ATTACHMENT 5 - Mechanical.pdf
PDF 17 MB Posted
- Solicitation number
- 36C77621B0009
About this file
This document provides details for a federal contract solicitation to expand and renovate a building for urgent and primary care services. The solicitation number is 36C77621B0009 issued by the Department of Veterans Affairs Technology Acquisition Center Austin. Contractors are sought to completely prepare the site for building operations, including demolition and removal of existing structures, and furnish all labor, materials, and work to expand and renovate building B400 for urgent and primary care as specified in the attached drawings and specifications. The location of the project is at the Tomah VA facility. Responses are due based on the standard solicitation timeline and procedures issued by the contracting agency.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A L
M
B
C N
OD
E
P
Q
R
S
F
G
T
H
U
V
W
I
K
AD ACCESS DOOR
ACFM ABSOLUTE CUBIC FEET PER MINUTE
AFF ABOVE FINISHED FLOOR
AFM AIR FLOW MEASURING DEVICE
AFMS AIR FLOW MOISTURIZING STATION
AHU AIR HANDLING UNIT
AMB AMBIENT
AP ACCESS PANEL
APPROX APPROXIMATE
ASR AUTOMATIC SPRINKLER RISER
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LGT LENGTH
LP LOW POINT
LRA LOCKED ROTOR AMPERS
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BTU(H) BRITISH THERMAL UNIT (PER HOUR)
MAX MAXIMUM
MBH 1000 BTU/HR
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MER MECHANICAL EQUIPMENT ROOM
MIN MINIMUM
MISC MISCELLANEOUS
MTG MOUNTING
NC NOISE CRITERIA
N.C. NORMALLY CLOSED
NIC NOT IN CONTRACT
NO. NUMBER
N.O. NORMALLY OPEN
NOM NOMINAL
NPSH NET POSITIVE SUCTION HEAD
(NRL) NEW LOCATION OF RELOCATED
MATERIAL OR EQUIPMENT
NTS NOT TO SCALE
CAP. CAPACITY
CDSR CONDENSER
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEAN OUT
COMP COMPRESSOR
COND CONDENSATE
CONT CONTINUATION
CW COLD WATER
DB DECIBELS
DBA DECIBELS (A-WEIGHTED SCALE)
DBT DRY BULB TEMPERATURE °F
DDC DIRECT DIGITAL DRIVE
DIA DIAMETER
DN DOWN
DP DIFFERENTIAL PRESSURE
DPT DEW POINT TEMPERATURE °F
DWG DRAWING
DX DIRECT EXPANSION
D&T DRIP & TRAP
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OPR OPERATING
OV OUTLET VELOCITY
PD PRESSURE DROP (FEET OF WATER)
PRESS PRESSURE
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH - GUAGE
QTY QUANTITY
RA RETURN/RELIEF AIR
RC ROOF CONDUCTOR
RD ROOF DRAIN
RH RELATIVE HUMIDITY
(RL) RELOCATED MATERIAL OR EQUIPMENT
RLA RUNNING LOAD AMPS
RPM REVOLUTIONS PER MINUTE
RET RETURN
RE REFERENCE
SA SUPPLY AIR
SA SHOCK ABSORBER
SA SOUND ATTENUATOR
SAN SANITARY WASTE
SCFM STANDARD CUBIC FEET PER MINUTE
SD SMOKE DETECTOR
SDP SMOKE DAMPER
SENS SENSIBLE
SF SQUARE FEET
SG SPECIFIC GRAVITY
SL SOUND LINING
SP STATIC PRESSURE (INCHES OF WATER)
SPD SPEED
SPL SOUND POWER LEVEL
SPS STATIC PRESSURE SENSOR
SS STAINLESS STEEL
STM STEAM
TAB TESTING, ADJUSTING AND BALANCING
TEMP TEMPERATURE
TP TOTAL PRESSURE; TRAP PRIMER
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
V VOLTS
VAC VACUUM
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
W WATTS
W/ WITH
W/O WITHOUT
WBT WET BULB TEMPERATURE
WDT WIDTH
WG WATER GUAGE
WH WALL HYDRANT
EA EACH; EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EFF EFFICIENCY
EGW ETHYLENE GLYCOL WATER SOLUTION
(% GLYCOL BY VOLUME)
EL ELEVATION
ENT ENTERING
EQ EQUIVALENT
ESP EXTERNAL STATIC PRESSURE
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXP EXPANSION
EXT EXTERNAL
(E) EXISTING
F FAHRENHEIT
FD FLOOR DRAIN
FDP FIRE DAMPER
FH FUME HOOD
FLA FULL LOAD AMPERS
FLEX FLEXIBLE CONNECTION
FLR FLOOR
FM FLOW METER
FPM FEET PER MINUTE
FS FLOW SWITCH
FSDP FIRE & SMOKE DAMPER
FT FEET or FOOT
GAL GALLONS
GPM GALLONS PER MINUTE
GR GRAINS
HB HOSE BIBB
HG MERCURY
HGT HEIGHT
HO HUB OUTLET
HP HORSE POWER
HR HOUR
HUM HUMIDIFIER
HZ HERTZ
ID INSIDE DIAMETER
IE INVERT ELEVATION
IFB INTEGRAL FACE AND BY-PASS
IN. INCHES
KW KILOWATTS
SEE MECHANICAL SYMBOLS, LEGENDS AND EQUIPMENT SCHEDULES
FOR ADDITIONAL ABBREVIATIONS. ALL ABBREVIATIONS, SYMBOLS,
AND LEGENDS SHOWN ON THIS DRAWINGS ARE NOT NECESSARILY
USED.
R
UNIT HEATER
OF AIR FLOW 45° OFFSETS
RETURN OR EXHAUST AIR FLOW
SUPPLY OR OUTSIDE AIR FLOW
SIDE WALL SUPPLY DIFFUSER
SIDE WALL RETURN or EXHAUST
GRILLE/REGISTER
PRESSURE REGULATING VALVE, FLANGED
HORIZONTAL FIRE DAMPER
REDUCER - ECCENTRIC
UP or DN
TEE OUTLET - UP
REDUCED PRESSURE BACKFLOW PREVENTER
AIR VENT
DROP OR RISE
DIRECTION OF FLOW
DIRECTION OF PIPE PITCH
CONNECT OUT OF TOP
FLOW METER
ELBOW - TURNED UP OR RISER CONNECTION
PRESSURE GUAGE WITH COCK
QUICK COUPLING
ELBOW - TURNED DOWN
TEE OUTLET - DOWN
CAP OR PLUG
THERMOMETER
ALIGNMENT GUIDE
PIPE UNION
PIPE ANCHOR
FLOOR DRAIN (ROUND)
ROOF DRAIN (RD)
RUNNING TRAP
CLEANOUT IN FLOOR
REDUCER - CONCENTRIC
HOSE CONNECTION
WALL HYDRANT
STEAM TRAP
CLEANOUT
HOSE BIBB
FLOW INDICATING BALANCE VALVE
ORIFICE PLATE
FLEXIBLE CONNECTION
STRAINER
PRESSURE REDUCING VALVE
SAFETY RELIEF VALVE
VERTICAL DUCT DROP
VERTICAL DUCT RISE
DIRECTION OF FLOW
SMOKE DAMPER
VERTICAL FIRE DAMPER
BUTTERFLY VALVE (ISOLATION OR THROTTLING)
SELF ACTUATING TYPE DIFFERENTIAL PRESSURE
AUTOMATIC FLOW CONTROL VALVE
3-WAY ELECTRIC CONTROL VALVE
BALL VALVE (ISOLATION OR THROTTLING)
PLUG VALVE (ISOLATION OR THROTTLING)
AUTOMATIC DPCV
CONTROL VALVE (DPCV)
SOLENOID VALVE
2-WAY ELECTRIC CONTROL VALVE
3-WAY PNEUMATIC CONTROL VALVE
2-WAY PNEUMATIC CONTROL VALVE
ANGLE VALVE
CHECK VALVE
ISOLATION VALVE
THROTTLING VALVE
AUTOMATIC DAMPER (MOTORIZED)
VOLUME DAMPER (MANUAL)
ROOM THERMOSTAT
SMOKE DETECTOR
FLOW SWITCH
STATIC PRESSURE SENSOR
AIR SYSTEMS
SUPPLY
RETURN
T
PRESSURE REGULATING VALVE, THREADED
FLOOR DRAIN (RECTANGULAR)
SA
RA
TE
GE
SUPPLY AIR
RETURN AIR
GENERAL EXHAUST
TOILET EXHAUST
(NOTES APPLY TO ALL MECHANICAL DRAWINGS.)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
VAV BOX
VAV BOX
OUTSIDE AIR INTAKE
DUCT SYSTEM LOCATION
PRESSURE
CLASSIFICATION
(INCH WATER
GAUGE)
REMARKS
FROM TO
FAN DISCHARGE
FAN INLETGRILLE
GENERAL EXHAUST
RETURN
SUPPLY
2"
2"
2"
4"
THROUGH OUT 2"
DIFFUSER
OWS OPERATOR WORK STATION
EXHAUST
HHWS HEATING HOT WATER SUPPLY
HHWR HEATING HOT WATER RETURN
CWS CONDENSER WATER SUPPLY
CWR CONDENSER WATER RETURN
HPR (PSIG)
LPR (PSIG)
PS
D
HPS (PSIG)
LPS (PSIG)
CS (PSIG)
PHWS
PHWR
RL
RS
CHWS
CHWR
RHG
CONDENSATE DRAIN
HIGH PRESSURE CONDENSATE RETURN
LOW PRESSURE CONDENSATE RETURN
LOW PRESSURE STEAM
CLEAN STEAM
PUMPED CONDENSATE
HIGH PRESSURE STEAM
PERIMETER HEATING WATER RETURN
PERIMETER HEATING WATER SUPPLY
CHILLED WATER SUPPLY
CHILLED WATER RETURN
REFRIGERANT HOT GAS
REFRIGERANT SUCTION
REFRIGERANT LIQUID
SD
FS
SP
SMOKE/FIRE COMBINATION DAMPER
INSTALL ALL WORK IN ACCORDANCE WITH THE WISCONSIN CODE, WISCONSIN PLUMBING CODE, WISCONSIN ENERGY CODE, WISCONSIN ELECTRIC CODE AND
THE REGULATIONS OF ALL AUTHORITIES HAVING JURISDICTION.
