Attachment 6 - 537-21-700 JBMC EHRM - Drawings - Set 3.pdf

PDF 36 MB Posted

Attached to
Y1DZ--VHA EHRM Infrastructure Upgrades - Jesse Brown VA Medical Center, Chicago, IL - Construction Project 537-21-700
Solicitation number
36C77625B0049
Issued by

View the file

Other files

File Type Posted
Attachment 2 - Abstract of Bids Chicago Pg 2 of 2.pdf PDF
36C77625B0049 0009.docx DOCX document
Attachment 1 - Abstract of Bids Chicago Pg 1 of 2.pdf PDF
36C77625B0049 0008.docx DOCX document
Attachment 2 - Specification Section 07 27 26 - Chicago EHRM - 537-21-700.pdf PDF
Attachment 1 - RFI Responses - Chicago EHRM - 537-21-700.xlsx XLSX spreadsheet
Attachment 3 - Phasing MEP Narrative and Product Data - Chicago EHRM - 537-21-700.pdf PDF
Attachment 4 - Blast Design and Physical Security Rpts - Chicago EHRM - 537-21-700.pdf PDF
36C77625B0049 0007.docx DOCX document
S06 - 36C77625B0049 0006 - Chicago EHRM.docx DOCX document
Attachment 1 - Attachment 16 - WD - IL20250009 Rev 11 - 10-3-25.pdf PDF
36C77625B0049 0005.docx DOCX document
Attachment 1 - 2nd Sign-In Sheet - 537-21-700 EHRM IU - Chicago 9-29-25.pdf PDF
Attachment 2 - Attachment 16 - WD - IL20250009 Rev 10 - 9-19-25.pdf PDF
36C77625B0049 0004.docx DOCX document
Attachment 14 - JB VAMC EHRM IU - Limited Asbestos and LBP Sampling Report REV 082622.pdf PDF
36C77625B0049 0003.docx DOCX document
36C77625B0049 0002.docx DOCX document
Attachment 2 - 2nd Site Visit Instructions - Jesse Brown VAMC.docx DOCX document
Attachment 1 - Sign-In Sheet - 537-21-700 EHRM IU - Chicago 9-17-25.pdf PDF
Attachment 1 - Addendum 01 Jesse Brown EHRM Infrastructure Upgrades.pdf PDF
36C77625B0049 0001.docx DOCX document
Attachment 4 - 537-21-700 JBMC EHRM - Drawings - Set 1_Part3.pdf PDF
Attachment 5 - 537-21-700 JBMC EHRM - Drawings - Set 2_Part1.pdf PDF
Attachment 7 - 537-21-700 Site Plan - Atrium Bldg.pdf PDF
Attachment 11 - 537-21-700 Site Plan - Taylor Bldg.pdf PDF
Attachment 15 - JA - 537-21-700 - JBMC EHRM Infra Upgrades.pdf PDF
Attachment 8 - 537-21-700 Site Plan - Bed Tower Bldg.pdf PDF
Attachment 10 - 537-21-700 Site Plan - Ogden Bldg.pdf PDF
Attachment 12 - 537-21-700 PRA EHRM JBMC 1st FL DEMO-ICRA.pdf PDF
Attachment 16 - WD - IL20250009 Rev 9 - 8-22-25.pdf PDF
36C77625B0049.docx DOCX document
Attachment 3 - 537-21-700 JBMC EHRM Specifications - Vol 2.pdf PDF
Attachment 4 - 537-21-700 JBMC EHRM - Drawings - Set 1_Part1.pdf PDF
Attachment 4 - 537-21-700 JBMC EHRM - Drawings - Set 1_Part2.pdf PDF
Attachment 5 - 537-21-700 JBMC EHRM - Drawings - Set 2_Part2.pdf PDF
Attachment 9 - 537-21-700 Site Plan - Damen Bldg.pdf PDF
Attachment 13 - Geotechnical Report JBVAMC Additions_9-21-2023.pdf PDF
Attachment 1 - VA Notice of Limitations on Subcontracting-Cert of Compliance for Construction.docx DOCX document
Attachment 2 - 537-21-700 JBMC EHRM Specifications - Vol 1.pdf PDF
Attachment 4 - 537-21-700 JBMC EHRM - Drawings - Set 1_Part4.pdf PDF
Attachment 17 - Site Visit Instructions - Jesse Brown VAMC.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA

OF

WORK

W POLK ST

W TAYLOR ST

W O

G D E N A

V E

S D

A M

E N

S T

INTERSTATE 290

1B 1A

11B

11A

GARAGE

V.B.A.

OFFICE

BLDG

T E

M P

TAYLOR STREET

O G D

EN

A V

EN

U E

S O

U T

H D

A M

E N

A V

E N

U E

POLK STREET

AREA OF WORK

LEGEND - PROJECT MAP

1C

STRUCTURAL

MECHANICAL

IMEG Corp.

1100 Warrenville Road, Suite 400W Naperville, IL 60563 Phone: 630.753.8525 Contact: Matt Mears E-mail: matthew.r.mears@imegcorp.com

Calibre Engineering, Inc.

9090 S. Ridgeline Blvd. Suite 105 HIghlands Ranch, CO 80129 Phone: 303.951.8943 Contact: Ed Sabia E-mail: esabia@calibre-engineering.com

ARCHITECT

NAGEL Architects + Engineers 13890 Bishops Drive, Suite 250 Brookfield, WI 53005 Phone: 262.649.1883 Contact: Greg Nagel E-mail: greg.nagel@nagel.us

FIRE PROTECTION

IMEG Corp.

1100 Warrenville Road, Suite 400W Naperville, IL 60563 Phone: 314.951.2535 Contact: Scott R. Przybysz E-mail: scott.r.przybysz@imegcorp.com

ELECTRICAL

IMEG Corp.

1100 Warrenville Road, Suite 400W Naperville, IL 60563 Phone: 779.771.6240 Contact: Anthony Vansant E-mail: anthony.j.vansant@imegcorp.com

PLUMBING

IMEG Corp.

1100 Warrenville Road, Suite 400W Naperville, IL 60563 Phone: 630.753.8525 Contact: Matt Mears E-mail: matthew.r.mears@imegcorp.com

CIVIL

Calibre Engineering, Inc.

9090 S. Ridgeline Blvd. Suite 105 HIghlands Ranch, CO 80129 Phone: 303.339.6272 Contact: Jordan Dillard E-mail: jdillard@calibre-engineering.com

BLAST DESIGN

HOHBACH-LEWIN, INC.

909 Montgomery Street, Suite 260 San Francisco, CA 94133 Phone: 415.610.5793 Contact: Andrew Arnold E-mail: aarnold@hohbach-lewin.com

TELECOMMUNICATIONS

IMEG Corp.

1100 Warrenville Road, Suite 400W Naperville, IL 60563 Phone: 608.221.6716 Contact: Marty Witt E-mail: martin.a.witt@imegcorp.com

DESIGNER LIST AND STAMPS

13890 Bishops Drive, Suite 250 Brookfield, WI 53005

DEPARTMENT OF VETERANS AFFAIRS

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

NAGEL A+E PROJECT NUMBER:VA PROJECT NUMBER:

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

NOT FOR CONSTRUCTION

Project NumberProject TitleDrawing Title Phase

NAGEL

project number:

1100 Warrenville Road Suite 400W Naperville, IL 60563

829 Wisconsin Ave Racine, WI 53403

C U s e rs \r o if .N

A G

E L

\O n e D ri v e

N a g e l S e rv ic e s L

L C

\D o c u m e n ts \J e s s e

B ro w n E

H R

M I n fr a s tr u c tu re U p g ra d e s

F

IN

A L

C D ro i.

fo n ta n .r v t

/1

/2

:5 :2

P

M

JESSE BROWN VAMC EHRM INFRASTRUCTURE UPGRADES

820 S DAMEN AVE, CHIGAGO, IL 60612

21011537-21-700

G001.3

COVER SHEET JESSE BROWN VAMC EHRM

INFRASTRUCTURE UPGRADES

820 S DAMEN AVE, CHIGAGO, IL 60612

537-21-700

VA BLDG

18 AUG 2025 RF RB

FULLY SPRINKLERED

ISSUED FOR BID &

CONSTRUCTION

21011

ISSUED FOR BID & CONSTRUCTION

PROJECT SITE MAP

PROJECT LOCATION MAP

PERSPECTIVE

SHEET # SHEET NAME

40E-TD107 BUILDING 40E - SEVENTH FLOOR DEMO PLAN – TECHNOLOGY

40E-TN101 BUILDING 40E - FIRST FLOOR PLAN – TECHNOLOGY

40E-TN102 BUILDING 40E - SECOND FLOOR PLAN – TECHNOLOGY

40E-TN103 BUILDING 40E - THIRD FLOOR PLAN – TECHNOLOGY

40E-TN104 BUILDING 40E - FOURTH FLOOR PLAN – TECHNOLOGY

40E-TN105 BUILDING 40E - FIFTH FLOOR PLAN – TECHNOLOGY

40E-TN106 BUILDING 40E - SIXTH FLOOR PLAN – TECHNOLOGY

40E-TN107 BUILDING 40E - SEVENTH FLOOR PLAN – TECHNOLOGY

40W-TD101 BUILDING 40W - FIRST FLOOR DEMO PLAN – TECHNOLOGY

40W-TD102 BUILDING 40W - SECOND FLOOR DEMO PLAN – TECHNOLOGY

40W-TD103 BUILDING 40W - THIRD FLOOR DEMO PLAN – TECHNOLOGY

40W-TD104 BUILDING 40W - FOURTH FLOOR DEMO PLAN – TECHNOLOGY

40W-TD105 BUILDING 40W - FIFTH FLOOR DEMO PLAN – TECHNOLOGY

40W-TD106 BUILDING 40W - SIXTH FLOOR DEMO PLAN – TECHNOLOGY

40W-TD107 BUILDING 40W - SEVENTH FLOOR DEMO PLAN – TECHNOLOGY

40W-TN101 BUILDING 40W - FIRST FLOOR PLAN – TECHNOLOGY

40W-TN102 BUILDING 40W - SECOND FLOOR PLAN – TECHNOLOGY

40W-TN103 BUILDING 40W - THIRD FLOOR PLAN – TECHNOLOGY

40W-TN104 BUILDING 40W - FOURTH FLOOR PLAN – TECHNOLOGY

40W-TN105 BUILDING 40W - FIFTH FLOOR PLAN – TECHNOLOGY

40W-TN106 BUILDING 40W - SIXTH FLOOR PLAN – TECHNOLOGY

40W-TN107 BUILDING 40W - SEVENTH FLOOR PLAN – TECHNOLOGY

40W-TN300 TR 40 - TECHNOLOGY ROOM ENLARGEMENTS

40W-TN301 TR 40 - TECHNOLOGY ROOM ENLARGEMENTS

40W-TN302 TR 40 - TECHNOLOGY ROOM ENLARGEMENTS

40W-TN303 TR 40 - TECHNOLOGY ROOM ENLARGEMENTS

T400 TECHNOLOGY RISER DIAGRAMS

T401 TECHNOLOGY RISER DIAGRAMS

T402 TECHNOLOGY RISER DIAGRAMS

T403 TECHNOLOGY RISER DIAGRAMS

T500 TECHNOLOGY DETAILS

T501 TECHNOLOGY DETAILS

T502 TECHNOLOGY DETAILS

T503 TECHNOLOGY DETAILS

T504 TECHNOLOGY DETAILS

T600 TECHNOLOGY SCHEDULES

SHEET # SHEET NAME

1B-TN110 BUILDING 1B - TENTH FLOOR PLAN – TECHNOLOGY

1B-TN300 TR 1B - TECHNOLOGY ROOM ENLARGEMENTS

1B-TN301 TR 1B - TECHNOLOGY ROOM ENLARGEMENTS

1B-TN302 TR 1B - TECHNOLOGY ROOM ENLARGEMENTS

11A-TD101 BUILDING 11A - FIRST FLOOR DEMO PLAN – TECHNOLOGY

11A-TD102 BUILDING 11A - SECOND FLOOR DEMO PLAN – TECHNOLOGY

11A-TD102.1 BUILDING 11A - SECOND FLOOR DEMO PLAN – TECHNOLOGY

11A-TD103 BUILDING 11A - THIRD FLOOR DEMO PLAN – TECHNOLOGY

11A-TD103.1 BUILDING 11A - THIRD FLOOR DEMO PLAN – TECHNOLOGY

11A-TD104 BUILDING 11A - FOURTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TD104.1 BUILDING 11A - FOURTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TD105 BUILDING 11A - FIFTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TD105.1 BUILDING 11A - FIFTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TD106 BUILDING 11A - SIXTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TD106.1 BUILDING 11A - SIXTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TD107 BUILDING 11A - SEVENTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TD107.1 BUILDING 11A - SEVENTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TN101 BUILDING 11A - FIRST FLOOR PLAN – TECHNOLOGY

11A-TN102 BUILDING 11A - SECOND FLOOR PLAN – TECHNOLOGY

11A-TN102.1 BUILDING 11A - SECOND FLOOR PLAN – TECHNOLOGY

11A-TN103 BUILDING 11A - THIRD FLOOR PLAN – TECHNOLOGY

11A-TN103.1 BUILDING 11A - THIRD FLOOR PLAN – TECHNOLOGY

11A-TN104 BUILDING 11A - FOURTH FLOOR PLAN – TECHNOLOGY

11A-TN104.1 BUILDING 11A - FOURTH FLOOR PLAN – TECHNOLOGY

11A-TN105 BUILDING 11A - FIFTH FLOOR PLAN – TECHNOLOGY

11A-TN105.1 BUILDING 11A - FIFTH FLOOR PLAN – TECHNOLOGY

11A-TN106 BUILDING 11A - SIXTH FLOOR PLAN – TECHNOLOGY

11A-TN106.1 BUILDING 11A - SIXTH FLOOR PLAN – TECHNOLOGY

11A-TN107 BUILDING 11A - SEVENTH FLOOR PLAN – TECHNOLOGY

11A-TN107.1 BUILDING 11A - SEVENTH FLOOR PLAN – TECHNOLOGY

11A-TN300 TR 11A - TECHNOLOGY ROOM ENLARGEMENTS

11A-TN301 TR 11A - TECHNOLOGY ROOM ENLARGEMENTS

11A-TN302 TR 11A - TECHNOLOGY ROOM ENLARGEMENTS

11A-TN303 TR 11A - TECHNOLOGY ROOM ENLARGEMENTS

11B-TD101 BUILDING 11B - FIRST FLOOR DEMO PLAN – TECHNOLOGY

11B-TD102 BUILDING 11B - SECOND FLOOR DEMO PLAN – TECHNOLOGY

11B-TD103 BUILDING 11B - THIRD FLOOR DEMO PLAN – TECHNOLOGY

11B-TD104 BUILDING 11B - FOURTH FLOOR DEMO PLAN – TECHNOLOGY

11B-TD105 BUILDING 11B - FIFTH FLOOR DEMO PLAN – TECHNOLOGY

11B-TD106 BUILDING 11B - SIXTH FLOOR DEMO PLAN – TECHNOLOGY

11B-TD107 BUILDING 11B - SEVENTH FLOOR DEMO PLAN – TECHNOLOGY

11B-TN101 BUILDING 11B - FIRST FLOOR PLAN – TECHNOLOGY

11B-TN102 BUILDING 11B - SECOND FLOOR PLAN – TECHNOLOGY

11B-TN103 BUILDING 11B - THRID FLOOR PLAN – TECHNOLOGY

11B-TN104 BUILDING 11B - FOURTH FLOOR PLAN – TECHNOLOGY

11B-TN105 BUILDING 11B - FIFTH FLOOR PLAN – TECHNOLOGY

11B-TN106 BUILDING 11B - SIXTH FLOOR PLAN – TECHNOLOGY

11B-TN107 BUILDING 11B - SEVENTH FLOOR PLAN – TECHNOLOGY

11B-TN301 TR 11B - TECHNOLOGY ROOM ENLARGEMENTS

11B-TN302 TR 11B - TECHNOLOGY ROOM ENLARGEMENTS

11B-TN303 TR 11B - TECHNOLOGY ROOM ENLARGEMENTS

11B-TN304 TR 11B - TECHNOLOGY ROOM ENLARGEMENTS

30-TD101 BUILDING 30 - FIRST FLOOR DEMO PLAN – TECHNOLOGY

30-TN101 BUILDING 30 - FIRST FLOOR PLAN – TECHNOLOGY

30-TN301 TR 30 -TECHNOLOGY ROOM ENLARGEMENTS

32-TD101 BUILDING 32 - FIRST FLOOR DEMO PLAN – TECHNOLOGY

32-TD102 BUILDING 32 - SECOND FLOOR DEMO PLAN – TECHNOLOGY

32-TN101 BUILDING 32 - FIRST FLOOR PLAN – TECHNOLOGY

32-TN102 BUILDING 32 - SECOND FLOOR PLAN – TECHNOLOGY

32-TN301 TR32 - TECHNOLOGY ROOM ENLARGEMENTS

40E-TD101 BUILDING 40E - FIRST FLOOR DEMO PLAN – TECHNOLOGY

40E-TD102 BUILDING 40E - SECOND FLOOR DEMO PLAN – TECHNOLOGY

40E-TD103 BUILDING 40E - THIRD FLOOR DEMO PLAN – TECHNOLOGY

40E-TD104 BUILDING 40E - FOURTH FLOOR DEMO PLAN – TECHNOLOGY

40E-TD105 BUILDING 40E - FIFTH FLOOR DEMO PLAN – TECHNOLOGY

40E-TD106 BUILDING 40E - SIXTH FLOOR DEMO PLAN – TECHNOLOGY

SHEET # SHEET NAME

15 - TECHNOLOGY - T

00-T000 TECHNOLOGY - LEGENDS, NOTES

00-TN101 FIRST FLOOR PLAN -TECHNOLOGY

00-TN102 SECOND FLOOR PLAN - TECHNOLOGY

00-TN103 FIRST FLOOR PLAN - TECHNOLOGY

00-TN104 FOURTH FLOOR PLAN - TECHNOLOGY

00-TN105 FIFTH FLOOR PLAN - TECHNOLOGY

00-TN106 SIXTH FLOOR PLAN - TECHNOLOGY

00-TN107 SEVENTH FLOOR PLAN - TECHNOLOGY

00-TN108 EIGHTH FLOOR PLAN - TECHNOLOGY

00-TN109 NINTH FLOOR PLAN- TECHNOLOGY

00-TN110 TENTH FLOOR PLAN - TECHNOLOGY

1AN-TD101 BUILDING 1A-N - FIRST FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD102 BUILDING 1A-N - SECOND FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD103 BUILDING 1A-N - THIRD FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD104 BUILDING 1A-N - FOURTH FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD105 BUILDING 1A-N - FIFTH FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD106 BUILDING 1A-N - SIXTH FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD107 BUILDING 1A-N - SEVENTH FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD108 BUILDING 1A-N - EIGHTH FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD109 BUILDING 1A-N - NINTH FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD110 BUILDING 1A-N - TENTH FLOOR DEMO PLAN - TECHNOLOGY

1AN-TN101 BUILDING 1A-N - FIRST FLOOR PLAN - TECHNOLOGY

1AN-TN102 BUILDING 1A-N - SECOND FLOOR PLAN - TECHNOLOGY

1AN-TN103 BUILDING 1A-N - THIRD FLOOR PLAN - TECHNOLOGY

1AN-TN104 BUILDING 1A-N - FOURTH FLOOR PLAN - TECHNOLOGY

1AN-TN105 BUILDING 1A-N - FIFTH FLOOR PLAN - TECHNOLOGY

1AN-TN106 BUILDING 1A-N - SIXTH FLOOR PLAN - TECHNOLOGY

1AN-TN107 BUILDING 1A-N - SEVENTH FLOOR PLAN - TECHNOLOGY

1AN-TN108 BUILDING 1A-N - EIGHTH FLOOR PLAN - TECHNOLOGY

1AN-TN109 BUILDING 1A-N - NINTH FLOOR PLAN - TECHNOLOGY

1AN-TN110 BUILDING 1A-N - TENTH FLOOR PLAN - TECHNOLOGY

1AS-TD101 BUILDING 1A-S - FIRST FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD102 BUILDING 1A-S - SECOND FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD103 BUILDING 1A-S - THIRD FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD104 BUILDING 1A-S - FOURTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD105 BUILDING 1A-S - FIFTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD106 BUILDING 1A-S - SIXTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD107 BUILDING 1A-S - SEVENTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD108 BUILDING 1A-S - EIGHTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD109 BUILDING 1A-S - NINTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD110 BUILDING 1A-S - TENTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TN101 BUILDING 1A-S - FIRST FLOOR PLAN - TECHNOLOGY

1AS-TN102 BUILDING 1A-S - SECOND FLOOR PLAN - TECHNOLOGY

1AS-TN103 BUILDING 1A-S - THIRD FLOOR PLAN - TECHNOLOGY

1AS-TN104 BUILDING 1A-S - FOUTH FLOOR PLAN - TECHNOLOGY

1AS-TN105 BUILDING 1A-S - FIFTH FLOOR PLAN - TECHNOLOGY

1AS-TN106 BUILDING 1A-S - SIXTH FLOOR PLAN - TECHNOLOGY

1AS-TN107 BUILDING 1A-S - SEVENTH FLOOR PLAN - TECHNOLOGY

1AS-TN108 BUILDING 1A-S - EIGHTH FLOOR PLAN - TECHNOLOGY

1AS-TN109 BUILDING 1A-S - NINTH FLOOR PLAN - TECHNOLOGY

1AS-TN110 BUILDING 1A-S - TENTH FLOOR PLAN - TECHNOLOGY

1AS-TN300 TR 1A - TECHNOLOGY ROOM ENLARGEMENTS

1AS-TN301 TR 1A - TECHNOLOGY ROOM ENLARGEMENTS

1AS-TN303 TR 1A - TECHNOLOGY ROOM ENLARGEMENTS

1AS-TN304 TR 1A - TECHNOLOGY ROOM ENLARGEMENTS

1AS-TN305 TR 1A - TECHNOLOGY ROOM ENLARGEMENTS

1AS-TN306 TECHNOLOGY ROOM ENLARGEMENTS

1AS-TN307 TECHNOLOGY ROOM ENLARGEMENTS

1B-TD101 BUILDING 1B - FIRST FLOOR DEMO PLAN – TECHNOLOGY

1B-TD102 BUILDING 1B - SECOND FLOOR DEMO PLAN – TECHNOLOGY

1B-TD103 BUILDING 1B - THIRD FLOOR DEMO PLAN – TECHNOLOGY

1B-TD104 BUILDING 1B - FOURTH FLOOR DEMO PLAN – TECHNOLOGY

1B-TD105 BUILDING 1B - FIFTH FLOOR DEMO PLAN – TECHNOLOGY

1B-TD106 BUILDING 1B - SIXTH FLOOR DEMO PLAN – TECHNOLOGY

1B-TD107 BUILDING 1B - SEVENTH FLOOR DEMO PLAN – TECHNOLOGY

1B-TD108 BUILDING 1B - EIGHTH FLOOR DEMO PLAN – TECHNOLOGY

1B-TD109 BUILDING 1B - NINTH FLOOR DEMO PLAN – TECHNOLOGY

1B-TD110 BUILDING 1B - TENTH FLOOR DEMO PLAN – TECHNOLOGY

1B-TN101 BUILDING 1B - FIRST FLOOR PLAN – TECHNOLOGY

1B-TN102 BUILDING 1B - SECOND FLOOR PLAN – TECHNOLOGY

1B-TN103 BUILDING 1B - THIRD FLOOR PLAN – TECHNOLOGY

1B-TN104 BUILDING 1B - FOURTH FLOOR PLAN – TECHNOLOGY

1B-TN105 BUILDING 1B - FIFTH FLOOR PLAN – TECHNOLOGY

1B-TN106 BUILDING 1B - SIXTH FLOOR PLAN – TECHNOLOGY

1B-TN107 BUILDING 1B - SEVENTH FLOOR PLAN – TECHNOLOGY

1B-TN108 BUILDING 1B - EIGHTH FLOOR PLAN – TECHNOLOGY

1B-TN109 BUILDING 1B - NINTH FLOOR PLAN – TECHNOLOGY

SHEET INDEX

SHEET # SHEET NAME

00.2 - GENERAL - G

G001.3 COVER SHEET

Revisions: Date:

Ryan Bourland Text Box

12 MAR 2025,

18 AUG 2025 R1

Ryan Bourland Line

TECHNOLOGY SYMBOL LIST

SYMBOL: DESCRIPTION: NOTE:

EQUIPMENT

LIST ABBREV.:

W

1.

CEILING INFORMATION OUTLET, COMBINATION

TELEPHONE/DATA COMMUNICATION

SC-IO-C

1.

WALL INFORMATION OUTLET, COMBINATION

TELEPHONE/DATA COMMUNICATION

SC-IO-W

1.

WALL INFORMATION OUTLET, WALL TELEPHONE

COMMUNICATION

SC-IO-W

1.

FLOOR INFORMATION OUTLET, DATA COMMUNICATION

ONLY

SC-IO-F

WAP

1.

CEILING INFORMATION OUTLET, DATA COMMUNICATION

ONLY, WIRELESS ACCESS POINT

SC-IO-C

TV

1.

WALL INFORMATION OUTLET, TELEVISION, MOUNTED AT

+84" UNLESS OTHERWISE NOTED

SC-IO-W

1.

FLOOR INFORMATION OUTLET, COMBINATION

TELEPHONE/DATA COMMUNICATION

SC-IO-F

1.

CEILING INFORMATION OUTLET, DATA COMMUNICATION

ONLY

SC-IO-C

M T .

CARD ACCESS READER; LETTER INDICATES AS

FOLLOWS:

M = MOUNT

C - CEILING D - DESK F- FLUSH H - HIDDEN M -

MULLION

P - PEDESTAL R - RACK S - SURFACE W - WALL

T = TECHNOLOGY/TYPE

B - BARCODE F - ELEVATOR FLOOR CALL

H - ELEVATOR HALL CALL M - MAG STRIP

P = PROXIMITY S - SMART CARD T - TOKEN

AC-CR1

CSS .

CONTROLLED SECURITY SCHEME SCHEDULE

IDENTIFIER

N/A

CCTV 2.

VIDEO SURVEILLANCE CAMERA WITH LENS,

WALL MOUNT OR CEILING MOUNTVS-CM-1

TECHNOLOGY ABBREVIATION KEY

TELECOMMUNICATIONS ROOMTR-#

ABOVE FINISHED FLOORAFF

BELOW FINISHED CEILINGBFC

CONDUITC

SIMILARSIM

TYPICALTYP

MOUNTING HEIGHT ABOVE FINISHED FLOOR+#

JUNCTION BOXJ-BOX

ABBR: DESCRIPTION:

UNLESS OTHERWISE NOTEDUON

FIELD OF VIEWFOV

DOUBLE POLE DOUBLE THROWDPDT

PAN TILT ZOOMPTZ

POWER OVER ETHERNETPOE

ABOVE FINISHED GRADEAFG

DELAYED EGRESSDE

TECHNOLOGY GENERAL NOTES:

1. ###-### INDICATES TECHNOLOGY EQUIPMENT SCHEDULE ITEM LABELED AS "EQUIPMENT

LIST ABBREVIATION"

2. REFER TO TECHNOLOGY EQUIPMENT SCHEDULE AND SPECIFICATIONS FOR FULL

DESCRIPTIONS AND MANUFACTURERS OF ALL DEVICES.

TECHNOLOGY MOUNTING SUBSCRIPT KEY:

A MOUNT AT +6" TO CENTERLINE ABOVE COUNTER OR BACKSPLASH

H MOUNT ORIENTED HORIZONTALLY

L MOUNT IN CASEWORK

M MOUNT IN MODULAR FURNITURE

S MOUNT IN SURFACE RACEWAY

A SLASH IS USED BETWEEN TWO SUBSCRIPTS, E.G., A/H.

1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE ADA STANDARDS FOR

ACCESSIBLE DESIGN. REFER TO THE ADA GUIDELINES FOR ALL CONFIGURATION DETAILS

ON THIS PAGE FOR ADDITIONAL INFORMATION.

2. CONCEAL ALL CONDUIT IN WALLS, PARTITIONS, ABOVE CEILING, IN FLOOR SLAB, ETC.

UNLESS OTHERWISE INDICATED ON THE PLANS OR IN THE SPECIFICATIONS. CONDUIT IN

MECHANICAL ROOMS AND STORAGE ROOMS WITHOUT CEILINGS MAY BE EXPOSED ON

BUILDING STRUCTURE.

3. BOXES LOCATED ON OPPOSITE SIDES OF NON-RATED WALLS SHALL BE OFFSET A MINIMUM

OF 6" HORIZONTALLY. BOXES ON OPPOSITE SIDES OF FIRE RATED WALLS SHALL BE

OFFSET A MINIMUM OF 24" HORIZONTALLY. "THRU-THE-WALL" BOXES SHALL NOT BE

ALLOWED WITHOUT PRIOR WRITTEN APPROVAL OF THE ARCHITECT/ENGINEER.

4. VERIFY ALL FURNITURE, MODULAR FURNITURE, AND EQUIPMENT LOCATIONS WITH

ARCHITECTURAL PLANS, ELEVATIONS, AND REVIEWED SHOP DRAWINGS. PRIOR TO MAKING

THE ACTUAL TELECOMMUNICATIONS INSTALLATION, ADJUST OUTLETS OR CONNECTION

LOCATIONS TO ACCOMMODATE FURNITURE AND/OR EQUIPMENT.

5. TELECOMMUNICATIONS EQUIPMENT SHALL BE MOUNTED TO ALLOW ACCESS TO

ELECTRICAL AND MECHANICAL EQUIPMENT. ALL MOUNTING OF TELECOMMUNICATION

DEVICES ON EQUIPMENT SUPPLIED BY ANOTHER CONTRACTOR SHALL BE APPROVED IN

ADVANCE BY THE OTHER CONTRACTOR.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL

OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE

EXPENSE OF THIS CONTRACTOR. ALL CONDUITS THROUGH WALLS SHALL BE GROUTED OR

SEALED INTO OPENINGS.

7. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS SHALL

BE TESTED AND CERTIFIED AS A SYSTEM PER ASTM E814 STANDARDS FOR FIRE TESTS OF

THROUGH-PENETRATION FIRESTOPS. REFER TO DIVISION 7 FOR ADDITIONAL INFORMATION

AND REQUIREMENTS SPECIFIC TO FIRESTOPPING.

8. THE TECHNOLOGY CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

THE CEILINGS, CEILING TILES, AND CEILING GRID ASSOCIATED WITH THE AREAS OF WORK

BY ALL CONTRACTORS.

9. ALL LADDER RACK AND CABLE TRAY SIZES ARE AS DEFINED ON THE DRAWINGS. REFER TO

MANUFACTURERS DOCUMENTS FOR INSTALLATION REQUIREMENTS.

10. FLUSH MOUNT ALL TELECOMMUNICATION OUTLETS AT +18" FROM FLOOR (CENTERLINE

DIMENSION), EXCEPT WHERE OTHERWISE NOTED. OUTLETS MAY BE SURFACE MOUNTED

WHEN CONDUIT IS SPECIFIED EXPOSED.

11. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO THE

WALLS, FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES

DAMAGE IS RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE

RATING, AND FINISH.

12. ALL VERTICAL PATHWAYS IN THE EXISTING STRUCTURE SHALL BE SCANNED OR X-RAY'D

PRIOR TO CORING AND DRILLING. DAMAGES CAUSED WITHOUT PROPER SCANNING SHALL

BE REPAIRED WITHOUT COST TO THE OWER WITHIN 8 HOURS.

13. ALL ADDITIONAL FLOOR SLEEVES SHALL REQUIRE THE CONTRACTOR TO SCAN THE FLOOR

PRIOR TO CORING. NO WORK SHALL PROCEED WITHOUT VERIFICATION THE CORE

LOCATION IS CLEAR OF CONDUIT WITHIN THE DECK.

14. TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE INSTALLED IN ALL

WALL AND FLOOR PENETRATIONS AT THE END OF EVERY WORK SHIFT WHILE WORK IS IN

PROGRESS. UN-SEALED OPENINGS ARE NOT ALLOWED TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH UN-SEALED PENETRATIONS.

15. RE-INSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT DURING CABLE

INSTALLATION.

16. ALL BACKBOX INSTALLED IN A FIRE-RATED WALL SHALL BE INSTALLED WITH FIRE PUTTY

PADS.

TECHNOLOGY INSTALLATION NOTES:

GENERAL NOTES:

1. ALL SYMBOLS AND ABBREVIATIONS LISTED MAY NOT BE APPLICABLE TO THIS PROJECT.

REFER TO THE TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE COMPLETE DESCRIPTION

AND ITEMS.

2. ALL SYMBOLS AND ABBREVIATIONS REFER TO TECHNOLOGY SHEETS ONLY AS DEFINED ON

THE SHEET INDEX. REFER TO THE GENERAL TECHNOLOGY NOTES FOR ADDITIONAL

INFORMATION.

3. ALL SYMBOLS LISTED ABOVE ARE FOR REFERENCE ONLY. REFER TO PLANS AND LINE TYPE

KEY FOR NEW, EXISTING TO REMAIN AND TO BE REMOVED ITEMS FOR ADDITIONAL

INFORMATION.

4. REFER TO RISERS ON SHEET(S): T400, T401, T402, T403.

TECHNOLOGY SYMBOL NOTES:

1. "#" INDICATES INFORMATION OUTLET FACEPLATE CONFIGURATION. REFER TO

INFORMATION OUTLET SCHEDULE ON T600 FOR ADDITIONAL INFORMATION.

2. "CM-#" ON FLOOR PLANS INDICATES CAMERA TYPE AND IS ASSOCIATED WITH THE

CORRESPONDING "VS-CM-#" EQUIPMENT SCHEDULE ABBREVIATION. "##-##" SUBSCRIPT

INDICATES FLOOR NUMBER-CAMERA NUMBER. REFER TO SHEET 1/T504 FOR CAMERA

MOUNTING DETAIL.

CABLE TRAY, CHANNEL TRAY, BASKET

TRAY

LADDER RACK

WIDTH X HEIGHT

WIDTH X HEIGHT

DIAMETERø C CONDUIT

CONDUIT DOWN

CONDUIT UP OR UP/DOWN

CONDUIT SLEEVE

CONTINUATION

SC-ER-1 FOUR POST EQUIPMENT RACK

N/A EXISTING TWO POST EQUIPMENT RACK

SC-VWM-1

N/A POWER POLE

VERTICAL WIRE MANAGER

SC-GND-1 WALL MOUNT GROUND BAR

PRIMARY FIBERP P P

SECONDARY FIBERS S S

WAP SC-IO-W WALL NFORMATION OUTLET, DATA COMMUNICATION

ONLY, WIRELESS ACCESS POINT

1.

#D

WALL NFORMATION OUTLET, DATA COMMUNICATION

ONLY

T

N/A CEILING NFORMATION OUTLET, TELEMETRY

SC-IO-W

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

TEMPERATURE CONTROLS CONTRACTORT.C.C.

ASBESTOS ABATEMENT CONTRACTOR

FIRE PROTECTION CONTRACTORF.P.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

VENTILATION CONTRACTORV.C.

ELECTRICAL CONTRACTORE.C.

A.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONSTRUCTION MANAGERC.M.

M

A X

20" MAX.

M

A X

20"-25" MAX.

M

A X

M

IN

. 4

M

A X

M

A X

10" MAX. 10"-24" MAX.

ADA GUIDELINES - FRONT ACCESS

ADA STANDARDS FOR ACCESSIBLE DESIGN

INSTALL ABOVE COUNTER

DEVICE AT 44" ABOVE

FINISHED FLOOR.

INSTALL ABOVE COUNTER

DEVICE AT 40" ABOVE

FINISHED FLOOR.

INSTALL DEVICE AT 18"

ABOVE FINISHED FLOOR.

ADA GUIDELINES - SIDE ACCESS

INSTALL DEVICE AT 44"

ABOVE FINISHED FLOOR.

INSTALL DEVICE AT 42"

ABOVE FINISHED FLOOR.

1. THE DRAWINGS INDICATE EXISTING ITEMS TO BE REMOVED. THE DRAWINGS ARE

INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED AND DO NOT INDICATE EVERY

BOX, CONDUIT, OR WIRE THAT MUST BE REMOVED. THE CONTRACTOR SHALL VISIT THE

SITE PRIOR TO SUBMITTING A BID AND VERIFY EXISTING CONDITIONS.

2. ITEMS (i.e. SPEAKERS, SWITCHES, ETC.) REMOVED AND NOT RELOCATED REMAIN THE

PROPERTY OF THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE

DISPOSAL OF MATERIAL THE OWNER DOES NOT WANT TO REUSE OR RETAIN. (i.e., FOR

MAINTENANCE PURPOSES).

3. EXISTING TO REMAIN DEVICES WITHIN OR ADJACENT TO THE PATH OF CONSTRUCTION

SHALL BE PROTECTED IN PLACE. DEVICES THAT MUST BE REMOVED SHALL BE TESTED

PRIOR TO REMOVAL, PROTECTED FROM DAMAGE, AND RE-INSTALLED IN ITS ORIGINAL

LOCATION DURING THE NEW CONSTRUCTION PHASE OF THE PROJECT.

4. OBTAIN APPROVAL FROM THE OWNER BEFORE TURNING OFF THE POWER TO

EQUIPMENT, SYSTEMS, PANELS, ETC. COORDINATE ALL OUTAGES WITH OWNER.

CONDUIT CONCEALED IN WALL CONSTRUCTION MAY BE ABANDONED IN PLACE IF NOT

AFFECTED BY OTHER CONSTRUCTION.

5. ALL CONDUIT SHALL BE REMOVED WHERE WALLS ARE BEING REMOVED. WHERE

CONDUIT IS IN THE CONCRETE SLAB, CUT OFF FLUSH, PULL OUT WIRE, AND PLUG.

WHERE CONDUIT IS RUN EXPOSED, ALL ASSOCIATED CLAMPS, SUPPORTS, HANGERS,

ETC., SHALL ALSO BE REMOVED.

6. COORDINATE ALL WORK WITH OTHER CONTRACTORS AT THE JOB SITE BEFORE

REMOVING EXISTING EQUIPMENT AND INSTALLING NEW ITEMS.

7. EXISTING CONDUIT IN GOOD CONDITION, MAY BE REUSED IN PLACE. RELOCATING

EXISTING CONDUIT SHALL NOT BE ALLOWED. BONDING CONDUCTORS SHALL BE

INSTALLED IN ALL REUSED CONDUIT TO ASSURE PROPER GROUND PATH.

8. EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A

JUNCTION BOX TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND

CONDUIT AND WIRING AS REQUIRED TO MAINTAIN POWER TO REMAINING EQUIPMENT.

9. DEVICES TO BE REMOVED SHALL HAVE ALL CONNECTED WIRING REMOVED TO THE

SOURCE.

10. DEVICES NOT TO BE REMOVED SHALL BE PROTECTED FROM THE ENVIRONMENT, AND

ALL ASSOCIATED CABLE/RACEWAYS ARE TO REMAIN AND BE PROTECTED. T.C. SHALL BE

RESPONSIBLE FOR REPAIR OF ANY INTERRUPTIONS TO PROTECTED DEVICES.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL CEILING TILES WHERE

THEIR RESPECTIVE WORK IS REQUIRED FOR ACCESS ABOVE THE CEILING. DAMAGED

CEILING TILES SHALL BE REPLACED WITH NEW TILES MATCHING THE EXISTING

CONDITIONS. THE CONTRACTOR SHALL DOCUMENT ANY TILES THAT ARE PRE-DAMAGED

PRIOR TO WORK AND SUBMIT EXISTING CONDITIONS TO THE CONTRACTIING AGENT FOR

RECORDS.

12. ALL ABANDONED EQUIPMENT IN THE TELECOMMUNICATION ROOMS BEING ABANDONED

OR TURNED OVER TO THE VA SHALL BE REMOVED AS PART OF THE CONTRACTORS

SCOPE. THIS INCLUDES BUT NOT LIMITED TO RACKS, CABINETS, PATCH PANEL, VOICE

WALLFIELDS AND BONDING SYSTEMS. COORDINATE WITH OWNER PRIOR TO REMOVAL.

13. CONTRACTOR IS TO REMOVE ALL REPLACED CABLING IN ITS ENTIRETLY TO THE TR. NO

CABLING SHALL BE ABANDONED IN PLACE

TECHNOLOGY DEMOLITION NOTES

1. THE EXISTING DATA NETWORK IS TO REMAIN OPERATIONAL DURING THE INSTALLATION

OF THE NEW TELECOM ROOM EQUIPMENT. THE SYSTEM SHALL NOT BE DISRUPTED

UNLESS COORDINATED IN ADVANCE WITH THE OWNER AND ENGINEER AND AT THEIR

DISCRETION ON DATE AND TIME.

2. REFER TO THE DRAWINGS FOR THE LOCATIONS OF THE NEW TELECOM ROOM

EQUIPMENT AND THE EXISTING TELECOM ROOM EQUIPMENT LOCATIONS.

3. CONSTRUCT NEW TELECOMMUNICATIONS ROOMS AND/OR EXPAND EXISTING TO

REMAIN TELECOMMUNICATIONS ROOMS. RENOVATION AND CONSTRUCTION OF

NEW TELECOMMUNICATION ROOMS SHALL BE COMPLETED AT THE START OF THE

PROJECT.

4. MAINTAIN THE EXISTING FIBER AND FEEDS TO THE EXISTING TELECOMMUNICATIONS

ROOM AS CURRENTLY CONSTRUCTED UNTIL THE END OF THE PROJECT.

5. ROUTE NEW FIBER TO THE NEW TELECOMMUNICATIONS ROOMS. MAINTAIN THE

EXISTING ROOMS AND FIBER BACKBONE CABLING UNTIL THE AREA BEING SERVED BY

EACH RESPECTIVE TELECOMMUNICATIONS ROOM HAS BEEN RE-FED.

6. PROVIDE NEW A/B POWER PANELS, HVAC, AND GROUNDING IN NEW AND EXISTING

TO REMAIN ROOMS. POWER ALL TELECOMMUNICATIONS ROOM LOADS FROM THE NEW

PANELS.

7. FOR NEW OR EXPANDED TELECOMMUNICATIONS ROOMS, PROVIDE NEW CABLES FROM

THE EXISTING OUTLETS TO THE NEW ROOMS. REMOVE ALL EXISTING CABLING AFTER

NEW CABLES HAVE BEEN PULLED TO THE OUTLETS TO MAINTAIN THE OPERATIONAL

CAPABILITY OF THE SPACES TO THE GREATEST EXTENT POSSIBLE.

8. AFTER NEW CABLING HAS BEEN INSTALLED, REMOVE EXISTING BACKBONE CABLING

IN TELECOMMUNICATIONS ROOMS BEING ABANDONED.

9. REFER TO THE TECHNOLOGY DEMOLITION NOTES FOR ADDITIONAL REQUIREMENTS.

PHASE 1 - PATHWAYS AND INFRASTRUCTURE

A. INSTALL NEW INTER-BUILDING UNDERGROUND DUCT BANK CONDUITS.

B. BUILD OUT NEW TR SPACES.

C. INSTALL NEW INTRA-BUILDING BACKBONE CABLING PATHWAYS.

PHASE 2 - BACKBONE CABLING

A. INSTALL INTER-BUILDING BACKBONE CABLING.

B. INSTALL INTRA-BUILDING BACKBONE CABLING.

C. TERMINATE AND TEST.

PHASE 3 - HORIZONTAL CABLING

A. INSTALL NEW CAT 6A CABLING.

• TERMINATE CABLING IN NEW TR PATCH PANELS.

• NEATLY COIL CABLING AT EXISTING OR EXPANDED TR LOCATIONS FOR CUTOVER

TO NEW RACKS AND PATCH PANELS.

B. NEATLY COIL CABLING AT EXISTING OUTLET LOCATIONS.

PHASE 4 - CUTOVER

A. OIT INSTALLATION OF NETWORK SWITCHES AT EACH TR PLANNED FOR CUTOVER .

PHASING FOR THE NUMBER OF CLOSET TO BE CONCURRENTLY WORKED ON SHALL

BE BASED ON A QUANTITY OF (10) 48-PORT NETWORK SWITCHES AVAILABLE BY THE

VA OIT.

B. REMOVE EXISTING OUTLET CABLING FROM OUTLET AND ROUTE NEW CAT 6A

CABLING INTO OUTLET.

• NEATLY COIL EXISTING CABLING ABOVE CEILING.

C. REMOVE EXISTING EQUIPMENT RACKS AND INSTALL NEW EQUIPMENT RACKS

EQUIPMENT IN REMODELED OR EXPANDED TR.

D. TERMINATE AND TEST NEW CABLING.

E. OIT CUTOVER AND PATCHING TO NETWORK SWITCHES.

PHASE 5 - DEMOLITION

A. REMOVE OLD FIBER OPTIC BACKBONE CABLING FROM EACH OLD TR FOLLOWING

SUCCESSFULL CUTOVER TO NEW TR.

• OTHER EXISTING SYSTEMS IN OLD TR TO REMAIN FUNCTIONAL.

B. REMOVE OLD HORIZONTAL CABLING FROM EACH OUTLET BACK TO ITS SOURCE

FOLLOWING SUCCESSFUL CUTOVER.

C. REMOVE ALL EQUIPMENT RACKS AND ASSOCIATED EQUIPMENT FROM EACH OLD TR

FOLLOWING SUCCESSFUL CUTOVER.

10. REFER TO THE DIV 01 SPECIFICATIONS FOR ADDITIONAL INFORMATION ON PHASING

TECHNOLOGY PHASING NOTES

FIRE WALL/PARTITION NOTES:

1. REFER TO THE PHASING PLAN FOR THE LOCATIONS OF FIRE RATED WALLS TO ENSURE

PROPER FIRESTOPPING AND WALL REPAIRS.

SUGGESTED MATRIX OF RESPONSIBILITY

ITEM: SHOWN ON:

FURNISHED

BY:

INSTALLED

BY: NOTES:

TECHNOLOGY ROUGH-IN, REFER TO

TECHNOLOGY EQUIPMENT SCHEDULE

AND SPECIFICATIONS FOR DEFINITION

T-SERIES E.C. E.C. 3. 4.

INFORMATION OUTLET FACEPLATES,

JACKS, AND TERMINATIONS

T-SERIES T.C. T.C.

CONDUIT SLEEVES (WHEN SHOWN ON

DRAWINGS)

T-SERIES E.C. E.C.

CONDUIT SLEEVES (NOT SHOWN BUT

REQUIRED FOR PROPER INSTALLATION

OF SYSTEM)

N/A T.C. T.C. 2. 4.

TELECOMMUNICATION SYSTEMS

ROUGH-IN

T-SERIES E.C. E.C. 1.

TELECOMMUNICATION EQUIPMENT,

CABLING, AND TERMINATIONS

T-SERIES T.C. T.C.

CABLE TRAY (INCLUDING WIRE BASKET

TRAY)

T-SERIES E.C. E.C.

LADDER RACK T-SERIES T.C. T.C. 5.

GROUNDING LUGS ON TECHNOLOGY

EQUIPMENT

T-SERIES T.C. E.C. 6.

BONDING SYSTEM FOR TECHNOLOGY

SYSTEM

T-SERIES E.C. E.C. 7. 8.

CONNECTION OF TECHNOLOGY

BONDING SYSTEM TO THE ELECTRICAL

GROUND SYSTEM

T-SERIES E.C. E.C.

LINE VOLTAGE POWER (+120V OR

GREATER)

E-SERIES E.C. E.C.

LINE VOLTAGE POWER (NOT SHOWN

BUT REQUIRED FOR PROPER

INSTALLATION OF SYSTEM)

N/A T.C. E.C. 2. 4.

LINE VOLTAGE POWER FOR DOOR

HARDWARE POWER SUPPLIES

ARCH SPEC E.C. E.C.

LOW VOLTAGE CABLING FOR

TECHNOLOGY SYSTEMS

T-SERIES T.C. T.C.

CABLE HANGERS AND SUPPORTS OR

OTHER CABLE ROUTING METHODS

(OTHER THAN CONDUIT AND CABLE

TRAY)

T-SERIES T.C. T.C. 5.

FLOOR BOX (ROUGH-IN) T & E SERIES E.C. E.C.

SUGGESTED MATRIX OF RESPONSIBILITY NOTES

1. LOCATIONS OF TELECOMMUNICATIONS ROUGH-INS SHALL BE INDICATED BY THE INFORMATION

OUTLET SYMBOLS ON THE DRAWINGS. REFER TO THE TECHNOLOGY SYMBOL LIST FOR

ADDITIONAL INFORMATION.

2. BASED ON THE INHERENT DIFFERENCES IN PRODUCTS FROM VARIOUS MANUFACTURERS, ALL

REQUIRED EQUIPMENT MAY NOT BE SHOWN ON THE DRAWINGS FOR ALL ACCEPTABLE

MANUFACTURERS.

3. INCLUDES BACKBOXES AND CONDUIT REQUIRED FOR THE TECHNOLOGY SYSTEMS

INSTALLATION. THE E.C. SHALL BASE THE BID ON THE BASIS OF DESIGN SHOWN ON THE

CONTRACT DOCUMENTS.

4. ALL CHANGES TO THE SLEEVES, BACKBOXES, CONDUITS, AND POWER REQUIRED BECAUSE OF

THE T.C.'S SELECTION OF AN ALTERNATE ACCEPTABLE MANUFACTURER OR FROM SYSTEM

CONFIGURATIONS THAT ARE LEFT TO THE CHOICE OF THE CONTRACTOR SHALL BE INCLUDED

IN THE T.C.'S BID. THIS BID SHALL INCLUDE INSTALLATION BY A LICENSED ELECTRICIAN.

5. UNLESS TRADE RULES DICTATE OTHERWISE.

6. FURNISHED AS PART OF THE EQUIPMENT WHEN POSSIBLE, OR FURNISHED TO THE E.C. FOR

INSTALLATION IN THE FIELD.

7. INCLUDES ALL CONDUCTORS, GROUND BARS, AND TERMINATIONS FOR THE COMPLETE

BONDING SYSTEM REQUIRED BY THE SPECIFICATIONS.

8. REFER TO ELECTRICAL DRAWINGS FOR LOCATIONS OF PANELS AND SWITCHBOARDS SHOWN

IN THE TECHNOLOGY BONDING RISER DIAGRAM AND TYPICAL TELECOM ROOM BONDING FLOW

DIAGRAM.

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #21006425.00

13100 watertown plank road, suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

B

IM

/2

.0

V

A -C h ic a g o

IL

-J

B E

H R

M /5

-7

.J

B E

H R

M .M

E P

T

C .r v t

/1

/2

:1 :4

A

M

00-T000

TECHNOLOGY - LEGENDS, NOTES JESSE BROWN VAMC EHRM

INFRASTRUCTURE UPGRADES

820 S DAMEN AVE, CHICAGO, IL 60612

537-21-700

VA BLDG

18 AUG 2025 MARWIT ALFARA

ISSUED FOR BID &

CONSTRUCTION

21011

LEGEND NOTES

TELECOM ROOM REFERENCES "TR"

TELECOM ROOM

DETAIL / SHEET

REFERENCE

FLOOR PLAN

REFERENCE ARCH ROOM NUMBER

BIOMED SERVER ROOM 1/1AS-TN307 00-TN107 7433

EXISTING TR 11T1 N/A 00-TN101 11T1

EXISTING TR 12T1 N/A 00-TN101 12T1

EXISTING TR 12T2 N/A 00-TN101 12T2

EXISTING TR 13T1 N/A 00-TN101 1362

EXISTING TR 14T2 N/A 00-TN101 14T2

EXISTING TR 14T3 N/A 00-TN101 14T3

EXISTING TR 14T4 N/A 00-TN101 14T4

EXISTING TR 15T1 N/A 00-TN101 15T1

EXISTING TR 22T1 N/A 00-TN102 22T1

EXISTING TR 22T2 N/A 00-TN102 22T2

EXISTING TR 24T1 N/A 00-TN102 24T1

EXISTING TR 32T1 N/A 00-TN103 32T1

EXISTING TR 32T2 N/A 00-TN103 32T2

EXISTING TR 34T1 N/A 00-TN103 34T1

EXISTING TR 35T1 N/A 00-TN103 35T1

EXISTING TR 42T1 N/A 00-TN104 42T1

EXISTING TR 42T2 N/A 00-TN104 42T2

EXISTING TR 44T1 N/A 00-TN104 44T1

EXISTING TR 45T1 N/A 00-TN104 45T1

EXISTING TR 52T1 N/A 00-TN105 52T1

EXISTING TR 52T2 N/A 00-TN105 52T2

EXISTING TR 54T1 N/A 00-TN105 54T1

EXISTING TR 55T1 N/A 00-TN105 55T1

EXISTING TR 62T1 N/A 00-TN106 62T1

EXISTING TR 62T2 N/A 00-TN106 62T2

EXISTING TR 64T1 N/A 00-TN106 64T1

EXISTING TR 72T1 N/A 00-TN107 72T1

EXISTING TR 72T2 N/A 00-TN107 72T2

EXISTING TR 74T1 N/A 00-TN107 74T1

EXISTING TR 84T1 N/A 00-TN108 84T1

EXISTING TR 94T1 N/A 00-TN109 94T1

EXISTING TR 104T1 N/A 00-TN110 104T1

EXISTING TR 1539F N/A 00-TN101 1538F

EXISTING TR 2330 N/A 00-TN102 2330

EXISTING TR 3362 N/A 00-TN103 3362

EXISTING TR 4634 N/A 00-TN104 4634

EXISTING TR 5362 N/A 00-TN105 5362

EXISTING TR 6362 N/A 00-TN106 6362

SERVER ROOM 1/1AS-TN306 00-TN107 7467

TR1A-1 1/1AS-TN300 00-TN101 TR1A-1

TR1A-2 4/1AS-TN300 00-TN102 TR1A-2

TR1A-3 1/1AS-TN301 00-TN103 TR1A-3

TR1A-4 4/1AS-TN301 00-TN104 TR1A-4

TR1A-5 1/1AS-TN302 00-TN105 TR1A-5

TR1A-6 4/1AS-TN302 00-TN106 TR1A-6

TR1A-7 1/1AS-TN303 00-TN107 TR1A-7

TR1A-8 4/1AS-TN303 00-TN108 TR1A-8

TR1A-9 1/1AS-TN304 00-TN109 TR1A-9

TR1A-10 4/1AS-TN304 00-TN110 TR1A-10

TR1AA-1 1/1A-TN305 00-TN101 TR1AA-1

TR1B-1 1/1B-TN300 00-TN101 TR1B-1

TR1B-2 4/1B-TN300 00-TN102 TR 1B-2

TR1B-3 1/1B-TN301 00-TN103 TR1B-3

TR1B-4 4/1B-TN301 00-TN104 TR1B-4

TR1B-5 1/1B-TN303 00-TN105 TR1B-5

TR11A-1A 1/11A-TN300 00-TN101 TR11A-1A

TR11A-2 4/11A-TN300 00-TN102 TR11A-2

TR11A-3 1/11A-TN301 00-TN103 TR11A-3

TR11A-4 4/11A-TN301 00-TN104 TR11A-4

TR11A-5 1/11A-TN302 00-TN105 TR11A-5

TR11A-6 4/11A-TN302 00-TN106 TR11A-6

TR11A-7 1/11A-TN303 00-TN107 TR11A-7

TR11B-1 1/11B-TN301 00-TN101 TR11B-1

TR11B-2 4/11B-TN301 00-TN102 TR11B-2

TR11B-3 1/11B-TN302 00-TN103 TR11B-3

TR11B-4 4/11B-TN302 00-TN104 TR11B-4

TR11B-5 1/11B-TN303 00-TN105 TR11B-5

TR11B-6 4/11B-TN303 00-TN106 TR11B-6

TR11B-7 1/11B-TN304 00-TN107 TR11B-7

TR30-1 1/30-TN301 00-TN101 TR30-1

TR32-1 1/32-TN301 00-TN101 TR32-1

TR40-1 1/40B-TN300 00-TN101 40-1

TR40-2 1/40B-TN301 00-TN102 40-2

TR40-3 4/40B-TN301 00-TN103 40-3

TR40-4 1/40B-TN302 00-TN104 40-4

TR40-5 4/40B-TN302 00-TN105 40-5

TR40-6 6/40B-TN302 00-TN106 40-6

TR40-7 1/40B-TN303 00-TN107 40-7

Revisions: Date:

Ryan Bourland Text Box

12 MAR 2025,

18 AUG 2025 R1

S

S S

S SS S S S S S

P PP P P P P P

P P P

P P

P P

P P

P P

P P

P P

S SS S S S S S SS

S

S S

S S

S S

S S

S S

S S

S S

S S

S P

P

P PP P P P P P

P P

P P

P P

P P

P PP P

P P

P P

SSS

S

P P

P PP P P P P P P P P P

P P

P P P

P P

P P

P

P P

P P

P

P PP P

P PP P P P P P P P P P P PP

P

P

S SS S S S S S S S S S S

S S

TR 1AA

1AA-1

TR11B

11B-1

TR11B

VESTIBULE

11B-1B

TR32

32-1

TR30

30-1

CONFERENCE

LUNCH RM

LOCKERS

1264A

STAFF

TOILET

CLEAN

STORAGE

(DRY)

CLEAN

STORAGE

(WET)

WAREHOUSE

MAIL ROOM

SHAFT

NURSE MGR

SOCIAL

WORKER

CHAIR

STATION

CUBICLES

CLEAN

STORAGE

ALCOVE

1266A

CHAIR

STATION

CUBICLES

1259A

CORRIDOR

TEMPORARY

NURSES

STATION

TEMPORARY

SOILED

UTILITY

PATIENT

TOILET

CHIEF

PHYSICIAN

IRM

12T1MECH ROOM

MAIN

ENTRANCE

WATER

TREATMENT

STORAGE

PATIENT

WAITING

AREA

WHEELCHAIR

STORAGE

1249A

BIO-MED

REPAIR

IRM

STORAGE

MECH

FAC

ELECTRICAL

12E2

TELEPHONE

CANTEEN

STORAGE

REFR

REFR

STORAGE

1210B

CONFERENCE

RM

OFFICE

STAFF

OFFICE

STAFF

OFFICE

STAFF

OFFICE

OUTPATIENT

PHARMACY

NARCOTIC

VAULT

TOILET

STORAGE

1213A

CORRIDOR

C1203

STORAGE

DISH

WASHING

HAC

CANTEEN

STORAGE

CORRIDOR

C1204

CORRIDOR

C1205

LOADING

DOCK

1280A

VESTIBULE

1275A

OFFICE

ELECTRICAL

ELECTRICAL

LOUNGE

HAC

SUPERVISOR

OFFICE

TELECOM

12T2

PHARMACY

CONSULTATION

1195A

CORRIDOR

C1115

OFFICE

CONSULT

OFFICE

DIETICIAN

OFFICE

SUPV CLINIC

SUPPORT

OFFICE

STORAGE/

COPIER

DERMLITE

RM

RN OFFICE

1200A

BEHAVIORAL

HEALTH LAB

1200B

DERMATOLOGY

EXAM ROOM

URGENT

CARE EXAM

1182A

URGENT

CARE EXAM

1182B

URGENT

CARE EXAM

1162A

STORAGE

OFFICE

OFFICE

102A

CORRIDOR

MEN'S

TOILET

WOMEN'S

TOILET

PROGRAM

ROOM

1T15

CORRIDOR

PAINT

STORAGE

CARPENTRY

STORAGE

ELECTRICAL

STORAGE

PLUMBING

STORAGE

HVAC

STORAGE

EXERCISE

AREA

RESIDENT

TEAM

1225A ELECTRICAL

1210C

CORRIDOR

C1207

CHIEF

1238 COPIER/STORAGE

PHARMACY/OFFICE

STAFF

OFFICE

MANAGER

PROCUREMENT

PHARMACIST

OFFICE

EMS HAC

STORAGE

FEMALE

TOILET

MALE TOILET

CORRIDOR

C1203

CORRIDOR

C1206

FAC

1210ASTAIR

STAIR

ELEVATOR

P1A

ELEVATOR

P2A

ELEVATOR

S3A

ELEVATOR

FUTURE

P4A

ELEVATOR

5A

STAIR

KITCHEN

KITCHEN

COOKING

AREA

FOOD SVC

VENDING

CANTEEN

DINING AREA

CORRIDOR

1294A

DERMATOLOGY

EXAM RM

DERMATOLOGY

EXAM RM

DERMATOLOGY

EXAM RM

DERMATOLOGY

EXAM RM

DERMATOLOGY

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

1181B

EXAM RM

1189A

EXAM RM

URGENT

CARE

CONSULTATION

RM

CORRIDOR

C1112

CORRIDOR

C1111

EXAM RM

URGENT

CARE

EXAM RM

GREEN

CLINIC

1170ELECTRICAL

11E3

EXAM RM

GREEN

CLINIC

EXAM RM

EXAM RM

EXAM RM

GREEN

CLINIC

EXAM RM

EXAM RM

WOMEN'S

TOILET

MEN'S

TOILET

NURSE

OFFICE

NURSE

OFFICE

MEN'S

TOILET

WOMEN'S

TOILET

EXAM RM

ELECTRICAL

11E2

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

CONSULTATION

RM

CORRIDOR

C1110

CORRIDOR

C1109

CORRIDOR

C1107

CORRIDOR

C1106

CORRIDOR

C1108

CASHIER

STORAGE

AGENT

CASHIER

NURSE

OFFICE

NURSE

OFFICE

NURSE

OFFICE

DERMATOLOGY

EXAM RM

ELECTRICAL

11E4

PHARMACY

STAFF

1195B

CLINIC

BREAK RM

EXAM RM

EXAM RM

1161B

EXAM RM

1161A

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

UROLOGY

NURSE

OFFICE

NURSE

OFFICE

EXAM/

SCREENING

EXAM/

SCREENING

EXAM/

SCREENING

ELECTRICAL

11E1

UROLOGY

EXAM RM

EXAM/

SCREENING

GU CLINIC

EXAM RM

EXAM/

SCREENING

GU CLINIC

EXAM RM

C1120

CONSULTATION

RM

URGENT

MAINT

VACANT

TOILET

1139A

URODYNAMIC/

ULTRASOUND

UROLOGY

TREATMENT

PROCEDURE

EXAM/

SCREENING

UROLOGY

OFFICE

HAC

TOILET

CLEAN

SUPPLY

ELECTRICAL

TOILET

DIRTY

UTILITIES

STERILE RM

MINOR OR

SURGY RM

GU CLINIC

EXAM RM

PHARMACIST

EXAM RM

NURSE

OFFICE

TELECOM

11T1

TOILET

DRESSING

RM

LOCKER

CORRIDOR

C1105

RECOVERY

RM

SUPPLY RM

UROLOGY

OFFICE

CLINICS

WOMEN'S

TOILET

MEN'S

TOILET

FLAMABLE

STORAGE

RADIOACTIVE

STORAGE

GENERATOR

RM

1300A

CORRIDOR

CANTEEN

CORRIDOR

C1202

CORRIDOR

C1201

STAIR

OFFICE

1302A

TRANSFORMER

RM

CHIEF

OFFICE

STORAGE

ELEVATOR

P-7B

FUTURE

ELEVATOR

P-6B

ELEVATOR

P-8B

ELEVATOR

P-9B

RESTROOM

ELEVATOR

S-10B

STAIR

TEL PHONE

DATA RM

13T1

TOILET

1345B

CLERICAL

SUPPORT

WAITING

CORRIDOR

INTAKE

NURSE

EXAM RM

EXAM RM

PROC

EXAM RM

EXAM RM

PROC

EXAM RM

ACCESIBLE

STAFF

TOILET

EXAM RM

CORRIDOR

PHYSICIAN

OFFICE

STAIRCASE

STORAGE

ELECTRICAL

CLOSET

FIRE CLOSET

CORRIDOR

SOILED

UTILITY RM

ELECTRICAL

CORRIDOR

C1305

CORRIDOR

C1303

CORRIDOR

C1304

CORRIDOR

C1306

CORRIDOR

C1301

MRI SUITE

STAGING

1345F

HOLDING

1345E

VIEW

1345C

IMAGING

SUPV OFFICE

1345A

OFFICE

MOHS LAB

PHOTO

THERAPY

EQUIP

CLOSET

1345J

MRI EQUIP

1390D

MRI GANTRY

RM

1345I

MALE REST

RM

REST RM

REST RM

STORAGE

HAC

WOMEN'S

TOILET

ELECTRICAL

ELECT.

CORRIDOR

C1302

HAC

PHONE

CLOSET

CORRIDOR

PATHOLOGY

LAB

OUTPATIENT

SPECIMEN

LAB

WAITING RM

SUPV BLOOD

DRAW

OFFICE

1363A

PATH

SUPPLY

1363B

MULTI

PURPOSE

RM

MED CENTER

SAFETY

OFFICER

OFFICE

1363C

OUTPATIENT

RADIOLOGY

WAITING

AREA

REST RM

CONTROL

RM

1379A

ELECTRICAL

STORAGE

STORAGE

STORAGE

STORAGE

1390B

STORAGE

1390C

STAIR

OUTPATIENT

RADIOLOGY

EXAM/TREATMENT

READING RM

COMPUTER

ASST /

ADPAC RPA

OFFICE

DRESSING

RM

DRESSING

RM

OUTPATIENT

RADIOLOGY

EXAM/TREATMENT

CORRIDOR

1376A

DRESS

1345D

SUPPORT

ALCOVE

1345H

CONTROL

RM

1345G

CORRIDOR

C1608

CORRIDOR

C1202B

ENTRANCE

C1101

CORRIDOR

C1102

MEN'S

TOILET

WOMEN'S

TOILET

HEALTH VET

CO-ORDR

CREDIT

UNION

WAITING RM

ELECTRICAL

PHYSICIAN

ASSIST

TRIAGE

TRIAGE

STORAGE

FIRE

CONTROL

PATIENT

ADVOCATE

OFFICE

OPTICAL

WAITING RM

1410B

OPTICAL

DISPENSARY

1410A

ELECTRICAL

SWITCH RM

STAIR

TRIAGE

RECEPTION

AND

ADMISSION

AMBULATORY

CARE SUPV

OFFICE

CHIEF

AMBULATORY

TRAVEL

OFFICE

VTS

MANAGER

ER HALLWAY

1431 MEDICAL

SUPPORT

1431C

ER STORAGE

1431B

TRIAGE

ICE MACH

E D

ATTENDING

TRIAGE

EMS

STORAGE

1431A

TELEPHONE

TRIAGE

NEGATIVE

PRESSURE

TOILET

CLEAN LINEN

EMS

TOILET

CLEAN

SUPPLY

AMBULANCE

DROP-OFF

VESTIBULE

C1408

CORRIDOR

C1407

HAC

CONSULT RM

PAC

CO-ORDR

CHIEF

CONSULT RM

CONSULT RM

CONSULT RM

CONSULT RM

CONSULT RM

ADDICTION

RECEPTION

VIST

CO-ORDR

ER OFFICE

TOILET

EXAM RM

1470A

VEST/STAIR

2B

CORRIDOR

C1445

CORRIDOR

C1406

ELECTRICAL

ER MGR

VESTIBULE

C1116

ER OFFICE

1459A

STAIR

CORRIDOR

C1409

ELEVATOR

P7

ELEVATOR

P8

ELEVATOR

P1

ELEVATOR

P2

ELEVATOR

P3

ELEVATOR

P4

ELEVATOR

S5

ELEVATOR

S6

TR1A

1A-1

EQUIP

STORAGE

CORRIDOR

C1404

CORRIDOR

C1402

ROOM

STAIR

5A

NURSE

STATION

EMERGENCY

RM

EXAM RM

1470B

EXAM RM

1470C

EXAM RM

1470D

EXAM RM

1470E

EXAM RM

1470F

EXAM RM

1470G

MEDS

1470H

EXAM RM

1470J

EXAM RM 9

1470KEXAM RM 10

1470L

ON CALL

1491B

EXAM RM 11

1470M

EXAM RM 12

1470N

SOILED

UTILITY

EXAM RM 13

1470P

EXAM RM 14

1470Q

EXAM RM

1470R

ELECTRICAL

14E6

COMM

14T3

OFFICE

1475A

LOUNGE

ELECTRICAL

CLOSET

14E4

TOILET

1491A

WAITING RM

LOGISTICS

AREA

MECH RM

OFFICE

TOILET

1472B

ON CALL

SECRET

OFFICE

MEN'S

TOILET

1473 DOCTOR

OFFICE

TELECOMMUNICATION

STAFF

OFFICE

ELEVATOR

FOYER

ELEVATOR

MECH

STAIR

GAS

STORAGE

1503 TELECOMMUNICATION

RM

14T4

BIOHAZARD

CONTAINER

CORRIDOR

C1401

PHARMACY

IV STORAGE

DONATED

CLOTHING

STORAGE

MORGUE

ELEVATOR

EMS LINEN

RM

EMS

STORAGE

FIRE HOSE

CONTROL

RM

1528B

FIRE ALARM

WAITING RM

CLEAN

SUPPLY

TOILET

1530B

CONSULT RM

TECH WORK

HAC

CONSULT RM

TOILET

GOWNED

WAITING

CONTROL

RM

1530A

CT IMAGING

RM

TOILET

1528A

CLEAN

GAS

CYLINDER

STORAGE

MEN'S

CHANGING

WOMEN'S

CHANGING

CORRIDOR

C1503

CORRIDOR

C1501

CORRIDOR

C1502

CORRIDOR

C1505B

CORRIDOR

C1405

CORRIDOR

C1504

ELECTRICAL

1541B

SECY OFFICE

INPT

HOLDING

CT IMAGING

RM

DIGITAL

RADIOLOGY

CORRIDDOR

C1506

RADIOLOGY /

FLUOROSCOPIC

RM

READING RM

ELECTRICAL

15E4

DIGITAL

RADIOLOGY

ULTRASOUND

PREP/

RECOVERY

RADIOLOGY

SUPPLY

1539 I R READING

RM

1539A

ANTE RM

1538B

CONTROL

RM

1538D

SPECIAL

PROCEDURES

INTERVENTIONAL

1538C

EQUIP RM

1538E

COMMUNICATIONS

1538F

STAIR

TOILET

1538A

CORRIDOR

C1506A

TOILET

1533A

MECH

SWITCHGEAR

RM

STAIRWELL

C1506B

VESTIBULE

1570A

ATS RM

1570C

ELECTRICAL

RM

HAC

TELEPHONE

CLOSET

15T1

SPD SUPV

OFFICE

ELECTRICAL

CLOSET

15E2

SPD

RECEIVING

STORAGE

CHIEF

RADIOLOGY

SECY OFFICE

RADIOLOGY

SVC

OPERATION

MGR

RADIOLOGY

SVC

CONFERENCE

RM

STORAGE

COMPUTER

CABINET

1581A

FAN RM

VESTIBULE

C1507

CORRIDOR

C1510

STAIR

RADIOLOGY

OFFICE

CORRIDOR

C1509

RADIOLOGY

READING RM

RADIOLOGY

OFFICE

RADIOLOGY

OFFICE

RADIOLOGY

OFFICE

RADIOLOGY

OFFICE

RADIOLOGY

SCHEDULING

RADIOLOGY

SVC

UTRASOUND

CORRIDOR

C1505

TOILET

CORRIDOR

C1505C

CORRIDOR

C1511

EVIDENCE

OFFICE VIEW

VESTIBULE

PHYSICAL

SECURITY

1540A

PHYSICAL

SECURITY

1540B

SQUAD RM

OFFICE

CONFERENCE

/ TRAINING

DEPUTY

CHIEF

POLICE

OPERATION

OPERATION

CAPTAIN

STORAGE

1554B

EVIDENCE

STORAGE

1542A

CLOSET

1544A

HOLD CELL

HOLD CELL

POLICE

INVESTIGATION

OFFICE

POLICE

CHIEF

TOILET

1555B

TEL CLOSET

14T2

TOILET

1499A

VESTIBULE

1499B

STAFF

LOCKER

TOILET

STAFF

LOCKER

TOILET

1628 STAFF

LOUNGE

MANUAL

EQUIP WASH

HAC

16H5

SALLY PORT

1635AELEVATOR

P-26

SACRISTY

SOILED

RECEIVING /

DECONTAM

STEAM

STERILIZER

CART WASH

ETO SVC

ETO RM

1639A

PREPARATION

SECURED

ITEMS

CART

STAGING

AREA

1640A

STERILE

SUPPLY

STORAGE

AND DIST

1640B

VESTIBULE

CHAPEL

VESTIBULE

1602A

SECY

BLESSED

SACRAMENT

ELEVATOR

PIT

P-27

FIRE

COMMAND

CENTER

1608 ELEVATOR

MACH RM

STAIR

ESCORT

WAITING RM

WHEELCHAIR

WASH

CHIEF

CHAPLAIN

CHAPLAIN

OFFICE

VENDING

MACH

ELECTRICAL

RM

16E1A

CORRIDOR

C1607

HAC

16H4

MALE TOILET

WOMEN'S

TOILET

TELEPHONE

ALCOVE

HAC

16H6

TOILET

1643A

SPD STAFF

OFFICE

TOILET

1646A

STAFF

LOCKER

SPD CHIEF

STAFF

LOUNGE

STAFF

LOCKER

DINNING

SPACE

VESTIBULE

1652A

EMS

STORAGE

1652B

HAC

16H2

GAS

CYLINDER

STORAGE

EMS OFFICE

STAIR

WASTE RM

STAFF

LOUNGE

STAFF

TOILET

VESTIBULE

WOMEN

STAFF

LOCKER

LINEN CHUTE

RM

16L1

TR40

40-1

VESTIBULE

MEN STAFF

LOCKER

SHOWER

1662B

TOILET

1662A

PAT TOILET

HOLDING RM

HOLDING RM

HOLDING RM

HOLDING RM

HOLDING RM

HOLDING RM

HOLDING RM

HOLDING RM

HOLDING RM

PAT CLINIC

PAT CLINIC

PAT CLOTH

CLOSET

STORAGE

CLEAN

SUPPLY

PANTRY

PAT TOILET

OFFICE

HOLDING RM

HOLDING RM

SOILED

UTILITY

HOLDING RM

ELEVATOR

OFFICE

PAT TOILET

VESTIBULE

CLEAN

SUPPLY

MINOR

PROCEDURE

MINOR

PROCEDURE

CLEAN LINEN

COMPUTER

TRAINING

SURGY

FAMILY

WAITING

VESTIBULE

BULK

STORAGE

VESTIBULE

1661A

VESTIBULE

1657A

EMS CLEAN

SUPPLY

RECEIVING

16H1

LOBBY

C1606

ELEVATOR

ELEVATOR

ELEVATOR

ELECTRICAL

RM

16E2

ELEVATOR

ELEVATOR

DISCHARGE

LOUNGE

ELEVATOR

REGISTRATION

SURGY

RECEPTION

HAC

16H3

CONSULT RM

1697B

ELEVATOR

MACH RM

1696A

CONSULT RM

1697A

MED RM

1687A

ELEVATOR

STAIR

15 ELEVATOR

LOBBY

C1604

NURSE

STATION

CORRIDOR

C1603

ELEVATOR

LOBBY

C1602

CORRIDOR

C1601

ELEVATOR

LOBBY

C1605

STAIR

ELECTRICAL

RM

16E1B

FIRE PUMP

RM

MECH PUMP

RM

CORRIDOR

C1113

CORRIDOR

C1114

FAC

ELEC

CLOSET

14E5

COPY

VESTIBULE

1521A

CORRIDOR

C1508

RECEPTION

ARMORY RM

CLOSET

1541A

CLOSET

1545A

CORRIDOR

C1411

VESTIBULE

ELECTRICAL

14E7

EXIT

CORRIDOR

1679A

TOOL

STORAGE

TOILET

1472A

ROOM

1479B

ADMIN

OFFICES

1479C

STAIR

OFFICE

1479D

TR1B

1B-1

TR 11A

11A-1AELEC RM

11A-1B

1.1

1.2

1.3

1.5

1.6

1.7

1.10

1.11

1.12

1.13

1.14 1.15

1.20

1.21

1.V1.O1.N1.M

1.4

1.J

1.J

2.4

2.4

2.3

2.3

2.2

2.2

2.1

2.1

2.5

2.6

2.7

2.8

2.10

2.9

X8X8.1

X7

X6.6

X6.5

X9

X10

X11 2.11

X12

2.12

2.13

2.14

2.A

2.C1

X13

2.D

2.C5

2.A5

2.B

2.B

2.C

2.D9 2.G2.F2.E

3.P

3.N

3.M

3.L

3.K

3.J

3.H

3.G

3.F

3.E

3.A

3.B

3.C

3.D

3.1 3.2 3.3 3.5 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.173.163.153.14

3.18 3.19

3.20 3.21 3.22 3.23 3.24

5.J1

5.N1

5.U

5.S

5.C

5.10 5.12 5.14 5.16 5.19 5.21 5.23

5.25 5.27 5.30 5.32

5.35 5.38 5.435.41

4.4

4.5

4.3

4.2

4.1

4.D54.C54.A 4.B 4.C 4.D 4.E 4.F

5.N

5.G

5.34

5.37 5.40 5.445.44.5 5.49

5.Y

5.BB

1.22

1.H1.G1.F 1.K 1.P 1.Q 1.R

1.19

1.18

1.17

1.16

1.8

1.A 1.B 1.C 1.D 1.E

1.L

3.J1

1.I

V2V1

VB

VA

X1 X2 X3

XB

XA

Y1

1.S 1.T 1.U

1.U2

5.A

Y2

Y3

Y4

EXISTING TR 14T4

(DEMARCATION)

EXISTING

TR 14T3

TR40-1

EXISTING TR 15T1

EXISTING TR 1539F

DAMEN WEST

(BALD. 1B)

EXISTING TR

14T2

ALL LOW VOLTAGE CABLING IN

THIS AREA SHALL BE SERVED

FROM TR1B-1

ALL LOW VOLTAGE CABLING IN

THIS AREA SHALL BE SERVED

FROM TR1B-1

ALL LOW VOLTAGE CABLING IN

THIS AREA SHALL BE SERVED

FROM TR1AA-1

ALL LOW VOLTAGE CABLING IN

THIS AREA SHALL BE SERVED

FROM TR1A-1

TR1B-1

TR1A-1

TR1AA-1

ALL LOW VOLTAGE CABLING IN

THIS AREA SHALL BE SERVED

FROM TR30-1

ALL LOW VOLTAGE CABLING IN

THIS AREA SHALL BE SERVED

FROM TR1A-1

ALL LOW VOLTAGE CABLING IN

THIS AREA SHALL BE SERVED

FROM TR1AA-1

ALL LOW VOLTAGE CABLING IN

THIS AREA SHALL BE SERVED

FROM TR40-1

TR11A-1A

TR32-1

ALL LOW VOLTAGE CABLING

IN THIS AREA SHALL BE

SERVED FROM TR11A-1A

ALL LOW VOLTAGE CABLING

IN THIS AREA SHALL BE

SERVED FROM TR32-1

TR30-1

ALL LOW VOLTAGE CABLING

IN THIS AREA SHALL BE

SERVED FROM TR11B-1

ALL LOW VOLTAGE CABLING

IN THIS AREA SHALL BE

SERVED FROM TR11A-1A

TR11B-1

EXISTING

TR 12T1

EXISTING TR 13T1

OGDEN

EXISTING TR 12T2

ATRIUM

EXISTING TR 11T1

ALL LOW VOLTAGE CABLING IN

THIS AREA SHALL BE SERVED

FROM TR30-1

SECONDARY FIBER ROUTE

WITH (1) 24-STR OM4 AND (1) 12-

ST OS1 TO TR1AA-1

PRIMARY FIBER ROUTE WITH (1)

24-STR OM4 AND (1) 12-ST OS1

TO TR1AA-1

ROUTE FOR SECONDARY

FIBER SERVING BLDGS:

TR1AA

(1) 4"CONDUIT TO SERVER

ROOM ON 7TH FLOOR FOR

SERVICE PROVIDER USE

ROUTE FOR PRIMARY

FIBER SERVING BLDGS:

TR1AA

ROUTE FOR PRIMARY FIBER

SERVING BLDGS:

TR1B

TR40

ROUTE FOR SECONDARY

FIBER SERVING BLDGS:

TR40

PRIMARY FIBER ROUTE

WITH (1) 24-STR OM4 AND

(1) 12-ST OS1 TO EACH

CLOSET:

TR1B-6

TR1B-5

TR1B-4

TR1B-3

TR1B-2

TR1B-1

SECONDARY FIBER

ROUTE WITH (1) 24-STR

OM4 AND (1) 12-ST OS1

TO EACH CLOSET:

TR40-7

TR40-6

TR40-5

TR40-4

TR40-3

TR40-2

TR40-1

PRIMARY FIBER ROUTE

WITH (1) 24-STR OM4 AND

(1) 12-ST OS1 TO EACH

CLOSET:

TR40-7

TR40-6

TR40-5

TR40-4

TR40-3

TR40-2

TR40-1

ROUTE FOR PRIMARY FIBER

SERVING BLDGS:

TR32

TR30

TR11B

TR-11A

ROUTE FOR PRIMARY FIBER

SERVING BLDGS:

TR32

TR30

SECONDARY FIBER ROUTE

WITH (1) 24-ST OS2 TO

TR32-1, AND (1) 24-STR OM4

AND (1) 12-ST OS1 TO TR30-1

PRIMARY FIBER ROUTE

WITH (1) 24-ST OS2 TO

TR32-1, AND (1) 24-STR OM4

AND (1) 12-ST OS1 TO TR30-1

SECONDARY FIBER ROUTE

WITH (1) 24-ST OS2 TO

TR32-1

PRIMARY FIBER ROUTE

WITH (1) 24-ST OS2 TO

TR32-1

PRIMARY FIBER ROUTE WITH

(1) 24-STR OM4 AND (1) 12-ST

OS1 TO EACH CLOSET:

TR11A-7

TR11A-6

TR11A-5

TR11A-4

TR11A-3

TR11A-2

TR11A-1

PRIMARY FIBER ROUTE WITH

(1) 24-STR OM4 AND (1) 12-ST

OS1 TO EACH CLOSET:

TR11B-7

TR11B-6

TR11B-5

TR11B-4

TR11B-3

TR11B-2

TR11B-1

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #21006425.00

13100 watertown plank road, suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

B

IM

/2

.0

V

A -C h ic a g o

IL

-J

B E

H R

M /5

-7

.J

B E

H R

M .M

E P

T

C .r v t

/1

/2

:1 :5

A

M

00-TN101

FIRST FLOOR PLAN -

TECHNOLOGY

JESSE BROWN VAMC EHRM

INFRASTRUCTURE UPGRADES

820 S DAMEN AVE, CHICAGO, IL 60612

537-21-700

VA BLDG

18 AUG 2025 MARWIT ALFARA

ISSUED FOR BID &

CONSTRUCTION

FULLY SPRINKLERED

21011

1" = 30'-0"

FIRST FLOOR PLAN - TECHNOLOGY

SHEET NOTES:

1. REFER TO 1/T402 FOR ADDITIONAL

INFORMATION ON FIBER BACKBONE ROUTING.

1 0 1

SCALE: 1" = 1' - 0"

1" = 30'-0"

30 30 60

KEYNOTES:

1. IBER INSTALLED OUTDOOR SHALL BE

INSTALLED IN CONDUIT, PROVIDE (4) 4"

CONDUIT INSTALLED IN DUCTBANK WITH

HANDHOLE LOCATED AT BOTH ENDS PRIOR TO

ENTERING THE BUILDING.

Revisions: Date:

Ryan Bourland Text Box

12 MAR 2025,

18 AUG 2025 R1

Ryan Bourland Line

S S

S S

S

S SS

S S

S SS S S S S S S

SS SS SS S S S S S S S S S S S S S S S

S S

S S

S SS

S S

S S

S S

S S

TR1A

1A-2

LOBBY

RECEPTION

2444A

HUMAN

RESOURCES

OFFICE

CORRIDOR

C2405

WALL

PARTITION

CLOSET

2446G

ELECTRICAL

2446F

ELECTRICAL

2446E

COMPLIANCE

OFFICER

OFFICE

STORAGE

2446D

AUDITORIUM

ELEC

CLOSET

24E4

TEL CLOSET

24T1

FIRE CLOSET

2447A

FLEET

OPERATION

OFFICE

2449A

SUPV OFFICE

2449B

ELEVATOR

P7

ELEVATOR

P8

ELEVATOR

P1

ELEVATOR

P2

ELEVATOR

P3

ELEVATOR

P4

ELEVATOR

S6

ELEVATOR

S5

STAIR

DIRECTORS

STAFF

OFFICE AREA

ELEC

CLOSET

TEL

CORRIDOR

C2408

VOLUNTARY

STORAGE

MENS TOILET

STORAGE

2446A

WALL

PARTITION

CLOSET

2446H

CORRIDOR

C2409

CORRIDOR

C2404

VESTIBULE

STORAGE

STORAGE

STORAGE

SOILED

UTILITY

TOILET/SHOWER

AREA

2497A

WAITING RM

CORRIDOR

C2301

IRM

STORAGE

IRM

STORAGE

IRM

STORAGE

IRM

STORAGE

STORAGE

PATIENT RM

2522 TOILET

2521A

WOMENS

TOILET

WOMENS

LOCKER

HAC

CORRIDOR

C2502

STORAGE

STORAGE

2530KINESIOTHERAPY

CLINIC

CLOSET

2520A

MENS TOILET

MENS TOILET

LOCKER

2580A

STORAGE

OFFICE

STAFF

STAIR

ELEC

CLOSET

25E2

ELEC

CLOSET

WORK RM

OFFICE

PM AND R

SECY STAFF

CORRIDOR

PM AND R

CHIEF

RESIDENT

OFFICE

DOCTOR

OFFICE

CONFERENCE

RM

DOCTOR

OFFICE

DOCTOR

OFFICE

FAC

25E1

OT OFFICE

ELECTRICAL

CLOSET

STORAGE

MULTIPURPOSE

THERAPY

GENERAL

STORAGE

2554B

GENERAL

STORAGE

2554A

ADL RM

OCCUPATIONAL

THERAPY

KITCHEN

ASSESSMENT

OCCUPATIONAL

THERAPY

VESTIBULE

NORMAL

SUBSTATION

RM

2556A

EMERGENCY

SUBSTATION

RM

2556B

CLOSET

2585A

CLOSET

2585B

PHYSICAL

THERAPY

CLINIC

FUTURE

CORRIDOR

2585C

CANTEEN

STORAGE

AUTOPSY

AREA

REFR

2477A

MECH SPACE

MORGUE

CLEAN

UTILITY

CLEAN

UTILITY

MECH

ELEVATOR

SPACE

FAMILY

VIEWING

STORAGE

HAC

UNISEX

TOILET

2462 RECEPTION

PIV

FILE RM

PIV

NUCLEAR

MED CHIEF

PIV

NUCLEAR

MED

READING RM

VISUAL

CO-ORDR

BONE

DENSITY

PROCEDURE

RM

TOILET

2474A

NUCLEAR

MED OFFICE

LOW AND

BLIND VISION

STAFF

OFFICE

STORAGE

AND EQUIP

2446C

DRESSING

RM

2462A

NUCLEAR

MED

TOILET

CORRIDOR

C2403

INJECTION

RM

CARDIOLOGY

TREATMENT

PROCESSING

RM

WAITING

CORRIDOR

C2401

STRESS LAB

STORAGE

2492A

TREATMENT

RM

TREATMENT

RM

LAB

NUCLEAR

MEDICINE

SCANNING

AREA

ELEC

24E5

FAC

2479A

WOMENS

TOILET

KITCHEN

2446B

ASST

DIRECTOR

CHIEF OF

STAFF

ACOS CLINIC

AFFAIRS

OFFICE

AD OFFICE

MGR

ANALYST

PA OFFICE

FELLOW

OFFICE

WOMENS

TOILET

BREAK RM

ASST TO

DIRECTOR

SECY STAFF

OFFICE

CORRIDOR

C2406

NORTH

PENTHOUSE

BUILDING 30

STORAGE

STORAGE

2413A

LOUNGE /

KITCHEN

TOILET

2413B

SECRET

AREA

ASSOCIATE

DIRECTOR

CORRIDOR

C2407

SECRET

STORAGE

2440A

STORAGE

ELEC

ASSOCIATE

DIRECTOR

PATIENT

CARE

DIRECTOR

OFFICE

OFFICE

ASSOCIATE

DIRECTOR

MENS TOILET

SECRET

TEL

PI OFFICE

CONFERENCE

RM

STAFF

OFFICE

STAIRS

STAIRS

STAIRS

STAIRS

5A

TR 1B

1B-2

1.1

1.2

1.3

1.5

1.6

1.7

1.10

1.11

1.12

1.13

1.14 1.15

1.20

1.21

1.V1.O1.N1.M

1.4

1.J

1.J

X11 2.11

X12

2.12

2.13

2.14

2.A

X13

2.D

2.C5

2.A5

2.B 2.C

2.D9 2.G2.F2.E

3.P

3.N

3.M

3.L

3.K

3.J

3.H

3.G

3.F

3.23 3.24

5.U

5.S

5.C

5.27 5.30 5.32

5.35 5.38 5.435.41

5.N

5.G

5.34

5.37 5.40 5.445.44.5 5.49

5.Y

5.BB

1.22

1.H1.G1.F 1.K 1.P 1.Q 1.R

1.19

1.18

1.17

1.16

1.8

1.A 1.B 1.C 1.D 1.E

1.L

3.J1

1.I

V2V1

VB

VA

1.S 1.T 1.U

1.U2

5.A

Y3

EXISTING TR 24T1

TR1A-2

ALL LOW VOLTAGE CABLING

IN THIS AREA SHALL BE

SERVED FROM TR1B-2

TR1B-2

ALL LOW VOLTAGE CABLING

IN THIS AREA SHALL BE

SERVED FROM TR1B-2

ALL LOW VOLTAGE CABLING

IN THIS AREA SHALL BE

SERVED FROM TR1A-2

ALL LOW VOLTAGE CABLING

IN THIS AREA SHALL BE

SERVED FROM TR40-2

SECONDARY FIBER ROUTE

WITH (1) 24-STR OM4 AND (1)

12-ST OS1 TO EACH CLOSET:

TR1B-6

TR1B-5

TR1B-4

TR1B-3

TR1B-2

TR1B-1

ROUTE FOR SECONDARY

FIBER SERVING BLDGS:

TR-1B

SECONDARY ROUTE FOR

FIBER SERVING BLDGS:

TR-1A

TR-1B

TR-11A

TR-11B

ROUTE FOR SECONDARY

FIBER SERVING BLDGS:

TR-1A

LOCATION OF (1) 4"

VERTICAL CONDUIT RISER

FOR SERVICE PROVIDER

FROM DEMARC TO SERVER

ROOM

KINESIOTHERAPY

CLINIC

PHYSICAL

THERAPY

CLINIC

FUTURE

CORRIDOR

2585C

STORAGE

OFFICE

STAFF

STAIR

PM AND R

SECY STAFF

WORK RM

OFFICE

CORRIDOR

CORRIDOR

C2502

MENS TOILET

MENS TOILET

LOCKER

2580A

CYSTOSCOPY

CYSTO

CLEAN UP

RM

2602A

OR-7

CYSTO

STORAGE

2602B

OR-6

2606 ELEVATOR

OR-5

STERILE

CORE ANNEX

STERILE

CORE

ELEC RM

26E2

STERILE

MACH

STAIR

ELEVATOR

VESTIBULE

OR-3

OR SUPPORT

OR-2

VESTIBULE

OR-1

EQUIP

STORAGE

OR SUPPORT

EQUIP

STORAGE

CLEAN LINEN

HAC

26H1

OR-4

CORRIDOR

C2601

CORRIDOR

C2602

O…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .