This document is a set of 100% construction documents (architectural, structural, mechanical, electrical, plumbing, fire protection, and civil drawings) for Project 586-401, the construction of a Community Living Center (CLC) Residential Neighborhood addition at G.V. Montgomery VAMC in Jackson, Mississippi. The project involves a new 10,570 gross square foot CLC addition to the existing 24,400 square foot facility, creating a total project scope of 34,970 square feet.

The construction documents specify a fully sprinklered, healthcare-occupancy building with 24 resident bedrooms (including 2 bariatric rooms), toilets, shared living spaces, administrative offices, and support facilities. The project includes 16 deductible alternates ranging from fence material substitutions to elimination of specific building components such as screen porches, canopies, landscape lighting, and window treatments. Construction classification is Type II (000) with NFPA 13 full sprinkler protection, 2-hour fire-rated separations for occupancy divisions, and comprehensive infection control risk assessment (ICRA) precautions designated as Level IV, requiring hard surface barriers, negative air pressure systems, HEPA filtration, and restricted access protocols during construction in the occupied healthcare facility. The documents include detailed site logistics plans, phasing information for two construction phases, utility coordination details, and accessibility requirements compliant with ADA standards. Design professional firms include Apogee Consulting Group (architectural, structural, mechanical, electrical, plumbing, fire protection, and technology), ForSite Group (civil engineering), and the U.S. Department of Veterans Affairs as the federal owner.

View the file

Other files

File Type Posted
Attachment 01 C - FAR Clause 52.212-4 - Construction KAE.docx DOCX document
36C77626B0023 0007.docx DOCX document
Attachment 01 S05 - Tech Questions Tracker w clarifications v1.xlsx XLSX spreadsheet
36C77626B0023 0006.docx DOCX document
Attachment 02 23-060_Addendum 02 Door Tags Locations.pdf PDF
Attachment 01 Asbestos AHERA Baseline Survey--February 2017.pdf PDF
36C77626B0023 0005.docx DOCX document
Attachment 08 M-601.pdf PDF
Attachment 07 M-504.pdf PDF
Attachment 09 A-104 Cubicle Curtains.pdf PDF
Attachment 06 M-503.pdf PDF
Attachment 03 107315 Extruded Alum Canopy.pdf PDF
Attachment 05 117300 Ceiling Pt. Lift System.pdf PDF
Attachment 04 331000 Water Utilities.pdf PDF
Attachment 02 051200 StructSteelFraming.pdf PDF
Attachment 01 S05 - Tech Questions Tracker.xlsx XLSX spreadsheet
36C77626B0023 0004.docx DOCX document
36C77626B0023 0003.docx DOCX document
36C77626B0023 0002.docx DOCX document
GeoReport.VA CLC Neighborhood - Jackson MS.EB245012_locked_.pdf PDF
S04 Site Visit Sign in Sheet 36C77626B0023.pdf PDF
36C77626B0023 0001.docx DOCX document
S02 36C77626B0023_1 Final.pdf PDF
Attachment 05 Wage Determination Hinds County MS 05_28_2026.pdf PDF
Attachment 04- Limitations on Subcontracting - Construction.pdf PDF
Attachment 3 P11 Vol2 Drawings SS Final.pdf PDF
Attachment 06 - Site Visit Details.docx DOCX document
Attchment 1 23-060 Specs 100 percent SS 20250618 Final.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP

STREET FACING BUILDING EXTERIOR PERSPECTIVE

PROJECT LOCATION MAP

/1

/2

:0

:3

A

M C

U s e rs

\J lo n g h u rs t\ D o c u m e n ts \A

-0

-V A

J a c k s o n

-C o n s tr u c t C

L C

R jlo n g h u rs tS M

A W

.r v t

G-001

COVER

1 7JNL

CLC RESIDENTIAL

NEIGHBORHOOD

G.V. MONTGOMERY VAMC

1500 E. WOODROW WILSON AVENUE

JACKSON, MS 39216 JUNE 23, 2025

100% CONSTRUCTION DOCUMENTS

586-40123-060

7A

CLC RESIDENTIAL NEIGHBORHOOD

G.V. MONTGOMERY VAMC

1500 E. WOODROW WILSON AVENUE

JACKSON, MS 39216

VA PROJECT #: 586-401

KC

JACKSON VA CLINIC

NORTH

JACKSON VA CLINIC

NORTH

DRAWING LIST

GENERAL

G-001 COVER 1 7

G-002 GENERAL INFORMATION 2 7

G-003 CODE SUMMARY - NFPA 101 3 7

G-004 ICRA INFORMATION AND DETAILS 4 7

G-005 OVERALL SITE LOGISTICS PLAN 5 7

G-006 SITE LOGISTICS PLAN 6 7

GL101 GROUND FLOOR LIFE SAFETY PLAN 7 7

CIVIL

CD101 CIVIL DEMOLITION PLAN 1 6

CS101 CIVIL SITE & UTILITY PLAN 2 6

CS102 CIVIL DEDUCT ALTERNATE SITE GRADING & UTILITY PLAN 3 6

CG101 GRADING & DRAINAGE PLAN 4 6

CG102 STORM AND SANITARY SEWER PROFILES 5 6

CS501 CIVIL DETAILS 6 6

LANDSCAPE

LP101 LANDSCAPE PLAN 1 3

LP102 LANDSCAPE DEDUCTIVE ALTERNATE PLAN 2 3

LP501 LANDSCAPE DETAILS 3 3

STRUCTURAL

S-001 STRUCTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 23

S-002 STRUCTURAL SCHEDULES 2 23

S-003 STRUCTURAL SCHEDULES 3 23

S-101 FOUNDATION PLAN 4 23

S-101.1 FOUNDATION PLAN - DEDUCT ALTERNATE #6 5 23

S-102 FOUNDATION WALL PLAN 6 23

S-102.1 FOUNDATION WALL PLAN - DEDUCT ALTERNATE #6 7 23

S-103 GROUND FLOOR PLAN 8 23

S-103.1 GROUND FLOOR PLAN - DEDUCT ALTERNATE #6 9 23

S-104 GROUND FLOOR WALL PLAN 10 23

S-104.1 GROUND FLOOR WALL PLAN - DEDUCT ALTERNATE #2, #6, #12 11 23

S-105 ROOF FRAMING PLAN 12 23

S-105.1 ROOF FRAMING PLAN - DEDUCT ALTERNATE #6 13 23

S-106 ROOF WALL FRAMING PLAN 14 23

S-106.1 ROOF WALL FRAMING PLAN - DEDUCT ALTERNATE #6 15 23

S-107 PERGOLA FOUNDATION PLAN 16 23

S-201 WALL SECTIONS 17 23

S-202 WALL SECTIONS 18 23

S-203 WALL SECTIONS 19 23

S-204 WALL SECTIONS - DEDUCT ALTERNATE #6 20 23

S-301 DETAILS 21 23

S-302 DETAILS 22 23

S-303 DETAILS 23 23

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 35

AD101 GROUND AND FIRST FLOOR DEMOLITION PLANS 2 35

AD102 EXTERIOR ELEVATIONS & AXONOMETRIC DEMOLITION 3 35

AD103 TEMPORARY COURTYARD DEMOLITION AND ADDITION 4 35

AD104 EXTERIOR WALL SECTIONS AND DETAILS DEMOLITION 5 35

A-100 OVERALL SITE & FUTURE GROWTH PLAN 6 35

A-100.1 OVERALL SITE & FUTURE GROWTH PLAN - SITE DEDUCT ALTERNATES 7 35

A-101 GROUND FLOOR PLAN 8 35

A-101.1 GROUND FLOOR PLAN - DEDUCT ALTERNATES 9 35

A-102 GROUND FLOOR DIMENSION PLAN 10 35

A-103 EDGE OF SLAB PLANS 11 35

A-104 GROUND FLOOR REFLECTED CEILING PLAN 12 35

A-104.1 GROUND FLOOR REFLECTED CEILING PLAN - DEDUCT ALTERNATES 13 35

A-105 ROOF PLAN / ROOF DEDUCT ALTERNATES 14 35

A-201 EXTERIOR ELEVATIONS 15 35

A-201.1 EXTERIOR ELEVATIONS - DEDUCT ALTERNATES 16 35

A-301 BUILDING SECTIONS 17 35

A-301.1 BUILDING SECTIONS - DEDUCT ALTERNATES 18 35

A-302 WALL SECTIONS - SCREEN PORCH 19 35

A-303 WALL SECTIONS - WITH DEDUCT ALTERNATES 20 35

A-304 WALL SECTIONS - WITH DEDUCT ALTERNATES 21 35

A-305 WALL SECTIONS - WITH DEDUCT ALTERNATES 22 35

A-306 WALL SECTIONS 23 35

A-307 ENLARGED PLAN DETAILS 24 35

A-401 FENCE AND PILASTER DETAILS 25 35

A-421 ENLARGED TOILET PLANS AND ELEVATIONS 26 35

A-501 EXTERIOR DETAILS - PENETRATION AND ROOF DETAILS 27 35

A-502 EXTERIOR MASONRY DETAILS - BRICK ON MTL STUDS 28 35

A-503 EXTERIOR DETAILS - METAL PANEL ON MTL STUDS (WITH DEDUCT ALTERNATES) 29 35

A-510 PARTITION TYPES & INTERIOR DETAILS 30 35

A-511 COLUMN DETAILS 31 35

A-512 INTERIOR DETAILS 32 35

A-513 CEILING DETAILS 33 35

A-601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 34 35

A-602 WINDOW ELEVATIONS 35 35

INTERIORS

I-001 GENERAL NOTES, ABBREVIATIONS AND ROOM FINISH SCHEDULE 1 11

I-101 GROUND FLOOR FINISH AND WALL PROTECTION PLAN 2 11

I-131 GROUND FLOOR PATTERN PLAN 3 11

I-141 GROUND FLOOR SIGNAGE PLAN 4 11

I-201 CASEWORK AND MILLWORK ELEVATIONS 5 11

I-202 CASEWORK DETAILS 6 11

I-401 INTERIOR ELEVATIONS 7 11

I-411 GROUND FLOOR OVERALL EQUIPMENT PLAN 8 11

I-421 ENLARGED EQUIPMENT PLANS 9 11

I-422 ENLARGED EQUIPMENT PLANS 10 11

I-601 EQUIPMENT AND AQUISITION SCHEDULE 11 11

EQUIPMENT

QH-101 VENDOR DRAWINGS - GULDMANN (FOR REFERENCE ONLY) 1 1

VOLUME 1 OF 2

DRAWING LIST

GENERAL

G-001.5 COVER 1 1

FIRE SUPPRESSION

FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 5

FX101 GROUND FLOOR FIRE SUPPRESSION PLAN 2 5

FX101.1 GROUND FLOOR FIRE SUPPRESSION PLAN - DEDUCT ALTERNATE 3 5

FX102 GROUND FLOOR FIRE SUPPRESSION REFLECTED CEILING PLAN 4 5

FX102.1 GROUND FLOOR FIRE SUPPRESSION REFLECTED CEILING PLAN - DEDUCT ALTERNATE 5 5

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 14

PW101 GROUND FLOOR DRAIN, WASTE, AND VENT PLAN 2 14

PP101 GROUND FLOOR DOMESTIC WATER PLAN 3 14

PG101 GROUND FLOOR MEDICAL GAS PLAN 4 14

PG102 GROUND FLOOR MEDICAL GAS PLAN 5 14

PW102 ROOF PLUMBING PLAN 6 14

P-401 ENLARGED PLUMBING PLANS AND PLUMBING SECTION 7 14

P-501 PLUMBING DETAILS 8 14

P-502 PLUMBING DETAILS 9 14

P-601 PLUMBING SCHEDULES 10 14

P-901 SANITARY PIPE RISERS 11 14

P-902 DOMESTIC PIPE RISERS 12 14

P-903 STORM PIPE RISERS 13 14

P-904 MEDICAL GAS PIPE RISERS 14 14

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 15

MH101 GROUND FLOOR HVAC PLAN 2 15

MH102 ROOF HVAC PLAN 3 15

MP101 GROUND FLOOR MECHANICAL PIPING PLAN 4 15

MP101.1 GROUND FLOOR MECHANICAL PIPING PLAN - DEDUCT ALTERNATE 5 15

M-301 MECHANICAL SECTIONS 6 15

M-401 ENLARGED MECHANICAL ROOM HVAC PLAN 7 15

M-402 ENLARGED MECHANICAL ROOM PIPING PLAN 8 15

M-402.1 ENLARGED MECHANICAL ROOM PIPING PLAN - DEDUCT ALTERNATE 9 15

M-501 MECHANICAL DETAILS 10 15

M-502 MECHANICAL DETAILS 11 15

M-503 MECHANICAL DETAILS 12 15

M-504 MECHANICAL CONTROLS 13 15

M-505 MECHANICAL CONTROLS 14 15

M-601 MECHANICAL SCHEDULES 15 15

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 13

ES101 SITE POWER AND LIGHTING PLAN 2 13

EL101 GROUND FLOOR LIGHTING PLAN 3 13

EP101 GENERATOR AND SWITCHGEAR ROOM AND PIPE BASEMENT POWER PLAN 4 13

EP102 PIPE BASEMENT EASTERN FLOOR OVERALL POWER PLAN 5 13

EP103 GROUND FLOOR POWER PLAN 6 13

EX101 ROOF LEVEL, LIGHTNING PROTECTION PLAN 7 13

EX102 EAST, NORTH, AND SOUTH LIGHTNING PROTECTION ELEVATIONS 8 13

E-401 ELECTRICAL ENLARGEMENTS 9 13

E-501 ELECTRICAL DETAILS 10 13

E-502 ELECTRICAL DETAILS 11 13

E-601 SINGLE LINE POWER DIAGRAM AND LIGHTING SCHEDULE 12 13

E-602 MECHANICAL EQUIPMENT CONNECTION & PANEL SCHEDULES 13 13

TECHNOLOGY

T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 7

TS101 TECHNOLOGY SITE PLAN 2 7

T-101 CLC GROUND FLOOR TECHNOLOGY PLAN 3 7

T-102 ROOF TECHNOLOGY PLAN 4 7

T-103 FIRST FLOOR TECHNOLOGY PLAN 5 7

T-501 TECHNOLOGY DETAILS 6 7

T-502 TECHNOLOGY DETAILS 7 7

FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 3

FA101 CLC GROUND FLOOR FIRE ALARM PLAN 2 3

FA102 ROOF FIRE ALARM PLAN 3 3

- VOLUME 1 - VOLUME 2

Docusign Envelope ID: B03CFFD6-4D75-44E6-906A-763AFD2AA6C2

6/19/2025

S SS S

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

N O

R T

H

0 4 8 16

1-1/2"

DIAMETER

GRAB BAR

TOILET

TISSUE

DISPENSER

SANITARY

NAPKIN

DISPOSAL

TOILET

FIXTURE

TOILET

FIXTURE

TOILET

TISSUE

DISPENSER

1-1/2"

DIAMETER

GRAB BAR

EXPOSED

PLUMBING AT

BARRIER

FREE

LAVATORIES

SHALL BE

INSULATED.

LEVER OPERATING

CONTROLLED

SOAP DISPENSER

NOTE: SINKS IN COUNTERS TO BE

MOUNTED WITH RIM NO MORE

THAN 2'-10" HIGH AND WITH AT

LEAST 2'-3" KNEE CLEARANCE.

CLEAR

ACCESSIBLE TOILET

TYPICAL ACCESSIBLE

CLEARANCE AT LAVATORY

TYPICAL ACCESSIBLE

LAVATORY AND MIRROR

1'-3" 1'-3"

M

IN

M A

X

M

A X

M

A X6

A

.F .F

1'-6"

5'-0" CLEAR

3'-0" 6"

3'-0"

" 3

1'-0" 3'-6"

2'-4"

5'-0" CLEAR

MIN

8"

MAX

6"

M

IN9

M

IN

M

IN

M A

X

17" MIN

/4

T O

B O

T T

O M

O F

R

E F

L E

C T

IV

S

U R

F A

C E

O

M

IR

R

O R

INTERCOM

STATION INTERCOM

MASTER

STATION

INTERCOM

WALL

OUTLET

INTERCOM STATION

TOWEL BAR

ACCESSIBLE

ROBE/COAT HOOK

ROBE/COAT

HOOK

TOILET ACCESSORIES

6"

ADA SHOWER

CONTROL WALL

ADA SHOWER

BACK WALL

1'-6"

SHOWER

HEAD

GRAB

BAR

CONTROL

AREA

FOLDABLE

SEAT

1'-6"

CONTROL

AREA

1'-0" 1'-0"

SHOWER

M A

X

M A

X

NOTE: FIRE EXTINGUISHERS HAVING

A GROSS WEIGHT NOT EXCEEDING

40 LB (18.14 KG) SHALL BE INSTALLED

SO THAT THE TOP OF THE FIRE

EXTINGUISHER IS NOT MORE THAN

5'-0" (1.53 M) ABOVE THE FLOOR.

FIRE EXTINGUISHER

CABINET

ELECTRICAL PANEL

DUPLEX

OUTLET

SWITCH

THERMOSTAT

TELEPHONE

OR DATA

OUTLET

FIRE ALARM

PULL

(3-6" MIN)

(4'-0" MAX)

INTERCOM

STATION

DUPLEX

OUTLET

COMPUTER

TERMINAL

MISC. WALL DEVICES

CLOCK

NURSE

CALL

DOME

LIGHT

CLOCK OUTLET

CLOCK & NURSE CALL DEVICES

TELEVISION

OUTLET

WALL MOUNTED TV

S T

A N

D

IN

G

O

.C

TELEVISION

OUTLET

F O

R S

E A

T E

D

O

.C

BLOCKING

WALL PROTECTION

'-0

HANDRAIL

OR DOOR FRAME

3" TO CORNERGUARD

CORNER GUARD

'-0

1 HOUR FIRE SEPARATION

2 HOUR FIRE SEPARATION

1 HOUR SMOKE RATED

# DEDUCT ALTERNATE NOTES

BID DEDUCT ALTERNATE #1

ALL WORK IN CONTRACT EXCEPT CHANGE FENCE AND PYLONS TO METAL

FENCE. SEE SHEET A-101.1.

