Attachment 2 - 537-21-700 JBMC EHRM Specifications - Vol 1.pdf

PDF 12 MB Posted

Attached to
Y1DZ--VHA EHRM Infrastructure Upgrades - Jesse Brown VA Medical Center, Chicago, IL - Construction Project 537-21-700
Solicitation number
36C77625B0049
Issued by

About this file

The file appears to be a technical specification document for an Electronic Health Record Management (EHRM) Infrastructure Upgrade project at the Jesse Brown VA Medical Center in Chicago, Illinois. The project (Solicitation Number 36C77625B0049) is being managed by the Department of Veterans Affairs Technology Acquisition Center Austin and involves construction and technology infrastructure improvements. The specification document (Attachment 2) likely details the technical requirements, system specifications, and performance criteria for the EHRM infrastructure upgrade, though a complete technical review would require examining the full document contents.

View the file

Other files

File Type Posted
Attachment 1 - Abstract of Bids Chicago Pg 1 of 2.pdf PDF
Attachment 2 - Abstract of Bids Chicago Pg 2 of 2.pdf PDF
36C77625B0049 0009.docx DOCX document
36C77625B0049 0008.docx DOCX document
Attachment 1 - RFI Responses - Chicago EHRM - 537-21-700.xlsx XLSX spreadsheet
Attachment 3 - Phasing MEP Narrative and Product Data - Chicago EHRM - 537-21-700.pdf PDF
Attachment 4 - Blast Design and Physical Security Rpts - Chicago EHRM - 537-21-700.pdf PDF
36C77625B0049 0007.docx DOCX document
Attachment 2 - Specification Section 07 27 26 - Chicago EHRM - 537-21-700.pdf PDF
S06 - 36C77625B0049 0006 - Chicago EHRM.docx DOCX document
36C77625B0049 0005.docx DOCX document
Attachment 1 - Attachment 16 - WD - IL20250009 Rev 11 - 10-3-25.pdf PDF
Attachment 2 - Attachment 16 - WD - IL20250009 Rev 10 - 9-19-25.pdf PDF
36C77625B0049 0004.docx DOCX document
Attachment 1 - 2nd Sign-In Sheet - 537-21-700 EHRM IU - Chicago 9-29-25.pdf PDF
Attachment 14 - JB VAMC EHRM IU - Limited Asbestos and LBP Sampling Report REV 082622.pdf PDF
36C77625B0049 0003.docx DOCX document
36C77625B0049 0002.docx DOCX document
Attachment 2 - 2nd Site Visit Instructions - Jesse Brown VAMC.docx DOCX document
Attachment 1 - Sign-In Sheet - 537-21-700 EHRM IU - Chicago 9-17-25.pdf PDF
Attachment 1 - Addendum 01 Jesse Brown EHRM Infrastructure Upgrades.pdf PDF
36C77625B0049 0001.docx DOCX document
Attachment 8 - 537-21-700 Site Plan - Bed Tower Bldg.pdf PDF
Attachment 10 - 537-21-700 Site Plan - Ogden Bldg.pdf PDF
Attachment 12 - 537-21-700 PRA EHRM JBMC 1st FL DEMO-ICRA.pdf PDF
Attachment 16 - WD - IL20250009 Rev 9 - 8-22-25.pdf PDF
36C77625B0049.docx DOCX document
Attachment 3 - 537-21-700 JBMC EHRM Specifications - Vol 2.pdf PDF
Attachment 4 - 537-21-700 JBMC EHRM - Drawings - Set 1_Part1.pdf PDF
Attachment 4 - 537-21-700 JBMC EHRM - Drawings - Set 1_Part2.pdf PDF
Attachment 5 - 537-21-700 JBMC EHRM - Drawings - Set 2_Part2.pdf PDF
Attachment 9 - 537-21-700 Site Plan - Damen Bldg.pdf PDF
Attachment 13 - Geotechnical Report JBVAMC Additions_9-21-2023.pdf PDF
Attachment 1 - VA Notice of Limitations on Subcontracting-Cert of Compliance for Construction.docx DOCX document
Attachment 4 - 537-21-700 JBMC EHRM - Drawings - Set 1_Part4.pdf PDF
Attachment 17 - Site Visit Instructions - Jesse Brown VAMC.pdf PDF
Attachment 4 - 537-21-700 JBMC EHRM - Drawings - Set 1_Part3.pdf PDF
Attachment 5 - 537-21-700 JBMC EHRM - Drawings - Set 2_Part1.pdf PDF
Attachment 6 - 537-21-700 JBMC EHRM - Drawings - Set 3.pdf PDF
Attachment 7 - 537-21-700 Site Plan - Atrium Bldg.pdf PDF
Attachment 11 - 537-21-700 Site Plan - Taylor Bldg.pdf PDF
Attachment 15 - JA - 537-21-700 - JBMC EHRM Infra Upgrades.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chicago, IL

Jesse Brown EHRM Infrastructure

Upgrades

Healthcare System / Project Number 537-21-700

PROJECT MANUAL

BID & CONSTRUCTION DOCUMENTS - R1

March 12, 2025

August 18, 2025, R1

Vol 1 of 2

Jesse Brown EHRM Infrastructure Upgrades, Chicago, IL

VA Project Num. 537-21-700 02-01-24

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21

01 01 10 FSS Fire Safety Section

01 01 20 IC Infection Control

01 01 20.10 IC JB Construction Safety Procedure

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01-24

01 32 16.01 Architectural and Engineering CPM Schedules 03-20

01 33 23 Shop Drawings, Product Data, and Samples 11-23

01 33 23.10 Submittal Register

01 35 26 Safety Requirements 12-23

01 35 26.10 Construction Safety Procedure

01 35 26.20 Construction Safety Procedure Appendix E

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 00.10 Quality Control Reports

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 06-21

01 45 36.01 Schedule of Special Inspections Template

01 45 35.02 Statement of Special Inspections Template

01 57 19 Temporary Environmental Controls 01-21

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 04-22

01 81 13 Sustainable Construction Requirements 10-17

01 91 00 General Commissioning Requirements 04-22

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 12-23

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 01-21

02 82 13.13 Glovebag Asbestos Abatement 01-21

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17

00 01 10-2

SECTION NO DIVISION AND SECTION TITLES DATE

04 05 16 Masonry Grouting 01-21

04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 31 00 Steel Decking 01-21

05 36 00 Composite Metal Decking 01-21

05 40 00 Cold-Formed Metal Framing 01-21

05 50 00 Metal Fabrications 08-18

05 51 00 Metal Stairs 01-21

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 20 00 Finish Carpentry 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 01-21

07 22 00 Roof and Deck Insulation 01-21

07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 01-21

07 60 00 Flashing and Sheet Metal 01-21

07 71 00 Roof Specialties 01-21

07 72 00 Roof Accessories 01-21

07 81 00 Applied Fireproofing 07-23

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 04-22

07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 17 10 Integrated Door Assemblies 01-21

08 31 13 Access Doors and Frames 04-22

08 41 13 Aluminum-Framed Entrances and Storefronts 01-21

08 51 13 Aluminum Windows 01-21

08 56 53 Blast Resistant Windows 01-21

08 71 00 Door Hardware 01-24

08 80 00 Glazing 01-21

08 90 00 Louvers and Vents 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 06 00 Schedule for Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 01-21

00 01 10-3

SECTION NO DIVISION AND SECTION TITLES DATE

09 65 16 Resilient Sheet Flooring 06-22

09 65 19 Resilient Tile Flooring 05-18

09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT (NOT USED)

DIVISION 12 – FURNISHINGS (NOT USED)

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-21

DIVISION 14– CONVEYING EQUIPMENT (NOT USED)

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-23

22 05 23 General-Duty Valves for Plumbing Piping 09-20

22 05 33 Heat Tracing for Plumbing Piping 09-20

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 05-21

22 13 00 Facility Sanitary and Vent Piping 09-20

22 14 00 Facility Storm Drainage 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

03-23

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23

23 08 00 Commissioning of HVAC Systems 03-23

23 09 23 Direct-Digital Control System for HVAC 03-23

23 21 13 Hydronic Piping 03-23

23 23 00 Refrigerant Piping 03-23

23 31 00 HVAC Ducts and Casings 03-23

23 37 00 Air Outlets and Inlets 03-23

23 81 00 Decentralized Unitary HVAC Equipment 03-23

00 01 10-4

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22

26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22

26 05 26 Grounding and Bonding for Electrical Systems 11-22

26 05 33 Raceway and Boxes for Electrical Systems 11-22

26 05 73 Overcurrent Protective Device Coordination Study 11-22

26 08 00 Commissioning of Electrical Systems 11-22

26 09 23 Lighting Controls 11-22

26 22 00 Low-Voltage Transformers 11-22

26 24 16 Panelboards 11-22

26 27 26 Wiring Devices 11-22

26 29 21 Enclosed Switches and Circuit Breakers 11-22

26 36 23 Automatic Transfer Switches 11-22

26 41 00 Facility Lightning Protection 11-22

26 43 13 Surge Protective Devices 11-22

26 51 00 Interior Lighting 11-22

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 05 36 Cable Trays For Communication Systems

27 05 53 Identification For Communication Systems

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Structured cabling 06-15

27 11 16 Communications Cabinets, Racks, Frames, and Enclosures

27 11 19 Communications Terminated Blocks and Patch Panels

27 11 26 Communications Rack Mounted Power Protection and Power

Strips

27 13 13 Communications Copper Backbone Cabling

27 13 13.13 Communications Copper Cabling Splicing and Terminations

27 13 23 Communications Optical Fiber Backbone Cabling

27 13 23.13 Communications Optical Fiber Splicing and Terminations

27 15 13 Communications Copper Horizontal Cabling

27 16 19 Communications Patch Cords, Station Cords, and cross-connect Wires

27 78 00 Closeout Submittals for Communications

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

00 01 10-5

SECTION NO DIVISION AND SECTION TITLES DATE

28 13 00 Physical Access Control System 10-11

28 13 16 Physical Access Control System and Database Management 09-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 08-23

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 31 13 Chain Link Fences and Gates 06-18

DIVISION 33 – UTILITIES

33 30 00 Sanitary Sewer Utilities 06-13

33 40 00 Storm Sewer Utilities 12-17

DIVISION 34 – TRANSPORTATION (NOT USED)

DIVISION 48 – Electrical Power Generation (NOT USED)

