ATTACHMENT 14 - Hazard.pdf

PDF 2 MB Posted

Attached to
Y1DZ--Expand and Renovate B400 for Urgent and Primary Care (Minor) - Tomah
Solicitation number
36C77621B0009
Issued by

About this file

This is a solicitation for a construction project to expand and renovate an urgent and primary care facility. The contractor shall demolish existing structures and complete all work required by the drawings and specifications, including demolition, site preparation, and furnishing labor and materials. The project involves expanding and renovating the B400 building for urgent and primary care services at a Department of Veterans Affairs medical center located in Tomah, Wisconsin. The solicitation number is 36C77621B0009.

View the file

Other files

File Type Posted
31 23 19 DEWATERING.pdf PDF
36C77621B0009 0003.pdf PDF
Drawings VF100 - VF101.pdf PDF
Technical Questions - FINAL - Tomah 8-2-21.pdf PDF
36C77621B0009 0002.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Monroe County - 7-9-21.pdf PDF
Site Visit Sign-in Sheet - Tomah - 9 AM - 7-12-21.pdf PDF
36C77621B0009 0001.pdf PDF
Site Visit Sign-in Sheet - Tomah - 10 AM - 7-13-21.pdf PDF
ATTACHMENT 20 - Site Visit Registration - Map.pdf PDF
36C77621B0009 - 6-29-21.pdf PDF
ATTACHMENT 15 - Fire Alarm.pdf PDF
ATTACHMENT 7 - Fire Protection.pdf PDF
ATTACHMENT 16 - Contractor Core Work Hours.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Monroe County - 5-14-21.pdf PDF
ATTACHMENT 12 - Furniture.pdf PDF
ATTACHMENT 4 - Electrical.pdf PDF
ATTACHMENT 13 - Civil.pdf PDF
ATTACHMENT 11 - Architectual.pdf PDF
ATTACHMENT 8 - Equipment.pdf PDF
ATTACHMENT 1 - Specifications Final 6-21-21.pdf PDF
ATTACHMENT 6 - Plumbing.pdf PDF
ATTACHMENT 2 - General.pdf PDF
ATTACHMENT 19 - Contractor Safety - Environmental Form.docx DOCX document
ATTACHMENT 10 - Signage.pdf PDF
ATTACHMENT 18 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 5 - Mechanical.pdf PDF
ATTACHMENT 9 - Interiors.pdf PDF
ATTACHMENT 3 - Structural.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

D

E

F F

G G

F.1 F.1

H H

I I

J

J

K K

L L

M M

5 6 6.1 7

14 15 16 17 18 19

H.5 H.5

I.4 I.4

J.7 J.7

AMBULANCE

GARAGE

10981098

MAIN

RECEPTION

10531053

OFFICE

ADMISSIONS

10791079

OFFICE

CLERK

10781078

OFFICE

10751075

OFFICE

XX

OFFICE

10741074

OFFICE

10731073

EXAM

10711071

EXAM

10721072

OFFICE

10701070

CLINIC

RECEPTION

10521052

PATIENT

ED

CONFERENCE

10551055

WAITING

10501050

INTAKE

10541054

INTAKE

10561056

FAMILY

TOILET

10421042

MEN'S

TOILET

10401040

WOMEN'S

TOILET

10381038

ELETRICAL

400E3A400E3A

ELECTRICAL

400E3400E3

TLT

10321032

WOMEN

VISITOR

TOILET

10341034

EXAM

10321032

OFFICE

10371037

ELEVATOR

XX

OFFICE

10351035MECH

10311031

MECHANICAL

400M3400M3

ANTE

10291029

STORAGE

10301030

WAITING /

CIRCULATION

10801080

WAITING

1080B1080B

SECURITY

XX

STAIR

S7S7

EXAM

1066E1066E

EXAM

1066D1066D

EXAM

1066C1066C

EXAM

1060A1060A

EXAM

1060B1060B

EXAM

1060C1060C

EXAM

1060D1060D

EXAM

1060E1060E

EXAM

1060F1060F

EXAM

1064B1064B

EXAM

1064C1064C

EXAM

10671067

CARE

TEAM

XX

COMPRESSOR

ROOM

1041A1041A

JAN

10411041

AGENT

CASHIER

10471047

TRAVEL &

PATIENT

FUNDS

10451045

ENCLOSED

WALKWAY

XX

OFFICE

PROVIDERS

1066G1066G

OFFICE

PROVIDERS

1066F1066F

OFFICE

RN'S

1064A1064A

OFFICE

10441044

SOILED

UTILITY

1066B1066B

TLT

1066A1066A

IT

1051B1051B

ELECT

1051A1051A

OFFICE

RNS

10651065

INTERVIEW

ROOM

10631063

OMNI

CELL

CLOSET

10611061

CLEAN

STORAGE

10691069

VAULT -

ELEC

400E3C400E3C

VAULT -

ELECT?

XX

STAIR

S8S8STAIR

S8S8

ENTRY

1080A1080A

OFFICE

10331033

STAFF

TOILET

10961096

STAFF

TOILET

10941094

OFFICE

10931093

EXAM

10911091

EXAM

10921092

WOMEN

TLT

10901090

NURSE

STATION

10851085 EXAM

10881088

EXAM

10861086

EXAM

10831083

EXAM

10841084

EXAM

10821082

STAIR

NURSE

STATION

10131013

EXAM

10101010

EXAM

10061006

EXAM

10041004

EXAM

10021002

OFFICE

10011001

OFFICE

10111011

OFFICE

10001000

CONFERENCE

10031003

DIRTY

UTILTIY

10181018

EXAM

10271027

OFFICE

10231023

OFFICE

10191019

OFFICE

10161016

EXAM

10221022

EXAM

10241024

OFFICE

10251025

OFFICE

10261026

OFFICE

10211021

OFFICE

10171017

WAITING

10131013

IT

10051005

EXAM

10281028

CORRIDOR

OC19OC19

STORAGE

1096A1096A

CORRIDOR

OC17OC17

CORRIDOR

OC11OC11

FLOOR MASTIC ON CONCRETE

CORRIDOR

OC12OC12

REMOTE DECONTAMINATION

SITE (AT GRADE).

COORDINATE FINAL

LOCATION WITH FACILITY.

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

I.5 I.5

HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES

1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF WISCONSIN AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, AND

STATE OF WISCONSIN DEPARTMENT OF PUBLIC HEALTH.

2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134

3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.

CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS (SHEET GI201) FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. THE ABATEMENT CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE REGULATIONS. WHERE OVERLAPS OCCUR, THE

MOST STRINGENT REQUIREMENTS APPLY.

4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A WIS LICENSED ASBESTOS

ABATEMENT CONTRACTOR.

5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A WIS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS SHALL BE

REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.

6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED.OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL

CONTRACTOR, AND THE COR.

7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR ASBESTOS

EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE ENVIRONMENT.

8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.

9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED MATERIALS

AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT DOCUMENTS. THE OWNER OR THIER REPRESETATIVE SHALL NOT BE RESPONSIBLE FOR LOST, DAMAGED OR STOLEN ITEMS.

10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE

NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.

11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE

LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, AND THE WISCONSIN DPH.

12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.

13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS BY THE

CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.

14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION

MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.

15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS SHOWING THE

NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.

16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES. THE BUILDING IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG METHODS ON

THE GROUND FLOOR TO MINIMIZE IMPACT ON BUILDING OPERATIONS.

17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD ABATEMENT

REQUIREMENTS, AND THE COR.

18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR. ALL

OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.

19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.

20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL BE

RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM ON HVAC

EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.

21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS. COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED

HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY

PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED TO THE OWNER WITHIN 35 DAYS OF

WASTE LEAVING THE SITE.

22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, AND SPECIFIC ORIGINAL FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY. SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR

ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.

23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

KEYNOTES-

LEGEND

QUANTITIES

PATH INDICATED IS PROVIDED FOR INTENT ONLY.

COORDINATE FINAL REMOVAL PATHWAYS, PHASING,

AND METHODS WITH GENERAL CONTRACTOR AND COR.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

AREA A

B400 KEY PLAN

AREA B

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: 612-249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t C a re

A n d

R e n o v a te s t F lo o r

P a ti e n t C a re

/6

-3

.B

.A

.r v t

/1

/2

:5

:4

A

M

H101

B400 - LEVEL 1 - HAZARDOUS MATERIAL

ABATEMENT

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

676-19-327

05/20/2021 MRP ENN

ISSUED FOR

CONSTRUCTION

Expand and Renovate B400 for Urgent and Primary Care

500 E Veterans St, Tomah, WI 54660

1/8" = 1'-0" F1

B400 LEVEL 1 - ASBESTOS ABATEMENT PLAN

1 ABATE FLOOR MASTIC ON CONCRETE FLOOR IN AREAS AS INDICATED. SEE

LEGEND BELOW.

AREAS ANTICIPATED TO BE IN-SCOPE OF REQUIRED MODIFICATION, COORDINATE WITH

DEMOLITION AND NEW WORK TO DETERMINE SPECIFIC EXTENTS.

± 2285 SF BLACK FLOOR MASTIC ON CONCRETE

Revisions: Date:

1 2

F F

G G

F.1

H H

I I

J J

K K

L

L

M M

3 4 5

H.5 H.5

I.4

J.7 J.7

SOILED

UTILITY

2055C2055C

OFFICE

20932093

OFFICE

20942094

OFFICE

20922092

OFFICE

20912091

OFFICE

20892089

OFFICE -

SW

20902090

OFFICE

20882088

OFFICE

20872087

OFFICE

20862086

OFFICE

20832083

OFFICE

20762076

OFFICE

20652065

OFFICE

20632063

OFFICE

20612061

OFFICE

20592059

OFFICE

20622062 OFFICE

20662066

CONF

20822082

MECH

2082A2082A

LOUNGE

20802080

OFFICE

20742074

OPEN

OFFICE

XX

MC

DIRECTOR

20702070

TELE

20602060

WOMEN

TLT

20642064

MEN TLT

20582058

STORAGE

20572057

CLINICAL

LABRATORY

20552055

CONFERENCE

ROOM

20452045

ENTRY

XX

EXAM

TREATMENT

20322032

CONTROL

20342034

CT SCAN

20422042

FLUOROSCOPY

20442044

MECHANICAL

20132013

STAIR

S9S9

ELEVATORS

XX

STAIR

S7S7

OFFICE

2007A2007A

READING

AREA

20072007

OFFICE

TECHNICIANS

20332033

ELEC.

20312031

OFFICE

20352035

OFFICE

20392039

PATIENT

HOLDING

20372037

LAB

20292029

LOCKER

ROOM

20302030

EXAM/

TREATMENT

ROOM

20262026

UTILITY

ROOM,

SOILED

20242024

EXAM/

TREATMENT

ROOM

20222022

EXAM/TREATMENT

ROOM

20202020

Room 20362036

OFFICE,

TECHNICIAN

20382038

STORAGE

2034A2034A

TOILET,

STAFF

2042A2042A

CONTROL

ROOM

2042B2042B

OFFICE,

TECHNICIAN

20402040

TOILET,

STAFF

2044A2044A

HAC

2044B2044B

CORRIDOR

OC24AOC24A

CORRIDOR

OC24BOC24B

CORRIDOR

OC24OC24

CORRIDOR

181181

OFFICE,

TECHNICIAN

20052005

BONE

DENSITY

ROOM

20032003

ULTRASOUND

20002000

X-RAY

ROOM

20082008

TOILET

20062006

X-RAY

ROOM

20022002

TOILET

2000A2000A

LAB,

STORAGE

20462046

LAB,

DROP-OFF

20482048

WAITING

ROOM

20502050

OFFICE,

TECHNICIAN

20522052

LAB

20542054

MECHANICAL

ROOM

20562056

Room 20532053

Room 20512051

Room 20472047

OFFICE

2055B2055B

Room 2055A2055A

Room 2055D2055D

TOILET

XX

TOILET

XX

ELEC

213213

LAB

20492049

STAIRS

215215

OFFICE

20722072

CLOSET

2072A2072A

CLOSET

2070B2070B

TOILET

2070A2070A

MECH

20732073

TOILET

20752075

CORRIDOR

OC29OC29

LAB

20272027

TREATMENT

ROOM

20252025

CLEAN

UTILITY

20232023

TREATMENT

ROOM

20212021

TREATMENT

ROOM

20192019

UNOCCUPIED

20172017

OFFICE

20152015

OFFICE

2015A2015A

TOILET

20282028

TOILET,

STAFF

2030A2030A

FLOOR MASTIC ON CONCRETE

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

I.5 I.5

HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES

1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF WISCONSIN AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, AND

STATE OF WISCONSIN DEPARTMENT OF PUBLIC HEALTH.

2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134

3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.

CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS (SHEET GI201) FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. THE ABATEMENT CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE REGULATIONS. WHERE OVERLAPS OCCUR, THE

MOST STRINGENT REQUIREMENTS APPLY.

4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A WIS LICENSED ASBESTOS

ABATEMENT CONTRACTOR.

5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A WIS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS SHALL BE

REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.

6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED.OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL

CONTRACTOR, AND THE COR.

7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR ASBESTOS

EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE ENVIRONMENT.

8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.

9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED MATERIALS

AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT DOCUMENTS. THE OWNER OR THIER REPRESETATIVE SHALL NOT BE RESPONSIBLE FOR LOST, DAMAGED OR STOLEN ITEMS.

10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE

NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.

11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE

LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, AND THE WISCONSIN DPH.

12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.

13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS BY THE

CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.

14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION

MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.

15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS SHOWING THE

NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.

16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES. THE BUILDING IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG METHODS ON

THE GROUND FLOOR TO MINIMIZE IMPACT ON BUILDING OPERATIONS.

17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD ABATEMENT

REQUIREMENTS, AND THE COR.

18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR. ALL

OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.

19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.

20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL BE

RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM ON HVAC

EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.

21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS. COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED

HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY

PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED TO THE OWNER WITHIN 35 DAYS OF

WASTE LEAVING THE SITE.

22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, AND SPECIFIC ORIGINAL FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY. SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR

ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.

23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

KEYNOTES-

LEGEND

QUANTITIES

PATH INDICATED IS PROVIDED FOR INTENT ONLY.

COORDINATE FINAL REMOVAL PATHWAYS, PHASING,

AND METHODS WITH GENERAL CONTRACTOR AND COR.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B400 KEY PLAN

AREA C

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: 612-249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t C a re

A n d

R e n o v a te s t F lo o r

P a ti e n t C a re

/6

-3

.B

.A

.r v t

/1

/2

:5

:5

A

M

H102

B400 - LEVEL 2 - HAZARDOUS MATERIAL

ABATEMENT

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

676-19-327

05/20/2021 MRP ENN

ISSUED FOR

CONSTRUCTION

Expand and Renovate B400 for Urgent and Primary Care

500 E Veterans St, Tomah, WI 54660

1/8" = 1'-0"

B400 LEVEL 2 - ASBESTOS ABATEMENT PLAN

1 ABATE FLOOR MASTIC ON CONCRETE FLOOR IN AREAS AS INDICATED. SEE

LEGEND BELOW.

AREAS ANTICIPATED TO BE IN-SCOPE OF REQUIRED MODIFICATION, COORDINATE WITH

DEMOLITION AND NEW WORK TO DETERMINE SPECIFIC EXTENTS.

± 880 SF BLACK FLOOR MASTIC ON CONCRETE

407.A

407.B1

407.C1

407.D1

407.E407.E

407.F407.F

407.G1407.G1

407.H407.H

407.I

407.J

407.K

407.L

407.M

407.N

407.14407.11 407.12.1407.12407.9407.7407.41407.4407.3407.21

J.39

J.40

J.41

407.H2

407.H1

407.13.1

OPEN

OFFICE

37903790

RESTROOM

37883788

OPEN

OFFICE

37753775

MECH /

ELEC

37803780

RESTROOM

37193719

MEDS

3711A3711A

BEDROOM

37133713

BEDROOM

37123712

LOCKERS

37163716

WARD

37373737

BEDROOM

37393739

BEDROOM

37413741

DINING

3749A3749A

CLEAN

LINENS

37433743 Room

37453745

CLOSET

37473747

ELEVATOR

LOBBY

7C357C35

DINING

37493749

BEDROOM

37673767

BEDROOM

37693769

WARD

37713771

BEDROOM

37853785

MECHANICAL

ROOM

3780A3780A

MECHANICAL

ROOM

37823782

LAUNDRY

37863786

DRESSING

37843784

SHOWERS

3784A3784A

STAIR

S4S4ELECTRICAL

37723772

DATA

CLOSET

3772A3772A

READING

37703770

BEDROOM

37683768

BEDROOM

37663766

TREATMENT

37643764

TOILET

37623762

CLOSET

37463746

TOILET

3744A3744A

NURSES

37443744

BEDROOM

37423742

BEDROOM

37403740

READING

37383738UTILITY

37363736

HAC

3736A3736A

STAIR

S6S6

WARD

37203720

CT CLINIC

37503750

STORAGE

37173717

DRESSING

37153715

SHOWERS

3715A3715A

37113711

DAY

ROOM

37103710

Room 37003700

BREAK

37653765

OFFICE

37813781

CLOSET

3750A3750A

CORRIDOR

7C367C36

CORRIDOR

7C337C33 CORRIDOR

37233723

CORRIDOR

7C377C37

CORRIDOR

7C327C32

CORRIDOR

7C317C31

CORRIDOR

7C397C39

CORRIDOR

7C387C38

ELEVATOR

20182018

Room 3775A3775A

12/12 WHITE FLOOR TILE

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

DEDUCT ALT 1: ELIMINATE

ALL WORK ASSOCIATED WITH

NORTH PORTION OF

BUILDING 407.

DEDUCT ALT 2:

ELIMINATE ALL WORK

ASSOCIATED WITH

SOUTH PORTION OF

BUILDING 407.

DEDUCT ALT 2:

ELIMINATE ALL WORK

ASSOCIATED WITH

SOUTH PORTION OF

BUILDING 407.

DEDUCT ALT 2:

ELIMINATE ALL WORK

ASSOCIATED WITH

SOUTH PORTION OF

BUILDING 407.

DEDUCT ALT 2:

ELIMINATE ALL WORK

ASSOCIATED WITH

SOUTH PORTION OF

BUILDING 407.

HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES

1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF WISCONSIN AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, AND

STATE OF WISCONSIN DEPARTMENT OF PUBLIC HEALTH.

2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134

3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.

CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS (SHEET GI201) FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. THE ABATEMENT CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE REGULATIONS. WHERE OVERLAPS OCCUR, THE

MOST STRINGENT REQUIREMENTS APPLY.

4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A WIS LICENSED ASBESTOS

ABATEMENT CONTRACTOR.

5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A WIS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS SHALL BE

REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.

6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED.OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL

CONTRACTOR, AND THE COR.

7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR ASBESTOS

EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE ENVIRONMENT.

8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.

9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED MATERIALS

AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT DOCUMENTS. THE OWNER OR THIER REPRESETATIVE SHALL NOT BE RESPONSIBLE FOR LOST, DAMAGED OR STOLEN ITEMS.

10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE

NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.

11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE

LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, AND THE WISCONSIN DPH.

12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.

13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS BY THE

CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.

14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION

MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.

15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS SHOWING THE

NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.

16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES. THE BUILDING IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG METHODS ON

THE GROUND FLOOR TO MINIMIZE IMPACT ON BUILDING OPERATIONS.

17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD ABATEMENT

REQUIREMENTS, AND THE COR.

18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR. ALL

OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.

19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.

20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL BE

RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM ON HVAC

EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.

21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS. COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED

HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY

PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED TO THE OWNER WITHIN 35 DAYS OF

WASTE LEAVING THE SITE.

22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, AND SPECIFIC ORIGINAL FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY. SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR

ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.

23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

KEYNOTES-

LEGEND

QUANTITIES

PATH INDICATED IS PROVIDED FOR INTENT ONLY.

COORDINATE FINAL REMOVAL PATHWAYS, PHASING,

AND METHODS WITH GENERAL CONTRACTOR AND COR.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B407 KEY PLAN

AREA A

Expand and Renovate B400 for Urgent and Primary Care

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1400 Van Buren St NE

UNIT 130,

Minneapolis, MN 55413 Phone: 612-249-5600 www.obernel.com

Hinman Cinsulting Enginers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t C a re

A n d

R e n o v a te s t F lo o r

P a ti e n t C a re

/6

-3

.B

.A

.r v t

/1

/2

:5

:0

A

M

H103-407

B407 - LEVEL 3 - HAZARDOUS MATERIAL

ABATEMENT

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

676-19-327

05/20/2021 MRP ENN

ISSUED FOR

CONSTRUCTION

500 E Veterans St, Tomah, WI 54660

1/8" = 1'-0" F1

B407 LEVEL 3 - ASBESTOS ABATEMENT PLAN

1 ABATE 12X12 FLOOR TILE FLOORING IN AREAS AS INDICATED. SEE LEGEND BELOW.

AREAS ANTICIPATED TO BE IN-SCOPE OF REQUIRED MODIFICATION, COORDINATE WITH

DEMOLITION AND NEW WORK TO DETERMINE SPECIFIC EXTENTS.

± 2628 SF 12 X 12 WHITE FLOOR TILE

DEDUCT ALT 1: ELIMINATE ALL WORK ASSOCIATED

WITH NORTH PORTION OF BUILDING 407.

DEDUCT ALT 2: ELIMINATE ALL WORK ASSOCIATED

WITH SOUTH PORTION OF BUILDING 407.

A

B

C

D

E

F F

G G

F.1 F.1

H H

I I

J

J

K K

L L

M M

5 6 6.1 7

14 15 16 17 18 19

H.5 H.5

I.4 I.4

J.7 J.7

AMBULANCE

GARAGE

10981098

MAIN

RECEPTION

10531053

OFFICE

ADMISSIONS

10791079

OFFICE

CLERK

10781078

OFFICE

10751075

OFFICE

XX

OFFICE

10741074

OFFICE

10731073

EXAM

10711071

EXAM

10721072

OFFICE

10701070

CLINIC

RECEPTION

10521052

PATIENT

ED

CONFERENCE

10551055

WAITING

10501050

INTAKE

10541054

INTAKE

10561056

FAMILY

TOILET

10421042

MEN'S

TOILET

10401040

WOMEN'S

TOILET

10381038

ELETRICAL

400E3A400E3A

ELECTRICAL

400E3400E3

TLT

10321032

WOMEN

VISITOR

TOILET

10341034

EXAM

10321032

OFFICE

10371037

ELEVATOR

XX

OFFICE

10351035MECH

10311031

MECHANICAL

400M3400M3

ANTE

10291029

STORAGE

10301030

WAITING /

CIRCULATION

10801080

WAITING

1080B1080B

SECURITY

XX

STAIR

S7S7

EXAM

1066E1066E

EXAM

1066D1066D

EXAM

1066C1066C

EXAM

1060A1060A

EXAM

1060B1060B

EXAM

1060C1060C

EXAM

1060D1060D

EXAM

1060E1060E

EXAM

1060F1060F

EXAM

1064B1064B

EXAM

1064C1064C

EXAM

10671067

CARE

TEAM

XX

COMPRESSOR

ROOM

1041A1041A

JAN

10411041

AGENT

CASHIER

10471047

TRAVEL &

PATIENT

FUNDS

10451045

ENCLOSED

WALKWAY

XX

OFFICE

PROVIDERS

1066G1066G

OFFICE

PROVIDERS

1066F1066F

OFFICE

RN'S

1064A1064A

OFFICE

10441044

SOILED

UTILITY

1066B1066B

TLT

1066A1066A

IT

1051B1051B

ELECT

1051A1051A

OFFICE

RNS

10651065

INTERVIEW

ROOM

10631063

OMNI

CELL

CLOSET

10611061

CLEAN

STORAGE

10691069

VAULT -

ELEC

400E3C400E3C

VAULT -

ELECT?

XX

STAIR

S8S8STAIR

S8S8

ENTRY

1080A1080A

OFFICE

10331033

STAFF

TOILET

10961096

STAFF

TOILET

10941094

OFFICE

10931093

EXAM

10911091

EXAM

10921092

WOMEN

TLT

10901090

NURSE

STATION

10851085 EXAM

10881088

EXAM

10861086

EXAM

10831083

EXAM

10841084

EXAM

10821082

STAIR

NURSE

STATION

10131013

EXAM

10101010

EXAM

10061006

EXAM

10041004

EXAM

10021002

OFFICE

10011001

OFFICE

10111011

OFFICE

10001000

CONFERENCE

10031003

DIRTY

UTILTIY

10181018

EXAM

10271027

OFFICE

10231023

OFFICE

10191019

OFFICE

10161016

EXAM

10221022

EXAM

10241024

OFFICE

10251025

OFFICE

10261026

OFFICE

10211021

OFFICE

10171017

WAITING

10131013

IT

10051005

EXAM

10281028

CORRIDOR

OC19OC19

STORAGE

1096A1096A

CORRIDOR

OC17OC17

CORRIDOR

OC11OC11

AIRCELL PIPE INSULATION

CORRIDOR

OC12OC12

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

I.5 I.5

MUD COMPOUND PIPE FITTINGS

HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES

1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF WISCONSIN AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, AND

STATE OF WISCONSIN DEPARTMENT OF PUBLIC HEALTH.

2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134

3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.

CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS ((SHEET GI201) FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. THE ABATEMENT CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE REGULATIONS. WHERE OVERLAPS OCCUR, THE

MOST STRINGENT REQUIREMENTS APPLY.

4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A WIS LICENSED ASBESTOS

ABATEMENT CONTRACTOR.

5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A WIS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS SHALL BE

REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.

6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED.OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL

CONTRACTOR, AND THE COR.

7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR ASBESTOS

EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE ENVIRONMENT.

8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.

9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED MATERIALS

AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT DOCUMENTS. THE OWNER OR THIER REPRESETATIVE SHALL NOT BE RESPONSIBLE FOR LOST, DAMAGED OR STOLEN ITEMS.

10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE

NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.

11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE

LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, AND THE WISCONSIN DPH.

12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.

13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS BY THE

CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.

14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION

MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.

15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS SHOWING THE

NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.

16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES. THE BUILDING IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG METHODS ON

THE GROUND FLOOR TO MINIMIZE IMPACT ON BUILDING OPERATIONS.

17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD ABATEMENT

REQUIREMENTS, AND THE COR.

18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR. ALL

OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.

19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.

20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL BE

RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM ON HVAC

EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.

21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS. COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED

HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY

PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED TO THE OWNER WITHIN 35 DAYS OF

WASTE LEAVING THE SITE.

22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, AND SPECIFIC ORIGINAL FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY. SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR

ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.

23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

KEYNOTES-

LEGEND

QUANTITIES

MUD COMPOUND PIPE FITTINGS AND

AIRCELL PIPE INSULATION

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

AREA A

B400 KEY PLAN

AREA B

C&S Engineers, Inc.

2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com

Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: 612-249-5600 www.obernel.com

Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com

B

IM

/6

-3

B

E x p a n d

R e lo c a te

U rg e n t C a re

A n d

R e n o v a te s t F lo o r

P a ti e n t C a re

/6

-3

.B

.A

.r v t

/1

/2

:5

:1

A

M

HC101

B400 - LEVEL 1 - HAZARDOUS MATERIAL

ABATEMENT - PIPING

TRIPLE C - THE A&E GROUP

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

676-19-327

05/20/2021 MRP ENN

ISSUED FOR

CONSTRUCTION

Expand and Renovate B400 for Urgent and Primary Care

500 E Veterans St, Tomah, WI 54660

AREAS ANTICIPATED TO BE IN-SCOPE OF REQUIRED MODIFICATION, COORDINATE

WITH DEMOLITION AND NEW WORK TO DETERMINE SPECIFIC EXTENTS.

1/8" = 1'-0" F1

B400 LEVEL 1 - ASBESTOS ABATEMENT PLAN - PIPING

1 ABATE PIPE AND PIPE FITTING INSULATION IN HATCHED AREAS. CONDITIONS ARE BASED

ON EXISTING DRAWINGS, AND FIELD CONDITIONS MAY VARY FROM RECORD DRAWINGS.

CONFIRM LAYOUT AND PRESENCE OF PIPES IN HATCHED AREAS (SEE LEGEND) AND IN

LOCATIONS AS NOTED. COORDINATE W/ THE GC AND THE VA COR TO DETERMINE

SPECIFIC ABATEMENT APPROACH, PHASING AND WASTE REMOVAL REQUIREMENTS ON

THIS FLOOR

107± PIPE FITTINGS INSULATION TO BE ABATED ON THIS LEVEL

352 LF ± OF PIPE TO BE ABATED ON THIS LEVEL

GI000-COVER SHEET
GI001-PROJECT SHEET INDEX
GI050-GENERAL NOTES
GI101-B400 -LEVEL 1 -FIRE AND LIFE SAFETY PLAN & CODE DATA
GI102-B400 -LEVEL 2 -FIRE AND LIFE SAFETY PLAN & CODE DATA
GI104-B407 -LEVEL 3 -FIRE AND LIFE SAFETY PLAN & CODE DATA -DEDUCT ALT #1 & #2
GI201-INFECTION CONTROL PLAN & INTERIM LIFE
GC101-PROJECT PHASING
GC102-PHASING PLANS
H101-B400 -LEVEL 1 -HAZARDOUS MATERIAL ABATEMENT
H102-B400 -LEVEL 2 -HAZARDOUS MATERIAL ABATEMENT
H103-407-B407 -LEVEL 3 -HAZARDOUS MATERIAL ABATEMENT
HC101-B400 -LEVEL 1 -HAZARDOUS MATERIAL ABATEMENT -PIPING
VF100-CONTROL POINT SITE PLAN
VF101-viuvTiiig i iuvCIVIL SURVEY PLAN
CD101-CIVIL DEMOLITION PLAN
CS101-CIVIL SITE PLAN
COo-CIVIL SITE PLAN STAGING AREA
CG101-CIVIL GRADING PLAN
CG501-CIVIL DETAIL SHEET 1
CG502-CIVIL DETAIL SHEET 2
CU101-CIVIL UTILITY PLAN
SJ001-GENERAL STRUCTURAL NOTES
SJ002-GENERAL STRUCTURAL NOTES CONTINUED
SJ003-SPECIAL INSPECTIONS
SB100-B400 -LEVEL 1 -FOUNDATION PLAN -OVERALL
SB101-B400 -LEVEL 1 - FOUNDATION PLAN -AREA A
SF102-B400 -LEVEL 2 - FRAMING PLAN -OVERALL
SF103-B400 -LEVEL 2 -ROOF FRAMING PLAN -AREA A
SF201-FRAMING ELEVATIONS
SF202-FRAMING ELEVATIONS
SF203-FRAMING ELEVATIONS
SF501-TYPICAL DETAILS
SF502-TYPICAL DETAILS
SF503-TYPICAL DETAILS
SF504-TYPICAL DETAILS
SF505-TYPICAL DETAILS
SB510-FOUNDATION DETAILS
SF520-FRAMING DETAILS
SF521-FRAMING DETAILS
SF530-COLD-FORMED STEEL FRAMING
SF601-GRAPHICAL COLUMN SCHEDULE
AE000-SYMBOLS, & GENERAL NOTES
AS101-ARCHITECTURAL SITE PLAN
AG100-FLOOR PLAN -LEVEL 1, URGENT CARE CENTER PROGRAM PLAN
AG103-FLOOR PLAN -LEVEL 1, CLINICAL SPACE PROGRAM PLAN
AG200-FLOOR PLAN -LEVEL 2, SPECIALTY CARE PROGRAM PLAN
AG201A-FLOOR PLAN -LEVEL 3 -SWING SPACE LAYOUT B407-DEDUCT ALT #1 & #2
AD101-B400 -LEVEL 1 -DEMOLITION PLAN
AD102-B400 -LEVEL 2 -DEMOLITION PLAN
AD103-407-B407 -LEVEL 3 -DEMOLITION PLAN -DEDUCT AL #1 & #2
AD121-B400 -LEVEL 1 -DEMOLITION RCP
AD122-B400 -LEVEL 2 -DEMOLITION RCP
AD123-407-B407 -LEVEL 3 -DEMOLITION RCP -DEDUCT ALT #1 & #2
AE101-B400 -LEVEL 1 -FLOOR PLAN -OVERALL
AE102-B400 -LEVEL 2 -FLOOR PLAN -OVERALL
AE103-407-B407 -LEVEL 3 -FLOOR PLAN -DEDUCT ALT #1& #2
AE104-B400 -ROOF PLAN -OVERALL
AC101-B400 -LEVEL 1 -REFLECTED CEILING PLAN
AC102-B400 -LEVEL 2 -REFLECTED CEILING PLAN
AC103-407-B407 -LEVEL 3 -REFLECTED CEILING PLAN -DEDUCT ALT #1 & #2
AE201-B400 EXTERIOR ELEVATIONS
AE201-407-B407 EXTERIOR ELEVATIONS -DEDUCT ALT #1 & #2
AE202-B400 EXTERIOR ELEVATIONS
AE301-BUILDING SECTIONS
AE320-WALL SECTIONS
AE321-WALL SECTIONS
AE322-WALL SECTIONS
AE401-B400 -LEVEL 1 -ENLARGED FLOOR PLANS
AE401A-B400 -LEVEL 1 -ENLARGED FLOOR PLANS
AE401B-B400 -LEVEL 1 -ENLARGED FLOOR PLANS
AE401C-B400 -LEVEL 1 -ENLARGED FLOOR PLANS
AE401D-B400 -LEVEL 1 -ENLARGED FLOOR PLANS
AE402-B400 -LEVEL 2 -ENLARGED FLOOR PLANS
AE500-EXTERIOR WALL AND ROOF ASSEMBLIES
AE520-EXTERIOR SECTION DETAILS
AE521-EXTERIOR SECTION DETAILS
AE551-DETAILS -INTERIOR
AE552-DETAILS -INTERIOR
AE560-DOOR DETAILS
AE561-DOOR AND LOUVER DETAILS
AE601-DOOR WINDOW & LOUVER SCHEDULES
AE710-ARCHITECTURAL DOOR, WINDOW & FRAME TYPES
AE720-STANDARD PARTITION TYPES
AE721-PARTITION HEAD DETAILS
AE722-PARTITION FRAMING DETAILS
AE730-TYPICAL MOUNTING HEIGHTS
AG900-B400 RENDERINGS
AG901-B400 RENDERINGS
AG902-B400/ B407 RENDERINGS
AW001-SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES & DETAILS
AW101-B400 -LEVEL 1 -SIGNAGE PLAN
AW102-B400 -LEVEL 2 -SIGNAGE PLAN
AW103-B407 -LEVEL 3 -SIGNAGE PLAN -DEDUCT ALT #1 & #2
IN001-NTERIOR FINISH ABBREVIATIONS, SYMBOLS, GENERAL NOTES & FINISH BOARDS
IN101-B400 -LEVEL 1 -INTERIOR FINISH PLAN -OVERALL
IN101A-B400 -LEVEL 1 -INTERIOR FINISH PLANS -AREA & A1
IN101B-B400 -LEVEL 1 -INTERIOR FINISH PLANS -AREA
IN102C-B400 -LEVEL 2 -INTERIOR FINISH PLANS -AREA C
IN103D-B407 -LEVEL 3 -INTERIOR FINISH PLANS -AREA A, B & C -DEDUCT ALT #1& #2
IN501-INTERIOR FINISH DETAILS
IN601-INTERIOR FINISH LEGEND AND SCHEDULES
IF101AB-B400 -LEVEL 1 -INTERIOR FURNITURE PLAN -FOR REFERENCE ONLY
IF102C-B400 -LEVEL 2 -INTERIOR FURNITURE PLAN -FOR REFERENE ONLY
IF103D-B407 -LEVEL 3 -INTERIOR FURNITURE PLAN -FOR REFERENCE ONLY -DEDUCT ALT #1 & #2
IF104-FURNITURE PLAN -FOR REFERENCE ONLY
IF105-FURNITURE PLAN -FOR REFERENCE ONLY
IF106-FURNITURE PLAN -FOR REFERENCE ONLY
Q001-EQUIPMENT SCHEDULE
Q101AB-B400 -LEVEL 1 -EQUIPMENT PLANS
Q101C-B400 -LEVEL 2 -EQUIPMENT PLAN
F000-FIRE PROTECTION ABBREVIATIONS AND SYMBOLS
FD101-B400 -LEVEL 1 - FIRE PROTECTION DEMOLITION PLAN
FD102-B400 -LEVEL 2 - FIRE PROTECTION DEMOLITION PLAN
FD103-407-B407 -LEVEL 3 - FIRE PROTECTION DEMOLITION PLAN
FP101-B400 -LEVEL 1 - FIRE PROTECTION PLAN
FP102-B400 -LEVEL 2 - FIRE PROTECTION PLAN
FP103-407-B407 -LEVEL 3 - FIRE PROTECTION PLAN
P-000-PLUMBING ABBREVIATIONS AND SYMBOLS
PD100-B400 -FOUNDATION -PLUMBING DEMOLITION PLAN
PD101-B400 -LEVEL 1 -PLUMBING DEMOLITION PLAN
PD102-B400 -LEVEL 2 -PLUMBING DEMOLITION PLAN
PD201-B400 -LEVEL 1 -MED GAS DEMOLITION PLAN
P-100-B400 -FOUNDATION -PLUMBING PLAN
P-101-B400 -LEVEL 1 -PLUMBING PLAN
P-102-B400 -LEVEL 2 -PLUMBING PLAN
P103-407-B407 -LEVEL 3 -PLUMBING PLAN
P-201-B400 -LEVEL 1 -MED GAS PLAN
P-300-B400 -PLUMBING ENLARGED PLANS
P-301-B400 -PLUMBING ENLARGED PLANS
P-302-B400 -PLUMBING ENLARGED PLANS
P-303-B400 -PLUMBING ENLARGED PLANS
P-304-B400 -PLUMBING ENLARGED PLANS
P-305-B400 -PLUMBING ENLARGED PLANS
P-400-PLUMBING RISERS
P-401-PLUMBING RISERS
P-402-PLUMBING RISERS
P-403-PLUMBING RISERS
P-404-PLUMBING RISERS
P-500-PLUMBING DETAILS
P-700-PLUMBING SCHEDULES
M-000-MECHANICAL ABBREVIATIONS AND SYMBOLS
MD101-B400 -LEVEL 1 -HVAC DEMOLITION PLAN
MD101A-B400 -LEVEL 1 -HVAC DEMO PLAN -DEDUCT ALT. #4
MD102-B400 -LEVEL 2 -HVAC DEMOLITION PLAN
MD103-407-B407 -LEVEL 3 -HVAC DEMOLITION PLAN
MD200-B400 -FOUNDATION -HVAC PIPING DEMOLITION PLAN
MD201-B400 -LEVEL 1 -HVAC PIPING DEMOLITION PLAN
MD202-B400 -LEVEL 2 -HVAC PIPING DEMOLITION PLAN
M-100-B400 -LEVEL 1 -HVAC TEMPORARY PLAN
M-101-B400 -LEVEL 1 - HVAC PLAN
M-101A-B400 -LEVEL 1 - HVAC PLAN -DEDUCT ALT. #4
M-102-B400 -LEVEL 2 - HVAC PLAN
M-103-407-B407 -LEVEL 3 - HVAC PLAN
MP200-B400 -FOUNDATION -HVAC PIPING PLAN
MP201-B400 -LEVEL 1 -HVAC PIPING PLAN
MP202-B400 -LEVEL 2 -HVAC PIPING PLAN
MP203-407-B407 -LEVEL 3 -HVAC PIPING PLAN
M-400-ENLARGED MECHANICAL PLANS
M-401-ENLARGED MECHANICAL PLANS
M-402-ENLARGED MECHANICAL PLANS -DEDUCT ALT. #4
M-500-MECHANICAL DETAILS
M-501-MECHANICAL DETAILS
M-502-MECHANICAL DETAILS
M-600-MECHANICAL SECTIONS
M-700-MECHANICAL SCHEDULES
M-800-MECHANICAL CONTROLS
M-801-MECHANICAL CONTROLS
M-802-MECHANICAL CONTROLS
E-000-ELECTRICAL ABBREVIATIONS AND SYMBOLS
ED101-B400 -LEVEL 1 - ELECTRICAL DEMOLITION PLAN
ED102-B400 -LEVEL 2 - ELECTRICAL DEMOLITION PLAN
ED103-407-B407 -LEVEL 3 - ELECTRICAL DEMOLITION PLAN
EL101-B400 -LEVEL 1 - LIGHTING PLAN
EL102-B400 -LEVEL 2 - LIGHTING PLAN
EL103-407-B407 -LEVEL 3 - LIGHTING PLAN
EL111-B400 -LEVEL 1 -LIGHTING CALCS
EL112-B400 -LEVEL 2 -LIGHTING CALCS
EL113-407-B407 -LEVEL 3 -LIGHTING CALCS
EP101-B400 -LEVEL 1 - POWER PLAN
EP102-B400 -LEVEL 2 - POWER PLAN
EP103-407-B407 -LEVEL 3 - POWER PLAN
EY101-B400 -LEVEL 1 - SPECIAL SYSTEMS PLAN
EY102-B400 -LEVEL 2 - SPECIAL SYSTEMS PLAN
EY103-407-B407 -LEVEL 3 - SPECIAL SYSTEMS PLAN
E-501-ELECTRICAL DETAILS
E-601-B400 ELECTRICAL DIAGRAMS
E-602-B400 ELECTRICAL DIAGRAMS
E-700-ELECTRICAL SCHEDULES
EF101-B400 -LEVEL 1 - FIRE ALARM DEMOLITION PLAN
EF102-B400 -LEVEL 2 - FIRE ALARM DEMOLITION PLAN
EF103-407-B407 -LEVEL 3 - FIRE ALARM DEMOLITION PLAN
EF201-B400 -LEVEL 1 - FIRE ALARM PLAN
EF202-B400 -LEVEL 2 - FIRE ALARM PLAN
EF203-407-B407 -LEVEL 3 - FIRE ALARM PLAN

File details come from the government source that posted it. Updated .