Attachment 2 P11 Vol1 Drawings SS Final.pdf
PDF 42 MB Posted
- Solicitation number
- 36C77626B0023
About this file
This document is a set of 100% construction documents (architectural, structural, mechanical, electrical, plumbing, fire protection, and civil drawings) for Project 586-401, the construction of a Community Living Center (CLC) Residential Neighborhood addition at G.V. Montgomery VAMC in Jackson, Mississippi. The project involves a new 10,570 gross square foot CLC addition to the existing 24,400 square foot facility, creating a total project scope of 34,970 square feet.
The construction documents specify a fully sprinklered, healthcare-occupancy building with 24 resident bedrooms (including 2 bariatric rooms), toilets, shared living spaces, administrative offices, and support facilities. The project includes 16 deductible alternates ranging from fence material substitutions to elimination of specific building components such as screen porches, canopies, landscape lighting, and window treatments. Construction classification is Type II (000) with NFPA 13 full sprinkler protection, 2-hour fire-rated separations for occupancy divisions, and comprehensive infection control risk assessment (ICRA) precautions designated as Level IV, requiring hard surface barriers, negative air pressure systems, HEPA filtration, and restricted access protocols during construction in the occupied healthcare facility. The documents include detailed site logistics plans, phasing information for two construction phases, utility coordination details, and accessibility requirements compliant with ADA standards. Design professional firms include Apogee Consulting Group (architectural, structural, mechanical, electrical, plumbing, fire protection, and technology), ForSite Group (civil engineering), and the U.S. Department of Veterans Affairs as the federal owner.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP
STREET FACING BUILDING EXTERIOR PERSPECTIVE
PROJECT LOCATION MAP
/1
/2
:0
:3
A
M C
U s e rs
\J lo n g h u rs t\ D o c u m e n ts \A
-0
-V A
J a c k s o n
-C o n s tr u c t C
L C
R jlo n g h u rs tS M
A W
.r v t
G-001
COVER
1 7JNL
CLC RESIDENTIAL
NEIGHBORHOOD
G.V. MONTGOMERY VAMC
1500 E. WOODROW WILSON AVENUE
JACKSON, MS 39216 JUNE 23, 2025
100% CONSTRUCTION DOCUMENTS
586-40123-060
7A
CLC RESIDENTIAL NEIGHBORHOOD
G.V. MONTGOMERY VAMC
1500 E. WOODROW WILSON AVENUE
JACKSON, MS 39216
VA PROJECT #: 586-401
KC
JACKSON VA CLINIC
NORTH
JACKSON VA CLINIC
NORTH
DRAWING LIST
GENERAL
G-001 COVER 1 7
G-002 GENERAL INFORMATION 2 7
G-003 CODE SUMMARY - NFPA 101 3 7
G-004 ICRA INFORMATION AND DETAILS 4 7
G-005 OVERALL SITE LOGISTICS PLAN 5 7
G-006 SITE LOGISTICS PLAN 6 7
GL101 GROUND FLOOR LIFE SAFETY PLAN 7 7
CIVIL
CD101 CIVIL DEMOLITION PLAN 1 6
CS101 CIVIL SITE & UTILITY PLAN 2 6
CS102 CIVIL DEDUCT ALTERNATE SITE GRADING & UTILITY PLAN 3 6
CG101 GRADING & DRAINAGE PLAN 4 6
CG102 STORM AND SANITARY SEWER PROFILES 5 6
CS501 CIVIL DETAILS 6 6
LANDSCAPE
LP101 LANDSCAPE PLAN 1 3
LP102 LANDSCAPE DEDUCTIVE ALTERNATE PLAN 2 3
LP501 LANDSCAPE DETAILS 3 3
STRUCTURAL
S-001 STRUCTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 23
S-002 STRUCTURAL SCHEDULES 2 23
S-003 STRUCTURAL SCHEDULES 3 23
S-101 FOUNDATION PLAN 4 23
S-101.1 FOUNDATION PLAN - DEDUCT ALTERNATE #6 5 23
S-102 FOUNDATION WALL PLAN 6 23
S-102.1 FOUNDATION WALL PLAN - DEDUCT ALTERNATE #6 7 23
S-103 GROUND FLOOR PLAN 8 23
S-103.1 GROUND FLOOR PLAN - DEDUCT ALTERNATE #6 9 23
S-104 GROUND FLOOR WALL PLAN 10 23
S-104.1 GROUND FLOOR WALL PLAN - DEDUCT ALTERNATE #2, #6, #12 11 23