BID DEDUCT ALTERNATE #2

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 AND SUBSTITUTE BRICK IN

PLACE OF RAINSCREEN. SEE SHEET A-201.1.

BID DEDUCT ALTERNATE #3

ALL WORK IN CONTRACT EXCEPT DEDUCT #1, #2, AND REMOVE SCREEN

SYSTEM AT FIRST-FLOOR PORCH. SEE SHEET A-201.1.

BID DEDUCT ALTERNATE #4

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #3 AND REMOVE

SCREEN SYSTEM AT GROUND FLOOR PORCH. SEE SHEET A-201.1.

BID DEDUCT ALTERNATE #5

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #4 AND OMIT

LANDSCAPE/HARDSCAPE IN THE SOUTHERN COURTYARD. SEE SHEET A101.1.

BID DEDUCT ALTERNATE #6

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #5 AND ELIMINATE

SCREEN PORCH, INCLUDING ASSOCIATED LIGHT FIXTURES, LIGHTING

CONTROLS, RECEPTACLES, AND NOTIFICATION DEVICES. INSTALL LIGHT

FIXTURE M1E AT DOUBLE DOORS EXITING THE BUILDING. INSTALL PULL

STATION AT DOUBLE DOORS EXITING THE BUILDING. SEE SHEETS EL101,

EP101, AND FA101.

BID DEDUCT ALTERNATE #7

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #6 AND ELIMINATE

LANDSCAPE LIGHTING, INCLUDING LIGHT FIXTURES AND LIGHTING

CONTROLS. SEE SHEET ES101.

BID DEDUCT ALTERNATE #8

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #7 AND OMIT

CANOPIES. SEE SHEET A-105.

BID DEDUCT ALTERNATE #9

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #8 AND ELIMINATE

NORTH COURTYARD. SEE SHEET A-101.1.

BID DEDUCT ALTERNATE #10

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #9 AND REDUCE

LANDSCAPING, TREE, AND SHRUB CALIPERS. SEE SHEET A-101.1.

BID DEDUCT ALTERNATE #11

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #10 AND ELIMINATE

THIRD CHILLER, INCLUDING ASSOCIATED BREAKER, DISCONNECT, AND

WIRING. SEE SHEET E-401.

BID DEDUCT ALTERNATE #12

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #11 AND MOVE

CEILING LIFTS TO ACTIVATION BUDGET. SEE SHEET A-104.1.

BID DEDUCT ALTERNATE #13

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #12 AND PLACE

WINDOW SHADES IN THE ACTIVATION BUDGET.

BID DEDUCT ALTERNATE #14

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #13 AND ELIMINATE

WINDOW SOFFITS AND SOLID SURFACE SILLS. SEE SHEET A-512 DETAIL 10.

BID DEDUCT ALTERNATE #15

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #14 AND SHELL FIVE

RESIDENT ROOMS. INSTALL ELECTRICAL WIRING, BOXES, SWITCHES AS

SHOWN, EXCLUDING LIGHT FIXTURES C1 AND D2. INSTALL LIGHT FIXTURE F1

AND CIRCUIT TO WALL SWITCH PER DETAIL 5/E-401. SEE SHEET EL101.

BID DEDUCT ALTERNATE #16

ALL WORK IN CONTRACT EXCEPT DEDUCT #1 THROUGH #15 AND ELIMINATE

BENCHES. SEE SHEET A-101.1.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:0

:3

A

M C

U s e rs

\J lo n g h u rs t\ D o c u m e n ts \A

-0

-V A

J a c k s o n

-C o n s tr u c t C

L C

R jlo n g h u rs tS M

A W

.r v t

G-002

GENERAL INFORMATION

2 7JNL

CLC RESIDENTIAL

NEIGHBORHOOD

G.V. MONTGOMERY VAMC

1500 E. WOODROW WILSON AVENUE

JACKSON, MS 39216 JUNE 23, 2025

100% CONSTRUCTION DOCUMENTS

586-40123-060

7A

KC

GENERAL SYMBOL LEGEND

STANDARD MOUNTING HEIGHTS

WALL RATING LEGEND

CODE SUMMARY - NFPA

DESIGNER FIRM NAME LIC.# PHONE#

EXTERIOR WALLS -(EACH ASSEMBLY):

ROOF/CEILING ASSEMBLY - (EACH ASSEMBLY):

ENERGY SUMMARY

THERMAL ENVELOPE

GROSS BUILDING AREA:

HIGH RISE:

METHOD OF COMPLIANCE

BUILDING DATA (NFPA 220):

FIRE DISTRICT:

SPRINKLERS:

MEZZANINE:

ALLOWABLE BUILDING HEIGHT:

CONSTRUCTION TYPE:

LEAD DESIGN PROFESSIONAL:

WALLS BELOW GRADE (EACH ASSEMBLY)

STANDPIPES:

MIXED OCCUPANCY:

STORY

NO.

DESCRIPTION & USE

BLDG AREA

PER STORY

(ACTUAL)

FIRE PROTECTION REQUIREMENTS *

STRUCTURAL DESIGN

IMPORTANCE FACTORS:

DESIGN LOADS:

LIVE LOADS:

SNOW LOAD:

WIND LOAD:

SEISMIC DESIGN CATEGORY A

SEISMIC DESIGN CATEGORY B, C, & D

SEISMIC RISK CATEGORY

SPECTRAL RESPONSE ACCELERATION S %g S %g

SITE CLASSIFICATION

BASIC STRUCTURAL SYSTEM (CHECK ONE)

SEISMIC BASE SHEAR Vx= Vy=

ANALYSIS PROCEDURE

ARCHITECTURAL, MECHANICAL, COMPONENTS ANCHORED?

LATERAL DESIGN CONTROL:

SOIL BEARING CAPACITIES:

CONSTRUCTED:

RENOVATED:

ORIGINAL USE(S) (CH.3):

CURRENT USE(S) (CH.3):

PROPOSED USE(S) (CH.3):

HAZARDOUS AREAS (NFPA 101 8.7 AND OCCUPANCY CHAPTER):

LIFE SAFETY PLAN REQUIREMENTS

CLIMATE ZONE

LOW E REQUIRED, IF APPLICABLE

OPENINGS (WINDOWS OR DOORS WITH GLAZING)

R-VALUE OF INSULATION:

PROJECTION FACTOR

SHADING COOEFFICIENT

DOOR R-VALUES

TOTAL SQUARE FOOTAGE OF SKYLIGHTS IN EACH ASS'Y

SKYLIGHTS IN EACH ASSEMBLY:

R-VALUE OF INSULATION:

U-VALUE OF SKYLIGHT

DESCRIPTION OF ASSEMBLY:

PRESCRIPTIVE (BUILDING CODE) PERFORMANCE (COMCheck)

PRESCRIPTIVE (ASHRAE 90.1)

IV (2HH)

I (442)

III (211)

II (222)I (332)

III (200)

II (111)

V (111)

FIRE

PROTECTION:

RETAINING

WALLS >5' HIGH:

STRUCTURAL:

MECHANICAL:

ELECTRICAL:

FIRE ALARM:

PLUMBING:

CODE ENFORCEMENT JURISDICTION:

ARCHITECTURAL:

CIVIL:

OWNER OR

OWNED BY: FEDERAL CITY/COUNTY PRIVATE STATE

NAME OF PROJECT:

PROPOSED USE:

ADDRESS:

DESCRIPTION OF ASSEMBLY:

U-VALUE OF TOTAL ASSEMBLY:

R-VALUE OF INSULATION:

OTHER:

NO NFPA 13YES NFPA 13R NFPA 13D

NO CLASSYES

NO YES

FEET

NO YES

NO YES CENTRAL REFERENCE SHEET #

NO YES SEPARATION: HR. EXCEPTION:

LIFE SAFETY PLAN SHEET #, IF PROVIDED:

STATE

COUNTY

AUTHORIZED AGENT

NFPA 13 NFPA 13R NFPA 13D

WIND (I W)

SNOW (I S)

SEISMIC (I E)

ROOF

MEZZANINE

FLOOR

PSF

PSF

PSF

PSF

BASIC WIND SPEED EXPOSURE

CATEGORY WIND BASE SHEARS

(FOR MWFRS) Vx=

MPH (ASCE 7-22)

COMPLIANCE WITH SECTION 1616.4 ONLY? NOYES

PROVIDE THE FOLLOWING SEISMIC DESIGN PARAMETERS:

BEARING WALL

BUILDING FRAME

MOMENT FRAME

DUAL W/SPECIAL MOMENT FRAME

DUAL W/INTERMEDIATE R/C OR SPECIAL STEEL

INVERTED PENDULUM

S 1

EARTHQUAKE

FIELD TEST (PROVIDE COPY OF TEST REPORT)

PRESUMPTIVE BEARING CAPACITY

PILE SIZE, TYPE, AND CAPACITY

PSF

PSF

DESCRIPTION OF ASSEMBLY:

R-VALUE OF INSULATION:

DESCRIPTION OF ASSEMBLY:

CLC RESIDENTIAL NEIGHBORHOOD

1500 E. WOODROW WILSON AVE, JACKSON, MS ZIP CODE: 39216

COMMUNITY LIVING CENTER

EMAIL:

Jeffrey Knight

CITY

APOGEE CONSULTING King Choy 11664 (919) 858-7420

APOGEE CONSULTING Kevin Kublank

NEW CONSTRUCTION ADDITION UPFIT

RECONSTRUCTION ALTERATION REPAIR RENOVATION

BOILER AND FUEL-FIRED HEATER ROOMS IN HEALTHCARE OCCUPANCY

CENTRAL/BULK LAUNDRIES OVER 100 SF IN HEALTHCARE OCCUPANCY

PAINT SHOPS IN HEALTHCARE OCCUPANCIES

PHYSICAL PLANT MAINTENANCE SHOPS IN HEALTHCARE OCCUPANCIES

SOILED LINEN ROOMS IN HEALTHCARE OCCUPANCY

WASTE COLLECTION ROOMS IN HEALTHCARE OCCUPANCY

STORAGE ROOM OVER 100 SF IN HEALTHCARE OCCUPANCY

LABORATORIES WITH FLAMMABLE/COMBUSTABLE MATERIALS (SMOKE PARTITION)

STORAGE ROOMS OVER 50 SF IN HEALTHCARE OCCUPANCY (SMOKE PARTITION)

MEDICAL GAS STORAGE

FIRE AND/OR SMOKE RATED WALL LOCATIONS

ASSUMED AND REAL PROPERTY LINE LOCATIONS

EXTERIOR WALL OPENING AREA WITH RESPECT TO DISTANCE TO ASSUMED

PROPERTY LINES

EXISTING STRUCTURES WITHIN 30' OF THE PROPOSED BUILDING

OCCUPANCY TYPES FOR EACH AREA

OCCUPANT LOADS FOR EACH AREA

EXIT ACCESS TRAVEL DISTANCES

COMMON PATH OF TRAVEL DISTANCE

DEAD END LENGTHS

CLEAR EXIT WIDTHS FOR EACH EXIT DOOR

MAXIMUM CALCULATED OCCUPANT LOAD CAPACITY EACH EXIT DOOR CAN

ACCOMMODATE BASED ON EGRESS WIDTH

ACTUAL OCCUPANT LOAD FOR EACH EXIT DOOR

A SEPARATE SCHEMATIC PLAN INDICATING WHERE FIRE RATED FLOOR/

CEILING AND/OR ROOF STRUCTURE IS PROVIDED FOR PURPOSES OF

OCCUPANCY SEPARATION

LOCATION OF DOORS WITH PANIC HARDWARE

LOCATION OF DOORS WITH DELAYED EGRESS LOCKS AND THE AMOUNT OF

DELAY

LOCATION OF DOORS WITH ELECTROMAGNETIC EGRESS LOCKS

LOCATION OF DOORS EQUIPPED WITH HOLD-OPEN DEVICES

LOCATION OF EMERGENCY ESCAPE WINDOWS

THE SQUARE FOOTAGE OF EACH FIRE AREA

THE SQUARE FOOTAGE OF EACH SMOKE COMPARTMENT

NOTE ANY CODE EXCEPTIONS OR TABLE NOTES THAT MAY HAVE BEEN

UTILIZED REGARDING THE ITEMS ABOVE

PERFORMANCE (ASHRAE 90.1)

2A

UNLIMITED

NA

C 24 10

YES

FLOOR EXISTING (SQ FT) NEW (SQ FT) SUB-TOTAL

PHONE:

FORSITE GROUP

Vy=

WIND

EMERGENCY LIGHTING:

EXIT SIGNS:

FIRE ALARM:

SMOKE DETECTION SYSTEMS:

PANIC HARDWARE:

BUILDING

ELEMENT

FIRE

SEPARATION

DISTANCE

(FEET)

PER T602

NONBEARING

WALLS &

PARTITIONS

STRUCTURAL

FRAME,

INCLUDING

COLUMNS,

GIRDERS,

TRUSSES

DETAIL #

AND

SHEET #

DESIGN

# FOR

RATED

ASS'Y

DESIGN

# FOR

RATED

PENETRATION

DESIGN

# FOR

RATED

JOINTS

RATING

PROVIDED

REQ'D

(HRS)

BEARING WALLS

EXTERIOR

NORTH

EAST

WEST

SOUTH

INTERIOR

EXTERIOR

NORTH

EAST

WEST

SOUTH

INTERIOR

FLOOR

CONSTRUCTION,

INCLUDING

SUPPORTING

BEAMS & JOINTS

ROOF

CONSTRUCTION,

INCLUDING

SUPPORTING

BEAMS & JOINTS

SHAFTS-EXIT

SHAFTS-OTHER

CORR. SEP.

OCC'Y SEP. (C)

PARTY/FIRE

WALL SEP.

SMOKE BARRIER

SEPARATION

TENANT SEP.

LIFE SAFETY SYSTEM REQUIREMENTS

INCID. USE SEP.

* INDICATE SECTION NUMBER PERMITTING REDUCTION

NO YES

NO YES

NO YES

NO YES

NO YES

PARTIAL

3 -- -- --

N/A -- -- -- ----

N/A -- -- -- ----

N/A -- -- -- ----

N/A -- -- -- ----

N/A -- -- -- ----

0 -- -- -- ----

0 -- -- -- ------

0 0 -- -- -->30'

0 0 -- -- -->30'

0 0 -- -- --25'

0 0 -- -- -->30'

N/A

N/A -- -- -- ----

N/A

PERCENTAGE OF WALL OPENING CALCULATIONS

DEGREE OF

OPENINGS

PROTECTION

ALLOWABLE AREA

FIRE SEPARATION

DISTANCE FEET FROM

PROPERTY LINES

ACTUAL SHOWN ON PLANS

EQUIVALENET LATERAL FORCE

DEPARTMENT OF VETERAN AFFAIRS

(601) 364-1330

Jeffrey.Knight1@VA.gov

(919) 858-7420

FEDERAL DEPT OF VETERAN AFFAIRS

Clay Massey 38677 (334) 887-6064

33282

APOGEE CONSULTING Kevin Kublank (919) 858-742033282

APOGEE CONSULTING William Shipley (919) 858-7420125188

APOGEE CONSULTING William Shipley (919) 858-7420125188

APOGEE CONSULTING William Shipley (919) 858-7420125188

APOGEE CONSULTING Hossein Dormohammadi 052983 (919) 858-7420

SCOPE TYPE:

ACTUAL BUILDING HEIGHT: FEET

UNLIMITED PER:

29 2

NA

1.25

20 (100 FOR FUTURE FLOOR)

NA

II (000)

V (000)

AREAS WITH HAZARD GREATER THAN PRIMARY OCCUPANCY

COOKING FACILITIES

BUILDING AREA

INTERIOR DESIGN: APOGEE CONSULTING Emilie Diggs 35985 (919) 858-7420

TECHNOLOGY: APOGEE CONSULTING Kevin Kublank (919) 858-7420

MALE FEMALE MALE FEMALE STD.

PLUMBING FIXTURE REQUIREMENTS

WATER CLOSETS DRINKING FOUNTAINS

USE

LAVATORIES

URINALS

SHOWERS/

TUBS

ACCESS.

SPACE EXISTING

NEW

REQUIRED PROVIDED

REGULAR W/5'

ACCESS

AISLE

ACCESSIBLE PARKING

TOTAL # OF PARKING SPACES # OF ACCESSIBLE SPACES PROVIDED

LOT OR

PARKING

AREA

TOTAL #

ACCESSIBLE

PROVIDED

VAN SPACES

W/8' ACCESS

AISLE

TOTAL NA

SEE CIVIL DRAWINGS

EXIST. --

NA

NA NA

NA

EXIST.

FLOOR SLAB ON GRADE (EACH ASSEMBLY)

HORIZONTAL/VERTICAL REQUIREMENT

DESCRIPTION OF ASSEMBLY:

U-VALUE OF TOTAL ASSEMBLY:

R-VALUE OF INSULATION:

SLAB HEATED

MECHANICAL SUMMARY - SEE MECHANICAL DRAWINGS

ELECTRICAL SUMMARY - SEE ELECTRICAL DRAWINGS

STRUCTURAL DESIGN - SEE STRUCTURAL DRAWINGS

PRIMARY OCCUPANCY: ASSEMBLY

BUSINESS EDUCATIONAL

INDUSTRIALHEALTHCARE MERCANTILE

RESIDENTIAL BOARD AND CARESTORAGE

DETENTION AND CORRECTIONAL

AMBULATORY HEALTH CARE

DAY CARE

ONE- AND TWO-FAMILY DWELLING

APARTMENT

LODGING OR ROOMING HOUSE

HOTELS AND DORMITORY

ELEVATED, 9" REINFORCED CONCRETE SLAB

WITH 2" TOPPING SLAB.

V = 0.1

NA

NA

NA

0.21

0.0

YES

2.86

OCCUPANCY

GROUND FLOOR

TOTAL

N/A

N/A

10,570

10,570

10,570

10,570

EXIST.

GROUND

EXISTING CLC 24,400 GSF

NEW CLC ADDITION 10,570 GSF

TOTAL 34,970 GSF

GL101

STEEL STUDS, 16IN O.C. AND BRICK

FACADE

R-19 BATT INSULATION AND R12.9

CONTINUOUS INSULATION

STEEL STUDS, 16IN O.C. AND METAL

PANEL FACADE

R-19 BATT INSULATION AND R12.9

CONTINUOUS INSULATION

ROOF INSULATION R=33

TPO ROOFING R=0.24

30 YEAR WARRANTY REQUIRED.

R-33 OVERALL AVERAGE MINIMUM

HEALTHCARE (SKILLED NURSING)

GROUND

EXISTING CLC & NEW CLC ADDITION

HEALTHCARE (SKILLED NURSING)

HEALTHCARE (SKILLED NURSING)

# STORIES

# STORIES

UNLIMITED

NON APPLICABLE

NON APPLICABLE

N/A

N/A

N/A

N/A

N/A

N/A

3 4 5

OVERALL U VALUE: 0.038

33282

David Reichard

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:0

:4

A

M C

U s e rs

\J lo n g h u rs t\ D o c u m e n ts \A

-0

-V A

J a c k s o n

-C o n s tr u c t C

L C

R jlo n g h u rs tS M

A W

.r v t

G-003

CODE SUMMARY - NFPA 101

3 7JNL

CLC RESIDENTIAL

NEIGHBORHOOD

G.V. MONTGOMERY VAMC

1500 E. WOODROW WILSON AVENUE

JACKSON, MS 39216 JUNE 23, 2025

100% CONSTRUCTION DOCUMENTS

586-40123-060

7A

KC

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

3 5/8" INSULATED WALL WITH

16 GA METAL STUDS @ 16"

O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

4 7/8"

A

FIRE RESISTANT SEALANT,

BOTH SIDES

1-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U419 D

TEMPORARY PREFABRICATED

ICRA WALL SYSTEM. BASIS OF

DESIGN: STARC WALL SYSTEM OR

EDGEGUARD SYSTEM OR EQUAL.

EXISTING CEILING

SYSTEM TO HAVE

INTEGRATED CEILING

SEAL.

ILSM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

FIRE EXTINGUISHER ON PORTABLE

FLOOR BRACKET (ILSM MAY REQUIRE

MORE THAN ONE).

PROVIDE STICKY MATS (CHANGED

END OF SHIFT OR MORE IF

NECESSARY TO MAINTAIN

CLEANLINESS).

HEPA NEGATIVE AIR UNIT

ISOLATE AND COVER ALL SUPPLY

DIFFUSERS NOT IN OPERATION

DURING PROJECT - COORDINATE W/

COR

COVER ALL RETURNS AT THE

GRATE/DIFFUSERS

SUSPENDED PLASTIC ZIPPER

WALL CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INSPECTION SHEETS VISIBLE TO

PUBLIC

FIRE PULL STATION WITH

AUDIO / VISUAL

EXISTING WALL

BARRIER

NOTE:

A. TURN UP EXHAUST ON EXTERIOR SIDE. CONTRACTOR SHALL VERIFY

LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM

EXHAUST. VERIFY LOCAL JURISDICTION CODE AND VA REQUIREMENTS

FOR DISTANCE PRIOR TO STARTING WORK.

EXHAUST LOCATION

- SEE NOTE A

G-004

_____3

G-004

G-003

FLEX DUCT

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

CLC RESIDENTIAL NEIGHBORHOOD

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES.

HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING

PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA AS LONG

AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.

2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE A

STAGING AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES -

CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND

LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE

MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE

IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON

COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY

TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST

PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. [AFTER EACH PHASE,

PERFORM TASKS STATED IN CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND

RELATED AREAS NOTE 2.

3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER ENTRANCE SPACES

(CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE

SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS

PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING

SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE

CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE

CONSTRUCTION AREA AND MATERIALS.

3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT OF

THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED

BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.

4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF

ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.

DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR

MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.

FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE

CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE

AREAS WITHOUT PRIOR APPROVAL OF THE COR.

5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY

ADJACENT EXCAVATION DEBRIS.

VENTILATION AND ENVIRONMENTAL CONTROLS

1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE

CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED

OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW

FROM CLEAN TO DIRTY AREAS.

2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH

RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT

AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE

DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF

FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR

SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO PREVENT

CONTAMINATION OF THE DUCTS.

3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH NON-FLANGE HANGER

HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM OF 7'-2" A.F.F.

4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE

VERIFIED DAILY.

5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE

AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA

ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE PROJECT IN THE FREQUENCY

AS IDENTIFIED BY THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS

1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL AND

DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN

(E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO

REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS

UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING

CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST

AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE

CONSTRUCTION ZONE OR WORK AREA.

2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL

CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL

CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE

CLEANING.

ICRA NOTES

IIILOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 V

V

IV

V

IV

III

IV

II

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects Includes, but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:

• Removal of preexisting floor covering, walls, casework or other building components.

• New drywall placement.

• Renovation work in a single room.

• Nonexisting cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Inspection and Non-Invasive Activities Includes, but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

• Physical Therapy

• Radiology departments

• All patient waiting rooms

• All outpatient clinics

• Research Areas

• Respiratory Therapy

• Office areas (non-clinical)

• FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

• Emergency Room

• Clinical Laboratories (specimen)

• Same Day Surgery

• Pharmacy

• Nutrition and Food

Service/Canteen

• Procedural Areas (GI)

• Inpatient Mental Health

• Any area caring for immunocompromised patients

• Cardiac Cath Lab/IR

• Central Sterile Supply

• Sterile Processing Service

• Intensive Care Units

IIII

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

During Construction Project Upon Completion of Project

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

14. Contain all trash and debris in the work area.

15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

16. Worker clothing must be clean and free of visible dust before leaving the work area.

HEPA vacuuming of clothing or use of cover suites is acceptable.

17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

• Medical/Surgical Units

• Negative pressure isolation rooms

• Outpatient Chemotherapy

Areas

• Operating rooms

• Post Anesthesia Care Unit

• Dialysis

• Dental

C

LA

S S

V

1. Includes all activities required by Class IV

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

7. Personnel will be required to wear coveralls at all times during Class V work activities.

Coveralls must be removed before leaving the anteroom.

8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.

14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

15. Contain all trash and debris in the work area.

16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.

18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).

Damaged shoe covers must be immediately changed.

19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

During Construction Project

C

LA

S S

I

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

2. Perform noninvasive work activity as to not block or interrupt patient care.

3. Perform noninvasive work activities in areas that are not directly occupied with patients.

4. Perform noninvasive work activity in a manner that does not create dust.

5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

C

LA

S S

II

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

1. Includes all activities required by Class I

2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

4. This Class of Precautions must never be used for construction or renovation activities.

5. Provide active means to prevent airborne dust from dispersing into atmosphere.

6. Water mist work surfaces to control dust while cutting.

7. Seal unused doors with duct tape.

8. Block off and seal air vents.

9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:

1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.

2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.

4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

C

LA

S S

II

I

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Provide active means to prevent airborne dust dispersion into the occupied areas.

4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,

7. If work area is contained, then it must be neutrally to negatively pressurized at all times.

8. Seal all doors with tape that will not leave residue.

9. Contain all trash and debris in the work area.

10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.

For Type C activities, follow procedures for Class IV.

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

A

.F .F

A P

P R

O X

SUSPENDED PLASTIC

ZIPPER WALL CURTAIN

BARRIER

POST ICRA, ILSM, FIRE

INSPECTION SHEETS VISIBLE TO

PUBLIC

HEPA NEGATIVE

AIR UNIT

FINISHED FLOORING TO BE KEPT CLEAN. FLOORS NOT

BEING REPLACED MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE PROTECT

AND STORE EXISTING WINDOW TO

BE RE-INSTALLED AFTER

CONSTRUCTION IS COMPLETE.

V .I

.F

E X

IS

T

IN

G

W A

L L

FLOOR SLAB ABOVE

CEILING

PLASTIC

WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L

H

IG

H T

HEPA NEGATIVE

AIR UNIT

EXISTING

WALL

EXISTING

CEILING

FLEX DUCT

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:0

:4

A

M C

U s e rs

\J lo n g h u rs t\ D o c u m e n ts \A

-0

-V A

J a c k s o n

-C o n s tr u c t C

L C

R jlo n g h u rs tS M

A W

.r v t

G-004

ICRA INFORMATION AND DETAILS

4 7JNL

CLC RESIDENTIAL

NEIGHBORHOOD

G.V. MONTGOMERY VAMC

1500 E. WOODROW WILSON AVENUE

JACKSON, MS 39216 JUNE 23, 2025

100% CONSTRUCTION DOCUMENTS

586-40123-060

7A

KC

Scale: No Scale

ICRA BARRIER WALL TYPE

Scale: No Scale

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: No Scale

ILSM CONSTRUCTION EGRESS SIGNAGE

Scale: No Scale

ICRA ROOM ELEVATION

Scale: No Scale

CROSS SECTION "A"

Scale: No Scale

ICRA MOBILE CONTAINMENT CART

FI L L E R

BEDR OO M

G148

BEDR OO M

G149

BEDR OO M

G150 BEDR OO M

G151

BEDR OO M

G152

BEDR OO M

G153

BEDR OO M

G142

BEDR OO M

G143

BEDR OO M

G144

BEDR OO M

G145

BEDR OO M

G146

BEDR OOM, BARI ATR IC

G141

BATH SU ITE

G154

BEDR OOM, BARI ATR IC

G161

SOILED UTI LITY

G174

CLEAN UTI LITY

G173

BEDR OO M

G172

BEDR OO M

G171

SIM.G 165

BEDR OO M

G170

BEDR OO M

G169

BEDR OO M

G168

BEDR OO M

G166

BEDR OO M

G165

BEDR OO M

G164

BEDR OO M

G163BEDR OO M

G162

OFFICE

G123

FAMILY

LOUN GE

G107

MED ICI NE ST ORAGE

G106

TEL EC OM CL OSET

G113

CON FERENC E

G131

STAF F L OUN GE

G126

OFFICE

G127

OFFICE

G128

MEC HANI CAL

(E)

G132

MEC HANI CAL

(E)

G132.1

CONC IER GE STAT ION

G105

SITTI NG AREA

G104

MIL TI- PU RPO SE AR EA

G112

LAUN DR Y

G109

SHARED O FFI CE

G129

TOILET

G148.1 TOILET

G149.1

TOILET

G150.1

TOILET

G151.1

TOILET

G152.1

TOILET

G153.1

TOILET

G146.1

TOILET

G145.1

TOILET

G144.1

TOILET

G143.1

TOILET

G142.1

TOILET

G141.1

TOILET

G166.1TOILET

G165.1

TOILET

G164.1TOILET

G163.1

TOILET

G162

TOILET

G161.1

STO RAGE

G140.1

CORRI DOR

G140 CORRI DOR

G160

STAI RS

G167

STAI RS

G147

STAI RS

G133

OXYG EN

STO RAGE

- EMPTY

G121

STO RAGE

G140.2

ELEC

G160.2

STO RAGE

G160.4

ALC OVE

G160.5

TOILET

G172.1

TOILET

G171.1

TOILET

G170.1

TOILET

G169.1

TOILET

G168.1

ELEVATO R

C1-G

ELEVATO R

C2-G

LOC KER RO OM

G130

TOILET

G130.2

TOILET

G130.1

ELEC

G120.1

STO RAG E/ LIN EN ST ORAGE

G110

KITC HEN

G111

ALC OVE

G140.5

ELEC CL OSET

G140.4

STO RAGE

G140.3

STO RAGE

G160.3

OFFICE

G124

MUL TI -PURPOSE AR EA

G102

OXYG EN

STO RAGE

- FULL

G121.1

OFFICE

G125

U P

3'-7 31/32"

11 23/32"

P ic k u p W in d o w

Ic e

R e f.

N

IC

F.E.C.

F.E.C.

F.E.C.

F .E

.C

F .E

.C

F.E.C.

F.E.C.

F .E

.C

F .E

.C

F.E.C.

OMNI CELLS

S

IG

N

AL

SIGNAL

SIGNAL

S

IG

N

AL

SIGNAL

SIGNAL

SIGNAL

SWI TCH ROOM

D E S K

D E S K

F

ILE

F

ILE

B O O K

C A S E

L A T E R A L

C R E D E N Z A

F

L

C-36

X

.8

12.27'

S…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .