This is a Questions and Answers document for the R3 National Forest's Roads IDIQ Multiple Award Task Order Contract (MATOC) solicitation. The document addresses three key inquiries regarding bonding requirements, subcontracting authority, and anticipated project scope and dollar ranges.

Performance and payment bonds will be required at the individual task order level rather than at the IDIQ contract level. Prime contractors are permitted to utilize qualified paving subcontractors provided all applicable FAR and Small Business Administration subcontracting requirements are satisfied. Future task orders will be similar in type of work to the Echo Amphitheater Pavement Preservation project seed project but will vary significantly in scope, complexity, and dollar value. The Government anticipates placing task orders ranging from $2,500.00 to $5,000,000.00. This MATOC is a 100 percent small business set-aside under NAICS code 237310 (Highway, Street and Bridge Construction) with a $45,000,000 small business size standard. The contract vehicle carries a shared $100,000,000 ceiling with an ordering period from October 1, 2026 through September 30, 2031, and the Government anticipates awarding up to 20 individual contracts under this solicitation.

View the file

Other files

File Type Posted
127EAX26R0006 R3 Roads QA6.docx DOCX document
127EAX26R0006 R3 Roads QA5.docx DOCX document
127EAX26R0006 0002.pdf PDF
Attachment 13 - Echo Amphitheatre Wage Determination NM20260011 18 May 2026.pdf PDF
Attachment 14 - NFSR 307-310 Road and Parking Lot Wage Determination NM20260011 18 May 2026.pdf PDF
127EAX26R0006 R3 Roads QA4.docx DOCX document
127EAX26R0006 0001.pdf PDF
Attachment 4 - NFSR 307-310 Road and Parking Lot Reconstruction Plans (signed) v2.pdf PDF
Attachment 5 - NFSR 307-310 Road and Parking Lot Reconstruction Specifications v2.pdf PDF
Attachment 6 - NFSR 307-310 Road and Parking Lot Reconstruction SOI v2.pdf PDF
127EAX26R0006 R3 Roads QA3.docx DOCX document
127EAX26R0006 R3 Roads QA1.docx DOCX document
Attachment 7 - NFSR 307-310 Road and Parking Lot Reconstruction Fire Plan.docx DOCX document
Attachment 2 - Past Performance Questionnaire.docx DOCX document
Attachment 12 - Echo Amphitheater Parking Lot Pavement Preservation Fire Plan.docx DOCX document
Attachment 1 - Task Order Proposal Request Forms (TOPR).doc DOC document
Attachment 11 - Echo Amphitheater Parking Lot Pavement Preservation Schedule of Items.pdf PDF
Attachment 6 - NFSR 307-310 Road and Parking Lot Reconstruction SOI.pdf PDF
Attachment 5 - NFSR 307-310 Road and Parking Lot Reconstruction Specifications.pdf PDF
Attachment 3 - NFSR 307-310 Road and Parking Lot Reconstruction SOW.pdf PDF
Attachment 4 - NFSR 307-310 Road and Parking Lot Reconstruction Plans (signed).pdf PDF
Attachment 9 - Echo Amphitheater Parking Lot Pavement Preservation Drawings.pdf PDF
127EAX26R0006 Final.pdf PDF
Attachment 10 - Echo Amphitheater Parking Lot Pavement Preservation FS Supplement Specs.docx DOCX document
Attachment 8 - Echo Amphitheater Parking Lot Pavement Preservation SOW.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

127EAX26R0006 R3 Roads MATOC Q&A #1

1. Are performance and payment bonds anticipated at the IDIQ contract level, the individual task order level, or both?

A: Bonds will be required at the task order level.

2. Will the prime contractor be permitted to utilize qualified paving subcontractors in performing task orders, provided all applicable FAR and SBA subcontracting requirements are met?

A: Yes, contractors will be allowed to hire and utilize subcontractors.

3. Will future task orders generally be similar in scope to the Echo Amphitheater Pavement Preservation project, or should offerors anticipate significantly larger road reconstruction projects as well?

A: Projects will be similar in the type of work, however projects will range in quantity and complexity. Task orders can be placed varying in dollar value from $2,500.00 up to $5,000,000.00.