Attachment 4 - 537-21-700 JBMC EHRM - Drawings - Set 1_Part4.pdf
PDF 40 MB Posted
- Solicitation number
- 36C77625B0049
About this file
This document is an architectural drawing set for the Jesse Brown VA Medical Center EHRM Infrastructure Upgrades project, specifically Attachment 4 showing phasing plans for Building 40's second through seventh floors. The project involves comprehensive telecommunications room (TR) infrastructure upgrades across multiple buildings, with a focus on precise phasing and infection control strategies.
The phasing plans detail critical construction requirements, including multiple renovation phases per telecommunication room tower based on Infection Control Risk Assessment (ICRA) classes. Key requirements include the General Contractor (GC) providing detailed Critical Path Method (CPM) schedules for each phase, written narratives describing work scope, temporary systems, infection control measures, and utility shutdowns. Strict dust control, negative pressure ventilation, and personnel protection protocols are mandated, with specific requirements for sealing work areas, using HEPA filtration, maintaining negative air pressure, and implementing controlled entry/exit procedures. The project covers floors 2-7 of Building 40, with meticulous attention to maintaining hospital operational needs and patient safety during the infrastructure upgrades.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES - PHASING PLAN
1. WORK ON THIS PROJECT IS ANTICIPATED TO BE PERFORMED AS A MULTIPLE
PHASE UNDER ONE GENERAL CONTRACT. WORK ON CABLE AND FIBER
REPLACEMENT WILL REQUIRE ACCESS TO SPACES ADJACENT AND ALONG THE
PATH OF CABLE AND FIBER REPLACEMENT. THESE SPACES ARE IN ADDITION
TO THE TRS AND OTHER RELATED ROOMS.
2. THE RENOVATION OF THE JESSE BROWN VA HOSPITAL EHRM WILL BE DIVIDED
IN MULTIPLE PHASES PER TELECOMMUNICATION ROOM TOWER AND AN
OVERALL DEPLOYMENT PHASE (PER BUILDING) BASED ON THE INFECTION
CONTROL RISK ASSESSMENT CLASSES SPECIFIED IN THE DRAWINGS:
ICRA CLASS I ICRA CLASS II ICRA CLASS III ICRA CLASS IV
3. THE PHASING SEQUENCE AND DURATION WILL DEPEND ON THE COORDINATION
BETWEEN THE GENERAL CONTRACTOR (GC) AND THE VA, CONSIDERING THE
HOSPITAL'S OPERATIONAL NEEDS AND PATIENT SAFETY.
4. THE GC SHALL PROVIDE A DETAILED CRITICAL PATH METHOD (CPM) SCHEDULE
FOR EACH PHASE, SHOWING THE START AND FINISH DATES, MILESTONES,
LOCATION, WORK HOURS FOR EACH PHASE AND DEPENDENCIES.
5. THE GC SHALL PROVIDE A WRITTEN NARRATIVE FOR EACH PHASE, DESCRIBING
THE SCOPE OF WORK, TEMPORARY SYSTEMS, INFECTION CONTROL
MEASURES AND UTILITY SHUTDOWNS.
6. THE GC SHALL OBTAIN THE VA'S APPROVAL BEFORE PROCEEDING TO THE
NEXT PHASE OR IF TWO PHASES CAN BE DONE SIMULTANEOUSLY.
7. THE CPM PHASING SHOULD COMPLY WITH THE CURRENT EDITION OF VA
CONSTRUCTION STANDARDS, VA HANDBOOKS, AND VA MASTER
SPECIFICATIONS
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. FOR VISUAL INSPECTION ONLY, DAMPEN CEILING TILE WITH WATER
SPRAY BEFORE REMOVING. REPLACE A CEILING TILE IMMEDIATELY
AFTER INSPECTION; DO NOT LEAVE UNATTENDED
AS ABOVE AND:
1. PROVIDE ACTIVE MEANS TO PREVENT DUST FROM DISPERSING. DUST
LEFT ON THE FLOORS, CLOTHING AND/OR BODY IS NOT ALLOWED IN
ORDER TO PREVENT SPREADING AND TRACKING. “ACTIVE MEANS” ARE:
a. VACUUM ATTACHMENTS ON TOOLS WITH HEPA VACUUM WHEN
GENERATING DUST, OR
b. HEPA VACUUMING IMMEDIATELY AS THE DUST IS GENERATED.
c. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
d. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
e. SEAL UNUSED DOORS WITH DUCT TAPE.
f. BLOCK OFF AND SEAL ALL HVAC AIR VENTS.
g. PLACE +TACKY MAT AT INSIDE OF ENTRANCE OF WORK AREA AND
CHANGE FREQUENTLY OR WHEN INEFFECTIVE.
h. WET MOP AND/OR VACUUM WITH +HEPA-FILTERED VACUUM THE
WORK AREA BEFORE LEAVING THE SITE. BROOMING IS NOT
SUFFICIENT.
2. WHENEVER TRANSPORTING OUTSIDE OF CONSTRUCTION SITE, WIPE
MATERIALS, EQUIPMENT AND WORK SURFACES WITH EPA REGISTERED,
UNSCENTED
+DISINFECTANT, WHICH HAS MANUFACTURER’S LABELING AS A
BACTERICIDE, TUBERCULOCIDE, VIRUCIDE, AND FUNGICIDE.
3. THERE SHALL BE NO STANDING, UNCOVERED WATER DURING
CONSTRUCTION. THIS INCLUDES WATER IN EQUIPMENT DRIP PANS AND
OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS. ALL
ACCIDENTAL SPILLS SHALL BE CLEANED UP AND DRIED WITHIN 12
HOURS. REMOVE AND DISPOSE OF POROUS MATERIALS THAT REMAIN
DAMP FOR MORE THAN 72 HOURS.
AS ABOVE AND:
1. COMPLETE ALL CRITICAL BARRIERS, I.E., +SHEETROCK, +PLYWOOD,
+PLASTIC, +PREFABRICATED MOVABLE WALL SYSTEM, TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD
BEFORE CONSTRUCTION BEGINS.
2. MAINTAIN NEGATIVE PRESSURE VENTILATION +(NPV) AT 0.01" WATER
COLUMN (WC) WITHIN THE WORK SITE UTILIZING NPV MACHINE.
3. NPV MONITORING DEVICES SHALL BE VISIBLE FROM OUTSIDE THE
WORKSITE AND READINGS SHALL BE DOCUMENTED DAILY OR MORE
OFTEN AS NEEDED. KEEP TRACK MONITORING DEVICE AND TRACKING
LOG AT OUTSIDE OF ENTRANCE AT THE SITE.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS. TAPE COVERING, UNLESS USING FORM-
FITTING SOLID LID.
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES. APPROPRIATELY
DURING CONSTRUCTION.
AS ABOVE AND:
1. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
2. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED USING A HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH
OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
3. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS SHALL BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA.
C L
A S
S I I
C L
A S
S I
C L
A S
S I
II
C L
A S
S I V
ICRA CONSTRUCTION PRECAUTIONS
NEW TELECOMMUNICATION ROOM (SEE SHEETS A001-A005 FOR TR PHASING)
2.4
2.4
2.3
2.3
2.2
2.2
2.1
2.1
2.5
2.5
2.6
2.6
2.7
2.7
2.8
2.8
2.10
2.10
2.9
2.9
X8
X8
X8.1
X8.1
X7
X7
X6.6
X6.6
X6.5
X6.5
X9
X9
X10
X10
X11
X11
2.11
2.11
X12
X12
2.12
2.12
2.13
2.13
2.14
2.14
2.A
2.A
2.C1
2.C1
X13
X13
2.D
2.C5 2.C5
2.A5
2.A5
2.B
2.B
2.C
2.D9 2.D9
2.G 2.G
2.D
2.C
CYSTOSCOPY
CYSTO
CLEAN
UP RM
2602A
OR-7
CYSTO
STORAGE
2602B
OR-6
ELEVATOR
OR-5
STERILE
CORE
ANNEX
STERILE
CORE
ELEC
RM
26E2
STERILE
MACH
STAIR
ELEVATOR
VESTIBULE
OR-3
OR
SUPPORT
OR-2
VESTIBULE
OR-1
EQUIP
STORAGE
OR
SUPPORT
EQUIP
STORAGE
CLEAN
LINEN
HAC
26H1
OR-4
CORRIDOR
C2601
CORRIDOR
C2602
OR
SUPPORT
CORRIDOR
C2609
CORRIDOR
C2603
ANEST
WORK
STORAGE
SATELLITE
PHARMACY
OFFICE
OFFICE
SOILED
UTILITY
TR40
40-2
RECYCLING
STAFF
LOUNGE
TOILET
2640C
ISOLATION
HOLDING
HOLDING
RM
HOLDING
RM
HOLDING
RM
HOLDING
RM
HOLDING
RM
HOLDING
BAY
HOLDING
BAY
HOLDING
BAY
HOLDING
BAY
HOLDING
BAY
TOILET
CLEAN
SUPPLY
NURSE
STATION
NURSE
STATION
NURSE
STATION
NURSE
STATION
NURSE
STATION
TOILET
SOILED
UTILITY
DICTATION
2640D
TOILET
2640B
TOILET
2640A
LINEN
CHUTE
26L1
CORRIDOR
C2608
EMS
26H2
STORAGE
STAIR
ST15
ELECTRICAL
RM
26E1
CORRIDOR
C2606
CORRIDOR
C2607
HAC
26H3
HOLDING
BAY
ELECTRICAL
RM
26E3
STORAGE
HOLDING
BAY
HOLDING
BAY
CORRIDOR
C2605
SURGICAL
SVC 9
SURGICAL
SVC 8
ANEST
ADMIN
OFFICER
CRNA
OFFICE
ANETHESIOLOGY
ATTENDING
OFFICE
ANEST
TECHS
OFFICE
ANETHESIOLOGY
ATTENDING
OFFICE
ANEST
RESIDENT
OFFFICE
ANETHESIOLOGY
ATTENDING
OFFICE
OFFICE
ANEST
SVC
SECY
OFFICE
LOCKER
TOILET
2681A
TOILET
2681B
CORRIDOR
C2604
HAC
26H4
ELEV
ELEV
CONTROL
STATION
ALCOVE
ELEV
ELEV
STAIR
STAIR
ELEV
ELEV
FE
CO2
FE
FE
FE
FE
FE
FE
CO2
FE
CO2
FE
CO2
FE
FE
FE
FE
CO2
1A
1B11A
11B
1AA
N O
R T
H
FIRE BARRIER, 1 HR
FIRE BARRIER, 2 HR
SMOKE BARRIER PER IBC 709 & NFPA 101 8.5
LEGEND - FIRE/SMOKE PARTITIONS
SMOKE PARTITION PER IBC 710 & NFPA 101 8.4
FE
EXISTING FIRE EXTINGUISHER
FE
EXISTING CO2 FIRE EXTINGUISHER
CO2
13890 Bishops Drive, Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C U s e rs \r o if .N
A G
E L
\O n e D ri v e
N a g e l S e rv ic e s L
L C
\D o c u m e n ts \J e s s e
B ro w n E
H R
M I n fr a s tr u c tu re U p g ra d e s
F
IN
A L
C D ro i.
