Attachment 2 - 537-21-700 JBMC EHRM Specifications - Vol 1.pdf
PDF 12 MB Posted
- Solicitation number
- 36C77625B0049
About this file
The file appears to be a technical specification document for an Electronic Health Record Management (EHRM) Infrastructure Upgrade project at the Jesse Brown VA Medical Center in Chicago, Illinois. The project (Solicitation Number 36C77625B0049) is being managed by the Department of Veterans Affairs Technology Acquisition Center Austin and involves construction and technology infrastructure improvements. The specification document (Attachment 2) likely details the technical requirements, system specifications, and performance criteria for the EHRM infrastructure upgrade, though a complete technical review would require examining the full document contents.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chicago, IL
Jesse Brown EHRM Infrastructure
Upgrades
Healthcare System / Project Number 537-21-700
PROJECT MANUAL
BID & CONSTRUCTION DOCUMENTS - R1
March 12, 2025
August 18, 2025, R1
Vol 1 of 2
Jesse Brown EHRM Infrastructure Upgrades, Chicago, IL
VA Project Num. 537-21-700 02-01-24
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 01 10 FSS Fire Safety Section
01 01 20 IC Infection Control
01 01 20.10 IC JB Construction Safety Procedure
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01-24
01 32 16.01 Architectural and Engineering CPM Schedules 03-20
01 33 23 Shop Drawings, Product Data, and Samples 11-23
01 33 23.10 Submittal Register
01 35 26 Safety Requirements 12-23
01 35 26.10 Construction Safety Procedure
01 35 26.20 Construction Safety Procedure Appendix E
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 45 00.10 Quality Control Reports
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 06-21
01 45 36.01 Schedule of Special Inspections Template
01 45 35.02 Statement of Special Inspections Template
01 57 19 Temporary Environmental Controls 01-21
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 04-22
01 81 13 Sustainable Construction Requirements 10-17
01 91 00 General Commissioning Requirements 04-22
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 12-23
02 41 00 Demolition 08-17
02 82 11 Traditional Asbestos Abatement 01-21
02 82 13.13 Glovebag Asbestos Abatement 01-21
02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 10-17
00 01 10-2
SECTION NO DIVISION AND SECTION TITLES DATE
04 05 16 Masonry Grouting 01-21
04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
05 31 00 Steel Decking 01-21
05 36 00 Composite Metal Decking 01-21
05 40 00 Cold-Formed Metal Framing 01-21
05 50 00 Metal Fabrications 08-18
05 51 00 Metal Stairs 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
06 20 00 Finish Carpentry 01-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 01-21
07 22 00 Roof and Deck Insulation 01-21
07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 01-21
07 60 00 Flashing and Sheet Metal 01-21
07 71 00 Roof Specialties 01-21
07 72 00 Roof Accessories 01-21
07 81 00 Applied Fireproofing 07-23
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 04-22
07 95 13 Expansion Joint Cover Assemblies 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 14 00 Interior Wood Doors 01-21
08 17 10 Integrated Door Assemblies 01-21
08 31 13 Access Doors and Frames 04-22
08 41 13 Aluminum-Framed Entrances and Storefronts 01-21
08 51 13 Aluminum Windows 01-21
08 56 53 Blast Resistant Windows 01-21
08 71 00 Door Hardware 01-24
08 80 00 Glazing 01-21
08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 06 00 Schedule for Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories 01-21
00 01 10-3
SECTION NO DIVISION AND SECTION TITLES DATE
09 65 16 Resilient Sheet Flooring 06-22
09 65 19 Resilient Tile Flooring 05-18
09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21
10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT (NOT USED)
DIVISION 12 – FURNISHINGS (NOT USED)
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
01-21
DIVISION 14– CONVEYING EQUIPMENT (NOT USED)
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-16
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-23
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 05 33 Heat Tracing for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 08 00 Commissioning of Plumbing Systems 11-16
22 11 00 Facility Water Distribution 05-21
22 13 00 Facility Sanitary and Vent Piping 09-20
22 14 00 Facility Storm Drainage 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
03-23
23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23
23 08 00 Commissioning of HVAC Systems 03-23
23 09 23 Direct-Digital Control System for HVAC 03-23
23 21 13 Hydronic Piping 03-23
23 23 00 Refrigerant Piping 03-23
23 31 00 HVAC Ducts and Casings 03-23
23 37 00 Air Outlets and Inlets 03-23
23 81 00 Decentralized Unitary HVAC Equipment 03-23
00 01 10-4
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22
26 05 26 Grounding and Bonding for Electrical Systems 11-22
26 05 33 Raceway and Boxes for Electrical Systems 11-22
26 05 73 Overcurrent Protective Device Coordination Study 11-22
26 08 00 Commissioning of Electrical Systems 11-22
26 09 23 Lighting Controls 11-22
26 22 00 Low-Voltage Transformers 11-22
26 24 16 Panelboards 11-22
26 27 26 Wiring Devices 11-22
26 29 21 Enclosed Switches and Circuit Breakers 11-22
26 36 23 Automatic Transfer Switches 11-22
26 41 00 Facility Lightning Protection 11-22
26 43 13 Surge Protective Devices 11-22
26 51 00 Interior Lighting 11-22
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 05 36 Cable Trays For Communication Systems
27 05 53 Identification For Communication Systems
27 08 00 Commissioning of Communications Systems 11-16
27 10 00 Structured cabling 06-15
27 11 16 Communications Cabinets, Racks, Frames, and Enclosures
27 11 19 Communications Terminated Blocks and Patch Panels
27 11 26 Communications Rack Mounted Power Protection and Power
Strips
27 13 13 Communications Copper Backbone Cabling
27 13 13.13 Communications Copper Cabling Splicing and Terminations
27 13 23 Communications Optical Fiber Backbone Cabling
27 13 23.13 Communications Optical Fiber Splicing and Terminations
27 15 13 Communications Copper Horizontal Cabling
27 16 19 Communications Patch Cords, Station Cords, and cross-connect Wires
27 78 00 Closeout Submittals for Communications
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
00 01 10-5
SECTION NO DIVISION AND SECTION TITLES DATE
28 13 00 Physical Access Control System 10-11
28 13 16 Physical Access Control System and Database Management 09-11
28 23 00 Video Surveillance 09-11
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 08-23
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 12 16 Asphalt Paving 09-15
32 31 13 Chain Link Fences and Gates 06-18
DIVISION 33 – UTILITIES
33 30 00 Sanitary Sewer Utilities 06-13
33 40 00 Storm Sewer Utilities 12-17
DIVISION 34 – TRANSPORTATION (NOT USED)
DIVISION 48 – Electrical Power Generation (NOT USED)
VA Project Num. 537-21-700 05-01-20
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
Drawing No. Title
GENERAL
G001.1 COVER SHEET
G001.2 COVER SHEET
G001.3 COVER SHEET
G002 GENERAL NOTES
G003 BUILDING CODE REVIEW
HAZARDOUS ABATEMENT
HA101 ASBESTOS AND ABATEMENT PLANS – LEVEL 1
HA102 ASBESTOS AND ABATEMENT PLANS – LEVEL 2
HA103 ASBESTOS AND ABATEMENT PLANS – LEVEL 3
HA104 ASBESTOS AND ABATEMENT PLANS – LEVEL 4
HA105 ASBESTOS AND ABATEMENT PLANS – LEVEL 5
HA106 ASBESTOS AND ABATEMENT PLANS – LEVEL 6
HA107 ASBESTOS AND ABATEMENT PLANS – LEVEL 7
HA108 ASBESTOS AND ABATEMENT PLANS – LEVEL 8
HA109 ASBESTOS AND ABATEMENT PLANS – LEVEL 9
HA110 ASBESTOS AND ABATEMENT PLANS – LEVEL 10
CIVIL
GC001 CIVIL COVER SHEET
SU100 TR11A-SURVEY PLAN
SU101 TR30-SURVEY PLAN
SU102 TR1AA-SURVEY PLAN
SU103 TR1B-SURVEY PLAN
SU104 TR11B-SURVEY PLAN
CE100 TR1AA-EXISTING CONDITIONS PLAN
CE101 TR1B-EXISTING CONDITION PLAN
CE102 TR11A-EXISTING CONDITIONS PLAN
CE103 TR11B-EXISTING CONDITIONS PLAN
CE104 TR30-EXISTING CONDITION PLAN
CD100 TR1AA-DEMOLITION PLAN
CD101 TR1B-DEMOLITION PLAN
00 01 15 - 2
CD102 TR11A-DEMOLITION PLAN
CD103 TR11B-DEMOLITION PLAN
CD104 TR30-DEMOLITION PLAN
CS100 TR1AA-CIVIL SITE PLAN
CS101 TR1B-CIVIL SITE PLAN
CS102 TR11A-CIVIL SITE PLAN
CS103 TR11B-CIVIL SITE PLAN
CS104 TR30-CIVIL SITE PLAN
CS500 SITE DETAILS
CG100 TR1AA-GRADING PLAN
CG101 TR1B -GRADING PLAN
CG102 TR11A-GRADING PLAN
CG103 TR11B-GRADING PLAN
CG104 TR30-GRADING PLAN
CU100 COMBINED SEWER PLAN AND PROFILES
CU501 UTILITY DETAILS
EC100 TR1AA-EROSION CONTROL PLAN
EC101 TR1B-EROSION CONTROL PLAN
EC102 TR11A-EROSION CONTROL PLAN
EC103 TR11B-EROSION CONTROL PLAN
EC104 TR30-EROSION CONTROL PLAN
EC500 EROSION CONTROL DETAILS
LS100 TR30-LANDSCAPING PLAN
LS101 TR11A-LANDSCAPING PLAN
LS102 TR1AA-LANDSCAPING PLAN
STRUCTURAL
S001 GENERAL STRUCTURAL NOTES, DESIGN LOADS &
ABBREVIATIONS
S002 GENERAL STRUCTURAL NOTES AND QA NOTES & TABLES
S003 ROOF SNOW DRIFT PLANS
S101 OVERALL SITE PLAN
1A-S101 TR1A-STRUCTURAL FLOOR PLANS
1AA-S101 TR1AA-STRUCTURAL FLOOR PLANS
1B-S101 TR1B-STRUCTURAL FLOOR PLAN
1B-S102 TR1B-STRUCTURAL FLOOR PLANS
11A-S101 TR11A-STRUCTURAL FLOOR PLAN
11A-S102 TR11A-STRUCTURAL FLOOR PLANS
00 01 15 - 3
11B-S101 TR11B-STRUCTURAL FLOOR PLANS
11B-S102 TR11B-STRUCTURAL FLOOR PLANS
30-S101 TR30-STRUCTURAL FLOOR PLANS
S301 TYPICAL CONCRETE DETAILS
S302 CONCRETE DETAILS
S303 CONCRETE DETAILS
S501 STRUCTURAL DETAILS
S502 STRUCTURAL DETAILS
S503 STRUCTURAL DETAILS
S504 STRUCTURAL DETAILS
S540 PERFORMANCE SPECIFIED FRAMING
ARCHITECTURAL
A001 PHASING PLAN
A002 TR 1AA & TR 30 PHASING PLAN
A003 TR 1B PHASING PLAN – FIRST LEVEL
A004 TR 11A PHASING PLAN
A005 TR 11B PHASING PLAN
A006 BUILDING 1A – FIRST FLOOR PHASING
A007 BUILDING 1A – SECOND FLOOR PHASING
A008 BUILDING 1A – THIRD FLOOR PHASING
A009 BUILDING 1A – FOURTH FLOOR PHASING
A010 BUILDING 1A – FIFTH FLOOR PHASING
A011 BUILDING 1A – SIXTH FLOOR PHASING
A012 BUILDING 1A – SEVENTH FLOOR PHASING
A013 BUILDING 1A – EIGHTH FLOOR PHASING
A014 BUILDING 1A – NINTH FLOOR PHASING
A015 BUILDING 1A – TENTH FLOOR PHASING
A016 BUILDING 1B – FIRST FLOOR PHASING
A017 BUILDING 1B – SECOND FLOOR PHASING
A018 BUILDING 1B – THIRD FLOOR PHASING
A019 BUILDING 1B – FOURTH FLOOR PHASING
A020 BUILDING 1B – FIFTH FLOOR PHASING
A021 BUILDING 1B – SIXTH FLOOR PHASING
A022 BUILDING 1B – SEVENTH FLOOR PHASING
A023 BUILDING 1B – EIGHTH FLOOR PHASING
A024 BUILDING 1B – NINTH FLOOR PHASING
00 01 15 - 4
A025 BUILDING 1B – TENTH FLOOR PHASING
A026 BUILDING 11A – FIRST FLOOR PHASING
A027 BUILDING 11A – SECOND FLOOR PHASING
A028 BUILDING 11A – THIRD FLOOR PHASING
A029 BUILDING 11A – FOURTH FLOOR PHASING
A030 BUILDING 11A – FIFTH FLOOR PHASING
A031 BUILDING 11A – SIXTH FLOOR PHASING
A032 BUILDING 11A – SEVENTH FLOOR PHASING
A033 BUILDING 11B – FIRST FLOOR PHASING
A034 BUILDING 11B – SECOND FLOOR PHASING
A035 BUILDING 11B – THIRD FLOOR PHASING
A036 BUILDING 11B – FOURTH FLOOR PHASING
A037 BUILDING 11B – FIFTH FLOOR PHASING
A038 BUILDING 11B – SIXTH FLOOR PHASING
A039 BUILDING 11B – SEVENTH FLOOR PHASING
A040 BUILDING 40 – FIRST FLOOR PHASING
A041 BUILDING 40 – SECOND FLOOR PHASING
A042 BUILDING 40 – THIRD FLOOR PHASING
A043 BUILDING 40 – FOURTH FLOOR PHASING
A044 BUILDING 40 – FIFTH FLOOR PHASING
A045 BUILDING 40 – SIXTH FLOOR PHASING
A046 BUILDING 40 – SEVENTH FLOOR PHASING
A047 BUILDING 32 – FIRST FLOOR PHASING
A048 BUILDING 30 – FIRST FLOOR PHASING
A100 DIAMOND COVERAGE DIAGRAM. SOCAMES 6 DESIGN ALERT 1
A101 FIRST FLOOR OVERALL PLAN - ARCHITECTURAL
A102 SECOND FLOOR OVERALL PLAN - ARCHITECTURAL
A103 THIRD FLOOR OVERALL PLAN - ARCHITECTURAL
A104 FOURTH FLOOR OVERALL PLAN - ARCHITECTURAL
A105 FIFTH FLOOR OVERALL PLAN - ARCHITECTURAL
A106 SIXTH FLOOR OVERALL PLAN - ARCHITECTURAL
A107 SEVENTH FLOOR OVERALL PLAN - ARCHITECTURAL
A108 EIGHTH FLOOR OVERALL PLAN - ARCHITECTURAL
A109 NINTH FLOOR OVERALL PLAN - ARCHITECTURAL
A110 PENTHOUSE OVERALL PLAN - ARCHITECTURAL
AD201 ENLARGED DEMO EXTERIOR ELEVATIONS - ARCHITECTURAL
A201 OVERALL EXTERIOR ELEVATIONS - ARCHITECTURAL
00 01 15 - 5
A202 OVERALL EXTERIOR ELEVATIONS - ARCHITECTURAL
A203 ENLARGED EXTERIOR ELEVATIONS - ARCHITECTURAL
A204 ENLARGED EXTERIOR ELEVATIONS - ARCHITECTURAL
A301 BUILDING SECTIONS
A302 BUILDING SECTIONS
A401 TR 1A - ARCHITECTURAL FLOOR PLANS
A402 TR 1A - ARCHITECTURAL FLOOR PLANS
A403 TR 1A - ARCHITECTURAL FLOOR PLANS
A404 NOT USED
A405 NOT USED
A406 TR 1AA - ARCHITECTURAL FLOOR PLANS
A407 TR 1B - ARCHITECTURAL FLOOR PLANS
A408 TR 1B - ARCHITECTURAL FLOOR PLANS
A409 TR 1B - ARCHITECTURAL FLOOR PLANS
A410 TR 1B - ARCHITECTURAL FLOOR PLANS
A411 TR 1B - ARCHITECTURAL FLOOR PLANS
A412 TR 11A - ARCHITECTURAL FLOOR PLANS
A413 TR 11A - ARCHITECTURAL FLOOR PLANS
A414 TR 11A - ARCHITECTURAL FLOOR PLANS
A415 TR 11A - ARCHITECTURAL FLOOR PLANS
A416 TR 11A - ARCHITECTURAL FLOOR PLANS
A417 TR 11B - ARCHITECTURAL FLOOR PLANS
A418 TR 11B - ARCHITECTURAL FLOOR PLANS
A419 TR 11B - ARCHITECTURAL FLOOR PLANS
A420 TR 11B - ARCHITECTURAL FLOOR PLANS
A421 TR 40 - ARCHITECTURAL FLOOR PLANS
A422 TR 40 - ARCHITECTURAL FLOOR PLANS
A423 TR 32 - ARCHITECTURAL FLOOR PLANS
A424 TR 30- ARCHITECTURAL FLOOR PLANS
AD501 DEMOLITION WALL SECTIONS
A501 WALL AND PARTITION TYPES
A502 WALL SECTIONS
A503 WALL SECTIONS
A504 EXTERIOR DETAILS
A505 EXTERIOR DETAILS
A506 EXTERIOR DETAILS
A601 DOOR AND FRAME SCHEDULE & DETAILS
00 01 15 - 6
A701 TYPICAL DETAILS
AF101 FINISH SCHEDULE
FIRE PROTECTION
F000 FIRE PROTECTION – LEGENDS, NOTES
F101 FIRST FLOOR OVERALL PLAN - FIRE PROTECTION
F102 SECOND FLOOR OVERALL PLAN - FIRE PROTECTION
F103 THIRD FLOOR OVERALL PLAN - FIRE PROTECTION
F104 FOURTH FLOOR OVERALL PLAN - FIRE PROTECTION
F105 FIFTH FLOOR OVERALL PLAN - FIRE PROTECTION
F106 SIXTH FLOOR OVERALL PLAN - FIRE PROTECTION
F107 SEVENTH FLOOR OVERALL PLAN - FIRE PROTECTION
F108 EIGHTH FLOOR OVERALL PLAN - FIRE PROTECTION
F109 NINTH FLOOR OVERALL PLAN - FIRE PROTECTION
F110 TENTH FLOOR OVERALL PLAN - FIRE PROTECTION
F401 TR 1A - FIRE PROTECTION FLOOR PLANS
F402 TR 1A - FIRE PROTECTION FLOOR PLANS
F403 TR 1A - FIRE PROTECTION FLOOR PLANS
F404 TR 1A - FIRE PROTECTION FLOOR PLANS
F411 TR 1B - FIRE PROTECTION FLOOR PLANS
F412 TR 1B - FIRE PROTECTION FLOOR PLANS
F413 TR 1B - FIRE PROTECTION FLOOR PLANS
F414 TR 1B - FIRE PROTECTION FLOOR PLANS
F415 TR 1B - FIRE PROTECTION FLOOR PLANS
F421 TR 11A - FIRE PROTECTION FLOOR PLANS
F422 TR 11A - FIRE PROTECTION FLOOR PLANS
F423 TR 11A - FIRE PROTECTION FLOOR PLANS
F424 TR 11A - FIRE PROTECTION FLOOR PLANS
F425 TR 11A - FIRE PROTECTION FLOOR PLANS
F431 TR 11B - FIRE PROTECTION FLOOR PLANS
F432 TR 11B - FIRE PROTECTION FLOOR PLANS
F433 TR 11B - FIRE PROTECTION FLOOR PLANS
F434 TR 11B - FIRE PROTECTION FLOOR PLANS
F451 TR 30 - FIRE PROTECTION FLOOR PLANS
F461 TR 32 - FIRE PROTECTION FLOOR PLANS
F471 TR 1AA - FIRE PROTECTION FLOOR PLANS
F500 FIRE PROTECTION DETAILS
00 01 15 - 7
F501 FIRE PROTECTION DIAGRAMS
F502 FIRE PROTECTION DIAGRAMS
PLUMBING
P000 PLUMBING – LEGENDS, NOTES
P100 UNDERFLOOR OVERALL PLAN - PLUMBING
P101 FIRST FLOOR OVERALL PLAN - PLUMBING
P102 SECOND FLOOR OVERALL PLAN - PLUMBING
P103 THIRD FLOOR OVERALL PLAN - PLUMBING
P104 FOURTH FLOOR OVERALL PLAN - PLUMBING
P105 FIFTH FLOOR OVERALL PLAN - PLUMBING
P106 SIXTH FLOOR OVERALL PLAN - PLUMBING
P107 SEVENTH FLOOR OVERALL PLAN - PLUMBING
P108 EIGHTH FLOOR OVERALL PLAN - PLUMBING
P401 TR 1A - PLUMBING FLOOR PLANS
P411 TR 1B - PLUMBING FLOOR PLANS
P412 TR 1B - PLUMBING FLOOR PLANS
P413 TR 1B - PLUMBING FLOOR PLANS
P421 TR 11A - PLUMBING FLOOR PLANS
P422 TR 11A - PLUMBING FLOOR PLANS
P423 TR 11A - PLUMBING FLOOR PLANS
P431 TR 11B - PLUMBING FLOOR PLANS
P432 TR 11B - PLUMBING FLOOR PLANS
P441 TR 40 - PLUMBING FLOOR PLANS
P451 TR 30 - PLUMBING FLOOR PLANS
P461 TR 32 - PLUMBING FLOOR PLANS
P471 TR 1AA - PLUMBING FLOOR PLANS
P500 PLUMBING DETAILS
MECHANICAL
M000 MECHANICAL – LEGEND, NOTES
M101 FIRST FLOOR OVERALL PLAN - MECHANICAL
M102 SECOND FLOOR OVERALL PLAN - MECHANICAL
M103 THIRD FLOOR OVERALL PLAN - MECHANICAL
M104 FOURTH FLOOR OVERALL PLAN - MECHANICAL
M105 FIFTH FLOOR OVERALL PLAN - MECHANICAL
00 01 15 - 8
M106 SIXTH FLOOR OVERALL PLAN - MECHANICAL
M107 SEVENTH FLOOR OVERALL PLAN - MECHANICAL
M108 EIGHTH FLOOR OVERALL PLAN - MECHANICAL
M109 NINTH FLOOR OVERALL PLAN - MECHANICAL
M110 TENTH FLOOR OVERALL PLAN - MECHANICAL
M111 ELEVENTH FLOOR OVERALL PLAN - MECHANICAL
M112 ROOF OVERALL PLAN - MECHANICAL
M401 TR 1A - MECHANICAL FLOOR PLANS
M402 TR 1A - MECHANICAL FLOOR PLANS
M403 TR 1A - MECHANICAL FLOOR PLANS
M404 TR 1A - MECHANICAL FLOOR PLANS
M411 TR 1B - MECHANICAL FLOOR PLANS
M412 TR 1B - MECHANICAL FLOOR PLANS
M413 TR 1B - MECHANICAL FLOOR PLANS
M421 TR 11A - MECHANICAL FLOOR PLANS
M422 TR 11A - MECHANICAL FLOOR PLANS
M423 TR 11A - MECHANICAL FLOOR PLANS
M424 TR 11A - MECHANICAL FLOOR PLANS
M425 TR 11A - MECHANICAL FLOOR PLANS
M426 TR 11A - MECHANICAL FLOOR PLANS
M431 TR 11B - MECHANICAL FLOOR PLANS
M432 TR 11B - MECHANICAL FLOOR PLANS
M433 TR 11B - MECHANICAL FLOOR PLANS
M434 TR 11B - MECHANICAL FLOOR PLANS
M441 TR 40 - MECHANICAL FLOOR PLANS
M442 TR 40 - MECHANICAL FLOOR PLANS
M443 TR 40 - MECHANICAL FLOOR PLANS
M444 TR 40 - MECHANICAL FLOOR PLANS
M451 TR 30 - MECHANICAL FLOOR PLANS
M461 TR 32 - MECHANICAL FLOOR PLANS
M471 TR 1AA - MECHANICAL FLOOR PLANS
M500 MECHANICAL DETAILS
M600 MECHANICAL DIAGRAMS
M601 MECHANICAL DIAGRAMS
M700 MECHANICAL SCHEDULES
00 01 15 - 9
ELECTRICAL
EC000 ELECTRICAL COVERSHEET
E101 FIRST FLOOR OVERALL PLAN - ELECTRICAL
E102 SECOND FLOOR OVERALL PLAN - ELECTRICAL
E103 THIRD FLOOR OVERALL PLAN - ELECTRICAL
E104 FOURTH FLOOR OVERALL PLAN - ELECTRICAL
E105 FIFTH FLOOR OVERALL PLAN - ELECTRICAL
E106 SIXTH FLOOR OVERALL PLAN - ELECTRICAL
E107 SEVENTH FLOOR OVERALL PLAN - ELECTRICAL
E108 EIGHTH FLOOR OVERALL PLAN - ELECTRICAL
E109 NINTH FLOOR OVERALL PLAN - ELECTRICAL
E110 TENTH FLOOR OVERALL PLAN - ELECTRICAL
E401 TR 1A – ELECTRICAL FLOOR PLANS
E402 TR 1A – ELECTRICAL FLOOR PLANS
E403 TR 1A – ELECTRICAL FLOOR PLANS
E404 TR 1A – ELECTRICAL FLOOR PLANS
E411 TR 1B – ELECTRICAL FLOOR PLANS
E412 TR 1B – ELECTRICAL FLOOR PLANS
E413 TR 1B – ELECTRICAL FLOOR PLANS
E414 TR 1B – ELECTRICAL FLOOR PLANS
E415 TR 1B – ELECTRICAL FLOOR PLANS
E421 TR 11A – ELECTRICAL FLOOR PLANS
E422 TR 11A – ELECTRICAL FLOOR PLANS
E423 TR 11A – ELECTRICAL FLOOR PLANS
E424 TR 11A – ELECTRICAL FLOOR PLANS
E425 TR 11A – ELECTRICAL FLOOR PLANS
E426 TR 11A – ELECTRICAL FLOOR PLANS
E431 TR 11B – ELECTRICAL FLOOR PLANS
E432 TR 11B – ELECTRICAL FLOOR PLANS
E433 TR 11B – ELECTRICAL FLOOR PLANS
E434 TR 11B – ELECTRICAL FLOOR PLANS
E441 TR 40 – ELECTRICAL FLOOR PLANS
E442 TR 40 – ELECTRICAL FLOOR PLANS
E443 TR 40 – ELECTRICAL FLOOR PLANS
E451 TR 30 – ELECTRICAL FLOOR PLANS
E461 TR 32 – ELECTRICAL FLOOR PLANS
E471 TR 1AA – ELECTRICAL FLOOR PLANS
00 01 15 - 10
EQ400 ELECTRICAL SCHEDULES
EQ500 ELECTRICAL DETAILS
EQ501 ELECTRICAL DETAILS
ER503 ELECTRICAL RISER
ER504 ELECTRICAL RISER
ER505 ELECTRICAL RISER
EP601 ELECTRICAL PANEL SCHEDULES
EP602 ELECTRICAL PANEL SCHEDULES
EP603 ELECTRICAL PANEL SCHEDULES
EP604 ELECTRICAL PANEL SCHEDULES
EP605 ELECTRICAL PANEL SCHEDULES
EP606 ELECTRICAL PANEL SCHEDULES
EP607 ELECTRICAL PANEL SCHEDULES
EP608 ELECTRICAL PANEL SCHEDULES
EP609 ELECTRICAL PANEL SCHEDULES
EP610 ELECTRICAL PANEL SCHEDULES
EP611 ELECTRICAL PANEL SCHEDULES
EP612 ELECTRICAL PANEL SCHEDULES
EP613 ELECTRICAL PANEL SCHEDULES
TECHNOLOGY
00-T000 TECHNOLOGY – LEGENDS, NOTES
00-TN101 FIRST FLOOR PLAN – TECHNOLOGY
00-TN102 SECOND FLOOR PLAN - TECHNOLOGY
00-TN103 THIRD FLOOR PLAN - TECHNOLOGY
00-TN104 FOURTH FLOOR PLAN - TECHNOLOGY
00-TN105 FIFTH FLOOR PLAN - TECHNOLOGY
00-TN106 SIXTH FLOOR PLAN - TECHNOLOGY
00-TN107 SEVENTH FLOOR PLAN - TECHNOLOGY
00-TN108 EIGHTH FLOOR PLAN - TECHNOLOGY
00-TN109 NINTH FLOOR PLAN - TECHNOLOGY
00-TN110 TENTH FLOOR PLAN - TECHNOLOGY
1AN-TD101 BUILDING 1AN – FIRST FLOOR DEMO PLAN – TECHNOLOGY
1AN-TD102 BUILDING 1AN – SECOND FLOOR DEMO PLAN - TECHNOLOGY
1AN-TD103 BUILDING 1AN – THIRD FLOOR DEMO PLAN - TECHNOLOGY
1AN-TD104 BUILDING 1AN – FOURTH FLOOR DEMO PLAN - TECHNOLOGY
1AN-TD105 BUILDING 1AN – FIFTH FLOOR DEMO PLAN - TECHNOLOGY
00 01 15 - 11
1AN-TD106 BUILDING 1AN – SIXTH FLOOR DEMO PLAN - TECHNOLOGY
1AN-TD107 BUILDING 1AN – SEVENTH FLOOR DEMO PLAN - TECHNOLOGY
1AN-TD108 BUILDING 1AN – EIGHTH FLOOR DEMO PLAN - TECHNOLOGY
1AN-TD109 BUILDING 1AN – NINTH FLOOR DEMO PLAN - TECHNOLOGY
1AN-TD110 BUILDING 1AN – TENTH FLOOR DEMO PLAN – TECHNOLOGY
1AN-TN101 BUILDING 1AN – FIRST FLOOR PLAN – TECHNOLOGY
1AN-TN102 BUILDING 1AN – SECOND FLOOR PLAN - TECHNOLOGY
1AN-TN103 BUILDING 1AN – THIRD FLOOR PLAN - TECHNOLOGY
1AN-TN104 BUILDING 1AN – FOURTH FLOOR PLAN - TECHNOLOGY
1AN-TN105 BUILDING 1AN – FIFTH FLOOR PLAN - TECHNOLOGY
1AN-TN106 BUILDING 1AN – SIXTH FLOOR PLAN - TECHNOLOGY
1AN-TN107 BUILDING 1AN – SEVENTH FLOOR PLAN - TECHNOLOGY
1AN-TN108 BUILDING 1AN – EIGHTH FLOOR PLAN - TECHNOLOGY
1AN-TN109 BUILDING 1AN – NINTH FLOOR PLAN - TECHNOLOGY
1AN-TN110 BUILDING 1AN – TENTH FLOOR PLAN - TECHNOLOGY
1AS-TD101 BUILDING 1AS – FIRST FLOOR DEMO PLAN - TECHNOLOGY
1AS-TD102 BUILDING 1AS – SECOND FLOOR DEMO PLAN - TECHNOLOGY
1AS-TD103 BUILDING 1AS – THIRD FLOOR DEMO PLAN - TECHNOLOGY
1AS-TD104 BUILDING 1AS – FOURTH FLOOR DEMO PLAN - TECHNOLOGY
1AS-TD105 BUILDING 1AS – FIFTH FLOOR DEMO PLAN - TECHNOLOGY
1AS-TD106 BUILDING 1AS – SIXTH FLOOR DEMO PLAN - TECHNOLOGY
1AS-TD107 BUILDING 1AS – SEVENTH FLOOR DEMO PLAN - TECHNOLOGY
1AS-TD108 BUILDING 1AS – EIGHTH FLOOR DEMO PLAN - TECHNOLOGY
1AS-TD109 BUILDING 1AS – NINTH FLOOR DEMO PLAN - TECHNOLOGY
1AS-TD110 BUILDING 1AS – TENTH FLOOR DEMO PLAN – TECHNOLOGY
1AS-TN101 BUILDING 1A-S – FIRST FLOOR PLAN – TECHNOLOGY
1AS-TN102 BUILDING 1A-S – SECOND FLOOR PLAN - TECHNOLOGY
1AS-TN103 BUILDING 1A-S – THIRD FLOOR PLAN - TECHNOLOGY
1AS-TN104 BUILDING 1A-S – FOURTH FLOOR PLAN - TECHNOLOGY
1AS-TN105 BUILDING 1A-S – FIFTH FLOOR PLAN - TECHNOLOGY
1AS-TN106 BUILDING 1A-S – SIXTH FLOOR PLAN - TECHNOLOGY
1AS-TN107 BUILDING 1A-S – SEVENTH FLOOR PLAN - TECHNOLOGY
1AS-TN108 BUILDING 1A-S – EIGHTH FLOOR PLAN - TECHNOLOGY
1AS-TN109 BUILDING 1A-S – NINTH FLOOR PLAN - TECHNOLOGY
1AS-TN110 BUILDING 1A-S – TENTH FLOOR PLAN – TECHNOLOGY
1AS-TN300 TR1A – TECHNOLOGY ROOM ENLARGEMENTS
1AS-TN301 TR1A – TECHNOLOGY ROOM ENLARGEMENTS
00 01 15 - 12
1AS-TN302 TR1A – TECHNOLOGY ROOM ENLARGEMENTS
1AS-TN303 TR1A – TECHNOLOGY ROOM ENLARGEMENTS
1AS-TN304 TR1A – TECHNOLOGY ROOM ENLARGEMENTS
1AS-TN305 TR1A – TECHNOLOGY ROOM ENLARGEMENTS
1AS-TN306 TECHNOLOGY ROOM ENLARGEMENTS
1AS-TN307 TECHNOLOGY ROOM ENLARGEMENTS
1B-TD101 BUILDING 1B – FIRST FLOOR DEMO PLAN - TECHNOLOGY
1B-TD102 BUILDING 1B – SECOND FLOOR DEMO PLAN - TECHNOLOGY
1B-TD103 BUILDING 1B – THIRD FLOOR DEMO PLAN - TECHNOLOGY
1B-TD104 BUILDING 1B – FOURTH FLOOR DEMO PLAN - TECHNOLOGY
1B-TD105 BUILDING 1B – FIFTH FLOOR DEMO PLAN - TECHNOLOGY
1B-TD106 BUILDING 1B – SIXTH FLOOR DEMO PLAN - TECHNOLOGY
1B-TD107 BUILDING 1B – SEVENTH FLOOR DEMO PLAN - TECHNOLOGY
1B-TD108 BUILDING 1B – EIGHTH FLOOR DEMO PLAN - TECHNOLOGY
1B-TD109 BUILDING 1B – NINTH FLOOR DEMO PLAN - TECHNOLOGY
1B-TD110 BUILDING 1B – TENTH FLOOR DEMO PLAN – TECHNOLOGY
1B-TN101 BUILDING 1B – FIRST FLOOR PLAN - TECHNOLOGY
1B-TN102 BUILDING 1B – SECOND FLOOR PLAN - TECHNOLOGY
1B-TN103 BUILDING 1B – THIRD FLOOR PLAN - TECHNOLOGY
1B-TN104 BUILDING 1B – FOURTH FLOOR PLAN - TECHNOLOGY
1B-TN105 BUILDING 1B – FIFTH FLOOR PLAN - TECHNOLOGY
1B-TN106 BUILDING 1B – SIXTH FLOOR PLAN - TECHNOLOGY
1B-TN107 BUILDING 1B – SEVENTH FLOOR PLAN - TECHNOLOGY
1B-TN108 BUILDING 1B – EIGHTH FLOOR PLAN - TECHNOLOGY
1B-TN109 BUILDING 1B – NINTH FLOOR PLAN - TECHNOLOGY
1B-TN110 BUILDING 1B – TENTH FLOOR PLAN – TECHNOLOGY
1B-TN300 TR1B – TECHNOLOGY ROOM ENLARGEMENTS
1B-TN301 TR1B – TECHNOLOGY ROOM ENLARGEMENTS
1B-TN302 TR1B – TECHNOLOGY ROOM ENLARGEMENTS
11A-TD101 BUILDING 11A – FIRST FLOOR DEMO PLAN – TECHNOLOGY
11A-TD101.1 BUILDING 11A – FIRST FLOOR DEMO PLAN – TECHNOLOGY
11A-TD102 BUILDING 11A – SECOND FLOOR DEMO PLAN – TECHNOLOGY
11A-TD102.1 BUILDING 11A – SECOND FLOOR DEMO PLAN - TECHNOLOGY
11A-TD103 BUILDING 11A – THIRD FLOOR DEMO PLAN – TECHNOLOGY
11A-TD103.1 BUILDING 11A – THIRD FLOOR DEMO PLAN - TECHNOLOGY
11A-TD104 BUILDING 11A – FOURTH FLOOR DEMO PLAN – TECHNOLOGY
11A-TD104.1 BUILDING 11A – FOURTH FLOOR DEMO PLAN - TECHNOLOGY
00 01 15 - 13
11A-TD105 BUILDING 11A – FIFTH FLOOR DEMO PLAN – TECHNOLOGY
11A-TD105.1 BUILDING 11A – FIFTH FLOOR DEMO PLAN - TECHNOLOGY
11A-TD106 BUILDING 11A – SIXTH FLOOR DEMO PLAN – TECHNOLOGY
11A-TD106.1 BUILDING 11A – SIXTH FLOOR DEMO PLAN - TECHNOLOGY
11A-TD107 BUILDING 11A – SEVENTH FLOOR DEMO PLAN – TECHNOLOGY
11A-TD107.1 BUILDING 11A – SEVENTH FLOOR DEMO PLAN – TECHNOLOGY
11A-TN101 BUILDING 11A – FIRST FLOOR PLAN – TECHNOLOGY
11A-TN101.1 BUILDING 11A – FIRST FLOOR PLAN – TECHNOLOGY
11A-TN102 BUILDING 11A – SECOND FLOOR PLAN – TECHNOLOGY
11A-TN102.1 BUILDING 11A – SECOND FLOOR PLAN - TECHNOLOGY
11A-TN103 BUILDING 11A – THIRD FLOOR PLAN – TECHNOLOGY
11A-TN103.1 BUILDING 11A – THIRD FLOOR PLAN - TECHNOLOGY
11A-TN104 BUILDING 11A – FOURTH FLOOR PLAN – TECHNOLOGY
11A-TN104.1 BUILDING 11A – FOURTH FLOOR PLAN - TECHNOLOGY
11A-TN105 BUILDING 11A – FIFTH FLOOR PLAN – TECHNOLOGY
11A-TN105.1 BUILDING 11A – FIFTH FLOOR PLAN - TECHNOLOGY
11A-TN106 BUILDING 11A – SIXTH FLOOR PLAN – TECHNOLOGY
11A-TN106.1 BUILDING 11A – SIXTH FLOOR PLAN - TECHNOLOGY
11A-TN107 BUILDING 11A – SEVENTH FLOOR PLAN – TECHNOLOGY
11A-TN107.1 BUILDING 11A – SEVENTH FLOOR PLAN – TECHNOLOGY
11A-TN300 TR11A – TECHNOLOGY ROOM ENLARGEMENTS
11A-TN301 TR11A – TECHNOLOGY ROOM ENLARGEMENTS
11A-TN302 TR11A – TECHNOLOGY ROOM ENLARGEMENTS
11A-TN303 TR11A – TECHNOLOGY ROOM ENLARGEMENTS
11B-TD101 BUILDING 11A – FIRST FLOOR DEMO PLAN - TECHNOLOGY
11B-TD102 BUILDING 11A – SECOND FLOOR DEMO PLAN - TECHNOLOGY
11B-TD103 BUILDING 11A – THIRD FLOOR DEMO PLAN - TECHNOLOGY
11B-TD104 BUILDING 11A – FOURTH FLOOR DEMO PLAN - TECHNOLOGY
11B-TD105 BUILDING 11A – FIFTH FLOOR DEMO PLAN - TECHNOLOGY
11B-TD106 BUILDING 11A – SIXTH FLOOR DEMO PLAN - TECHNOLOGY
11B-TD107 BUILDING 11A – SEVENTH FLOOR DEMO PLAN - TECHNOLOGY
11B-TN101 BUILDING 11B – FIRST FLOOR PLAN - TECHNOLOGY
11B-TN102 BUILDING 11B – SECOND FLOOR PLAN - TECHNOLOGY
11B-TN103 BUILDING 11B – THIRD FLOOR PLAN - TECHNOLOGY
11B-TN104 BUILDING 11B – FOURTH FLOOR PLAN - TECHNOLOGY
11B-TN105 BUILDING 11B – FIFTH FLOOR PLAN - TECHNOLOGY
11B-TN106 BUILDING 11B – SIXTH FLOOR PLAN - TECHNOLOGY
00 01 15 - 14
11B-TN107 BUILDING 11B – SEVENTH FLOOR PLAN – TECHNOLOGY
11B-TN301 TR11B – TECHNOLOGY ROOM ENLARGEMENTS
11B-TN302 TR11B – TECHNOLOGY ROOM ENLARGEMENTS
11B-TN303 TR11B – TECHNOLOGY ROOM ENLARGEMENTS
11B-TN304 TR11B – TECHNOLOGY ROOM ENLARGEMENTS
30-TD101 BUILDING 30 – FIRST FLOOR DEMO PLAN – TECHNOLOGY
30-TN101 BUILDING 30 – FIRST FLOOR PLAN – TECHNOLOGY
30-TN301 TR30 – TECHNOLOGY ROOM ENLARGEMENTS
32-TD101 BUILDING 32 – FIRST FLOOR DEMO PLAN - TECHNOLOGY
32-TD102 BUILDING 32 – SECOND FLOOR DEMO PLAN – TECHNOLOGY
32-TN101 BUILDING 32 – FIRST FLOOR PLAN - TECHNOLOGY
32-TN102 BUILDING 32 – SECOND FLOOR PLAN - TECHNOLOGY
32-TN301 TR32 – TECHNOLOGY ROOM ENLARGEMENTS
40E-TD101 BUILDING 40A – FIRST FLOOR DEMO PLAN - TECHNOLOGY
40E-TD102 BUILDING 40A – SECOND FLOOR DEMO PLAN - TECHNOLOGY
40E-TD103 BUILDING 40A – THIRD FLOOR DEMO PLAN - TECHNOLOGY
40E-TD104 BUILDING 40A – FOURTH FLOOR DEMO PLAN - TECHNOLOGY
40E-TD105 BUILDING 40A – FIFTH FLOOR DEMO PLAN - TECHNOLOGY
40E-TD106 BUILDING 40A – SIXTH FLOOR DEMO PLAN - TECHNOLOGY
40E-TD107 BUILDING 40A – SEVENTH FLOOR DEMO PLAN – TECHNOLOGY
40E-TN101 BUILDING 40A – FIRST FLOOR PLAN - TECHNOLOGY
40E-TN102 BUILDING 40A – SECOND FLOOR PLAN - TECHNOLOGY
40E-TN103 BUILDING 40A – THIRD FLOOR PLAN - TECHNOLOGY
40E-TN104 BUILDING 40A – FOURTH FLOOR PLAN - TECHNOLOGY
40E-TN105 BUILDING 40A – FIFTH FLOOR PLAN - TECHNOLOGY
40E-TN106 BUILDING 40A – SIXTH FLOOR PLAN - TECHNOLOGY
40E-TN107 BUILDING 40A – SEVENTH FLOOR PLAN - TECHNOLOGY
40W-TD101 BUILDING 40B – FIRST FLOOR DEMO PLAN - TECHNOLOGY
40W-TD102 BUILDING 40B – SECOND FLOOR DEMO PLAN - TECHNOLOGY
40W-TD103 BUILDING 40B – THIRD FLOOR DEMO PLAN - TECHNOLOGY
40W-TD104 BUILDING 40B – FOURTH FLOOR DEMO PLAN - TECHNOLOGY
40W-TD105 BUILDING 40B – FIFTH FLOOR DEMO PLAN - TECHNOLOGY
40W-TD106 BUILDING 40B – SIXTH FLOOR DEMO PLAN - TECHNOLOGY
40W-TD107 BUILDING 40B – SEVENTH FLOOR DEMO PLAN - TECHNOLOGY
40W-TN101 BUILDING 40B – FIRST FLOOR PLAN - TECHNOLOGY
40W-TN102 BUILDING 40B – SECOND FLOOR PLAN - TECHNOLOGY
40W-TN103 BUILDING 40B – THIRD FLOOR PLAN - TECHNOLOGY
00 01 15 - 15
40W-TN104 BUILDING 40B – FOURTH FLOOR PLAN - TECHNOLOGY
40W-TN105 BUILDING 40B – FIFTH FLOOR PLAN - TECHNOLOGY
40W-TN106 BUILDING 40B – SIXTH FLOOR PLAN - TECHNOLOGY
40W-TN107 BUILDING 40B – SEVENTH FLOOR PLAN - TECHNOLOGY
40W-TN300 TR40 – TECHNOLOGY ROOM ENLARGEMENTS
40W-TN301 TR40 – TECHNOLOGY ROOM ENLARGEMENTS
40W-TN302 TR40 – TECHNOLOGY ROOM ENLARGEMENTS
40W-TN303 TR40 – TECHNOLOGY ROOM ENLARGEMENTS
T400 TECHNOLOGY RISER DIAGRAMS
T401 TECHNOLOGY RISER DIAGRAMS
T402 TECHNOLOGY RISER DIAGRAMS
T403 TECHNOLOGY RISER DIAGRAMS
T500 TECHNOLOGY DETAILS
T501 TECHNOLOGY DETAILS
T502 TECHNOLOGY DETAILS
T503 TECHNOLOGY DETAILS
T504 TECHNOLOGY DETAILS
T600 TECHNOLOGY SCHEDULES
- - - END - - -
VA Project Num. 537-21-700 11-01-21
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 CONTRACTOR WORK HOURS
A. Normal working hours for this contract will be from 7:00AM to 4:30PM (local time) Monday through Friday except for weekends and established Federal Holidays.
B. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR.
Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.
1.3 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials, equipment, management, supervision, tools, and all other necessary resources to construct the project as required by drawings and specifications. The contractor is responsible to perform a site survey and investigation to satisfy themselves as to the extent of the work. The place of work is located at VA Medical Center Jesse Brown Chicago IL.
Refer to Scope of Work for Performance period days.
B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting Officer..
C. Offices of Nagel Architect + Engineers, as
Architect-Engineers, will render certain technical services
01 00 00 -2 during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans
Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.4 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: As provided in the contract documents this project will engage a Contractor to furnish all labor, tools, material, equipment, and supervision to
Electronic Health Records Modernization (EHRM)
Infrastructure Upgrades at the Jesse Brown VA Medical
Center – Chicago, IL. Work includes general construction, alterations, foundations, superstructure, exterior enclosure, roofing, interior construction, interior finishes, plumbing, HVAC, Fire protection, electrical, furnishings, necessary selective removal of existing structures and construction, site preparation, site improvements, site utilities, and certain other items.
01 00 00 -3
1.5 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents shall be obtained from the website where the solicitation is posted. Additional copies shall be at Contractor's expense.
1.6 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees.
This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The
General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Guards (NOT USED)
D. Key Control:
01 00 00 -4
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) and Medical Center police for any locked storage area, office or storage trailer, and any other locks installed by permission of the COR at the project site. The purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.
See Section 08 71 00, DOOR HARDWARE and coordinate.
E. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings shall be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
01 00 00 -5
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of
“sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents shall be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access.
Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for
General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA
Medical Center Facility Manager.
1.7 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The
Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities shall be erected by the Contractor only with
01 00 00 -6 the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the
