Attachment 1 - Addendum 01 Jesse Brown EHRM Infrastructure Upgrades.pdf
PDF 5 MB Posted
- Solicitation number
- 36C77625B0049
About this file
This document is an Addendum for EHRM Infrastructure Upgrades at the Jesse Brown VA Medical Center in Chicago, IL, with project number 537-21-700. The addendum, dated September 12, 2025, involves relocating camera locations across multiple technology room sheets (1AS-TN300 through 40W-TN303), specifically in various technology rooms labeled TR1A, TR1B, TR11A, TR11B, TR30, TR32, and TR40. The changes impact numerous specific areas within these rooms, with each sheet detailing precise camera repositioning requirements. A final sheet (T600) indicates an update to the Technology equipment Schedule will also be necessary. The document includes detailed technical drawings showing equipment room layouts, pathways, and rack elevations, with notes emphasizing that camera locations are reference points and final placement must be submitted to and coordinated with the VA prior to installation.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jesse Brown VA Medical Center
820 S. Damen Ave Chicago IL 60612
EHRM Infrastructure Upgrades
VA Project #537-21-700
ADDENDUM 01
September 12, 2025
The following becomes a part of the original Plans and Specifications and takes precedence over any items that may conflict. The bidder shall acknowledge receipt of this Addendum on their bid form, incorporating its provisions in their bid.
Addendum #1 Narrative
Jesse Brown VA EHRM
IMEG #21006425.00
Specifications:
None
Drawings:
Sheet 1AS-TN300
1. Relocate the Camera loca�on in TR1A-1 and TR1A-2.
Sheet 1AS-TN301
2. Relocate the Camera loca�on in TR1A-3 and TR1A-4.
Sheet 1AS-TN302
1. Relocate the Camera loca�on in TR1A-5 and TR1A-6.
Sheet 1AS-TN303
1. Relocate the Camera loca�on in TR1A-7 and TR1A-8.
Sheet 1AS-TN304
1. Relocate the Camera loca�on in TR1A-9 and TR1A-10.
Sheet 1AS-TN305
1. Relocate the Camera loca�on in TR1AA-1.
Sheet 1B-TN300
1. Relocate the Camera loca�on in TR1B-1 and TR1B-2.
Sheet 1B-TN301
1. Relocate the Camera loca�on in TR1B-3 and TR1B-4.
Sheet 1B-TN302
2. Relocate the Camera loca�on in TR1B-5.
Sheet 11A-TN300
1. Relocate the Camera loca�on in TR11A-1A and TR11A-2.
Sheet 11A-TN301
1. Relocate the Camera loca�on in TR11A-3 and TR11A-4.
Sheet 11A-TN302
1. Relocate the Camera loca�on in TR11A-5 and TR11A-6.
IMEG #21006425.00
September 12, 2025
Sheet 11A-TN303
1. Relocate the Camera loca�on in TR11A-7.
Sheet 11B-TN300
1. Relocate the Camera loca�on in TR11B-1 and TR11B-2.
Sheet 11B-TN301
1. Relocate the Camera loca�on in TR11B-3 and TR11B-4.
Sheet 11B-TN302
1. Relocate the Camera loca�on in TR11B-5 and TR11B-6.
Sheet 11B-TN303
1. Relocate the Camera loca�on in TR11B-7.
Sheet 30-TN301
1. Relocate the Camera loca�on in TR30-1.
Sheet 32-TN301
1. Relocate the Camera loca�on in TR32-1.
Sheet 40W-TN300
1. Relocate the Camera loca�on in TR40-1.
Sheet 40W-TN301
1. Relocate the Camera loca�on in TR40-2 and TR40-3.
Sheet 40W-TN302
1. Relocate the Camera loca�on in TR40-4, TR40-5, and TR40-6.
Sheet 40W-TN303
1. Relocate the Camera loca�on in TR40-7.
Sheet T600
1. Update Technology equipment Schedule.
W S C
S S
CCTV
WS
C
S S
CCTV
TR1A
1A-1
1AS-TN300
VS-CM-1
1A-1
SC-VWM-1
SC-PDU-2
SC-ER-1
SC-GND-1
AC-ACP-1
SC-TTB
(TYP.)
(TYP.)
(TYP.)
(TYP.)
/8
13'-9 1/8"
AC-PSP-1
1.10
1.J
1.J1.I
3'-6 1/8"
/4
3'-9 5/8"
TR1A
1A-1
"x
18"x6"
"x
"x
SC-CT-1
PW-CPW-1(8)
18"x6"
1.10
1.J
1.J1.I
(TYP.)
(TYP.)
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-BLK-1
SC-UPS-1SC-UPS-1
SC-ER-1 SC-VWM-1 SC-PDU-2
(TYP.)(TYP.)1
SC-ER-1
1 2
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
TR1A
1A-2
1AS-TN300
VS-CM-1
1A-2
SC-GND-1
AC-ACP-1
SC-TTB
(TYP.)SC-VWM-1
SC-ER-1
(TYP.)
(TYP.)
/8
/8
5'-0 7/8"
SC-PDU-2
(TYP.)
15'-3 3/4"
/4
AC-PSP-1
1.10
1.J
1.J1.I
4'-9 3/4"
TR1A
1A-2
STAIR
18"x6"
"x
"x
"x
SC-CT-1
18"x6"
PW-CPW-1(8)
1.10
1.J
1.J1.I
(8) 4" CONDUIT SLEEVES
(2) 4"CONDUIT SLEEVES
(TYP.)
(TYP.) SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-VWM-1SC-ER-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-PDU-2
(TYP.)(TYP.)(TYP.)
1 1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:5
P
M
1AS-TN300
TR 1A - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1A-1
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1A-1
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1A-1
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1A-2
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1A-2
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1A-2
LEGEND - KEY PLAN - 1A
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE
OWNER. THE FINAL QUANTITY AND LOCATIONS ARE TO BE
CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK.
REFER TO 2/T500 RACK MOUNT BONDING BUS BAR DETAIL FOR
ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH
SIDES.
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE
OWNER. THE FINAL QUANTITY AND LOCATIONS ARE TO BE
CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK.
REFER TO 2/T500 RACK MOUNT BONDING BUS BAR DETAIL FOR
ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
Revisions: Date:
ADDENDUM #1 08/18/2025
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
09/12/2025
S
S
WS
CCTV
CCTV
C S
S
WS
TR1A
1A-3
1AS-TN301
VS-CM-1
1A-3
SC-TTB
AC-ACP-1
SC-GND-1
SC-VWM-1
(TYP.)
/8
(TYP.)
SC-PDU-2
SC-ER-1
(TYP.)
(TYP.)
14'-3 5/8"
/8
AC-PSP-1
1.10
1.J
1.J1.I
4'-1 1/2" 4'-3 1/8"
/8
TR1A
1A-3
18"x6"
"x
"x
"x
SC-CT-1
18"x6"
(8) 1.10
1.J
1.J1.I
PW-CPW-1
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
(TYP.) (TYP.) SC-ER-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-VWM-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-PDU-2
(TYP.)(TYP.)(TYP.)
1 2
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
TR1A
1A-4
1AS-TN301
VS-CM-1
1A-4
AC-ACP-1
SC-GND-1
SC-TTB
(TYP.)
SC-ER-1
SC-PDU-2
SC-VWM-1
(TYP.)
(TYP.)
(TYP.)
/8
5'-1 3/4"
AC-PSP-1
15'-4 1/4"
/8
1.10
1.J
1.J1.I
4'-9 1/2"
/8
TR1A
1A-4
18"x6" "x
"x
"x
SC-CT-1
18"x6"
PW-CPW-1(8)
1.10
1.J
1.J1.I
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
(TYP.)
(TYP.)
SC-HWM-1
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-VWM-1 SC-ER-1
SC-PDU-1
SC-UPS-1
SC-PDU-2
(TYP.)(TYP.) (TYP.)
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-UPS-1
1 2
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:0
P
M
1AS-TN301
TR 1A - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1A-3
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1A-3
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1A-3
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1A-4
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1A-4
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1A-4
LEGEND - KEY PLAN - 1A
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
Revisions: Date:
ADDENDUM #1 08/18/2025
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
CCTV
S
S
WS
CCTV
C S
S
WS
TR1A
1A-6
1AS-TN302
VS-CM-1
1A-6
SC-PDU-2
SC-ER-1
SC-TTB
AC-ACP-1
(TYP.)
(TYP.)
(TYP.)
(TYP.)
/8
5'-0 3/8"
15'-1 7/8"
/8
SC-VWM-1
AC-PSP-1
1.10
1.J
1.J1.I
SC-GND-1
4'-9 1/4"
/4 " 1
TR1A
1A-6
18"x6"
"x
"x
"x
SC-CT-1
18"x6"
PW-CPW-1(8)
1.10
1.J
1.J1.I
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
(TYP.)
(TYP.)
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-MPP-1
SC-BLK-2
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-ER-1 SC-VWM-1 SC-PDU-2
(TYP.)(TYP.) (TYP.)
1 2
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-1
TR1A
1A-5
1AS-TN302
VS-CM-1
SC-VWM-1
SC-ER-1
(TYP.)
(TYP.)
SC-GND-1
AC-ACP-1
SC-TTB
(TYP.)
SC-PDU-2
(TYP.)
/4
/2
15'-6 3/8"
AC-PSP-1
1.10
1.J
1.J1.I
4'-6 7/8" 5'-6 1/2"
/8
TR1A
1A-5
"x
"x
"x
SC-CT-1
18"x6"
18"x6"
(8)
1.10
1.J
1.J1.I
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES PW-CPW-1
(TYP.)
(TYP.)
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-VWM-1 SC-ER-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-PDU-2
(TYP.)(TYP.)(TYP.)
1 2
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-1
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:0
P
M
1AS-TN302
TR 1A - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1A-6
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1A-6
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1A-6
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1A-5
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1A-5
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1A-5
LEGEND - KEY PLAN - 1A
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
Revisions: Date:
ADDENDUM #1 08/18/2025
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
S
S
WS
WS
C S
S
CCTV
TR1A
1A-7
1AS-TN303
VS-CM-1
1A-7
SC-VWM-1
SC-PDU-2
SC-GND-1
SC-ER-1
AC-ACP-1
SC-TTB
(TYP.)
(TYP.)
(TYP.)
(TYP.)
/2
5'-8" 5'-10"
15'-8 5/8"
/8
AC-PSP-1
1.10
1.J
1.J1.I
TR1A
1A-7
18"x6"
"x
"x
"x
SC-CT-1
PW-CPW-1(8)
18"x6"
1.10
1.J
1.J1.I
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
(TYP.)
(TYP.)
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
SC-HWM-2
SC-BLK-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-ER-1 SC-VWM-1 SC-PDU-2
(TYP.) (TYP.) (TYP.)
1 2
SC-BLK-2
SC-MPP-1
NETWORK SWITCH
TR1A
1A-8
1AS-TN303
VS-CM-1
1A-8
SC-VWM-1
SC-PDU-2
SC-ER-1
SC-TTB
(TYP.)
(TYP.)
(TYP.)
(TYP.)
/4
5'-3 5/8"
AC-ACP-1
AC-PSP-1
15'-3"
/4
1.10
1.J
1.J1.I
/8
4'-6 1/4"
SC-GND-1
TR1A
1A-8
18"x6"
"x
"x
"x
SC-CT-1
18"x6"
PW-CPW-1(8)
1.10
1.J
1.J1.I
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
(TYP.)
(TYP.)
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
SC-HWM-2
SC-BLK-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-ER-1 SC-VWM-1 SC-PDU-2
(TYP.) (TYP.) (TYP.)
1 2
NETWORK SWITCH
SC-BLK-2
SC-MPP-1
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:0
P
M
1AS-TN303
TR 1A - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1A-7
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1A-7
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1A-7
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1A-8
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1A-8
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1A-8
LEGEND - KEY PLAN - 1A
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
Revisions: Date:
ADDENDUM #1 08/18/2025
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
C S
S
WS
CCTV
C S
S
WS
TR1A
1A-10
1AS-TN304
VS-CM-1
1A-10
SC-VWM-1
SC-PDU-2
SC-TTB
SC-ER-1
(TYP.)
(TYP.)
(TYP.)
(TYP.)
5'-0 5/8"
SC-GND-1
AC-PSP-1
15'-5"
/8
AC-ACP-1
1.10
1.J
1.J1.I
/8
4'-11 1/4"
TR1A
1A-10
18"x6"
"x
"x
"x
SC-CT-1
18"x6"
(8)
1.10
1.J
1.J1.I
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
PW-CPW-1
(TYP.)
(TYP.)
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-ER-1 SC-VWM-1 SC-PDU-2
(TYP.)(TYP.)(TYP.)
SC-BLK-1
SC-BLK-1
SC-BLK-1
1 2
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
TR1A
1A-9
1AS-TN304
VS-CM-1
1A-9
SC-VWM-1
SC-PDU-2
SC-ER-1
SC-TTB
(TYP.)
(TYP.)
(TYP.)
(TYP.)
6'-0 5/8"
/8
/8
AC-PSP-1
15'-4 3/4"
AC-ACP-1
1.10
1.J
1.J1.I
3'-11"
SC-GND-1
TR1A
1A-9
18"x6"
"x
"x
"x
SC-CT-1
1.10
1.J
1.J1.I
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
PW-CPW-1(8)
(TYP.)
(TYP.)
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-ER-1 SC-VWM-1 SC-PDU-2
(TYP.)(TYP.)(TYP.)
1 2
SC-BLK-1
SC-BLK-1
SC-BLK-1
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:0
P
M
1AS-TN304
TR 1A - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1A-10
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1A-10
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1A-10
LEGEND - KEY PLAN - 1A
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1A-9
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1A-9
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1A-9
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
Revisions: Date:
ADDENDUM #1 08/18/2025
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
W S
S
S
CCTV
TR 1AA
1AA-1
1AS-TN305
VS-CM-1
1AA-1
SC-GND-1
SC-TTB
AC-ACP-1
(TYP.)
/8
3'-9 5/8"3'-8 7/8"
11'-3 7/8"
AC-PSP-1
1.1
1.2
1.U
1.U2
SPACE
RESERVED FOR
FUTURE RACK
SC-ER-1SC-VWM-1
/4
TR 1AA
1AA-1
"x
18"x6"
"x
"x
18"x6"
SC-CT-1
(TYP.)
PW-CPW-1(8)
1.1
1.2
1.U
1.U2
(TYP.)
SC-HWM-2
NETWORK SWITCH
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-MPP-1
SC-BLK-1
SC-BLK-1
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-HWM-2
SC-BLK-1
SC-HWM-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
NETWORK SWITCH
NETWORK SWITCH
SC-ER-1
(TYP.)
SC-PDU-1
SC-UPS-1
SC-PDU-2
(TYP.)
1 2
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
SC-CAB-45 SC-CAB-45 SC-CAB-45 SC-CAB-45
MDA-B
4-8
MDA-B
4-7
MDA-A
4-5
MDA-A
4-4
EXISTING CABINET EXISTING CABINET EXISTING CABINET EXISTING CABINET
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:0
P
M
1AS-TN305
TR 1AA - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1AA-1
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1AA-1
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1AA-1
LEGEND - KEY PLAN - 1AA
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
1" = 1'-0"
EQUIPMENT RACK ELEVATION-SERVER ROOM
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
Revisions: Date:
ADDENDUM #1 08/18/2025
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
CSS
W
S
C C
T V
W S
C C
T V
C S
S
TR 1B
1B-2
B
-T N
SC-GND-1 AC-ACP-1
1B-2
SC-TTB
(TYP.)
5'-8 3/4"
/4
VS-CM-1
AC-PSP-1
1.N
1.19
V2V1
VB
VA
SPACE
RESERVED
FOR
FUTURE
RACK
SC-ER-1
SC-VWM-1
/8
6'-8 1/8"
TR 1B
1B-2
18"x6"
18"x6"
"x
"x
SC-CT-1
(TYP.)
18"x6"
PW-CPW-1
(TYP.)
1.N
1.19
V2V1
VB
VA
(8) 4" SLEEVES
(2) 4"CONDUIT SLEEVES
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-HWM-2
SC-HWM-2
SC-HWM-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
NETWORK SWITCH
NETWORK SWITCH
NETWORK SWITCH
SC-UPS-1
SC-VWM-1 SC-PDU-2
(TYP.)(TYP.) 1
2SC-ER-1
TR1B
1B-1
B
-T N
VS-CM-1
1B-1
(TYP.)
AC-ACP-1
SC-GND-1
15'-2 1/8"
/8
SC-TTB
AC-PSP-1
1.N
1.19
V2V1
VB
VA
SPACE
RESERVED
FOR FUTURE
RACK
/8
3'-0"
8'-6"
SC-VWM-1
(TYP.)
SC-ER-1
(TYP.)
TR1B
1B-1
18"x6"
"x
18"x6"
"x
SC-CT-1
18"x6"
PW-CPW-1
(TYP.)
1.N
1.19
V2V1
VB
VA
(TYP.)
SC-VWM-1 SC-PDU-2
(TYP.)(TYP.)
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-UPS-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-UPS-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
1 2SC-ER-1
(TYP.)
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:0
P
M
1B-TN300
TR 1B - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1B-2
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1B-2
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1B-2
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1B-1
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1B-1
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1B-1
LEGEND - KEY PLAN - 1B
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND LOCATIONS ARE TO BE
CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING BUS BAR DETAIL FOR
ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE
OWNER. THE FINAL QUANTITY AND LOCATIONS ARE TO BE
CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER
TO 2/T500 RACK MOUNT BONDING BUS BAR DETAIL FOR
ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
(8) 4"CONDUIT REFER
TO 1B-TN101 FOR
CONTINUATION
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
Revisions: Date:
ADDENDUM #1 08/18/2025
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
S
C C
T V
W
S
C C
T V
CSS
TR1B
1B-3
B
-T N
VS-CM-1
1B-3
SC-GND-1
SC-TTB
AC-ACP-1
(TYP.)
5'-8 3/4"
SC-ER-1
SC-PDU-2
SC-VWM-1
(TYP.)
(TYP.)
AC-PSP-1
16'-6"
/8
1.N
1.19
V2V1
VB
VA
SPACE
RESERVED
FOR
FUTURE
RACK
TR1B
1B-3
18"x6"
18"x6"
"x
"x
SC-CT-1
PW-CPW-1
(TYP.)
18"x6"
1.N
1.19
V2V1
VB
VA
(8) 4" SLEEVES
(2) 4"CONDUIT SLEEVES
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-UPS-1
SC-VWM-1 SC-PDU-2
(TYP.) (TYP.)1
2SC-ER-1
TR1B
1B-4
1B-TN301
VS-CM-1
1B-4
SC-GND-1
SC-ER-1
(TYP.)
SC-PDU-2
(TYP.)
SC-VWM-1
(TYP.)
SC-TTB
(TYP.)
5'-8 3/4"5'-9 3/4"
/8
/4
AC-ACP-1
/8
16'-6"
1.N
1.19
V2V1
VB
VA
AC-PSP-1
1 TR1B
1B-4
18"x6"
18"x6"
18"x6"
"x
"x
SC-CT-1
(TYP.)
PW-CPW-1
(TYP.)
1.N
1.19
V2V1
VB
VA
(8) 4" SLEEVES
(2) 4"CONDUIT SLEEVES
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-HWM-2
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-ER-1 SC-VWM-1 SC-PDU-2
(TYP.)(TYP.)(TYP.)
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
NETWORK SWITCH
1 2
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:0
P
M
1B-TN301
TR 1B - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1B-3
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1B-3
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1B-3
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1B-4
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR1B-4
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR1B-4
LEGEND - KEY PLAN - 1B
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE
OWNER. THE FINAL QUANTITY AND LOCATIONS ARE TO BE
CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK.
REFER TO 2/T500 RACK MOUNT BONDING BUS BAR DETAIL FOR
ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE
OWNER. THE FINAL QUANTITY AND LOCATIONS ARE TO BE
CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK.
REFER TO 2/T500 RACK MOUNT BONDING BUS BAR DETAIL FOR
ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
Revisions: Date:
ADDENDUM #1 08/18/2025
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
CSS
C C
T V
TR1B
1B-5
B
-T N
VS-CM-1
SC-GND-1 AC-ACP-1
SC-TTB
(TYP.)
5'-8 7/8"
/8
AC-PSP-1
16'-6"
/2
1.N
1.19
V2V1
VB
VA
SPACE
RESERVED
FOR
FUTURE
RACK
SC-VWM-1
SC-ER-1
(TYP.)
TR1B
1B-5
18"x6"
18"x6"
"x
"x
SC-CT-1
18"x6"
PW-CPW-1
(TYP.)
1.N
1.19
V2V1
VB
VA
(8) 4" SLEEVES
(TYP.)
(2) 4"CONDUIT SLEEVES
NETWORK SWITCH
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-2
SC-HWM-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-PDU-1
SC-UPS-1
SC-VWM-1 SC-PDU-2
(TYP.)(TYP.) 1
2SC-ER-1
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:0
P
M
1B-TN302
TR 1B - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR1B-5
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY- TR1B-5
1" = 1'-0"
EQUIPMENT RACK ELEVATION- TR1B-5
LEGEND - KEY PLAN - 1B
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
Revisions: Date:
ADDENDUM #1 08/18/2025
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
S
C C
T V
WS
C S
S
CCTV
TR 11A
11A-1A
11A-TN300
SC-GND-1
VS-CM-1
AC-ACP-1
11A-1B
/8
/4
SC-TTB
(TYP.)
5'-11" 5'-10 5/8"
SC-ER-1
SC-PDU-2
(TYP.)
SC-VWM-1
(TYP.)
AC-PSP-1
16'-9 1/2"
3.J
3.1
3.J1
X2 X3
XB
(TYP.)
TR 11A
11A-1A1 "x
18"x6"
18"x6"
"x
PW-CPW-1
(TYP.)
18"x6"
SC-CT-1
3.J
3.1
3.J1
X2 X3
XB
(TYP.)
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-HWM-2
SC-HWM-2
SC-HWM-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
SC-HWM-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
NETWORK SWITCH
NETWORK SWITCH
NETWORK SWITCH
SC-BLK-1
(TYP.)
SC-ER-1 SC-VWM-1
(TYP.)
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-PDU-2
(TYP.)
1 2
SC-BLK-1
SC-MPP-1
NETWORK SWITCH
TR11A
11A-3
A
-T N
VS-CM-1
AC-ACP-1
/8
/8
3'-7 1/4"
SC-PDU-2
SC-VWM-1
SC-ER-1
(TYP.)
(TYP.)
(TYP.)
SC-GND-1
SC-TTB
(TYP.)
AC-PSP-1
3'-6 5/8"
12'-4 5/8"
3.J
3.1
3.J1
X2 X3
XB
XA
TR11A
11A-2
"x
18"x6"
"x
18"x6"
SC-CT-1
(TYP.)
PW-CPW-1
(TYP.)
"x
3.J
3.1
3.J1
X2 X3
XB
XA
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1 SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
SC-HWM-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-VWM-1 SC-ER-1
(TYP.) (TYP.)
SC-PDU-2
(TYP.)
1 2
SC-BLK-1
SC-BLK-1
SC-MPP-1
NETWORK SWITCH
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:1
P
M
11A-TN300
TR 11A - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT-TR11A-1A
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY-TR11A-1A
1" = 1'-0"
EQUIPMENT RACK ELEVATION-TR11A-1A
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR11A-2
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR11A-2
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR11A-2
LEGEND - KEY PLAN - 11A
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
Revisions: Date:
ADDENDUM #1 08/18/2025
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
S
WS
CCTV
2D
CCTV
C S
S
WS
TR11A
11A-3
A
-T N
VS-CM-1
11A-3
SC-GND-1
SC-TTB
(TYP.)
AC-ACP-1
SC-VWM-1
(TYP.)
SC-PDU-2
(TYP.)
SC-ER-1
(TYP.)
3'-7"
/4
3'-6 7/8"
AC-PSP-1
11'-0"
3.J
3.1
3.J1
X2 X3
XB
XA
TR11A
11A-3
"x
"x
"x
18"x6"
18"x6"
SC-CT-1
(TYP.)
PW-CPW-1
(TYP.)
3.J
3.1
3.J1
X2 X3
XB
XA
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
SC-BLK-2
SC-HWM-1
NETWORK SWITCH
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-1
SC-BLK-1
SC-FDC-1 SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-VWM-1 SC-ER-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-PDU-2
(TYP.)
SC-BLK-1
(TYP.) (TYP.)
1 2
SC-BLK-1
SC-BLK-1
TR11A
11A-4
A
-T N
VS-CM-1
11A-4
SC-TTB
(TYP.)
SC-GND-1
AC-ACP-1
SC-VWM-1
(TYP.)
SC-ER-1
(TYP.)
3'-7 3/4"
SC-PDU-2
(TYP.)
3'-6 3/8"
AC-PSP-1
11'-0"
3.J
3.1
3.J1
X2 X3
XB
XA
TR11A
11A-4
"x
18"x6"
18"x6"
"x
SC-CT-1
"x
(TYP.)
PW-CPW-1
(TYP.)
3.J
3.1
3.J1
X2 X3
XB
XA
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
SC-ER-1SC-VWM-1
SC-HWM-1
SC-HWM-2
SC-HWM-2
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-UPS-1
SC-HWM-1
SC-HWM-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-UPS-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-2
(TYP.)(TYP.) (TYP.)
NETWORK SWITCH
NETWORK SWITCH
NETWORK SWITCH
SC-BLK-1
SC-BLK-1
SC-MPP-1
SC-MPP-1
NETWORK SWITCH
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:1
P
M
11A-TN301
TR 11A - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR11A-3
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR11A-3
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR11A-3
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR11A-4
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR11A-4
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR11A-4
LEGEND - KEY PLAN - 11A
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
Revisions: Date:
ADDENDUM #1 08/18/2025
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
S
WS
CCTV
CSS
W
S
CCTV
TR11A
11A-5
11A-TN302
SC-GND-1
VS-CM-1
11A-8
AC-ACP-1
SC-TTB
(TYP.)
SC-VWM-1
SC-PDU-2
(TYP.)
(TYP.)
/8
/4
3'-6 3/8" 3'-6 3/4"
AC-PSP-1
12'-4 5/8"
/8
"3.J
3.1
3.J1
X2 X3
XB
XA
SC-ER-1
(TYP.)
TR11A
11A-5
18"x6"
"x
"x
"x
18"x6"
SC-CT-1
(TYP.)
PW-CPW-1
(TYP.)
3.J
3.1
3.J1
X2 X3
XB
XA
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
SC-HWM-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-VWM-1 SC-ER-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
(TYP.) (TYP.)
SC-PDU-2
(TYP.)
SC-BLK-1
NETWORK SWITCH
SC-MPP-1
SC-MPP-1
TR11A
11A-6
A
-T N
VS-CM-1
11A-6
SC-GND-1
AC-ACP-1
SC-VWM-1
SC-ER-1
SC-PDU-2
SC-TTB
(TYP.)
(TYP.)
(TYP.)
(TYP.)
4'-0 5/8"4'-0"
/8
3.H
3.G
3.1 3.2
5.BB
AC-PSP-1
TR11A
11A-6
"x
18"x6"
"x
"x
18"x6"
"x
(TYP.)
PW-CPW-1
3.H
3.G
3.1 3.2
5.BB
18"x6"
SC-CT-1
(TYP.)
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
SC-ER-1 SC-VWM-1 SC-PDU-2
(TYP.)(TYP.)(TYP.)
SC-BLK-1
1 2
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:1
P
M
11A-TN302
TR 11A - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR11A-5
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR11A-5
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR11A-5
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR11A-6
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR11A-6
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR11A-6
LEGEND - KEY PLAN - 11A
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER. THE FINAL QUANTITY AND
LOCATIONS ARE TO BE CONFIRMED WITH THE OWNER PRIOR TO INSTALLATION.
KEYNOTES:
1. INSTALL SC-GND-2 AT TOP RU IN THE REAR OF EACH RACK. REFER TO 2/T500 RACK MOUNT BONDING
BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. INSTALL SC-PDU-2 AT THE REAR OF EACH RACK ON BOTH SIDES.
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
SCALE: 1/2" = 1' - 0"
2 0 2 41
Revisions: Date:
ADDENDUM #1 08/18/2025
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY.
THE FINAL LOCATION SHALL BE SUBMITTED TO AND
COORDINATED WITH THE VA PRIOR TO INSTALLATION.
NOTES:
1. THE CAMERA LOCATION INDICATED IS FOR REFERENCE ONLY. THE FINAL LOCATION SHALL BE SUBMITTED TO
AND COORDINATED WITH THE VA PRIOR TO INSTALLATION.
CSS
CCTV
TR11A
11A-7
CORRIDOR
C7204
LAB
11A-TN303
VS-CM-1
11A-7
SC-VWM-1
SC-PDU-2
SC-GND-1
AC-ACP-1
SC-ER-1
SC-TTB
(TYP.)
(TYP.)
(TYP.)
(TYP.)
/8
/2
3'-7 5/8" 3'-8 1/4"
11'-1 1/4"
AC-PSP-1
3.H
3.G
3.1 3.2
5.BB
TR11A
11A-7
CORRIDOR
C7204
LAB
"x
"x
18"x6"
18"x6"
(TYP.)
(TYP.)
PW-CPW-1
3.H
3.G
3.1 3.2
5.BB
SC-CT-1
18"x6"
"x
"x
(2) 4"CONDUIT SLEEVES
(8) 4" CONDUIT SLEEVES
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-HWM-1
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-HWM-2
NETWORK SWITCH
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-BLK-2
SC-HWM-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-MPP-1
SC-BLK-2
SC-BLK-2
SC-BLK-1
SC-FDC-1
SC-BLK-1
SC-MPP-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-BLK-1
SC-PDU-1
SC-UPS-1 SC-UPS-1
(TYP.) (TYP.) (TYP.)
SC-ER-1 SC-VWM-1 SC-PDU-21 2
SC-BLK-1
SC-BLK-1
SC-BLK-1
N O
R T
H
TR AREAS
1AS
40W
1B 11A 11B
1AN
40E
263 SHUMAN BOULEVARD
SUITE 550
NAPERVILLE, IL 60563
P: 630.527.2320
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #21006425.00
13100 watertown plank road, suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
B
IM
/2
.0
V
A -C h ic a g o
IL
-J
B E
H R
M /5
-7
.J
B E
H R
M .M
E P
T
C .r v t
/9
/2
:0
:1
P
M
11A-TN303
TR 11A - TECHNOLOGY ROOM
ENLARGEMENTS
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHICAGO, IL 60612
537-21-700
VA BLDG
12 MAR 2025
18 AUG 2025 R1
MARWIT ALFARA
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
1/2" = 1'-0"
EQUIPMENT ROOM LAYOUT - TR11A-7
1/2" = 1'-0"
EQUIPMENT ROOM PATHWAY - TR11A-7
1" = 1'-0"
EQUIPMENT RACK ELEVATION - TR11A-7
LEGEND - KEY PLAN - 11A
NOTES:
1. NETWORK SWITCHES ARE FURNISHED AND INSTALLED BY THE OWNER.