fo n ta n .r v t
/1
/2
:5
:4
A
M
A041
BUILDING 40 - SECOND FLOOR
PHASING PLAN
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHIGAGO, IL 60612
537-21-700
VA BLDG
18 AUG 2025 ES RF
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
3/32" = 1'-0"
BUILDING 40 - SECOND FLOOR PHASING
N O
R T
H
Revisions: Date:
Ryan Bourland Text Box
12 MAR 2025,
18 AUG 2025 R1
Ryan Bourland Line
Ryan Bourland Line
PHASE UNDER ONE GENERAL CONTRACT. WORK ON CABLE AND FIBER
REPLACEMENT WILL REQUIRE ACCESS TO SPACES ADJACENT AND ALONG THE
PATH OF CABLE AND FIBER REPLACEMENT. THESE SPACES ARE IN ADDITION
TO THE TRS AND OTHER RELATED ROOMS.
2. THE RENOVATION OF THE JESSE BROWN VA HOSPITAL EHRM WILL BE DIVIDED
IN MULTIPLE PHASES PER TELECOMMUNICATION ROOM TOWER AND AN
OVERALL DEPLOYMENT PHASE (PER BUILDING) BASED ON THE INFECTION
CONTROL RISK ASSESSMENT CLASSES SPECIFIED IN THE DRAWINGS:
ICRA CLASS I ICRA CLASS II ICRA CLASS III ICRA CLASS IV
3. THE PHASING SEQUENCE AND DURATION WILL DEPEND ON THE COORDINATION
BETWEEN THE GENERAL CONTRACTOR (GC) AND THE VA, CONSIDERING THE
HOSPITAL'S OPERATIONAL NEEDS AND PATIENT SAFETY.
4. THE GC SHALL PROVIDE A DETAILED CRITICAL PATH METHOD (CPM) SCHEDULE
FOR EACH PHASE, SHOWING THE START AND FINISH DATES, MILESTONES,
LOCATION, WORK HOURS FOR EACH PHASE AND DEPENDENCIES.
5. THE GC SHALL PROVIDE A WRITTEN NARRATIVE FOR EACH PHASE, DESCRIBING
THE SCOPE OF WORK, TEMPORARY SYSTEMS, INFECTION CONTROL
MEASURES AND UTILITY SHUTDOWNS.
6. THE GC SHALL OBTAIN THE VA'S APPROVAL BEFORE PROCEEDING TO THE
NEXT PHASE OR IF TWO PHASES CAN BE DONE SIMULTANEOUSLY.
7. THE CPM PHASING SHOULD COMPLY WITH THE CURRENT EDITION OF VA
CONSTRUCTION STANDARDS, VA HANDBOOKS, AND VA MASTER
SPECIFICATIONS
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. FOR VISUAL INSPECTION ONLY, DAMPEN CEILING TILE WITH WATER
SPRAY BEFORE REMOVING. REPLACE A CEILING TILE IMMEDIATELY
AFTER INSPECTION; DO NOT LEAVE UNATTENDED
AS ABOVE AND:
1. PROVIDE ACTIVE MEANS TO PREVENT DUST FROM DISPERSING. DUST
LEFT ON THE FLOORS, CLOTHING AND/OR BODY IS NOT ALLOWED IN
ORDER TO PREVENT SPREADING AND TRACKING. “ACTIVE MEANS” ARE:
a. VACUUM ATTACHMENTS ON TOOLS WITH HEPA VACUUM WHEN
GENERATING DUST, OR
b. HEPA VACUUMING IMMEDIATELY AS THE DUST IS GENERATED.
c. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
d. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
e. SEAL UNUSED DOORS WITH DUCT TAPE.
f. BLOCK OFF AND SEAL ALL HVAC AIR VENTS.
g. PLACE +TACKY MAT AT INSIDE OF ENTRANCE OF WORK AREA AND
CHANGE FREQUENTLY OR WHEN INEFFECTIVE.
h. WET MOP AND/OR VACUUM WITH +HEPA-FILTERED VACUUM THE
WORK AREA BEFORE LEAVING THE SITE. BROOMING IS NOT
SUFFICIENT.
2. WHENEVER TRANSPORTING OUTSIDE OF CONSTRUCTION SITE, WIPE
MATERIALS, EQUIPMENT AND WORK SURFACES WITH EPA REGISTERED,
UNSCENTED
+DISINFECTANT, WHICH HAS MANUFACTURER’S LABELING AS A
BACTERICIDE, TUBERCULOCIDE, VIRUCIDE, AND FUNGICIDE.
3. THERE SHALL BE NO STANDING, UNCOVERED WATER DURING
CONSTRUCTION. THIS INCLUDES WATER IN EQUIPMENT DRIP PANS AND
OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS. ALL
ACCIDENTAL SPILLS SHALL BE CLEANED UP AND DRIED WITHIN 12
HOURS. REMOVE AND DISPOSE OF POROUS MATERIALS THAT REMAIN
DAMP FOR MORE THAN 72 HOURS.
AS ABOVE AND:
1. COMPLETE ALL CRITICAL BARRIERS, I.E., +SHEETROCK, +PLYWOOD,
+PLASTIC, +PREFABRICATED MOVABLE WALL SYSTEM, TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD
BEFORE CONSTRUCTION BEGINS.
2. MAINTAIN NEGATIVE PRESSURE VENTILATION +(NPV) AT 0.01" WATER
COLUMN (WC) WITHIN THE WORK SITE UTILIZING NPV MACHINE.
3. NPV MONITORING DEVICES SHALL BE VISIBLE FROM OUTSIDE THE
WORKSITE AND READINGS SHALL BE DOCUMENTED DAILY OR MORE
OFTEN AS NEEDED. KEEP TRACK MONITORING DEVICE AND TRACKING
LOG AT OUTSIDE OF ENTRANCE AT THE SITE.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS. TAPE COVERING, UNLESS USING FORM-
FITTING SOLID LID.
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES. APPROPRIATELY
DURING CONSTRUCTION.
AS ABOVE AND:
1. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
2. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED USING A HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH
OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
3. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS SHALL BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA.
C L
A S
S I I
C L
A S
S I
C L
A S
S I
II
C L
A S
S I V
ICRA CONSTRUCTION PRECAUTIONS
NEW TELECOMMUNICATION ROOM (SEE SHEETS A001-A005 FOR TR PHASING)
2.4
2.4
2.3
2.3
2.2
2.2
2.1
2.1
2.5
2.5
2.6
2.6
2.7
2.7
2.8
2.8
2.10
2.10
2.9
2.9
X8
X8
X8.1
X8.1
X7
X7
X6.6
X6.6
X6.5
X6.5
X9
X9
X10
X10
X11
X11
2.11
2.11
X12
X12
2.12
2.12
2.13
2.13
2.14
2.14
2.A
2.A
2.C1
2.C1
X13
X13
2.D
2.C5 2.C5
2.A5
2.A5
2.B
2.B
2.C
2.D9 2.D9
2.G 2.G
2.D
2.C
UTILITY
ELECTRICAL
36E3
ELECTRICAL
CLOSET
36E4 UTILITY
ELECTRICAL
36E5
UTILITY
ELECTRICAL
36E6
FOREMAN
OFFICE
TR40
40-3
STAIR
ELECTRICAL
UTILITY
MECH
ELECTRICAL
CLOSET
36E7
ELECTRICAL
CLOSET
36E9
STAIR
VESTIBULE
V3602
ELEVATOR
P-20
ELEVATOR
P-21
ELEVATOR
P-22
CORRIDOR
C3602
MECH
UTILITY
MECH
REVERSE
OSMOSIS
RM
STAIR
ELECTRICAL
CLOSET
36E2
ELECTRICAL
CLOSET
36E1
UTILITY
MECH
UTILITY
MECH
MECH
PNEUMATIC
TUBE
RM
ELEV
P23
ELEV
P24 ELEV
P25
TOILET
UTILITY
MECH
UTILITY
MECH
UTILITY
MECH
FE
CO2
FE
CO2
FE
CO2
FE
CO2
FE
CO2
FE
CO2
FE
FE
CO2
FE
CO2
FE
CO2
FE
CO2
FE
CO2
FE
CO2
FE
CO2
1A
1B11A
11B
1AA
N O
R T
H
FIRE BARRIER, 1 HR
FIRE BARRIER, 2 HR
SMOKE BARRIER PER IBC 709 & NFPA 101 8.5
LEGEND - FIRE/SMOKE PARTITIONS
SMOKE PARTITION PER IBC 710 & NFPA 101 8.4
FE
EXISTING FIRE EXTINGUISHER
FE
EXISTING CO2 FIRE EXTINGUISHER
CO2
13890 Bishops Drive, Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C U s e rs \r o if .N
A G
E L
\O n e D ri v e
N a g e l S e rv ic e s L
L C
\D o c u m e n ts \J e s s e
B ro w n E
H R
M I n fr a s tr u c tu re U p g ra d e s
F
IN
A L
C D ro i.
fo n ta n .r v t
/1
/2
:5
:5
A
M
A042
BUILDING 40 - THIRD FLOOR
PHASING PLAN
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHIGAGO, IL 60612
537-21-700
VA BLDG
18 AUG 2025 ES RF
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
3/32" = 1'-0"
BUILDING 40 PHASING PLAN - THIRD FLOOR
N O
R T
H
Revisions: Date:
Ryan Bourland Text Box
12 MAR 2025,
18 AUG 2025 R1
Ryan Bourland Line
PHASE UNDER ONE GENERAL CONTRACT. WORK ON CABLE AND FIBER
REPLACEMENT WILL REQUIRE ACCESS TO SPACES ADJACENT AND ALONG THE
PATH OF CABLE AND FIBER REPLACEMENT. THESE SPACES ARE IN ADDITION
TO THE TRS AND OTHER RELATED ROOMS.
2. THE RENOVATION OF THE JESSE BROWN VA HOSPITAL EHRM WILL BE DIVIDED
IN MULTIPLE PHASES PER TELECOMMUNICATION ROOM TOWER AND AN
OVERALL DEPLOYMENT PHASE (PER BUILDING) BASED ON THE INFECTION
CONTROL RISK ASSESSMENT CLASSES SPECIFIED IN THE DRAWINGS:
ICRA CLASS I ICRA CLASS II ICRA CLASS III ICRA CLASS IV
3. THE PHASING SEQUENCE AND DURATION WILL DEPEND ON THE COORDINATION
BETWEEN THE GENERAL CONTRACTOR (GC) AND THE VA, CONSIDERING THE
HOSPITAL'S OPERATIONAL NEEDS AND PATIENT SAFETY.
4. THE GC SHALL PROVIDE A DETAILED CRITICAL PATH METHOD (CPM) SCHEDULE
FOR EACH PHASE, SHOWING THE START AND FINISH DATES, MILESTONES,
LOCATION, WORK HOURS FOR EACH PHASE AND DEPENDENCIES.
5. THE GC SHALL PROVIDE A WRITTEN NARRATIVE FOR EACH PHASE, DESCRIBING
THE SCOPE OF WORK, TEMPORARY SYSTEMS, INFECTION CONTROL
MEASURES AND UTILITY SHUTDOWNS.
6. THE GC SHALL OBTAIN THE VA'S APPROVAL BEFORE PROCEEDING TO THE
NEXT PHASE OR IF TWO PHASES CAN BE DONE SIMULTANEOUSLY.
7. THE CPM PHASING SHOULD COMPLY WITH THE CURRENT EDITION OF VA
CONSTRUCTION STANDARDS, VA HANDBOOKS, AND VA MASTER
SPECIFICATIONS
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. FOR VISUAL INSPECTION ONLY, DAMPEN CEILING TILE WITH WATER
SPRAY BEFORE REMOVING. REPLACE A CEILING TILE IMMEDIATELY
AFTER INSPECTION; DO NOT LEAVE UNATTENDED
AS ABOVE AND:
1. PROVIDE ACTIVE MEANS TO PREVENT DUST FROM DISPERSING. DUST
LEFT ON THE FLOORS, CLOTHING AND/OR BODY IS NOT ALLOWED IN
ORDER TO PREVENT SPREADING AND TRACKING. “ACTIVE MEANS” ARE:
a. VACUUM ATTACHMENTS ON TOOLS WITH HEPA VACUUM WHEN
GENERATING DUST, OR
b. HEPA VACUUMING IMMEDIATELY AS THE DUST IS GENERATED.
c. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
d. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
e. SEAL UNUSED DOORS WITH DUCT TAPE.
f. BLOCK OFF AND SEAL ALL HVAC AIR VENTS.
g. PLACE +TACKY MAT AT INSIDE OF ENTRANCE OF WORK AREA AND
CHANGE FREQUENTLY OR WHEN INEFFECTIVE.
h. WET MOP AND/OR VACUUM WITH +HEPA-FILTERED VACUUM THE
WORK AREA BEFORE LEAVING THE SITE. BROOMING IS NOT
SUFFICIENT.
2. WHENEVER TRANSPORTING OUTSIDE OF CONSTRUCTION SITE, WIPE
MATERIALS, EQUIPMENT AND WORK SURFACES WITH EPA REGISTERED,
UNSCENTED
+DISINFECTANT, WHICH HAS MANUFACTURER’S LABELING AS A
BACTERICIDE, TUBERCULOCIDE, VIRUCIDE, AND FUNGICIDE.
3. THERE SHALL BE NO STANDING, UNCOVERED WATER DURING
CONSTRUCTION. THIS INCLUDES WATER IN EQUIPMENT DRIP PANS AND
OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS. ALL
ACCIDENTAL SPILLS SHALL BE CLEANED UP AND DRIED WITHIN 12
HOURS. REMOVE AND DISPOSE OF POROUS MATERIALS THAT REMAIN
DAMP FOR MORE THAN 72 HOURS.
AS ABOVE AND:
1. COMPLETE ALL CRITICAL BARRIERS, I.E., +SHEETROCK, +PLYWOOD,
+PLASTIC, +PREFABRICATED MOVABLE WALL SYSTEM, TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD
BEFORE CONSTRUCTION BEGINS.
2. MAINTAIN NEGATIVE PRESSURE VENTILATION +(NPV) AT 0.01" WATER
COLUMN (WC) WITHIN THE WORK SITE UTILIZING NPV MACHINE.
3. NPV MONITORING DEVICES SHALL BE VISIBLE FROM OUTSIDE THE
WORKSITE AND READINGS SHALL BE DOCUMENTED DAILY OR MORE
OFTEN AS NEEDED. KEEP TRACK MONITORING DEVICE AND TRACKING
LOG AT OUTSIDE OF ENTRANCE AT THE SITE.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS. TAPE COVERING, UNLESS USING FORM-
FITTING SOLID LID.
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES. APPROPRIATELY
DURING CONSTRUCTION.
AS ABOVE AND:
1. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
2. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED USING A HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH
OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
3. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS SHALL BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA.
C L
A S
S I I
C L
A S
S I
C L
A S
S I
II
C L
A S
S I V
ICRA CONSTRUCTION PRECAUTIONS
NEW TELECOMMUNICATION ROOM (SEE SHEETS A001-A005 FOR TR PHASING)
2.4
2.4
2.3
2.3
2.2
2.2
2.1
2.1
2.5
2.5
2.6
2.6
2.7
2.7
2.8
2.8
2.10
2.10
2.9
2.9
X8
X8
X8.1
X8.1
X7
X7
X6.6
X6.6
X6.5
X6.5
X9
X9
X10
X10
X11
X11
2.11
2.11
X12
X12
2.12
2.12
2.13
2.13
2.14
2.14
2.A
2.A
2.C1
2.C1
X13
X13
2.D
2.C5 2.C5
2.A5
2.A5
2.B
2.B
2.C
2.D9 2.D9
2.G 2.G
2.D
2.C
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
ICU
PAT
RM
OFFICE
CORRIDOR
C4603
CORRIDOR
C4604
CORRIDOR
C4605
CORRIDOR
C4606
CORRIDOR
C4604A
NURSE
STATION
EQUIP
STORAGE
NURSE
STATION
NURSE
STATION
NURSE
STATION
OFFICE
SOILED
UTILITY
SOILED
UTILITY
CLEAN
LINEN
BREAK
RM
NURSE
STATION
CONSULT
CONSULT
4656EQUIP
PARKING
4694A
HAC
46H3TOILET
ALCOVE
4687A
OFFICE
CONFERENCE
RM
STAFF
LOUNGE
OFFICE
PHYS
VIEWING
CORRIDOR
C4608
CORRIDOR
C4609
CORRIDOR
C4610
CORRIDOR
C4611
CORRIDOR
C4612
ELEV
LOBBY
C4601
CORRIDOR
C4602
TOILET
4650A STAFF
LOCKER
4650B
ELEC
46E1
ELECTRICAL
RM
46E1
EMS
46H2
TR40
40-4
LINEN
46L1
TEAM
RM
VASCULAR
TEAM
RM
UIC
TEAM
RM
TEAM
4 RM
TEAM
5 RM
ON-CALL
TELEMETRY
PAT
RM
ON-CALL
TELEMETRY
PAT
RM
ON-CALL
TELEMETRY
PAT
RM
NURSE
MGR
OFFICE
SOILED
UTILITY
NOURISH
NURSE
STATION
TELEMETRY
PAT
RM
TELEMETRY
PAT
RM
TELEMETRY
PAT
RM
TELEMETRY
PAT
RM
TELEMETRY
PAT
RM
TELEMETRY
PAT
RM
TELEMETRY
PAT
RM
TELEMETRY
PAT
RM
TELEMETRY
PAT
RM
TELEMETRY
PAT
RM
VISITOR
WAITING
TOILET
4601A
TOILET
4603A
TOILET
4602A
TOILET
4605A
TOILET
4604A TOILET
4606A TOILET
4612A
TOILET
4614A TOILET
4616A TOILET
4618A
TOILET
4620A
TOILET
4622A
TOILET
4624A
TOILET
4625A
TOILET
4626A
TOILET
4627A
OFFICE
STEP
DN
ISOLATION
PAT
RM
STEP
DN
ISOLATION
PAT
RM
STEP
DN
ISOLATION
PAT
RM
STEP
DN
ISOLATION
PAT
RM
STEP
DN
ISOLATION
PAT
RM
STEP
DN
ISOLATION
PAT
RM
STEP
DN
ISOLATION
PAT
RM
MEDICATION
RM
TELEMETRY
OFFICE
STAFF
LOUNGE
EQUIP
STORAGE
STAFF
LOCKER
4617B
TOILET
4617A
ALCOVE
4615A
CLEAN
SUPPLY
CLEAN
LINEN
TEAM
RM
CONFERENCE
RM
ANTE
RM
RECYCLING
DIALYSIS
TREATMENT
VESTIBULE
4602B
VESTIBULE
4604B
VESTIBULE
4606B VESTIBULE
4612B VESTIBULE
4614B VESTIBULE
4616B
VESTIBULE
4618B
VESTIBULE
4620B
VESTIBULE
4622B
VESTIBULE
4624B
ALCOVE
4629A
HAC
46H1
ALCOVE
4633A
TOILET
4630A
TOILET
4632A
TOILET
4634A
TOILET
4636A
TOILET
4638A
TOILET
4640A
TOILET
4642A
EQUIP
4648A
LOUNGE
4648B
TOILET
4648C
STORAGE
4648D
ALCOVE
4645A
STORAGE
4649A
ICU
PAT
ISOLATION
RM
TOILET
4657A
VESTIBULE
4657B
ICE
PAT
ISOLATION
RM
ICU
FAMILY
WAITING
CORRIDOR
C4607
TOILET
4600A
TOILET
4600B
TOILET
4698B
ANTE
RM
4698A
STAIR
ELEV
ELEV
ELEV
ELEV
23 ELEV
ELEV
STAIR
STAIR
FE
FE
CO2
FE
FE
CO2
FE
CO2
FE
FE
FE
FE
FE
FE
CO2
1A
1B11A
11B
1AA
N O
R T
H
FIRE BARRIER, 1 HR
FIRE BARRIER, 2 HR
SMOKE BARRIER PER IBC 709 & NFPA 101 8.5
LEGEND - FIRE/SMOKE PARTITIONS
SMOKE PARTITION PER IBC 710 & NFPA 101 8.4
FE
EXISTING FIRE EXTINGUISHER
FE
EXISTING CO2 FIRE EXTINGUISHER
CO2
13890 Bishops Drive, Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C U s e rs \r o if .N
A G
E L
\O n e D ri v e
N a g e l S e rv ic e s L
L C
\D o c u m e n ts \J e s s e
B ro w n E
H R
M I n fr a s tr u c tu re U p g ra d e s
F
IN
A L
C D ro i.
fo n ta n .r v t
/1
/2
:5
:0
A
M
A043
BUILDING 40 - FOURTH FLOOR
PHASING PLAN
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHIGAGO, IL 60612
537-21-700
VA BLDG
18 AUG 2025 ES RF
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
3/32" = 1'-0"
BUILDING 40 PHASING - 4TH FLOOR
N O
R T
H
Revisions: Date:
Ryan Bourland Text Box
12 MAR 2025,
18 AUG 2025 R1
Ryan Bourland Line
PHASE UNDER ONE GENERAL CONTRACT. WORK ON CABLE AND FIBER
REPLACEMENT WILL REQUIRE ACCESS TO SPACES ADJACENT AND ALONG THE
PATH OF CABLE AND FIBER REPLACEMENT. THESE SPACES ARE IN ADDITION
TO THE TRS AND OTHER RELATED ROOMS.
2. THE RENOVATION OF THE JESSE BROWN VA HOSPITAL EHRM WILL BE DIVIDED
IN MULTIPLE PHASES PER TELECOMMUNICATION ROOM TOWER AND AN
OVERALL DEPLOYMENT PHASE (PER BUILDING) BASED ON THE INFECTION
CONTROL RISK ASSESSMENT CLASSES SPECIFIED IN THE DRAWINGS:
ICRA CLASS I ICRA CLASS II ICRA CLASS III ICRA CLASS IV
3. THE PHASING SEQUENCE AND DURATION WILL DEPEND ON THE COORDINATION
BETWEEN THE GENERAL CONTRACTOR (GC) AND THE VA, CONSIDERING THE
HOSPITAL'S OPERATIONAL NEEDS AND PATIENT SAFETY.
4. THE GC SHALL PROVIDE A DETAILED CRITICAL PATH METHOD (CPM) SCHEDULE
FOR EACH PHASE, SHOWING THE START AND FINISH DATES, MILESTONES,
LOCATION, WORK HOURS FOR EACH PHASE AND DEPENDENCIES.
5. THE GC SHALL PROVIDE A WRITTEN NARRATIVE FOR EACH PHASE, DESCRIBING
THE SCOPE OF WORK, TEMPORARY SYSTEMS, INFECTION CONTROL
MEASURES AND UTILITY SHUTDOWNS.
6. THE GC SHALL OBTAIN THE VA'S APPROVAL BEFORE PROCEEDING TO THE
NEXT PHASE OR IF TWO PHASES CAN BE DONE SIMULTANEOUSLY.
7. THE CPM PHASING SHOULD COMPLY WITH THE CURRENT EDITION OF VA
CONSTRUCTION STANDARDS, VA HANDBOOKS, AND VA MASTER
SPECIFICATIONS
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. FOR VISUAL INSPECTION ONLY, DAMPEN CEILING TILE WITH WATER
SPRAY BEFORE REMOVING. REPLACE A CEILING TILE IMMEDIATELY
AFTER INSPECTION; DO NOT LEAVE UNATTENDED
AS ABOVE AND:
1. PROVIDE ACTIVE MEANS TO PREVENT DUST FROM DISPERSING. DUST
LEFT ON THE FLOORS, CLOTHING AND/OR BODY IS NOT ALLOWED IN
ORDER TO PREVENT SPREADING AND TRACKING. “ACTIVE MEANS” ARE:
a. VACUUM ATTACHMENTS ON TOOLS WITH HEPA VACUUM WHEN
GENERATING DUST, OR
b. HEPA VACUUMING IMMEDIATELY AS THE DUST IS GENERATED.
c. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
d. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
e. SEAL UNUSED DOORS WITH DUCT TAPE.
f. BLOCK OFF AND SEAL ALL HVAC AIR VENTS.
g. PLACE +TACKY MAT AT INSIDE OF ENTRANCE OF WORK AREA AND
CHANGE FREQUENTLY OR WHEN INEFFECTIVE.
h. WET MOP AND/OR VACUUM WITH +HEPA-FILTERED VACUUM THE
WORK AREA BEFORE LEAVING THE SITE. BROOMING IS NOT
SUFFICIENT.
2. WHENEVER TRANSPORTING OUTSIDE OF CONSTRUCTION SITE, WIPE
MATERIALS, EQUIPMENT AND WORK SURFACES WITH EPA REGISTERED,
UNSCENTED
+DISINFECTANT, WHICH HAS MANUFACTURER’S LABELING AS A
BACTERICIDE, TUBERCULOCIDE, VIRUCIDE, AND FUNGICIDE.
3. THERE SHALL BE NO STANDING, UNCOVERED WATER DURING
CONSTRUCTION. THIS INCLUDES WATER IN EQUIPMENT DRIP PANS AND
OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS. ALL
ACCIDENTAL SPILLS SHALL BE CLEANED UP AND DRIED WITHIN 12
HOURS. REMOVE AND DISPOSE OF POROUS MATERIALS THAT REMAIN
DAMP FOR MORE THAN 72 HOURS.
AS ABOVE AND:
1. COMPLETE ALL CRITICAL BARRIERS, I.E., +SHEETROCK, +PLYWOOD,
+PLASTIC, +PREFABRICATED MOVABLE WALL SYSTEM, TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD
BEFORE CONSTRUCTION BEGINS.
2. MAINTAIN NEGATIVE PRESSURE VENTILATION +(NPV) AT 0.01" WATER
COLUMN (WC) WITHIN THE WORK SITE UTILIZING NPV MACHINE.
3. NPV MONITORING DEVICES SHALL BE VISIBLE FROM OUTSIDE THE
WORKSITE AND READINGS SHALL BE DOCUMENTED DAILY OR MORE
OFTEN AS NEEDED. KEEP TRACK MONITORING DEVICE AND TRACKING
LOG AT OUTSIDE OF ENTRANCE AT THE SITE.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS. TAPE COVERING, UNLESS USING FORM-
FITTING SOLID LID.
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES. APPROPRIATELY
DURING CONSTRUCTION.
AS ABOVE AND:
1. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
2. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED USING A HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH
OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
3. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS SHALL BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA.
C L
A S
S I I
C L
A S
S I
C L
A S
S I
II
C L
A S
S I V
ICRA CONSTRUCTION PRECAUTIONS
NEW TELECOMMUNICATION ROOM (SEE SHEETS A001-A005 FOR TR PHASING)
2.4
2.4
2.3
2.3
2.2
2.2
2.1
2.1
2.5
2.5
2.6
2.6
2.7
2.7
2.8
2.8
2.10
2.10
2.9
2.9
X8
X8
X8.1
X8.1
X7
X7
X6.6
X6.6
X6.5
X6.5
X9
X9
X10
X10
X11
X11
2.11
2.11
X12
X12
2.12
2.12
2.13
2.13
2.14
2.14
2.A
2.A
2.C1
2.C1
X13
X13
2.D
2.A5
2.A5
2.B
2.B
2.C
2.D9 2.D9
2.G 2.G
2.D
2.C
CORRIDOR
C5606
ELEVATOR
LOBBY
C5601
CORRIDOR
C5602
CORRIDOR
C5603
CORRIDOR
C5604
CORRIDOR
C5607
CORRIDOR
C5605
ELEV
LOBBY
C5608
CORRIDOR
C5609
CORRIDOR
C5610
CORRIDOR
C5611
CORRIDOR
C5612
CORRIDOR
C5613
NURSE
STATION
5605 CONFERENCE
RM
MED
RM
SOILED
UTILITY
CLEAN
SUPPLY
PANTRY
TEAM
RM
SOCIAL
WORK
OFFICE
SOCIAL
WORK
OFFICE
5616ALCOVE
5613A
CLEAN
LINEN
PARK
STRETCH
ALCOVE
NURSE
MGR
NURSE
OFFICE
STAFF
LOUNGE
EQUIP
STORAGE
TOILET
5619A
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
CHARTING
PM
AND R
GYM
WASTE
RM
TEAM
RM
TEAM
RM
STAFF
LOUNGE
SOCIAL
WORK
OFFICE
ISOLATION
MS
AND N
PAT
RM
ISOLATION
MS
AND N
PAT
RM
CHANGE
NURSE
OFFICE
VISITOR
WAITING
EQUIP
STORAGE
5650A
TOILET
5650B
ELEC
RM
56E1
TOILET
5654A
CONFERENCE
RM
CHARTING
5697A
CLEAN
SUPPLY
SOILED
UTILITY
MED
RM
ALCOVE
PANTRY
5685A
LINEN
EQUIP
STORAGE
ALCOVE
5665A
N MGR
OFFICE
ELEC
RM
56E3
CHARGE
NURSE
HAC
56H1
ELEC
RM
56E2
LOCKER
5631ALCOVE
5629B
TOILET
5627A
TOILET
5628A
TOILET
5629A
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
ISOLATION
MS
AND N
PAT
RM
ISOLATION
MS
AND N
PAT
RM
ISOLATION
MS
AND N
PAT
RM
VESTIBULE
5630B
VESTIBULE
5632B
VESTIBULE
5634B
VESTIBULE
5636B
VESTIBULE
5638B
VESTIBULE
5642B
VESTIBULE
5644B
ANTE
RM
5646B
ANTE
RM
5648B
TOILET
5630A
TOILET
5632A
TOILET
5634A
TOILET
5636A
TOILET
5638A
TOILET
5642A
TOILET
5644A
TOILET
5646ATOILET
5648A
TOILET
5649A
HAC
56H3
TEAM
RM
ISOLATION
MS
AND N
PAT
RM
NURSE
STATION
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
EQUIP
STORAGE
VESTIBULE
5660B
VESTIBULE
5662B
VESTIBULE
5664B
VESTIBULE
5666B
VESTIBULE
5668B
VESTIBULE
5670B
VESTIBULE
5672B
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
ANTE
RM
5656B
TOILET
5656A
TOILET
5657A
TOILET
5660A
TOILET
5662A
TOILET
5664A
TOILET
5666A
TOILET
5668A
TOILET
5670A
TOILET
5672A
LINEN
CHUTE
56L1
TR40
40-5
EMS
56H2
TOILET
5675A
ALCOVE
5675B
TOILET
5674A
TOILET
5673A
TOILET
5678A
TOILET
5680A
TOILET
5682A
TOILET
5684A
TOILET
5688A
TOILET
5690A
TOILET
5692A
TOILET
5694A
TOILET
5696A
TOILET
5698A TOILET
5600A
TOILET
5600B
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
5694 PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
VESTIBULE
5678B
VESTIBULE
5680B
VESTIBULE
5682B
VESTIBULE
5684B
VESTIBULE
5688B
VESTIBULE
5690B
VESTIBULE
5692B
VESTIBULE
5694B
VESTIBULE
5696B
VESTIBULE
5698B
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
TOILET
5602A TOILET
5604A
TOILET
5608A
TOILET
5610A TOILET
5612A
TOILET
5618A TOILET
5620A
TOILET
5622A
TOILET
5624A
TOILET
5626A
VESTIBULE
5602B VESTIBULE
5604B
VESTIBULE
5608B VESTIBULE
5610B
VESTIBULE
5612B VESTIBULE
5618B VESTIBULE
5620B VESTIBULE
5622B
VESTIBULE
5624B
VESTIBULE
5626B
STAIR
ELEV
ELEV
ELEV
ELEV
23 ELEV
ELEV
STAIRS
STAIRS
FE
CO2
FE
FE
CO2
FE
FE
FE
FE
FE
FE
FE
FE
CO2
1A
1B11A
11B
1AA
N O
R T
H
FIRE BARRIER, 1 HR
FIRE BARRIER, 2 HR
SMOKE BARRIER PER IBC 709 & NFPA 101 8.5
LEGEND - FIRE/SMOKE PARTITIONS
SMOKE PARTITION PER IBC 710 & NFPA 101 8.4
FE
EXISTING FIRE EXTINGUISHER
FE
EXISTING CO2 FIRE EXTINGUISHER
CO2
13890 Bishops Drive, Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C U s e rs \r o if .N
A G
E L
\O n e D ri v e
N a g e l S e rv ic e s L
L C
\D o c u m e n ts \J e s s e
B ro w n E
H R
M I n fr a s tr u c tu re U p g ra d e s
F
IN
A L
C D ro i.
fo n ta n .r v t
/1
/2
:5
:2
A
M
A044
BUILDING 40 - FIFTH FLOOR
PHASING PLAN
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHIGAGO, IL 60612
537-21-700
VA BLDG
18 AUG 2025 ES RF
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
3/32" = 1'-0"
BUILDING 40 WEST - 5TH FLOOR
N O
R T
H
Revisions: Date:
Ryan Bourland Text Box
12 MAR 2025,
18 AUG 2025 R1
Ryan Bourland Line
PHASE UNDER ONE GENERAL CONTRACT. WORK ON CABLE AND FIBER
REPLACEMENT WILL REQUIRE ACCESS TO SPACES ADJACENT AND ALONG THE
PATH OF CABLE AND FIBER REPLACEMENT. THESE SPACES ARE IN ADDITION
TO THE TRS AND OTHER RELATED ROOMS.
2. THE RENOVATION OF THE JESSE BROWN VA HOSPITAL EHRM WILL BE DIVIDED
IN MULTIPLE PHASES PER TELECOMMUNICATION ROOM TOWER AND AN
OVERALL DEPLOYMENT PHASE (PER BUILDING) BASED ON THE INFECTION
CONTROL RISK ASSESSMENT CLASSES SPECIFIED IN THE DRAWINGS:
ICRA CLASS I ICRA CLASS II ICRA CLASS III ICRA CLASS IV
3. THE PHASING SEQUENCE AND DURATION WILL DEPEND ON THE COORDINATION
BETWEEN THE GENERAL CONTRACTOR (GC) AND THE VA, CONSIDERING THE
HOSPITAL'S OPERATIONAL NEEDS AND PATIENT SAFETY.
4. THE GC SHALL PROVIDE A DETAILED CRITICAL PATH METHOD (CPM) SCHEDULE
FOR EACH PHASE, SHOWING THE START AND FINISH DATES, MILESTONES,
LOCATION, WORK HOURS FOR EACH PHASE AND DEPENDENCIES.
5. THE GC SHALL PROVIDE A WRITTEN NARRATIVE FOR EACH PHASE, DESCRIBING
THE SCOPE OF WORK, TEMPORARY SYSTEMS, INFECTION CONTROL
MEASURES AND UTILITY SHUTDOWNS.
6. THE GC SHALL OBTAIN THE VA'S APPROVAL BEFORE PROCEEDING TO THE
NEXT PHASE OR IF TWO PHASES CAN BE DONE SIMULTANEOUSLY.
7. THE CPM PHASING SHOULD COMPLY WITH THE CURRENT EDITION OF VA
CONSTRUCTION STANDARDS, VA HANDBOOKS, AND VA MASTER
SPECIFICATIONS
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. FOR VISUAL INSPECTION ONLY, DAMPEN CEILING TILE WITH WATER
SPRAY BEFORE REMOVING. REPLACE A CEILING TILE IMMEDIATELY
AFTER INSPECTION; DO NOT LEAVE UNATTENDED
AS ABOVE AND:
1. PROVIDE ACTIVE MEANS TO PREVENT DUST FROM DISPERSING. DUST
LEFT ON THE FLOORS, CLOTHING AND/OR BODY IS NOT ALLOWED IN
ORDER TO PREVENT SPREADING AND TRACKING. “ACTIVE MEANS” ARE:
a. VACUUM ATTACHMENTS ON TOOLS WITH HEPA VACUUM WHEN
GENERATING DUST, OR
b. HEPA VACUUMING IMMEDIATELY AS THE DUST IS GENERATED.
c. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
d. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
e. SEAL UNUSED DOORS WITH DUCT TAPE.
f. BLOCK OFF AND SEAL ALL HVAC AIR VENTS.
g. PLACE +TACKY MAT AT INSIDE OF ENTRANCE OF WORK AREA AND
CHANGE FREQUENTLY OR WHEN INEFFECTIVE.
h. WET MOP AND/OR VACUUM WITH +HEPA-FILTERED VACUUM THE
WORK AREA BEFORE LEAVING THE SITE. BROOMING IS NOT
SUFFICIENT.
2. WHENEVER TRANSPORTING OUTSIDE OF CONSTRUCTION SITE, WIPE
MATERIALS, EQUIPMENT AND WORK SURFACES WITH EPA REGISTERED,
UNSCENTED
+DISINFECTANT, WHICH HAS MANUFACTURER’S LABELING AS A
BACTERICIDE, TUBERCULOCIDE, VIRUCIDE, AND FUNGICIDE.
3. THERE SHALL BE NO STANDING, UNCOVERED WATER DURING
CONSTRUCTION. THIS INCLUDES WATER IN EQUIPMENT DRIP PANS AND
OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS. ALL
ACCIDENTAL SPILLS SHALL BE CLEANED UP AND DRIED WITHIN 12
HOURS. REMOVE AND DISPOSE OF POROUS MATERIALS THAT REMAIN
DAMP FOR MORE THAN 72 HOURS.
AS ABOVE AND:
1. COMPLETE ALL CRITICAL BARRIERS, I.E., +SHEETROCK, +PLYWOOD,
+PLASTIC, +PREFABRICATED MOVABLE WALL SYSTEM, TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD
BEFORE CONSTRUCTION BEGINS.
2. MAINTAIN NEGATIVE PRESSURE VENTILATION +(NPV) AT 0.01" WATER
COLUMN (WC) WITHIN THE WORK SITE UTILIZING NPV MACHINE.
3. NPV MONITORING DEVICES SHALL BE VISIBLE FROM OUTSIDE THE
WORKSITE AND READINGS SHALL BE DOCUMENTED DAILY OR MORE
OFTEN AS NEEDED. KEEP TRACK MONITORING DEVICE AND TRACKING
LOG AT OUTSIDE OF ENTRANCE AT THE SITE.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS. TAPE COVERING, UNLESS USING FORM-
FITTING SOLID LID.
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES. APPROPRIATELY
DURING CONSTRUCTION.
AS ABOVE AND:
1. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
2. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED USING A HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH
OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
3. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS SHALL BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA.
C L
A S
S I I
C L
A S
S I
C L
A S
S I
II
C L
A S
S I V
ICRA CONSTRUCTION PRECAUTIONS
NEW TELECOMMUNICATION ROOM (SEE SHEETS A001-A005 FOR TR PHASING)
2.4
2.4
2.3
2.3
2.2
2.2
2.1
2.1
2.5
2.5
2.6
2.6
2.7
2.7
2.8
2.8
2.10
2.10
2.9
2.9
X8
X8
X8.1
X8.1
X7
X7
X6.6
X6.6
X6.5
X6.5
X9
X9
X10
X10
X11
X11
2.11
2.11
X12
X12
2.12
2.12
2.13
2.13
2.14
2.14
2.A
2.A
2.C1
2.C1
X13
X13
2.D
2.A5
2.A5
2.C
2.D9 2.D9
2.G 2.G
2.D
2.C
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
PATIENT
RM
CORRIDOR
C6613
ALCOVE
6677C
ALCOVE
6675B
ALCOVE
6675C
TOILET
6677A
EQUIP
STORAGE
6677B
TOILET
6675A
TOILET
6676A
OFFICE
ALCOVE
CORRIDOR
C6611
EQUIP
STORAGE
ALCOVE
6667A
ELEC
RM
66E3
LINEN
PANTRY
6683A
CLEAN
SUPPLY
SOILED
UTILITY
CHARGE
NURSE
OFFICE
TEAM
RM
ISOLATION
MS
AND N
PAT
RM
ANTEROOM
6662B
TOILET
6662A
MED
RM
CHARTING
CONFERENCE
RM
WASTE
RM
PATIENT
LOUNGE
PM
AND R
RM
REHAB
TEAM
RM
STAFF
LOUNGE
CLC
TEAM
RM
ISOLATION
MS
AND N
PAT
RM
ISOLATION
MS
AND N
PAT
RM
ANTE
RM
TOILET
6659A
HAC
66H3
TOILET
6658A
TOILET
6655A
ELECTRICAL
RM
66E1
CHARTING
WEST
CEILING
DINING
RM
VISITOR
WAITING
ELEV
LOBBY
C6608
ELEV
LOBBY
C6607
CORRIDOR
C6606
EMS
66H2
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
TOILET
6664A
VESTIBULE
6664B
TOILET
6666A
VESTIBULE
6666B
TOILET
6668A
VESTIBULE
6668B
TOILET
6670A
VESTIBULE
6670B
TOILET
6672A
VESTIBULE
6672B
TOILET
6674A
VESTIBULE
6674B
TOILET
6600A
TOILET
6600B
CORRIDOR
C6610
CORRIDOR
C6612
CORRIDOR
C6609
NURSE
STATION
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
PRIVATE
MS
AND N
PAT
RM
TOILET
6678A
TOILET
6680A
TOILET
6682A
TOILET
6686A
TOILET
6688A
TOILET
6690A
TOILET
6692A
TOILET
6694A
TOILET
6696A
TOILET
6698A
VESTIBULE
6678B
VESTIBULE
6680B
VESTIBULE
6682B
VESTIBULE
6686B
VESTIBULE
6688B
VESTIBULE
6690B
VESTIBULE
6692B
VESTIBULE
6694B
VESTIBULE
6696B
VESTIBULE
6698B
CORRIDOR
ALCOVE
6613A
EQUIP
PARK
ALCOVE
PARK
STRETCH
CLEAN
LINEN
STAFF
LOUNGE
EQUIP
STORAGE
TOILET
6619A
MED
SURGICAL
SOCIAL
WORK
INPT
MED
SURGICAL
SOCIALWORK
OFFICE
EQUIPMENT
CLEANING
SOCIALWORK
HOMELESS
PGM
CRRC
OFFICE
CONFERENCE
RM
MED
RM
PANTRY
TEAM
RM
MEDICINE
TEAM
OFFICE
MED
SVC
OFFICE
LOCKER
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
TOILET
6627A
TOILET
6628A
TOILET
6629A
ALCOVE
6629B
CORRIDOR
C6601
CORRIDOR
C6605
CORRIDOR
C6602
TOILET
C6604
NURSE
STATION
ELEC
RM
66E2
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
TOILET
6602A TOILET
6604A TOILET
6608A
TOILET
6610A
TOILET
6612A
TOILET
6618A TOILET
6620A
TOILET
6622A
TOILET
6624A
TOILET
6626A
VESTIBULE
6602B VESTIBULE
6604B VESTIBULE
6608B VESTIBULE
6610B
VESTIBULE
6612B VESTIBULE
6618B
VESTIBULE
6620B VESTIBULE
6622B
VESTIBULE
6624B VESTIBULE
6626B
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
SEMI
PRIVATE
MS
AND N
PAT
RM
ISOLATION
MS
AND N
PAT
RM
ISOLATION
MS
AND N
PAT
RM
ISOLATION
MS
AND N
PAT
RM
TOILET
6630A
TOILET
6632A
TOILET
6634A
TOILET
6636A
TOILET
6638A
TOILET
6642A
TOILET
6644A
TOILET
6646B
TOILET
6648B
TOILET
6650A
VESTIBULE
6630B
VESTIBULE
6632B
VESTIBULE
6634B
VESTIBULE
6636B
VESTIBULE
6638B
VESTIBULE
6642B
VESTIBULE
6644B
ANTE
RM
6646A
SOCIAL
WORKER
OFFICE
HAC
66H1
ANTE
RM
6648A
TR40
40-6
LINEN
CHUTE
66L1
STAIRS
STAIRS
ELEV
ELEV
ELEV
ELEV
ELEV
STAIRS
FE
CO2
FE
FE
CO2
FE
FE
FE
FE
FE
FE
FE
FE
CO2
FE
CO2
FE
1A
1B11A
11B
1AA
N O
R T
H
FIRE BARRIER, 1 HR
FIRE BARRIER, 2 HR
SMOKE BARRIER PER IBC 709 & NFPA 101 8.5
LEGEND - FIRE/SMOKE PARTITIONS
SMOKE PARTITION PER IBC 710 & NFPA 101 8.4
FE
EXISTING FIRE EXTINGUISHER
FE
EXISTING CO2 FIRE EXTINGUISHER
CO2
13890 Bishops Drive, Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C U s e rs \r o if .N
A G
E L
\O n e D ri v e
N a g e l S e rv ic e s L
L C
\D o c u m e n ts \J e s s e
B ro w n E
H R
M I n fr a s tr u c tu re U p g ra d e s
F
IN
A L
C D ro i.
fo n ta n .r v t
/1
/2
:5
:3
A
M
A045
BUILDING 40 - SIXTH FLOOR
PHASING PLAN
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHIGAGO, IL 60612
537-21-700
VA BLDG
18 AUG 2025 ES RF
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
3/32" = 1'-0"
BUILDING 40 PHASING PLAN - SIXTH FLOOR
N O
R T
H
Revisions: Date:
Ryan Bourland Text Box
12 MAR 2025,
18 AUG 2025 R1
Ryan Bourland Line
PHASE UNDER ONE GENERAL CONTRACT. WORK ON CABLE AND FIBER
REPLACEMENT WILL REQUIRE ACCESS TO SPACES ADJACENT AND ALONG THE
PATH OF CABLE AND FIBER REPLACEMENT. THESE SPACES ARE IN ADDITION
TO THE TRS AND OTHER RELATED ROOMS.
2. THE RENOVATION OF THE JESSE BROWN VA HOSPITAL EHRM WILL BE DIVIDED
IN MULTIPLE PHASES PER TELECOMMUNICATION ROOM TOWER AND AN
OVERALL DEPLOYMENT PHASE (PER BUILDING) BASED ON THE INFECTION
CONTROL RISK ASSESSMENT CLASSES SPECIFIED IN THE DRAWINGS:
ICRA CLASS I ICRA CLASS II ICRA CLASS III ICRA CLASS IV
3. THE PHASING SEQUENCE AND DURATION WILL DEPEND ON THE COORDINATION
BETWEEN THE GENERAL CONTRACTOR (GC) AND THE VA, CONSIDERING THE
HOSPITAL'S OPERATIONAL NEEDS AND PATIENT SAFETY.
4. THE GC SHALL PROVIDE A DETAILED CRITICAL PATH METHOD (CPM) SCHEDULE
FOR EACH PHASE, SHOWING THE START AND FINISH DATES, MILESTONES,
LOCATION, WORK HOURS FOR EACH PHASE AND DEPENDENCIES.
5. THE GC SHALL PROVIDE A WRITTEN NARRATIVE FOR EACH PHASE, DESCRIBING
THE SCOPE OF WORK, TEMPORARY SYSTEMS, INFECTION CONTROL
MEASURES AND UTILITY SHUTDOWNS.
6. THE GC SHALL OBTAIN THE VA'S APPROVAL BEFORE PROCEEDING TO THE
NEXT PHASE OR IF TWO PHASES CAN BE DONE SIMULTANEOUSLY.
7. THE CPM PHASING SHOULD COMPLY WITH THE CURRENT EDITION OF VA
CONSTRUCTION STANDARDS, VA HANDBOOKS, AND VA MASTER
SPECIFICATIONS
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. FOR VISUAL INSPECTION ONLY, DAMPEN CEILING TILE WITH WATER
SPRAY BEFORE REMOVING. REPLACE A CEILING TILE IMMEDIATELY
AFTER INSPECTION; DO NOT LEAVE UNATTENDED
AS ABOVE AND:
1. PROVIDE ACTIVE MEANS TO PREVENT DUST FROM DISPERSING. DUST
LEFT ON THE FLOORS, CLOTHING AND/OR BODY IS NOT ALLOWED IN
ORDER TO PREVENT SPREADING AND TRACKING. “ACTIVE MEANS” ARE:
a. VACUUM ATTACHMENTS ON TOOLS WITH HEPA VACUUM WHEN
GENERATING DUST, OR
b. HEPA VACUUMING IMMEDIATELY AS THE DUST IS GENERATED.
c. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
d. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
e. SEAL UNUSED DOORS WITH DUCT TAPE.
f. BLOCK OFF AND SEAL ALL HVAC AIR VENTS.
g. PLACE +TACKY MAT AT INSIDE OF ENTRANCE OF WORK AREA AND
CHANGE FREQUENTLY OR WHEN INEFFECTIVE.
h. WET MOP AND/OR VACUUM WITH +HEPA-FILTERED VACUUM THE
WORK AREA BEFORE LEAVING THE SITE. BROOMING IS NOT
SUFFICIENT.
2. WHENEVER TRANSPORTING OUTSIDE OF CONSTRUCTION SITE, WIPE
MATERIALS, EQUIPMENT AND WORK SURFACES WITH EPA REGISTERED,
UNSCENTED
+DISINFECTANT, WHICH HAS MANUFACTURER’S LABELING AS A
BACTERICIDE, TUBERCULOCIDE, VIRUCIDE, AND FUNGICIDE.
3. THERE SHALL BE NO STANDING, UNCOVERED WATER DURING
CONSTRUCTION. THIS INCLUDES WATER IN EQUIPMENT DRIP PANS AND
OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS. ALL
ACCIDENTAL SPILLS SHALL BE CLEANED UP AND DRIED WITHIN 12
HOURS. REMOVE AND DISPOSE OF POROUS MATERIALS THAT REMAIN
DAMP FOR MORE THAN 72 HOURS.
AS ABOVE AND:
1. COMPLETE ALL CRITICAL BARRIERS, I.E., +SHEETROCK, +PLYWOOD,
+PLASTIC, +PREFABRICATED MOVABLE WALL SYSTEM, TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD
BEFORE CONSTRUCTION BEGINS.
2. MAINTAIN NEGATIVE PRESSURE VENTILATION +(NPV) AT 0.01" WATER
COLUMN (WC) WITHIN THE WORK SITE UTILIZING NPV MACHINE.
3. NPV MONITORING DEVICES SHALL BE VISIBLE FROM OUTSIDE THE
WORKSITE AND READINGS SHALL BE DOCUMENTED DAILY OR MORE
OFTEN AS NEEDED. KEEP TRACK MONITORING DEVICE AND TRACKING
LOG AT OUTSIDE OF ENTRANCE AT THE SITE.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS. TAPE COVERING, UNLESS USING FORM-
FITTING SOLID LID.
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES. APPROPRIATELY
DURING CONSTRUCTION.
AS ABOVE AND:
1. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
2. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED USING A HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH
OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
3. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS SHALL BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA.
C L
A S
S I I
C L
A S
S I
C L
A S
S I
II
C L
A S
S I V
ICRA CONSTRUCTION PRECAUTIONS
NEW TELECOMMUNICATION ROOM (SEE SHEETS A001-A005 FOR TR PHASING)
2.4
2.4
2.3
2.3
2.2
2.2
2.1
2.1
2.5
2.5
2.6
2.6
2.7
2.7
2.8
2.8
2.10
2.10
2.9
2.9
X8
X8
X8.1
X8.1
X7
X7
X6.6
X6.6
X6.5
X6.5
X9
X9
X10
X10
X11
X11
2.11
2.11
X12
X12
2.12
2.12
2.13
2.13
2.14
2.14
2.A
2.A
2.C1
2.C1
X13
X13
2.D
2.A5
2.A5
2.C
2.D9 2.D9
2.G 2.G
2.D
2.C
SEMI-PRIVATE
MH
AND B
PATIENT
RM
TOILET
7611A
NURSE
OFFICE
SEMI-PRIVATE
MH
AND B
PATIENT
RM
SEMI-PRIVATE
MH
AND B
PATIENT
RM
SEMI-PRIVATE
MH
AND B
PATIENT
RM
TOILET
7612A
TOILET
7613A
TOILET
7614A
LAUNDRY
PSYCHOLOGY
OFFICE
SEMI-PRIVATE
MH
AND B
PATIENT
RM
PRIVATE
MH
AND B
PATIENT
RM
SEMI-PRIVATE
MH
AND B
PATIENT
RM
TOILET
7616A
TOILET
7618A
ELEC
7617A
TOILET
7619A
ELEC
RM
76E2
SEMI-PRIVATE
MH
AND B
PATIENT
RM
TOILET
7620A
SEMI-PRIVATE
MH
AND B
PATIENT
RM
7620B
TOILET
7622A
PRIVATE
MH
AND B
PATIENT
RM
TOILET
7621A
TOILET
SEMI-PRIVATE
MH
AND B
PATIENT
RM
SEMI-PRIVATE
MH
AND B
PATIENT
RM
TOILET
7625A
TOILET
7626A
PRIMARY
PHYSICIAN
AND
MED
STUDENT
OFFICE
SEMI-PRIVATE
MH
AND B
PATIENT
RM
TOILET
7628A
HAC
76H1
MUSIC
RM
QUIET
RM
EXERCISE
AREA
SEMI-PRIVATE
MH
AND B
PATIENT
RM
TOILET
7630A
VISITOR
WAITING
TOILET
ELEV
LOBBY
C7606
DAY
ROOM
NURSE
STATION
MUSIC
RM
QUIET
RM
OFFICE
OFFICE
RECYC
CONFERENCE
OFFICE
7687 OFFICE
CORRIDOR
C7605
CORRIDOR
C7607
DAY
RM
CORRIDOR
C7601
CORRIDOR
C7603
ELEV
LOBBY
C7602
NURSE
STATION
NURSE
STATION
MEDICATION
RM
CLEAN
SUPPLY
CLEAN
LINEN
EQUIP
STORAGE
STAFF
TOILET
STAFF
LOUNGE
RECYC
GEN
WASTE
EXAM
RM
ELECTRICAL
RM
76E1
SEMI
PRIVATE
MH
AND B
PATIENT
RM
TOILET
7632A
EMS
76H2
TOILET
7640A
PHONE
CORRIDOR
C7604
LINEN
CHUTE
76L1
PRIVATE
PATIENT
RM
PRIVATE
PATIENT
RM
PRIVATE
PATIENT
RM
PRIVATE
PATIENT
RM
PRIVATE
PATIENT
RM
PRIVATE
PATIENT
RM
PRIVATE
PATIENT
RM
OFFICE
OFFICE
OFFICE
PRIVATE
PATIENT
RM
LAUNDRY
PRIVATE
PATIENT
RM
SEMI
PRIVATE
PATIENT
RM
PRIVATE
PATIENT
RM
SEMI
PRIVATE
PATIENT
RM
STORAGE
PRIVATE
PATIENT
RM
EXTRA
PRIVATE
PATIENT
RM
7652B
ANTE
RM
TOILET
7652A
TOILET
7654A
TOILET
7651A
TOILET
7655A
TOILET
7656A
TOILET
7660A
TOILET
7661A
TOILET
7657A
TOILET
7662A
TOILET
7666A
TOILET
7668A
TOILET
7670A
TOILET
7671A
TOILET
7669A
CLOSET
7665A
ELEC
RM
76E3
HAC
76H3
PHONE
TR40
40-7
STAIRS
ELEV
ELEV
ELEV
23 ELEV
STAIRS
STAIR
FE
CO2
FE
CO2
FE
FE
FE
FE
FE
FE
FE
CO2
1A
1B11A
11B
1AA
N O
R T
H
FIRE BARRIER, 1 HR
FIRE BARRIER, 2 HR
SMOKE BARRIER PER IBC 709 & NFPA 101 8.5
LEGEND - FIRE/SMOKE PARTITIONS
SMOKE PARTITION PER IBC 710 & NFPA 101 8.4
FE
EXISTING FIRE EXTINGUISHER
FE
EXISTING CO2 FIRE EXTINGUISHER
CO2
13890 Bishops Drive, Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C U s e rs \r o if .N
A G
E L
\O n e D ri v e
N a g e l S e rv ic e s L
L C
\D o c u m e n ts \J e s s e
B ro w n E
H R
M I n fr a s tr u c tu re U p g ra d e s
F
IN
A L
C D ro i.
fo n ta n .r v t
/1
/2
:5
:4
A
M
A046
BUILDING 40 - SEVENTH FLOOR
PHASING PLAN
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHIGAGO, IL 60612
537-21-700
VA BLDG
18 AUG 2025 ES RF
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
3/32" = 1'-0"
BUILDING 40 WEST - 7TH FLOOR
N O
R T
H
Revisions: Date:
Ryan Bourland Text Box
12 MAR 2025,
18 AUG 2025 R1
Ryan Bourland Line
PHASE UNDER ONE GENERAL CONTRACT. WORK ON CABLE AND FIBER
REPLACEMENT WILL REQUIRE ACCESS TO SPACES ADJACENT AND ALONG THE
PATH OF CABLE AND FIBER REPLACEMENT. THESE SPACES ARE IN ADDITION
TO THE TRS AND OTHER RELATED ROOMS.
2. THE RENOVATION OF THE JESSE BROWN VA HOSPITAL EHRM WILL BE DIVIDED
IN MULTIPLE PHASES PER TELECOMMUNICATION ROOM TOWER AND AN
OVERALL DEPLOYMENT PHASE (PER BUILDING) BASED ON THE INFECTION
CONTROL RISK ASSESSMENT CLASSES SPECIFIED IN THE DRAWINGS:
ICRA CLASS I ICRA CLASS II ICRA CLASS III ICRA CLASS IV
3. THE PHASING SEQUENCE AND DURATION WILL DEPEND ON THE COORDINATION
BETWEEN THE GENERAL CONTRACTOR (GC) AND THE VA, CONSIDERING THE
HOSPITAL'S OPERATIONAL NEEDS AND PATIENT SAFETY.
4. THE GC SHALL PROVIDE A DETAILED CRITICAL PATH METHOD (CPM) SCHEDULE
FOR EACH PHASE, SHOWING THE START AND FINISH DATES, MILESTONES,
LOCATION, WORK HOURS FOR EACH PHASE AND DEPENDENCIES.
5. THE GC SHALL PROVIDE A WRITTEN NARRATIVE FOR EACH PHASE, DESCRIBING
THE SCOPE OF WORK, TEMPORARY SYSTEMS, INFECTION CONTROL
MEASURES AND UTILITY SHUTDOWNS.
6. THE GC SHALL OBTAIN THE VA'S APPROVAL BEFORE PROCEEDING TO THE
NEXT PHASE OR IF TWO PHASES CAN BE DONE SIMULTANEOUSLY.
7. THE CPM PHASING SHOULD COMPLY WITH THE CURRENT EDITION OF VA
CONSTRUCTION STANDARDS, VA HANDBOOKS, AND VA MASTER
SPECIFICATIONS
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. FOR VISUAL INSPECTION ONLY, DAMPEN CEILING TILE WITH WATER
SPRAY BEFORE REMOVING. REPLACE A CEILING TILE IMMEDIATELY
AFTER INSPECTION; DO NOT LEAVE UNATTENDED
AS ABOVE AND:
1. PROVIDE ACTIVE MEANS TO PREVENT DUST FROM DISPERSING. DUST
LEFT ON THE FLOORS, CLOTHING AND/OR BODY IS NOT ALLOWED IN
ORDER TO PREVENT SPREADING AND TRACKING. “ACTIVE MEANS” ARE:
a. VACUUM ATTACHMENTS ON TOOLS WITH HEPA VACUUM WHEN
GENERATING DUST, OR
b. HEPA VACUUMING IMMEDIATELY AS THE DUST IS GENERATED.
c. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
d. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
e. SEAL UNUSED DOORS WITH DUCT TAPE.
f. BLOCK OFF AND SEAL ALL HVAC AIR VENTS.
g. PLACE +TACKY MAT AT INSIDE OF ENTRANCE OF WORK AREA AND
CHANGE FREQUENTLY OR WHEN INEFFECTIVE.
h. WET MOP AND/OR VACUUM WITH +HEPA-FILTERED VACUUM THE
WORK AREA BEFORE LEAVING THE SITE. BROOMING IS NOT
SUFFICIENT.
2. WHENEVER TRANSPORTING OUTSIDE OF CONSTRUCTION SITE, WIPE
MATERIALS, EQUIPMENT AND WORK SURFACES WITH EPA REGISTERED,
UNSCENTED
+DISINFECTANT, WHICH HAS MANUFACTURER’S LABELING AS A
BACTERICIDE, TUBERCULOCIDE, VIRUCIDE, AND FUNGICIDE.
3. THERE SHALL BE NO STANDING, UNCOVERED WATER DURING
CONSTRUCTION. THIS INCLUDES WATER IN EQUIPMENT DRIP PANS AND
OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS. ALL
ACCIDENTAL SPILLS SHALL BE CLEANED UP AND DRIED WITHIN 12
HOURS. REMOVE AND DISPOSE OF POROUS MATERIALS THAT REMAIN
DAMP FOR MORE THAN 72 HOURS.
AS ABOVE AND:
1. COMPLETE ALL CRITICAL BARRIERS, I.E., +SHEETROCK, +PLYWOOD,
+PLASTIC, +PREFABRICATED MOVABLE WALL SYSTEM, TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD
BEFORE CONSTRUCTION BEGINS.
2. MAINTAIN NEGATIVE PRESSURE VENTILATION +(NPV) AT 0.01" WATER
COLUMN (WC) WITHIN THE WORK SITE UTILIZING NPV MACHINE.
3. NPV MONITORING DEVICES SHALL BE VISIBLE FROM OUTSIDE THE
WORKSITE AND READINGS SHALL BE DOCUMENTED DAILY OR MORE
OFTEN AS NEEDED. KEEP TRACK MONITORING DEVICE AND TRACKING
LOG AT OUTSIDE OF ENTRANCE AT THE SITE.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS. TAPE COVERING, UNLESS USING FORM-
FITTING SOLID LID.
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES. APPROPRIATELY
DURING CONSTRUCTION.
AS ABOVE AND:
1. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
2. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED USING A HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH
OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
3. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS SHALL BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA.
C L
A S
S I I
C L
A S
S I
C L
A S
S I
II
C L
A S
S I V
ICRA CONSTRUCTION PRECAUTIONS
NEW TELECOMMUNICATION ROOM (SEE SHEETS A001-A005 FOR TR PHASING)
4.44.4
4.54.5
4.34.3
4.24.2
4.14.1
4.D5
4.C5
4.C5
4.A
4.A
4.B
4.B
4.C
4.C
4.D
4.D
4.E
4.E
4.F
4.F
OFFICE
STAFF
OFFICE
1220 LOUNGE
HAC
SUPERVISOR
OFFICE
TELECOM
12T2
PHARMACY
CONSULTATION
1195A
CORRIDOR
C1115
OFFICE
CONSULT
OFFICE
DIETICIAN
OFFICE
SUPV
CLINIC
SUPPORT
OFFICE
DERMLITE
RM
STORAGE
OFFICE
OFFICE
102A
CORRIDOR
MEN'S
TOILET
WOMEN'S
TOILET
PROGRAM
ROOM
1T15
CORRIDOR
PAINT
STORAGE
CARPENTRY
STORAGE
ELECTRICAL
STORAGE
PLUMBING
STORAGE
HVAC
STORAGE
EXERCISE
AREA
FAC
1210A
STAIR
TR32
32-1
STAFF
OFFICE
1T15
STORAGE
1A
1B11A
11B
1AA
N O
R T
H
FIRE BARRIER, 1 HR
FIRE BARRIER, 2 HR
SMOKE BARRIER PER IBC 709 & NFPA 101 8.5
LEGEND - FIRE/SMOKE PARTITIONS
SMOKE PARTITION PER IBC 710 & NFPA 101 8.4
FE
EXISTING FIRE EXTINGUISHER
FE
EXISTING CO2 FIRE EXTINGUISHER
CO2
13890 Bishops Drive, Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C U s e rs \r o if .N
A G
E L
\O n e D ri v e
N a g e l S e rv ic e s L
L C
\D o c u m e n ts \J e s s e
B ro w n E
H R
M I n fr a s tr u c tu re U p g ra d e s
F
IN
A L
C D ro i.
fo n ta n .r v t
/1
/2
:5
:4
A
M
A047
BUILDING 32 - FIRST FLOOR
PHASING PLAN
JESSE BROWN VAMC EHRM
INFRASTRUCTURE UPGRADES
820 S DAMEN AVE, CHIGAGO, IL 60612
537-21-700
VA BLDG
18 AUG 2025 ES RF
ISSUED FOR BID &
CONSTRUCTION
FULLY SPRINKLERED
21011
3/32" = 1'-0"
BUILDING 32 PHASING PLAN - FIRST FLOOR
N O
R T
H
Revisions: Date:
Ryan Bourland Text Box
12 MAR 2025,
18 AUG 2025 R1
Ryan Bourland Line
UP
1. WORK ON THIS PROJECT IS ANTICIPATED TO BE PERFORMED AS A MULTIPLE
PHASE UNDER ONE GENERAL CONTRACT. WORK ON CABLE AND FIBER
REPLACEMENT WILL REQUIRE ACCESS TO SPACES ADJACENT AND ALONG THE
PATH OF CABLE AND FIBER REPLACEMENT. THESE SPACES ARE IN ADDITION
TO THE TRS AND OTHER RELATED ROOMS.
2. THE RENOVATION OF THE JESSE BROWN VA HOSPITAL EHRM WILL BE DIVIDED
IN MULTIPLE PHASES PER TELECOMMUNICATION ROOM TOWER AND AN
OVERALL DEPLOYMENT PHASE (PER BUILDING) BASED ON THE INFECTION
CONTROL RISK ASSESSMENT CLASSES SPECIFIED IN THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .