Attachment_2_Price_Schedule_Sheet_Rev_1_0001.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- GRSM CALL OUT TREE SERVICES Federal contract opportunity
- Solicitation number
- 140P5326Q0031
About this file
This is a price schedule sheet for hazard tree removal services at Great Smoky Mountains National Park (GRSM), organized into three Contract Line Items (CLINs) with varying mobilization and response timeframes.
CLIN 010 requires a 5-business-day mobilization response for hazard tree removal across four geographic zones: Tennessee East, Tennessee West, North Carolina East, and North Carolina West. Contractors must bid mobilization costs for three equipment configurations—Bucket Truck/Chipper with Crew, Crane & Operator, and 55 Cubic Yard Grapple-truck & Operator—with estimated quantities ranging from 1 to 2 units per configuration per zone. CLIN 020 specifies a 72-hour mobilization response for strainer hazard tree removal along a designated 1.5-mile section of Deep Creek, with contractors bidding the same three equipment types. CLIN 030 is structured as a per-tree pricing model for hazard tree removal and hauling, with pricing differentiated by tree diameter (40 inches or greater), condition (dead), accessibility (equipment access or foot access only), and target classification (High Value, Standard, or Strainer Tree). An additional hauling line item (36D) covers 55-cubic-yard loads with equipment access at an estimated 20 loads. All pricing must include an ISA Certified Arborist, MUTCD-compliant traffic control, crew labor, equipment mobilization, environmental compliance, and access restriction management. Contractors will submit prices for the Base Year and two Option Periods across all CLINs, with total pricing required for all bid activities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_-_Solicitation_Rev_2_0002.docx | DOCX document | |
| Sol_140P5326Q0031_Amd_0002.pdf | ||
| 9_18_26_Vendro_Q_A_0002.docx | DOCX document | |
| B08_Attachment_1-_A04_SOW_Hazard_Tree-Removal_2026_Rev_1_0001.docx | DOCX document | |
| Sol_140P5326Q0031_Amd_0001.pdf | ||
| Attachment_8-_Haywood_County_SC_WD_2015-5901.pdf | ||
| Attachment_9-_Sevier_County_SC_WD_2015-4667.pdf | ||
| Attachment_10-_Swain_County_SC_WD_2015-4417.pdf | ||
| Sol_140P5326Q0031.pdf | ||
| Attachment_5_-_Limitations_on_Subcontracting_Worksheet.xlsx | XLSX spreadsheet | |
| Attachment_1-_A04_SOW_Hazard_Tree-Removal_2026.docx | DOCX document | |
| Attachment_7-_Cocke_County_SC_WD_2015-4669.pdf | ||
| Attachment_4-_52_212-3_Offeror_Representations_and_Certifications_Commercial_Products_and_Commercial_Services_.docx | DOCX document | |
| Attachment_6-_Blount_County_SC_WD_2015-4643.pdf | ||
| Attachment_3_-_LPTA_Technical_Acceptability_(Services).docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 010 -5 Day Mobilize CLIN 0010- Hazard tree removal 5 business day response mobilization contractor bid sheet
| Estimated Quantity (not a guarantee) | BASE Year | Option Period 1 | Option Period 2 | |||||||
| Sub CLIN | Location | Crew/Equipment | Qty | Price (per mobilization) | Price (per mobilization) | Price (per mobilization) | Key | Value | Desc | |
| 0010A | TN/East | Bucket Truck/Chipper + Crew | 2 | All locations and equipment include an ISA Certified Arborist and Traffic control | ||||||
| 0010B | TN/East | Crane & Operator | 1 | Location | TN/East | Tree located in TN, between Elkmont and east border of GSMNP (inclusive of Elkmont) | ||||
| 0010C | TN/East | 55 cubic yard Grapple-truck & Operator. | 2 | TN/West | Tree located in TN, between Elkmont and west border of GSMNP | |||||
| 0010D | TN/West | Bucket Truck/Chipper + Crew | 2 | NC/East | Tree located in NC, between Oconaluftee and east boundary of GSMNP (inclusive of Oconaluftee, Mingus Mill, Collins Picnic Area & Smokemont CG) | |||||
| 0010E | TN/West | Crane & Operator | 1 | NC/West | Tree located in NC, between Oconaluftee and west boundary of GSMNP | |||||
| 0010F | TN/West | 55 cubic yard Grapple-truck & Operator. | 2 | Crew/Equipment | Bucket Truck/Chipper + Crew | Mobilization cost of standard crew of tree workers, bucket truck, and chipper which is considered the minimal equipment for this contract | ||||
| 0010G | NC/East | Bucket Truck/Chipper + Crew | 1 | Crane & Operator | Additional costs to mobilize a crane + operator if it is necessary for task item. | |||||
| 0010H | NC/East | Crane & Operator | 0 | Grapple-truck & Operator | Additional costs to mobilize a grapple-truck + operator if it is necessary for task item. | |||||
| 0010I | NC/East | 55 cubic yard Grapple-truck & Operator. | 1 | |||||||
| 0010J | NC/West | Bucket Truck/Chipper + Crew | 1 | Price shall include all required elements under the SOW, including: | ||||||
| • | ISA Certified Arborist | |||||||||
| • | MUTCD compliant traffic control | |||||||||
| • | Crew labor | |||||||||
| • | Equipment (bucket truck/chipper, crane if required, grapple truck) | |||||||||
| • | Environmental compliance | |||||||||
| • | Access restrictions | |||||||||
| • | Geographic mobilization (TN East, TN West, NC East, NC West) | |||||||||
| 0010K | NC/West | Crane & Operator | 1 | |||||||
| 0010L | NC/West | 55 cubic yard Grapple-truck & Operator. | 1 |
Total Price
CLIN 020 72 Hour Mobilize
| CLIN 0020- Strainer hazard tree removal 72 hours response mobilization contractor bid sheet | |||||||||
| Estimated Quantaties (not a guarantee) | BASE | Option Period 1 | Option Period 2 | ||||||
| Sub CLIN | Location | Crew/Equipment | Qty | Price (per mobilization) | Price (per mobilization) | Price (per mobilization) | All locations and equipment will include an ISA Certified Arborist and traffic control | ||
| 0020A | Deep Creek | Bucket Truck/Chipper + Crew | 1 | Value | Desc | ||||
| 0020B | Deep Creek | Crane & Operator | 1 | Location | Deep Creek | Tree(s) located along the 1.5 mile section of Deep Creek identified in the Statement of Work | |||
| 0020C | Deep Creek | 55 Cubic Yard Grapple-truck & Operator | 1 | Crew/Equipment | Bucket Truck/Chipper + Crew | Mobilization cost of standard crew of tree workers, bucket truck, and chipper which is considered the minimal equipment for this contract | |||
| Crane & Operator | Additional costs to mobilize a crane + operator if it is necessary for task item. | ||||||||
| Total Price | Grapple-truck & Operator | Additional costs to mobilize a grapple-truck + operator if it is necessary for task item. |
Price shall include all required support:
-ISA Certified Arborist -MUTCD traffic control -Swift‑water hazard considerations -Environmental compliance -Crew labor + equipment -Deep Creek access restrictions per SOW
CLIN 030 Per Tree Hazard tree and hauling per tree and load contractor bid sheet
| Estimated Amounts (not a guarantee) | BASE | Option Period 1 | Option Period 2 | ||||||||
| Sub Clin | Diameter | Live/Dead | Access | Target | Qty | Price (per tree) | Price (per tree) | Price (per tree) | |||
| 030A | <20" | Live | Equpment Access | High Value Target | 1 | KEY | Values | Desc | |||
| 030B | <20" | Live | Equpment Access | Standard Target | 1 | Diameter | <20" | In Inches, Diameter at Breast Height | |||
| 030C | <20" | Live | Equpment Access | Strainer Tree | 1 | 20"-40" | In Inches, Diameter at Breast Height | ||||
| 030D | <20" | Live | Foot access only | High Value Target | 1 | >40" | In Inches, Diameter at Breast Height | ||||
| 030E | <20" | Live | Foot access only | Standard Target | 1 | Live/Dead | Live | Tree living at time of bid | |||
| 030F | <20" | Live | Foot access only | Strainer Tree | 1 | Dead | Tree dead at time of bid | ||||
| 030G | <20" | Dead | Equpment Access | High Value Target | 1 | Access | Equipment Access | Tree is accessible by equipment, generally this includes bucket truck, grapple truck, crane, skidder, and any other wheeled or soft-tracked equipment. | |||
| 030H | <20" | Dead | Equpment Access | Standard Target | 1 | Foot Access Only | Tree is not accessible by wheeled or soft-tracked equipment, and will need to be access on foot | ||||
| 030I | <20" | Dead | Equpment Access | Strainer Tree | 1 | Target | High Value Target | Immobile target of high value, including but not limited to buildings, historic structures & utilities | |||
| 030J | <20" | Dead | Foot access only | High Value Target | 1 | Standard Target | Target of lower value, including but not limited to roadways, trails, campsites, picnic sites. | ||||
| 030K | <20" | Dead | Foot access only | Standard Target | 1 | Strainer Tree | Tree that is fell into, or threatening to fall into, the Deep Creek waterway in the 1.5 mile section of stream identified in the statement of work. | ||||
| 030L | <20" | Dead | Foot access only | Strainer Tree | 1 | ||||||
| 030M | 20-40" | Live | Equpment Access | High Value Target | 1 | Price shall include: |
-Hazard tree removal per SOW definitions -ISA Certified Arborist -Traffic control -Environmental mitigation (bat/squirrel rules) -Hauling according to SOW rules (developed areas vs roadside) -Complexity categories -Strainer tree removals
| 030N | 20-40" | Live | Equpment Access | Standard Target | 1 |
| 030O | 20-40" | Live | Equpment Access | Strainer Tree | 1 |
| 030P | 20-40" | Live | Foot access only | High Value Target | 1 |
| 030Q | 20-40" | Live | Foot access only | Standard Target | 1 |
| 030R | 20-40" | Live | Foot access only | Strainer Tree | 1 |
| 030S | 20-40" | Dead | Equpment Access | High Value Target | 1 |
| 030T | 20-40" | Dead | Equpment Access | Standard Target | 1 |
| 030U | 20-40" | Dead | Equpment Access | Strainer Tree | 1 |
| 030V | 20-40" | Dead | Foot access only | High Value Target | 1 |
| 030W | 20-40" | Dead | Foot access only | Standard Target | 1 |
| 030X | 20-40" | Dead | Foot access only | Strainer Tree | 1 |
| 030Y | >40" | Live | Equpment Access | High Value Target | 1 |
| 030Z | >40" | Live | Equpment Access | Standard Target | 1 |
| 030AA | >40" | Live | Equpment Access | Strainer Tree | 1 |
| 030BB | >40" | Live | Foot access only | High Value Target | 1 |
| 030CC | >40" | Live | Foot access only | Standard Target | 1 |
| 030DD | >40" | Live | Foot access only | Strainer Tree | 1 |
| 030EE | >40" | Dead | Equpment Access | High Value Target | 1 |
| 030FF | >40" | Dead | Equpment Access | Standard Target | 1 |
| 030GG | >40" | Dead | Equpment Access | Strainer Tree | 1 |
| 030HH | >40" | Dead | Foot access only | High Value Target | 1 |
| 030II | >40" | Dead | Foot access only | Standard Target | 1 |
Total
| Hauling | Load Size | Access | Qty | Price | Price | Price |
| 36D | 55 Cubic Yards | Equpment Access | 20 | |||
| Total Price |
Totals For All Activities
| Totals for all bid activities | ||||
| BASE Year | Option Period 1 | Option Period 2 | ||
| CLIN 010-5 Day Mobilization | Total Price | |||
| CLIN 020-72 hour Mobilization | Total Price | |||
| CLIN 030-Per Tree Bid Price | Total Price | |||
| Total Price |
File details come from the government source that posted it. Updated .