VA Project Num. 537-21-700 05-01-20

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

Drawing No. Title

GENERAL

G001.1 COVER SHEET

G001.2 COVER SHEET

G001.3 COVER SHEET

G002 GENERAL NOTES

G003 BUILDING CODE REVIEW

HAZARDOUS ABATEMENT

HA101 ASBESTOS AND ABATEMENT PLANS – LEVEL 1

HA102 ASBESTOS AND ABATEMENT PLANS – LEVEL 2

HA103 ASBESTOS AND ABATEMENT PLANS – LEVEL 3

HA104 ASBESTOS AND ABATEMENT PLANS – LEVEL 4

HA105 ASBESTOS AND ABATEMENT PLANS – LEVEL 5

HA106 ASBESTOS AND ABATEMENT PLANS – LEVEL 6

HA107 ASBESTOS AND ABATEMENT PLANS – LEVEL 7

HA108 ASBESTOS AND ABATEMENT PLANS – LEVEL 8

HA109 ASBESTOS AND ABATEMENT PLANS – LEVEL 9

HA110 ASBESTOS AND ABATEMENT PLANS – LEVEL 10

CIVIL

GC001 CIVIL COVER SHEET

SU100 TR11A-SURVEY PLAN

SU101 TR30-SURVEY PLAN

SU102 TR1AA-SURVEY PLAN

SU103 TR1B-SURVEY PLAN

SU104 TR11B-SURVEY PLAN

CE100 TR1AA-EXISTING CONDITIONS PLAN

CE101 TR1B-EXISTING CONDITION PLAN

CE102 TR11A-EXISTING CONDITIONS PLAN

CE103 TR11B-EXISTING CONDITIONS PLAN

CE104 TR30-EXISTING CONDITION PLAN

CD100 TR1AA-DEMOLITION PLAN

CD101 TR1B-DEMOLITION PLAN

00 01 15 - 2

CD102 TR11A-DEMOLITION PLAN

CD103 TR11B-DEMOLITION PLAN

CD104 TR30-DEMOLITION PLAN

CS100 TR1AA-CIVIL SITE PLAN

CS101 TR1B-CIVIL SITE PLAN

CS102 TR11A-CIVIL SITE PLAN

CS103 TR11B-CIVIL SITE PLAN

CS104 TR30-CIVIL SITE PLAN

CS500 SITE DETAILS

CG100 TR1AA-GRADING PLAN

CG101 TR1B -GRADING PLAN

CG102 TR11A-GRADING PLAN

CG103 TR11B-GRADING PLAN

CG104 TR30-GRADING PLAN

CU100 COMBINED SEWER PLAN AND PROFILES

CU501 UTILITY DETAILS

EC100 TR1AA-EROSION CONTROL PLAN

EC101 TR1B-EROSION CONTROL PLAN

EC102 TR11A-EROSION CONTROL PLAN

EC103 TR11B-EROSION CONTROL PLAN

EC104 TR30-EROSION CONTROL PLAN

EC500 EROSION CONTROL DETAILS

LS100 TR30-LANDSCAPING PLAN

LS101 TR11A-LANDSCAPING PLAN

LS102 TR1AA-LANDSCAPING PLAN

STRUCTURAL

S001 GENERAL STRUCTURAL NOTES, DESIGN LOADS &

ABBREVIATIONS

S002 GENERAL STRUCTURAL NOTES AND QA NOTES & TABLES

S003 ROOF SNOW DRIFT PLANS

S101 OVERALL SITE PLAN

1A-S101 TR1A-STRUCTURAL FLOOR PLANS

1AA-S101 TR1AA-STRUCTURAL FLOOR PLANS

1B-S101 TR1B-STRUCTURAL FLOOR PLAN

1B-S102 TR1B-STRUCTURAL FLOOR PLANS

11A-S101 TR11A-STRUCTURAL FLOOR PLAN

11A-S102 TR11A-STRUCTURAL FLOOR PLANS

00 01 15 - 3

11B-S101 TR11B-STRUCTURAL FLOOR PLANS

11B-S102 TR11B-STRUCTURAL FLOOR PLANS

30-S101 TR30-STRUCTURAL FLOOR PLANS

S301 TYPICAL CONCRETE DETAILS

S302 CONCRETE DETAILS

S303 CONCRETE DETAILS

S501 STRUCTURAL DETAILS

S502 STRUCTURAL DETAILS

S503 STRUCTURAL DETAILS

S504 STRUCTURAL DETAILS

S540 PERFORMANCE SPECIFIED FRAMING

ARCHITECTURAL

A001 PHASING PLAN

A002 TR 1AA & TR 30 PHASING PLAN

A003 TR 1B PHASING PLAN – FIRST LEVEL

A004 TR 11A PHASING PLAN

A005 TR 11B PHASING PLAN

A006 BUILDING 1A – FIRST FLOOR PHASING

A007 BUILDING 1A – SECOND FLOOR PHASING

A008 BUILDING 1A – THIRD FLOOR PHASING

A009 BUILDING 1A – FOURTH FLOOR PHASING

A010 BUILDING 1A – FIFTH FLOOR PHASING

A011 BUILDING 1A – SIXTH FLOOR PHASING

A012 BUILDING 1A – SEVENTH FLOOR PHASING

A013 BUILDING 1A – EIGHTH FLOOR PHASING

A014 BUILDING 1A – NINTH FLOOR PHASING

A015 BUILDING 1A – TENTH FLOOR PHASING

A016 BUILDING 1B – FIRST FLOOR PHASING

A017 BUILDING 1B – SECOND FLOOR PHASING

A018 BUILDING 1B – THIRD FLOOR PHASING

A019 BUILDING 1B – FOURTH FLOOR PHASING

A020 BUILDING 1B – FIFTH FLOOR PHASING

A021 BUILDING 1B – SIXTH FLOOR PHASING

A022 BUILDING 1B – SEVENTH FLOOR PHASING

A023 BUILDING 1B – EIGHTH FLOOR PHASING

A024 BUILDING 1B – NINTH FLOOR PHASING

00 01 15 - 4

A025 BUILDING 1B – TENTH FLOOR PHASING

A026 BUILDING 11A – FIRST FLOOR PHASING

A027 BUILDING 11A – SECOND FLOOR PHASING

A028 BUILDING 11A – THIRD FLOOR PHASING

A029 BUILDING 11A – FOURTH FLOOR PHASING

A030 BUILDING 11A – FIFTH FLOOR PHASING

A031 BUILDING 11A – SIXTH FLOOR PHASING

A032 BUILDING 11A – SEVENTH FLOOR PHASING

A033 BUILDING 11B – FIRST FLOOR PHASING

A034 BUILDING 11B – SECOND FLOOR PHASING

A035 BUILDING 11B – THIRD FLOOR PHASING

A036 BUILDING 11B – FOURTH FLOOR PHASING

A037 BUILDING 11B – FIFTH FLOOR PHASING

A038 BUILDING 11B – SIXTH FLOOR PHASING

A039 BUILDING 11B – SEVENTH FLOOR PHASING

A040 BUILDING 40 – FIRST FLOOR PHASING

A041 BUILDING 40 – SECOND FLOOR PHASING

A042 BUILDING 40 – THIRD FLOOR PHASING

A043 BUILDING 40 – FOURTH FLOOR PHASING

A044 BUILDING 40 – FIFTH FLOOR PHASING

A045 BUILDING 40 – SIXTH FLOOR PHASING

A046 BUILDING 40 – SEVENTH FLOOR PHASING

A047 BUILDING 32 – FIRST FLOOR PHASING

A048 BUILDING 30 – FIRST FLOOR PHASING

A100 DIAMOND COVERAGE DIAGRAM. SOCAMES 6 DESIGN ALERT 1

A101 FIRST FLOOR OVERALL PLAN - ARCHITECTURAL

A102 SECOND FLOOR OVERALL PLAN - ARCHITECTURAL

A103 THIRD FLOOR OVERALL PLAN - ARCHITECTURAL

A104 FOURTH FLOOR OVERALL PLAN - ARCHITECTURAL

A105 FIFTH FLOOR OVERALL PLAN - ARCHITECTURAL

A106 SIXTH FLOOR OVERALL PLAN - ARCHITECTURAL

A107 SEVENTH FLOOR OVERALL PLAN - ARCHITECTURAL

A108 EIGHTH FLOOR OVERALL PLAN - ARCHITECTURAL

A109 NINTH FLOOR OVERALL PLAN - ARCHITECTURAL

A110 PENTHOUSE OVERALL PLAN - ARCHITECTURAL

AD201 ENLARGED DEMO EXTERIOR ELEVATIONS - ARCHITECTURAL

A201 OVERALL EXTERIOR ELEVATIONS - ARCHITECTURAL

00 01 15 - 5

A202 OVERALL EXTERIOR ELEVATIONS - ARCHITECTURAL

A203 ENLARGED EXTERIOR ELEVATIONS - ARCHITECTURAL

A204 ENLARGED EXTERIOR ELEVATIONS - ARCHITECTURAL

A301 BUILDING SECTIONS

A302 BUILDING SECTIONS

A401 TR 1A - ARCHITECTURAL FLOOR PLANS

A402 TR 1A - ARCHITECTURAL FLOOR PLANS

A403 TR 1A - ARCHITECTURAL FLOOR PLANS

A404 NOT USED

A405 NOT USED

A406 TR 1AA - ARCHITECTURAL FLOOR PLANS

A407 TR 1B - ARCHITECTURAL FLOOR PLANS

A408 TR 1B - ARCHITECTURAL FLOOR PLANS

A409 TR 1B - ARCHITECTURAL FLOOR PLANS

A410 TR 1B - ARCHITECTURAL FLOOR PLANS

A411 TR 1B - ARCHITECTURAL FLOOR PLANS

A412 TR 11A - ARCHITECTURAL FLOOR PLANS

A413 TR 11A - ARCHITECTURAL FLOOR PLANS

A414 TR 11A - ARCHITECTURAL FLOOR PLANS

A415 TR 11A - ARCHITECTURAL FLOOR PLANS

A416 TR 11A - ARCHITECTURAL FLOOR PLANS

A417 TR 11B - ARCHITECTURAL FLOOR PLANS

A418 TR 11B - ARCHITECTURAL FLOOR PLANS

A419 TR 11B - ARCHITECTURAL FLOOR PLANS

A420 TR 11B - ARCHITECTURAL FLOOR PLANS

A421 TR 40 - ARCHITECTURAL FLOOR PLANS

A422 TR 40 - ARCHITECTURAL FLOOR PLANS

A423 TR 32 - ARCHITECTURAL FLOOR PLANS

A424 TR 30- ARCHITECTURAL FLOOR PLANS

AD501 DEMOLITION WALL SECTIONS

A501 WALL AND PARTITION TYPES

A502 WALL SECTIONS

A503 WALL SECTIONS

A504 EXTERIOR DETAILS

A505 EXTERIOR DETAILS

A506 EXTERIOR DETAILS

A601 DOOR AND FRAME SCHEDULE & DETAILS

00 01 15 - 6

A701 TYPICAL DETAILS

AF101 FINISH SCHEDULE

FIRE PROTECTION

F000 FIRE PROTECTION – LEGENDS, NOTES

F101 FIRST FLOOR OVERALL PLAN - FIRE PROTECTION

F102 SECOND FLOOR OVERALL PLAN - FIRE PROTECTION

F103 THIRD FLOOR OVERALL PLAN - FIRE PROTECTION

F104 FOURTH FLOOR OVERALL PLAN - FIRE PROTECTION

F105 FIFTH FLOOR OVERALL PLAN - FIRE PROTECTION

F106 SIXTH FLOOR OVERALL PLAN - FIRE PROTECTION

F107 SEVENTH FLOOR OVERALL PLAN - FIRE PROTECTION

F108 EIGHTH FLOOR OVERALL PLAN - FIRE PROTECTION

F109 NINTH FLOOR OVERALL PLAN - FIRE PROTECTION

F110 TENTH FLOOR OVERALL PLAN - FIRE PROTECTION

F401 TR 1A - FIRE PROTECTION FLOOR PLANS

F402 TR 1A - FIRE PROTECTION FLOOR PLANS

F403 TR 1A - FIRE PROTECTION FLOOR PLANS

F404 TR 1A - FIRE PROTECTION FLOOR PLANS

F411 TR 1B - FIRE PROTECTION FLOOR PLANS

F412 TR 1B - FIRE PROTECTION FLOOR PLANS

F413 TR 1B - FIRE PROTECTION FLOOR PLANS

F414 TR 1B - FIRE PROTECTION FLOOR PLANS

F415 TR 1B - FIRE PROTECTION FLOOR PLANS

F421 TR 11A - FIRE PROTECTION FLOOR PLANS

F422 TR 11A - FIRE PROTECTION FLOOR PLANS

F423 TR 11A - FIRE PROTECTION FLOOR PLANS

F424 TR 11A - FIRE PROTECTION FLOOR PLANS

F425 TR 11A - FIRE PROTECTION FLOOR PLANS

F431 TR 11B - FIRE PROTECTION FLOOR PLANS

F432 TR 11B - FIRE PROTECTION FLOOR PLANS

F433 TR 11B - FIRE PROTECTION FLOOR PLANS

F434 TR 11B - FIRE PROTECTION FLOOR PLANS

F451 TR 30 - FIRE PROTECTION FLOOR PLANS

F461 TR 32 - FIRE PROTECTION FLOOR PLANS

F471 TR 1AA - FIRE PROTECTION FLOOR PLANS

F500 FIRE PROTECTION DETAILS

00 01 15 - 7

F501 FIRE PROTECTION DIAGRAMS

F502 FIRE PROTECTION DIAGRAMS

PLUMBING

P000 PLUMBING – LEGENDS, NOTES

P100 UNDERFLOOR OVERALL PLAN - PLUMBING

P101 FIRST FLOOR OVERALL PLAN - PLUMBING

P102 SECOND FLOOR OVERALL PLAN - PLUMBING

P103 THIRD FLOOR OVERALL PLAN - PLUMBING

P104 FOURTH FLOOR OVERALL PLAN - PLUMBING

P105 FIFTH FLOOR OVERALL PLAN - PLUMBING

P106 SIXTH FLOOR OVERALL PLAN - PLUMBING

P107 SEVENTH FLOOR OVERALL PLAN - PLUMBING

P108 EIGHTH FLOOR OVERALL PLAN - PLUMBING

P401 TR 1A - PLUMBING FLOOR PLANS

P411 TR 1B - PLUMBING FLOOR PLANS

P412 TR 1B - PLUMBING FLOOR PLANS

P413 TR 1B - PLUMBING FLOOR PLANS

P421 TR 11A - PLUMBING FLOOR PLANS

P422 TR 11A - PLUMBING FLOOR PLANS

P423 TR 11A - PLUMBING FLOOR PLANS

P431 TR 11B - PLUMBING FLOOR PLANS

P432 TR 11B - PLUMBING FLOOR PLANS

P441 TR 40 - PLUMBING FLOOR PLANS

P451 TR 30 - PLUMBING FLOOR PLANS

P461 TR 32 - PLUMBING FLOOR PLANS

P471 TR 1AA - PLUMBING FLOOR PLANS

P500 PLUMBING DETAILS

MECHANICAL

M000 MECHANICAL – LEGEND, NOTES

M101 FIRST FLOOR OVERALL PLAN - MECHANICAL

M102 SECOND FLOOR OVERALL PLAN - MECHANICAL

M103 THIRD FLOOR OVERALL PLAN - MECHANICAL

M104 FOURTH FLOOR OVERALL PLAN - MECHANICAL

M105 FIFTH FLOOR OVERALL PLAN - MECHANICAL

00 01 15 - 8

M106 SIXTH FLOOR OVERALL PLAN - MECHANICAL

M107 SEVENTH FLOOR OVERALL PLAN - MECHANICAL

M108 EIGHTH FLOOR OVERALL PLAN - MECHANICAL

M109 NINTH FLOOR OVERALL PLAN - MECHANICAL

M110 TENTH FLOOR OVERALL PLAN - MECHANICAL

M111 ELEVENTH FLOOR OVERALL PLAN - MECHANICAL

M112 ROOF OVERALL PLAN - MECHANICAL

M401 TR 1A - MECHANICAL FLOOR PLANS

M402 TR 1A - MECHANICAL FLOOR PLANS

M403 TR 1A - MECHANICAL FLOOR PLANS

M404 TR 1A - MECHANICAL FLOOR PLANS

M411 TR 1B - MECHANICAL FLOOR PLANS

M412 TR 1B - MECHANICAL FLOOR PLANS

M413 TR 1B - MECHANICAL FLOOR PLANS

M421 TR 11A - MECHANICAL FLOOR PLANS

M422 TR 11A - MECHANICAL FLOOR PLANS

M423 TR 11A - MECHANICAL FLOOR PLANS

M424 TR 11A - MECHANICAL FLOOR PLANS

M425 TR 11A - MECHANICAL FLOOR PLANS

M426 TR 11A - MECHANICAL FLOOR PLANS

M431 TR 11B - MECHANICAL FLOOR PLANS

M432 TR 11B - MECHANICAL FLOOR PLANS

M433 TR 11B - MECHANICAL FLOOR PLANS

M434 TR 11B - MECHANICAL FLOOR PLANS

M441 TR 40 - MECHANICAL FLOOR PLANS

M442 TR 40 - MECHANICAL FLOOR PLANS

M443 TR 40 - MECHANICAL FLOOR PLANS

M444 TR 40 - MECHANICAL FLOOR PLANS

M451 TR 30 - MECHANICAL FLOOR PLANS

M461 TR 32 - MECHANICAL FLOOR PLANS

M471 TR 1AA - MECHANICAL FLOOR PLANS

M500 MECHANICAL DETAILS

M600 MECHANICAL DIAGRAMS

M601 MECHANICAL DIAGRAMS

M700 MECHANICAL SCHEDULES

00 01 15 - 9

ELECTRICAL

EC000 ELECTRICAL COVERSHEET

E101 FIRST FLOOR OVERALL PLAN - ELECTRICAL

E102 SECOND FLOOR OVERALL PLAN - ELECTRICAL

E103 THIRD FLOOR OVERALL PLAN - ELECTRICAL

E104 FOURTH FLOOR OVERALL PLAN - ELECTRICAL

E105 FIFTH FLOOR OVERALL PLAN - ELECTRICAL

E106 SIXTH FLOOR OVERALL PLAN - ELECTRICAL

E107 SEVENTH FLOOR OVERALL PLAN - ELECTRICAL

E108 EIGHTH FLOOR OVERALL PLAN - ELECTRICAL

E109 NINTH FLOOR OVERALL PLAN - ELECTRICAL

E110 TENTH FLOOR OVERALL PLAN - ELECTRICAL

E401 TR 1A – ELECTRICAL FLOOR PLANS

E402 TR 1A – ELECTRICAL FLOOR PLANS

E403 TR 1A – ELECTRICAL FLOOR PLANS

E404 TR 1A – ELECTRICAL FLOOR PLANS

E411 TR 1B – ELECTRICAL FLOOR PLANS

E412 TR 1B – ELECTRICAL FLOOR PLANS

E413 TR 1B – ELECTRICAL FLOOR PLANS

E414 TR 1B – ELECTRICAL FLOOR PLANS

E415 TR 1B – ELECTRICAL FLOOR PLANS

E421 TR 11A – ELECTRICAL FLOOR PLANS

E422 TR 11A – ELECTRICAL FLOOR PLANS

E423 TR 11A – ELECTRICAL FLOOR PLANS

E424 TR 11A – ELECTRICAL FLOOR PLANS

E425 TR 11A – ELECTRICAL FLOOR PLANS

E426 TR 11A – ELECTRICAL FLOOR PLANS

E431 TR 11B – ELECTRICAL FLOOR PLANS

E432 TR 11B – ELECTRICAL FLOOR PLANS

E433 TR 11B – ELECTRICAL FLOOR PLANS

E434 TR 11B – ELECTRICAL FLOOR PLANS

E441 TR 40 – ELECTRICAL FLOOR PLANS

E442 TR 40 – ELECTRICAL FLOOR PLANS

E443 TR 40 – ELECTRICAL FLOOR PLANS

E451 TR 30 – ELECTRICAL FLOOR PLANS

E461 TR 32 – ELECTRICAL FLOOR PLANS

E471 TR 1AA – ELECTRICAL FLOOR PLANS

00 01 15 - 10

EQ400 ELECTRICAL SCHEDULES

EQ500 ELECTRICAL DETAILS

EQ501 ELECTRICAL DETAILS

ER503 ELECTRICAL RISER

ER504 ELECTRICAL RISER

ER505 ELECTRICAL RISER

EP601 ELECTRICAL PANEL SCHEDULES

EP602 ELECTRICAL PANEL SCHEDULES

EP603 ELECTRICAL PANEL SCHEDULES

EP604 ELECTRICAL PANEL SCHEDULES

EP605 ELECTRICAL PANEL SCHEDULES

EP606 ELECTRICAL PANEL SCHEDULES

EP607 ELECTRICAL PANEL SCHEDULES

EP608 ELECTRICAL PANEL SCHEDULES

EP609 ELECTRICAL PANEL SCHEDULES

EP610 ELECTRICAL PANEL SCHEDULES

EP611 ELECTRICAL PANEL SCHEDULES

EP612 ELECTRICAL PANEL SCHEDULES

EP613 ELECTRICAL PANEL SCHEDULES

TECHNOLOGY

00-T000 TECHNOLOGY – LEGENDS, NOTES

00-TN101 FIRST FLOOR PLAN – TECHNOLOGY

00-TN102 SECOND FLOOR PLAN - TECHNOLOGY

00-TN103 THIRD FLOOR PLAN - TECHNOLOGY

00-TN104 FOURTH FLOOR PLAN - TECHNOLOGY

00-TN105 FIFTH FLOOR PLAN - TECHNOLOGY

00-TN106 SIXTH FLOOR PLAN - TECHNOLOGY

00-TN107 SEVENTH FLOOR PLAN - TECHNOLOGY

00-TN108 EIGHTH FLOOR PLAN - TECHNOLOGY

00-TN109 NINTH FLOOR PLAN - TECHNOLOGY

00-TN110 TENTH FLOOR PLAN - TECHNOLOGY

1AN-TD101 BUILDING 1AN – FIRST FLOOR DEMO PLAN – TECHNOLOGY

1AN-TD102 BUILDING 1AN – SECOND FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD103 BUILDING 1AN – THIRD FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD104 BUILDING 1AN – FOURTH FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD105 BUILDING 1AN – FIFTH FLOOR DEMO PLAN - TECHNOLOGY

00 01 15 - 11

1AN-TD106 BUILDING 1AN – SIXTH FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD107 BUILDING 1AN – SEVENTH FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD108 BUILDING 1AN – EIGHTH FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD109 BUILDING 1AN – NINTH FLOOR DEMO PLAN - TECHNOLOGY

1AN-TD110 BUILDING 1AN – TENTH FLOOR DEMO PLAN – TECHNOLOGY

1AN-TN101 BUILDING 1AN – FIRST FLOOR PLAN – TECHNOLOGY

1AN-TN102 BUILDING 1AN – SECOND FLOOR PLAN - TECHNOLOGY

1AN-TN103 BUILDING 1AN – THIRD FLOOR PLAN - TECHNOLOGY

1AN-TN104 BUILDING 1AN – FOURTH FLOOR PLAN - TECHNOLOGY

1AN-TN105 BUILDING 1AN – FIFTH FLOOR PLAN - TECHNOLOGY

1AN-TN106 BUILDING 1AN – SIXTH FLOOR PLAN - TECHNOLOGY

1AN-TN107 BUILDING 1AN – SEVENTH FLOOR PLAN - TECHNOLOGY

1AN-TN108 BUILDING 1AN – EIGHTH FLOOR PLAN - TECHNOLOGY

1AN-TN109 BUILDING 1AN – NINTH FLOOR PLAN - TECHNOLOGY

1AN-TN110 BUILDING 1AN – TENTH FLOOR PLAN - TECHNOLOGY

1AS-TD101 BUILDING 1AS – FIRST FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD102 BUILDING 1AS – SECOND FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD103 BUILDING 1AS – THIRD FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD104 BUILDING 1AS – FOURTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD105 BUILDING 1AS – FIFTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD106 BUILDING 1AS – SIXTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD107 BUILDING 1AS – SEVENTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD108 BUILDING 1AS – EIGHTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD109 BUILDING 1AS – NINTH FLOOR DEMO PLAN - TECHNOLOGY

1AS-TD110 BUILDING 1AS – TENTH FLOOR DEMO PLAN – TECHNOLOGY

1AS-TN101 BUILDING 1A-S – FIRST FLOOR PLAN – TECHNOLOGY

1AS-TN102 BUILDING 1A-S – SECOND FLOOR PLAN - TECHNOLOGY

1AS-TN103 BUILDING 1A-S – THIRD FLOOR PLAN - TECHNOLOGY

1AS-TN104 BUILDING 1A-S – FOURTH FLOOR PLAN - TECHNOLOGY

1AS-TN105 BUILDING 1A-S – FIFTH FLOOR PLAN - TECHNOLOGY

1AS-TN106 BUILDING 1A-S – SIXTH FLOOR PLAN - TECHNOLOGY

1AS-TN107 BUILDING 1A-S – SEVENTH FLOOR PLAN - TECHNOLOGY

1AS-TN108 BUILDING 1A-S – EIGHTH FLOOR PLAN - TECHNOLOGY

1AS-TN109 BUILDING 1A-S – NINTH FLOOR PLAN - TECHNOLOGY

1AS-TN110 BUILDING 1A-S – TENTH FLOOR PLAN – TECHNOLOGY

1AS-TN300 TR1A – TECHNOLOGY ROOM ENLARGEMENTS

1AS-TN301 TR1A – TECHNOLOGY ROOM ENLARGEMENTS

00 01 15 - 12

1AS-TN302 TR1A – TECHNOLOGY ROOM ENLARGEMENTS

1AS-TN303 TR1A – TECHNOLOGY ROOM ENLARGEMENTS

1AS-TN304 TR1A – TECHNOLOGY ROOM ENLARGEMENTS

1AS-TN305 TR1A – TECHNOLOGY ROOM ENLARGEMENTS

1AS-TN306 TECHNOLOGY ROOM ENLARGEMENTS

1AS-TN307 TECHNOLOGY ROOM ENLARGEMENTS

1B-TD101 BUILDING 1B – FIRST FLOOR DEMO PLAN - TECHNOLOGY

1B-TD102 BUILDING 1B – SECOND FLOOR DEMO PLAN - TECHNOLOGY

1B-TD103 BUILDING 1B – THIRD FLOOR DEMO PLAN - TECHNOLOGY

1B-TD104 BUILDING 1B – FOURTH FLOOR DEMO PLAN - TECHNOLOGY

1B-TD105 BUILDING 1B – FIFTH FLOOR DEMO PLAN - TECHNOLOGY

1B-TD106 BUILDING 1B – SIXTH FLOOR DEMO PLAN - TECHNOLOGY

1B-TD107 BUILDING 1B – SEVENTH FLOOR DEMO PLAN - TECHNOLOGY

1B-TD108 BUILDING 1B – EIGHTH FLOOR DEMO PLAN - TECHNOLOGY

1B-TD109 BUILDING 1B – NINTH FLOOR DEMO PLAN - TECHNOLOGY

1B-TD110 BUILDING 1B – TENTH FLOOR DEMO PLAN – TECHNOLOGY

1B-TN101 BUILDING 1B – FIRST FLOOR PLAN - TECHNOLOGY

1B-TN102 BUILDING 1B – SECOND FLOOR PLAN - TECHNOLOGY

1B-TN103 BUILDING 1B – THIRD FLOOR PLAN - TECHNOLOGY

1B-TN104 BUILDING 1B – FOURTH FLOOR PLAN - TECHNOLOGY

1B-TN105 BUILDING 1B – FIFTH FLOOR PLAN - TECHNOLOGY

1B-TN106 BUILDING 1B – SIXTH FLOOR PLAN - TECHNOLOGY

1B-TN107 BUILDING 1B – SEVENTH FLOOR PLAN - TECHNOLOGY

1B-TN108 BUILDING 1B – EIGHTH FLOOR PLAN - TECHNOLOGY

1B-TN109 BUILDING 1B – NINTH FLOOR PLAN - TECHNOLOGY

1B-TN110 BUILDING 1B – TENTH FLOOR PLAN – TECHNOLOGY

1B-TN300 TR1B – TECHNOLOGY ROOM ENLARGEMENTS

1B-TN301 TR1B – TECHNOLOGY ROOM ENLARGEMENTS

1B-TN302 TR1B – TECHNOLOGY ROOM ENLARGEMENTS

11A-TD101 BUILDING 11A – FIRST FLOOR DEMO PLAN – TECHNOLOGY

11A-TD101.1 BUILDING 11A – FIRST FLOOR DEMO PLAN – TECHNOLOGY

11A-TD102 BUILDING 11A – SECOND FLOOR DEMO PLAN – TECHNOLOGY

11A-TD102.1 BUILDING 11A – SECOND FLOOR DEMO PLAN - TECHNOLOGY

11A-TD103 BUILDING 11A – THIRD FLOOR DEMO PLAN – TECHNOLOGY

11A-TD103.1 BUILDING 11A – THIRD FLOOR DEMO PLAN - TECHNOLOGY

11A-TD104 BUILDING 11A – FOURTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TD104.1 BUILDING 11A – FOURTH FLOOR DEMO PLAN - TECHNOLOGY

00 01 15 - 13

11A-TD105 BUILDING 11A – FIFTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TD105.1 BUILDING 11A – FIFTH FLOOR DEMO PLAN - TECHNOLOGY

11A-TD106 BUILDING 11A – SIXTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TD106.1 BUILDING 11A – SIXTH FLOOR DEMO PLAN - TECHNOLOGY

11A-TD107 BUILDING 11A – SEVENTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TD107.1 BUILDING 11A – SEVENTH FLOOR DEMO PLAN – TECHNOLOGY

11A-TN101 BUILDING 11A – FIRST FLOOR PLAN – TECHNOLOGY

11A-TN101.1 BUILDING 11A – FIRST FLOOR PLAN – TECHNOLOGY

11A-TN102 BUILDING 11A – SECOND FLOOR PLAN – TECHNOLOGY

11A-TN102.1 BUILDING 11A – SECOND FLOOR PLAN - TECHNOLOGY

11A-TN103 BUILDING 11A – THIRD FLOOR PLAN – TECHNOLOGY

11A-TN103.1 BUILDING 11A – THIRD FLOOR PLAN - TECHNOLOGY

11A-TN104 BUILDING 11A – FOURTH FLOOR PLAN – TECHNOLOGY

11A-TN104.1 BUILDING 11A – FOURTH FLOOR PLAN - TECHNOLOGY

11A-TN105 BUILDING 11A – FIFTH FLOOR PLAN – TECHNOLOGY

11A-TN105.1 BUILDING 11A – FIFTH FLOOR PLAN - TECHNOLOGY

11A-TN106 BUILDING 11A – SIXTH FLOOR PLAN – TECHNOLOGY

11A-TN106.1 BUILDING 11A – SIXTH FLOOR PLAN - TECHNOLOGY

11A-TN107 BUILDING 11A – SEVENTH FLOOR PLAN – TECHNOLOGY

11A-TN107.1 BUILDING 11A – SEVENTH FLOOR PLAN – TECHNOLOGY

11A-TN300 TR11A – TECHNOLOGY ROOM ENLARGEMENTS

11A-TN301 TR11A – TECHNOLOGY ROOM ENLARGEMENTS

11A-TN302 TR11A – TECHNOLOGY ROOM ENLARGEMENTS

11A-TN303 TR11A – TECHNOLOGY ROOM ENLARGEMENTS

11B-TD101 BUILDING 11A – FIRST FLOOR DEMO PLAN - TECHNOLOGY

11B-TD102 BUILDING 11A – SECOND FLOOR DEMO PLAN - TECHNOLOGY

11B-TD103 BUILDING 11A – THIRD FLOOR DEMO PLAN - TECHNOLOGY

11B-TD104 BUILDING 11A – FOURTH FLOOR DEMO PLAN - TECHNOLOGY

11B-TD105 BUILDING 11A – FIFTH FLOOR DEMO PLAN - TECHNOLOGY

11B-TD106 BUILDING 11A – SIXTH FLOOR DEMO PLAN - TECHNOLOGY

11B-TD107 BUILDING 11A – SEVENTH FLOOR DEMO PLAN - TECHNOLOGY

11B-TN101 BUILDING 11B – FIRST FLOOR PLAN - TECHNOLOGY

11B-TN102 BUILDING 11B – SECOND FLOOR PLAN - TECHNOLOGY

11B-TN103 BUILDING 11B – THIRD FLOOR PLAN - TECHNOLOGY

11B-TN104 BUILDING 11B – FOURTH FLOOR PLAN - TECHNOLOGY

11B-TN105 BUILDING 11B – FIFTH FLOOR PLAN - TECHNOLOGY

11B-TN106 BUILDING 11B – SIXTH FLOOR PLAN - TECHNOLOGY

00 01 15 - 14

11B-TN107 BUILDING 11B – SEVENTH FLOOR PLAN – TECHNOLOGY

11B-TN301 TR11B – TECHNOLOGY ROOM ENLARGEMENTS

11B-TN302 TR11B – TECHNOLOGY ROOM ENLARGEMENTS

11B-TN303 TR11B – TECHNOLOGY ROOM ENLARGEMENTS

11B-TN304 TR11B – TECHNOLOGY ROOM ENLARGEMENTS

30-TD101 BUILDING 30 – FIRST FLOOR DEMO PLAN – TECHNOLOGY

30-TN101 BUILDING 30 – FIRST FLOOR PLAN – TECHNOLOGY

30-TN301 TR30 – TECHNOLOGY ROOM ENLARGEMENTS

32-TD101 BUILDING 32 – FIRST FLOOR DEMO PLAN - TECHNOLOGY

32-TD102 BUILDING 32 – SECOND FLOOR DEMO PLAN – TECHNOLOGY

32-TN101 BUILDING 32 – FIRST FLOOR PLAN - TECHNOLOGY

32-TN102 BUILDING 32 – SECOND FLOOR PLAN - TECHNOLOGY

32-TN301 TR32 – TECHNOLOGY ROOM ENLARGEMENTS

40E-TD101 BUILDING 40A – FIRST FLOOR DEMO PLAN - TECHNOLOGY

40E-TD102 BUILDING 40A – SECOND FLOOR DEMO PLAN - TECHNOLOGY

40E-TD103 BUILDING 40A – THIRD FLOOR DEMO PLAN - TECHNOLOGY

40E-TD104 BUILDING 40A – FOURTH FLOOR DEMO PLAN - TECHNOLOGY

40E-TD105 BUILDING 40A – FIFTH FLOOR DEMO PLAN - TECHNOLOGY

40E-TD106 BUILDING 40A – SIXTH FLOOR DEMO PLAN - TECHNOLOGY

40E-TD107 BUILDING 40A – SEVENTH FLOOR DEMO PLAN – TECHNOLOGY

40E-TN101 BUILDING 40A – FIRST FLOOR PLAN - TECHNOLOGY

40E-TN102 BUILDING 40A – SECOND FLOOR PLAN - TECHNOLOGY

40E-TN103 BUILDING 40A – THIRD FLOOR PLAN - TECHNOLOGY

40E-TN104 BUILDING 40A – FOURTH FLOOR PLAN - TECHNOLOGY

40E-TN105 BUILDING 40A – FIFTH FLOOR PLAN - TECHNOLOGY

40E-TN106 BUILDING 40A – SIXTH FLOOR PLAN - TECHNOLOGY

40E-TN107 BUILDING 40A – SEVENTH FLOOR PLAN - TECHNOLOGY

40W-TD101 BUILDING 40B – FIRST FLOOR DEMO PLAN - TECHNOLOGY

40W-TD102 BUILDING 40B – SECOND FLOOR DEMO PLAN - TECHNOLOGY

40W-TD103 BUILDING 40B – THIRD FLOOR DEMO PLAN - TECHNOLOGY

40W-TD104 BUILDING 40B – FOURTH FLOOR DEMO PLAN - TECHNOLOGY

40W-TD105 BUILDING 40B – FIFTH FLOOR DEMO PLAN - TECHNOLOGY

40W-TD106 BUILDING 40B – SIXTH FLOOR DEMO PLAN - TECHNOLOGY

40W-TD107 BUILDING 40B – SEVENTH FLOOR DEMO PLAN - TECHNOLOGY

40W-TN101 BUILDING 40B – FIRST FLOOR PLAN - TECHNOLOGY

40W-TN102 BUILDING 40B – SECOND FLOOR PLAN - TECHNOLOGY

40W-TN103 BUILDING 40B – THIRD FLOOR PLAN - TECHNOLOGY

00 01 15 - 15

40W-TN104 BUILDING 40B – FOURTH FLOOR PLAN - TECHNOLOGY

40W-TN105 BUILDING 40B – FIFTH FLOOR PLAN - TECHNOLOGY

40W-TN106 BUILDING 40B – SIXTH FLOOR PLAN - TECHNOLOGY

40W-TN107 BUILDING 40B – SEVENTH FLOOR PLAN - TECHNOLOGY

40W-TN300 TR40 – TECHNOLOGY ROOM ENLARGEMENTS

40W-TN301 TR40 – TECHNOLOGY ROOM ENLARGEMENTS

40W-TN302 TR40 – TECHNOLOGY ROOM ENLARGEMENTS

40W-TN303 TR40 – TECHNOLOGY ROOM ENLARGEMENTS

T400 TECHNOLOGY RISER DIAGRAMS

T401 TECHNOLOGY RISER DIAGRAMS

T402 TECHNOLOGY RISER DIAGRAMS

T403 TECHNOLOGY RISER DIAGRAMS

T500 TECHNOLOGY DETAILS

T501 TECHNOLOGY DETAILS

T502 TECHNOLOGY DETAILS

T503 TECHNOLOGY DETAILS

T504 TECHNOLOGY DETAILS

T600 TECHNOLOGY SCHEDULES

- - - END - - -

VA Project Num. 537-21-700 11-01-21

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 CONTRACTOR WORK HOURS

A. Normal working hours for this contract will be from 7:00AM to 4:30PM (local time) Monday through Friday except for weekends and established Federal Holidays.

B. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR.

Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.

1.3 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials, equipment, management, supervision, tools, and all other necessary resources to construct the project as required by drawings and specifications. The contractor is responsible to perform a site survey and investigation to satisfy themselves as to the extent of the work. The place of work is located at VA Medical Center Jesse Brown Chicago IL.

Refer to Scope of Work for Performance period days.

B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting Officer..

C. Offices of Nagel Architect + Engineers, as

Architect-Engineers, will render certain technical services

01 00 00 -2 during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans

Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.4 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: As provided in the contract documents this project will engage a Contractor to furnish all labor, tools, material, equipment, and supervision to

Electronic Health Records Modernization (EHRM)

Infrastructure Upgrades at the Jesse Brown VA Medical

Center – Chicago, IL. Work includes general construction, alterations, foundations, superstructure, exterior enclosure, roofing, interior construction, interior finishes, plumbing, HVAC, Fire protection, electrical, furnishings, necessary selective removal of existing structures and construction, site preparation, site improvements, site utilities, and certain other items.

01 00 00 -3

1.5 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents shall be obtained from the website where the solicitation is posted. Additional copies shall be at Contractor's expense.

1.6 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees.

This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The

General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Guards (NOT USED)

D. Key Control:

01 00 00 -4

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) and Medical Center police for any locked storage area, office or storage trailer, and any other locks installed by permission of the COR at the project site. The purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.

See Section 08 71 00, DOOR HARDWARE and coordinate.

E. Document Control:

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings shall be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

01 00 00 -5

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of

“sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an

Engineering Document Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

“Sensitive information” including drawings and other documents shall be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access.

Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of (2 to 5) permits shall be issued for

General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA

Medical Center Facility Manager.

1.7 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The

Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities shall be erected by the Contractor only with

01 00 00 -6 the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the

Contracting Officer, the buildings and utilities shall be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the

Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

Use of equipment and tools that transmit vibrations and

01 00 00 -7 noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by

Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of

Contractor's materials and equipment shall be permitted subject to fire and safety requirements.

H. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service shall be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

The work to be outlined shall include, but not be limited to:

2. To ensure such executions, Contractor shall furnish the

COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each

01 00 00 -8 specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof.

Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to

Medical Center Director, COR and Contractor.

Phase I:

Phase II:

I. Building shall be vacated by Government in accordance with above phasing beginning immediately after date of receipt of Notice to Proceed and turned over to Contractor.

J. When an area is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or

Company (Department of Veterans Affairs or municipal) whichever shall be required to respond to an alarm from

Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility services for

Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, of utility services or of fire

01 00 00 -9 protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems shall be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center

Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK

RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 14 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor shall be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical

Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system shall be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

01 00 00 -10

5. In case of a contract construction emergency, service shall be interrupted on approval of COR. Such approval shall be confirmed in writing as soon as practical.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel them originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions;

so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane shall be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances shall be approved by the COR.

N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.8 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of

VA Supply Service, of areas of building in which

01 00 00 -11 alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the

Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and the COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which shall be furnished by

Government. Provided the contract work is changed by reason of this subparagraph B, the contract shall be modified accordingly.

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved.

They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other

01 00 00 -12 surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by

Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.9 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the

Government are identified by attached tags or noted on drawings or in specifications as items to be stored.

Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to

01 00 00 -13 re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the

Contractor and be removed by Contractor from Medical

Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government.

When rooms and spaces are vacated by the Department of

Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused shall be removed by the

Government in advance of work to avoid interfering with

Contractor's operation.

4. PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the Polychlorinated Biphenyl

(PCB) transformers and capacitors. The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the Environmental

Protection Agency (EPA) and the Department of

Transportation (DOT) as outlined in Code of Federal

Regulation (CFR), Titled 40 and 49 respectively. The

EPA's Toxic Substance Control Act (TSCA) Compliance

Program Policy Nos. 6-PCB-6 and 6-PCB-7 also apply. Upon removal of PCB transformers and capacitors for disposal, the "originator" copy of the Uniform Hazardous Waste

Manifest (EPA Form 8700-22), along with the Uniform

Hazardous Waste Manifest Continuation Sheet (EPA Form

8700-22A) shall be returned to the Contracting Officer who will annotate the contract file and transmit the

Manifest to the Medical Center's Chief and the COR.

01 00 00 -14

a) Copies of the following listed CFR titles shall be obtained…

This is the start of the file's text. The full file is on GovTribe.