This is a Specifications document for the Southwest Region 03 Kaibab National Forest NFSR 307/310 Road and Parking Lot Reconstruction project located in the Tusayan Ranger District, with a specification date of February 3, 2026. The document serves as supplemental specifications to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24 U.S. Customary Units), 2024, which are incorporated by reference and available for free download from the Federal Highway Administration website.

The specifications detail construction and material requirements for road and parking lot reconstruction work. Key work activities include clearing and grubbing with Forest Products Utilization Standards specifying minimum piece lengths of 10 feet for saw products and 10 feet for non-saw products with maximum stump heights of 6 feet; untreated aggregate course placement with multiple compaction method options ranging from equipment operation to density requirements of 95.0 percent per AASHTO standards; road reconditioning including cattleguard deck removal and cleaning; stockpiled aggregate handling with pit or quarry development requiring compliance with MSHA 30 CFR Part 56; and aggregate gradation specifications for surface courses designated as F, G, H, S, T, and U with specific sieve size requirements. The document establishes measurement and payment procedures using decimal accuracy standards for various pay items, defines key terms specific to Forest Service projects, and includes illustrations of road structure components. All merchantable timber harvested during clearing and grubbing operations is designated as Government property and must be decked at specified locations. The U.S. Department of Agriculture Forest Service is the contracting federal agency.

View the file

Other files

File Type Posted
127EAX26R0006 R3 Roads QA6.docx DOCX document
127EAX26R0006 R3 Roads QA5.docx DOCX document
127EAX26R0006 0002.pdf PDF
Attachment 13 - Echo Amphitheatre Wage Determination NM20260011 18 May 2026.pdf PDF
Attachment 14 - NFSR 307-310 Road and Parking Lot Wage Determination NM20260011 18 May 2026.pdf PDF
127EAX26R0006 R3 Roads QA4.docx DOCX document
127EAX26R0006 0001.pdf PDF
Attachment 4 - NFSR 307-310 Road and Parking Lot Reconstruction Plans (signed) v2.pdf PDF
Attachment 6 - NFSR 307-310 Road and Parking Lot Reconstruction SOI v2.pdf PDF
127EAX26R0006 R3 Roads QA3.docx DOCX document
127EAX26R0006 R3 Roads QA2.docx DOCX document
127EAX26R0006 R3 Roads QA1.docx DOCX document
Attachment 7 - NFSR 307-310 Road and Parking Lot Reconstruction Fire Plan.docx DOCX document
Attachment 2 - Past Performance Questionnaire.docx DOCX document
Attachment 12 - Echo Amphitheater Parking Lot Pavement Preservation Fire Plan.docx DOCX document
Attachment 1 - Task Order Proposal Request Forms (TOPR).doc DOC document
Attachment 11 - Echo Amphitheater Parking Lot Pavement Preservation Schedule of Items.pdf PDF
Attachment 6 - NFSR 307-310 Road and Parking Lot Reconstruction SOI.pdf PDF
Attachment 5 - NFSR 307-310 Road and Parking Lot Reconstruction Specifications.pdf PDF
Attachment 3 - NFSR 307-310 Road and Parking Lot Reconstruction SOW.pdf PDF
Attachment 4 - NFSR 307-310 Road and Parking Lot Reconstruction Plans (signed).pdf PDF
Attachment 9 - Echo Amphitheater Parking Lot Pavement Preservation Drawings.pdf PDF
127EAX26R0006 Final.pdf PDF
Attachment 10 - Echo Amphitheater Parking Lot Pavement Preservation FS Supplement Specs.docx DOCX document
Attachment 8 - Echo Amphitheater Parking Lot Pavement Preservation SOW.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOUTHWEST

REGION 03 KAIBAB

NATIONAL FOREST

NFSR 307/310 ROAD AND

PARKING LOT

RECONSTRUCTION

TUSAYAN RANGER DISTRICT

02/03/2026

Specifications

Forest Service

U.S. Department of Agriculture

The Standard Specifications for Construction of Roads and Bridges on Federal

Highway Projects (FP-24 U.S. Customary Units), 2024 are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.

Available online for free download at https://highways.dot.gov/federal-lands/specs

Contents

PREFACE

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Section 102. - BID, AWARD, AND EXECUTION OF CONTRACT

Section 103. – SCOPE OF WORK

Section 104. – CONTROL OF WORK

Section 104. – CONTROL OF WORK

Section 105. – CONTROL OF MATERIAL

Section 106. – ACCEPTANCE OF WORK

Section 108. - PROSECUTION AND PROGRESS

Section 109. - MEASUREMENT AND PAYMENT

Section 109. - MEASUREMENT AND PAYMENT

Section 109. - MEASUREMENT AND PAYMENT

Section 201. - CLEARING AND GRUBBING ............................ Error! Bookmark not defined.

Section 301. - UNTREATED AGGREGATE COURSES

Section 301. - UNTREATED AGGREGATE COURSES

Section 303. - ROAD RECONDITIONING

Section 314. - STOCKPILED AGGREGRATES

Section 703. - AGGREGATE https://highways.dot.gov/federal-lands/specs

PREFACE

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-24 for construction of

National Forest System Roads. The Forest Service Supplemental Specifications (FSSS) shall be incorporated in the FP-24. The applicable specifications for the project will be the FP-24 as modified by the FSSS.

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Add the following paragraph to Subsection 101.01 Meaning of Terms:

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

Add the following to Subsection 101.03 Abbreviations:

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSSS – Forest Service Supplemental Specifications

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(d) Miscellaneous unit abbreviations.

MP - milepost location ppm - parts per million volume

STA – station location

MFBM - thousand feet board measure volume

Make the following changes to Subsection 101.04 Definitions:

Delete these definitions and replace with the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings —Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work. (Timber Contracts) does not apply, replace NTP with Contract Award.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition

Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or

“design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Forest Service Supplemental Specifications – The Forest Service uses supplemental specifications to modify the FP-24 to meet the agency needs and intents. FSSS revise the FP-24 by adding, deleting, replacing, revising, replacing part of entire sections or subsections or adding new sections to the FP.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the

Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36

CFR, part 260.

Utilization Standards — The minimum size and percent soundness of trees described in Public

Works contract specifications or Timber Sale and stewardship contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms

Section 102. - BID, AWARD, AND EXECUTION OF CONTRACT

Delete Section 102 Bid, Award, and Execution of Contract in its entirety.

Section 103. – SCOPE OF WORK

Delete all of Section 103 Scope of Work except Subsection 103.01 Intent of Contract.

Section 104. – CONTROL OF WORK

Delete Subsection 104.07 Coordination of Contract Documents.

Section 104. – CONTROL OF WORK

Add the following Subsection 104.12 Use of Roads by Contractor:

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Section 105. – CONTROL OF MATERIAL

Delete second paragraph and subparagraphs (a) and (b) in Subsection 105.05 Use of Material

Found in the Work and replace it with the following:

The right to use and process material found in the work excludes the use and processing of material for nongovernment contract work, except for the disposal of waste material. Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material at government-approved agreed to location(s), at no additional cost to government.

Section 106. – ACCEPTANCE OF WORK

Delete the 3rd and 4th paragraphs in Subsection 106.01 Conformity with Contract

Requirements.

Section 108. - PROSECUTION AND PROGRESS

Delete Section 108 Prosecution and Progress in its entirety.

Section 109. - MEASUREMENT AND PAYMENT

Delete Subsections 109.06 Pricing and Adjustments, 109.07 Estimated Work, 109.08 Progress

Payments, and 109.09 Final Payment.

Delete Table 109-1 of Subsection 109.01 Measurement of Work and replace with the following:

Table 109-1

Decimal Accuracy of Quantities for Payment

Pay Item Level of Precision

Acre 0.01

Cubic Foot 1

Cubic Yard 1

Cubic Yard Exception - Structure Excavation;

Sheathing; Materials; Bedding, Bed Course, and

Backfill, Materials; Gabions;

0.1

Cubic Yard Exception – Concrete; Masonry 0.01

Day 1

Each 1

Gallon 1

Hour 0.1

Linear Foot 1

Linear Foot Exception - Timber, Steel, and Concrete

Piles

0.1

M-Gallon 0.1

Mile 0.01

Month 0.1

Pound 1

Square Foot 0.1

Square Yard 0.1

Station 0.1

Thousand Board Feet Measure 0.01

Ton 0.1

Ton Exception - Calcium Chloride; Sodium Chloride;

Hydrated Lime; Bituminous Materials; Pavements; Bed

Course Materials

0.01

Week 0.1

Delete Subsection 109.02(c) Measurement Terms and Definitions, Contract quantity and replace with:

(c) Contract quantity. The quantity to be paid is the quantity listed in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity when that error exceeds 15% or more. If there is evidence that a quantity specific as a contract quantity is incorrect by 15% or more, submit calculations, drawings, or other evidence indicating why the quantity is in error and request in writing that the quantity be adjusted.

Section 201. - CLEARING AND GRUBBING

Delete paragraph (c) in Subsection 201.04(c) Clearing and replace with the following:

(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to maximum stump height shown in table below.

Fall and buck the merchantable material at lengths longer than the minimum lengths listed, or in multiples thereof (i.e. 8 ft, 16 ft, 24 ft, 32 ft), not to exceed 16 feet in length to allow for transportation of the material. Merchantable timber shall be decked at designated location(s).

Forest Products Utilization Standards:

Species Product Max. Stump

Height

Minimum Specifications

Piece Required to be Removed

Length

(feet)

Diameter

Inside Bark at Small End

(inches)

1/

All Saw 6 10 14 6.67

All Non-saw 6 10 9 NA

All POL* 6 10 6 NA

1/ Enter Merchantability Factor (Merch. Factor) or Net Scale in % of Gross Scale, whichever is appropriate.

*POL = product other than logs

Section 201. - CLEARING AND GRUBBING

Delete Subsection 201.06 Disposal and replace with the following:

201.06 Disposal. Merchantable timber is Government property. Dispose of clearing and grubbing debris according to Subsection 203.07.

Section 301. - UNTREATED AGGREGATE COURSES

Add the following to Subsection 301.03 General:

Written approval of the roadbed is required before placing aggregate.

For pit run material, furnish material smaller than the maximum size identified in the plans, no gradation will be required otherwise. After processing on the road, remove all oversize material from the road and dispose as directed by the CO.

Provide additives or binder, if required, at the proportions specified.

Develop and use Government furnished sources according to Section 105.

If the aggregate is produced and stockpiled before placement, handle and stockpile according to

Section 314.

Section 301. - UNTREATED AGGREGATE COURSES

Delete and Replace Subsection 301.05 Compacting with the following:

Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

(a) Compaction A. Operating spreading and hauling equipment over the full width of the travelway.

(b) Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(4)(a).

(c) Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(4)(a).

(d) Compaction D. Compact to a density of at least 95.0 percent of the maximum density, as determined by AASHTO T 99, method C or D.

(e) Compaction E. Compact to a density of at least 95.0 percent of the maximum density, as determined by AASHTO T 180, method C or D.

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

Section 303. - ROAD RECONDITIONING

Add the following to Subsection 303.08 Roadway Reconditioning:

Remove cattleguard decks. Clean the deck and the area beneath the cattleguard of soil and other material to the bottom of the original foundation over the entire width of the installation.

Dispose of waste at designated sites or according to Subsection 204.14. Reinstall the cattleguard deck.

Section 314. - STOCKPILED AGGREGRATES

Add the following to Subsection 314.01 Description:

Pit or quarry development work consists of clearing, grubbing, stripping topsoil, removing overburden, constructing access roads, conducting restoration activities, and performing other incidental work required for pit or quarry development. Includes processing and crushing material to produce specified aggregates.

Add the following to Subsection 314.04 Stockpile Site after the first sentence of second paragraph:

Submit a plan of operation according to Section 105.02. Perform the work in accordance with

MSHA 30 CFR, part 56.

Delete the following paragraph of Subsection 314.05 Stockpile:

Protect stockpiles with an approved cover.

Section 703. - AGGREGATE

Delete Surface Columns F, G, and H in Table 703-1 in Subsection 703.05 Subbase, Base, and

Surface Course Aggregate and replace with the following F, G, H, S, T, and U columns:

T a b le

-1 rg et V a lu e R a n g es f o r S u rf a ce

G ra d a ti o n

P er ce n t b y M a ss

P a ss in g D es ig n a te d S ie v e

(A A

S H

T O

T a n d

T

G ra d in g D es ig n a ti

S u rf ce

U

.0

If t h e p la st ic it y i n d ex

P

I) i s g re at er t h an th e T

V r an g e fo r th e

N o s ie v e si ze i s

-1

H

G

.0

F

-1

-8

-6

-5

-3

-2

.0

-1 ie v e

S iz e

/2 i ch i

/4 i

/2 i

/8 i

N

File details come from the government source that posted it. Updated .