S-105 ROOF FRAMING PLAN 12 23
S-105.1 ROOF FRAMING PLAN - DEDUCT ALTERNATE #6 13 23
S-106 ROOF WALL FRAMING PLAN 14 23
S-106.1 ROOF WALL FRAMING PLAN - DEDUCT ALTERNATE #6 15 23
S-107 PERGOLA FOUNDATION PLAN 16 23
S-201 WALL SECTIONS 17 23
S-202 WALL SECTIONS 18 23
S-203 WALL SECTIONS 19 23
S-204 WALL SECTIONS - DEDUCT ALTERNATE #6 20 23
S-301 DETAILS 21 23
S-302 DETAILS 22 23
S-303 DETAILS 23 23
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 35
AD101 GROUND AND FIRST FLOOR DEMOLITION PLANS 2 35
AD102 EXTERIOR ELEVATIONS & AXONOMETRIC DEMOLITION 3 35
AD103 TEMPORARY COURTYARD DEMOLITION AND ADDITION 4 35
AD104 EXTERIOR WALL SECTIONS AND DETAILS DEMOLITION 5 35
A-100 OVERALL SITE & FUTURE GROWTH PLAN 6 35
A-100.1 OVERALL SITE & FUTURE GROWTH PLAN - SITE DEDUCT ALTERNATES 7 35
A-101 GROUND FLOOR PLAN 8 35
A-101.1 GROUND FLOOR PLAN - DEDUCT ALTERNATES 9 35
A-102 GROUND FLOOR DIMENSION PLAN 10 35
A-103 EDGE OF SLAB PLANS 11 35
A-104 GROUND FLOOR REFLECTED CEILING PLAN 12 35
A-104.1 GROUND FLOOR REFLECTED CEILING PLAN - DEDUCT ALTERNATES 13 35
A-105 ROOF PLAN / ROOF DEDUCT ALTERNATES 14 35
A-201 EXTERIOR ELEVATIONS 15 35
A-201.1 EXTERIOR ELEVATIONS - DEDUCT ALTERNATES 16 35
A-301 BUILDING SECTIONS 17 35
A-301.1 BUILDING SECTIONS - DEDUCT ALTERNATES 18 35
A-302 WALL SECTIONS - SCREEN PORCH 19 35
A-303 WALL SECTIONS - WITH DEDUCT ALTERNATES 20 35
A-304 WALL SECTIONS - WITH DEDUCT ALTERNATES 21 35
A-305 WALL SECTIONS - WITH DEDUCT ALTERNATES 22 35
A-306 WALL SECTIONS 23 35
A-307 ENLARGED PLAN DETAILS 24 35
A-401 FENCE AND PILASTER DETAILS 25 35
A-421 ENLARGED TOILET PLANS AND ELEVATIONS 26 35
A-501 EXTERIOR DETAILS - PENETRATION AND ROOF DETAILS 27 35
A-502 EXTERIOR MASONRY DETAILS - BRICK ON MTL STUDS 28 35
A-503 EXTERIOR DETAILS - METAL PANEL ON MTL STUDS (WITH DEDUCT ALTERNATES) 29 35
A-510 PARTITION TYPES & INTERIOR DETAILS 30 35
A-511 COLUMN DETAILS 31 35
A-512 INTERIOR DETAILS 32 35
A-513 CEILING DETAILS 33 35
A-601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 34 35
A-602 WINDOW ELEVATIONS 35 35
INTERIORS
I-001 GENERAL NOTES, ABBREVIATIONS AND ROOM FINISH SCHEDULE 1 11
I-101 GROUND FLOOR FINISH AND WALL PROTECTION PLAN 2 11
I-131 GROUND FLOOR PATTERN PLAN 3 11
I-141 GROUND FLOOR SIGNAGE PLAN 4 11
I-201 CASEWORK AND MILLWORK ELEVATIONS 5 11
I-202 CASEWORK DETAILS 6 11
I-401 INTERIOR ELEVATIONS 7 11
I-411 GROUND FLOOR OVERALL EQUIPMENT PLAN 8 11
I-421 ENLARGED EQUIPMENT PLANS 9 11
I-422 ENLARGED EQUIPMENT PLANS 10 11
I-601 EQUIPMENT AND AQUISITION SCHEDULE 11 11
EQUIPMENT
QH-101 VENDOR DRAWINGS - GULDMANN (FOR REFERENCE ONLY) 1 1
VOLUME 1 OF 2
DRAWING LIST
GENERAL
G-001.5 COVER 1 1
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 5
FX101 GROUND FLOOR FIRE SUPPRESSION PLAN 2 5
FX101.1 GROUND FLOOR FIRE SUPPRESSION PLAN - DEDUCT ALTERNATE 3 5
FX102 GROUND FLOOR FIRE SUPPRESSION REFLECTED CEILING PLAN 4 5
FX102.1 GROUND FLOOR FIRE SUPPRESSION REFLECTED CEILING PLAN - DEDUCT ALTERNATE 5 5
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 14
PW101 GROUND FLOOR DRAIN, WASTE, AND VENT PLAN 2 14
PP101 GROUND FLOOR DOMESTIC WATER PLAN 3 14
PG101 GROUND FLOOR MEDICAL GAS PLAN 4 14
PG102 GROUND FLOOR MEDICAL GAS PLAN 5 14
PW102 ROOF PLUMBING PLAN 6 14
P-401 ENLARGED PLUMBING PLANS AND PLUMBING SECTION 7 14
P-501 PLUMBING DETAILS 8 14
P-502 PLUMBING DETAILS 9 14
P-601 PLUMBING SCHEDULES 10 14
P-901 SANITARY PIPE RISERS 11 14
P-902 DOMESTIC PIPE RISERS 12 14
P-903 STORM PIPE RISERS 13 14
P-904 MEDICAL GAS PIPE RISERS 14 14
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 15
MH101 GROUND FLOOR HVAC PLAN 2 15
