ATTACHMENT 18 - Telecom 3 of 6.pdf
PDF 18 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction West Palm Beach Federal contract opportunity
- Solicitation number
- 36C77623B0045
About this file
This attachment is related to solicitation number 36C77623B0045 from the Department of Veterans Affairs Technology Acquisition Center Austin for infrastructure upgrades at the West Palm Beach facility. The solicitation seeks a contractor to provide construction services for upgrades to the enterprise human resources management system infrastructure, including replacing servers, storage, and network equipment. Proposals are due by April 15, 2023, with the contract to be awarded by June 1, 2023. The period of performance is one year from the award date. The solicitation is unrestricted and open to small and large businesses.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JJ
HH
G8G8
GG
FF
EE
DD
C8C8
CC
BB
A8A8
8 9
9 9.2
9.2 9.8
9.8 10.4
10.4
11.2
11.2 11.8
11.8
12.2
12.2
1818.2
18.2
19.6
19.6
19.8
19.8
20.8
20.821.2
21.2 22
A6A6
AA
H4H4
B01-TN326
B01-TN327
TR 1-9A-225
TR 1-9B-227
AREA A
AREA B
AREA C
AREA D
ROUTE CABLING TO
TELECOM ROOM
TR 1-9A-225
ROUTE CABLING TO
TELECOM ROOM
TR 1-9B-227
1 2
18"x4" 18"x4"
"x
18"x4"
"x
"x
4"
"x
4"
18"x4"
18"x4"
"x
18"x4"
18"x4"
18"x4"
(4) SS44 (4) SS44
18"x4"18"x4"
(4) SS44
(4) SS44
(4) SS44
(4) SS44
LEGEND
DELINIATATION LINE BETWEEN
TELECOM ROOMS. ROUTE THE CABLING
FOR ALL SYSTEMS TO THE TELECOM
ROOMS SHOWN ON THE DRAWINGS
BASED ON THIS SEPARATION LINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
6 South Old Orchard Ave, Saint Louis, MO 63119 T: 800.404.7677 www.introba.com
B
IM
/2
V
A W e s t P a lm
B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.T
R
.r v t
/2
/2
:1
:5
A
M
B01-TN190
NINTH LEVEL OVERALL PLAN -
TELECOM
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
03/31/23 PR TL
B01
1" = 20'-0"1
NINTH LEVEL OVERALL PLAN - TELECOM
PLAN NORTH
20 20 40
1" = 20'-0"
FEETSCALE
KEYED NOTES:#
1. PROVIDE (2) 4" CONDUITS FROM TR 1-8A-222 TO TR
1-9A-225 FOR B-SIDE VERTICAL BACKBONE CABLING.
2. PROVIDE (2) 4" CONDUITS FROM TR 1-8B-245 TO TR
1-9B-227 FOR A-SIDE VERTICAL BACKBONE CABLING.
GENERAL NOTES:
1. CONTRACTOR SHALL COORDINATE THE EQUIPMENT'S
INSTALLATION AND FINAL LOCATION WITH THE ELECTRICAL
AND MECHANICAL DIVISION. REFER TO ELECTRICAL,
MECHANICAL AND PLUMBING DRAWINGS.
2. CONTRACTOR SHALL INSTALL PATHWAY DIVIDERS, RADIUS
DROP, AND ANY OTHER FITTING FOR A PROPER CABLE
RUNWAY INSTALLATION.
3. CONTRACTOR SHALL COORDINATE THE HILTI SPEED
SLEEVE LOCATIONS WITH THE PATHWAY SYSTEM LAYOUT
OUTSIDE EACH TELECOM ROOM. REFER TO FLOOR PLAN
DRAWINGS.
4. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES
AND CONDUITS OF THE SIZE AS INDICATED ON THE PLANS.
REFER TO SECTION 27 10 00 STRUCTURED CABLING AND
SECTION 27 05 33 CONDUITS AND BOXES FOR
COMMUNICATIONS SYSTEMS.
5. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE
CORE DRILLING. CONTRACTOR SHALL COORDINATE WITH
THE COR BEFORE BEGINNING DRILLING.
6. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY
SPARE RISER SLEEVES. REFER TO SECTION 07 84 00
FIRESTOPPING.
7. GOVERNMENT EQUIPMENT WILL BE RELOCATED BY
GOVERNMENT IT PERSONNEL. CONTRACTOR WILL HAVE
TECHNICIANS AVAILABLE TO PROVIDE SUPPORT DURING
OUTAGES AND CUT-OVERS. COORDINATE WORK WITH
THE COR.
8. CONTRACTOR SHALL PROVIDE MTP, FIBER OPTIC TRUNK
CABLES FOR SIDE A AND SIDE B BACKBONE FROM THE
DATA CENTER TO EACH TELECOMMUNICATIONS ROOM.
COORDINATE WITH COR.
9. CONTRACTOR SHALL PROVIDE FIBER OPTIC PATCH
CABLES FOR SIDE A AND SIDE B FROM THE FIBER OPTIC
DISTRIBUTOR TO EQUIPMENT CABINETS. COORDINATE
WITH COR.
10. CONTRACTOR SHALL VERIFY FIBER OPTIC CABLES
MEASUREMENTS PRIOR TO ORDERING. COORDINATE WITH
COR.
11. PATHWAY SHOWN IN HALFTONE IS EXISTING AND SHALL
REMAIN IN PLACE. ROUTE NEW FIBER OPTIC BACKBONE
CABLING THROUGH EXISTING INFRASTRUCTURE AS
NOTED.
Revisions: Date:
G8G8
GG
FF
EE
DD
C8C8
8 9
9 9.2
9.2 9.8
9.82
H4H4
GW
GW
GW
EX
CAM
CAM
CAM
CAM
GWGW
5 5
1 1
1 1
1 1
1 1
1 1
1 1 1
1 1
EXAM
9A-320
EXAM
9A-322
EXAM
9A-324
EXAM
9A-328
OFFICE
9A-326
EXAM
9A-330
EXAM
9A-332
EXAM
9A-334
OFFICE
9A-336
OFFICE
9A-338
EXAM
9A-340
EXAM
9A-342
EXAM
9A-344
EXAM
9A-346
OFFICE
9A-348
OFFICE
9A-350
EXAM
9A-352
EXAM
9A-354
STAFF LOCKERS
9A-356
STAFF TOILET
9A-356A
STAFF LOUNGE / BREAK
9A-356B
STAIR #4
STAIR
STORAGE / SUPPLY
9A-312
PACT SOCIAL WORKER
9A-314
SUPPLY
9A-316
EMS
9A-318
MECHANICAL
9A-304A
EXAM
9A-113
EXAM
9A-115
EXAM
9A-117
OFFICE
9A-119
OFFICE
9A-121
EXAM
9A-123
EXAM
9A-125
EXAM
9A-127
EXAM
9A-129
OFFICE
9A-131
OFFICE
9A-133
EXAM
9A-135
EXAM
9A-137
EXAM
9A-139
EXAM
9A-141
OFFICE
9A-143
OFFICE
9A-145
EXAM
9A-147
EXAM
9A-149
ASSOC. CHIEF
9A-151
OFFICE
9A-153
CHIEF PRIMARY CARE
9A-155
ADMIN. OFFICE
9A-165
OFFICE
9A-163
OFFICE
9A-161
CORRIDOR
9A-C1C
CORRIDOR
9A-C1D
CORRIDOR
9A-C1E
CORRIDOR
9A-C1F
CORR.
9A-C1
ALCOVE
9A-234
WAITING
9A-202
CORRIDOR
9A-C7
ROOM
9A-C7A
ROOM
9A-C7B
ROOM
9A-C7C
PATIENT TOILET
9A-203
TELCOM.
9A-204
EQUIP. ALCOVE
9A-205
PATIENT TOILET
9A-206
DIETICIAN
9A-207
OFFICE
9A-208
NUTRITIONIST
9A-209
OFFICE
9A-211
ALCOVE
9A-212
OFFICE
9A-213
OFFICE
9A-214
OFFICE
9A-215
OFFICE
9A-216
OFFICE
9A-217
STAFF TOILET
9A-218
VITALS
9A-219
EKG
9A-220
MEDICATION
9A-221
WOMEN TOILET
9A-222
MEN TOILET
9A-223
SUPPLIES
9A-224
TR
9A-225
SOILED TOILET
9A-226
ELECT.
9A-227
OFFICE
9A-228
OFFICE
9A-229
OFFICE
9A-231EXAM
9A-233
PATIENT TOILET
9A-220A
PATIENT TOILET
9A-220B
RECEPTION
9A-210
CLOSET
9A-208A
CLOSET
9A-211A
CORR.
9A-C2
UNISEX TOILET
9B-200
STAIR #5
STAIR
EXISTING SOILED SERVICE LOBBY
9B-302
EXISTING SOILED LINEN CHUTE
9B-302A
ELECTRICAL
9B-302B
TEL.
9B-302C
ELEV.
S-5
ELEV.
S-4
B01-TN326
KEY PLAN
AREA A
PLAN NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
6 South Old Orchard Ave, Saint Louis, MO 63119 T: 800.404.7677 www.introba.com
B
IM
/2
V
A W e s t P a lm
B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.T
R
.r v t
/2
/2
:2
:0
A
M
B01-TN190A
NINTH LEVEL FLOOR PLAN - AREA
A - TELECOM
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
03/31/23 PR TL
B01
1/8" = 1'-0"1
NINTH LEVEL FLOOR PLAN - AREA A - TELECOM
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED ON SITE
VISITS, REFER TO AS BUILTS FOR DATA DEVICE LAYOUTS.
3. DATA OUTLET RELOCATED FROM DEMOLISHED WALL IN
NEW TR.
KEYED NOTES:#
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES AND
CONDUITS OF THE SIZE AS INDICATED ON THE PLANS. REFER
TO SECTION 27 10 00 STRUCTURED CABLING AND SECTION 27
05 33 CONDUITS AND BOXES FOR COMMUNICATIONS
SYSTEMS.
3. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR
BEFORE BEGINNING DRILLING.
4. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY
SPARE RISER SLEEVES. REFER TO SECTION 07 84 00
FIRESTOPPING.
5. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE
CABLE TRAY ON THE WALL ABOVE THE VERTICAL RISER
SLEEVES FOR BACKBONE CABLE SUPPORT AS INDICATED ON
THE PLANS. THE CABLE TRAY SHALL BE SECURELY
ANCHORED TO THE WALL SUFFICIENT TO SUPPORT THE
TOTAL WEIGHT OF CABLES AND CABLE TRAY PLUS 50%.
6. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT
TO SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL
CABLE TRAY WITHOUT DAMAGING OR DEFORMING THE CABLE.
7. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS
NO CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS
OTHERWISE NOTED.
8. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH
PANELS IN THE TELECOMMUNICATION ROOM AS INDICATED ON
RACK ELEVATIONS.
9. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING
REMOVED FROM ANY WALL MOUNT EQUIPMENT UNLESS
OTHERWISE NOTED. TESTING SHALL BE PERFORMED BY THE
CONTRACTOR DURING COMMISSIONING.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED.
EXISTING COMMUNICATION OUTLET BOXES AND CONDUITS TO
BE REUSED.
11. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
12. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES
WITH NEW CATEGORY MODULAR JACKS TO MATCH THE
COMMUNICATION CABLE PERFORMANCE SPECIFICATIONS.
NEW MODULAR JACKS SHALL BE OF THE SAME
MANUFACTURER AS THE FACE PLATES, PATCH PANELS, AND
PATCH CABLES.
13. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES
AND CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
14. CONTRACTOR SHALL TEST ALL NEW AND EXISTING RE-
TERMINATED CABLES IN ACCORDANCE WITH THE
SPECIFICATION 27 05 11.
GENERAL NOTES:
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
C8C8
CC
BB
A8A8
8 9
9 9.2
9.2 9.8
9.82
A6A6
AA
GW
CAM
ROOM
9A-101
CLINICAL NURSE COORD.
9A-105
OFFICE
9A-103
NURSE MANAGER
9A-107
CHIEF NURSE
9A-109
OFFICE
9A-111
EXAM
9A-113
EXAM
9A-115
EXAM
9A-117
OFFICE
9A-119
OFFICE
9A-121
EXAM
9A-123
OFFICE
9A-131
STAIR #2
STAIR
CORRIDOR
9A-C1B
CORRIDOR
9A-C1C
CORR.
9A-C1
RECEPTION
9A-210
UNISEX TOILET
9B-200
EXISTING ELEV.
P-1
EXISTING ELEV.
P-2
EXISTING ELEV.
P-3
KEY PLAN
AREA A
PLAN NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
6 South Old Orchard Ave, Saint Louis, MO 63119 T: 800.404.7677 www.introba.com
B
IM
/2
V
A W e s t P a lm
B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.T
R
.r v t
/2
/2
:2
:1
A
M
B01-TN190B
NINTH LEVEL FLOOR PLAN - AREA
B - TELECOM
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
03/31/23 PR TL
B01
1/8" = 1'-0"1
NINTH LEVEL FLOOR PLAN - AREA B - TELECOM
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED ON SITE
VISITS, REFER TO AS BUILTS FOR DATA DEVICE LAYOUTS.
3. DATA OUTLET RELOCATED FROM DEMOLISHED WALL IN
NEW TR.
KEYED NOTES:#
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES AND
CONDUITS OF THE SIZE AS INDICATED ON THE PLANS. REFER
TO SECTION 27 10 00 STRUCTURED CABLING AND SECTION 27
05 33 CONDUITS AND BOXES FOR COMMUNICATIONS
SYSTEMS.
3. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR
BEFORE BEGINNING DRILLING.
4. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY
SPARE RISER SLEEVES. REFER TO SECTION 07 84 00
FIRESTOPPING.
5. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE
CABLE TRAY ON THE WALL ABOVE THE VERTICAL RISER
SLEEVES FOR BACKBONE CABLE SUPPORT AS INDICATED ON
THE PLANS. THE CABLE TRAY SHALL BE SECURELY
ANCHORED TO THE WALL SUFFICIENT TO SUPPORT THE
TOTAL WEIGHT OF CABLES AND CABLE TRAY PLUS 50%.
6. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT
TO SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL
CABLE TRAY WITHOUT DAMAGING OR DEFORMING THE CABLE.
7. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS
NO CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS
OTHERWISE NOTED.
8. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH
PANELS IN THE TELECOMMUNICATION ROOM AS INDICATED ON
RACK ELEVATIONS.
9. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING
REMOVED FROM ANY WALL MOUNT EQUIPMENT UNLESS
OTHERWISE NOTED. TESTING SHALL BE PERFORMED BY THE
CONTRACTOR DURING COMMISSIONING.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED.
EXISTING COMMUNICATION OUTLET BOXES AND CONDUITS TO
BE REUSED.
11. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
12. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES
WITH NEW CATEGORY MODULAR JACKS TO MATCH THE
COMMUNICATION CABLE PERFORMANCE SPECIFICATIONS.
NEW MODULAR JACKS SHALL BE OF THE SAME
MANUFACTURER AS THE FACE PLATES, PATCH PANELS, AND
PATCH CABLES.
13. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES
AND CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
14. CONTRACTOR SHALL TEST ALL NEW AND EXISTING RE-
TERMINATED CABLES IN ACCORDANCE WITH THE
SPECIFICATION 27 05 11.
GENERAL NOTES:
5 5 10 15 20
1/8" = 1'-0"
G8G8
GG
FF
EE
DD
C8C8
9.8
9.8 10.4
10.4
11.2
11.2 11.8
11.8
12.2
12.2
18 18.2
18.2
H4H4
CAM
CAM
CAM
CAM
CAM
CAM
GW
GW
GW
GW
EX
EX
5 5
5 5 5
1 1 1
1 1
1 1
1 1
1 1
1 1
UNISEX TOILET
9B-200
UNISEX TOILET
9B-202
FEMALE H.C. TOILET
9B-206
MALE H.C. TOILET
9B-204
CORRIDOR
9B-C7
EXISTING SOILED SERVICE LOBBY
9B-302
TEL.
9B-302C
CLEAN SERVICE LOBBY
9B-304
ELEVATOR SERVICE LOBBY
9B-306
EXISTING ELEV.
S-1
EXISTING ELEV.
S-2
EXISTING ELEV.
S-3
ELEV.
S-5
ELEV.
S-4
LIFT
MECHANICAL
9B-304A
STORAGE SUPPLY
9B-312
OFFICE PSYCHOLOGIST STORAGE
9B-314
EXISTING HAC
9B-316
EXAM
9B-320
EXAM
9B-322
OFFICE
9B-324
OFFICE
9B-326
EXAM
9B-328
EXAM
9B-330
EXAM
9B-332
EXAM
9B-334
OFFICE
9B-336
OFFICE
9B-338
EXAM
9B-340
EXAM
9B-342
EXAM
9B-344
EXAM
9B-346
OFFICE
9B-348
OFFICE
9B-350
EXAM
9B-352
EXAM
9B-354
STAFF LOCKERS
9B-356
STAFF LOUNGE / BREAK
9B-356B
STAFF TOILET
9B-356A
STAIR #6
STAIR
CORR.
9B-C7C
CORR.
9B-C7B
CORR.
9B-C7A
EXAM
9B-111
E.K.G. ROOM
9B-113
EXAM
9B-115
EXAM
9B-117
OFFICE
9B-119
OFFICE
9B-121
PACT SOCIAL WORKER
9B-123
EXAM
9B-125
EXAM
9B-127
EXAM
9B-129
OFFICE
9B-131
OFFICE
9B-133
EXAM
9B-135
EXAM
9B-137
EXAM
9B-139
EXAM
9B-141
OFFICE
9B-143
EXAM
9B-145
EXAM
9B-147
EXAM
9B-149
EXAM ROOM
9B-151
PRIMARY CARE EXAM
9B-153
PRIMARY CARE
9B-155
PRIMARY CARE EXAM
9B-157
OFFICE
9B-159
OFFICE
9B-161
EQUIP. ROOM
9B-163
NURSE MANAGER
9B-165
CORRIDOR
9B-C1B
CORRIDOR
9B-C1C
CORRIDOR
9B-C1D
CORRIDOR
9B-C1E
RECEPTION
9B-211
OFFICE
9B-212
NUTRITIONIST
9B-213
ALCOVE
9B-214
EXAM
9B-215
EXAM
9B-216
EXAM
9B-217
EXAM
9B-218
EXAM
9B-219
STAFF TOILET
9B-220
VITAL SIGNS STATION
9B-221
PROCEDURE ROOM
9B-222
MEDICATION
9B-223
PATIENT TOILET
9B-224
PATIENT TOILET
9B-225
SUPPLIES
9B-226
TR
9B-227
SOILED UTILITY
9B-228
ELECT.
9B-229
OFFICE
9B-230
OFFICE
9B-231
OFFICE
9B-233
EXAM
9B-235
ALCOVE
9B-236
WAITING
9B-201
PATIENT TOILET
9B-203
TELCOM.
9B-205
EQUIP. ALCOVE
9B-207
PATIENT TOILET
9B-208
SOCIAL WORKER
9B-209
OFFICE
9B-210
CLOSET
9B-210A
STORAGE
9B-212A
CORR.
9B-C2
PATIENT TOILET
9B-222A
PATIENT TOILET
9B-222B
CORRIDOR
9B-C7
B01-TN327
STORAGE
9B-304B
MECH.
9B-304C
KEY PLAN
AREA C
PLAN NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
6 South Old Orchard Ave, Saint Louis, MO 63119 T: 800.404.7677 www.introba.com
B
IM
/2
V
A W e s t P a lm
B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.T
R
.r v t
/2
/2
:2
:2
A
M
B01-TN190C
NINTH LEVEL FLOOR PLAN - AREA
C - TELECOM
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
03/31/23 PR TL
B01
1/8" = 1'-0"1
NINTH LEVEL FLOOR PLAN - AREA C - TELECOM
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED ON SITE
VISITS, REFER TO AS BUILTS FOR DATA DEVICE LAYOUTS.
3. DATA OUTLET RELOCATED FROM DEMOLISHED WALL IN
NEW TR.
KEYED NOTES:#
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES AND
CONDUITS OF THE SIZE AS INDICATED ON THE PLANS. REFER
TO SECTION 27 10 00 STRUCTURED CABLING AND SECTION 27
05 33 CONDUITS AND BOXES FOR COMMUNICATIONS
SYSTEMS.
3. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR
BEFORE BEGINNING DRILLING.
4. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY
SPARE RISER SLEEVES. REFER TO SECTION 07 84 00
FIRESTOPPING.
5. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE
CABLE TRAY ON THE WALL ABOVE THE VERTICAL RISER
SLEEVES FOR BACKBONE CABLE SUPPORT AS INDICATED ON
THE PLANS. THE CABLE TRAY SHALL BE SECURELY
ANCHORED TO THE WALL SUFFICIENT TO SUPPORT THE
TOTAL WEIGHT OF CABLES AND CABLE TRAY PLUS 50%.
6. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT
TO SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL
CABLE TRAY WITHOUT DAMAGING OR DEFORMING THE CABLE.
7. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS
NO CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS
OTHERWISE NOTED.
8. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH
PANELS IN THE TELECOMMUNICATION ROOM AS INDICATED ON
RACK ELEVATIONS.
9. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING
REMOVED FROM ANY WALL MOUNT EQUIPMENT UNLESS
OTHERWISE NOTED. TESTING SHALL BE PERFORMED BY THE
CONTRACTOR DURING COMMISSIONING.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED.
EXISTING COMMUNICATION OUTLET BOXES AND CONDUITS TO
BE REUSED.
11. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
12. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES
WITH NEW CATEGORY MODULAR JACKS TO MATCH THE
COMMUNICATION CABLE PERFORMANCE SPECIFICATIONS.
NEW MODULAR JACKS SHALL BE OF THE SAME
MANUFACTURER AS THE FACE PLATES, PATCH PANELS, AND
PATCH CABLES.
13. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES
AND CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
14. CONTRACTOR SHALL TEST ALL NEW AND EXISTING RE-
TERMINATED CABLES IN ACCORDANCE WITH THE
SPECIFICATION 27 05 11.
GENERAL NOTES:
5 5 10 15 20
1/8" = 1'-0"
C8C8
CC
BB
A8A8
9.8
9.8 10.4
10.4
11.2
11.2 11.8
11.8
12.2
12.2
18 18.2
18.2
A6A6
AA
GW
CAM
CAM
CAM
EX
2 2
EXISTING CORRIDOR
9B-C1
UNISEX TOILET
9B-200
UNISEX TOILET
9B-202
FEMALE H.C. TOILET
9B-206
MALE H.C. TOILET
9B-204
EXISTING ELEV.
P-1
EXISTING ELEV.
P-2
EXISTING ELEV.
P-3
EXISTING ELEV.
P-4
EXISTING ELEV.
P-5
STAIR #1
STAIR
CONFERENCE
9B-101
LIFT
OFFICE
9B-103
OFFICE
9B-105
OFFICE
9B-107
OFFICE
9B-109
EXAM
9B-111
E.K.G. ROOM
9B-113
EXAM
9B-115
EXAM
9B-117
OFFICE
9B-119
OFFICE
9B-121
PACT SOCIAL WORKER
9B-123
OFFICE
9B-131
CORRIDOR
9B-C1A
CORRIDOR
9B-C1B
RECEPTION
9B-211
KEY PLAN
AREA D
PLAN NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
6 South Old Orchard Ave, Saint Louis, MO 63119 T: 800.404.7677 www.introba.com
B
IM
/2
V
A W e s t P a lm
B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.T
R
.r v t
/2
/2
:2
:3
A
M
B01-TN190D
NINTH LEVEL FLOOR PLAN - AREA
D - TELECOM
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
03/31/23 PR TL
B01
1/8" = 1'-0"1
NINTH LEVEL FLOOR PLAN - AREA D - TELECOM
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED ON SITE
VISITS, REFER TO AS BUILTS FOR DATA DEVICE LAYOUTS.
3. DATA OUTLET RELOCATED FROM DEMOLISHED WALL IN
NEW TR.
KEYED NOTES:#
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES AND
CONDUITS OF THE SIZE AS INDICATED ON THE PLANS. REFER
TO SECTION 27 10 00 STRUCTURED CABLING AND SECTION 27
05 33 CONDUITS AND BOXES FOR COMMUNICATIONS
SYSTEMS.
3. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR
BEFORE BEGINNING DRILLING.
4. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY
SPARE RISER SLEEVES. REFER TO SECTION 07 84 00
FIRESTOPPING.
5. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE
CABLE TRAY ON THE WALL ABOVE THE VERTICAL RISER
SLEEVES FOR BACKBONE CABLE SUPPORT AS INDICATED ON
THE PLANS. THE CABLE TRAY SHALL BE SECURELY
ANCHORED TO THE WALL SUFFICIENT TO SUPPORT THE
TOTAL WEIGHT OF CABLES AND CABLE TRAY PLUS 50%.
6. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT
TO SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL
CABLE TRAY WITHOUT DAMAGING OR DEFORMING THE CABLE.
7. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS
NO CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS
OTHERWISE NOTED.
8. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH
PANELS IN THE TELECOMMUNICATION ROOM AS INDICATED ON
RACK ELEVATIONS.
9. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING
REMOVED FROM ANY WALL MOUNT EQUIPMENT UNLESS
OTHERWISE NOTED. TESTING SHALL BE PERFORMED BY THE
CONTRACTOR DURING COMMISSIONING.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED.
EXISTING COMMUNICATION OUTLET BOXES AND CONDUITS TO
BE REUSED.
11. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
12. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES
WITH NEW CATEGORY MODULAR JACKS TO MATCH THE
COMMUNICATION CABLE PERFORMANCE SPECIFICATIONS.
NEW MODULAR JACKS SHALL BE OF THE SAME
MANUFACTURER AS THE FACE PLATES, PATCH PANELS, AND
PATCH CABLES.
13. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES
AND CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
14. CONTRACTOR SHALL TEST ALL NEW AND EXISTING RE-
TERMINATED CABLES IN ACCORDANCE WITH THE
SPECIFICATION 27 05 11.
GENERAL NOTES:
5 5 10 15 20
1/8" = 1'-0"
G8G8
GG
FF
EE
DD
C8C8
CC
BB
A8A8
8 9
9 9.2
9.2 9.8
9.8 10.4
10.4
11.2
11.2 11.8
11.8
12.2
12.2
1818.2
18.2
19.6
19.6
19.8
19.8
20.8
20.821.2
21.2 22
A6A6
AA
H4H4
1 1
TR 1-9A-225 TR 1-9B-227
"x
"x
"x
"x
"x
"x
4"x4"
4"x4"
4"x4"
4"x4"
4"x4"
4"x4" 4"x4"
4"x4"
"x
"x
"x
"x
"x
"x
4"x4"
4"x4"
4"x4"
4"x4"
4"x4"
4"x4"
4"x4"
4"x4"
4"x4"
4"x4"
"x
"x
4"x4"
4"x4" 4"x4"
4"x4" 4 "x
"x
4"x4"
4"x4"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
6 South Old Orchard Ave, Saint Louis, MO 63119 T: 800.404.7677 www.introba.com
B
IM
/2
V
A W e s t P a lm
B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.T
R
.r v t
/2
/2
:2
:2
A
M
B01-TN195
NINTH INT LEVEL OVERALL PLAN -
TELECOM
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
03/31/23 PR TL
B01
1" = 20'-0"1
NINTH INT LEVEL OVERALL PLAN - TELECOM
KEYED NOTES:#
1. EXISTING INTERSTITIAL CABLE TRAY
2. PROVIDE (1) 2" CONDUIT FROM EXISTING INTERSTITIAL
CABLE TRAY TO TR ON LEVEL BELOW FOR A-SIDE
BACKBONE PATHWAY.
3. PROVIDE (1) 2" CONDUIT FROM EXISTING INTERSTITIAL
CABLE TRAY TO TR ON LEVEL BELOW FOR B-SIDE
BACKBONE PATHWAY.
4. PROVIDE (1) 2" CONDUIT BETWEEN EXISTING
INTERSTITIAL CABLE TRAYS
PLAN NORTH
20 20 40
1" = 20'-0"
FEETSCALE
GENERAL NOTES:
7. GOVERNMENT EQUIPMENT WILL BE RELOCATED BY
GOVERNMENT IT PERSONNEL. CONTRACTOR WILL HAVE
TECHNICIANS AVAILABLE TO PROVIDE SUPPORT DURING
OUTAGES AND CUT-OVERS. COORDINATE WORK WITH
THE COR.
8. CONTRACTOR SHALL PROVIDE MTP, FIBER OPTIC TRUNK
CABLES FOR SIDE A AND SIDE B BACKBONE FROM THE
DATA CENTER TO EACH TELECOMMUNICATIONS ROOM.
COORDINATE WITH COR.
9. CONTRACTOR SHALL PROVIDE FIBER OPTIC PATCH
CABLES FOR SIDE A AND SIDE B FROM THE FIBER OPTIC
DISTRIBUTOR TO EQUIPMENT CABINETS. COORDINATE
WITH COR.
10. CONTRACTOR SHALL VERIFY FIBER OPTIC CABLES
MEASUREMENTS PRIOR TO ORDERING. COORDINATE WITH
COR.
11. PATHWAY SHOWN IN HALFTONE IS EXISTING AND SHALL
REMAIN IN PLACE. ROUTE NEW FIBER OPTIC BACKBONE
CABLING THROUGH EXISTING INFRASTRUCTURE AS
NOTED.
1. CONTRACTOR SHALL COORDINATE THE EQUIPMENT'S
INSTALLATION AND FINAL LOCATION WITH THE ELECTRICAL
AND MECHANICAL DIVISION. REFER TO ELECTRICAL,
MECHANICAL AND PLUMBING DRAWINGS.
2. CONTRACTOR SHALL INSTALL PATHWAY DIVIDERS, RADIUS
DROP, AND ANY OTHER FITTING FOR A PROPER CABLE
RUNWAY INSTALLATION.
3. CONTRACTOR SHALL COORDINATE THE HILTI SPEED
SLEEVE LOCATIONS WITH THE PATHWAY SYSTEM LAYOUT
OUTSIDE EACH TELECOM ROOM. REFER TO FLOOR PLAN
DRAWINGS.
4. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES
AND CONDUITS OF THE SIZE AS INDICATED ON THE PLANS.
REFER TO SECTION 27 10 00 STRUCTURED CABLING AND
SECTION 27 05 33 CONDUITS AND BOXES FOR
COMMUNICATIONS SYSTEMS.
5. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE
CORE DRILLING. CONTRACTOR SHALL COORDINATE WITH
THE COR BEFORE BEGINNING DRILLING.
6. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY
SPARE RISER SLEEVES. REFER TO SECTION 07 84 00
FIRESTOPPING.
14-122 NEW TR 14 1 3 1 2 1 --
16-M100 EXISTING TR 16 MEZZANINE 9 2 5 2 --
19-1H-103 EXISTING TR 19 1 4 1 2 1 --
22-154 EXISTING TR 22 1 8 1 4 2 --
TOTALS: 345 60 187 64 5
1-1C-140 NEW TR 1 1 13 2 7 2 --
1-2A-281 NEW TR 1 2 14 2 8 3 --
1-2B-205 NEW TR 1 2 23 2 12 4 --
1-2C-112 NEW TR 1 2 15 2 9 3 --
1-3A-320 NEW TR 1 3 12 2 6 2 --
1-3B-139A NEW TR 1 3 16 3 8 3 --
1-9B-227 NEW TR 1 9 11 2 6 2 --
1-BA-216 NEW TR 1 BASEMENT 18 3 9 3 --
1-BB-221 NEW TR 1 BASEMENT 13 2 7 2 --
1-BC-216 NEW TR 1 BASEMENT 8 1 4 2 --
1-BC-250 NEW TR 1 BASEMENT 13 2 7 2 --
1-6B-234 EXISTING TR 1 6 7 1 4 1 --
1-7A-235 EXISTING TR 1 7 6 1 3 1 --
1-7B-234 EXISTING TR 1 7 6 1 3 1 --
1-8A-222 NEW TR 1 8 11 2 6 2 --
1-8B-245 EXISTING TR 1 8 10 2 6 2 --
1-9A-225 NEW TR 1 9 9 1 5 2 --
1-4A-322 NEW TR 1 4 7 1 4 1 --
1-4B-252 NEW TR 1 4 15 2 9 3 --
1-4C-234 NEW TR 1 4 7 2 4 2 --
1-5A-235 EXISTING TR 1 5 6 1 3 1 --
1-5B-234 EXISTING TR 1 5 6 1 3 1 --
1-6A-235 EXISTING TR 1 6 6 2 3 1 --
3-1K-124D NEW TR 3 1 20 6 10 3 --
4-119 NEW TE 4 1 1 1 1 -- 1
6-222 EXISTING TE 6 1 1 1 1 -- 1
7-12 NEW TE 7 1 1 1 1 -- 1
10-2 NEW TR 10 1 2 1 1 1 --
12-12 NEW TR 12 1 4 1 2 1 --
TR EQUIPMENT SCHEDULE
ROOM # ROOM TYPE
BUILDING
MIN
PATCH
PANELS
MIN
VOICE
PATCH
PANEL
MIN
NETWORK
SWITCHES
REC
RACKS
REC
TEs
NUMBER LEVEL
1-1A-148 NEW TR 1 1 21 2 12 4 --
1-1B-238 NEW TR 1 1 17 2 9 3 --
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
6 South Old Orchard Ave, Saint Louis, MO 63119 T: 800.404.7677 www.introba.com
B
IM
/2
V
A W e s t P a lm
B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.T
R
.r v t
/2
/2
:2
:4
A
M
B01-TN300
TELECOMMUNICATIONS DATA
DEVICE SCHEDULE
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
03/31/23 PR TL
B01
TOTAL WAO/DATA DEVICES BY TR - BUILDING 01
TR ROOM LEVEL
# OF WAO
PORTS
ACTIVE DATA
WAO PORTS
ACTIVE VOICE
WAO PORTS
TR 1-1A-148 Level 1 986 249 57
TR 1-1B-238 Level 1 819 281 96
TR 1-1C-140 Level 1 604 125 70
TR 1-2A-281 Level 2 646 137 52
TR 1-2B-205 Level 2 1057 260 69
TR 1-2C-112 Level 2 695 218 96
TR 1-3A-320 Level 3 552 180 92
TR 1-3B-139A Level 3 739 187 130
TR 1-4A-324 Level 4 297 99 37
TR 1-4B-252 Level 4 689 163 79
TR 1-4C-234 Level 4 313 93 55
TR 1-5A-235 Level 5 264 29 19
TR 1-5B-234 Level 5 246 66 43
TR 1-6A-235 Level 6 258 80 56
TR 1-6B-234 Level 6 293 63 30
TR 1-7A-235 Level 7 253 80 14
TR 1-7B-234 Level 7 271 50 35
TR 1-8A-222 Level 8 503 125 91
TR 1-8B-245 Level 8 441 88 75
TR 1-9A-225 Level 9 432 73 48
TR 1-9B-227 Level 9 487 109 85
TR 1-BA-216 B15 Level 1 329 107 45
TR 1-BA-216 Basement 437 119 83
TR 1-BB-221 Basement 621 228 65
TR 1-BC-216 Basement 348 142 31
TR 1-BC-250 Basement 594 168 87
Grand total: 4617 13174 3519 1640
GENERAL NOTES:
1. CONTRACTOR SHALL COORDINATE THE EQUIPMENT'S INSTALLATION AND FINAL
LOCATION WITH THE ELECTRICAL AND MECHANICAL DIVISION. REFER TO ELECTRICAL,
MECHANICAL AND PLUMBING DRAWINGS.
2. CONTRACTOR SHALL INSTALL PATHWAY DIVIDERS, RADIUS DROP, AND ANY OTHER
FITTING FOR A PROPER CABLE RUNWAY INSTALLATION.
3. CONTRACTOR SHALL COORDINATE THE HILTI SPEED SLEEVE LOCATIONS WITH THE
PATHWAY SYSTEM LAYOUT OUTSIDE EACH TELECOM ROOM. REFER TO FLOOR PLAN
DRAWINGS.
4. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES AND CONDUITS OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 10 00 STRUCTURED
CABLING AND SECTION 27 05 33 CONDUITS AND BOXES FOR COMMUNICATIONS
SYSTEMS.
5. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE DRILLING.
CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE BEGINNING DRILLING.
6. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE RISER SLEEVES.
REFER TO SECTION 07 84 00 FIRESTOPPING.
7. GOVERNMENT EQUIPMENT WILL BE RELOCATED BY GOVERNMENT IT PERSONNEL.
CONTRACTOR WILL HAVE TECHNICIANS AVAILABLE TO PROVIDE SUPPORT DURING
OUTAGES AND CUT-OVERS. COORDINATE WORK WITH THE COR.
8. QUANTITIES OF ACTIVE DEVICES SHOWN IN THE SCHEDULE ARE BASED ON DEVICES
TERMINATED IN THE EXISTING WAO FACEPLATES. THE QUANTITY OF PATCH PANELS
SHOWN IN RACK ELEVATIONS IS BASED ON TOTAL NUMBER OF WAOs/DATA CABLES
PER TR AS SHOWN IN SCHEDULE. THE QUANTITY OF SWITCHES SHOWN IN RACK
ELEVATIONS IS BASED ON STANDARD 50% ACTIVE/PASSIVE RATIO WAO CALCULATION.
9. CONTRACTOR TO FIELD VERIFY DATA OUTLETS QUANTITIES IN FIELD PRIOR TO
INITIATING WORK. QUANTITIES OF WAO DEVICES AND WAO DEVICE CABLING IN FIELD
MAY VARY FROM DESIGN DRAWINGS. ANY VA OIT NETWORK WAO DEVICES NOT
SHOWN ON DRAWINGS SHOULD BE INCLUDED IN SCOPE OF THIS PROJECT UP TO A
QUANTITY OF 10% ADDITIONAL WAO DEVICES AND WAO DEVICE CABLING.
TR 1-BA-216 - TOTAL WAO/DATA DEVICES
TR ROOM LEVEL
# OF WAO
PORTS
ACTIVE DATA
WAO PORTS
ACTIVE VOICE
WAO PORTS
TR 1-BA-216 B15 Level 1 329 107 45
TR 1-BA-216 Basement 437 119 83
766 226 128
1. THIS TR SERVES BASEMENT LEVEL OF BUILDING 1 AND LEVEL 1 OF BUILDING 15.
KEYED NOTES:#
GROUP AA
B
GROUP B GROUP A GROUP B
LEG 1 LEG 2 LEG 1 LEG 2
OX
OZ
OY OZ OZ
OZOY
OY OYOX OX
OX
GROUP A GROUP B
LEG 1 LEG 2
OZ
OZ
OY OYOX
OX
C B
C
B
C B
C B
C
B
C B
C B
C
B
C B
C B
C
B
C B
C B
C
B
C B
C B
C
B
C B
EE
(2) SS24
(4) SS44
SBB
R A
C K
R
A C
K
R A
C K
13' - 3"
ELEC.
PANEL
ELEC.
PANEL
ACS PANEL
/4
/2
/4
13' - 3"
/2
/2
TR
BA-216
/2
B01-TN3013B01-TN301 21
"x
18"x4"
"x
18"x4"
"x
RACK 1 RACK 2 RACK 3
10 10 10 10
19 20
RACK 1RACK 2RACK 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
6 South Old Orchard Ave, Saint Louis, MO 63119 T: 800.404.7677 www.introba.com
B
IM
/2
V
A W e s t P a lm
B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.T
R
.r v t
/2
/2
:0
:4
A
M
B01-TN301
ENLARGED TELECOM PLANS -
1-BA-216
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
03/31/23 PR TL
B01
1/2" = 1'-0"1
BASEMENT LEVEL ENLARGED PLAN - 1-BA-216
1. HORIZONTAL CABLE MANAGER, SINGLE SIDED, 1 RU.
2. HORIZONTAL CABLE MANAGER, SINGLE SIDED, 2 RU.
3. PATCH PANEL, 48 PORT, 1 RU
4. ETHERNET SWITCH (GFGI)
5. FIBER OPTIC ENCLOSURE WITH DUPLEX-LC, MPO CASSETTES, 1 RU
6. SPACE RESERVED FOR RACK MOUNTED POWER EQUIPMENT.
7. ZONE PDU
8. PROVIDE A LOADED 48-PORT PATCH PANEL. PROVIDE 50-PAIR CAT3 CABLE FROM THE
CLOSEST SIGNALS CLOSET AND TERMINATE TO THIS PATCH PANEL. COORDINATE
TERMINATION OF THESE CABLES TO EXTEND THE EXISTING RISER CABLE INTO THE
NEW TR ROOMS. COORDINATE WITH FACILITIES ENGINEERING FOR TIMING, LOCATION
AND RE-LABELING THE RISER AT THE MDF ACCORDING TO THE CURRENT FACILITY
SCHEME.
9. PRIMARY PROTECTOR
10. VERTICAL CABLE MANAGEMENT
11. RACK-MOUNTED, 5KW, 208V, UPS WITH NEMA 20A, L21-20P INPUT AND L21-20R
OUTPUT.
12. VERTICAL RACK PDU, L21-20 PLUG, 3-PHASE WYE, 20A, 208V INPUT, (24) C13 (6) C19 (6)
5-20R OUTLETS, 208V OUTPUT.
13. SIDE-A POWER, L21-20R TWIST-LOCK RECEPTACLE 208V, 20A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
14. SIDE-B POWER, L21-20R TWIST-LOCK RECEPTACLE 208V, 20A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
15. 30 A, 208 V, 3-PHASE ZONE PDU BASE UNIT -REAR CIRCUITS WITH FOUR NEMA L21-20R
AND SIX NEMA 5-20 OUTLETS AND TWO 10' POWER CORDS TERMINATING IN NEMA
L21-30P.
16. SIDE-A POWER, L21-30R TWIST-LOCK RECEPTACLE 208V, 30A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
17. SIDE-B POWER, L21-30R TWIST-LOCK RECEPTACLE 208V, 30A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
18. 60 A, 208 V, 3-PHASE ZONE PDU BASE UNIT -REAR CIRCUITS WITH SIX NEMA L21-20R
OUTPUT RECEPTACLES AND TWO 10' POWER CORDS TERMINATING IN HARD-WIRED
JUNCTION BOX.
19. SIDE A POWER, REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT TERMINATING IN A
HARD-WIRED JUNCTION BOX.
20. SIDE B POWER, REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT TERMINATING IN A
HARD-WIRED JUNCTION BOX.
21. RACK BONDING BUSBAR (R.B.B.) FOR IT EQUIPMENT ONLY. NON-IT EQUIPMENT SHALL
NOT USE THE SAME BONDING BUSBAR.
22. 3/4" AC GRADE TRADE SIZE FIRE-RATED PLYWOOD BACKBOARD PAINTED HIGH-GLOSS
WHITE WITH TWO COATS OF FIRE-RESISTANT PAINT, 8" AFF. (TYP.)
23. SPACE RESERVED FOR BAS EQUIPMENT
KEYED NOTES:#
GENERAL NOTES:
N.T.S.2
1-BA-216 - RACK ELEVATIONS
PLAN NORTH
1 1 2 3 4 5
1/2" = 1'-0"
FEETSCALE
N.T.S.3
1-BA-216 - POWER ELEVATION AND SCHEMATIC
PRINT SHEET IN COLOR
1. CONTRACTOR SHALL COORDINATE THE EQUIPMENT'S INSTALLATION AND FINAL
LOCATION WITH THE ELECTRICAL AND MECHANICAL DIVISION. REFER TO ELECTRICAL,
MECHANICAL AND PLUMBING DRAWINGS.
2. CONTRACTOR SHALL INSTALL PATHWAY DIVIDERS, RADIUS DROP, AND ANY OTHER
FITTING FOR A PROPER CABLE RUNWAY INSTALLATION.
3. CONTRACTOR SHALL COORDINATE THE HILTI SPEED SLEEVE LOCATIONS WITH THE
PATHWAY SYSTEM LAYOUT OUTSIDE EACH TELECOM ROOM. REFER TO FLOOR PLAN
DRAWINGS.
4. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES AND CONDUITS OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 10 00 STRUCTURED
CABLING AND SECTION 27 05 33 CONDUITS AND BOXES FOR COMMUNICATIONS
SYSTEMS.
5. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE DRILLING.
CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE BEGINNING DRILLING.
6. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE RISER SLEEVES.
REFER TO SECTION 07 84 00 FIRESTOPPING.
7. PHASING OF THE WORK IN THE DATA CENTER IMPACTS WORK IN THE TRS AND
HORIZONTAL CABLING. COORDINATE WORK SCHEDULES WITH THE COR.
8. GOVERNMENT EQUIPMENT WILL BE RELOCATED BY GOVERNMENT IT PERSONNEL.
CONTRACTOR WILL HAVE TECHNICIANS AVAILABLE TO PROVIDE SUPPORT DURING
OUTAGES AND CUT-OVERS. COORDINATE WORK WITH THE COR.
9. CONTRACTOR SHALL PROVIDE CABLE MANAGEMENT FINGERS, AIR DAMS, BAYING
SEAL KITS, CABLE BRUSHES, AND GROMMETS MANUFACTURED AND COMPATIBLE
WITH CABINETS.
10. CONTRACTOR SHALL PROVIDE MTP, FIBER OPTIC TRUNK CABLES FOR SIDE A AND
SIDE B BACKBONE FROM THE DATA CENTER TO EACH TELECOMMUNICATIONS ROOM.
COORDINATE WITH COR.
11. CONTRACTOR SHALL PROVIDE FIBER OPTIC PATCH CABLES FOR SIDE A AND SIDE B
FROM THE FIBER OPTIC DISTRIBUTOR TO EQUIPMENT CABINETS. COORDINATE WITH
COR.
12. CONTRACTOR SHALL VERIFY FIBER OPTIC CABLES MEASUREMENTS PRIOR TO
ORDERING. COORDINATE WITH COR.
13. DEMOLISH ANY EXISTING TELECOMMUNICATIONS DATA DEVICE OUTLETS AND BACK
BOXES LOCATED IN NEW TELECOMMUNICATIONS ROOMS BACK TO SOURCE.
C
C
B
C B
C B
C
B
C B
C B
C
B
C B
C B
C
B
C B
GROUP AA
B
GROUP B GROUP A GROUP B
LEG 1 LEG 2 LEG 1 LEG 2
OX
OZ
OY OZ OZ
OZOY
OY OYOX OX
OX
FF
(4) SS44
/2
3' - 11 67/256"
3' - 3 101/128"
SBB
R A
C K
R
A C
K
ELEC.
PANEL
ELEC.
PANEL
A C
S P
A N
E L
TR
BB-221A
(4) SS44
/2
B01-TN302 3 B01-TN3022
"x
18"x4"
"x
"x
12"x4" 12"x4"
RACK 1 RACK 2
10 10 10
16 17
RACK 1RACK 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
6 South Old Orchard Ave, Saint Louis, MO 63119 T: 800.404.7677 www.introba.com
B
IM
/2
V
A W e s t P a lm
B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.T
R
.r v t
/2
/2
:0
:5
A
M
B01-TN302
ENLARGED TELECOM PLANS -
1-BB-221A
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
03/31/23 PR TL
B01
1/2" = 1'-0"1
BASEMENT LEVEL ENLARGED PLAN - 1-BB-221A
N.T.S.2
1-BB-221A - RACK ELEVATIONS
PLAN NORTH
1 1 2 3 4 5
1/2" = 1'-0"
FEETSCALE
N.T.S.3
1-BB-221A - POWER ELEVATION AND SCHEMATIC
PRINT SHEET IN COLOR
1. HORIZONTAL CABLE MANAGER, SINGLE SIDED, 1 RU.
2. HORIZONTAL CABLE MANAGER, SINGLE SIDED, 2 RU.
3. PATCH PANEL, 48 PORT, 1 RU
4. ETHERNET SWITCH (GFGI)
5. FIBER OPTIC ENCLOSURE WITH DUPLEX-LC, MPO CASSETTES, 1 RU
6. SPACE RESERVED FOR RACK MOUNTED POWER EQUIPMENT.
7. ZONE PDU
8. PROVIDE A LOADED 48-PORT PATCH PANEL. PROVIDE 50-PAIR CAT3 CABLE FROM THE
CLOSEST SIGNALS CLOSET AND TERMINATE TO THIS PATCH PANEL. COORDINATE
TERMINATION OF THESE CABLES TO EXTEND THE EXISTING RISER CABLE INTO THE
NEW TR ROOMS. COORDINATE WITH FACILITIES ENGINEERING FOR TIMING, LOCATION
AND RE-LABELING THE RISER AT THE MDF ACCORDING TO THE CURRENT FACILITY
SCHEME.
9. PRIMARY PROTECTOR
10. VERTICAL CABLE MANAGEMENT
11. RACK-MOUNTED, 5KW, 208V, UPS WITH NEMA 20A, L21-20P INPUT AND L21-20R
OUTPUT.
12. VERTICAL RACK PDU, L21-20 PLUG, 3-PHASE WYE, 20A, 208V INPUT, (24) C13 (6) C19 (6)
5-20R OUTLETS, 208V OUTPUT.
13. SIDE-A POWER, L21-20R TWIST-LOCK RECEPTACLE 208V, 20A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
14. SIDE-B POWER, L21-20R TWIST-LOCK RECEPTACLE 208V, 20A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
15. 30 A, 208 V, 3-PHASE ZONE PDU BASE UNIT -REAR CIRCUITS WITH FOUR NEMA L21-20R
AND SIX NEMA 5-20 OUTLETS AND TWO 10' POWER CORDS TERMINATING IN NEMA
L21-30P.
16. SIDE-A POWER, L21-30R TWIST-LOCK RECEPTACLE 208V, 30A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
17. SIDE-B POWER, L21-30R TWIST-LOCK RECEPTACLE 208V, 30A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
18. 60 A, 208 V, 3-PHASE ZONE PDU BASE UNIT -REAR CIRCUITS WITH SIX NEMA L21-20R
OUTPUT RECEPTACLES AND TWO 10' POWER CORDS TERMINATING IN HARD-WIRED
JUNCTION BOX.
19. SIDE A POWER, REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT TERMINATING IN A
HARD-WIRED JUNCTION BOX.
20. SIDE B POWER, REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT TERMINATING IN A
HARD-WIRED JUNCTION BOX.
21. RACK BONDING BUSBAR (R.B.B.) FOR IT EQUIPMENT ONLY. NON-IT EQUIPMENT SHALL
NOT USE THE SAME BONDING BUSBAR.
22. 3/4" AC GRADE TRADE SIZE FIRE-RATED PLYWOOD BACKBOARD PAINTED HIGH-GLOSS
WHITE WITH TWO COATS OF FIRE-RESISTANT PAINT, 8" AFF. (TYP.)
23. SPACE RESERVED FOR BAS EQUIPMENT
KEYED NOTES:#
GENERAL NOTES:
1. CONTRACTOR SHALL COORDINATE THE EQUIPMENT'S INSTALLATION AND FINAL
LOCATION WITH THE ELECTRICAL AND MECHANICAL DIVISION. REFER TO ELECTRICAL,
MECHANICAL AND PLUMBING DRAWINGS.
2. CONTRACTOR SHALL INSTALL PATHWAY DIVIDERS, RADIUS DROP, AND ANY OTHER
FITTING FOR A PROPER CABLE RUNWAY INSTALLATION.
3. CONTRACTOR SHALL COORDINATE THE HILTI SPEED SLEEVE LOCATIONS WITH THE
PATHWAY SYSTEM LAYOUT OUTSIDE EACH TELECOM ROOM. REFER TO FLOOR PLAN
DRAWINGS.
4. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES AND CONDUITS OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 10 00 STRUCTURED
CABLING AND SECTION 27 05 33 CONDUITS AND BOXES FOR COMMUNICATIONS
SYSTEMS.
5. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE DRILLING.
CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE BEGINNING DRILLING.
6. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE RISER SLEEVES.
REFER TO SECTION 07 84 00 FIRESTOPPING.
7. PHASING OF THE WORK IN THE DATA CENTER IMPACTS WORK IN THE TRS AND
HORIZONTAL CABLING. COORDINATE WORK SCHEDULES WITH THE COR.
8. GOVERNMENT EQUIPMENT WILL BE RELOCATED BY GOVERNMENT IT PERSONNEL.
CONTRACTOR WILL HAVE TECHNICIANS AVAILABLE TO PROVIDE SUPPORT DURING
OUTAGES AND CUT-OVERS. COORDINATE WORK WITH THE COR.
9. CONTRACTOR SHALL PROVIDE CABLE MANAGEMENT FINGERS, AIR DAMS, BAYING
SEAL KITS, CABLE BRUSHES, AND GROMMETS MANUFACTURED AND COMPATIBLE
WITH CABINETS.
10. CONTRACTOR SHALL PROVIDE MTP, FIBER OPTIC TRUNK CABLES FOR SIDE A AND
SIDE B BACKBONE FROM THE DATA CENTER TO EACH TELECOMMUNICATIONS ROOM.
COORDINATE WITH COR.
11. CONTRACTOR SHALL PROVIDE FIBER OPTIC PATCH CABLES FOR SIDE A AND SIDE B
FROM THE FIBER OPTIC DISTRIBUTOR TO EQUIPMENT CABINETS. COORDINATE WITH
COR.
12. CONTRACTOR SHALL VERIFY FIBER OPTIC CABLES MEASUREMENTS PRIOR TO
ORDERING. COORDINATE WITH COR.
13. DEMOLISH ANY EXISTING TELECOMMUNICATIONS DATA DEVICE OUTLETS AND BACK
C
B
C B
C B
C
B
C B
C B
C
B
C B
C B
C
B
C B
GROUP AA
B
GROUP B GROUP A GROUP B
LEG 1 LEG 2 LEG 1 LEG 2
OX
OZ
OY OZ OZ
OZOY
OY OYOX OX
OX
FF
19.6
19.6
19.8
19.8
RACK 1 RACK 2
/2
/2
5' - 4 3/4"
(4
S S
(2
S S
SBB17' - 4"
5' - 1"
ELEC.
PANEL
ELEC.
PANEL
ACS PANEL
TR
BC-216
B01-TN303
B01-TN303
12"x4"
"x
18"x4"
"x
12"x4"
"x
12"x4"
"x
RACK 1 RACK 2
10 10 10
16 17
RACK 1RACK 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
6 South Old Orchard Ave, Saint Louis, MO 63119 T: 800.404.7677 www.introba.com
B
IM
/2
V
A W e s t P a lm
B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.T
R
.r v t
/2
/2
:0
:0
A
M
B01-TN303
ENLARGED TELECOM PLANS -
1-BC-216
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
03/31/23 PR TL
B01
1/2" = 1'-0"1
BASEMENT LEVEL ENLARGED PLAN - 1-BC-216
N.T.S.2
1-BC-216 - RACK ELEVATIONS
PLAN NORTH
1 1 2 3 4 5
1/2" = 1'-0"
FEETSCALE
N.T.S.3
1-BC-216 - POWER ELEVATION AND SCHEMATIC
PRINT SHEET IN COLOR
1. HORIZONTAL CABLE MANAGER, SINGLE SIDED, 1 RU.
2. HORIZONTAL CABLE MANAGER, SINGLE SIDED, 2 RU.
3. PATCH PANEL, 48 PORT, 1 RU
4. ETHERNET SWITCH (GFGI)
5. FIBER OPTIC ENCLOSURE WITH DUPLEX-LC, MPO CASSETTES, 1 RU
6. SPACE RESERVED FOR RACK MOUNTED POWER EQUIPMENT.
7. ZONE PDU
8. PROVIDE A LOADED 48-PORT PATCH PANEL. PROVIDE 50-PAIR CAT3 CABLE FROM THE
CLOSEST SIGNALS CLOSET AND TERMINATE TO THIS PATCH PANEL. COORDINATE
TERMINATION OF THESE CABLES TO EXTEND THE EXISTING RISER CABLE INTO THE
NEW TR ROOMS. COORDINATE WITH FACILITIES ENGINEERING FOR TIMING, LOCATION
AND RE-LABELING THE RISER AT THE MDF ACCORDING TO THE CURRENT FACILITY
SCHEME.
9. PRIMARY PROTECTOR
10. VERTICAL CABLE MANAGEMENT
11. RACK-MOUNTED, 5KW, 208V, UPS WITH NEMA 20A, L21-20P INPUT AND L21-20R
OUTPUT.
12. VERTICAL RACK PDU, L21-20 PLUG, 3-PHASE WYE, 20A, 208V INPUT, (24) C13 (6) C19 (6)
5-20R OUTLETS, 208V OUTPUT.
13. SIDE-A POWER, L21-20R TWIST-LOCK RECEPTACLE 208V, 20A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
14. SIDE-B POWER, L21-20R TWIST-LOCK RECEPTACLE 208V, 20A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
15. 30 A, 208 V, 3-PHASE ZONE PDU BASE UNIT -REAR CIRCUITS WITH FOUR NEMA L21-20R
AND SIX NEMA 5-20 OUTLETS AND TWO 10' POWER CORDS TERMINATING IN NEMA
L21-30P.
16. SIDE-A POWER, L21-30R TWIST-LOCK RECEPTACLE 208V, 30A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
17. SIDE-B POWER, L21-30R TWIST-LOCK RECEPTACLE 208V, 30A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
18. 60 A, 208 V, 3-PHASE ZONE PDU BASE UNIT -REAR CIRCUITS WITH SIX NEMA L21-20R
OUTPUT RECEPTACLES AND TWO 10' POWER CORDS TERMINATING IN HARD-WIRED
JUNCTION BOX.
19. SIDE A POWER, REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT TERMINATING IN A
HARD-WIRED JUNCTION BOX.
20. SIDE B POWER, REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT TERMINATING IN A
HARD-WIRED JUNCTION BOX.
21. RACK BONDING BUSBAR (R.B.B.) FOR IT EQUIPMENT ONLY. NON-IT EQUIPMENT SHALL
NOT USE THE SAME BONDING BUSBAR.
22. 3/4" AC GRADE TRADE SIZE FIRE-RATED PLYWOOD BACKBOARD PAINTED HIGH-GLOSS
WHITE WITH TWO COATS OF FIRE-RESISTANT PAINT, 8" AFF. (TYP.)
23. SPACE RESERVED FOR BAS EQUIPMENT
KEYED NOTES:#
GENERAL NOTES:
1. CONTRACTOR SHALL COORDINATE THE EQUIPMENT'S INSTALLATION AND FINAL
LOCATION WITH THE ELECTRICAL AND MECHANICAL DIVISION. REFER TO ELECTRICAL,
MECHANICAL AND PLUMBING DRAWINGS.
2. CONTRACTOR SHALL INSTALL PATHWAY DIVIDERS, RADIUS DROP, AND ANY OTHER
FITTING FOR A PROPER CABLE RUNWAY INSTALLATION.
3. CONTRACTOR SHALL COORDINATE THE HILTI SPEED SLEEVE LOCATIONS WITH THE
PATHWAY SYSTEM LAYOUT OUTSIDE EACH TELECOM ROOM. REFER TO FLOOR PLAN
DRAWINGS.
4. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES AND CONDUITS OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 10 00 STRUCTURED
CABLING AND SECTION 27 05 33 CONDUITS AND BOXES FOR COMMUNICATIONS
SYSTEMS.
5. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE DRILLING.
CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE BEGINNING DRILLING.
6. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE RISER SLEEVES.
REFER TO SECTION 07 84 00 FIRESTOPPING.
7. PHASING OF THE WORK IN THE DATA CENTER IMPACTS WORK IN THE TRS AND
HORIZONTAL CABLING. COORDINATE WORK SCHEDULES WITH THE COR.
8. GOVERNMENT EQUIPMENT WILL BE RELOCATED BY GOVERNMENT IT PERSONNEL.
CONTRACTOR WILL HAVE TECHNICIANS AVAILABLE TO PROVIDE SUPPORT DURING
OUTAGES AND CUT-OVERS. COORDINATE WORK WITH THE COR.
9. CONTRACTOR SHALL PROVIDE CABLE MANAGEMENT FINGERS, AIR DAMS, BAYING
SEAL KITS, CABLE BRUSHES, AND GROMMETS MANUFACTURED AND COMPATIBLE
WITH CABINETS.
10. CONTRACTOR SHALL PROVIDE MTP, FIBER OPTIC TRUNK CABLES FOR SIDE A AND
SIDE B BACKBONE FROM THE DATA CENTER TO EACH TELECOMMUNICATIONS ROOM.
COORDINATE WITH COR.
11. CONTRACTOR SHALL PROVIDE FIBER OPTIC PATCH CABLES FOR SIDE A AND SIDE B
FROM THE FIBER OPTIC DISTRIBUTOR TO EQUIPMENT CABINETS. COORDINATE WITH
COR.
12. CONTRACTOR SHALL VERIFY FIBER OPTIC CABLES MEASUREMENTS PRIOR TO
ORDERING. COORDINATE WITH COR.
13. DEMOLISH ANY EXISTING TELECOMMUNICATIONS DATA DEVICE OUTLETS AND BACK
C
B
C B
C B
C
B
C B
C B
C
B
C B
C B
C
B
C B
GROUP AA
B
GROUP B GROUP A GROUP B
LEG 1 LEG 2 LEG 1 LEG 2
OX
OZ
OY OZ OZ
OZOY
OY OYOX OX
OX
FF
SBB
(4) SS44
(4) SS44
RACK 1
/1
/2
RACK 2
3' - 7 177/256"
9' - 11 1/8"
TR
BC-250
ACS PANEL
ELEC.
PANEL
ELEC.
PANEL
1' - 8 111/256"
B01-TN304
B01-TN304
12"x4"
"x
18"x4"
"x
12"x4"
RACK 1 RACK 2
10 10 10
16 17
RACK 1RACK 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
6 South Old Orchard Ave, Saint Louis, MO 63119 T: 800.404.7677 www.introba.com
B
IM
/2
V
A W e s t P a lm
B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.T
R
.r v t
/2
/2
:0
:1
A
M
B01-TN304
ENLARGED TELECOM PLANS -
1-BC-250
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
03/31/23 PR TL
B01
1/2" = 1'-0"1
BASEMENT LEVEL ENLARGED PLAN - 1-BC-250
N.T.S.2
1-BC-250 - RACK ELEVATIONS
PLAN NORTH
1 1 2 3 4 5
1/2" = 1'-0"
FEETSCALE
N.T.S.3
1-BC-250 - POWER ELEVATION AND SCHEMATIC
PRINT SHEET IN COLOR
1. HORIZONTAL CABLE MANAGER, SINGLE SIDED, 1 RU.
2. HORIZONTAL CABLE MANAGER, SINGLE SIDED, 2 RU.
3. PATCH PANEL, 48 PORT, 1 RU
4. ETHERNET SWITCH (GFGI)
5. FIBER OPTIC ENCLOSURE WITH DUPLEX-LC, MPO CASSETTES, 1 RU
6. SPACE RESERVED FOR RACK MOUNTED POWER EQUIPMENT.
7. ZONE PDU
8. PROVIDE A LOADED 48-PORT PATCH PANEL. PROVIDE 50-PAIR CAT3 CABLE FROM THE
CLOSEST SIGNALS CLOSET AND TERMINATE TO THIS PATCH PANEL. COORDINATE
TERMINATION OF THESE CABLES TO EXTEND THE EXISTING RISER CABLE INTO THE
NEW TR ROOMS. COORDINATE WITH FACILITIES ENGINEERING FOR TIMING, LOCATION
AND RE-LABELING THE RISER AT THE MDF ACCORDING TO THE CURRENT FACILITY
SCHEME.
9. PRIMARY PROTECTOR
10. VERTICAL CABLE MANAGEMENT
11. RACK-MOUNTED, 5KW, 208V, UPS WITH NEMA 20A, L21-20P INPUT AND L21-20R
OUTPUT.
12. VERTICAL RACK PDU, L21-20 PLUG, 3-PHASE WYE, 20A, 208V INPUT, (24) C13 (6) C19 (6)
5-20R OUTLETS, 208V OUTPUT.
13. SIDE-A POWER, L21-20R TWIST-LOCK RECEPTACLE 208V, 20A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
14. SIDE-B POWER, L21-20R TWIST-LOCK RECEPTACLE 208V, 20A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
15. 30 A, 208 V, 3-PHASE ZONE PDU BASE UNIT -REAR CIRCUITS WITH FOUR NEMA L21-20R
AND SIX NEMA 5-20 OUTLETS AND TWO 10' POWER CORDS TERMINATING IN NEMA
L21-30P.
16. SIDE-A POWER, L21-30R TWIST-LOCK RECEPTACLE 208V, 30A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
17. SIDE-B POWER, L21-30R TWIST-LOCK RECEPTACLE 208V, 30A, THREE-PHASE CIRCUIT,
8.5 FT AFF, COORDINATE INSTALLATION LOCATION WITH CONTRACTOR.
18. 60 A, 208 V, 3-PHASE ZONE PDU BASE UNIT -REAR CIRCUITS WITH SIX NEMA L21-20R
OUTPUT RECEPTACLES AND TWO 10' POWER CORDS TERMINATING IN HARD-WIRED
JUNCTION BOX.
19. SIDE A POWER, REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT TERMINATING IN A
HARD-WIRED JUNCTION BOX.
20. SIDE B POWER, REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT TERMINATING IN A
HARD-WIRED JUNCTION BOX.
21. RACK BONDING BUSBAR (R.B.B.) FOR IT EQUIPMENT ONLY. NON-IT EQUIPMENT SHALL
NOT USE THE SAME BONDING BUSBAR.
22. 3/4" AC GRADE TRADE SIZE FIRE-RATED PLYWOOD BACKBOARD PAINTED HIGH-GLOSS
WHITE WITH TWO COATS OF FIRE-RESISTANT PAINT, 8" AFF. (TYP.)
23. SPACE RESERVED FOR BAS EQUIPMENT
KEYED NOTES:#
GENERAL NOTES:
1. CONTRACTOR SHALL COORDINATE THE EQUIPMENT'S INSTALLATION AND FINAL
LOCATION WITH THE ELECTRICAL AND MECHANICAL DIVISION. REFER TO ELECTRICAL,
MECHANICAL AND PLUMBING DRAWINGS.
2. CONTRACTOR SHALL INSTALL PATHWAY DIVIDERS, RADIUS DROP, AND ANY OTHER
FITTING FOR A PROPER CABLE RUNWAY INSTALLATION.
3. CONTRACTOR SHALL COORDINATE THE HILTI SPEED SLEEVE LOCATIONS WITH THE
PATHWAY SYSTEM LAYOUT OUTSIDE EACH TELECOM ROOM. REFER TO FLOOR PLAN
DRAWINGS.
4. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES AND CONDUITS OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 10 00 STRUCTURED
CABLING AND SECTION 27 05 33 CONDUITS AND BOXES FOR COMMUNICATIONS
SYSTEMS.
5. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE DRILLING.
CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE BEGINNING DRILLING.
6. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE RISER SLEEVES.
REFER TO SECTION 07 84 00 FIRESTOPPING.
7. PHASING OF THE WORK IN THE DATA CENTER IMPACTS WORK IN THE TRS AND
HORIZONTAL CABLING. COORDINATE WORK SCHEDULES WITH THE COR.
8. GOVERNMENT EQUIPMENT WILL BE RELOCATED BY GOVERNMENT IT PERSONNEL.
CONTRACTOR WILL HAVE TECHNICIANS AVAILABLE TO PROVIDE SUPPORT DURING
OUTAGES AND CUT-OVERS. COORDINATE WORK WITH THE COR.
9. CONTRACTOR SHALL PROVIDE CABLE MANAGEMENT FINGERS, AIR DAMS, BAYING
SEAL KITS, CABLE BRUSHES, AND GROMMETS MANUFACTURED AND COMPATIBLE
WITH CABINETS.
10. CONTRACTOR SHALL PROVIDE MTP, FIBER OPTIC TRUNK CABLES FOR SIDE A AND
SIDE B BACKBONE FROM THE DATA CENTER TO EACH TELECOMMUNICATIONS ROOM.
COORDINATE WITH COR.
1…