This is a Schedule of Items for a federal construction contract for the Kaibab National Forest.

The project, NFSR307/310 Road and Parking Lot Reconstruction, is dated 02/03/26 and includes both base bid and additive bid line items. The base bid encompasses roadwork on FSR 310 and FSR 307, plus Grandview Parking Lot improvements. FSR 310 base bid work includes mobilization (1 LS), roadway reconditioning with cattle guard cleaning and culvert maintenance (0.88 miles at DQ), government source aggregate base installation grading G, 4-inch compacted (0.88 miles at DQ), and temporary traffic control (1 LS). FSR 307 base bid work involves the same types of services across 1.62 miles of roadway. The Grandview Parking Lot base bid requires commercial sourced aggregate gradation T, 4-inch compacted across 25,500 SF, parking lot drives, and boulder barriers (222 EA actual quantity). Additive items are organized by priority: Priority #3 includes FSR 307 roadwork mobilization, 1.62 miles of roadway reconditioning and aggregate base installation, culvert cleaning, and temporary traffic control; Priority #4 includes FSR 310 roadwork with 1.3 miles of roadway reconditioning and aggregate base installation. All line items contain unit costs and total cost columns, which are blank in this template version, requiring bidders to provide pricing for each itemized service.

View the file

Other files

File Type Posted
127EAX26R0006 R3 Roads QA6.docx DOCX document
127EAX26R0006 R3 Roads QA5.docx DOCX document
127EAX26R0006 0002.pdf PDF
Attachment 13 - Echo Amphitheatre Wage Determination NM20260011 18 May 2026.pdf PDF
Attachment 14 - NFSR 307-310 Road and Parking Lot Wage Determination NM20260011 18 May 2026.pdf PDF
127EAX26R0006 R3 Roads QA4.docx DOCX document
127EAX26R0006 0001.pdf PDF
Attachment 4 - NFSR 307-310 Road and Parking Lot Reconstruction Plans (signed) v2.pdf PDF
Attachment 5 - NFSR 307-310 Road and Parking Lot Reconstruction Specifications v2.pdf PDF
Attachment 6 - NFSR 307-310 Road and Parking Lot Reconstruction SOI v2.pdf PDF
127EAX26R0006 R3 Roads QA3.docx DOCX document
127EAX26R0006 R3 Roads QA2.docx DOCX document
127EAX26R0006 R3 Roads QA1.docx DOCX document
Attachment 7 - NFSR 307-310 Road and Parking Lot Reconstruction Fire Plan.docx DOCX document
Attachment 2 - Past Performance Questionnaire.docx DOCX document
Attachment 12 - Echo Amphitheater Parking Lot Pavement Preservation Fire Plan.docx DOCX document
Attachment 1 - Task Order Proposal Request Forms (TOPR).doc DOC document
Attachment 11 - Echo Amphitheater Parking Lot Pavement Preservation Schedule of Items.pdf PDF
Attachment 5 - NFSR 307-310 Road and Parking Lot Reconstruction Specifications.pdf PDF
Attachment 3 - NFSR 307-310 Road and Parking Lot Reconstruction SOW.pdf PDF
Attachment 4 - NFSR 307-310 Road and Parking Lot Reconstruction Plans (signed).pdf PDF
Attachment 9 - Echo Amphitheater Parking Lot Pavement Preservation Drawings.pdf PDF
127EAX26R0006 Final.pdf PDF
Attachment 10 - Echo Amphitheater Parking Lot Pavement Preservation FS Supplement Specs.docx DOCX document
Attachment 8 - Echo Amphitheater Parking Lot Pavement Preservation SOW.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project:

NFSR307/310 ROAD AND PARKING LOT

RECONSTRUCTION

Forest: Kaibab National Forest Date: 02/03/26

Pay Item # Method of Measure

Esitmated Quantity

Pay Unit

Unit Cost Total

15101(01) LS 1 LS $

30315(01) DQ 0.88 Mile $

30103(01) DQ 0.88 Mile $

63501(01) LS 1 LS $

30315(02) DQ 1.62 Mile

30103(02) DQ 1.62 Mile $

30103(3) DQ 25500 SF

0001(01)

AQ 222 EA $

15101(02) LS 1 LS $

30315(03) DQ 1.62 Mile $

30103(04) DQ 1.62 Mile $

60702(01) DQ 1 Each $

63501(02) LS 1 LS $

30315(04) DQ 1.3 Mile $

30103(05) DQ 1.3 Mile $

AQ= Actual Quantity DQ= Design Quantity LS= Lump Sum

Government source aggregate base, grading G, 4‐inch (compacted in place) compaction method A

SCHEDULE OF ITEMS

Base Bid Line Items

Pay Item Description

FSR 310 Roadwork ‐ Base Bid

Mobilization

Roadway reconditioning. Cattle guard cleaning per FSSS 303.07. Culvert inlet/outlet maintenance per FP‐ 24 303.03.

Roadway reconditioning. Cattle guard cleaning per FSSS 303.07. Culvert inlet/outlet maintenance per FP‐ 24 303.03.

Temporary Traffic Control for Base Bid

FSR 307 Roadwork ‐ Base Bid

Roadway reconditioning. Cattle guard cleaning per FSSS 303.07. Culvert inlet/outlet maintenance per FP‐ 24 303.03.

Government source aggregate base, grading G, 4‐inch (compacted in place) compaction method A

Grandview Parking Lot ‐ Base Bid

Commercial Sourced Aggregate Gradation T, Grading, 4‐inch (compactred in‐place), Compaction Method A. Parking Lot Drives, Boulder Barrier

Base Bid Total

Additive Bid Line Items

FSR 307 Roadwork ‐ Additive Items ‐ Priority #3

Mobilization

Base Bid + Additive Items Total

Government source aggregate base, grading G, 4‐inch (compacted in place) compaction method A Clean out existing culvert per FP‐24 607.02

Temporary Traffic Control for Additive Items

FSR 310 Roadwork ‐ Additive Items ‐ Priority #4

Roadway reconditioning. Cattle guard cleaning per FSSS 303.07. Culvert inlet/outlet maintenance Government source aggregate base, grading G, 4‐inch (compacted in place) compaction method A

Additive Items Total