTED ON

DRAWINGS.

2" 2" 1/2" 1/2"

4" 2" 1" -

4" 2"

2"

2"3"

2" 1/2"

1/2"

3/4"

1/2"

1/2"

3/4"

EMERG. EYE WASH 2"2" 1"

SHOWER 2"2" 3/4"3/4"

1"

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK

AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-

BUILT" CONDITIONS AND THESE DRAWINGS.

B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,

VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS

HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO

KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET

PLUMBING PIPING TO AVOID BEAMS.

C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES,

HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING

PIPING, EQUIPMENT, ETC.

D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF

EXISTING CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE

INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH

ARCHITECTURAL PLANS FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY

CEILING TILE OR GRID DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH

NEW BY THIS CONTRACTOR.

E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR

INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH

WALLS AND/OR CEILINGS TO MATCH EXISTING.

F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS

PANELS FOR ACCESSIBILITY.

G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.

H. PROVIDE NEPCO MIXING VALVE TO ALL NEW EYEWASH STATIONS, LAVATORIES,

SHOWERS, AND SINKS. SEE DETAIL B6 ON SHEET P501.

I. FIRE CAULK PIPE PENTERATIONS AT RATED WALLS, CEILING, AND FLOORS. REFER

THE ARCHITECTURE SHEET GI101, GI102, AND GI104 FOR FIRE RATINGS.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

AREA A

B400 KEY PLAN

AREA B

AREA

A1

AREA C

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t

C a re A n d

R e n o v a te s t F lo o r P a ti e n t C a re

/6

-3

.4

.M

E P

.r v t

/2

/2

:0

:3

A

M

P-101

B400 - LEVEL 1 - PLUMBING PLAN

Expand and Renovate B400 for

Urgent and Primary Care

500 E Veterans St, Tomah, WI 54660

676-19-327

400/407

05/20/2021 K.LEITCH P.KOTTA

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

ISSUED FOR

CONSTRUCTION

SCALE: 1/8" = 1'-0"

F1

B400 - LEVEL 1 - PLUMBING PLAN

1. NO KEYNOTES ON THIS SHEET.

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

1 2 3 4 5 6

6.1

7 7.8 8 9 9.1 9.9 10 11 11.2 12 13 14 18171615

M.3

M

L

K.3

K

J.4

J.3

J

I.5

I.2

I

H.1

H

G

F.1

F

E

D

C

B

A

3" V UP

4" VTR

P-304

F4

FREEZELESS

ROOF HYDRANT

P-811

MECH

OFFICE TECHNICIANS

INFUSION ROOM

MECH

EXAM 1

CLEAN UTILITY - LOGISTICS

TLT

TEAM WORK AREA

MED EQUIPMENT STORAGE

EXAM 5

EXAM 3

EXAM 2

EXAM 4

CORRIDOR

OC22

CLEAN LINENS

SOILED UTILITY

TEAM WORK / SUPPORT

UCC

HALLWAY

UCC

TEMPORARY

2007A

SOILED UTILITY

TELE

8" RD

8" ORD

8" RD

8" ORD

PLUMBING FIXTURE ROUGH-IN

CONNECTION SCHEDULE

FIXTURE WASTE VENT CW HW

LAVATORY

WATER CLOSET (FV)

SINK

CLINICAL SINK

MOP BASIN

NOTES:

1. SIZES SHALL BE AS SCHEDULED UNLESS OTHERWISE NOTED ON

DRAWINGS.

2" 2" 1/2" 1/2"

4" 2" 1" -

4" 2"

2"

2"3"

2" 1/2"

1/2"

3/4"

1/2"

1/2"

3/4"

EMERG. EYE WASH 2"2" 1"

SHOWER 2"2" 3/4"3/4"

1"

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK

AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-

BUILT" CONDITIONS AND THESE DRAWINGS.

B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,

VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS

HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO

KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET

PLUMBING PIPING TO AVOID BEAMS.

C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES,

HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING

PIPING, EQUIPMENT, ETC.

D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF EXISTING

CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE INSTALLATION

OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL PLANS

FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY CEILING TILE OR GRID

DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH NEW BY THIS

CONTRACTOR.

E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR

INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH

WALLS AND/OR CEILINGS TO MATCH EXISTING.

F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS

PANELS FOR ACCESSIBILITY.

G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.

H. PROVIDE NEPCO MIXING VALVE TO ALL NEW EYEWASH STATIONS, LAVATORIES,

SHOWERS, AND SINKS. SEE DETAIL B6 ON SHEET P501.

I. FIRE CAULK PIPE PENTERATIONS AT RATED WALLS, CEILING, AND FLOORS. REFER

THE ARCHITECTURE SHEET GI101, GI102, AND GI104 FOR FIRE RATINGS.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

AREA A

B400 KEY PLAN

AREA B

AREA

A1

AREA C

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t

C a re A n d

R e n o v a te s t F lo o r P a ti e n t C a re

/6

-3

.4

.M

E P

.r v t

/2

/2

:0

:3

A

M

P-102

B400 - LEVEL 2 - PLUMBING PLAN

Expand and Renovate B400 for

Urgent and Primary Care

500 E Veterans St, Tomah, WI 54660

676-19-327

400/407

05/20/2021 K.LEITCH P.KOTTA

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

ISSUED FOR

CONSTRUCTION

SCALE: 1/8" = 1'-0"

F1

B400 - LEVEL 2 - PLUMBING PLAN

1 CONNECT WASTE BELOW FLOOR. WATER AND VENT

IN CEILING TO NEW FIXTURES.

2 PROVIDE MIXING VALVE WITHIN 2'-0" OF FIXTURE.

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

407.A

407.B1

407.C1

407.D1

407.E

407.F

407.G1

407.H

407.I

407.J

407.K

407.L

407.M

407.N

407.14407.11 407.12.1407.12

407.9407.7

407.41407.4407.3407.21

J.39

J.40

J.41

407.H2

407.H1

407.13.1

FD-C

FD-C

2" V1

2" V

2" W

DN

UP

OFFICE

3790A

MECH / ELECT

3790C

OFFICE

3775B

OPEN OFFICE

OFFICE

3790B

MECH / ELEC

RESTROOM

OPEN OFFICE

DEDUCT ALT 1:

REMOVE WORK

ASSOCIATED WITH

B407 NORTH.

DEDUCT ALT 2:

REMOVE WORK

ASSOCIATED WITH

B407 SOUTH.

DEDUCT ALT 2:

REMOVE WORK

ASSOCIATED WITH

B407 SOUTH.

DEDUCT ALT 2:

REMOVE WORK

ASSOCIATED WITH

B407 SOUTH.

BEDROOM

BEDROOM

MECHANICAL ROOM

3780A

MECHANICAL ROOM

BEDROOM

MEDS

3711A

BEDROOM

STORAGE

DINING

3749A

BREAK

3765 BEDROOM

WARD

READING

BEDROOM

TREATMENT

CT CLINIC

TOILET

3744A

CLOSET

RESTROOM

SHOWERS

3784A

DRESSING

DRESSING

SHOWERS

3715A

Room

DAY ROOM

TOILET

CLOSET

3750A

CORRIDOR

7C36

CORRIDOR

7C31

DATA CLOSET

3772A

ELECTRICAL

CORRIDOR

7C38

CORRIDOR

7C39

OFFICE

STAIR

S4

CORRIDOR

7C37

CORRIDOR

7C32

HAC

3736A

NURSES

BEDROOM

BEDROOM

READING

UTILITY

WARD

STAIR

S6

DINING

LOCKERS

WARD

BEDROOM

BEDROOM

CLEAN LINENS

Room

CLOSET

ELEVATOR LOBBY

7C35

ELEVATOR

CORRIDOR

CORRIDOR

7C33

BEDROOM

LAUNDRY

DEDUCT ALT 2:

REMOVE WORK

ASSOCIATED WITH

B407 SOUTH. 2

PLUMBING FIXTURE ROUGH-IN

CONNECTION SCHEDULE

FIXTURE WASTE VENT CW HW

LAVATORY

WATER CLOSET (FV)

SINK

CLINICAL SINK

MOP BASIN

NOTES:

1. SIZES SHALL BE AS SCHEDULED UNLESS OTHERWISE NOTED ON

DRAWINGS.

2" 2" 1/2" 1/2"

4" 2" 1" -

4" 2"

2"

2"3"

2" 1/2"

1/2"

3/4"

1/2"

1/2"

3/4"

EMERG. EYE WASH 2"2" 1"

SHOWER 2"2" 3/4"3/4"

1"

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK

AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-

BUILT" CONDITIONS AND THESE DRAWINGS.

B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,

VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS

HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO

KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET

PLUMBING PIPING TO AVOID BEAMS.

C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES,

HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING

PIPING, EQUIPMENT, ETC.

D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF EXISTING

CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE INSTALLATION

OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL PLANS

FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY CEILING TILE OR GRID

DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH NEW BY THIS

CONTRACTOR.

E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR

INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH

WALLS AND/OR CEILINGS TO MATCH EXISTING.

F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS

PANELS FOR ACCESSIBILITY.

G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.

H. PROVIDE NEPCO MIXING VALVE TO ALL NEW EYEWASH STATIONS, LAVATORIES,

SHOWERS, AND SINKS.

I. REFER TO ARCHITECTURE SHEET GI104 FOR PARTITION RATINGS.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

B407 KEY PLAN

AREA A

KEY PLAN

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t

C a re A n d

R e n o v a te s t F lo o r P a ti e n t C a re

/6

-3

.4

.M

E P

.r v t

/2

/2

:0

:0

A

M

P103-407

B407 - LEVEL 3 - PLUMBING PLAN

Expand and Renovate B400 for

Urgent and Primary Care

500 E Veterans St, Tomah, WI 54660

676-19-327

400/407

05/20/2021 K.LEITCH P.KOTTA

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

ISSUED FOR

CONSTRUCTION

SCALE: 1/8" = 1'-0"

F2

B407 - LEVEL 3 - PLUMBING PLAN

1 PROVIDE NEW FLOOR DRAIN AND ROUTE TO

EXISTING WASTE AND VENT AS SHOWN. WASTE

PIPING SHOWN ON PLAN IS ROUTED IN FLOOR

BELOW.

2 GENERAL CONTRACTOR TO PATCH AND REPAIR

WALLS AS NEEDED. MATCH EXISTING CONDITIONS.

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

M

L

K.3

K

J.4

J.3

J

I.5

I.2

I

H.1

H

G

F.1

F

E

D

C

B

A

EXAM 4

MEDS

CORRIDOR

OC22

EXAM 7

ANTE ROOM

1108A

(E)3/4" O2

(E)3/4" MA

(E)1" MV

CONF

CONSULT ROOM 2

CONSULT ROOM 1

CLEAN UTILITY

EXAM 10

CHAIR EXAM

1085b

EXAM 6

OFFICE

EXAM 8

ALCOVE

WHEELCHAIR ALCOVE

EQ. ALCOVE

EXAM 13 / CONSULT RM 3

EXAM 2

TEAM WORK STATIONS

WAITING

1032B

TEAM AREA

1101A

TEAM AREA

1086A

PATIENT TLT

TLT

1022B

STAFF TLT

1019B

MECH

STAFF TOILET

BARIATRIC/ WOMENS HEALTH TLT

1100B

TLT

1104B

TLT/SHWR

1087 EXAM 2 - NEGATIVE PRESS

1104A

EXAM 5 BARIATRIC/ WOMENS HEALTH

1100A

RECEPT CHECK IN/OUT

1032A

WEIGH AREA

MEDS

CORRIDOR

OC11

EXAM 12

FAMILY TLT

NURSE MANAGER OFFICE

OFFICE

CLEAN SUPPLY

EXAM 7

SOILED UTILITY / SPD

CORRIDOR

OC13

EXAM 1

TLT

1108C

LOGISTICS STORAGE

AMBULANCE BAY

TELEHEALTH

TRIAGE

RECEPTION

1080C

TELEHEALTH

STOR

CLEAN UTLITY

VESTIBULE

EXAM 9

STAFF LOUNGE

EXAM 1- NEGATIVE PRESS

1108B

WAITING

CORRIDOR

OC20

SOILED UTILITY

MENTAL HEALTH

1099A

CORRIDOR

OC21

CORRIDOR

OC19

HALLWAY

OC14

EXAM 8

EXAM 11

LACTATION

HAC

TLT MENTAL HEALTH

1099B

A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR

TO BEGINNING OF WORK AND NOTIFY THE ARCHITECT/

ENGINEER OF ANY DISCREPANCIES BETWEN THE "AS-BUILT"

CONDITIONS AND THESE DRAWINGS.

B. COORDINATE ALL MEDICAL GAS INSTALLATION WITH GENERAL,

FIRE PROTECTION, VENTILATION, AND ELECTRICAL

CONTRACTORS. INSTALL ALL MEDICAL GAS PIPING AS HIGH AS

POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND

RISES) TO KEEP MEDICAL GAS PIPING TIGHT TO THE STRUCTURE

OR DUCTWORK ABOVE. OFFSET MEDICAL GAS PIPING TO AVOID

BEAMS AND INSTALLATION BY ALL TRADES.

C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS

AND CEILING TYPES, HEIGHTS, SOFFIT AREAS, AND ELEVATIONS

FOR INSTALLATION OF NEW MEDICAL PIPING, EQUIPMENT, ETC.

D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-

INSTALLIN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .