ATTACHMENT 14 - Hazard.pdf
PDF 2 MB Posted
- Solicitation number
- 36C77621B0009
About this file
This is a solicitation for a construction project to expand and renovate an urgent and primary care facility. The contractor shall demolish existing structures and complete all work required by the drawings and specifications, including demolition, site preparation, and furnishing labor and materials. The project involves expanding and renovating the B400 building for urgent and primary care services at a Department of Veterans Affairs medical center located in Tomah, Wisconsin. The solicitation number is 36C77621B0009.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
E
F F
G G
F.1 F.1
H H
I I
J
J
K K
L L
M M
5 6 6.1 7
14 15 16 17 18 19
H.5 H.5
I.4 I.4
J.7 J.7
AMBULANCE
GARAGE
10981098
MAIN
RECEPTION
10531053
OFFICE
ADMISSIONS
10791079
OFFICE
CLERK
10781078
OFFICE
10751075
OFFICE
XX
OFFICE
10741074
OFFICE
10731073
EXAM
10711071
EXAM
10721072
OFFICE
10701070
CLINIC
RECEPTION
10521052
PATIENT
ED
CONFERENCE
10551055
WAITING
10501050
INTAKE
10541054
INTAKE
10561056
FAMILY
TOILET
10421042
MEN'S
TOILET
10401040
WOMEN'S
TOILET
10381038
ELETRICAL
400E3A400E3A
ELECTRICAL
400E3400E3
TLT
10321032
WOMEN
VISITOR
TOILET
10341034
EXAM
10321032
OFFICE
10371037
ELEVATOR
XX
OFFICE
10351035MECH
10311031
MECHANICAL
400M3400M3
ANTE
10291029
STORAGE
10301030
WAITING /
CIRCULATION
10801080
WAITING
1080B1080B
SECURITY
XX
STAIR
S7S7
EXAM
1066E1066E
EXAM
1066D1066D
EXAM
1066C1066C
EXAM
1060A1060A
EXAM
1060B1060B
EXAM
1060C1060C
EXAM
1060D1060D
EXAM
1060E1060E
EXAM
1060F1060F
EXAM
1064B1064B
EXAM
1064C1064C
EXAM
10671067
CARE
TEAM
XX
COMPRESSOR
ROOM
1041A1041A
JAN
10411041
AGENT
CASHIER
10471047
TRAVEL &
PATIENT
FUNDS
10451045
ENCLOSED
WALKWAY
XX
OFFICE
PROVIDERS
1066G1066G
OFFICE
PROVIDERS
1066F1066F
OFFICE
RN'S
1064A1064A
OFFICE
10441044
SOILED
UTILITY
1066B1066B
TLT
1066A1066A
IT
1051B1051B
ELECT
1051A1051A
OFFICE
RNS
10651065
INTERVIEW
ROOM
10631063
OMNI
CELL
CLOSET
10611061
CLEAN
STORAGE
10691069
VAULT -
ELEC
400E3C400E3C
VAULT -
ELECT?
XX
STAIR
S8S8STAIR
S8S8
ENTRY
1080A1080A
OFFICE
10331033
STAFF
TOILET
10961096
STAFF
TOILET
10941094
OFFICE
10931093
EXAM
10911091
EXAM
10921092
WOMEN
TLT
10901090
NURSE
STATION
10851085 EXAM
10881088
EXAM
10861086
EXAM
10831083
EXAM
10841084
EXAM
10821082
STAIR
NURSE
STATION
10131013
EXAM
10101010
EXAM
10061006
EXAM
10041004
EXAM
10021002
OFFICE
10011001
OFFICE
10111011
OFFICE
10001000
CONFERENCE
10031003
DIRTY
UTILTIY
10181018
EXAM
10271027
OFFICE
10231023
OFFICE
10191019
OFFICE
10161016
EXAM
10221022
EXAM
10241024
OFFICE
10251025
OFFICE
10261026
OFFICE
10211021
OFFICE
10171017
WAITING
10131013
IT
10051005
EXAM
10281028
CORRIDOR
OC19OC19
STORAGE
1096A1096A
CORRIDOR
OC17OC17
CORRIDOR
OC11OC11
FLOOR MASTIC ON CONCRETE
CORRIDOR
OC12OC12
REMOTE DECONTAMINATION
SITE (AT GRADE).
COORDINATE FINAL
LOCATION WITH FACILITY.
AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL
I.5 I.5
HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES
1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF WISCONSIN AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, AND
STATE OF WISCONSIN DEPARTMENT OF PUBLIC HEALTH.
2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134
3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.
CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS (SHEET GI201) FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. THE ABATEMENT CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE REGULATIONS. WHERE OVERLAPS OCCUR, THE
MOST STRINGENT REQUIREMENTS APPLY.
4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A WIS LICENSED ASBESTOS
ABATEMENT CONTRACTOR.
5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A WIS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS SHALL BE
REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.
6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED.OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL
CONTRACTOR, AND THE COR.
7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR ASBESTOS
EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE ENVIRONMENT.
8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.
9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED MATERIALS
AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT DOCUMENTS. THE OWNER OR THIER REPRESETATIVE SHALL NOT BE RESPONSIBLE FOR LOST, DAMAGED OR STOLEN ITEMS.
10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE
NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.
11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE
LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, AND THE WISCONSIN DPH.
12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.
13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS BY THE
CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.
14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION
MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.
15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS SHOWING THE
NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.
16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES. THE BUILDING IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG METHODS ON
THE GROUND FLOOR TO MINIMIZE IMPACT ON BUILDING OPERATIONS.
17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD ABATEMENT
REQUIREMENTS, AND THE COR.
18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR. ALL
OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.
19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.
20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL BE
RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM ON HVAC
EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.
21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS. COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED
HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY
PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED TO THE OWNER WITHIN 35 DAYS OF
WASTE LEAVING THE SITE.
22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, AND SPECIFIC ORIGINAL FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY. SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR
ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.
23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
KEYNOTES-
LEGEND
QUANTITIES
PATH INDICATED IS PROVIDED FOR INTENT ONLY.
COORDINATE FINAL REMOVAL PATHWAYS, PHASING,
AND METHODS WITH GENERAL CONTRACTOR AND COR.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AREA A
B400 KEY PLAN
AREA B
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: 612-249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t C a re
A n d
R e n o v a te s t F lo o r
P a ti e n t C a re
/6
-3
.B
.A
.r v t
/1
/2
:5
:4
A
M
H101
B400 - LEVEL 1 - HAZARDOUS MATERIAL
ABATEMENT
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
676-19-327
05/20/2021 MRP ENN
ISSUED FOR
CONSTRUCTION
Expand and Renovate B400 for Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
1/8" = 1'-0" F1
B400 LEVEL 1 - ASBESTOS ABATEMENT PLAN
1 ABATE FLOOR MASTIC ON CONCRETE FLOOR IN AREAS AS INDICATED. SEE
LEGEND BELOW.
AREAS ANTICIPATED TO BE IN-SCOPE OF REQUIRED MODIFICATION, COORDINATE WITH
DEMOLITION AND NEW WORK TO DETERMINE SPECIFIC EXTENTS.
± 2285 SF BLACK FLOOR MASTIC ON CONCRETE
Revisions: Date:
1 2
F F
G G
F.1
H H
I I
J J
K K
L
L
M M
3 4 5
H.5 H.5
I.4
J.7 J.7
SOILED
UTILITY
2055C2055C
OFFICE
20932093
OFFICE
20942094
OFFICE
20922092
OFFICE
20912091
OFFICE
20892089
OFFICE -
SW
20902090
OFFICE
20882088
OFFICE
20872087
OFFICE
20862086
OFFICE
20832083
OFFICE
20762076
OFFICE
20652065
OFFICE
20632063
OFFICE
20612061
OFFICE
20592059
OFFICE
20622062 OFFICE
20662066
CONF
20822082
MECH
2082A2082A
LOUNGE
20802080
OFFICE
20742074
OPEN
OFFICE
XX
MC
DIRECTOR
20702070
TELE
20602060
WOMEN
TLT
20642064
MEN TLT
20582058
STORAGE
20572057
CLINICAL
LABRATORY
20552055
CONFERENCE
ROOM
20452045
ENTRY
XX
EXAM
TREATMENT
20322032
CONTROL
20342034
CT SCAN
20422042
FLUOROSCOPY
20442044
MECHANICAL
20132013
STAIR
S9S9
ELEVATORS
XX
STAIR
S7S7
OFFICE
2007A2007A
READING
AREA
20072007
OFFICE
TECHNICIANS
20332033
ELEC.
20312031
OFFICE
20352035
OFFICE
20392039
PATIENT
HOLDING
20372037
LAB
20292029
LOCKER
ROOM
20302030
EXAM/
TREATMENT
ROOM
20262026
UTILITY
ROOM,
SOILED
20242024
EXAM/
TREATMENT
ROOM
20222022
EXAM/TREATMENT
ROOM
20202020
Room 20362036
OFFICE,
TECHNICIAN
20382038
STORAGE
2034A2034A
TOILET,
STAFF
2042A2042A
CONTROL
ROOM
2042B2042B
OFFICE,
TECHNICIAN
20402040
TOILET,
STAFF
2044A2044A
HAC
2044B2044B
CORRIDOR
OC24AOC24A
CORRIDOR
OC24BOC24B
CORRIDOR
OC24OC24
CORRIDOR
181181
OFFICE,
TECHNICIAN
20052005
BONE
DENSITY
ROOM
20032003
ULTRASOUND
20002000
X-RAY
ROOM
20082008
TOILET
20062006
X-RAY
ROOM
20022002
TOILET
2000A2000A
LAB,
STORAGE
20462046
LAB,
DROP-OFF
20482048
WAITING
ROOM
20502050
OFFICE,
TECHNICIAN
20522052
LAB
20542054
MECHANICAL
ROOM
20562056
Room 20532053
Room 20512051
Room 20472047
OFFICE
2055B2055B
Room 2055A2055A
Room 2055D2055D
TOILET
XX
TOILET
XX
ELEC
213213
LAB
20492049
STAIRS
215215
OFFICE
20722072
CLOSET
2072A2072A
CLOSET
2070B2070B
TOILET
2070A2070A
MECH
20732073
TOILET
20752075
CORRIDOR
OC29OC29
LAB
20272027
TREATMENT
ROOM
20252025
CLEAN
UTILITY
20232023
TREATMENT
ROOM
20212021
TREATMENT
ROOM
20192019
UNOCCUPIED
20172017
OFFICE
20152015
OFFICE
2015A2015A
TOILET
20282028
TOILET,
STAFF
2030A2030A
FLOOR MASTIC ON CONCRETE
AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL
I.5 I.5
HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES
1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF WISCONSIN AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, AND
STATE OF WISCONSIN DEPARTMENT OF PUBLIC HEALTH.
2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134
3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.
CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS (SHEET GI201) FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. THE ABATEMENT CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE REGULATIONS. WHERE OVERLAPS OCCUR, THE
MOST STRINGENT REQUIREMENTS APPLY.
4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A WIS LICENSED ASBESTOS
ABATEMENT CONTRACTOR.
5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A WIS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS SHALL BE
REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.
6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED.OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL
CONTRACTOR, AND THE COR.
7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR ASBESTOS
EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE ENVIRONMENT.
8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.
9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED MATERIALS
AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT DOCUMENTS. THE OWNER OR THIER REPRESETATIVE SHALL NOT BE RESPONSIBLE FOR LOST, DAMAGED OR STOLEN ITEMS.
10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE
NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.
11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE
LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, AND THE WISCONSIN DPH.
12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.
13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS BY THE
CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.
14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION
MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.
15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS SHOWING THE
NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.
16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES. THE BUILDING IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG METHODS ON
THE GROUND FLOOR TO MINIMIZE IMPACT ON BUILDING OPERATIONS.
17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD ABATEMENT
REQUIREMENTS, AND THE COR.
18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR. ALL
OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.
19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.
20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL BE
RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM ON HVAC
EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.
21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS. COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED
HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY
PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED TO THE OWNER WITHIN 35 DAYS OF
WASTE LEAVING THE SITE.
22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, AND SPECIFIC ORIGINAL FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY. SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR
ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.
23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
KEYNOTES-
LEGEND
QUANTITIES
PATH INDICATED IS PROVIDED FOR INTENT ONLY.
COORDINATE FINAL REMOVAL PATHWAYS, PHASING,
AND METHODS WITH GENERAL CONTRACTOR AND COR.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B400 KEY PLAN
AREA C
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: 612-249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t C a re
A n d
R e n o v a te s t F lo o r
P a ti e n t C a re
/6
-3
.B
.A
.r v t
/1
/2
:5
:5
A
M
H102
B400 - LEVEL 2 - HAZARDOUS MATERIAL
ABATEMENT
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
676-19-327
05/20/2021 MRP ENN
ISSUED FOR
CONSTRUCTION
Expand and Renovate B400 for Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
1/8" = 1'-0"
B400 LEVEL 2 - ASBESTOS ABATEMENT PLAN
1 ABATE FLOOR MASTIC ON CONCRETE FLOOR IN AREAS AS INDICATED. SEE
LEGEND BELOW.
AREAS ANTICIPATED TO BE IN-SCOPE OF REQUIRED MODIFICATION, COORDINATE WITH
DEMOLITION AND NEW WORK TO DETERMINE SPECIFIC EXTENTS.
± 880 SF BLACK FLOOR MASTIC ON CONCRETE
407.A
407.B1
407.C1
407.D1
407.E407.E
407.F407.F
407.G1407.G1
407.H407.H
407.I
407.J
407.K
407.L
407.M
407.N
407.14407.11 407.12.1407.12407.9407.7407.41407.4407.3407.21
J.39
J.40
J.41
407.H2
407.H1
407.13.1
OPEN
OFFICE
37903790
RESTROOM
37883788
OPEN
OFFICE
37753775
MECH /
ELEC
37803780
RESTROOM
37193719
MEDS
3711A3711A
BEDROOM
37133713
BEDROOM
37123712
LOCKERS
37163716
WARD
37373737
BEDROOM
37393739
BEDROOM
37413741
DINING
3749A3749A
CLEAN
LINENS
37433743 Room
37453745
CLOSET
37473747
ELEVATOR
LOBBY
7C357C35
DINING
37493749
BEDROOM
37673767
BEDROOM
37693769
WARD
37713771
BEDROOM
37853785
MECHANICAL
ROOM
3780A3780A
MECHANICAL
ROOM
37823782
LAUNDRY
37863786
DRESSING
37843784
SHOWERS
3784A3784A
STAIR
S4S4ELECTRICAL
37723772
DATA
CLOSET
3772A3772A
READING
37703770
BEDROOM
37683768
BEDROOM
37663766
TREATMENT
37643764
TOILET
37623762
CLOSET
37463746
TOILET
3744A3744A
NURSES
37443744
BEDROOM
37423742
BEDROOM
37403740
READING
37383738UTILITY
37363736
HAC
3736A3736A
STAIR
S6S6
WARD
37203720
CT CLINIC
37503750
STORAGE
37173717
DRESSING
37153715
SHOWERS
3715A3715A
37113711
DAY
ROOM
37103710
Room 37003700
BREAK
37653765
OFFICE
37813781
CLOSET
3750A3750A
CORRIDOR
7C367C36
CORRIDOR
7C337C33 CORRIDOR
37233723
CORRIDOR
7C377C37
CORRIDOR
7C327C32
CORRIDOR
7C317C31
CORRIDOR
7C397C39
CORRIDOR
7C387C38
ELEVATOR
20182018
Room 3775A3775A
12/12 WHITE FLOOR TILE
AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL
DEDUCT ALT 1: ELIMINATE
ALL WORK ASSOCIATED WITH
NORTH PORTION OF
BUILDING 407.
DEDUCT ALT 2:
ELIMINATE ALL WORK
ASSOCIATED WITH
SOUTH PORTION OF
BUILDING 407.
DEDUCT ALT 2:
ELIMINATE ALL WORK
ASSOCIATED WITH
SOUTH PORTION OF
BUILDING 407.
DEDUCT ALT 2:
ELIMINATE ALL WORK
ASSOCIATED WITH
SOUTH PORTION OF
BUILDING 407.
DEDUCT ALT 2:
ELIMINATE ALL WORK
ASSOCIATED WITH
SOUTH PORTION OF
BUILDING 407.
HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES
1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF WISCONSIN AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, AND
STATE OF WISCONSIN DEPARTMENT OF PUBLIC HEALTH.
2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134
3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.
CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS (SHEET GI201) FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. THE ABATEMENT CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE REGULATIONS. WHERE OVERLAPS OCCUR, THE
MOST STRINGENT REQUIREMENTS APPLY.
4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A WIS LICENSED ASBESTOS
ABATEMENT CONTRACTOR.
5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A WIS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS SHALL BE
REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.
6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED.OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL
CONTRACTOR, AND THE COR.
7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR ASBESTOS
EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE ENVIRONMENT.
8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.
9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED MATERIALS
AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT DOCUMENTS. THE OWNER OR THIER REPRESETATIVE SHALL NOT BE RESPONSIBLE FOR LOST, DAMAGED OR STOLEN ITEMS.
10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE
NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.
11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE
LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, AND THE WISCONSIN DPH.
12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.
13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS BY THE
CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.
14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION
MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.
15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS SHOWING THE
NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.
16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES. THE BUILDING IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG METHODS ON
THE GROUND FLOOR TO MINIMIZE IMPACT ON BUILDING OPERATIONS.
17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD ABATEMENT
REQUIREMENTS, AND THE COR.
18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR. ALL
OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.
19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.
20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL BE
RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM ON HVAC
EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.
21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS. COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED
HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY
PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED TO THE OWNER WITHIN 35 DAYS OF
WASTE LEAVING THE SITE.
22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, AND SPECIFIC ORIGINAL FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY. SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR
ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.
23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
KEYNOTES-
LEGEND
QUANTITIES
PATH INDICATED IS PROVIDED FOR INTENT ONLY.
COORDINATE FINAL REMOVAL PATHWAYS, PHASING,
AND METHODS WITH GENERAL CONTRACTOR AND COR.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B407 KEY PLAN
AREA A
Expand and Renovate B400 for Urgent and Primary Care
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1400 Van Buren St NE
UNIT 130,
Minneapolis, MN 55413 Phone: 612-249-5600 www.obernel.com
Hinman Cinsulting Enginers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t C a re
A n d
R e n o v a te s t F lo o r
P a ti e n t C a re
/6
-3
.B
.A
.r v t
/1
/2
:5
:0
A
M
H103-407
B407 - LEVEL 3 - HAZARDOUS MATERIAL
ABATEMENT
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
676-19-327
05/20/2021 MRP ENN
ISSUED FOR
CONSTRUCTION
500 E Veterans St, Tomah, WI 54660
1/8" = 1'-0" F1
B407 LEVEL 3 - ASBESTOS ABATEMENT PLAN
1 ABATE 12X12 FLOOR TILE FLOORING IN AREAS AS INDICATED. SEE LEGEND BELOW.
AREAS ANTICIPATED TO BE IN-SCOPE OF REQUIRED MODIFICATION, COORDINATE WITH
DEMOLITION AND NEW WORK TO DETERMINE SPECIFIC EXTENTS.
± 2628 SF 12 X 12 WHITE FLOOR TILE
DEDUCT ALT 1: ELIMINATE ALL WORK ASSOCIATED
WITH NORTH PORTION OF BUILDING 407.
DEDUCT ALT 2: ELIMINATE ALL WORK ASSOCIATED
WITH SOUTH PORTION OF BUILDING 407.
A
B
C
D
E
F F
G G
F.1 F.1
H H
I I
J
J
K K
L L
M M
5 6 6.1 7
14 15 16 17 18 19
H.5 H.5
I.4 I.4
J.7 J.7
AMBULANCE
GARAGE
10981098
MAIN
RECEPTION
10531053
OFFICE
ADMISSIONS
10791079
OFFICE
CLERK
10781078
OFFICE
10751075
OFFICE
XX
OFFICE
10741074
OFFICE
10731073
EXAM
10711071
EXAM
10721072
OFFICE
10701070
CLINIC
RECEPTION
10521052
PATIENT
ED
CONFERENCE
10551055
WAITING
10501050
INTAKE
10541054
INTAKE
10561056
FAMILY
TOILET
10421042
MEN'S
TOILET
10401040
WOMEN'S
TOILET
10381038
ELETRICAL
400E3A400E3A
ELECTRICAL
400E3400E3
TLT
10321032
WOMEN
VISITOR
TOILET
10341034
EXAM
10321032
OFFICE
10371037
ELEVATOR
XX
OFFICE
10351035MECH
10311031
MECHANICAL
400M3400M3
ANTE
10291029
STORAGE
10301030
WAITING /
CIRCULATION
10801080
WAITING
1080B1080B
SECURITY
XX
STAIR
S7S7
EXAM
1066E1066E
EXAM
1066D1066D
EXAM
1066C1066C
EXAM
1060A1060A
EXAM
1060B1060B
EXAM
1060C1060C
EXAM
1060D1060D
EXAM
1060E1060E
EXAM
1060F1060F
EXAM
1064B1064B
EXAM
1064C1064C
EXAM
10671067
CARE
TEAM
XX
COMPRESSOR
ROOM
1041A1041A
JAN
10411041
AGENT
CASHIER
10471047
TRAVEL &
PATIENT
FUNDS
10451045
ENCLOSED
WALKWAY
XX
OFFICE
PROVIDERS
1066G1066G
OFFICE
PROVIDERS
1066F1066F
OFFICE
RN'S
1064A1064A
OFFICE
10441044
SOILED
UTILITY
1066B1066B
TLT
1066A1066A
IT
1051B1051B
ELECT
1051A1051A
OFFICE
RNS
10651065
INTERVIEW
ROOM
10631063
OMNI
CELL
CLOSET
10611061
CLEAN
STORAGE
10691069
VAULT -
ELEC
400E3C400E3C
VAULT -
ELECT?
XX
STAIR
S8S8STAIR
S8S8
ENTRY
1080A1080A
OFFICE
10331033
STAFF
TOILET
10961096
STAFF
TOILET
10941094
OFFICE
10931093
EXAM
10911091
EXAM
10921092
WOMEN
TLT
10901090
NURSE
STATION
10851085 EXAM
10881088
EXAM
10861086
EXAM
10831083
EXAM
10841084
EXAM
10821082
STAIR
NURSE
STATION
10131013
EXAM
10101010
EXAM
10061006
EXAM
10041004
EXAM
10021002
OFFICE
10011001
OFFICE
10111011
OFFICE
10001000
CONFERENCE
10031003
DIRTY
UTILTIY
10181018
EXAM
10271027
OFFICE
10231023
OFFICE
10191019
OFFICE
10161016
EXAM
10221022
EXAM
10241024
OFFICE
10251025
OFFICE
10261026
OFFICE
10211021
OFFICE
10171017
WAITING
10131013
IT
10051005
EXAM
10281028
CORRIDOR
OC19OC19
STORAGE
1096A1096A
CORRIDOR
OC17OC17
CORRIDOR
OC11OC11
AIRCELL PIPE INSULATION
CORRIDOR
OC12OC12
AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL
I.5 I.5
MUD COMPOUND PIPE FITTINGS
HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES
1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF WISCONSIN AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, AND
STATE OF WISCONSIN DEPARTMENT OF PUBLIC HEALTH.
2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134
3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.
CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS ((SHEET GI201) FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. THE ABATEMENT CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE REGULATIONS. WHERE OVERLAPS OCCUR, THE
MOST STRINGENT REQUIREMENTS APPLY.
4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A WIS LICENSED ASBESTOS
ABATEMENT CONTRACTOR.
5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A WIS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS SHALL BE
REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.
6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED.OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL
CONTRACTOR, AND THE COR.
7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR ASBESTOS
EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE ENVIRONMENT.
8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.
9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED MATERIALS
AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT DOCUMENTS. THE OWNER OR THIER REPRESETATIVE SHALL NOT BE RESPONSIBLE FOR LOST, DAMAGED OR STOLEN ITEMS.
10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE
NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.
11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE
LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, AND THE WISCONSIN DPH.
12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.
13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS BY THE
CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.
14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION
MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.
15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS SHOWING THE
NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.
16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES. THE BUILDING IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG METHODS ON
THE GROUND FLOOR TO MINIMIZE IMPACT ON BUILDING OPERATIONS.
17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD ABATEMENT
REQUIREMENTS, AND THE COR.
18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR. ALL
OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.
19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.
20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL BE
RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM ON HVAC
EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.
21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS. COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED
HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY
PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED TO THE OWNER WITHIN 35 DAYS OF
WASTE LEAVING THE SITE.
22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, AND SPECIFIC ORIGINAL FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY. SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR
ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.
23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
KEYNOTES-
LEGEND
QUANTITIES
MUD COMPOUND PIPE FITTINGS AND
AIRCELL PIPE INSULATION
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AREA A
B400 KEY PLAN
AREA B
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: 612-249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t C a re
A n d
R e n o v a te s t F lo o r
P a ti e n t C a re
/6
-3
.B
.A
.r v t
/1
/2
:5
:1
A
M
HC101
B400 - LEVEL 1 - HAZARDOUS MATERIAL
ABATEMENT - PIPING
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
676-19-327
05/20/2021 MRP ENN
ISSUED FOR
CONSTRUCTION
Expand and Renovate B400 for Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
AREAS ANTICIPATED TO BE IN-SCOPE OF REQUIRED MODIFICATION, COORDINATE
WITH DEMOLITION AND NEW WORK TO DETERMINE SPECIFIC EXTENTS.
1/8" = 1'-0" F1
B400 LEVEL 1 - ASBESTOS ABATEMENT PLAN - PIPING
1 ABATE PIPE AND PIPE FITTING INSULATION IN HATCHED AREAS. CONDITIONS ARE BASED
ON EXISTING DRAWINGS, AND FIELD CONDITIONS MAY VARY FROM RECORD DRAWINGS.
CONFIRM LAYOUT AND PRESENCE OF PIPES IN HATCHED AREAS (SEE LEGEND) AND IN
LOCATIONS AS NOTED. COORDINATE W/ THE GC AND THE VA COR TO DETERMINE
SPECIFIC ABATEMENT APPROACH, PHASING AND WASTE REMOVAL REQUIREMENTS ON
THIS FLOOR
107± PIPE FITTINGS INSULATION TO BE ABATED ON THIS LEVEL
352 LF ± OF PIPE TO BE ABATED ON THIS LEVEL
| GI000-COVER SHEET |
| GI001-PROJECT SHEET INDEX |
| GI050-GENERAL NOTES |
| GI101-B400 -LEVEL 1 -FIRE AND LIFE SAFETY PLAN & CODE DATA |
| GI102-B400 -LEVEL 2 -FIRE AND LIFE SAFETY PLAN & CODE DATA |
| GI104-B407 -LEVEL 3 -FIRE AND LIFE SAFETY PLAN & CODE DATA -DEDUCT ALT #1 & #2 |
| GI201-INFECTION CONTROL PLAN & INTERIM LIFE |
| GC101-PROJECT PHASING |
| GC102-PHASING PLANS |
| H101-B400 -LEVEL 1 -HAZARDOUS MATERIAL ABATEMENT |
| H102-B400 -LEVEL 2 -HAZARDOUS MATERIAL ABATEMENT |
| H103-407-B407 -LEVEL 3 -HAZARDOUS MATERIAL ABATEMENT |
| HC101-B400 -LEVEL 1 -HAZARDOUS MATERIAL ABATEMENT -PIPING |
| VF100-CONTROL POINT SITE PLAN |
| VF101-viuvTiiig i iuvCIVIL SURVEY PLAN |
| CD101-CIVIL DEMOLITION PLAN |
| CS101-CIVIL SITE PLAN |
| COo-CIVIL SITE PLAN STAGING AREA |
| CG101-CIVIL GRADING PLAN |
| CG501-CIVIL DETAIL SHEET 1 |
| CG502-CIVIL DETAIL SHEET 2 |
| CU101-CIVIL UTILITY PLAN |
| SJ001-GENERAL STRUCTURAL NOTES |
| SJ002-GENERAL STRUCTURAL NOTES CONTINUED |
| SJ003-SPECIAL INSPECTIONS |
| SB100-B400 -LEVEL 1 -FOUNDATION PLAN -OVERALL |
| SB101-B400 -LEVEL 1 - FOUNDATION PLAN -AREA A |
| SF102-B400 -LEVEL 2 - FRAMING PLAN -OVERALL |
| SF103-B400 -LEVEL 2 -ROOF FRAMING PLAN -AREA A |
| SF201-FRAMING ELEVATIONS |
| SF202-FRAMING ELEVATIONS |
| SF203-FRAMING ELEVATIONS |
| SF501-TYPICAL DETAILS |
| SF502-TYPICAL DETAILS |
| SF503-TYPICAL DETAILS |
| SF504-TYPICAL DETAILS |
| SF505-TYPICAL DETAILS |
| SB510-FOUNDATION DETAILS |
| SF520-FRAMING DETAILS |
| SF521-FRAMING DETAILS |
| SF530-COLD-FORMED STEEL FRAMING |
| SF601-GRAPHICAL COLUMN SCHEDULE |
| AE000-SYMBOLS, & GENERAL NOTES |
| AS101-ARCHITECTURAL SITE PLAN |
| AG100-FLOOR PLAN -LEVEL 1, URGENT CARE CENTER PROGRAM PLAN |
| AG103-FLOOR PLAN -LEVEL 1, CLINICAL SPACE PROGRAM PLAN |
| AG200-FLOOR PLAN -LEVEL 2, SPECIALTY CARE PROGRAM PLAN |
| AG201A-FLOOR PLAN -LEVEL 3 -SWING SPACE LAYOUT B407-DEDUCT ALT #1 & #2 |
| AD101-B400 -LEVEL 1 -DEMOLITION PLAN |
| AD102-B400 -LEVEL 2 -DEMOLITION PLAN |
| AD103-407-B407 -LEVEL 3 -DEMOLITION PLAN -DEDUCT AL #1 & #2 |
| AD121-B400 -LEVEL 1 -DEMOLITION RCP |
| AD122-B400 -LEVEL 2 -DEMOLITION RCP |
| AD123-407-B407 -LEVEL 3 -DEMOLITION RCP -DEDUCT ALT #1 & #2 |
| AE101-B400 -LEVEL 1 -FLOOR PLAN -OVERALL |
| AE102-B400 -LEVEL 2 -FLOOR PLAN -OVERALL |
| AE103-407-B407 -LEVEL 3 -FLOOR PLAN -DEDUCT ALT #1& #2 |
| AE104-B400 -ROOF PLAN -OVERALL |
| AC101-B400 -LEVEL 1 -REFLECTED CEILING PLAN |