TO OBTAIN ALL CONSTRUCTION INFORMATION, ALL SPECIFICATION AND DRAWINGS (E.G. ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION MUST BE USED.
BRING TO THE ATTENTION OF THE ARCHITECT/ENGINEER ANY INFORMATIONAL CONFLICTS WITHIN THE SPECIFICATIONS AND DRAWINGS. THE CONTRACTOR(S) SHALL NOT PROCEED WITH ANY WORK, EXCEPT AT ITS OWN RISK, UNTIL ALL CONFLICTS ARE RESOLVED AND THE CLARIFYING INFORMATION IS ISSUED TO THE
CONTRACTOR(S) BY THE ARCHITECT/ENGINEER.
COORDINATE DIFFUSER & REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS.
COORDINATE ALL WALL MOUNTED DEVICES SUCH AS THERMOSTATS AND CONTROL PANELS WITH ARCHITECTURAL INTERIOR ELEVATIONS.
ALL DIMENSIONS SHOWN FOR DUCTWORK ARE NET INSIDE DIMENSIONS.
FURNISH AND INSTALL ALL MANUALLY OPERATED VOLUME CONTROL (BALANCING) DAMPERS NECESSARY TO PERFORM THE BALANCING WORK.
THOUGH SOME OFFSETS & TRANSITIONS ARE SHOWN IN PIPING & SHEET METAL TO HELP INDICATE THE PHYSICAL RELATIONSHIP BETWEEN THEM, IT IS NOT THE INTENT OF THE DRAWINGS TO SHOW ALL PIPING & SHEET METAL OFFSETS & TRANSITIONS REQUIRED. THE CONTRACTOR SHALL FULLY COORDINATE THE MECHANICAL WORK WITHIN ITSELF & WITH THE WORK OF ALL TRADES TO PROVIDE COMPLETE & OPERABLE SYSTEMS WITHOUT INTERFERENCES.
DUCT CONSTRUCTION SHALL FOLLOW THE LATEST SMACNA STANDARDS FOR THE SPECIFIC PRESSURE CLASSIFICATIONS INDICATED BELOW.
BUILDING IS TO BE FULLY SPRINKLED; SPRINKLER LAYOUT SHALL CONFORM TO NFPA 13. REFLECTED CEILING PLANS SHOW SPRINKLER LAYOUT FOR SOME AREAS. REFER TO SPECIFICATIONS & ARCHITECTURAL DRAWINGS FOR ADDITIONAL LAYOUT REQUIREMENTS.
PROVIDE DUCT PRESSURE CLASSIFICATIONS AS FOLLOWS:
EXISTING TRADES SHOWN IN LIGHT LINES.
NEW CONSTRUCTION SHOWN IN DARK LINES.
VAV BOXAIR INLET
FAN INLETVAV BOX
3"
BCW BOOSTED COLD WATER
SUB-METER FOR COLD WATER, HOT WATER, GAS
HORIZONTAL SMOKE/FIRE COMBINATION DAMPER
TEST PORT
HB
ST
HC
S
M
M
M
AIR VENT WITH VALVE
RD
FD
FD
CO
CO
RISER DESIGNATION (TYPE AS INDICATED)
SECTION NUMBER
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
E1-1.0
E1-1.0
KEY NOTE
DUCTWORK
SEAL/LEAKAGE
CLASS
A
A
A
A
A
A
NEW DUCTWORK
DEMO DUCTWORK
EXISTING DUCTWORK
1. (E) MECHANICAL SHOWN ON DRAWINGS IS BASED ON AVAILABLE DRAWINGS. INSTALLING CONTRACTOR IS
RESPONSIBLE FOR FIELD VERIFICATION OF (E) CONDITIONS
2. REMOVED PIPING TO BE CAPPED & VALVED AT MAIN - NO DEADLEGS TO REMAIN
3. REMOVED DUCTWORK TO BE CAPPED AND SEALED AIR TIGHT AT MAIN.
4. COORDINATE SYSTEM SHUT-DOWNS WITH FACILITIES
5. COORDINATE HOT/FREEZE TAPS WITH FACILITIES
6. ANY ITEMS DESIGNATED BY FACILITIES TO BE RETAINED SHALL BE REMOVED AND TURNED OVER DAMAGE FREE
7. PIPING SHALL BE LABELED PER VA STANDARDS
8. AS-BUILT MARK-UPS WITH VALVE LOCATIONS & LIST SHALL BE TURNED OVER TO FACILITIES
9. ALL PENETRATIONS SHALL BE PROPERLY SEALED AND FIRE STOPPED
GENERAL DEMOLITION NOTES:
FTR FINNED TUBE RADIATOR
SYMBOLS:ABBREVIATIONS:
LINE TYPES: GENERAL NOTES:
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
DEMO PIPING
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
DEDUCTIVE ALTERNATE:
POINT OF DISCONNECT
POINT OF CONNECTION
1. Deduct Alternate #1: Remove B407 North Swing Space.
a. Remove 60 days from schedule.
2. Deduct Alternate #2: Remove B407 South Swing Space, Bathroom refresh and IT closet infrastructure from project.
a. Remove 90 days from schedule.
3. Deduct Alternate #3: Remove sealed bubble wall fountain in Waiting Room 1082 from project.
a. Remove 14 days from schedule.
4. Deduct Alternate #4: Rebuild (E) AHU rather than install new one.
a. Remove 90 calendar days from schedule.
5. Deduct Alternate #5: Remove exterior entrance canopy at staff lounge 1102.
a. Remove 14 calendar days from schedule.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:2
A
M
M-000
MECHANICAL ABBREVIATIONS AND
SYMBOLS
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
MECHANICAL SHEET INDEX
M-000 MECHANICAL ABBREVIATIONS AND SYMBOLS
MD101 B400 - LEVEL 1 - HVAC DEMOLITION PLAN
MD101A B400 - LEVEL 1 - HVAC DEMOLITION PLAN - DEDUCT ALT. #4
MD102 B400 - LEVEL 2 - HVAC DEMOLITION PLAN
MD103-407 B407 - LEVEL 3 - HVAC DEMOLITION PLAN
MD200 B400 - FOUNDATION - HVAC PIPING DEMOLITION PLAN
MD201 B400 - LEVEL 1 - HVAC PIPING DEMOLITION PLAN
MD202 B400 - LEVEL 2 - HVAC PIPING DEMOLITION PLAN
M-100 B400 - LEVEL 1 - HVAC TEMPORARY PLAN
M-101 B400 - LEVEL 1 - HVAC PLAN
M-101A B400 - LEVEL 1 - HVAC PLAN - DEDUCT ALT. #4
M-102 B400 - LEVEL 2 - HVAC PLAN
M-103-407 B407 - LEVEL 3 - HVAC PLAN
MP200 B400 - FOUNDATION - HVAC PIPING PLAN
MP201 B400 - LEVEL 1 - HVAC PIPING PLAN
MP202 B400 - LEVEL 2 - HVAC PIPING PLAN
MP203-407 B407 - LEVEL 3 - HVAC PIPING PLAN
M-400 ENLARGED MECHANICAL PLANS
M-401 ENLARGED MECHANICAL PLANS
M-402 ENLARGED MECHANICAL PLANS - DEDUCT ALT. #4
M-500 MECHANICAL DETAILS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-600 MECHANICAL SECTIONS
M-700 MECHANICAL SCHEDULES
M-800 MECHANICAL CONTROLS
M-801 MECHANICAL CONTROLS
M-802 MECHANICAL CONTROLS
Pending Totals: NEW Plumbing systems in crawl space and 1st floor are original. Provide complete new plumbing piping systems, basement, crawl space, 1st floor. Replace all cold water, hot water, drain, waste, and vent piping throughout.
Fixtures / Piping 111175 [ Field Engineer Review Completed on 07/29/2014 by VHATOMBueniM.] [ Auto Generated Project Pending on 07/29/2014 for Project Number 676-14- 122 created by VHATOMBueniM.] Project 676-14-122 replaced the sanitary and storm sewer piping under the west wing.
Replace piping in the basement and in the 1st and 2nd floors, which exceed maximum life expectancy.
Fire Sprinkler / Pump 90803 Sprinkler piping is in good condition.
Pending Totals: NEW Ambulance Bay exhaust fan Square inline May have a control issue. Fan was running continuously when no source of CO contamination was present. (2010 vintage
Ventil (O.A. & Exh) 111174 Ventilation is in good condition.
Room Air Dist/Term 111173 VAV boxes and reheating coils in good condition.
Heating System 277776 2nd floor steam piping and convectors removed, replaced by hot water heaters or air-side heating.
Heating System 111168 The original steam piping and convectors on the 1st floor has exceeded their life expectancy and should be replaced.
Engr. Control syst. 111167 METASYS controls on the 1st and 2nd floors installed in 2005 and are in good condition.
Ducts & Water Dist 111166 Ducts and piping in good condition.
Pending Totals: NEW Air Handler (2004) serving the current dental in good condition, Air Handler is Mixed Air, Pre-Filter, Air Blender, Hot Water Pumped Heating Coil, CW Cooling Coil, Diffuser, Supply Fan with ABB VFD, Filter, Steam Humidifier on discharge *AHU-8 Trane MN: MCCB025UAODOUA SN:K04M65739A
Mechanical Rec No Description
Building 400 FCA Report
Disclaimer: These items have been determined to have reached their end of life usefulnes. This scope of work contract did not allocate funding for the below mentioned deficiencies. The following information was received from the owner's assessment report dated 1/6/2017.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
43886
05/20/2021 KAEKO LEITCH
1 2 3 4 5 6 6.1 7 7.8 8 9 9.1 9.9 10 11 11.2 12 13 14 18171615
M.3
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
(E )1
4" x1
2" S
A (E
)1 8" x1 2"
S A
(E )2
8" x1
2" S
A
(E)30"x12" RA
(E)30"x12" RA
(E)24"x4"
(E )2
4" x1
0" R
A (E
)1 8" x8
R A
(E )1
4" x8
R
A (E
)8 "x
8"
(E )3
0" x1
2" S
A
(E)30"x12" SA
(E)12"x6"
(E)12"x6"
(E)16"x14" (E)18"x14"
(E)36"x16"
(E )2
4" x1
2" (E
)2 0" x1 2"
(E)18"x12" (E)14"x12"
(E)10"x10"
(E)10"x10"
(E)16"x12" SA
(E )2
2" x1
2" S
A (E
)2 8" x1 2"
S A
(E)32"x12" SA
(E)32"x12"
(E)20"x12"
(E)18"x30"
(E )2
0" x1
2"
(E)12"x8" SA
(E)14"x12"
(E)18"x10"
(E)14"x8"
(E )1
4" ø
(E )1
0" ø
(E)10"x10"
(E)10"x8"
(E)14"ø SA
(E)10"ø SA
(E)14"x4"
(E)10"x8"
(E)12"x8"
(E)14"x8"(E)12"x8"(E)8"x8"
(E )3
2" x1
2"
(E)8"x10"
(E )1
2" x1
0" (E
)1 2" x1 2"
(E )2
0" x1
2"
(E)10"ø
(E )1
2" x1
0"
(E )1
0" ø
(E )8
"ø
(E)8"ø
(E )1
2" x1
2"
3 3
2 1
1 1
2 1
5 5
(E)3-13
(E)3-15
(E)3-14
(E)3-12
(E)3-10
(E)3-9
(E)3-7
(E)3-6
(E)3-8 (E)3-5
(E)3-4
(E)3-1
(E)1-13
(E)1-11
(E)1-9
(E)1-12
(E)1-10
(E)1-8
(E)1-6
(E)1-2
(E)1-3 (E)1-4
(E)3-11
(E)8"ø
(E)8"ø
(E)8"ø
(E)8"ø
(E)8"x8"
(E)8"ø
(E)8"ø
(E)6"ø
(E )1
0" x1
0" R
A (E
)1 4" x1 0"
R A
(E)20"x10" RA
(E)6"ø
(E)30"x12" SA UP
(E)30"x12" RA UP ø8" ø8"
(E)8"x8"
(E )3
0" x1
2" ø10" ø10" ø8" (E)8"ø ø8"
(E)8"ø
(E)20"x14"
(E )3
6" x1
6" (E
)3 6" x1 0" ø10" ø6"
(E)10"x12" ø6" ø6"
(E)24"x4" ø10" ø10" ø6" ø10" ø10"
(E)10"x8"
(E)16"x96"
(E)3-3
(E)3-2
(E)1-7
(E)1-1 ø8" ø8" ø8" ø8"
(E)22"x8" ø8"
(E)10"ø ø8" ø8" ø8"
(E)12"x12"
(E)10"x8"
(E)12"x12"
(E)12"x12"
(E )1
2" x1
0"
(E )1
2" x1
2"
(E)6"x6"
(E)6"ø ø8"
(E)12"x12"
(E)8"ø
(E)20"x12"
(E)
COOLING
TOWER
(E)1-5
(E)8"ø
(E)12"x8" ø8"
(E)30"x12" RA
(E)24"x10" RA
EXAM
EXAM
EXAM
OFFICE
OFFICE
OFFICE
OFFICE
EXAM
OFFICE
OFFICE
DIRTY UTILTIY
OFFICE
WAITING
NURSE STATION
OFFICE
1011 EXAM
CONFERENCE
EXAM
EXAM
EXAM
OFFICE
OFFICE
WOMEN VISITOR TOILET
TLT
MECH
IT
OFFICE
OFFICE
OFFICE
EXAM
STAIR
WAITING / CIRCULATION
EXAM
EXAM
EXAM
NURSE STATION
EXAM
EXAM
WOMEN TLT
EXAM
EXAM
OFFICE
STORAGE
1096A
STAFF TOILET
STAFF TOILET
AMBULANCE GARAGE
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
PRIOR TO BEGINNING WORK AND NOTIFY THE ARCHITECT/
ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-
BUILT" CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL DUCTWORK INSTALLATION WITH
GENERAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL
CONTRACTORS. INSTALL ALL DUCTWORK AS HIGH AS
POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS
AND RISES) TO KEEP DUCTWORK TIGHT TO THE
STRUCTURE ABOVE. OFFSET DUCTWORK TO AVOID
BEAMS
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL
PLANS FOR CEILING TYPES, HEIGHTS, SOFFIT AREAS, AND
ELEVATIONS FOR INSTALLATION OF NEW VENTILATION
DUCTWORK, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND
RE-INSTALLING OF EXISTING CEILING TILE NOT REMOVED
BY THE GENERAL CONTRACTOR FOR THE INSTALLATION
OF NEW VENTILATION DUCTWORK, EQUIPMENT, ETC.
VERIFY WITH ARCHITECTURAL PLANS FOR CEILING WORK
BY THE GENERAL CONTRACTOR. ANY CEILING TILE OR
GRID DAMAGED DURING CONSTRUCTION SHALL BE
REPLACED WITH NEW BY THIS CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS
AND/ OR CEILINGS FOR INSTALLATION OF NEW
VENTILATION DUCTWORK, EQUIPMENT, ETC. AS REQUIRED.
PATCH WALLS AND OR CEILINGS TO MATCH EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL
ELECTRICAL, CONTROL, AND ACCESS PANELS FOR
ACCESSIBILITY.
G. ALL DAMPERS, ETC. SHALL BE INSTALLED IN ACCESSIBLE
CEILINGS.
H. FIRE CAULK DUCT PENTERATIONS AT RATED WALLS,
CEILING, AND FLOORS. REFER THE ARCHITECTURE SHEET
GI101, GI102, AND GI104 FOR FIRE RATINGS.
I. CONTRACTOR SHALL MAINTAIN ALL RECOMENDED
EQUIPMENT CLEARANCES.
J. REFER TO ARCHITECTURAL PLAN FOR FIRE RATED WALL /
PARTITION / FLOOR / CEILING / ASSEMBLY LOCATIONS.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:0
A
M
MD101
B400 - LEVEL 1 - HVAC DEMOLITION
PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 1 - HVAC DEMOLITION PLAN
1 REMOVE AND REPLACE EXISTING DIFFUSER
AND FLEX DUCT. ANY FLEX DUCT RUNOUT
SHALL NOT EXCEED 5 FEET.
2 REMOVE AND REPLACE EXISTING GRILLE. SEE
NEW WORK FOR LOCATION.
3 EXISTING VAV BOX TO BE REUSED. REMOVE
EXISTING CONTROLS AND REPLACE WITH NEW
DDC CONTROLS. SEE SPECS FOR DETAILS.
4 REMOVE EXISTING BRANCH MAIN TO POINT
INDICATED ON PLAN. CAP AND SEAL
DUCTWORK.
5 REMOVE DUCTWORK TO POINT INDICATED ON
PLAN AND PREPARE FOR FUTURE
CONNECTION. SEE M-101 FOR FUTURE
CONNECTION.
6 REMOVE DUCTWORK TO POINT INDICATED ON
PLAN. CAP AND SEAL DUCT AIR TIGHT.
7 REMOVE EXISTING EXHAUST FAN, FLEX
CONNECTIONS AND DUCT TRANSITIONS.
PREPARE EXISTING EXHAUST INLET AND
OUTLET FOR FUTURE CONNECTION. SEE
M-101 FOR NEW EXHAUST FAN.
8 CONTRACTOR TO RELOCATE EXISTING OA
LOUVER, DUCTWORK, DAMPER, AND
CONTROLS. SEE M-101 FOR NEW LOCATION.
9 REMOVE AHU AND ASSOCIATED
ACCESSORIES.
10 REMOVE EXISTING WINDOW AND PREPARE
OPENING FOR NEW INTAKE LOUVER. SEE NEW
WORK FOR DETAILS.
11 REMOVE INTAKE LOUVER AND PROVIDE
INSULATED CAP AROUND OPENING.
COORDINATE WORK WITH GENERAL
CONTRACTOR.
12 REMOVE EXISTING RETURN AIR DUCT 1'-0"
BELOW FLOOR PENETRATION. CAP AND SEAL
DUCT AIR TIGHT. INFILL FLOOR OPENING WITH
MATERIALS SIMILAR TO EXISTING.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
1 2 3 4 5 6 6.1 7 7.8 8 9 9.1 9.9 10 11 11.2 12 13 18171615
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
(E )1
4" x1
2" S
A (E
)1 8" x1 2"
S A
(E )2
8" x1
2" S
A
(E)30"x12" RA
(E)30"x12" RA
(E)24"x4"
(E )2
4" x1
0" R
A (E
)1 8" x8
R A
(E )1
4" x8
R
A (E
)8 "x
8"
(E )3
0" x1
2" S
A
(E)30"x12" SA
(E)12"x6"
(E)12"x6"
(E)16"x14" (E)18"x14"
(E)36"x16"
(E )2
4" x1
2" (E
)2 0" x1 2"
(E)18"x12" (E)14"x12"
(E)10"x10"
(E)10"x10"
(E)16"x12" SA
(E )2
2" x1
2" S
A (E
)2 8" x1 2"
S A
(E)32"x12" SA
(E)32"x12"
(E)20"x12"
(E)18"x30"
(E )2
0" x1
2"
(E)12"x8" SA
(E)14"x12"
(E)18"x10"
(E)14"x8"
(E )1
4" ø
(E )1
0" ø
(E)10"x10"
(E)10"x8"
(E)14"ø SA
(E)10"ø SA
(E)14"x4"
(E)10"x8"
(E)12"x8"
(E)14"x8"(E)12"x8"(E)8"x8"
(E )3
2" x1
2" S
A
(E)8"x10"
(E )1
2" x1
0" (E
)1 2" x1 2"
(E )2
0" x1
2"
(E)10"ø
(E )1
2" x1
0"
(E )1
0" ø
(E )8
"ø
(E)8"ø
(E )1
2" x1
2"
3 3
2 1
1 1
2 1
4 4
(E)3-13
(E)3-15
(E)3-14
(E)3-12
(E)3-10
(E)3-9
(E)3-7
(E)3-6
(E)3-8 (E)3-5
(E)3-4
(E)3-1
(E)1-13
(E)1-11
(E)1-9
(E)1-12
(E)1-10
(E)1-8
(E)1-6
(E)1-2
(E)1-3 (E)1-4
(E)3-11
(E)8"ø
(E)8"ø
(E)8"ø
(E)8"ø
(E)8"x8"
(E)8"ø
(E)8"ø
(E)6"ø
(E )1
0" x1
0" R
A (E
)1 4" x1 0"
R A
(E)20"x10" RA
(E)6"ø
(E)30"x12" SA UP
(E)30"x12" RA UP ø8" ø8"
(E)8"x8"
(E )3
0" x1
2" ø10" ø10" ø8" (E)8"ø ø8"
(E)8"ø
(E)20"x14"
(E )3
6" x1
6" (E
)3 6" x1 0" ø10" ø6"
(E)10"x12" ø6" ø6"
(E)24"x4" ø10" ø10" ø6" ø10" ø10"
(E)10"x8"
(E)16"x96"
(E)3-3
(E)3-2
(E)1-7
(E)1-1 ø8" ø8" ø8" ø8"
(E)22"x8" ø8"
(E)10"ø ø8" ø8" ø8"
(E)12"x12"
(E)10"x8"
(E)12"x12"
(E)12"x12"
(E )1
2" x1
0"
(E )1
2" x1
2"
(E)6"x6"
(E)6"ø ø8"
(E)12"x12"
(E)8"ø
(E)20"x12"
(E)
COOLING
TOWER
(E)1-5
(E)8"ø
(E)12"x8" ø8"
(E)30"x12" RA
(E)24"x10" RA
(E)80"x12" (E)72"x12" (E)58"x12"
(E) 30x20 RA DN
DEDUCT ALT. #4:
REBUILD (E) AHU RATHER
THAN INSTALL NEW ONE
DEDUCT ALT. #4:
REBUILD (E) AHU RATHER
THAN INSTALL NEW ONE
EXAM
EXAM
EXAM
OFFICE
OFFICE
OFFICE
OFFICE
EXAM
OFFICE
OFFICE
DIRTY UTILTIY
OFFICE
WAITING
NURSE STATION
OFFICE
1011 EXAM
CONFERENCE
EXAM
EXAM
EXAM
OFFICE
OFFICE
WOMEN VISITOR TOILET
TLT
MECH
IT
OFFICE
OFFICE
OFFICE
EXAM
STAIR
WAITING / CIRCULATION
EXAM
EXAM
EXAM
NURSE STATION
EXAM
EXAM
WOMEN TLT
EXAM
EXAM
OFFICE
STORAGE
1096A
STAFF TOILET
STAFF TOILET
AMBULANCE GARAGE
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
PRIOR TO BEGINNING WORK AND NOTIFY THE ARCHITECT/
ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-
BUILT" CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL DUCTWORK INSTALLATION WITH
GENERAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL
CONTRACTORS. INSTALL ALL DUCTWORK AS HIGH AS
POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS
AND RISES) TO KEEP DUCTWORK TIGHT TO THE
STRUCTURE ABOVE. OFFSET DUCTWORK TO AVOID
BEAMS
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL
PLANS FOR CEILING TYPES, HEIGHTS, SOFFIT AREAS, AND
ELEVATIONS FOR INSTALLATION OF NEW VENTILATION
DUCTWORK, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND
RE-INSTALLING OF EXISTING CEILING TILE NOT REMOVED
BY THE GENERAL CONTRACTOR FOR THE INSTALLATION
OF NEW VENTILATION DUCTWORK, EQUIPMENT, ETC.
VERIFY WITH ARCHITECTURAL PLANS FOR CEILING WORK
BY THE GENERAL CONTRACTOR. ANY CEILING TILE OR
GRID DAMAGED DURING CONSTRUCTION SHALL BE
REPLACED WITH NEW BY THIS CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS
AND/ OR CEILINGS FOR INSTALLATION OF NEW
VENTILATION DUCTWORK, EQUIPMENT, ETC. AS REQUIRED.
PATCH WALLS AND OR CEILINGS TO MATCH EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL
ELECTRICAL, CONTROL, AND ACCESS PANELS FOR
ACCESSIBILITY.
G. ALL DAMPERS, ETC. SHALL BE INSTALLED IN ACCESSIBLE
CEILINGS.
H. FIRE CAULK DUCT PENTERATIONS AT RATED WALLS,
CEILING, AND FLOORS. REFER THE ARCHITECTURE SHEET
GI101, GI102, AND GI104 FOR FIRE RATINGS.
I. CONTRACTOR SHALL MAINTAIN ALL RECOMENDED
EQUIPMENT CLEARANCES.
J. REFER TO ARCHITECTURAL PLAN FOR FIRE RATED WALL /
PARTITION / FLOOR / CEILING / ASSEMBLY LOCATIONS.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d R e lo c a te U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t
C a re /6
-3
.4
.M
E P
D e s ig n O p ti o n M a y
.r v t
/2
/2
:0
:0
A
M
MD101A
B400 - LEVEL 1 - HVAC DEMO PLAN
- DEDUCT ALT. #4
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 1 - HVAC DEMOLITION PLAN
1 REMOVE AND REPLACE EXISTING DIFFUSER
AND FLEX DUCT. ANY FLEX DUCT RUNOUT
SHALL NOT EXCEED 5 FEET.
2 REMOVE AND REPLACE EXISTING GRILLE. SEE
NEW WORK FOR LOCATION.
3 EXISTING VAV BOX TO BE REUSED. REMOVE
EXISTING CONTROLS AND REPLACE WITH NEW
DDC CONTROLS. SEE SPECS FOR DETAILS.
4 REMOVE DUCTWORK TO POINT INDICATED ON
PLAN AND PREPARE FOR FUTURE
CONNECTION. SEE M-101 FOR FUTURE
CONNECTION.
5 REMOVE DUCTWORK TO POINT INDICATED ON
PLAN. CAP AND SEAL DUCT AIR TIGHT.
6 REMOVE EXISTING EXHAUST FAN, FLEX
CONNECTIONS AND DUCT TRANSITIONS.
PREPARE EXISTING EXHAUST INLET AND
OUTLET FOR FUTURE CONNECTION. SEE
M-101 FOR NEW EXHAUST FAN.
7 CONTRACTOR TO RELOCATE EXISTING OA
LOUVER, DUCTWORK, DAMPER, AND
CONTROLS. SEE M-101 FOR NEW LOCATION.
8 REMOVE AHU AND ASSOCIATED
ACCESSORIES.
9 REMOVE EXISTING WINDOW AND PREPARE
OPENING FOR NEW INTAKE LOUVER. SEE NEW
WORK FOR DETAILS.
10 REMOVE INTAKE LOUVER AND PROVIDE
INSULATED CAP AROUND OPENING.
COORDINATE WORK WITH GENERAL
CONTRACTOR.
11 PRIOR TO CONSTRUCTION, CONTRACTOR TO
PROVIDE A PRE-TAB REPORT AND SUBMIT
REPORT TO ENGINEER/OWNER.
Revisions: Date:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
(E)8"x10" SA
(E)12"x10" SA
(E)16"x8" RA
(E)14"x6"
(E)10"x10"
(E)14"x6"
(E)6"x12"
(E)24"x10" RA
(E )2
6" x1
2" R
A (E
)3 4" x1 2"
R A
(E)44"x12" RA(E)44"x22" RA
(E)AH-3
(E)44"x12" RA
(E)8"x8" EA
(E)8"x8"
(E)12"x12" SA
(E)6"x12" SA
(E)6"ø
(E)10"x12" SA
(E)6"x12" SA
(E)14"x8" EA
(E)8"x8" SA
(E)30"x12" SA
(E )3
8" x1
2" R
A
(E)30"x12" SA
(E)30"x12" SA
(E)30"x12" SA
1 2
1 2
(E)5
(E)2
(E)3
(E)7
(E)8
(E)3-18 (E)3-19
(E)38"x12" RA
(E)8"x12"
(E)10"x10"
(E)16"x8" RA
(E)10"ø
(E)4
(E)1
(E)10
(E)9
(E)6
(E)3-20
(E)3-41
(E)
COOLING
TOWER
OFFICE
UNOCCUPIED
CLEAN UTILITY
LAB
MECHANICAL
OFFICE
2015A
TOILET, STAFF
2030A
UTILITY ROOM, SOILED
TOILET
LOCKER ROOM
LAB
TREATMENT ROOM
2025 EXAM/ TREATMENT ROOM
EXAM/ TREATMENT ROOM
TREATMENT ROOM
EXAM/TREATMENT ROOM
TREATMENT ROOM
STAIR
S9
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
PRIOR TO BEGINNING WORK AND NOTIFY THE ARCHITECT/
ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-
BUILT" CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL DUCTWORK INSTALLATION WITH
GENERAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL
CONTRACTORS. INSTALL ALL DUCTWORK AS HIGH AS
POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS
AND RISES) TO KEEP DUCTWORK TIGHT TO THE
STRUCTURE ABOVE. OFFSET DUCTWORK TO AVOID
BEAMS
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL
PLANS FOR CEILING TYPES, HEIGHTS, SOFFIT AREAS, AND
ELEVATIONS FOR INSTALLATION OF NEW VENTILATION
DUCTWORK, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND
RE-INSTALLING OF EXISTING CEILING TILE NOT REMOVED
BY THE GENERAL CONTRACTOR FOR THE INSTALLATION
OF NEW VENTILATION DUCTWORK, EQUIPMENT, ETC.
VERIFY WITH ARCHITECTURAL PLANS FOR CEILING WORK
BY THE GENERAL CONTRACTOR. ANY CEILING TILE OR
GRID DAMAGED DURING CONSTRUCTION SHALL BE
REPLACED WITH NEW BY THIS CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS
AND/ OR CEILINGS FOR INSTALLATION OF NEW
VENTILATION DUCTWORK, EQUIPMENT, ETC. AS REQUIRED.
PATCH WALLS AND OR CEILINGS TO MATCH EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL
ELECTRICAL, CONTROL, AND ACCESS PANELS FOR
ACCESSIBILITY.
G. ALL DAMPERS, ETC. SHALL BE INSTALLED IN ACCESSIBLE
CEILINGS.
H. FIRE CAULK DUCT PENTERATIONS AT RATED WALLS,
CEILING, AND FLOORS. REFER THE ARCHITECTURE SHEET
GI101, GI102, AND GI104 FOR FIRE RATINGS.
I. CONTRACTOR SHALL MAINTAIN ALL RECOMENDED
EQUIPMENT CLEARANCES.
J. REFER TO ARCHITECTURAL PLAN FOR FIRE RATED WALL /
PARTITION / FLOOR / CEILING / ASSEMBLY LOCATIONS.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:1
A
M
MD102
B400 - LEVEL 2 - HVAC DEMOLITION
PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 2 - HVAC DEMOLITION PLAN
1 REMOVE AND REPLACE EXISTING DIFFUSER
AND FLEX DUCT. ANY FLEX DUCT RUNOUT
SHALL NOT EXCEED 5 FEET.
2 REMOVE AND REPLACE EXISTING GRILLE. SEE
NEW WORK FOR LOCATION.
3 EXISTING VAV BOX TO BE REUSED. REMOVE
EXISTING CONTROLS AND REPLACE WITH NEW
DDC CONTROLS. SEE SPECS FOR DETAILS.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
(E)FTR (E)FTR
(E)FTR (E)FTR
(E)FTR (E)FTR
(E)FTR (E)R-1
(E)R-1
(E)R-1
(E)FTR
(E)FTR
(E)FTR
(E)FTR
(E)FTR (E)FTR (E)FTR
(E)FTR
(E)FTR
(E)R-1
(E)FTR
(E)R-1
407.A
407.B1
407.C1
407.D1
407.E
407.F
407.G1
407.H
407.I
407.J
407.K
407.L
407.M
407.N
407.14407.11 407.12.1407.12
407.9407.7
407.41407.4407.3407.21
J.39
J.40
J.41
407.H2
407.H1
407.13.1
OPEN OFFICE
RESTROOM
RESTROOM
OPEN OFFICE
OFFICE
3775B
MECH / ELEC
3 3
DEDUCT ALT 1:
REMOVE WORK
ASSOCIATED WITH
B407 NORTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
DEDUCT ALT 2:
REMOVE WORK
ASSOCIATED WITH
B407 SOUTH.
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
PRIOR TO BEGINNING WORK AND NOTIFY THE ARCHITECT/
ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-
BUILT" CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL DUCTWORK INSTALLATION WITH
GENERAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL
CONTRACTORS. INSTALL ALL DUCTWORK AS HIGH AS
POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS
AND RISES) TO KEEP DUCTWORK TIGHT TO THE
STRUCTURE ABOVE. OFFSET DUCTWORK TO AVOID
BEAMS
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL
PLANS FOR CEILING TYPES, HEIGHTS, SOFFIT AREAS, AND
ELEVATIONS FOR INSTALLATION OF NEW VENTILATION
DUCTWORK, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND
RE-INSTALLING OF EXISTING CEILING TILE NOT REMOVED
BY THE GENERAL CONTRACTOR FOR THE INSTALLATION
OF NEW VENTILATION DUCTWORK, EQUIPMENT, ETC.
VERIFY WITH ARCHITECTURAL PLANS FOR CEILING WORK
BY THE GENERAL CONTRACTOR. ANY CEILING TILE OR
GRID DAMAGED DURING CONSTRUCTION SHALL BE
REPLACED WITH NEW BY THIS CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS
AND/ OR CEILINGS FOR INSTALLATION OF NEW
VENTILATION DUCTWORK, EQUIPMENT, ETC. AS REQUIRED.
PATCH WALLS AND OR CEILINGS TO MATCH EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL
ELECTRICAL, CONTROL, AND ACCESS PANELS FOR
ACCESSIBILITY.
G. ALL DAMPERS, ETC. SHALL BE INSTALLED IN ACCESSIBLE
CEILINGS.
H. FIRE CAULK DUCT PENTERATIONS AT RATED WALLS,
CEILING, AND FLOORS. REFER THE ARCHITECTURE SHEET
GI101, GI102, AND GI104 FOR FIRE RATINGS.
I. CONTRACTOR SHALL MAINTAIN ALL RECOMENDED
EQUIPMENT CLEARANCES.
J. REFER TO ARCHITECTURAL PLAN FOR FIRE RATED WALL /
PARTITION / FLOOR / CEILING / ASSEMBLY LOCATIONS.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
B407 KEY PLAN
AREA A
KEY PLAN
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:1
A
M
MD103-407
B407 - LEVEL 3 - HVAC DEMOLITION
PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B407 - LEVEL 3 - HVAC DEMOLITION PLAN
1 CONTRACTOR SHALL DISCONNECT/REMOVE
EXISTING RADIATION COVER AND PREP
EQUIPMENT FOR NEW COVER.
2 EXISTING WINDOW TO BE REMOVED AND
REPLACED WITH LOUVER. PREPARE OPENING
FOR LOUVER CONNECTION.
3 REMOVE EXISTING PNEUMATIC ACTUATOR
SERVING STEAM RADIATOR AND PREPARE
FOR FUTURE WORK. SEE MP203-407 FOR
DETAILS.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
(E)2 1/2"
(E)2 1/2"
(E)2 1/2"
(E)2 1/2"
5" HHWR
5" HHWS
(E)5" HHWS UP
(E)5" HHWR UP
2 1/2" HHWR UP
2 1/2" HHWS UP
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR
TO BEGINNING WORK AND NOTIFY THE ARCHITECT/ ENGINEER
OF ANY DISCREPANCIES BETWEEN THE "AS-BUILT" CONDITIONS
AND THESE DRAWINGS.
B. COORDINATE ALL HVAC PIPING INSTALLATION WITH GENERAL,
PLUMBING, FIRE PROTECTION, VENTILATION, AND ELECTRICAL
CONTRACTORS. INSTALL ALL HVAC PIPING AS HIGH AS
POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND
RISES) TO KEEP HVAC PIPING TIGHT TO THE STRUCTURE OR
DUCTWORK ABOVE. OFFSET HVAC PIPING TO AVOID BEAMS.
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS
FOR CEILING TYPES, HEIGHTS, SOFFIT AREAS, AND ELEVATIONS
FOR INSTALLATION OF NEW HVAC PIPING, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-
INSTALLING OF EXISTING CEILING TILE NOT REMOVED BY THE
GENERAL CONTRACTOR FOR THE INSTALLATION OF NEW HVAC
PIPING, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL PLANS
FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY
CEILING TILE OR GRID DAMAGED DURING CONSTRUCTION SHALL
BE REPLACED WITH NEW BY THIS CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR
CEILINGS TO INSTALL NEW HVAC PIPING, EQUIPMENT, ETC. AS
REQUIRED. PATCH WALLS AND/OR CEILINGS TO MATCH
EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL,
CONTROL, AND ACCESS PANELS FOR ACCESSIBILITY.
G. ALL SHUT-OFF VALVES, CONTROL VALVES, STRAINERS, ETC...
SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.
H. PROVIDE 1/2" DRAIN VALVE AT ALL LOW POINTS OF EACH
SYSTEM TO ENABLE COMPLETE DRAINAGE. PROVIDE 1/2" VENT
VALVES AT ALL HIGH POINTS OF EACH SYSTEM TO ENABLE
COMPLETE VENTING.
I. REFER TO HVAC PIPING DETAILS ON SHEET 1/M502 FOR
ADDITIONAL INFORMATION ON INDIVIDUAL TERMINAL DEVICES
AND COILS.
J. ALL CONTROL VALVES ON THE HEATING DEVICES SHALL BE 2-
WAY UNLESS OTHERWISE NOTED.
K. FIRE CAULK PIPE PENTERATIONS AT RATED WALLS, CEILING,
AND FLOORS. REFER THE ARCHITECTURE SHEET GI101, GI102,
AND GI104 FOR FIRE RATINGS.
L. ELEMENTS SHOWN IN DARK LINEWEIGHT ARE NEW. ELEMENTS
SHOWN IN LIGHT LINEWEIGHT ARE EXISTING.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:2
A
M
MD200
B400 - FOUNDATION - HVAC PIPING
DEMOLITION PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
2508 29th Avenue NE
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - FOUNDATION - HVAC PIPING PLAN
1 REMOVE 2-1/2" HHWR AND CAP AT POINT
SHOWN ON PLAN.
2 REMOVE 2-1/2" HHWS AND CAP AT POINT
SHOW ON PLAN.
3 REMOVE 2-1/2" HHWS/R AT POINT AS SHOW
ON PLAN AND PREPARE FOR FUTURE
CONNECTION.
1 REMOVE 2-1/2" HHWR AND CAP AT POINT
SHOWN ON PLAN.
2 REMOVE 2-1/2" HHWS AND CAP AT POINT
SHOW ON PLAN.
3 REMOVE 2-1/2" HHWS/R AT POINT AS SHOW
ON PLAN AND PREPARE FOR FUTURE
CONNECTION.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
TT
T
T
T
T
T
T
T
T
T T
T
T
TT
T
T
T
T
T
TT
T
TT
1 2 3 4 5 6 6.1 7 7.8 8 9 10 11 11.2 12 13 14 18171615
M.3
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
(E)2" HHWS
(E)2" HHWR
(E)3/4" HHWR
(E)1 1/2" HHWR
(E)1 1/4" HHWS
(E)1 1/2" HHWS
(E)3/4" HHWR
(E)1" HHWR
(E)1 1/4" HHWR
(E)1 1/2" HHWS
(E)1 1/4" HHWR
(E)1 1/4" HHWS
(E)2" HHWR
(E)1" HHWS
(E)2" HHWR
(E)2" HHWR
(E)2" HHWR
(E)2" HHWS
(E)1 1/4" HHWS
(E)2"
(E)2"
(E)1 1/4" HHWR
(E)1" LPS(#) DN
(E)1 1/4" LPS(#)
(E)3" CHWR DN
(E)3" CHWS DN
(E)3" CHWR
(E)3" CHWS
(E)3-15
(E)3-13
(E)3-12
(E)3-14
(E)3-10 (E)3-9
(E)3-11
(E)3-6
(E)3-7
(E)3-8
REMOVE AHU,
CONTROLS,
AND PIPIPNG
(E)1-5
(E)3-5
(E)3-3
(E)3-4
(E)3-1
(E)3-2
(E)1-1
(E)1-2
(E)1-3
(E)1-6
(E)1-7
(E)1-8
(E)1-10
(E)1-12
(E)1-13
(E)1-9
(E)1-11
(E) AH-1
5 5
5 5
(E)
COOLING
TOWER
EXAM
EXAM
EXAM
OFFICE
OFFICE
OFFICE
OFFICE
EXAM
OFFICE
OFFICE
DIRTY UTILTIY
OFFICE
WAITING
NURSE STATION
OFFICE
EXAM
CONFERENCE
EXAM
EXAM
EXAM
OFFICE
OFFICE
WOMEN
VISITOR
TOILET
TLT
MECH
IT
OFFICE
OFFICE
OFFICE
EXAM
STAIR
WAITING / CIRCULATION
EXAM
EXAM
EXAM
NURSE STATION
1085 EXAM
EXAM
WOMEN TLT
EXAM
EXAM
OFFICE
STORAGE
1096A
STAFF TOILET
1094 STAFF TOILET
AMBULANCE GARAGE
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR
TO BEGINNING WORK AND NOTIFY THE ARCHITECT/ ENGINEER
OF ANY DISCREPANCIES BETWEEN THE "AS-BUILT" CONDITIONS
AND THESE DRAWINGS.
B. COORDINATE ALL HVAC PIPING INSTALLATION WITH GENERAL,
PLUMBING, FIRE PROTECTION, VENTILATION, AND ELECTRICAL
CONTRACTORS. INSTALL ALL HVAC PIPING AS HIGH AS
POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND
RISES) TO KEEP HVAC PIPING TIGHT TO THE STRUCTURE OR
DUCTWORK ABOVE. OFFSET HVAC PIPING TO AVOID BEAMS.
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS
FOR CEILING TYPES, HEIGHTS, SOFFIT AREAS, AND ELEVATIONS
FOR INSTALLATION OF NEW HVAC PIPING, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-
INSTALLING OF EXISTING CEILING TILE NOT REMOVED BY THE
GENERAL CONTRACTOR FOR THE INSTALLATION OF NEW HVAC
PIPING, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL PLANS
FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY
CEILING TILE OR GRID DAMAGED DURING CONSTRUCTION SHALL
BE REPLACED WITH NEW BY THIS CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR
CEILINGS TO INSTALL NEW HVAC PIPING, EQUIPMENT, ETC. AS
REQUIRED. PATCH WALLS AND/OR CEILINGS TO MATCH
EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL,
CONTROL, AND ACCESS PANELS FOR ACCESSIBILITY.
G. ALL SHUT-OFF VALVES, CONTROL VALVES, STRAINERS, ETC...
SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.
H. PROVIDE 1/2" DRAIN VALVE AT ALL LOW POINTS OF EACH
SYSTEM TO ENABLE COMPLETE DRAINAGE. PROVIDE 1/2" VENT
VALVES AT ALL HIGH POINTS OF EACH SYSTEM TO ENABLE
COMPLETE VENTING.
I. REFER TO HVAC PIPING DETAILS ON SHEET 1/M502 FOR
ADDITIONAL INFORMATION ON INDIVIDUAL TERMINAL DEVICES
AND COILS.
J. ALL CONTROL VALVES ON THE HEATING DEVICES SHALL BE 2-
WAY UNLESS OTHERWISE NOTED.
K. FIRE CAULK PIPE PENTERATIONS AT RATED WALLS, CEILING,
AND FLOORS. REFER THE ARCHITECTURE SHEET GI101, GI102,
AND GI104 FOR FIRE RATINGS.
L. ELEMENTS SHOWN IN DARK LINEWEIGHT ARE NEW. ELEMENTS
SHOWN IN LIGHT LINEWEIGHT ARE EXISTING.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:2
A
M
MD201
B400 - LEVEL 1 - HVAC PIPING
DEMOLITION PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 1 - HVAC PIPING DEMOLITION PLAN
1 REMOVE EXISTING CONDENSATE
CONNECTED TO EXISTING OUTSIDE AIR
LOUVER.
2 REMOVE HWS/R BRANCH BACK TO MAIN.
CAP AND SEAL WATER TIGHT.
3 REMOVE EXISTING CONVECTOR, PIPING,
AND FITTINGS BACK TO MAIN. CAP AND SEAL
MAIN WATER TIGHT.
4 REMOVE EXISTING THERMOSTAT AND
CONTROL WIRING. REMOVE ASSOCIATED
EQUIPMENT, GRAPHICS AND CONTROL
POINTS FROM BAS.
5 REMOVE EXISTING THERMOSTAT AND
CONTROL WIRING. WHERE APPLICABLE,
REUSE EXISTING ROUGH-IN.
6 REMOVE CHILLED WATER STEAM, AND
CONDENSATE PIPING BACK TO MAIN. CAP
AND SEAL WATER TIGHT.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
T T
T
T T
T
T
T
T
T
T T
T
TTT
T
T
T
T
TTT
T T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TTT
T T
TT
T
T
T
T
T
T
T
T
T
T
T
1 2 3 4 5 6 6.1 7 7.8 8 9 9.1 9.9 10 11 11.2 12 13 14 18171615
M.3
M
L
K.3
K
J.4
J.3
J
I.5
I.2
I
H.1
H
G
F.1
F
E
D
C
B
A
(E)2
(E)4
(E)5
(E)1
(E)3
(E)10
(E)8
(E)3-18
(E)3-19
(E)3-20
(E)2" HHWS
(E)2" HHWR
(E)
COOLING
TOWER
(E)3-41
(E)1 1/2" HHWS
(E)1 1/4" HHWR
(E)1 1/2" HHWS
(E)1 1/4" HHWR
(E)3/4" HHWR
(E)3/4" HHWS
(E)3/4" HHWR
(E)3/4" HHWS
(E)3/4" HHWS(E)3/4" HHWR
(E)3/4" HHWR
(E)3/4" HHWS
(E)1 1/4" HHWS
(E)1 1/4" HHWR
(E)3/4" HHWS
(E)3/4" HHWR
(E)3/4" HHWS
(E)3/4" HHWR
(E)1 1/2" HHWR
(E)1 1/4" HHWS
(E)FTR
(E)FTR
(E)FTR (E)FTR
(E)FTR
(E)FTR
(E)3/4" HHWR(E)3/4" HHWS
(E)1 1/4" HHWR
(E)1 1/2" HHWS
(E)FTR
(E)3/4" HHWR
(E)3/4" HHWS
(E)3/4" HHWR
(E)3/4" HHWS
(E)FTR
(E)1 1/2" HHWS
(E)1" HHWR(E)3/4"
(E)3/4"
(E)3/4"
(E)3/4"
(E)3/4"
(E)3/4"
(E)3/4" HHWR
(E)FTR
(E)3/4" HHWS
(E)1" HHWS
(E)1 1/2" HHWR
(E)3/4" HHWR
(E)FTR
(E)3/4" HHWS (E)3/4"
(E)3/4"
(E)FTR
(E)1" HHWS
(E)1 1/2" HHWR
(E)3/4" HHWR
(E)3/4" HHWS
(E)FTR
(E)3/4" HHWR (E)3/4" HHWS
(E)3/4" HHWS
(E)1 1/2" HHWR
(E)FTR
(E)3/4" HHWS (E)3/4" HHWR
(E)2" HHWR
(E)2" HHWS
(E)2" HHWS
(E)FTR
(E)3/4" HHWS (E)3/4" HHWR
(E)3/4" HHWR
(E)1 1/2" HHWS
(E)3/4" HHWS
(E)FTR
(E)3/4" HHWR
(E)2 1/2" CHWS(E)2 1/2" CHWR
(E)2 1/2" HHWR
(E)2 1/2" HHWS
(E)1 1/2" HHWS
(E)1 1/2" HHWR
(E)1" HHWR
(E)1" HHWS
(E)1" HHWR
(E)1" HHWS
(E)3/4" HHWS
(E)3/4" HHWR
(E)1" HHWR
(E)1" HHWS
(E)1 1/2" HHWR
(E)1 1/2" HHWR
(E)1" HHWS
(E)1" HHWR
(E)3/4" HHWR
(E)3/4" HHWS
(E)3" HHWR
(E)3" HHWS
(E)3" HHWR
(E)3" HHWS
(E)1 1/4" HHWR (E)3" HHWR
(E)1" HHWR
(E)3" HHWS
OFFICE
UNOCCUPIED
CLEAN UTILITY
LAB
CORRIDOR
OC24A
MECHANICAL
EXAM TREATMENT
OFFICE
2015A
TOILET, STAFF
2030A
UTILITY ROOM, SOILED
TOILET
LOCKER ROOM
LAB
TREATMENT ROOM
EXAM/ TREATMENT ROOM
EXAM/ TREATMENT ROOM
TREATMENT ROOM
EXAM/TREATMENT ROOM
TREATMENT ROOM
STAIR
S9
OFFICE, TECHNICIAN
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR
TO BEGINNING WORK AND NOTIFY THE ARCHITECT/ ENGINEER
OF ANY DISCREPANCIES BETWEEN THE "AS-BUILT" CONDITIONS
AND THESE DRAWINGS.
B. COORDINATE ALL HVAC PIPING INSTALLATION WITH GENERAL,
PLUMBING, FIRE PROTECTION, VENTILATION, AND ELECTRICAL
CONTRACTORS. INSTALL ALL HVAC PIPING AS HIGH AS
POSSIBLE. PROVIDE ALL NECESSARY OFFSETS (DROPS AND
RISES) TO KEEP HVAC PIPING TIGHT TO THE STRUCTURE OR
DUCTWORK ABOVE. OFFSET HVAC PIPING TO AVOID BEAMS.
C. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS
FOR CEILING TYPES, HEIGHTS, SOFFIT AREAS, AND ELEVATIONS
FOR INSTALLATION OF NEW HVAC PIPING, EQUIPMENT, ETC.
D. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND RE-
INSTALLING OF EXISTING CEILING TILE NOT REMOVED BY THE
GENERAL CONTRACTOR FOR THE INSTALLATION OF NEW HVAC
PIPING, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL PLANS
FOR CEILING WORK BY THE GENERAL CONTRACTOR. ANY
CEILING TILE OR GRID DAMAGED DURING CONSTRUCTION SHALL
BE REPLACED WITH NEW BY THIS CONTRACTOR.
E. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS AND/OR
CEILINGS TO INSTALL NEW HVAC PIPING, EQUIPMENT, ETC. AS
REQUIRED. PATCH WALLS AND/OR CEILINGS TO MATCH
EXISTING.
F. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL ELECTRICAL,
CONTROL, AND ACCESS PANELS FOR ACCESSIBILITY.
G. ALL SHUT-OFF VALVES, CONTROL VALVES, STRAINERS, ETC...
SHALL BE INSTALLED IN ACCESSIBLE CEILINGS.
H. PROVIDE 1/2" DRAIN VALVE AT ALL LOW POINTS OF EACH
SYSTEM TO ENABLE COMPLETE DRAINAGE. PROVIDE 1/2" VENT
VALVES AT ALL HIGH POINTS OF EACH SYSTEM TO ENABLE
COMPLETE VENTING.
I. REFER TO HVAC PIPING DETAILS ON SHEET 1/M502 FOR
ADDITIONAL INFORMATION ON INDIVIDUAL TERMINAL DEVICES
AND COILS.
J. ALL CONTROL VALVES ON THE HEATING DEVICES SHALL BE 2-
WAY UNLESS OTHERWISE NOTED.
K. FIRE CAULK PIPE PENTERATIONS AT RATED WALLS, CEILING,
AND FLOORS. REFER THE ARCHITECTURE SHEET GI101, GI102,
AND GI104 FOR FIRE RATINGS.
L. ELEMENTS SHOWN IN DARK LINEWEIGHT ARE NEW. ELEMENTS
SHOWN IN LIGHT LINEWEIGHT ARE EXISTING.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
GENERAL NOTES
KEY PLAN
KEYNOTES
AREA A
B400 KEY PLAN
AREA B
AREA
A1
AREA C
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street Suite 1710 San Francisco, CA 94108 Phone: 415-621-4423 www.hce.com
B
IM
/6
-3
B
E x p a n d
R e lo c a te
U rg e n t
C a re A n d
R e n o v a te s t F lo o r P a ti e n t C a re
/6
-3
.4
.M
E P
.r v t
/2
/2
:0
:3
A
M
MD202
B400 - LEVEL 2 - HVAC PIPING
DEMOLITION PLAN
Expand and Renovate B400 for
Urgent and Primary Care
500 E Veterans St, Tomah, WI 54660
676-19-327
400/407
05/20/2021 K.LEITCH P.KOTTA
TRIPLE C - THE A&E GROUP
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
ISSUED FOR
CONSTRUCTION
SCALE: 1/8" = 1'-0"
F1
B400 - LEVEL 2 - HVAC PIPING PLAN DEMOLITION PLAN
1 REMOVE EXISTING THERMOSTAT AND
CONTROL WIRING. WHERE APPLICABLE,
REUSE EXISTING ROUGH-IN.
2 REMOVE EXISTING THERMOSTAT SERVING
VAV BOX (E)3-41 AND PREPARE BOX FOR
FUTURE THERMOSTAT CONTROL WIRING.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
C&S Engineers, Inc.
2575 E. Camelback Rd, Suite 740 Phoenix, AZ 85016 Phone: 602-997-7536 Fax: 602-997-7592 www.cscos.com
Obernel 1331 Tyler Street NE Suite 201 Minneapolis, MN 55413 Phone: (612) 249-5600 www.obernel.com
Hinman Consulting Engineers 601 California Street…
This is the start of the file's text. The full file is on GovTribe.