Attachment_3_-_LPTA_Technical_Acceptability_(Services).docx
DOCX document 34 KB Posted
- Attached to
- GRSM CALL OUT TREE SERVICES Federal contract opportunity
- Solicitation number
- 140P5326Q0031
About this file
This is a Lowest Price Technically Acceptable (LPTA) Technical Acceptability and Price Submission Template for a Call-As-Needed Hazard Tree Removal service contract at Great Smoky Mountains National Park (RFQ No. 140P5326R0023). Quoters must complete all required sections to achieve technical acceptability; omission of any required entry results in automatic rejection and ineligibility for award.
The template requires quoters to provide: (1) company information including legal name, UEI, CAGE code, and primary point of contact; (2) evidence of three completed projects within the last five years relevant to hazard tree removal, felling, woody material disposal, and tree work in developed or roadside environments, including customer/owner details, location, project scope, timing, contract/PO numbers, and reference contacts; (3) identification of any key subcontractors and their specialized roles; and (4) a compliance checklist confirming adherence to mandatory Statement of Work requirements, including on-site ISA-Certified Arborist presence, response timeframes (5 days standard, 72 hours for strainer trees), ANSI Z133 and A300 standards compliance, woody material disposal procedures, park resource protection, Indiana Bat and Northern Flying Squirrel protection rules, MUTCD traffic control compliance, OSHA safety practices with certified sawyers, daily personnel and work logs, and seasonal/work-hour restrictions. Quoters must also acknowledge the 183-calendar-day period of performance from award notice and disclose any known schedule constraints or material lead times that could impact performance completion.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_-_Solicitation_Rev_2_0002.docx | DOCX document | |
| Sol_140P5326Q0031_Amd_0002.pdf | ||
| 9_18_26_Vendro_Q_A_0002.docx | DOCX document | |
| Sol_140P5326Q0031_Amd_0001.pdf | ||
| B08_Attachment_1-_A04_SOW_Hazard_Tree-Removal_2026_Rev_1_0001.docx | DOCX document | |
| Attachment_2_Price_Schedule_Sheet_Rev_1_0001.xlsx | XLSX spreadsheet | |
| Attachment_8-_Haywood_County_SC_WD_2015-5901.pdf | ||
| Attachment_9-_Sevier_County_SC_WD_2015-4667.pdf | ||
| Attachment_10-_Swain_County_SC_WD_2015-4417.pdf | ||
| Attachment_4-_52_212-3_Offeror_Representations_and_Certifications_Commercial_Products_and_Commercial_Services_.docx | DOCX document | |
| Attachment_6-_Blount_County_SC_WD_2015-4643.pdf | ||
| Attachment_1-_A04_SOW_Hazard_Tree-Removal_2026.docx | DOCX document | |
| Attachment_7-_Cocke_County_SC_WD_2015-4669.pdf | ||
| Sol_140P5326Q0031.pdf | ||
| Attachment_5_-_Limitations_on_Subcontracting_Worksheet.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3 — LPTA TECHNICAL ACCEPTABILITY & PRICE SUBMISSION TEMPLATE (SERVICES) Project Name: Call-As-Needed Hazard Tree Removal Park Location: Great Smoky Mountains National Park
RFQ No.: 140P5326R0023______________________
INSTRUCTIONS (READ FIRST):
Quoter shall complete and submit this template with its quotation. To be rated Technically Acceptable (PASS), the quoter must enter all required information. Omission of any required entry will result in Technically Unacceptable (FAIL) and ineligibility for award. Award will be Lowest Price Technically Acceptable (LPTA).
1) Quoter Information (Required) Legal name: Click or tap here to enter text.
UEI (if applicable):Click or tap here to enter text.
CAGE (if applicable): Click or tap here to enter text.
Primary POC (name/title): Click or tap here to enter text.
Email / Phone: Click or tap here to enter text.
2) Relevant Experience (PASS/FAIL) — Two (3) completed projects within last five (5) years Each project must be relevant to hazard tree removal, felling, woody material disposal, and tree work in developed or roadway environments.
Complete all fields:
Project 1 Customer/Owner: Click or tap here to enter text.
Location (city/state): Click or tap here to enter text.
Relevance (check):
☐ Hazard tree removal ☐ Roadside tree work ☐ Both ☐ Other (explain):Click or tap here to enter text.
Brief scope (1–3 sentences):
Timing evidence (required):
☐ Month/Year–Month/Year ☐ Year completed; Enter: Click or tap here to enter text.
Contract/PO No. (if applicable): Click or tap here to enter text.
POC name/title + email/phone: Click or tap here to enter text.
Project 2 Customer/Owner: Click or tap here to enter text.
Location (city/state): Click or tap here to enter text.
Relevance (check):
☐ Hazard tree removal ☐ Roadside tree work ☐ Both ☐ Other (explain): Click or tap here to enter text.
Contract/PO No. (if applicable): Click or tap here to enter text.
POC name/title + email/phone: Click or tap here to enter text.
Project 3 Customer/Owner: Click or tap here to enter text.
Location (city/state): Click or tap here to enter text.
Relevance (check):
☐ Hazard tree removal ☐ Roadside tree work ☐ Both ☐ Other (explain): Click or tap here to enter text.
Contract/PO No. (if applicable): Click or tap here to enter text.
POC name/title + email/phone: Click or tap here to enter text.
3) Key Subcontractor Identification (PASS/FAIL) — As applicable Will specialized work be subcontracted? ☐Yes ☐ No If yes, identify subcontractor(s) and role(s):
Subcontractor name: Click or tap here to enter text.
Trade/role: Click or tap here to enter text.
City/state + phone/email: Click or tap here to enter text.
(Repeat as needed.)
4) SOW/Specs Compliance Checklist (PASS/FAIL) Mark one box per row (no blanks). Notes optional.
| Minimum requirement (from SOW/specs) |
| Comply |
| Does Not Comply |
| Notes |
| ISA-Certified Arborist on-site at all times during tree work. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Respond within required timeframes: 5 days (standard) / 72 hours (strainer trees). | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Perform work using ANSI Z133 and ANSI A300. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Dispose of woody material according to SOW rules. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Protect Park resources and infrastructure. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Comply with Indiana Bat and Northern Flying Squirrel rules. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Follow MUTCD traffic control requirements. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Provide OSHA-compliant safety practices and certified sawyers. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Maintain daily logs of personnel, equipment, weather, and work performed. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Comply with work-hour and seasonal restrictions. | ||
| ☐ | ☐ | Click or tap here to enter text. |
Period of Performance:
The quoter acknowledges the period of performance and agrees to complete all services required by the Statement of Work within 183 calendar days from the Award Notice. The quoter has identified below any known or anticipated schedule constraints, material lead times, or other factors that could affect meeting this period of performance.
Known or anticipated delays/constraints: ☐N/A Click or tap here to enter text.
5) Quoter Certification (Required) Authorized representative name/title: Click or tap here to enter text.
Signature: _______________________________________________ Date: Click or tap to enter a date.
By signing above, the quoter certifies that the information provided in this template is accurate and that the quoter’s quotation fully complies with the Statement of Work and specifications for this Hazard Tree Removal service contract.
File details come from the government source that posted it. Updated .