| AC102-B400 -LEVEL 2 -REFLECTED CEILING PLAN |
| AC103-407-B407 -LEVEL 3 -REFLECTED CEILING PLAN -DEDUCT ALT #1 & #2 |
| AE201-B400 EXTERIOR ELEVATIONS |
| AE201-407-B407 EXTERIOR ELEVATIONS -DEDUCT ALT #1 & #2 |
| AE202-B400 EXTERIOR ELEVATIONS |
| AE301-BUILDING SECTIONS |
| AE320-WALL SECTIONS |
| AE321-WALL SECTIONS |
| AE322-WALL SECTIONS |
| AE401-B400 -LEVEL 1 -ENLARGED FLOOR PLANS |
| AE401A-B400 -LEVEL 1 -ENLARGED FLOOR PLANS |
| AE401B-B400 -LEVEL 1 -ENLARGED FLOOR PLANS |
| AE401C-B400 -LEVEL 1 -ENLARGED FLOOR PLANS |
| AE401D-B400 -LEVEL 1 -ENLARGED FLOOR PLANS |
| AE402-B400 -LEVEL 2 -ENLARGED FLOOR PLANS |
| AE500-EXTERIOR WALL AND ROOF ASSEMBLIES |
| AE520-EXTERIOR SECTION DETAILS |
| AE521-EXTERIOR SECTION DETAILS |
| AE551-DETAILS -INTERIOR |
| AE552-DETAILS -INTERIOR |
| AE560-DOOR DETAILS |
| AE561-DOOR AND LOUVER DETAILS |
| AE601-DOOR WINDOW & LOUVER SCHEDULES |
| AE710-ARCHITECTURAL DOOR, WINDOW & FRAME TYPES |
| AE720-STANDARD PARTITION TYPES |
| AE721-PARTITION HEAD DETAILS |
| AE722-PARTITION FRAMING DETAILS |
| AE730-TYPICAL MOUNTING HEIGHTS |
| AG900-B400 RENDERINGS |
| AG901-B400 RENDERINGS |
| AG902-B400/ B407 RENDERINGS |
| AW001-SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES & DETAILS |
| AW101-B400 -LEVEL 1 -SIGNAGE PLAN |
| AW102-B400 -LEVEL 2 -SIGNAGE PLAN |
| AW103-B407 -LEVEL 3 -SIGNAGE PLAN -DEDUCT ALT #1 & #2 |
| IN001-NTERIOR FINISH ABBREVIATIONS, SYMBOLS, GENERAL NOTES & FINISH BOARDS |
| IN101-B400 -LEVEL 1 -INTERIOR FINISH PLAN -OVERALL |
| IN101A-B400 -LEVEL 1 -INTERIOR FINISH PLANS -AREA & A1 |
| IN101B-B400 -LEVEL 1 -INTERIOR FINISH PLANS -AREA |
| IN102C-B400 -LEVEL 2 -INTERIOR FINISH PLANS -AREA C |
| IN103D-B407 -LEVEL 3 -INTERIOR FINISH PLANS -AREA A, B & C -DEDUCT ALT #1& #2 |
| IN501-INTERIOR FINISH DETAILS |
| IN601-INTERIOR FINISH LEGEND AND SCHEDULES |
| IF101AB-B400 -LEVEL 1 -INTERIOR FURNITURE PLAN -FOR REFERENCE ONLY |
| IF102C-B400 -LEVEL 2 -INTERIOR FURNITURE PLAN -FOR REFERENE ONLY |
| IF103D-B407 -LEVEL 3 -INTERIOR FURNITURE PLAN -FOR REFERENCE ONLY -DEDUCT ALT #1 & #2 |
| IF104-FURNITURE PLAN -FOR REFERENCE ONLY |
| IF105-FURNITURE PLAN -FOR REFERENCE ONLY |
| IF106-FURNITURE PLAN -FOR REFERENCE ONLY |
| Q001-EQUIPMENT SCHEDULE |
| Q101AB-B400 -LEVEL 1 -EQUIPMENT PLANS |
| Q101C-B400 -LEVEL 2 -EQUIPMENT PLAN |
| F000-FIRE PROTECTION ABBREVIATIONS AND SYMBOLS |
| FD101-B400 -LEVEL 1 - FIRE PROTECTION DEMOLITION PLAN |
| FD102-B400 -LEVEL 2 - FIRE PROTECTION DEMOLITION PLAN |
| FD103-407-B407 -LEVEL 3 - FIRE PROTECTION DEMOLITION PLAN |
| FP101-B400 -LEVEL 1 - FIRE PROTECTION PLAN |
| FP102-B400 -LEVEL 2 - FIRE PROTECTION PLAN |
| FP103-407-B407 -LEVEL 3 - FIRE PROTECTION PLAN |
| P-000-PLUMBING ABBREVIATIONS AND SYMBOLS |
| PD100-B400 -FOUNDATION -PLUMBING DEMOLITION PLAN |
| PD101-B400 -LEVEL 1 -PLUMBING DEMOLITION PLAN |
| PD102-B400 -LEVEL 2 -PLUMBING DEMOLITION PLAN |
| PD201-B400 -LEVEL 1 -MED GAS DEMOLITION PLAN |
| P-100-B400 -FOUNDATION -PLUMBING PLAN |
| P-101-B400 -LEVEL 1 -PLUMBING PLAN |
| P-102-B400 -LEVEL 2 -PLUMBING PLAN |
| P103-407-B407 -LEVEL 3 -PLUMBING PLAN |
| P-201-B400 -LEVEL 1 -MED GAS PLAN |
| P-300-B400 -PLUMBING ENLARGED PLANS |
| P-301-B400 -PLUMBING ENLARGED PLANS |
| P-302-B400 -PLUMBING ENLARGED PLANS |
| P-303-B400 -PLUMBING ENLARGED PLANS |
| P-304-B400 -PLUMBING ENLARGED PLANS |
| P-305-B400 -PLUMBING ENLARGED PLANS |
| P-400-PLUMBING RISERS |
| P-401-PLUMBING RISERS |
| P-402-PLUMBING RISERS |
| P-403-PLUMBING RISERS |
| P-404-PLUMBING RISERS |
| P-500-PLUMBING DETAILS |
| P-700-PLUMBING SCHEDULES |
| M-000-MECHANICAL ABBREVIATIONS AND SYMBOLS |
| MD101-B400 -LEVEL 1 -HVAC DEMOLITION PLAN |
| MD101A-B400 -LEVEL 1 -HVAC DEMO PLAN -DEDUCT ALT. #4 |
| MD102-B400 -LEVEL 2 -HVAC DEMOLITION PLAN |
| MD103-407-B407 -LEVEL 3 -HVAC DEMOLITION PLAN |
| MD200-B400 -FOUNDATION -HVAC PIPING DEMOLITION PLAN |
| MD201-B400 -LEVEL 1 -HVAC PIPING DEMOLITION PLAN |
| MD202-B400 -LEVEL 2 -HVAC PIPING DEMOLITION PLAN |
| M-100-B400 -LEVEL 1 -HVAC TEMPORARY PLAN |
| M-101-B400 -LEVEL 1 - HVAC PLAN |
| M-101A-B400 -LEVEL 1 - HVAC PLAN -DEDUCT ALT. #4 |
| M-102-B400 -LEVEL 2 - HVAC PLAN |
| M-103-407-B407 -LEVEL 3 - HVAC PLAN |
| MP200-B400 -FOUNDATION -HVAC PIPING PLAN |
| MP201-B400 -LEVEL 1 -HVAC PIPING PLAN |
| MP202-B400 -LEVEL 2 -HVAC PIPING PLAN |
| MP203-407-B407 -LEVEL 3 -HVAC PIPING PLAN |
| M-400-ENLARGED MECHANICAL PLANS |
| M-401-ENLARGED MECHANICAL PLANS |
| M-402-ENLARGED MECHANICAL PLANS -DEDUCT ALT. #4 |
| M-500-MECHANICAL DETAILS |
| M-501-MECHANICAL DETAILS |
| M-502-MECHANICAL DETAILS |
| M-600-MECHANICAL SECTIONS |
| M-700-MECHANICAL SCHEDULES |
| M-800-MECHANICAL CONTROLS |
| M-801-MECHANICAL CONTROLS |
| M-802-MECHANICAL CONTROLS |
| E-000-ELECTRICAL ABBREVIATIONS AND SYMBOLS |
| ED101-B400 -LEVEL 1 - ELECTRICAL DEMOLITION PLAN |
| ED102-B400 -LEVEL 2 - ELECTRICAL DEMOLITION PLAN |
| ED103-407-B407 -LEVEL 3 - ELECTRICAL DEMOLITION PLAN |
| EL101-B400 -LEVEL 1 - LIGHTING PLAN |
| EL102-B400 -LEVEL 2 - LIGHTING PLAN |
| EL103-407-B407 -LEVEL 3 - LIGHTING PLAN |
| EL111-B400 -LEVEL 1 -LIGHTING CALCS |
| EL112-B400 -LEVEL 2 -LIGHTING CALCS |
| EL113-407-B407 -LEVEL 3 -LIGHTING CALCS |
| EP101-B400 -LEVEL 1 - POWER PLAN |
| EP102-B400 -LEVEL 2 - POWER PLAN |
| EP103-407-B407 -LEVEL 3 - POWER PLAN |
| EY101-B400 -LEVEL 1 - SPECIAL SYSTEMS PLAN |
| EY102-B400 -LEVEL 2 - SPECIAL SYSTEMS PLAN |
| EY103-407-B407 -LEVEL 3 - SPECIAL SYSTEMS PLAN |
| E-501-ELECTRICAL DETAILS |
| E-601-B400 ELECTRICAL DIAGRAMS |
| E-602-B400 ELECTRICAL DIAGRAMS |
| E-700-ELECTRICAL SCHEDULES |
| EF101-B400 -LEVEL 1 - FIRE ALARM DEMOLITION PLAN |
| EF102-B400 -LEVEL 2 - FIRE ALARM DEMOLITION PLAN |
| EF103-407-B407 -LEVEL 3 - FIRE ALARM DEMOLITION PLAN |
| EF201-B400 -LEVEL 1 - FIRE ALARM PLAN |
| EF202-B400 -LEVEL 2 - FIRE ALARM PLAN |
| EF203-407-B407 -LEVEL 3 - FIRE ALARM PLAN |
File details come from the government source that posted it. Updated .