ATTACHMENT 6 - Plumbing.pdf
PDF 13 MB Posted
- Solicitation number
- 36C77621B0009
About this file
This document provides details for a federal contract solicitation to expand and renovate a medical facility. The solicitation number is 36C77621B0009 issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The contractor will be responsible for demolishing existing structures, site preparation, and furnishing all labor, materials, and work to expand and renovate the B400 building for urgent and primary care services at the Tomah medical center as outlined in the attached drawings and specifications. The response due date and contract award date are not stated.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DWR
DWS
SSD
GV
FD
ST
ST
V
AV
SAN
SAN
PD
AW
W
CA
G
LPG
HWR
LPHWR
HPHWR
140 HWR
HW
LPHW
HPHW
SHW
140 HW
CW
LPCW
HPCW
SCW
TW
PW PROCESS WATER
UNDER SLAB SANITARY DRAIN
UNDER SLAB STORM DRAIN
FOUNDATION DRAIN
PUMP DISCHARGE (TYPE AS INDICATED)
UTILITY COMPRESSED AIR
(PRESSURE AS INDICATED)
SANITARY OR WASTE DRAIN
SANITARY VENT
NATURAL GAS (PRESSURE AS INDICATED)
STORM (RAINWATER) DRAIN
SOFTENED HOT WATER
HIGH PRESSURE DOM HOT WATER RETURN
TEMPERED WATER
DOM HOT WATER RETURN
LOW PRESSURE DOM HOT WATER RETURN
SOFTENED COLD WATER
LOW PRESSURE DOM HOT WATER
HIGH PRESSURE DOM HOT WATER
HIGH PRESSURE DOM COLD WATER
LOW PRESSURE DOM COLD WATER
DOM COLD WATER
DOM HOT WATER
(CHILLED) DRINKING WATER RETURN
SUBSOIL DRAINAGE
(CHILLED) DRINKING WATER SUPPLY
(TEMP 110° OR AS INDICATED)
(TEMP 110° OR AS INDICATED)
(TEMP. 110° OR AS INDICATED)
(TEMP 110° OR AS INDICATED)
(TEMP 110° OR AS INDICATED)
(TEMP 110° OR AS INDICATED)
NATURAL GAS VENT
HIGH TEMP DOM HOT WATER RETURN
HIGH TEMP DOM HOT WATER
WASTE
ACID RESISTANT WASTE
ACID RESISTANT VENT
LIQUID PETROLEUM GAS
DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL
AIR VENT WITH VALVE
WATER HAMMER ARRESTOR
ELBOW - TURNED UP
FLOW INDICATING BALANCE VALVE
PLUG VALVE or GAS COCK
BALL VALVE
BUTTERFLY VALVE
PRESSURE GAUGE WITH COCK
DIRECTION OF FLOW
BRANCH TOP CONNECTION
TEE OUTLET - DOWN
ELBOW - TURNED DOWN
QUICK COUPLING
FLOW METER
DROP OR RISE
CAP OR PLUG
THERMOMETER
PIPE ALIGNMENT GUIDE
REDUCER - ECCENTRIC
REDUCER - CONCENTRIC
FLOOR DRAIN (ROUND)
ROOF DRAIN
FLOOR CLEANOUT or EXTERIOR CLEANOUT
PIPE UNION
PIPE ANCHOR
HOSE BIBB
WALL HYDRANT
CLEANOUT
PRESSURE REGULATOR VALVE FLANGED
FLEXIBLE CONNECTION
MECHANICAL EXPANSION JOINT
BASKET STRAINER
PRESSURE RELIEF VALVE or
STRAINER
SOLENOID VALVE
BALANCING VALVE
ISOLATION VALVE or GATE VALVE
CHECK VALVE
ANGLE VALVE
POINT OF DISCONNECT
POINT OF CONNECTION
DESCRIPTIONDESCRIPTIONSYMBOL SYMBOL
BACKFLOW PREVENTER (TYPE AS
INDICATED BY ASSE STANDARD)
TEMP PRESSURE RELIEF VALVE
FLOOR DRAIN (RECTANGULAR)
HEAT TRACED PIPE
(SYSTEM AS INDICATED)
A
L
M
B
C
N
OD
E
P
Q
R
S
F
G
TH
U
V
W
I
K
ABBR ABBREVIATION
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AG ABOVE GRADE
AMB AMBIENT
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
AP ACCESS PANEL
APPROX APPROXIMATE
LAV LAVATORY
LGT LENGTH
LPG LIQUID PETROLEUM GAS
LWT LEAVING WATER TEMPERATURE
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BHP BRAKE HORSEPOWER
BLV BALANCING VALVE
BTU/H BRITISH THERMAL UNIT PER HOUR
MAX MAXIMUM
MBH 1000 BTU/HR
MIN MINIMUM
MISC MISCELLANEOUS
MTG MOUNTING
NA NOT APPLICABLE
N.C. NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NITROUS OXIDE
N.O. NORMALLY OPEN
NO. NUMBER
NOM NOMINAL
NTS NOT TO SCALE
CAP. CAPACITY
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
COMP COMPRESSOR
COND CONDENSATE
CONT CONTINUATION
CV CHECK VALVE
CW COLD WATER
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DOM DOMESTIC
DWH DOMESTIC WATER HEATER
DWG DRAWING
DWS (CHILLED) DRINKING WATER SUPPLY
DWR (CHILLED) DRINKING WATER RETURN
OD OUTSIDE DIAMETER
OFL OVERFLOW
ORD OVERFLOW ROOF DRAIN
OSD OPEN SITE DRAIN
PC PUMPED CONDENSATE
PD
PUMPED DISCHARGE (TYPE AS
INDICATED)
PDI PLUMBING DRAINAGE INSTITUTE
PH PHASE (ELECTRICAL)
PPM PARTS PER MILLION
QTY QUANTITY
REF REFERENCE
RD ROOF DRAIN
RL RELOCATED MATERIAL OR EQUIPMENT
RV PRESSURE RELIEF VALVE
RPM REVOLUTIONS PER MINUTE
RO REVERSE OSMOSIS SUPPLY
SAN SANITARY OR WASTE
SCFM STANDARD CUBIC FEET PER MINUTE
SCW SOFTENED COLD WATER
SE SEWAGE EJECTOR
SG SPECIFIC GRAVITY
SK SINK
SH SHOWER
SHW SOFTENED HOT WATER
SP SUMP PUMP
SPEC SPECIFICATION
SQ. FT. SQUARE FEET
SS STAINLESS STEEL
SSD SUB-SOIL DRAINAGE
ST STORM (RAINWATER)
STD STANDARD
STM STEAM
SV SOLENOID VALVE
TEMP TEMPERATURE
TP TRAP PRIMER
TPU TRAP PRIMER UNIT