Contracting Officer, the buildings and utilities shall be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
Use of equipment and tools that transmit vibrations and
01 00 00 -7 noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by
Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of
Contractor's materials and equipment shall be permitted subject to fire and safety requirements.
H. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service shall be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the
COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each
01 00 00 -8 specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof.
Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to
Medical Center Director, COR and Contractor.
Phase I:
Phase II:
I. Building shall be vacated by Government in accordance with above phasing beginning immediately after date of receipt of Notice to Proceed and turned over to Contractor.
J. When an area is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or
Company (Department of Veterans Affairs or municipal) whichever shall be required to respond to an alarm from
Contractor's employee or watchman.
K. Utilities Services: Maintain existing utility services for
Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, of utility services or of fire
01 00 00 -9 protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems shall be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center
Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR
ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK
RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 14 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor shall be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical
Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system shall be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
01 00 00 -10
5. In case of a contract construction emergency, service shall be interrupted on approval of COR. Such approval shall be confirmed in writing as soon as practical.
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel them originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions;
so that they are completely behind the finished surfaces.
M. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane shall be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances shall be approved by the COR.
N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.8 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of
VA Supply Service, of areas of building in which
01 00 00 -11 alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the
Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and the COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which shall be furnished by
Government. Provided the contract work is changed by reason of this subparagraph B, the contract shall be modified accordingly.
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved.
They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other
01 00 00 -12 surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by
Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.9 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the
Government are identified by attached tags or noted on drawings or in specifications as items to be stored.
Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to
01 00 00 -13 re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the
Contractor and be removed by Contractor from Medical
Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government.
When rooms and spaces are vacated by the Department of
Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused shall be removed by the
Government in advance of work to avoid interfering with
Contractor's operation.
4. PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the Polychlorinated Biphenyl
(PCB) transformers and capacitors. The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the Environmental
Protection Agency (EPA) and the Department of
Transportation (DOT) as outlined in Code of Federal
Regulation (CFR), Titled 40 and 49 respectively. The
EPA's Toxic Substance Control Act (TSCA) Compliance
Program Policy Nos. 6-PCB-6 and 6-PCB-7 also apply. Upon removal of PCB transformers and capacitors for disposal, the "originator" copy of the Uniform Hazardous Waste
Manifest (EPA Form 8700-22), along with the Uniform
Hazardous Waste Manifest Continuation Sheet (EPA Form
8700-22A) shall be returned to the Contracting Officer who will annotate the contract file and transmit the
Manifest to the Medical Center's Chief and the COR.
01 00 00 -14
a) Copies of the following listed CFR titles shall be obtained…