MH102 ROOF HVAC PLAN 3 15
MP101 GROUND FLOOR MECHANICAL PIPING PLAN 4 15
MP101.1 GROUND FLOOR MECHANICAL PIPING PLAN - DEDUCT ALTERNATE 5 15
M-301 MECHANICAL SECTIONS 6 15
M-401 ENLARGED MECHANICAL ROOM HVAC PLAN 7 15
M-402 ENLARGED MECHANICAL ROOM PIPING PLAN 8 15
M-402.1 ENLARGED MECHANICAL ROOM PIPING PLAN - DEDUCT ALTERNATE 9 15
M-501 MECHANICAL DETAILS 10 15
M-502 MECHANICAL DETAILS 11 15
M-503 MECHANICAL DETAILS 12 15
M-504 MECHANICAL CONTROLS 13 15
M-505 MECHANICAL CONTROLS 14 15
M-601 MECHANICAL SCHEDULES 15 15
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 13
ES101 SITE POWER AND LIGHTING PLAN 2 13
EL101 GROUND FLOOR LIGHTING PLAN 3 13
EP101 GENERATOR AND SWITCHGEAR ROOM AND PIPE BASEMENT POWER PLAN 4 13
EP102 PIPE BASEMENT EASTERN FLOOR OVERALL POWER PLAN 5 13
EP103 GROUND FLOOR POWER PLAN 6 13
EX101 ROOF LEVEL, LIGHTNING PROTECTION PLAN 7 13
EX102 EAST, NORTH, AND SOUTH LIGHTNING PROTECTION ELEVATIONS 8 13
E-401 ELECTRICAL ENLARGEMENTS 9 13
E-501 ELECTRICAL DETAILS 10 13
E-502 ELECTRICAL DETAILS 11 13
E-601 SINGLE LINE POWER DIAGRAM AND LIGHTING SCHEDULE 12 13
E-602 MECHANICAL EQUIPMENT CONNECTION & PANEL SCHEDULES 13 13
TECHNOLOGY
T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 7
TS101 TECHNOLOGY SITE PLAN 2 7
T-101 CLC GROUND FLOOR TECHNOLOGY PLAN 3 7
T-102 ROOF TECHNOLOGY PLAN 4 7
T-103 FIRST FLOOR TECHNOLOGY PLAN 5 7
T-501 TECHNOLOGY DETAILS 6 7
T-502 TECHNOLOGY DETAILS 7 7
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 3
FA101 CLC GROUND FLOOR FIRE ALARM PLAN 2 3
FA102 ROOF FIRE ALARM PLAN 3 3
- VOLUME 1 - VOLUME 2
Docusign Envelope ID: B03CFFD6-4D75-44E6-906A-763AFD2AA6C2
6/19/2025
S SS S
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
N O
R T
H
0 4 8 16
1-1/2"
DIAMETER
GRAB BAR
TOILET
TISSUE
DISPENSER
SANITARY
NAPKIN
DISPOSAL
TOILET
FIXTURE
TOILET
FIXTURE
TOILET
TISSUE
DISPENSER
1-1/2"
DIAMETER
GRAB BAR
EXPOSED
PLUMBING AT
BARRIER
FREE
LAVATORIES
SHALL BE
INSULATED.
LEVER OPERATING
CONTROLLED
SOAP DISPENSER
NOTE: SINKS IN COUNTERS TO BE
MOUNTED WITH RIM NO MORE
THAN 2'-10" HIGH AND WITH AT
LEAST 2'-3" KNEE CLEARANCE.
CLEAR
ACCESSIBLE TOILET
TYPICAL ACCESSIBLE
CLEARANCE AT LAVATORY
TYPICAL ACCESSIBLE
LAVATORY AND MIRROR
1'-3" 1'-3"
M
IN
M A
X
M
A X
M
A X6
A
.F .F
1'-6"
5'-0" CLEAR
3'-0" 6"
3'-0"
" 3
1'-0" 3'-6"
2'-4"
5'-0" CLEAR
MIN
8"
MAX
6"
M
IN9
M
IN
M
IN
M A
X
17" MIN
/4
T O
B O
T T
O M
O F
R
E F
L E
C T
IV
S
U R
F A
C E
O
M
IR
R
O R
INTERCOM
STATION INTERCOM
MASTER
STATION
INTERCOM
WALL
OUTLET
INTERCOM STATION
TOWEL BAR
ACCESSIBLE
ROBE/COAT HOOK
ROBE/COAT
HOOK
TOILET ACCESSORIES
6"
ADA SHOWER
CONTROL WALL
ADA SHOWER
BACK WALL
1'-6"
SHOWER
HEAD
GRAB
BAR
CONTROL
AREA
FOLDABLE
SEAT
1'-6"
CONTROL
AREA
1'-0" 1'-0"
SHOWER
M A
X
M A
X
NOTE: FIRE EXTINGUISHERS HAVING
A GROSS WEIGHT NOT EXCEEDING
40 LB (18.14 KG) SHALL BE INSTALLED
SO THAT THE TOP OF THE FIRE
EXTINGUISHER IS NOT MORE THAN
5'-0" (1.53 M) ABOVE THE FLOOR.
FIRE EXTINGUISHER
CABINET
ELECTRICAL PANEL
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
(3-6" MIN)
(4'-0" MAX)
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
MISC. WALL DEVICES
CLOCK
NURSE
CALL
DOME
LIGHT
CLOCK OUTLET
CLOCK & NURSE CALL DEVICES
TELEVISION
OUTLET
WALL MOUNTED TV
S T
A N
D
IN
G
O
.C
TELEVISION
OUTLET
F O
R S
E A
T E
D
O
.C
BLOCKING
WALL PROTECTION
'-0
HANDRAIL
OR DOOR FRAME
3" TO CORNERGUARD
CORNER GUARD
'-0
1 HOUR FIRE SEPARATION
2 HOUR FIRE SEPARATION
1 HOUR SMOKE RATED
# DEDUCT ALTERNATE NOTES
BID DEDUCT ALTERNATE #1
ALL WORK IN CONTRACT EXCEPT CHANGE FENCE AND PYLONS TO METAL
FENCE. SEE SHEET A-101.1.
BID DEDUCT ALTERNATE #2
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 AND SUBSTITUTE BRICK IN
PLACE OF RAINSCREEN. SEE SHEET A-201.1.
BID DEDUCT ALTERNATE #3
ALL WORK IN CONTRACT EXCEPT DEDUCT #1, #2, AND REMOVE SCREEN
SYSTEM AT FIRST-FLOOR PORCH. SEE SHEET A-201.1.
BID DEDUCT ALTERNATE #4
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #3 AND REMOVE
SCREEN SYSTEM AT GROUND FLOOR PORCH. SEE SHEET A-201.1.
BID DEDUCT ALTERNATE #5
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #4 AND OMIT
LANDSCAPE/HARDSCAPE IN THE SOUTHERN COURTYARD. SEE SHEET A101.1.
BID DEDUCT ALTERNATE #6
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #5 AND ELIMINATE
SCREEN PORCH, INCLUDING ASSOCIATED LIGHT FIXTURES, LIGHTING
CONTROLS, RECEPTACLES, AND NOTIFICATION DEVICES. INSTALL LIGHT
FIXTURE M1E AT DOUBLE DOORS EXITING THE BUILDING. INSTALL PULL
STATION AT DOUBLE DOORS EXITING THE BUILDING. SEE SHEETS EL101,
EP101, AND FA101.
BID DEDUCT ALTERNATE #7
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #6 AND ELIMINATE
LANDSCAPE LIGHTING, INCLUDING LIGHT FIXTURES AND LIGHTING
CONTROLS. SEE SHEET ES101.
BID DEDUCT ALTERNATE #8
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #7 AND OMIT
CANOPIES. SEE SHEET A-105.
BID DEDUCT ALTERNATE #9
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #8 AND ELIMINATE
NORTH COURTYARD. SEE SHEET A-101.1.
BID DEDUCT ALTERNATE #10
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #9 AND REDUCE
LANDSCAPING, TREE, AND SHRUB CALIPERS. SEE SHEET A-101.1.
BID DEDUCT ALTERNATE #11
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #10 AND ELIMINATE
THIRD CHILLER, INCLUDING ASSOCIATED BREAKER, DISCONNECT, AND
WIRING. SEE SHEET E-401.
BID DEDUCT ALTERNATE #12
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #11 AND MOVE
CEILING LIFTS TO ACTIVATION BUDGET. SEE SHEET A-104.1.
BID DEDUCT ALTERNATE #13
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #12 AND PLACE
WINDOW SHADES IN THE ACTIVATION BUDGET.
BID DEDUCT ALTERNATE #14
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #13 AND ELIMINATE
WINDOW SOFFITS AND SOLID SURFACE SILLS. SEE SHEET A-512 DETAIL 10.
BID DEDUCT ALTERNATE #15
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #14 AND SHELL FIVE
RESIDENT ROOMS. INSTALL ELECTRICAL WIRING, BOXES, SWITCHES AS
SHOWN, EXCLUDING LIGHT FIXTURES C1 AND D2. INSTALL LIGHT FIXTURE F1
AND CIRCUIT TO WALL SWITCH PER DETAIL 5/E-401. SEE SHEET EL101.
BID DEDUCT ALTERNATE #16
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #15 AND ELIMINATE
BENCHES. SEE SHEET A-101.1.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:0
:3
A
M C
U s e rs
\J lo n g h u rs t\ D o c u m e n ts \A
-0
-V A
J a c k s o n
-C o n s tr u c t C
L C
R jlo n g h u rs tS M
A W
.r v t
G-002
GENERAL INFORMATION
2 7JNL
CLC RESIDENTIAL
NEIGHBORHOOD
G.V. MONTGOMERY VAMC
1500 E. WOODROW WILSON AVENUE
JACKSON, MS 39216 JUNE 23, 2025
100% CONSTRUCTION DOCUMENTS
586-40123-060
7A
KC
GENERAL SYMBOL LEGEND
STANDARD MOUNTING HEIGHTS
WALL RATING LEGEND
CODE SUMMARY - NFPA
DESIGNER FIRM NAME LIC.# PHONE#
EXTERIOR WALLS -(EACH ASSEMBLY):
ROOF/CEILING ASSEMBLY - (EACH ASSEMBLY):
ENERGY SUMMARY
THERMAL ENVELOPE
GROSS BUILDING AREA:
HIGH RISE:
METHOD OF COMPLIANCE
BUILDING DATA (NFPA 220):
FIRE DISTRICT:
SPRINKLERS:
MEZZANINE:
ALLOWABLE BUILDING HEIGHT:
CONSTRUCTION TYPE:
LEAD DESIGN PROFESSIONAL:
WALLS BELOW GRADE (EACH ASSEMBLY)
STANDPIPES:
MIXED OCCUPANCY:
STORY
NO.
DESCRIPTION & USE
BLDG AREA
PER STORY
(ACTUAL)
FIRE PROTECTION REQUIREMENTS *
STRUCTURAL DESIGN
IMPORTANCE FACTORS:
DESIGN LOADS:
LIVE LOADS:
SNOW LOAD:
WIND LOAD:
SEISMIC DESIGN CATEGORY A
SEISMIC DESIGN CATEGORY B, C, & D
SEISMIC RISK CATEGORY
SPECTRAL RESPONSE ACCELERATION S %g S %g
SITE CLASSIFICATION
BASIC STRUCTURAL SYSTEM (CHECK ONE)
SEISMIC BASE SHEAR Vx= Vy=
ANALYSIS PROCEDURE
ARCHITECTURAL, MECHANICAL, COMPONENTS ANCHORED?
LATERAL DESIGN CONTROL:
SOIL BEARING CAPACITIES:
CONSTRUCTED:
RENOVATED:
ORIGINAL USE(S) (CH.3):
CURRENT USE(S) (CH.3):
PROPOSED USE(S) (CH.3):
HAZARDOUS AREAS (NFPA 101 8.7 AND OCCUPANCY CHAPTER):
LIFE SAFETY PLAN REQUIREMENTS
CLIMATE ZONE
LOW E REQUIRED, IF APPLICABLE
OPENINGS (WINDOWS OR DOORS WITH GLAZING)
R-VALUE OF INSULATION:
PROJECTION FACTOR
SHADING COOEFFICIENT
DOOR R-VALUES
TOTAL SQUARE FOOTAGE OF SKYLIGHTS IN EACH ASS'Y
SKYLIGHTS IN EACH ASSEMBLY:
R-VALUE OF INSULATION:
U-VALUE OF SKYLIGHT
DESCRIPTION OF ASSEMBLY:
PRESCRIPTIVE (BUILDING CODE) PERFORMANCE (COMCheck)
PRESCRIPTIVE (ASHRAE 90.1)
IV (2HH)
I (442)
III (211)
II (222)I (332)
III (200)
II (111)
V (111)
FIRE
PROTECTION:
RETAINING
WALLS >5' HIGH:
STRUCTURAL:
MECHANICAL:
ELECTRICAL:
FIRE ALARM:
PLUMBING:
CODE ENFORCEMENT JURISDICTION:
ARCHITECTURAL:
CIVIL:
OWNER OR
OWNED BY: FEDERAL CITY/COUNTY PRIVATE STATE
NAME OF PROJECT:
PROPOSED USE:
ADDRESS:
DESCRIPTION OF ASSEMBLY:
U-VALUE OF TOTAL ASSEMBLY:
R-VALUE OF INSULATION:
OTHER:
NO NFPA 13YES NFPA 13R NFPA 13D
NO CLASSYES
NO YES
FEET
NO YES
NO YES CENTRAL REFERENCE SHEET #
NO YES SEPARATION: HR. EXCEPTION:
LIFE SAFETY PLAN SHEET #, IF PROVIDED:
STATE
COUNTY
AUTHORIZED AGENT
NFPA 13 NFPA 13R NFPA 13D
WIND (I W)
SNOW (I S)
SEISMIC (I E)
ROOF
MEZZANINE
FLOOR
PSF
PSF
PSF
PSF
BASIC WIND SPEED EXPOSURE
CATEGORY WIND BASE SHEARS
(FOR MWFRS) Vx=
MPH (ASCE 7-22)
COMPLIANCE WITH SECTION 1616.4 ONLY? NOYES
PROVIDE THE FOLLOWING SEISMIC DESIGN PARAMETERS:
BEARING WALL
BUILDING FRAME
MOMENT FRAME
DUAL W/SPECIAL MOMENT FRAME
DUAL W/INTERMEDIATE R/C OR SPECIAL STEEL
INVERTED PENDULUM
S 1
EARTHQUAKE
FIELD TEST (PROVIDE COPY OF TEST REPORT)
PRESUMPTIVE BEARING CAPACITY
PILE SIZE, TYPE, AND CAPACITY
PSF
PSF
DESCRIPTION OF ASSEMBLY:
R-VALUE OF INSULATION:
DESCRIPTION OF ASSEMBLY:
CLC RESIDENTIAL NEIGHBORHOOD
1500 E. WOODROW WILSON AVE, JACKSON, MS ZIP CODE: 39216
COMMUNITY LIVING CENTER
EMAIL:
Jeffrey Knight
CITY
APOGEE CONSULTING King Choy 11664 (919) 858-7420
APOGEE CONSULTING Kevin Kublank
NEW CONSTRUCTION ADDITION UPFIT
RECONSTRUCTION ALTERATION REPAIR RENOVATION
BOILER AND FUEL-FIRED HEATER ROOMS IN HEALTHCARE OCCUPANCY
CENTRAL/BULK LAUNDRIES OVER 100 SF IN HEALTHCARE OCCUPANCY
PAINT SHOPS IN HEALTHCARE OCCUPANCIES
PHYSICAL PLANT MAINTENANCE SHOPS IN HEALTHCARE OCCUPANCIES
SOILED LINEN ROOMS IN HEALTHCARE OCCUPANCY
WASTE COLLECTION ROOMS IN HEALTHCARE OCCUPANCY
STORAGE ROOM OVER 100 SF IN HEALTHCARE OCCUPANCY
LABORATORIES WITH FLAMMABLE/COMBUSTABLE MATERIALS (SMOKE PARTITION)
STORAGE ROOMS OVER 50 SF IN HEALTHCARE OCCUPANCY (SMOKE PARTITION)
MEDICAL GAS STORAGE
FIRE AND/OR SMOKE RATED WALL LOCATIONS
ASSUMED AND REAL PROPERTY LINE LOCATIONS
EXTERIOR WALL OPENING AREA WITH RESPECT TO DISTANCE TO ASSUMED
PROPERTY LINES
EXISTING STRUCTURES WITHIN 30' OF THE PROPOSED BUILDING
OCCUPANCY TYPES FOR EACH AREA
OCCUPANT LOADS FOR EACH AREA
EXIT ACCESS TRAVEL DISTANCES
COMMON PATH OF TRAVEL DISTANCE
DEAD END LENGTHS
CLEAR EXIT WIDTHS FOR EACH EXIT DOOR
MAXIMUM CALCULATED OCCUPANT LOAD CAPACITY EACH EXIT DOOR CAN
ACCOMMODATE BASED ON EGRESS WIDTH
ACTUAL OCCUPANT LOAD FOR EACH EXIT DOOR
A SEPARATE SCHEMATIC PLAN INDICATING WHERE FIRE RATED FLOOR/
CEILING AND/OR ROOF STRUCTURE IS PROVIDED FOR PURPOSES OF
OCCUPANCY SEPARATION
LOCATION OF DOORS WITH PANIC HARDWARE
LOCATION OF DOORS WITH DELAYED EGRESS LOCKS AND THE AMOUNT OF
DELAY
LOCATION OF DOORS WITH ELECTROMAGNETIC EGRESS LOCKS
LOCATION OF DOORS EQUIPPED WITH HOLD-OPEN DEVICES
LOCATION OF EMERGENCY ESCAPE WINDOWS
THE SQUARE FOOTAGE OF EACH FIRE AREA
THE SQUARE FOOTAGE OF EACH SMOKE COMPARTMENT
NOTE ANY CODE EXCEPTIONS OR TABLE NOTES THAT MAY HAVE BEEN
UTILIZED REGARDING THE ITEMS ABOVE
PERFORMANCE (ASHRAE 90.1)
2A
UNLIMITED
NA
C 24 10
YES
FLOOR EXISTING (SQ FT) NEW (SQ FT) SUB-TOTAL
PHONE:
FORSITE GROUP
Vy=
WIND
EMERGENCY LIGHTING:
EXIT SIGNS:
FIRE ALARM:
SMOKE DETECTION SYSTEMS:
PANIC HARDWARE:
BUILDING
ELEMENT
FIRE
SEPARATION
DISTANCE
(FEET)
PER T602
NONBEARING
WALLS &
PARTITIONS
STRUCTURAL
FRAME,
INCLUDING
COLUMNS,
GIRDERS,
TRUSSES
DETAIL #
AND
SHEET #
DESIGN
# FOR
RATED
ASS'Y
DESIGN
# FOR
RATED
PENETRATION
DESIGN
# FOR
RATED
JOINTS
RATING
PROVIDED
REQ'D
(HRS)
BEARING WALLS
EXTERIOR
NORTH
EAST
WEST
SOUTH
INTERIOR
EXTERIOR
NORTH
EAST
WEST
SOUTH
INTERIOR
FLOOR
CONSTRUCTION,
INCLUDING
SUPPORTING
BEAMS & JOINTS
ROOF
CONSTRUCTION,
INCLUDING
SUPPORTING
BEAMS & JOINTS
SHAFTS-EXIT
SHAFTS-OTHER
CORR. SEP.
OCC'Y SEP. (C)
PARTY/FIRE
WALL SEP.
SMOKE BARRIER
SEPARATION
TENANT SEP.
LIFE SAFETY SYSTEM REQUIREMENTS
INCID. USE SEP.
* INDICATE SECTION NUMBER PERMITTING REDUCTION
NO YES
NO YES
NO YES
NO YES
NO YES
PARTIAL
3 -- -- --
N/A -- -- -- ----
N/A -- -- -- ----
N/A -- -- -- ----
N/A -- -- -- ----
N/A -- -- -- ----
0 -- -- -- ----
0 -- -- -- ------
0 0 -- -- -->30'
0 0 -- -- -->30'
0 0 -- -- --25'
0 0 -- -- -->30'
N/A
N/A -- -- -- ----
N/A
PERCENTAGE OF WALL OPENING CALCULATIONS
DEGREE OF
OPENINGS
PROTECTION
ALLOWABLE AREA
FIRE SEPARATION
DISTANCE FEET FROM
PROPERTY LINES
ACTUAL SHOWN ON PLANS
EQUIVALENET LATERAL FORCE
DEPARTMENT OF VETERAN AFFAIRS
(601) 364-1330
Jeffrey.Knight1@VA.gov
(919) 858-7420
FEDERAL DEPT OF VETERAN AFFAIRS
Clay Massey 38677 (334) 887-6064
33282
APOGEE CONSULTING Kevin Kublank (919) 858-742033282
APOGEE CONSULTING William Shipley (919) 858-7420125188
APOGEE CONSULTING William Shipley (919) 858-7420125188
APOGEE CONSULTING William Shipley (919) 858-7420125188
APOGEE CONSULTING Hossein Dormohammadi 052983 (919) 858-7420
SCOPE TYPE:
ACTUAL BUILDING HEIGHT: FEET
UNLIMITED PER:
29 2
NA
1.25
20 (100 FOR FUTURE FLOOR)
NA
II (000)
V (000)
AREAS WITH HAZARD GREATER THAN PRIMARY OCCUPANCY
COOKING FACILITIES
BUILDING AREA
INTERIOR DESIGN: APOGEE CONSULTING Emilie Diggs 35985 (919) 858-7420
TECHNOLOGY: APOGEE CONSULTING Kevin Kublank (919) 858-7420
MALE FEMALE MALE FEMALE STD.
PLUMBING FIXTURE REQUIREMENTS
WATER CLOSETS DRINKING FOUNTAINS
USE
LAVATORIES
URINALS
SHOWERS/
TUBS
ACCESS.
SPACE EXISTING
NEW
REQUIRED PROVIDED
REGULAR W/5'
ACCESS
AISLE
ACCESSIBLE PARKING
TOTAL # OF PARKING SPACES # OF ACCESSIBLE SPACES PROVIDED
LOT OR
PARKING
AREA
TOTAL #
ACCESSIBLE
PROVIDED
VAN SPACES
W/8' ACCESS
AISLE
TOTAL NA
SEE CIVIL DRAWINGS
EXIST. --
NA
NA NA
NA
EXIST.
FLOOR SLAB ON GRADE (EACH ASSEMBLY)
HORIZONTAL/VERTICAL REQUIREMENT
DESCRIPTION OF ASSEMBLY:
U-VALUE OF TOTAL ASSEMBLY:
R-VALUE OF INSULATION:
SLAB HEATED
MECHANICAL SUMMARY - SEE MECHANICAL DRAWINGS
ELECTRICAL SUMMARY - SEE ELECTRICAL DRAWINGS
STRUCTURAL DESIGN - SEE STRUCTURAL DRAWINGS
PRIMARY OCCUPANCY: ASSEMBLY
BUSINESS EDUCATIONAL
INDUSTRIALHEALTHCARE MERCANTILE
RESIDENTIAL BOARD AND CARESTORAGE
DETENTION AND CORRECTIONAL
AMBULATORY HEALTH CARE
DAY CARE
ONE- AND TWO-FAMILY DWELLING
APARTMENT
LODGING OR ROOMING HOUSE
HOTELS AND DORMITORY
ELEVATED, 9" REINFORCED CONCRETE SLAB
WITH 2" TOPPING SLAB.
V = 0.1
NA
NA
NA
0.21
0.0
YES
2.86
OCCUPANCY
GROUND FLOOR
TOTAL
N/A
N/A
10,570
10,570
10,570
10,570
EXIST.
GROUND
EXISTING CLC 24,400 GSF
NEW CLC ADDITION 10,570 GSF
TOTAL 34,970 GSF
GL101
STEEL STUDS, 16IN O.C. AND BRICK
FACADE
R-19 BATT INSULATION AND R12.9
CONTINUOUS INSULATION
STEEL STUDS, 16IN O.C. AND METAL
PANEL FACADE
R-19 BATT INSULATION AND R12.9
CONTINUOUS INSULATION
ROOF INSULATION R=33
TPO ROOFING R=0.24
30 YEAR WARRANTY REQUIRED.
R-33 OVERALL AVERAGE MINIMUM
HEALTHCARE (SKILLED NURSING)
GROUND
EXISTING CLC & NEW CLC ADDITION
HEALTHCARE (SKILLED NURSING)
HEALTHCARE (SKILLED NURSING)
# STORIES
# STORIES
UNLIMITED
NON APPLICABLE
NON APPLICABLE
N/A
N/A
N/A
N/A
N/A
N/A
3 4 5
OVERALL U VALUE: 0.038
33282
David Reichard
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:0
:4
A
M C
U s e rs
\J lo n g h u rs t\ D o c u m e n ts \A
-0
-V A
J a c k s o n
-C o n s tr u c t C
L C
R jlo n g h u rs tS M
A W
.r v t
G-003
CODE SUMMARY - NFPA 101
3 7JNL
CLC RESIDENTIAL
NEIGHBORHOOD
G.V. MONTGOMERY VAMC
1500 E. WOODROW WILSON AVENUE
JACKSON, MS 39216 JUNE 23, 2025
100% CONSTRUCTION DOCUMENTS
586-40123-060
7A
KC
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
3 5/8" INSULATED WALL WITH
16 GA METAL STUDS @ 16"
O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
4 7/8"
A
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U419 D
TEMPORARY PREFABRICATED
ICRA WALL SYSTEM. BASIS OF
DESIGN: STARC WALL SYSTEM OR
EDGEGUARD SYSTEM OR EQUAL.
EXISTING CEILING
SYSTEM TO HAVE
INTEGRATED CEILING
SEAL.
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE).
PROVIDE STICKY MATS (CHANGED
END OF SHIFT OR MORE IF
NECESSARY TO MAINTAIN
CLEANLINESS).
HEPA NEGATIVE AIR UNIT
ISOLATE AND COVER ALL SUPPLY
DIFFUSERS NOT IN OPERATION
DURING PROJECT - COORDINATE W/
COR
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC ZIPPER
WALL CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS VISIBLE TO
PUBLIC
FIRE PULL STATION WITH
AUDIO / VISUAL
EXISTING WALL
BARRIER
NOTE:
A. TURN UP EXHAUST ON EXTERIOR SIDE. CONTRACTOR SHALL VERIFY
LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM
EXHAUST. VERIFY LOCAL JURISDICTION CODE AND VA REQUIREMENTS
FOR DISTANCE PRIOR TO STARTING WORK.
EXHAUST LOCATION
- SEE NOTE A
G-004
_____3
G-004
G-003
FLEX DUCT
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
CLC RESIDENTIAL NEIGHBORHOOD
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES.
HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING
PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA AS LONG
AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE A
STAGING AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES -
CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND
LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE
MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE
IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON
COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY
TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST
PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. [AFTER EACH PHASE,
PERFORM TASKS STATED IN CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND
RELATED AREAS NOTE 2.
3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER ENTRANCE SPACES
(CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE
SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS
PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING
SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE
CONSTRUCTION AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT OF
THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED
BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF
ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR
MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.
FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE
CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE
AREAS WITHOUT PRIOR APPROVAL OF THE COR.
5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY
ADJACENT EXCAVATION DEBRIS.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE
CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED
OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW
FROM CLEAN TO DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH
RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT
AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE
DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF
FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR
SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO PREVENT
CONTAMINATION OF THE DUCTS.
3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH NON-FLANGE HANGER
HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM OF 7'-2" A.F.F.
4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE
AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE PROJECT IN THE FREQUENCY
AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS
1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL AND
DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN
(E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO
REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS
UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING
CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST
AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE
CONSTRUCTION ZONE OR WORK AREA.
2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL
CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL
CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE
CLEANING.
ICRA NOTES
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
A
.F .F
A P
P R
O X
SUSPENDED PLASTIC
ZIPPER WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS VISIBLE TO
PUBLIC
HEPA NEGATIVE
AIR UNIT
FINISHED FLOORING TO BE KEPT CLEAN. FLOORS NOT
BEING REPLACED MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE PROTECT
AND STORE EXISTING WINDOW TO
BE RE-INSTALLED AFTER
CONSTRUCTION IS COMPLETE.
V .I
.F
E X
IS
T
IN
G
W A
L L
FLOOR SLAB ABOVE
CEILING
PLASTIC
WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L
H
IG
H T
HEPA NEGATIVE
AIR UNIT
EXISTING
WALL
EXISTING
CEILING
FLEX DUCT
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:0
:4
A
M C
U s e rs
\J lo n g h u rs t\ D o c u m e n ts \A
-0
-V A
J a c k s o n
-C o n s tr u c t C
L C
R jlo n g h u rs tS M
A W
.r v t
G-004
ICRA INFORMATION AND DETAILS
4 7JNL
CLC RESIDENTIAL
NEIGHBORHOOD
G.V. MONTGOMERY VAMC
1500 E. WOODROW WILSON AVENUE
JACKSON, MS 39216 JUNE 23, 2025
100% CONSTRUCTION DOCUMENTS
586-40123-060
7A
KC
Scale: No Scale
ICRA BARRIER WALL TYPE
Scale: No Scale
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: No Scale
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: No Scale
ICRA ROOM ELEVATION
Scale: No Scale
CROSS SECTION "A"
Scale: No Scale
ICRA MOBILE CONTAINMENT CART
FI L L E R
BEDR OO M
G148
BEDR OO M
G149
BEDR OO M
G150 BEDR OO M
G151
BEDR OO M
G152
BEDR OO M
G153
BEDR OO M
G142
BEDR OO M
G143
BEDR OO M
G144
BEDR OO M
G145
BEDR OO M
G146
BEDR OOM, BARI ATR IC
G141
BATH SU ITE
G154
BEDR OOM, BARI ATR IC
G161
SOILED UTI LITY
G174
CLEAN UTI LITY
G173
BEDR OO M
G172
BEDR OO M
G171
SIM.G 165
BEDR OO M
G170
BEDR OO M
G169
BEDR OO M
G168
BEDR OO M
G166
BEDR OO M
G165
BEDR OO M
G164
BEDR OO M
G163BEDR OO M
G162
OFFICE
G123
FAMILY
LOUN GE
G107
MED ICI NE ST ORAGE
G106
TEL EC OM CL OSET
G113
CON FERENC E
G131
STAF F L OUN GE
G126
OFFICE
G127
OFFICE
G128
MEC HANI CAL
(E)
G132
MEC HANI CAL
(E)
G132.1
CONC IER GE STAT ION
G105
SITTI NG AREA
G104
MIL TI- PU RPO SE AR EA
G112
LAUN DR Y
G109
SHARED O FFI CE
G129
TOILET
G148.1 TOILET
G149.1
TOILET
G150.1
TOILET
G151.1
TOILET
G152.1
TOILET
G153.1
TOILET
G146.1
TOILET
G145.1
TOILET
G144.1
TOILET
G143.1
TOILET
G142.1
TOILET
G141.1
TOILET
G166.1TOILET
G165.1
TOILET
G164.1TOILET
G163.1
TOILET
G162
TOILET
G161.1
STO RAGE
G140.1
CORRI DOR
G140 CORRI DOR
G160
STAI RS
G167
STAI RS
G147
STAI RS
G133
OXYG EN
STO RAGE
- EMPTY
G121
STO RAGE
G140.2
ELEC
G160.2
STO RAGE
G160.4
ALC OVE
G160.5
TOILET
G172.1
TOILET
G171.1
TOILET
G170.1
TOILET
G169.1
TOILET
G168.1
ELEVATO R
C1-G
ELEVATO R
C2-G
LOC KER RO OM
G130
TOILET
G130.2
TOILET
G130.1
ELEC
G120.1
STO RAG E/ LIN EN ST ORAGE
G110
KITC HEN
G111
ALC OVE
G140.5
ELEC CL OSET
G140.4
STO RAGE
G140.3
STO RAGE
G160.3
OFFICE
G124
MUL TI -PURPOSE AR EA
G102
OXYG EN
STO RAGE
- FULL
G121.1
OFFICE
G125
U P
3'-7 31/32"
11 23/32"
P ic k u p W in d o w
Ic e
R e f.
N
IC
F.E.C.
F.E.C.
F.E.C.
F .E
.C
F .E
.C
F.E.C.
F.E.C.
F .E
.C
F .E
.C
F.E.C.
OMNI CELLS
S
IG
N
AL
SIGNAL
SIGNAL
S
IG
N
AL
SIGNAL
SIGNAL
SIGNAL
SWI TCH ROOM
D E S K
D E S K
F
ILE
F
ILE
B O O K
C A S E
L A T E R A L
C R E D E N Z A
F
L
C-36
X
.8
12.27'
S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .