This is Amendment 0001 to Solicitation 127EAX26R0006, issued by USDA-FS CSA Southwest 7 (Albuquerque, NM) on July 10, 2026, with an effective date of July 1, 2026. The amendment updates attachments for the NFSR 307-310 Road and Parking Lot Reconstruction project to correct discrepancies found in the original documents. Specific changes include an additional specification under FSSS 201 for utilization standards; modifications to line items 30103(03) (changed to CQ and CY due to area changes at slightly higher cost), 0001(01) (changed to LSQ and LS at roughly equivalent cost), and 30315(03) and 30103(04) (estimated quantity adjusted to 3.38 with no unit cost change). Drawing revisions include added seasonal restriction notes on Page C03, Point 101 repositioning on Page C05, commercial source guidance on Page C06, removal of check dam work descriptions on Page C11, and roadway width specification on Page C12 for NFSR 310 project milepost 0.00.

The Period of Performance is established as October 1, 2026 through September 30, 2031. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the original solicitation using one of three methods: completing copies of the amendment, acknowledging receipt on each offer copy, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt at the designated location prior to the specified deadline may result in offer rejection. Except as modified by this amendment, all terms and conditions of the referenced solicitation remain unchanged and in full force and effect.

View the file

Other files

File Type Posted
127EAX26R0006 R3 Roads QA6.docx DOCX document
127EAX26R0006 R3 Roads QA5.docx DOCX document
127EAX26R0006 0002.pdf PDF
Attachment 14 - NFSR 307-310 Road and Parking Lot Wage Determination NM20260011 18 May 2026.pdf PDF
Attachment 13 - Echo Amphitheatre Wage Determination NM20260011 18 May 2026.pdf PDF
127EAX26R0006 R3 Roads QA4.docx DOCX document
Attachment 4 - NFSR 307-310 Road and Parking Lot Reconstruction Plans (signed) v2.pdf PDF
Attachment 5 - NFSR 307-310 Road and Parking Lot Reconstruction Specifications v2.pdf PDF
Attachment 6 - NFSR 307-310 Road and Parking Lot Reconstruction SOI v2.pdf PDF
127EAX26R0006 R3 Roads QA3.docx DOCX document
127EAX26R0006 R3 Roads QA2.docx DOCX document
127EAX26R0006 R3 Roads QA1.docx DOCX document
Attachment 8 - Echo Amphitheater Parking Lot Pavement Preservation SOW.docx DOCX document
Attachment 11 - Echo Amphitheater Parking Lot Pavement Preservation Schedule of Items.pdf PDF
Attachment 10 - Echo Amphitheater Parking Lot Pavement Preservation FS Supplement Specs.docx DOCX document
Attachment 9 - Echo Amphitheater Parking Lot Pavement Preservation Drawings.pdf PDF
Attachment 3 - NFSR 307-310 Road and Parking Lot Reconstruction SOW.pdf PDF
Attachment 4 - NFSR 307-310 Road and Parking Lot Reconstruction Plans (signed).pdf PDF
Attachment 5 - NFSR 307-310 Road and Parking Lot Reconstruction Specifications.pdf PDF
Attachment 6 - NFSR 307-310 Road and Parking Lot Reconstruction SOI.pdf PDF
Attachment 1 - Task Order Proposal Request Forms (TOPR).doc DOC document
Attachment 12 - Echo Amphitheater Parking Lot Pavement Preservation Fire Plan.docx DOCX document
127EAX26R0006 Final.pdf PDF
Attachment 2 - Past Performance Questionnaire.docx DOCX document
Attachment 7 - NFSR 307-310 Road and Parking Lot Reconstruction Fire Plan.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

127EAX26R0006

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

7EAX

ALBUQUERQUE NM 87102-3498

333 BROADWAY BLVD SE

USDA-FS CSA SOUTHWEST 7

07/10/20260001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODEAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/01/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

Update the following attachments for the NFSR 307-310 Road and Parking Lot Reconstruction project (original attachments had some discrepancies):

Specs:

- Additional spec listed under FSSS 201 for utilization standards

SOI:

- Line item 30103(03) changed to CQ and CY (slightly more expensive due to area changes)

- Line item 0001(01) has been changed to LSQ and LS (roughly the same cost) - approximate number of boulders/work didn't change

- Line items 30315(03) and 30103(04) have an estimated quantity of 3.38 now (no unit cost Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

MATTHEW M. BIRD

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

127EAX26R0006/0001

change) Drawings:

- Page C03 - added a note about seasonal restrictions (none)

- Page C05 - moved Point 101 (turning radius issue)

- Page C06 - added a note about commercial source once onsite boulders are expended

- Page C11 - removed work descriptions about check dams

- Page C12 - added roadway width to NFSR 310 project milepost 0.00

Period of Performance: 10/01/2026 to 09/30/2031