TPV TEMPERATURE AND PRESSURE
UON UNLESS OTHERWISE NOTED
V SANITARY VENT
VEL VELOCITY
VTR VENT THRU ROOF
W/ WITH
WC WATER CLOSET
WG WATER GAGE
WHA WATER HAMMER ARRESTOR
WH WALL HYDRANT
W/0 WITHOUT
EA EACH
ECO EXTERIOR CLEANOUT
EEW EMERGENCY EYE WASH
EEW/ESH COMBINATION EMERGENCY EYE WASH/
EEW/EFW COMBINATION EMERGENCY EYE WASH/
EFF EFFICIENCY
EFW EMERGENCY FACE WASH
EL ELEVATION
EQ EQUIVALENT
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EXP EXPANSION
EXT EXTERNAL
(E) EXISTING MATERIAL OR EQUIPMENT
_°F DEGREES FAHRENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FL FLOOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOOR SINK
FT FOOT OR FEET
FTD FOOTER DRAINAGE
G NATURAL GAS (PRESSURE AS
INDICATED)
GAL GALLON
GS GAS COCK
HB HOSE BIBB
HG MERCURY
HGT HEIGHT
HP HORSE POWER
HPCW HIGH PRESSURE DOM. COLD WATER
HPHW HIGH PRESSURE DOM. HOT WATER
(TEMP. 110° OR AS INDICATED)
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN. INCHES
KW KILOWATTS
SEE MECHANICAL SYMBOLS, LEGENDS AND EQUIPMENT SCHEDULES FOR ADDITIONAL ABBREVIATIONS. ALL ABBREVIATIONS, SYMBOLS, AND LEGENDS SHOWN ON THIS DRAWINGS ARE NOT NECESSARILY USED.
BV BALL VALVE
(PRESSURE AS INDICATED)
CA UTILITY COMPRESSED AIR
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GV GATE VALVE
HPHWR HIGH PRESSURE DOM. HOT WATER
RETURN (TEMP. 110° OR AS INDICATED)
HR HOUR
MSB MOP SERVICE BASIN
PRESS. PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH - GAUGE
PV PLUG VALVE
PW PROCESS WATER
TW TEMPERED WATER
TYP TYPICAL
UR URINAL
Y
YD YARD
(TYPE AS INDICATED)
EMERGENCY SHOWER
EMERGENCY FACE WASH
RELIEF VALVE
PRESSURE REGULATOR VALVE THREADED
SUB-METER FOR COLD WATER, HOT WATER, GAS
BCW BOOSTED COLD WATER
M
RD
FD
FD
CO
CO
S
HB
RISER DESIGNATION (TYPE AS INDICATED)
SECTION NUMBER
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
E1-1.0
E1-1.0
KEY NOTE
1. (E) PLUMBING SHOWN ON DRAWINGS IS BASED ON AVAILABLE DRAWINGS. INSTALLING CONTRACTOR IS
RESPONSIBLE FOR FIELD VERIFICATION OF (E) CONDITIONS
2. REMOVED WATER PIPING TO BE CAPPED & VALVED AT MAIN - NO DEADLEGS GREATER THAN 2.5D TO REMAIN
3. COORDINATE SYSTEM SHUT-DOWNS WITH FACILITIES
4. COORDINATE HOT/FREEZE TAPS WITH FACILITIES
5. ANY FIXTURES DESIGNATED BY FACILITIES TO BE RETAINED SHALL BE REMOVED AND TURNED OVER DAMAGE FREE
6. PIPING SHALL BE LABELED PER VA STANDARDS
7. AS-BUILT MARK-UPS WITH VALVE LOCATIONS & LIST SHALL BE TURNED OVER TO FACILITIES
8. ALL PENETRATIONS SHALL BE PROPERLY SEALED AND FIRE STOPPED
GENERAL NOTES:
PLUMBING PIPING SYMBOLS:
PLUMBING VALVES AND ACCESSORIES SYMBOLS:
DRAWING SYMBOLS:
ABBREVIATIONS:
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
FMD FLOW MEASURING DEVICE
DEDUCTIVE ALTERNATE:
1. Deduct Alternate #1: Remove B407 North Swing Space.
a. Remove 60 days from schedule.
2. Deduct Alternate #2: Remove B407 South Swing Space, Bathroom refresh and IT closet infrastructure from project.
a. Remove 90 days from schedule.
3. Deduct Alternate #3: Remove sealed bubble wall fountain in Waiting Room 1082 from project.
a. Remove 14 days from schedule.
4. Deduct Alternate #4: Rebuild (E) AHU rather than install new one.
a. Remove 90 calendar days from schedule.
5. Deduct Alternate #5: Remove exterior entrance canopy at staff lounge 1102.
a. Remove 14 calendar days from schedule.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:1
A
M
P-000
PLUMBING ABBREVIATIONS AND
SYMBOLS
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
PLUMBING SHEET INDEX
P-000 PLUMBING ABBREVIATIONS AND SYMBOLS
PD100 B400 - FOUNDATION - PLUMBING DEMOLITION PLAN
PD101 B400 - LEVEL 1 - PLUMBING DEMOLITION PLAN
PD102 B400 - LEVEL 2 - PLUMBING DEMOLITION PLAN
PD201 B400 - LEVEL 1 - MED GAS DEMOLITION PLAN
P-100 B400 - FOUNDATION - PLUMBING PLAN
P-101 B400 - LEVEL 1 - PLUMBING PLAN
P-102 B400 - LEVEL 2 - PLUMBING PLAN
P103-407 B407 - LEVEL 3 - PLUMBING PLAN
P-201 B400 - LEVEL 1 - MED GAS PLAN
P-300 B400 - PLUMBING ENLARGED PLANS
P-301 B400 - PLUMBING ENLARGED PLANS
P-302 B400 - PLUMBING ENLARGED PLANS
P-303 B400 - PLUMBING ENLARGED PLANS
P-304 B400 - PLUMBING ENLARGED PLANS
P-305 B400 - PLUMBING ENLARGED PLANS
P-400 PLUMBING RISERS
P-401 PLUMBING RISERS
P-402 PLUMBING RISERS
P-403 PLUMBING RISERS
P-404 PLUMBING RISERS
P-500 PLUMBING DETAILS
P-700 PLUMBING SCHEDULES
Pending Totals: NEW Plumbing systems in crawl space and 1st floor are original. Provide complete new plumbing piping systems, basement, crawl space, 1st floor. Replace all cold water, hot water, drain, waste, and vent piping throughout.
Fixtures / Piping 111175 [ Field Engineer Review Completed on 07/29/2014 by VHATOMBueniM.] [ Auto Generated Project Pending on 07/29/2014 for Project Number 676-14- 122 created by VHATOMBueniM.] Project 676-14-122 replaced the sanitary and storm sewer piping under the west wing.
Replace piping in the basement and in the 1st and 2nd floors, which exceed maximum life expectancy.
Fire Sprinkler / Pump 90803 Sprinkler piping is in good condition.
Pending Totals: NEW Ambulance Bay exhaust fan Square inline May have a control issue. Fan was running continuously when no source of CO contamination was present. (2010 vintage
Ventil (O.A. & Exh) 111174 Ventilation is in good condition.
Room Air Dist/Term 111173 VAV boxes and reheating coils in good condition.
Heating System 277776 2nd floor steam piping and convectors removed, replaced by hot water heaters or air-side heating.
Heating System 111168 The original steam piping and convectors on the 1st floor has exceeded their life expectancy and should be replaced.
Engr. Control syst. 111167 METASYS controls on the 1st and 2nd floors installed in 2005 and are in good condition.
Ducts & Water Dist 111166 Ducts and piping in good condition.
Pending Totals: NEW Air Handler (2004) serving the current dental in good condition, Air Handler is Mixed Air, Pre-Filter, Air Blender, Hot Water Pumped Heating Coil, CW Cooling Coil, Diffuser, Supply Fan with ABB VFD, Filter, Steam Humidifier on discharge *AHU-8 Trane MN: MCCB025UAODOUA SN:K04M65739A
Mechanical Rec No Description
Building 400 FCA Report
Disclaimer: These items have been determined to have reached their end of life usefulnes. This scope of work contract did not allocate funding for the below mentioned deficiencies. The following information was received from the owner's assessment report dated 1/6/2017.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
43886
05/20/2021 KAEKO LEITCH
1 2 3 4 5 6 6.1 7 7.8 8 9 9.1 9.9 10 11 11.2 12 13 14 18171615
M.3
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
(E)1 1/2" CW
(E)1 1/2" HW
(E)3/4" HWR
(E)2 1/2" CW
(E)2" HW
(E)1 1/4" HWR
(E)1 1/4" CW
(E)1 1/2" HW
(E)1/2" HWR
(E)1" HW
(E)2" CW
(E)1/2"
(E)1/2"
(E)3/4" HWR
(E)1 1/2" HW
(E)2 1/2" CW
(E )2
C
W (E
)1
/4
H W
(E )1
/2
H W
R
(E )4
W
(E)4" W
UP
(E)2"
(E)4"
(E)4" W
(E)6" W
(E)2" V
(E)4" W
(E)4" W
(E)2"
(E)4"
(E)3"
(E)2" V
(E)2" V
UP
UP
UP
UP
UP
UP
UP
UP
UP
(E)4" W
UP
(E)4" W
UP
(E)1 1/2"
UP
(E)2"
UP
(E)1"
UP
UP
(E)1" CW
(E)3/4" HW
(E)1/2" HWR
UP
UP
UP
(E)1/2" HW
(E)1/2" CW
(E)4" W
UP
(E)2" W
UP
(E)6" ST
UP
(E)3/4" CW
(E)3/4"
(E)4" W
(E)3/4"
(E)2 1/2" CW
(E)4" ST
UP
(E)1 1/2" HW
(E)1 1/4" HWR
(E )6
S
T
(E )4
W
(E)4" ST
UP
(E)2" W
(E)3/4" HW
(E)3/4" HWR
(E)2" CW
(E)3" W
UP
UP
UP
UP
(E)4" W
(E)4" W
(E)4" W
UP
(E)4" ST
UP
(E)4" W
UP
(E)6" ST
(E)4" W
(E)5" W
(E)6" ST
(E)2" W
(E)2" W
UP
(E)4" W
UP
(E)4" W
UP
(E)6" ST
(E)1/2"
(E)3/4" HW
(E)3/4" CW
(E)4" ST
UP
(E)1/2" HWR
UP
(E)1/2" HW
UP
(E)1/2" CW
UP
(E)3" W
UP
(E)3" W
(E)3/4" HWR
(E)2 1/2" CW
(E)1 1/2" HW
(E)4" W
(E )4
W
(E)4" W
(E )4
W
(E)12" W
(E)6" W
(E)8" ST
(E)8" ST
(E)4" W
(E)4" W (E)4" W
(E)4" W
(E)2" V
(E)2" V(E)2" V (E)2" V
(E)2" V
(E)2" V
(E)1 1/4" CW
(E)1 1/4" CW
1 1/4"
3/4" 1/2"
(E)3/4" CW
(E)2" CW
(E)1 1/4" HW
(E)4" W
(E)4" W
(E)4" W
(E)4" W
(E)4" W
(E)4" ST
(E)2" W
(E)2" W
UP
(E)4" W
(E)2" W
UP
(E)2" W
(E)2" W
(E)1/2" HWR
(E)2" W
(E)1/2"
(E)1/2"
(E)2"
(E)3/4"
(E)3/4"
(E)3/4"
(E)2 1/2" CW
(E)1 1/2" HW
(E)3/4" HWR
(E)4" W (E)2" W
UP
4"
UP(E)4" W
(E)6" ST
(E)3/4"
13 14
(E)2" W
UP
(E)2" W
(E)4" W
(E)4" ST
UP
UP
(E)4" ST
(E)4" ST
(E)2"
UP
(E)1/2" CW
UP
11 11
1212 1414
(E)1 1/4" HWR
(E)2" HW
(E)2 1/2" CW
(E )5
W
(E)2" W
UP
1/2" CW
(E)4" W
(E)1/2" CW
UP
UP
UP
(E)1/2" HWR
(E)1/2" HW
(E)1/2" CW
(E)4" W
(E)1/2" HW
(E)1/2" CW
(E)1/2" CW
(E)3"
(E)3"
(E)1/2"
(E)1/2"
(E )3
(E)1"
(E)2"
(E)1" CW
(E)3" W
(E)1/2" CW
(E)1/2" HW
(E)1/2" CW
(E)1/2" HW
(E )4
W
(E )6
S
T
(E )2
/2
C
W
(E )1
/2
H
W
(E)1/2" HWR
(E)1 1/4" HW
(E)1 1/2" CW
(E)4" W
(E)1/2"
(E)3/4"
(E)1/2"
(E)1/2"
(E )1
/2
(E )1
/2
(E )1
/2
(E)4" W
(E)4" ST
(E)1/2" CW
(E)4" W
(E)1/2" HW
UP
UP
UP
UP
(E)2"
(E)1/2"
(E)1/2"
(E)1/2" CW
(E)3/4" CW
(E)3/4" CW
(E)3/4" HW
(E)3/4" HWR
(E)2" W
(E )1
/4
H
W R
(E)3" W
(E)1/2" HW
(E)4" ST
(E)4" ST
(E)2" V
(E)2" W
(E)4" ST
(E)3" W
UP
UP
UP
UP
(E)2" W
(E)2" W
(E)2" W
UP
(E)2" W
UP
(E)3/4" CW
(E)3/4" HW
UP
UP
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK
AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-
BUILT" CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,
VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS
HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO
KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET
PLUMBING PIPING TO AVOID BEAMS.
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES,
HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING
PIPING, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF EXISTING
CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE INSTALLATION
OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL PLANS
FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY CEILING TILE OR GRID
DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH NEW BY THIS
CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR
INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH
WALLS AND/OR CEILINGS TO MATCH EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS
PANELS FOR ACCESSIBILITY.
G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:0
A
M
PD100
B400 - FOUNDATION - PLUMBING
DEMOLITION PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P. KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - FOUNDATION - PLUMBING DEMOLITION PLAN
1 REROUTE EXISTING EXTERIOR DRAIN SPOUTS IN
AREA OF NEW CONSTRUCTION. DRAIN SPOUTS
TO SPILL ONTO NEW ROOF.
2 REMOVE PIPING BACK TO POINT INDICATED ON
PLAN. CAP AND SEAL PIPING WATER-TIGHT.
3 REMOVE EXISTING WASTE AND WATER RISERS
BACK TO POINT INDICATED ON PLAN AND
PREPARE FOR FUTURE CONNECTION.
4 EXISTING FLOOR CLEANOUT TO REMAIN.
MAINTAIN EXISTING OPENING.
5 REMOVE WASTE SERVING SINK ABOVE BACK TO
POINT INDICATED ON PLAN.
6 REMOVE WASTE SERVING LAVATORY ABOVE
BACK TO POINT INDICATED ON PLAN.
7 REMOVE EXISTING WATER RISER BACK TO POINT
INDICATED ON PLAN AND PREPARE FOR FUTURE
CONNECTION.
8 EXISTING 2" VENT SERVING DECONTAM TANK TO
REMAIN.
9 TO EXISTING DECONTAM TANK LOCATED UNDER
AMBULANCE BAY.
10 TO EXISTING CATCH BASIN LOCATED UNDER
AMBULANCE BAY.
11 REMOVE WASTE AND WATER SERVING SINK
ABOVE TO POINT INDICATED ON PLAN.
12 REMOVE WASTE ANDW ATER SERVING LAVATORY
ABOVE TO POINT INDICATED ON PLAN.
13 REMOVE WASTE SERVING FLOOR DRAIN ABOVE
TO POINT INDICATED ON PLAN
14 REMOVE WASTE AND WATER SERVING WATER
CLOSET ABOVE BACK TO POINT INDICATED ON
PLAN.
15 REMOVE PIPING BACK TO POINT INDICATED ON
PLAN AND PREPARE FOR FUTURE CONNECTION.
16 REMOVE WASTE SERVING WATER CLOSET
ABOVE BACK TO POINT INDICATED ON PLAN.
17 REMOVE EXISTING WASTE RISER BACK TO POINT
INDICATED FOUNDATION PLAN AND PREPARE
FOR FUTURE LOCATION.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
(E)2" (E)2"
(E)2" V
(E)2"
(E)1 1/2"
(E)2" V
(E)2" V
(E)2" V
(E)2" V
(E)2" V
(E)2" V
1 1
(E) 2" CW
(E) 1/2" RHW
(E) 3/4" HW
(E)2" CW
(E)1 1/4" HW
(E)2" W UP
(E)1/2" CW
(E)1/2" HW
(E)1/2" HWR
(E)3" W
(E)3/4" UP
(E)1" UP
(E)2" UP
(E)1 1/2" UP
(E)1 1/4" CW
(E)3/4"
(E)3/4"
(E)1 1/4"
(E)3/4" CW
(E)1/2" HW
(E)1 1/2"
(E)2"
(E)2"
(E)2"
(E)2" W
(E)1/2" HW
(E)1/2" CW
(E)6" ST
(E)2" W (E)4" W
(E)1 1/2"
(E)2"
(E)1/2" CW UP & DN
(E)3/4" CW UP & DN
(E)3/4" HW UP & DN
(E)1 1/2"
(E)1 1/2"
(E)1 1/2"
(E)1/2"
(E)1/2"
(E)2" V
(E)2" V (E)1 1/2"
(E)4" ST UP
(E)1 1/2"
(E)1 1/2" (E)1 1/2"
(E)2" (E)2"
(E)2"
(E)2" W UP
(E)1 1/2"
(E)1/2" HWR UP
(E)1" HW UP
(E)1" CW UP
(E)3" (E)1 1/2" V
(E)2" V
(E)1 1/2"
(E)3"
(E)2"
(E)2"
(E)1 1/2" (E)1 1/2"
(E)4" W
(E)1 1/2"
(E)1 1/2"
(E)4"
(E)1 1/2" V
(E)1 1/2" V
(E)1 1/2" V
(E)1 1/2"
(E)1 1/2" V
(E)1/2" CW
(E)1/2" HW
(E)1/2" CW
UP & DN
UP & DN
UP & DN
UP & DN
(E)2" V
(E)2" W
UP & DN
UP & DN
UP
(E)4" ST
(E)1/2" CW
(E)4" W
(E)1/2" HW
UP & DN
UP & DN
UP & DN
UP & DN
(E)1 1/2" W
UP & DN
(E)2" V
(E)2" V
(E)2" V
UP
UP
UP
(E)1/2" HWR
(E)4" W
UP
(E)3" W
(E)2" W
(E)2" V
(E)3" W
DN
UP
UP
UP
(E)4" W
(E)4" ST
(E)4" W
UP & DN
UP & DN
UP & DN
(E)1 1/2"
(E)1 1/2"
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK
AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-
BUILT" CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,
VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS
HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO
KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET
PLUMBING PIPING TO AVOID BEAMS.
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES,
HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING
PIPING, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF EXISTING
CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE INSTALLATION
OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL PLANS
FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY CEILING TILE OR GRID
DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH NEW BY THIS
CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR
INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH
WALLS AND/OR CEILINGS TO MATCH EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS
PANELS FOR ACCESSIBILITY.
G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.
EXAM
EXAM
EXAM
OFFICE
OFFICE
OFFICE
OFFICE
EXAM
OFFICE
OFFICE
DIRTY UTILTIY
OFFICE
WAITING
NURSE STATION
OFFICE
EXAM
CONFERENCE
EXAM
EXAM
EXAM
1002OFFICE
OFFICE
WOMEN VISITOR TOILET
TLT
MECH
IT
OFFICE
OFFICE
OFFICE
EXAM
STAIR
WAITING / CIRCULATION
EXAM
EXAM
EXAM
NURSE STATION
1085 EXAM
EXAM
WOMEN TLT
EXAM
EXAM
OFFICE
STORAGE
1096A
STAFF TOILET
STAFF TOILET
AMBULANCE GARAGE
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:0
A
M
PD101
B400 - LEVEL 1 - PLUMBING
DEMOLITION PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
1 REMOVE FIXTURE, WASTE, WATER AND VENT BACK
TO POINTS INDICATED ON PLAN.
2 REROUTE WATER RISERS FROM BASEMENT TO
OVERHEAD.
3 REMOVE PLUMBING FIXTURE AND PIPING BACK TO
MAIN. CAP AND SEAL WATER TIGHT AT MAIN.
4 REMOVE EXISTING WASTE RISER BACK TO POINT
INDICATED FOUNDATION PLAN AND PREPARE FOR
FUTURE LOCATION.
5 REMOVE FLOOR DRAIN AND ASSOCIATED WASTE
AND VENT BACK TO POINT INDICATED ON PLAN. SEE
PD100 FOR UNDERGROUND DEMO.
6 REMOVE 1/2" HWR BACK TO POINT INDICATED ON PL
AND PREPARE FOR FUTURE CONNECTION. SEE
P-302 FOR CONTINUATION.
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 1 - PLUMBING DEMOLITION PLAN
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
1 1
(E)2"
(E)2"
(E)2"
(E)2"
(E)2" (E)2"
(E)2"
(E)2" UP
(E)2"
(E)2"
(E)2"
(E)2"
(E)2" DN
(E)2"
(E)2"
(E)2"
(E)2" DN
(E)2" DN
(E)2"
(E)2"
(E)2"
(E)2" DN
(E)2" V
(E)2" V (E)2" V
(E)2" V UP
(E)2" W UP
(E)2" DN
(E)2"
(E)2" DN
(E)2"
(E)2" DN
(E)2" (E)2" DN
(E)2" V
(E)2" V
(E)2" V
(E)2" V
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING
WORK AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN
THE "AS-BUILT" CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,
VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS
HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO
KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET
PLUMBING PIPING TO AVOID BEAMS.
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING
TYPES, HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW
PLUMBING PIPING, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF
EXISTING CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE
INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH
ARCHITECTURAL PLANS FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY
CEILING TILE OR GRID DAMAGED DURING CONSTRUCTION SHALL BE REPLACED
WITH NEW BY THIS CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR
INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH
WALLS AND/OR CEILINGS TO MATCH EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS
PANELS FOR ACCESSIBILITY.
G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.
OFFICE
UNOCCUPIED
CLEAN UTILITY
LAB
MECHANICAL
OFFICE
2015A
TOILET, STAFF
2030A
UTILITY ROOM, SOILED
TOILET
LOCKER ROOM
LAB
TREATMENT ROOM
EXAM/ TREATMENT ROOM
EXAM/ TREATMENT ROOM
2022TREATMENT ROOM
EXAM/TREATMENT ROOM
TREATMENT ROOM
STAIR
S9
OFFICE
2007A
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:0
A
M
PD102
B400 - LEVEL 2 - PLUMBING
DEMOLITION PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 2 - PLUMBING DEMOLITION PLAN
1 REMOVE FIXTURE, WASTE, WATER AND VENT BACK TO
POINTS INDICATED ON PLAN.
2 REMOVE ALL EXISTING DRAIN SPOUTS SERVING
CANOPY AND PROVIDE NEW ROUTING FOR SPILLOVER
ON NEW ROOF.
3 REMOVE EXISTING RO WATER SYSTEM AND
ASSOCIATED PIPING. NOT ABLE TO ABTAIN EXISTING
DRAWINGS OF ROUTING. CONTRACTOR TO FIELD
VERIFY ROUTING AND PROVIDE COORDINATED
DRAWINGS PER SPECIFICATION SECTION 22 05 11,
PARAGRAPH 1.4.1.
4 REMOVE EXISTING VENT PIPE TO THIS PINT AND
PREPARE TO RECONNECT TO NEW FIXTURE.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
BUILDING 400 MEDICAL VACUUM VALVE SCHEDULE
BUILDING 400 MEDICAL OXYGEN VALVE SCHEDULE
BUILDING 400 DENTAL AIR VALVE SCHEDULE
BUILDING 400 MEDICAL AIR VALVE SCHEDULE
BUILDING 400 DENTAL VACUUM VALVE SCHEDULE
BUILDING 400 EXISTING MEDICAL GAS VALVE SCHEDULE
TYPEFLOOR NO.MARK
MV-OC19-09 EAST ZONE SHUT OFF
LOCATION
OC19 CORRIDOR1ST FLOOR
TYPEFLOOR NO.MARK
O2-OC15-03 SHUT OFF FOR FUTURE USE
O2-OC19-12
LOCATION
1ST FLOOR OC15 CORRIDOR
1ST FLOOR OC19 CORRIDOR EMERGENCY SHUT OFF
DA-1041A-01
TYPEFLOOR NO.
MAIN SHUT OFF1ST FLOOR
MARK LOCATION
ROOM 1041A
O2-OC15-04 1ST FLOOR OC15 CORRIDOR EAST ZONE SHUT OFF
MA-OC19-09
TYPEFLOOR NO.
EMERGENCY SHUT OFF1ST FLOOR
MARK LOCATION
OC19 CORRIDOR
TYPEFLOOR NO.MARK LOCATION
DV-1017-01 MAIN SHUT OFF NORTH WEST CORRIDORROOM 10171ST FLOOR
1 2 3 4 5 6 6.1 7 7.8 8 9 9.1 9.9 10 11 11.2 12 13 14 18171615
M.3
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
DUE TO LIMITED LIMITED INFORMATION AND
ACCESS CONTRACTOR TO FIELD VERIFY AND
REMOVE ALL ABANDONED
DENTAL GAS PIPING IN FIRST
FLOOR CEILING SERVING
SECOND FLOOR. PROVIDE COORDINATION
DRAWINGS PER SPECIFICATION 22 0511,
PARAGRAPH 1.4.I. AND COORDINATE WITH
PROJECT ENGINEER PRIOR TO ANY
DEMOLITION.
(E)3/4" O2
(E)1" MV
(E)3/4" MA
(E)3/4" O2
(E)3/4" MA
(E)1" MV
EXAM
1027 EXAM
EXAM
OFFICE
OFFICE
OFFICE
OFFICE
EXAM
OFFICE
OFFICE
DIRTY UTILTIY
OFFICE
WAITING
NURSE STATION
OFFICE
EXAM
CONFERENCE
EXAM
EXAM
EXAM
OFFICE
OFFICE
WOMEN
VISITOR
TOILET
TLT
MECH
IT
1005 OFFICE
OFFICE
OFFICE
EXAM
STAIR
WAITING / CIRCULATION
EXAM
EXAM
EXAM
NURSE STATION
EXAM
EXAM
WOMEN TLT
EXAM
EXAM
OFFICE
STORAGE
1096A
STAFF TOILET
STAFF TOILET
AMBULANCE GARAGE
A. DEMOLITION DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE BASED ON
FIELD OBSERVATION AND EXISTING RECORD DRAWINGS. CONTRACTOR
SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK AND
NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN
"AS-BUILT" CONDITIONS AND THESE DRAWINGS. PROVIDE ADDITIONAL
DEMOLITION AS REQUIRED BASED ON FIELD CONDITIONS.
B. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF
EXISTING CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR
THE DEMOLITION OF EXISTING MEDICAL GAS PIPING, EQUIPMENT, ETC.
VERIFY WITH ARCHITECTURAL PLANS FOR CEILING WORK BY THE GENERAL
CONTRACTOR. ANY CEILING TILE OR GRID DAMAGED DURING
CONSTRUCTION SHALL BE REPLACED WITH NEW BY THIS CONTRACTOR.
C. THIS CONTRACTOR SHALL OPEN ALL WALLS AND/ OR CEILINGS FOR
DEMOLITION OF EXISTING MEDICAL GAS PIPING, EQUIPMENT, ETC. AS
REQUIRED.
D. THIS CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL HOLE/WALLS AND/
OR CEILINGS FROM DEMOLISHED MEDICAL GAS PIPING, EQUIPMENT, ETC. IN
FLOORS, WALLS, AND CEILINGS TO MATCH EXISTING.
E. REFER TO ARCHITECTURAL SHEET GI101 FOR PARTITION RATINGS.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:0
A
M
PD201
B400 - LEVEL 1 - MED GAS
DEMOLITION PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 1 - MED GAS DEMOLITION PLAN
1 REMOVE ZONE VALVE BOX.
2 LOCATION OF EXISTING MED GAS RISERS. DUE TO
LIMITED INFORMATION OF EXISTING MED GAS
DRAWINGS, CONTRACTOR TO VERIFY LOCATION OF
EXISTING SHUTOFF VALVES.
3 REMOVE MED GAS PIPING BACK TO POINT
INDICATED ON PLAN AND PREPARE PIPING FOR
FUTURE CONNECTION. SEE NEW WORK FOR
DETAILS.
4 REMOVE EXISTING MED GAS DROPS AND
ASSOCIATED OUTLETS AT HEADWALLS AS
INDICATED ON PLAN.
5 REMOVE EXISTING AREA ALARM PANEL, MED GAS
PIPING, AND ASSOCIATED ACCESSORIES.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
P-301
F1
P-301
F4
P-300
F5
P-300
C1
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK
AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE
"AS-BUILT" CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,
VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS
HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO
KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE.
OFFSET PLUMBING PIPING TO AVOID BEAMS.
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING
TYPES, HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW
PLUMBING PIPING, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF
EXISTING CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE
INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH
ARCHITECTURAL PLANS FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY
CEILING TILE OR GRID DAMAGED DURING CONSTRUCTION SHALL BE REPLACED
WITH NEW BY THIS CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR
INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH
WALLS AND/OR CEILINGS TO MATCH EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS
PANELS FOR ACCESSIBILITY.
G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.
H. PROVIDE NEPCO MIXING VALVE TO ALL NEW EYEWASH STATIONS, LAVATORIES,
SHOWERS, AND SINKS.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:1
A
M
P-100
B400 - FOUNDATION - PLUMBING
PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - FOUNDATION - PLUMBING PLAN
1. NO KEYNOTES ON THIS SHEET.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
CONF
MEDS
EXAM 7
EXAM 4
ANTE ROOM
1108A
P-302
F5
P-302
C1
P-303
F1
P-303
F4
HAC
TLT
1104B
CONSULT ROOM 2
CONSULT ROOM 1
CLEAN UTILITY
EXAM 10
CHAIR EXAM
1085b
EXAM 6
OFFICE
EXAM 8
ALCOVE
WHEELCHAIR ALCOVE
EQ. ALCOVE
EXAM 13 / CONSULT RM 3
EXAM 2
TEAM WORK STATIONS
WAITING
1032B
TEAM AREA
1101A
TEAM AREA
1086A
PATIENT TLT
TLT
1022B
STAFF TLT
1019B
MECH
STAFF TOILET
BARIATRIC/ WOMENS HEALTH TLT
1100B
TLT/SHWR
EXAM 2 - NEGATIVE PRESS
1104A
EXAM 5 BARIATRIC/ WOMENS HEALTH
1100A
RECEPT CHECK IN/OUT
1032A
WEIGH AREA
MEDS
CORRIDOR
OC11EXAM 12
FAMILY TLT
NURSE MANAGER OFFICE
OFFICE
CLEAN SUPPLY
EXAM 7
SOILED UTILITY / SPD
CORRIDOR
OC13
EXAM 1
TLT
1108C
LOGISTICS STORAGE
AMBULANCE BAY
TELEHEALTH
TRIAGE
RECEPTION
1080C
TELEHEALTH
STOR
CLEAN UTLITY
VESTIBULE
EXAM 9
STAFF LOUNGE
EXAM 1- NEGATIVE PRESS
1108B
WAITING
CORRIDOR
OC20
SOILED UTILITY
MENTAL HEALTH
1099A
CORRIDOR
OC21
CORRIDOR
OC19
CORRIDOR
OC22
HALLWAY
OC14
EXAM 8
EXAM 11
LACTATION
IT
1051B
ELECT
1051A
TLT MENTAL HEALTH
1099B
MAIN ELEC A
1104C MAIN ELEC B
1104D
P-912 P-114
P-103
P-103
P-103
P-502
PLUMBING FIXTURE ROUGH-IN
CONNECTION SCHEDULE
FIXTURE WASTE VENT CW HW
LAVATORY
WATER CLOSET (FV)
SINK
CLINICAL SINK
MOP BASIN
NOTES:
1. SIZES SHALL BE AS SCHEDULED UNLESS OTHERWISE NOTED ON
DRAWINGS.
2" 2" 1/2" 1/2"
4" 2" 1" -
4" 2"
2"
2"3"
2" 1/2"
1/2"
3/4"
1/2"
1/2"
3/4"
EMERG. EYE WASH 2"2" 1"
SHOWER 2"2" 3/4"3/4"
1"
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK
AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-
BUILT" CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,
VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS
HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO
KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET
PLUMBING PIPING TO AVOID BEAMS.
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES,
HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING
PIPING, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF
EXISTING CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE
INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH
ARCHITECTURAL PLANS FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY
CEILING TILE OR GRID DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH
NEW BY THIS CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR
INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH
WALLS AND/OR CEILINGS TO MATCH EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS
PANELS FOR ACCESSIBILITY.
G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.
H. PROVIDE NEPCO MIXING VALVE TO ALL NEW EYEWASH STATIONS, LAVATORIES,
SHOWERS, AND SINKS. SEE DETAIL B6 ON SHEET P501.
I. FIRE CAULK PIPE PENTERATIONS AT RATED WALLS, CEILING, AND FLOORS. REFER
THE ARCHITECTURE SHEET GI101, GI102, AND GI104 FOR FIRE RATINGS.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:3
A
M
P-101
B400 - LEVEL 1 - PLUMBING PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 1 - PLUMBING PLAN
1. NO KEYNOTES ON THIS SHEET.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
1 2 3 4 5 6
6.1
7 7.8 8 9 9.1 9.9 10 11 11.2 12 13 14 18171615
M.3
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
3" V UP
4" VTR
P-304
F4
FREEZELESS
ROOF HYDRANT
P-811
MECH
OFFICE TECHNICIANS
INFUSION ROOM
MECH
EXAM 1
CLEAN UTILITY - LOGISTICS
TLT
TEAM WORK AREA
MED EQUIPMENT STORAGE
EXAM 5
EXAM 3
EXAM 2
EXAM 4
CORRIDOR
OC22
CLEAN LINENS
SOILED UTILITY
TEAM WORK / SUPPORT
UCC
HALLWAY
UCC
TEMPORARY
2007A
SOILED UTILITY
TELE
8" RD
8" ORD
8" RD
8" ORD
PLUMBING FIXTURE ROUGH-IN
CONNECTION SCHEDULE
FIXTURE WASTE VENT CW HW
LAVATORY
WATER CLOSET (FV)
SINK
CLINICAL SINK
MOP BASIN
NOTES:
1. SIZES SHALL BE AS SCHEDULED UNLESS OTHERWISE NOTED ON
DRAWINGS.
2" 2" 1/2" 1/2"
4" 2" 1" -
4" 2"
2"
2"3"
2" 1/2"
1/2"
3/4"
1/2"
1/2"
3/4"
EMERG. EYE WASH 2"2" 1"
SHOWER 2"2" 3/4"3/4"
1"
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK
AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-
BUILT" CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,
VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS
HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO
KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET
PLUMBING PIPING TO AVOID BEAMS.
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES,
HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING
PIPING, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF EXISTING
CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE INSTALLATION
OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL PLANS
FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY CEILING TILE OR GRID
DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH NEW BY THIS
CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR
INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH
WALLS AND/OR CEILINGS TO MATCH EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS
PANELS FOR ACCESSIBILITY.
G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.
H. PROVIDE NEPCO MIXING VALVE TO ALL NEW EYEWASH STATIONS, LAVATORIES,
SHOWERS, AND SINKS. SEE DETAIL B6 ON SHEET P501.
I. FIRE CAULK PIPE PENTERATIONS AT RATED WALLS, CEILING, AND FLOORS. REFER
THE ARCHITECTURE SHEET GI101, GI102, AND GI104 FOR FIRE RATINGS.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:3
A
M
P-102
B400 - LEVEL 2 - PLUMBING PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 2 - PLUMBING PLAN
1 CONNECT WASTE BELOW FLOOR. WATER AND VENT
IN CEILING TO NEW FIXTURES.
2 PROVIDE MIXING VALVE WITHIN 2'-0" OF FIXTURE.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
407.A
407.B1
407.C1
407.D1
407.E
407.F
407.G1
407.H
407.I
407.J
407.K
407.L
407.M
407.N
407.14407.11 407.12.1407.12
407.9407.7
407.41407.4407.3407.21
J.39
J.40
J.41
407.H2
407.H1
407.13.1
FD-C
FD-C
2" V1
2" V
2" W
DN
UP
OFFICE
3790A
MECH / ELECT
3790C
OFFICE
3775B
OPEN OFFICE
OFFICE
3790B
MECH / ELEC
RESTROOM
OPEN OFFICE
DEDUCT ALT 1:
REMOVE WORK
ASSOCIATED WITH
B407 NORTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
BEDROOM
BEDROOM
MECHANICAL ROOM
3780A
MECHANICAL ROOM
BEDROOM
MEDS
3711A
BEDROOM
STORAGE
DINING
3749A
BREAK
3765 BEDROOM
WARD
READING
BEDROOM
TREATMENT
CT CLINIC
TOILET
3744A
CLOSET
RESTROOM
SHOWERS
3784A
DRESSING
DRESSING
SHOWERS
3715A
Room
DAY ROOM
TOILET
CLOSET
3750A
CORRIDOR
7C36
CORRIDOR
7C31
DATA CLOSET
3772A
ELECTRICAL
CORRIDOR
7C38
CORRIDOR
7C39
OFFICE
STAIR
S4
CORRIDOR
7C37
CORRIDOR
7C32
HAC
3736A
NURSES
BEDROOM
BEDROOM
READING
UTILITY
WARD
STAIR
S6
DINING
LOCKERS
WARD
BEDROOM
BEDROOM
CLEAN LINENS
Room
CLOSET
ELEVATOR LOBBY
7C35
ELEVATOR
CORRIDOR
CORRIDOR
7C33
BEDROOM
LAUNDRY
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH. 2
PLUMBING FIXTURE ROUGH-IN
CONNECTION SCHEDULE
FIXTURE WASTE VENT CW HW
LAVATORY
WATER CLOSET (FV)
SINK
CLINICAL SINK
MOP BASIN
NOTES:
1. SIZES SHALL BE AS SCHEDULED UNLESS OTHERWISE NOTED ON
DRAWINGS.
2" 2" 1/2" 1/2"
4" 2" 1" -
4" 2"
2"
2"3"
2" 1/2"
1/2"
3/4"
1/2"
1/2"
3/4"
EMERG. EYE WASH 2"2" 1"
SHOWER 2"2" 3/4"3/4"
1"
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK
AND NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-
BUILT" CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION,
VENTILATION, AND ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS
HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND RISES) TO
KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET
PLUMBING PIPING TO AVOID BEAMS.
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES,
HEIGHTS, SOFFIT AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING
PIPING, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-INSTALLING OF EXISTING
CEILING TILE NOT REMOVED BY THE GENERAL CONTRACTOR FOR THE INSTALLATION
OF NEW PLUMBING PIPING, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL PLANS
FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY CEILING TILE OR GRID
DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH NEW BY THIS
CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR CEILINGS FOR
INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC. AS REQUIRED. PATCH
WALLS AND/OR CEILINGS TO MATCH EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL, CONTROL, AND ACCESS
PANELS FOR ACCESSIBILITY.
G. ALL SHUT-OFF VALVES, ETC. SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.
H. PROVIDE NEPCO MIXING VALVE TO ALL NEW EYEWASH STATIONS, LAVATORIES,
SHOWERS, AND SINKS.
I. REFER TO ARCHITECTURE SHEET GI104 FOR PARTITION RATINGS.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
B407 KEY PLAN
AREA A
KEY PLAN
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:0
A
M
P103-407
B407 - LEVEL 3 - PLUMBING PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F2
B407 - LEVEL 3 - PLUMBING PLAN
1 PROVIDE NEW FLOOR DRAIN AND ROUTE TO
EXISTING WASTE AND VENT AS SHOWN. WASTE
PIPING SHOWN ON PLAN IS ROUTED IN FLOOR
BELOW.
2 GENERAL CONTRACTOR TO PATCH AND REPAIR
WALLS AS NEEDED. MATCH EXISTING CONDITIONS.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
EXAM 4
MEDS
CORRIDOR
OC22
EXAM 7
ANTE ROOM
1108A
(E)3/4" O2
(E)3/4" MA
(E)1" MV
CONF
CONSULT ROOM 2
CONSULT ROOM 1
CLEAN UTILITY
EXAM 10
CHAIR EXAM
1085b
EXAM 6
OFFICE
EXAM 8
ALCOVE
WHEELCHAIR ALCOVE
EQ. ALCOVE
EXAM 13 / CONSULT RM 3
EXAM 2
TEAM WORK STATIONS
WAITING
1032B
TEAM AREA
1101A
TEAM AREA
1086A
PATIENT TLT
TLT
1022B
STAFF TLT
1019B
MECH
STAFF TOILET
BARIATRIC/ WOMENS HEALTH TLT
1100B
TLT
1104B
TLT/SHWR
1087 EXAM 2 - NEGATIVE PRESS
1104A
EXAM 5 BARIATRIC/ WOMENS HEALTH
1100A
RECEPT CHECK IN/OUT
1032A
WEIGH AREA
MEDS
CORRIDOR
OC11
EXAM 12
FAMILY TLT
NURSE MANAGER OFFICE
OFFICE
CLEAN SUPPLY
EXAM 7
SOILED UTILITY / SPD
CORRIDOR
OC13
EXAM 1
TLT
1108C
LOGISTICS STORAGE
AMBULANCE BAY
TELEHEALTH
TRIAGE
RECEPTION
1080C
TELEHEALTH
STOR
CLEAN UTLITY
VESTIBULE
EXAM 9
STAFF LOUNGE
EXAM 1- NEGATIVE PRESS
1108B
WAITING
CORRIDOR
OC20
SOILED UTILITY
MENTAL HEALTH
1099A
CORRIDOR
OC21
CORRIDOR
OC19
HALLWAY
OC14
EXAM 8
EXAM 11
LACTATION
HAC
TLT MENTAL HEALTH
1099B
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR
TO BEGINNING OF WORK AND NOTIFY THE ARCHITECT/
ENGINEER OF ANY DISCREPANCIES BETWEN THE "AS-BUILT"
CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL MEDICAL GAS INSTALLATION WITH GENERAL,
FIRE PROTECTION, VENTILATION, AND ELECTRICAL
CONTRACTORS. INSTALL ALL MEDICAL GAS PIPING AS HIGH AS
POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND
RISES) TO KEEP MEDICAL GAS PIPING TIGHT TO THE STRUCTURE
OR DUCTWORK ABOVE. OFFSET MEDICAL GAS PIPING TO AVOID
BEAMS AND INSTALLATION BY ALL TRADES.
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS
AND CEILING TYPES, HEIGHTS, SOFFIT AREAS, AND ELEVATIONS
FOR INSTALLATION OF NEW MEDICAL PIPING, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-
INSTALLIN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .