Attachment 05 117300 Ceiling Pt. Lift System.pdf

PDF 40 KB Posted

Attached to
Y1DA--586-401 | Construct CLC Residential Neighborhood | Jackson, MS | Scott Tom
Solicitation number
36C77626B0023
Issued by

About this file

This is Section 11 73 00 of the construction specifications for the G.V. Montgomery VAMC CLC Residential Neighborhood project in Jackson, Mississippi, addressing ceiling-mounted patient lift systems for physically challenged patient transfers. The specification requires high-strength extruded aluminum ceiling track systems with anchor supports tested for 1.5 times the motor's weight capacity and maximum allowable deflection of no more than 1mm per 200mm of track length. Lift units must be constructed of steel frame systems with gear-reduced high torque motors and feature lifting capacities of 550 lbs for non-bariatric lifts or 750-1000 lbs for bariatric lifts, equipped with electronic soft-start and soft-stop motor controls, emergency lowering and stopping devices, current limiters, mechanical emergency brakes, and VO plastic fire-retardant cabs meeting UL 94 standards.

The specification mandates compliance with ISO 10535 and UL 60601-1 standards, with manufacturer certifications and independent third-party inspection by a registered structural engineer serving as Inspector of Record. Submittals include detailed shop drawings showing structural supports with either 2D CAD or 3D BIM files, stamped structural calculations, room layouts with bed positions and obstruction identification, and manufacturer's literature detailing lifting capacity, lifting speed, motor specifications, straps, and slings. Rechargeable batteries must provide up to 35 transfers with 200 lbs load or minimum 17 transfers at maximum load, compliant with IEC 6100-1-2. Installation requires manufacturer supervision and qualified representatives, with mandatory personnel training, performance testing in the presence of the Resident Engineer and Inspector of Record, and post-installation inspection per manufacturer's installation checklist and VA Patient Safety Alert AL14-07, with periodic manufacturer inspections on a yearly basis.

View the file

Other files

File Type Posted
Attachment 01 C - FAR Clause 52.212-4 - Construction KAE.docx DOCX document
36C77626B0023 0007.docx DOCX document
Attachment 01 S05 - Tech Questions Tracker w clarifications v1.xlsx XLSX spreadsheet
36C77626B0023 0006.docx DOCX document
Attachment 02 23-060_Addendum 02 Door Tags Locations.pdf PDF
Attachment 01 Asbestos AHERA Baseline Survey--February 2017.pdf PDF
36C77626B0023 0005.docx DOCX document
Attachment 09 A-104 Cubicle Curtains.pdf PDF
Attachment 06 M-503.pdf PDF
Attachment 03 107315 Extruded Alum Canopy.pdf PDF
Attachment 04 331000 Water Utilities.pdf PDF
Attachment 02 051200 StructSteelFraming.pdf PDF
Attachment 08 M-601.pdf PDF
Attachment 07 M-504.pdf PDF
Attachment 01 S05 - Tech Questions Tracker.xlsx XLSX spreadsheet
36C77626B0023 0004.docx DOCX document
36C77626B0023 0003.docx DOCX document
GeoReport.VA CLC Neighborhood - Jackson MS.EB245012_locked_.pdf PDF
36C77626B0023 0002.docx DOCX document
S04 Site Visit Sign in Sheet 36C77626B0023.pdf PDF
36C77626B0023 0001.docx DOCX document
S02 36C77626B0023_1 Final.pdf PDF
Attachment 06 - Site Visit Details.docx DOCX document
Attchment 1 23-060 Specs 100 percent SS 20250618 Final.pdf PDF
Attachment 05 Wage Determination Hinds County MS 05_28_2026.pdf PDF
Attachment 04- Limitations on Subcontracting - Construction.pdf PDF
Attachment 3 P11 Vol2 Drawings SS Final.pdf PDF
Attachment 2 P11 Vol1 Drawings SS Final.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G.V. Montgomery VAMC June 29, 2026

CLC Residential Neighborhood 100% Construction Documents

Jackson, MS 39216 Project No: 586-401

Addendum 01

11 73 00 - 1

SECTION 11 73 00

CEILING MOUNTED PATIENT LIFT SYSTEM

PART 1 - GENERAL

1.1 DESCRIPTION

A. Ceiling Mounted Patient Lift Systems for the transfer of physically challenged patients are specified in this section.

1.2 RELATED WORK

A. Section 01 00 00, GENERAL REQUIREMENTS: Requirements for pre-test of equipment.

B. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL

COMPONENTS: Seismic requirements for non-structural equipment.

C. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General

Electrical Requirements and items, which are common to sections of

Division 26.

1.3 QUALITY ASSURANCE

A. Certification for compliance is required for Ceiling Mounted Patient

Lift Systems. Certifications shall be provided by the manufacturer who will conduct testing to ensure that the ceiling lift and charging system are safe and in compliance with ISO 10535 & UL 60601-1.

B. Inspection of equipment after installation is required prior to use for patient movement. Inspection shall be in accordance with manufacturer’s installation checklist and the facilities installation checklist

(Patient Safety Alert AL14-07).

C. Certification of compliance with VA requirements shall be provided by an independent third party, Inspector of Record (IOR), who will observe installation and manufacturer’s testing to ensure that the ceiling structure, ceiling lift, and charging system is safe and compliance with shop drawings, structural calculations, specifications, ISO 10535 requirements, and code requirements. IOR shall be a registered structural engineer in the state of installation.

1.4 SUBMITTALS

A. Submit in accordance with specification Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, AND SAMPLES.

1. Shop drawings shall show structural supports to the underside of structure. Structural calculations for the support of the track and its attachment to ceiling structure shall be submitted. Shop

11 73 00 - 2 drawings used in the quoting phase shall be PDFs, and either 2D CAD files or 3D BIM files showing structural support to underside of structure. Shop drawings shall also provide general room layout with bed position and all obstructions to ceiling lift.

2. Once the purchase order is accepted by the vendor, a set of stamped drawings shall be provided by the vendor. Shop drawings and structural calculations shall be signed and stamped by a registered structural engineer, and shall meet all code requirements in the jurisdiction having authority. Structural engineer shall ensure ceiling minimum structure capacity shall support the loads specified in the shop and installation drawings and be in compliance with local structural and seismic codes.

3. Shop drawings shall show obstructions such as curtains, lights and sprinklers, and coordinate their relocation.

4. Manufacturer shall provide BIM (Building Information Model) for clash detection on the request of the Resident Engineer (RE), VA

Construction Agent, or General Contractor.

B. Certificates of Compliance from Manufacturer

C. Manufacturer's Literature and Data:

1. Lifting Capacity

2. Lifting Speed

3. Vertical Axis Motor

4. Emergency Brake

5. Emergency Lowering Device

6. Emergency Stopping Device

7. Electronic Soft-Start and Soft-Stop Motor Control

8. Current Limiter for Circuit Protection

9. Strap Length

10. All equipment anchors and supports. Submittals shall include weights, dimensions, center of gravity of the structural support, standard connections, manufacturer's recommendations and behavior problems (e.g., vibration, thermal expansion,) associated with equipment or piping so that the proposed installation can be properly reviewed.

11 73 00 - 3

D. Individual Room layouts showing location of lift system installation shall be approved before proceeding with installation of lifts.

E. Manufacturer’s Checklist for after installation inspection.

1.5 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are listed in the text by the basic designation only.

B. International Organization for Standardization (ISO):

10535-21................Hoist for the Transfer of Disabled Persons-

Requirements and Test Methods

C. Underwriters Laboratories (UL):

60601-1-20..............Medical Electrical Equipment: General

Requirements for Safety

94-2013.................UL Standards for Safety Test for Flammability of Plastic Materials for Parts in Devices and

Appliances-Fifth Edition

D. International Electromagnetic Commission (IEC):

60601-1-2(2015).........Medical electrical equipment – Part 1-2:

General requirements for basic safety and essential performance – Collateral Standard:

Electromagnetic disturbances – Requirements and tests.

E. VA Patient Safety Alert AL14-07

PART 2 - PRODUCTS

2.1 CEILING TRACK SYSTEM

A. The Ceiling Track shall be made from high strength extruded aluminum or

VA approved equal. Provide anchor supports at ceiling substrate.

B. Installed rail shall be security tested for 1.5 times greater than the motor’s weight capacity and maximum allowable deflection of a horizontal rail is no more than 1mm (1/16th inch) per 200mm (7.87 inch) of track length. (As per ISO 10535 standards.)

11 73 00 - 4

2.2 LIFT UNIT

A. The Lift Unit shall be constructed of a steel frame system driven by a gear reduced high torque motor or VA approved equal.

B. The Lift system shall have the following features.

1. Lifting capacity: 550 lbs (249.476 kg) for non-bariatric lifts 750-

1000 lbs (340.194- 498.952 kg)for bariatric lifts

2. Electronic soft-start and soft-stop motor control

3. Emergency lowering device

4. Emergency stopping device

5. Current limiter for circuit protection in case of overload.

6. Safety device that stops the motor to lift when batteries are low.

7. Horizontal axis motor: per manufacturer recommendations

8. Emergency brake (in case of mechanical failure)

9. Strap length:

10. Cab: VO plastic–fire retardant, UL 94

2.3 MOTORS

A. Vertical Movement-DC Motor

2.4 BATTERIES

A. The life cycle (number of charging cycles) for batteries shall be in compliance with IEC 6100-1-2.

B. Provide rechargeable batteries with up to 35 transfers with a load of

200lbs (74kg) (for repositioning) a minimum of 17 transfers with its maximum load.

2.5 CHARGER

A. Charger

2.6 STRAPS AND SLING

A. The straps shall meet ISO 10535 guidelines. The straps shall ensure the patient’s safety by preventing the patient from falling out of the sling.

B. The sling shall meet ISO 10535 guidelines. The sling shall cradle the body of the patient. Bariatric slings shall be rated to a minimum of

750 lbs.

PART 3 - EXECUTION

11 73 00 - 5

3.1 INSTALLATION

A. Install ceiling mounted patient lift system as per manufacturer's instruction and under the supervision of manufacturer's qualified representative and as shown on drawings.

B. If the distance in between the suspended ceiling and anchors is more than 12” consult with manufacturer to determine if lateral braces will be required.

3.2 INSTRUCTION AND PERSONNEL TRAINING

A. Training shall be provided for the required personnel to educate them on proper operation and maintenance for the lift system equipment.

3.3 TEST

A. Conduct performance test, in the presence of the Resident Engineer (RE) and/or Inspector of Record (IOR), and a manufacturer's field representative, to show that the patient lift system equipment and control devices operate properly and in accordance with design, specification, and code requirements.

3.4 INSPECTION

A. Inspection of installed ceiling mounted patient lift systems shall be conducted in accordance with the manufacturer’s installation checklist and the VA installation checklist (Patient Safety Alert AL14-07) prior to use for patient movement.

B. Periodic Inspection shall be provided by the manufacturer on a yearly basis in compliance with ISO 10535.

---END---

11 73 00 - 6

---INTENTIONALLY BLANk---

File details come from the government source that posted it. Updated .