ATTACHMENT 13 - Plumbing.pdf
PDF 2 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction West Palm Beach Federal contract opportunity
- Solicitation number
- 36C77623B0045
About this file
This solicitation is for construction services to upgrade electronic health record infrastructure at the Department of Veterans Affairs Medical Center in West Palm Beach, Florida. The solicitation seeks to modernize plumbing systems across multiple floors and areas of the facility, including replacing and installing new plumbing fixtures. Upgrades will be made to domestic water supply, sanitary waste, and vent piping. Bidders should reference the attached architectural and mechanical drawings which provide details on demolition, new construction requirements, and plumbing fixture schedules. The solicitation number is 36C77623B0045 and was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The response due date and anticipated award date are not specified.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C8
C
B
A8
A6
A
19 19.6 19.8 20.8 21.2 22 23 24 25 26 27
ELEV. (FUTURE)-1
P-7-1
ELEV.-2
P-8-2
ELEV.-2
P-10-2
ELEV.-2
P-9-2
TELE ROOM
1C-124
HAC
1C-122
CORR.
1C-121
FPF ASSISTANT
1C-126
THCH OFFICE
1C-206
ROOM
1C-222B
OFFICE
1C-271
PSYCH. OFFICE
1C-273
M. TLT.
1C-121B
F. TLT.
1C-121A
OFFICE
1C-112
ELEC.
1C-109
OFFICE
1C-114
F. TLT
1C-107
OFFICE
1C-116
BEAUTY SHOP
1C-232
RECPT. CLERK
1C-251
OFFICE
1C-138
UPS ELEC. RM.
1C-136
TR
1C-140
F. TLT
1C-134
M. TLT
1C-132
OFFICE
1C-142
CUBICLES
1C-130
OFFICE
1C-135C
OFFICE
1C-135F
ELEC.
1C-133
CLOSET
1C-135
PSYCHIATRIST
1C-135G
SUPV. OFFICE
1C-135H
SACRIST
1E-115C
COMMUNITY CARE
OFFICE
1C-131
UPSTAIR
STAIR
H.A.C.
1C-139
CORR.
1C-C3
OFFICE
1C-135B
M. TLT
1C-105
CATHOLIC CHAPLAIN
1E-118
CHIEF CHAPLAIN
SERVICES
1E-117
CHAPLAIN
1E-119
CHAPLAIN
1E-117
PSYCHIATRIST
1C-135E
OFFICE
1C-135D
ULTRA SOUND
1C-203
EUCHARIST
1E-114
DISPLAY
1C-221A
VOCATIONAL
REHABILITATION
CORRIDOR
1C-111
ADMIN.
1C-111
CORR.
1C-C3
CHANCEL
1E-115A
SECRETARY
1C-102
CORRIDOR
1C-101
CORRIDOR
1E-113
VEST.
C1-103
DECEDENT AFFAIRS
PATIENT SVC.
1G-122
ALCOVE
CI-104
FOOD SERVICE AREA
1C-233
WAITING
1C-250 CORR.
1C-250VENDOR
1C-222
OFFICE
1C-113
OFFICE
1C-115
OFFICE
1C-116A
SEATING
1C-222A
OFFICE
1C-135A
CORR.
1C-C1
NURSE
1C-146
STAIR #9
STAIR
WAITING
1C-280
VENDING MACHINES
1C-221
CORRIDOR
1C-C1
NAVE
1E-115
CHAPLAIN
1E-116
PSYCH. OFFICE
1C-275
B01-P101F
B01-P101F
OFFICE
1C-144
C
TR
1C-140
CORR.
1C-C3
OFFICE
1C-144
2 (E)1/2" DHW
(E)1 1/2" V
(E)1/2" DCW
C
TR
1C-140
CORR.
1C-C3
OFFICE
1C-144
(E)1/2" DHW
(E)1 1/2" V
(E)1/2" DCW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com
KEYPLAN
PLAN NORTH
AREA F
03/31/23
B
IM
/2
V
A W e s t
P a lm B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.M T
R
.r v t
/3
/2
:3
:3
A
M
B01-P101F
FIRST LEVEL FLOOR PLAN - AREA
F - PLUMBING
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
B01
03/31/23 JWB NLC
1/16" = 1'-0"1
FIRST LEVEL FLOOR PLAN - AREA F - PLUMBING
5 5 10 15 20 25 30 35 40 45
1/16" = 1'-0"
FEETSCALE
SHEET NOTES:
1. REMOVE SINK. SINK SHALL BE RELOCATED TO OFFICE 1C-144.
2. RELOCATED SINK. RECONNECT TO EXISTING VENT, SANITARY, AND DOMESTIC WATER PIPING.
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO DESIGN AND INSTALL A COMPLETE FIRE PROTECTION SYSTEM WITHIN THE PROJECT AREA. THIS INCLUDES, BUT IS NOT LIMITED TO, RELOCATING PIPING TO ACCOMMODATE NEW CONSTRUCTION REQUIREMENTS, REVISING SPRINKLER HEAD LAYOUTS, AND COMPLYING WITH NFPA-13
AND DIVISION 21 SPECIFICATION REQUIREMENTS.
2. THIS PROJECT AREA IS WITHIN AN EXISTING FACILITY CONNECTED TO CITY DOMESTIC COLD WATER AND IS
PROTECTED BY AN EXISTING REDUCED PRESSURE BACKFLOW PREVENTER.
3. THE EXISTING DOMESTIC HOT WATER SYSTEM IS CONNECTED TO WATER HEATERS HEATING THE WATER TO 140 DEGREES, IT IS ROUTED TO AN ASSE 1017 THERMOSTATIC MIXING VALVE, DELIVERING THE HOT WATER PROVIDED TO THE PROJECT AREA PLUMBING FIXTURES AT 110 DEGREES. THE EXISTING HOT WATER SYSTEM
HAS A RECIRCULATING SYSTEM WITH A CIRCULATING PUMP.
4. THIS IS AN EXISTING BUILDING WITH AN EXISTING DOMESTIC WATER SYSTEM THAT IS BEING MODIFIED TO REPLACE AND/OR INSTALL NEW PLUMBING FIXTURES. HOT AND COLD WATER DEMANDS HAVE BEEN CALCULATED TO VERIFY THE EXISTING SYSTEM AND WATER HEATER EQUIPMENT IS ADEQUATE TO MEET THE NEEDS OF THE PLUMBING FIXTURES. THE USE OF A DIVERSITY FACTOR FOR CAPACITY HAS BEEN INCLUDED
IN THE DOMESTIC WATER DESIGN.
5. SEE ARCHITECTURAL SERIES SHEETS FOR OCCUPANT LOAD FOR PLUMBING FIXTURES.
PLUMBING GENERAL NOTES:
1/4" = 1'-0"3
FIRST LEVEL FLOOR PLAN - TR 1C-140 - NEW - PLUMBING
1/4" = 1'-0"2
FIRST LEVEL FLOOR PLAN - TR 1C-140 - DEMO - PLUMBING
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
Revisions: Date:
J
H
G8
G
E
D
C8
C
H4
1 2 3 4 5 6 7 8 9 9.2 9.8
STAIRWELL
ENCLOSURE
STAIR
STAIR #4-1
STAIR-1
ROOM
2A-304
STORAGE ROOM
2A-305
HAC
2A-302
ROOM
2A-303
MECHANICAL
2A-306
STAFF TLT.
2A-323
MED RM.
2A-321A
STAFF
2A-325
SOILED UTILITY
2A-326
CLEAN UTILITY
2A-327
ELECT. ROOM
2A-328
O.R. NURSE
MANAGER
2A-332
TRASH
2A-330
RECOVERY ROOM
ISOLATION BDRM
2A-329A
ANTE ROOM
2A-329
GAS STORAGE
2A-334
STAIR 5
STAIR
ELECT.
2B-302B
TEL.
2B-302C
MECHANICAL
2A-304A
MALE TLT.
2B-200
STAIR #2-2
STAIR-2
OFFICE
2A-118
OFFICE
2A-114
OFFICE CLERICAL
2A-119
HAC
2A-234
EQUIPMENT AND
APPARATUS
STORAGE
2A-236
CYSTOSCOPY ROOM
2A-238
EXTERNAL
RADIOGRAPHIC
CONTROL
2A-238B
INSTRUMENT PREP.
AND STERILIZATION
2A-238A
CYSTOSCOPY ROOM
2A-242
IMPLANT STORAGE
ROOM
2A-212
FROZEN SECT LAB
2A-229
DICT. CUBIC.
2A-227B
PHYS/STAFF LOUNGE
2A-227
MED. ROOM
2A-225A
ANASTHESIA
2A-225
SOILED HOLDING
AREA
2A-223
ROOM
2A-221
O.R. #5
2A-211
O.R. #3
2A-207
O.R. #4
2A-209
TELEPHONE/SWITCH
GEAR
2A-310
O.R. #6
2A-213
MALE LOCKERS
2A-246
SUB STERILE ROOM
2A-213A
UB STERILE
2A-207A
CORRIDOR
2A-C4
CORRIDOR
2A-227A
FINE INSTRUMENT
PREP. AND STOR.
2A-210
FEMALE LOCKERS
2A-244
F. TOILET/SHOWERS
2A-244A
RECOVERY ROOM
2A-320
RECOV RM NURSE
STATION
2A-321
SOILED LINEN CHUTE
2B-302A
SOILED SERVICE
LOBBY
2B-302
PATIENT TOILET
2A-205
CORRIDOR
2A-C7
BREAK RM
2A-279
ANESTHESIA
2A-278
NURSES ST.
2A-280
PATIENT TLT
2A-276
CLEAN
2A-274
PATIENT TLT
2A-277
MED
2A-269
SOIL
2A-275
ROOM
2A-272
CORRIDOR-2
2A-C3-2
BLANKETS
2A-271
CORRIDOR
2A-C1
NOURISHMENT
2A-273
PATIENT TLT
2A-266
TR
2A-281
CORRIDOR-2
2A-C7-2
PRE-OP
2A-C6
ANTE RM
2A-282
CLINICAL
COORDINATOR
2A-116
ATRIUM
B01-P102A
B01-P102A
G.8
9.8
CONTROL
STATION/CRT
2A-258
CORRIDOR
2A-C4
1/2"
1/2"
1 1/2"
TR
2A-281
CONTROL
STATION/CRT
2A-258CORRIDOR
2A-C4
TR
2A-281
CONTROL
STATION/CRT
2A-258
CORRIDOR
2A-C4
1/2" DOMESTIC COLD WATER
1/2" DOMESTIC HOT WATER
1 1/2" VENT
2" SANITARY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com
KEYPLAN
PLAN NORTH
AREA A
03/31/23
B
IM
/2
V
A W e s t
P a lm B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.M T
R
.r v t
/3
/2
:3
:3
A
M
B01-P102A
SECOND LEVEL FLOOR PLAN -
AREA A - PLUMBING
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
B01
03/31/23 JWB NLC
1/16" = 1'-0"1
SECOND LEVEL FLOOR PLAN - AREA A - PLUMBING
1/4" = 1'-0"2
SECOND LEVEL FLOOR PLAN -ANESTH. - DEMOLITION - PLUMBING
1/4" = 1'-0"3
SECOND LEVEL FLOOR PLAN - TR 2A-281 - NEW - PLUMBING
SHEET NOTES:
1. REMOVE SINK AND ASSOCIATED PIPING. CAP AT NEAREST MAIN.
2. CAP VENT AND DOMESTIC WATER PIPING AT MAIN IN INTERSTITIAL SPACE ABOVE ASSOCIATED FLOOR.
3. CAP SANITARY PIPING AT MAIN IN INTERSTITIAL SPACE BELOW ASSOCIATED FLOOR.
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO DESIGN AND INSTALL A COMPLETE FIRE PROTECTION SYSTEM WITHIN THE PROJECT AREA. THIS INCLUDES, BUT IS NOT LIMITED TO, RELOCATING PIPING TO ACCOMMODATE NEW CONSTRUCTION REQUIREMENTS, REVISING SPRINKLER HEAD LAYOUTS, AND COMPLYING WITH NFPA-13
AND DIVISION 21 SPECIFICATION REQUIREMENTS.
2. THIS PROJECT AREA IS WITHIN AN EXISTING FACILITY CONNECTED TO CITY DOMESTIC COLD WATER AND IS
PROTECTED BY AN EXISTING REDUCED PRESSURE BACKFLOW PREVENTER.
3. THE EXISTING DOMESTIC HOT WATER SYSTEM IS CONNECTED TO WATER HEATERS HEATING THE WATER TO 140 DEGREES, IT IS ROUTED TO AN ASSE 1017 THERMOSTATIC MIXING VALVE, DELIVERING THE HOT WATER PROVIDED TO THE PROJECT AREA PLUMBING FIXTURES AT 110 DEGREES. THE EXISTING HOT WATER SYSTEM
HAS A RECIRCULATING SYSTEM WITH A CIRCULATING PUMP.
4. THIS IS AN EXISTING BUILDING WITH AN EXISTING DOMESTIC WATER SYSTEM THAT IS BEING MODIFIED TO REPLACE AND/OR INSTALL NEW PLUMBING FIXTURES. HOT AND COLD WATER DEMANDS HAVE BEEN CALCULATED TO VERIFY THE EXISTING SYSTEM AND WATER HEATER EQUIPMENT IS ADEQUATE TO MEET THE NEEDS OF THE PLUMBING FIXTURES. THE USE OF A DIVERSITY FACTOR FOR CAPACITY HAS BEEN INCLUDED
IN THE DOMESTIC WATER DESIGN.
5. SEE ARCHITECTURAL SERIES SHEETS FOR OCCUPANT LOAD FOR PLUMBING FIXTURES.
PLUMBING GENERAL NOTES:
5 5 10 15 20 25 30 35 40 45
1/16" = 1'-0"
FEETSCALE
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
TYPICAL PLUMBING DEMOLITION ISOMETRIC
G8
G
E
D
C8
H4
4 5 6 7 8 9 9.2 9.8
STAIR #5-6
STAIR-6
STAIR #4-6
STAIR-6
STAFF TOILET
8A-356A
INFECTION DISEASES
8A-352
CLINICAL
PHARMACIST
8A-346
EXAM
8A-340
EXAM
8A-334
EXAM
8A-328
EXAM
8A-322
DISPOSAL CHUTE
8A-318
EXAM
8A-320
STORAGE
8A-316
BMS HAC
8A-312
BMS HAC
8A-314
ELECT.
8A-302B
TELE.
8A-302C
COUNSELING
8A-113
EXAM
8A-117
COUNSELING
8A-229
EXAM
8A-121
EXAM
8A-129
EXAM
8A-127
EXAM
8A-123
EXAM
8A-125
OFFICE
8A-131
EXAM
8A-133
EXAM
8A-139
EXAM
8A-141
EXAM
8A-135
EXAM
8A-137
OFFICE
8A-143
EXAM
8A-147
EXAM
8A-149
EEG
8A-155
EXAM
8A-151
EXAM
8A-153
CLOSET
8A-159
PATIENT TOILET
8A-161
CORRIDOR
8A-C1E
PROGRAM ASSISTANT
8A-163
ASSIST. CHIEF
MEDICINE SERVICES
8A-165
EXAM
8A-226
EXAM
8A-227
CLEAN UTILITY RM
8A-225
ELEC. CLOSET
8A-221
STORAGE
8A-220
SOILED UTILITY ROOM
8A-224
PATIENT TOILET
8A-219
PATIENT TOILET
8A-218
MEDICATION
8A-217
STAFF TOILET
8A-215
EXAM
8A-214
EXAM
8A-213
EXAM
8A-212
EXAM
8A-211
EXAM
8A-210
WORK RM
8A-207
PATIENT TOILET
8A-206
SOILED LINEN CHUTE
8A-302A
READING ROOM
8A-145
EXAM
8A-157
INFECTION
DISEASESRM
8A-354
INFECTION DISEASES
8A-344
EXAM
8A-332
EXAM
8A-330
EXAM ROOM
8A-228
EXAM
8A-326
RHEUMATOLOGY
8A-336
OFFICE
8A-329
OFFICE
8A-348
DOCTOR'S OFFICE
8A-350
RECEPTION
8A-208
ALCOVE
8A-209
SCALES
8A-216
CORRIDOR
8A-C1C
CORRIDOR
8A-C1D
CORRIDOR
8A-C2
CORRIDOR
8A-C1
CORRIDOR
8A-C1B
CORRIDOR
8A-C7B
CORRIDOR
8A-C7A
CORRIDOR
8A-C7
CORRIDOR
8A-C7C
STAFF LOUNGE
8A-356B
LOCKERS
8A-C7E
ALCOVE
8A-205
COMM CLOSET
8A-204
PATIENT TOILET
8A-203
WAITING
8A-202
SOILED SERVICE
LOBBY
8A-302
TR
8A-222
EXAM
8A-324
B01-P108A
B01-P108A
G.8
9.8
ALLERGY CLINIC
8A-223
1/2"
1/2"
1 1/2"
TR
8A-222
CORRIDOR
8A-C7
ELEC. CLOSET
8A-221
TR
8A-222
CORRIDOR
8A-C7
ELEC. CLOSET
8A-221
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com
KEYPLAN
PLAN NORTH
AREA A
03/31/23
B
IM
/2
V
A W e s t
P a lm B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.M T
R
.r v t
/3
/2
:3
:3
A
M
B01-P108A
EIGHTH LEVEL FLOOR PLAN -
AREA A - PLUMBING
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
B01
03/31/23 JWB NLC
1/16" = 1'-0"1
EIGHTH LEVEL FLOOR PLAN - AREA A - PLUMBING
1/4" = 1'-0"2
EIGHTH LEVEL FLOOR PLAN - ALLERGY CLINIC - DEMOLITION - PLUMBING
1/4" = 1'-0"3
EIGHTH LEVEL FLOOR PLAN - TR 8A-222 - NEW - PLUMBING
SHEET NOTES:
1. REMOVE SINK AND ASSOCIATED PIPING. CAP AT NEAREST MAIN.
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO DESIGN AND INSTALL A COMPLETE FIRE PROTECTION SYSTEM WITHIN THE PROJECT AREA. THIS INCLUDES, BUT IS NOT LIMITED TO, RELOCATING PIPING TO ACCOMMODATE NEW CONSTRUCTION REQUIREMENTS, REVISING SPRINKLER HEAD LAYOUTS, AND COMPLYING WITH NFPA-13
AND DIVISION 21 SPECIFICATION REQUIREMENTS.
2. THIS PROJECT AREA IS WITHIN AN EXISTING FACILITY CONNECTED TO CITY DOMESTIC COLD WATER AND IS
PROTECTED BY AN EXISTING REDUCED PRESSURE BACKFLOW PREVENTER.
3. THE EXISTING DOMESTIC HOT WATER SYSTEM IS CONNECTED TO WATER HEATERS HEATING THE WATER TO 140 DEGREES, IT IS ROUTED TO AN ASSE 1017 THERMOSTATIC MIXING VALVE, DELIVERING THE HOT WATER PROVIDED TO THE PROJECT AREA PLUMBING FIXTURES AT 110 DEGREES. THE EXISTING HOT WATER SYSTEM
HAS A RECIRCULATING SYSTEM WITH A CIRCULATING PUMP.
4. THIS IS AN EXISTING BUILDING WITH AN EXISTING DOMESTIC WATER SYSTEM THAT IS BEING MODIFIED TO REPLACE AND/OR INSTALL NEW PLUMBING FIXTURES. HOT AND COLD WATER DEMANDS HAVE BEEN CALCULATED TO VERIFY THE EXISTING SYSTEM AND WATER HEATER EQUIPMENT IS ADEQUATE TO MEET THE NEEDS OF THE PLUMBING FIXTURES. THE USE OF A DIVERSITY FACTOR FOR CAPACITY HAS BEEN INCLUDED
IN THE DOMESTIC WATER DESIGN.
5. SEE ARCHITECTURAL SERIES SHEETS FOR OCCUPANT LOAD FOR PLUMBING FIXTURES.
PLUMBING GENERAL NOTES:
5 5 10 15 20 25 30 35 40 45
1/16" = 1'-0"
FEETSCALE
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
2 2 4 6 8 10
1/4" = 1'-0"
G8
G
E
D
C8
C
H4
9.8 10.4 11.2 11.812.2 13 14 15 16 17 1818.2
ELEV.-8
P-1-8
ELEV.-4
P-7-4
STAIR #1-7
STAIR-7
ELEV.-9
S-4-9
ELEV.-9
S-2-9
ELEV.-9
S-1-9
ELECT.
8A-302B
TELE.
8A-302C
LIFT 1
LIFT
PATIENT SERVICE
LOBBY
8B-306
BLIND REHAP ROOM
8B-314
LOW VISION COORD.
8B-316
EYE LANE
8B-320
EYE LANE
8B-322
EYE LANE
8B-328
EYE LANE
8B-334
EYE LANE
8B-332
EYE LANE
8B-340
EYE LANE
8B-346
EYE LANE
8B-344
TOILET
8B-350
TOILET
8B-352A
STAFF LOUNGE
8B-352
STAIR #6-8
STAIR-8
EYE LANE
8B-153
EYE LANE
8B-151
EYE LANE
8B-147
EYE LANE
8B-149
EYE LANE
8B-141
EYE LANE
8B-139
EYE LANE
8B-137
EYE LANE
8B-135
EYE LANE
8B-129
EYE LANE
8B-127
PA EXAM
ROOM/OFFICE
8B-157
MD/OD OFFICE
8B-155
MD/OD OFFICE
8B-145
MD/OD OFFICE
8B-133
MD/OD OFFICE
8B-143
MD/OD OFFICE
8B-131
PROVIDER OFFICE
8B-125
EXAM ROOM
8B-119
EXAM ROOM
8B-117
EXAM ROOM
8B-121
EXAM ROOM
8B-123
EXAM ROOM
8B-109
EXAM ROOM
8B-111
EXAM ROOM
8B-103
PROVIDER OFFICE
8B-115
PROVIDER OFFICE
8B-113
CORR.
8B-201
EYE LANE
8B-221
EYE LANE
8B-222
EYE LANE
8B-224
STORAGE ROOM
8B-220
TECH EYE LANE
8B-213
TECH EYE LANE
8B-215
VISUAL FIELD
8B-233
IOL MASTER/A SCAN
ROOM
8B-235
PROCEDURE ROOM
8B-246
SURGICAL NURSE
OFFICE
8B-242
LASER ROOM
8B-248
ADMINISTRATION
STATION
8B-231
EXAM ROOM-1
8B-216-1
EXAM ROOM
8B-212
EYE
CONFERENCE/TEACHING
ROOM
8B-230
ELEV.-9
S-5-9 EYE LANE-1
8B-330-1
EYE LANE
8B-342
ELEV.-9
S-3-9
HAC
8B-312
EYE LANE
8B-326
MD/OD OFFICE
8B-348
MD/OD OFFICE
8B-338
MALE TLT.
8B-200
PUBLIC TOILET
8B-204
PUBLIC TOILET
8B-206
UNISEX RESTROOM
8B-234
UNISEX RESTROOM
8B-236
ELEC. CLOSET
8B-247
PHOTOGRAPHY/TOMOGRAPHY
ROOM
8B-241
CORR.
8B-C7A
DILATION WAITING
AREA
8B-238
CORR.
8B-C7B
CORR.
8B-C7C
CORR.
8B-C1E
CORRIDOR
8B-C6
CORR.
8B-C1C
CORR.
8B-C4
CORR.
8B-C3
CORR.
8B-317
CORR.
8B-C1B
CORR.
8B-C1A
CORR.
8B-C1D
EYE LANE
8B-324
PROCEDURE ROOM
8B-232
EYE CLINIC PATIENT
WAITING
8B-210
FEMALE TLT.
8B-202
SOILED SERVICE
LOBBY
8A-302
UPS ELEC. RM.
8B-304B
EYE CLINIC CHECK-IN
DESK
8B-208
CORR.
8B-C1
MD/OD OFFICE
8B-336
EXAM ROOM
8B-214
B01-P108C
B01-P108C
G.8
9.8
1/2"
1/2" 1 1/2"
1/2"
1/2" 1 1/2"
TR
8B-245
CORRIDOR
8B-C6
TR
8B-245
CORRIDOR
8B-C6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com
KEYPLAN
PLAN NORTH
AREA C
03/31/23
B
IM
/2
V
A W e s t
P a lm B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.M T
R
.r v t
/3
/2
:3
:4
A
M
B01-P108C
EIGHTH LEVEL FLOOR PLAN -
AREA C - PLUMBING
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
B01
03/31/23 JWB NLC
1/16" = 1'-0"1
EIGHTH LEVEL FLOOR PLAN - AREA C - PLUMBING
1/4" = 1'-0"2
EIGHTH LEVEL FLOOR PLAN - OCT SCANNER/HRT - DEMOLITION - PLUMBING
1/4" = 1'-0"3
EIGHTH LEVEL FLOOR PLAN - TR 8B-245 - NEW - PLUMBING
SHEET NOTES:
1. REMOVE SINK AND ASSOCIATED PIPING. CAP AT NEAREST MAIN.
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO DESIGN AND INSTALL A COMPLETE FIRE PROTECTION SYSTEM WITHIN THE PROJECT AREA. THIS INCLUDES, BUT IS NOT LIMITED TO, RELOCATING PIPING TO ACCOMMODATE NEW CONSTRUCTION REQUIREMENTS, REVISING SPRINKLER HEAD LAYOUTS, AND COMPLYING WITH NFPA-13
AND DIVISION 21 SPECIFICATION REQUIREMENTS.
2. THIS PROJECT AREA IS WITHIN AN EXISTING FACILITY CONNECTED TO CITY DOMESTIC COLD WATER AND IS
PROTECTED BY AN EXISTING REDUCED PRESSURE BACKFLOW PREVENTER.
3. THE EXISTING DOMESTIC HOT WATER SYSTEM IS CONNECTED TO WATER HEATERS HEATING THE WATER TO 140 DEGREES, IT IS ROUTED TO AN ASSE 1017 THERMOSTATIC MIXING VALVE, DELIVERING THE HOT WATER PROVIDED TO THE PROJECT AREA PLUMBING FIXTURES AT 110 DEGREES. THE EXISTING HOT WATER SYSTEM
HAS A RECIRCULATING SYSTEM WITH A CIRCULATING PUMP.
4. THIS IS AN EXISTING BUILDING WITH AN EXISTING DOMESTIC WATER SYSTEM THAT IS BEING MODIFIED TO REPLACE AND/OR INSTALL NEW PLUMBING FIXTURES. HOT AND COLD WATER DEMANDS HAVE BEEN CALCULATED TO VERIFY THE EXISTING SYSTEM AND WATER HEATER EQUIPMENT IS ADEQUATE TO MEET THE NEEDS OF THE PLUMBING FIXTURES. THE USE OF A DIVERSITY FACTOR FOR CAPACITY HAS BEEN INCLUDED
IN THE DOMESTIC WATER DESIGN.
5. SEE ARCHITECTURAL SERIES SHEETS FOR OCCUPANT LOAD FOR PLUMBING FIXTURES.
PLUMBING GENERAL NOTES:
5 5 10 15 20 25 30 35 40 45
1/16" = 1'-0"
FEETSCALE
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
2 2 4 6 8 10
1/4" = 1'-0"
G8
G
E
D
C8
H4
4 5 6 7 8 9 9.2 9.8
EXAM
9A-149
ASSOC. CHIEF
9A-151
EXAM
9A-147
OFFICE
9A-153
CORRIDOR
9A-C1F
OFFICE
9A-119
OFFICE
9A-111
EXAM
9A-113EXAM
9A-117
EXAM
9A-115
OFFICE
9A-121
CHIEF PRIMARY CARE
9A-155
OFFICE
9A-145
OFFICE
9A-143
EXAM
9A-139
EXAM
9A-137
EXAM
9A-135
OFFICE
9A-133
OFFICE
9A-131
OFFICE
9A-213
CLOSET
9A-208A
CLOSET
9A-211A
OFFICE
9A-214
OFFICE
9A-208
NUTRITIONIST
9A-209
MEDICATION
9A-221
OFFICE
9A-215
OFFICE
9A-216
OFFICE
9A-217
ELECT.
9A-227
OFFICE
9A-229OFFICE
9A-231
EXAM
9A-233
MEN TOILET
9A-223
WOMEN TOILET
9A-222
PATIENT TOILET
9A-220B
SUPPLIES
9A-224
PATIENT TOILET
9A-220A
SOILED TOILET
9A-226
EXAM
9A-330
EXAM
9A-328
EXAM
9A-334
EXAM
9A-346
EXAM
9A-340
EXAM
9A-344
EXAM
9A-342
STAIR #5-7
STAIR-7PACT SOCIAL
WORKER
9A-314
SUPPLY
9A-316
TELCOM.
9A-204
PATIENT TOILET
9A-203
EXISTING SOILED
SERVICE LOBBY
9B-302
EXISTING SOILED
LINEN CHUTE
9B-302A
TEL.
9B-302C
ELECTRICAL
9B-302B
EXAM
9A-127
EXAM
9A-129
EXAM
9A-125
EXAM
9A-123
OFFICE
9A-161
STAFF TOILET
9A-356A
EXAM
9A-352
EXAM
9A-354
STAFF LOCKERS
9A-356
ALCOVE
9A-212
OFFICE
9A-228
PATIENT TOILET
9A-206
EXAM
9A-322
EXAM
9A-320
EMS
9A-318
ROOM
9A-C7B
STAIR #4-7
STAIR-7
EXAM
9A-141
STORAGE / SUPPLY
9A-312
EXAM
9A-324
DIETICIAN
9A-207
OFFICE
9A-336
OFFICE
9A-326
OFFICE
9A-348
OFFICE
9A-338STAFF LOUNGE /
BREAK
9A-356B
OFFICE
9A-350
MECHANICAL
9A-304A
OFFICE
9A-163
ADMIN. OFFICE
9A-165
EKG
9A-220
CORRIDOR
9A-C1C
VITALS
9A-219
CORR.
9A-C2
ROOM
9A-C7A
OFFICE
9A-211
RECEPTION
9A-210
EQUIP. ALCOVE
9A-205
CORRIDOR
9A-C1D
CORRIDOR
9A-C1E
CORR.-1
9A-C1-1
ALCOVE
9A-234
WAITING
9A-202
ROOM
9A-C7C
CORRIDOR
9A-C7
B01-P109A
B01-P109A
1/2"
1/2" 1 1/2"
TR
9A-225
CORRIDOR
9A-C7
TR
9A-225
CORRIDOR
9A-C7
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com
KEYPLAN
PLAN NORTH
AREA A
03/31/23
B
IM
/2
V
A W e s t
P a lm B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.M T
R
.r v t
/3
/2
:3
:4
A
M
B01-P109A
NINTH LEVEL FLOOR PLAN - AREA
A - PLUMBING
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
B01
03/31/23 JWB NLC
1/16" = 1'-0"1
NINTH LEVEL FLOOR PLAN - AREA A - PLUMBING
1/4" = 1'-0"2
NINTH LEVEL FLOOR PLAN - OFFICE - DEMOLITION - PLUMBING
1/4" = 1'-0"3
NINTH LEVEL FLOOR PLAN - TR 9A-225 - NEW - PLUMBING
SHEET NOTES:
1. REMOVE SINK AND ASSOCIATED PIPING. CAP AT NEAREST MAIN.
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO DESIGN AND INSTALL A COMPLETE FIRE PROTECTION SYSTEM WITHIN THE PROJECT AREA. THIS INCLUDES, BUT IS NOT LIMITED TO, RELOCATING PIPING TO ACCOMMODATE NEW CONSTRUCTION REQUIREMENTS, REVISING SPRINKLER HEAD LAYOUTS, AND COMPLYING WITH NFPA-13
AND DIVISION 21 SPECIFICATION REQUIREMENTS.
2. THIS PROJECT AREA IS WITHIN AN EXISTING FACILITY CONNECTED TO CITY DOMESTIC COLD WATER AND IS
PROTECTED BY AN EXISTING REDUCED PRESSURE BACKFLOW PREVENTER.
3. THE EXISTING DOMESTIC HOT WATER SYSTEM IS CONNECTED TO WATER HEATERS HEATING THE WATER TO 140 DEGREES, IT IS ROUTED TO AN ASSE 1017 THERMOSTATIC MIXING VALVE, DELIVERING THE HOT WATER PROVIDED TO THE PROJECT AREA PLUMBING FIXTURES AT 110 DEGREES. THE EXISTING HOT WATER SYSTEM
HAS A RECIRCULATING SYSTEM WITH A CIRCULATING PUMP.
4. THIS IS AN EXISTING BUILDING WITH AN EXISTING DOMESTIC WATER SYSTEM THAT IS BEING MODIFIED TO REPLACE AND/OR INSTALL NEW PLUMBING FIXTURES. HOT AND COLD WATER DEMANDS HAVE BEEN CALCULATED TO VERIFY THE EXISTING SYSTEM AND WATER HEATER EQUIPMENT IS ADEQUATE TO MEET THE NEEDS OF THE PLUMBING FIXTURES. THE USE OF A DIVERSITY FACTOR FOR CAPACITY HAS BEEN INCLUDED
IN THE DOMESTIC WATER DESIGN.
5. SEE ARCHITECTURAL SERIES SHEETS FOR OCCUPANT LOAD FOR PLUMBING FIXTURES.
PLUMBING GENERAL NOTES:
5 5 10 15 20 25 30 35 40 45
1/16" = 1'-0"
FEETSCALE
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
2 2 4 6 8 10
1/4" = 1'-0"
G8
G
E
D
C8
C
H4
9.8 10.4 11.2 11.812.2 13 14 15 16 17 1818.2
EXISTING ELEV.
P-1
STAIR #1-8
STAIR-8
ELEV.-10
S-5-10
ELEV.-10
S-4-10
EXISTING ELEV.
S-2
EXISTING ELEV.
S-1
STORAGE
9B-304B
EXISTING ELEV.
S-3
UNISEX TOILET
9B-200
MALE H.C. TOILET
9B-204
FEMALE H.C. TOILET
9B-206
OFFICE
9B-103
OFFICE
9B-159
NURSE MANAGER
9B-165
EQUIP. ROOM
9B-163
PRIMARY CARE
9B-155
EXAM
9B-125
PACT SOCIAL
WORKER
9B-123
EXAM
9B-129
EXAM
9B-127
OFFICE
9B-121EXAM
9B-117
EXAM
9B-115
E.K.G. ROOM
9B-113
EXAM
9B-111
OFFICE
9B-119
EXAM
9B-219
CLOSET
9B-210A
OFFICE
9B-210
STORAGE
9B-212A
EXAM
9B-216
EXAM
9B-215
MEDICATION
9B-223
EXAM
9B-218
EXAM
9B-217
PATIENT TOILET
9B-225
PATIENT TOILET
9B-224
SUPPLIES
9B-226
PATIENT TOILET
9B-222B
PATIENT TOILET
9B-222A
ELECT.
9B-229
OFFICE
9B-231
OFFICE
9B-233
EXAM
9B-235
EXAM
9B-141
OFFICE
9B-143
EXAM
9B-139
EXAM
9B-135
EXAM
9B-137
OFFICE
9B-133
OFFICE
9B-131
SOILED UTILITY
9B-228
OFFICE
9B-230
EXAM
9B-149
EXAM
9B-147
PRIMARY CARE EXAM
9B-153
EXAM ROOM
9B-151
SOCIAL WORKER
9B-209
PATIENT TOILET
9B-208
STAFF TOILET
9B-220
TELCOM.
9B-205
PATIENT TOILET
9B-203
OFFICE
9B-348
OFFICE
9B-338
OFFICE
9B-336
OFFICE
9B-326
EXAM
9B-328
EXAM
9B-330
EXAM
9B-332
EXAM
9B-334
EXAM
9B-340
EXAM
9B-342
EXAM
9B-344
EXAM
9B-346
EXAM
9B-354
EXAM
9B-352
OFFICE
9B-350
STAFF TOILET
9B-356A
STORAGE SUPPLY
9B-312
OFFICE
PSYCHOLOGIST
STORAGE
9B-314
EXISTING SOILED
SERVICE LOBBY
9B-302
TEL.
9B-302C
ELECTRICAL
9B-302B
ELEVATOR SERVICE
LOBBY
9B-306
CORRIDOR-1
9B-C7-1
NUTRITIONIST
9B-213
EXISTING HAC
9B-316
EXAM
9B-320
EXAM
9B-322
PRIMARY CARE EXAM
9B-157
OFFICE
9B-212
ALCOVE
9B-214
OFFICE
9B-105
OFFICE
9B-324
EXAM
9B-145
OFFICE
9B-109
UNISEX TOILET
9B-202
MECHANICAL
9B-304A
CORR.
9B-C7A
CORR.
9B-C7B
CORR.
9B-C7C
STAIR #6-9
STAIR-9
STAFF LOUNGE /
BREAK
9B-356B
STAFF LOCKERS
9B-356
OFFICE
9B-161
CORRIDOR
9B-C1E
CORRIDOR
9B-C1D
CORRIDOR
9B-C1C
CORRIDOR
9B-C1B
CORRIDOR
9B-C1A
VITAL SIGNS STATION
9B-221
CORR.
9B-C2
ALCOVE
9B-236
CORRIDOR
9B-C7
EQUIP. ALCOVE
9B-207
RECEPTION
9B-211
WAITING
9B-201
PROCEDURE ROOM
9B-222
EXISTING CORRIDOR
9B-C1
B01-P109C
B01-P109C
11/2"
1/2" 1 1/2"
TR
9B-227
CORRIDOR
9B-C714
TR
9B-227
CORRIDOR
9B-C7
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com
KEYPLAN
PLAN NORTH
AREA C
03/31/23
B
IM
/2
V
A W e s t
P a lm B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.M T
R
.r v t
/3
/2
:3
:5
A
M
B01-P109C
NINTH LEVEL FLOOR PLAN - AREA
C - PLUMBING
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
B01
03/31/23 JWB NLC
1/16" = 1'-0"1
NINTH LEVEL FLOOR PLAN - AREA C - PLUMBING
1/4" = 1'-0"2
NINTH LEVEL FLOOR PLAN - PCSH INTERN - DEMOLITION - PLUMBING
1/4" = 1'-0"3
NINTH LEVEL FLOOR PLAN - TR 9B-227 - NEW - PLUMBING
SHEET NOTES:
1. REMOVE SINK AND ASSOCIATED PIPING. CAP AT NEAREST MAIN.
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO DESIGN AND INSTALL A COMPLETE FIRE PROTECTION SYSTEM WITHIN THE PROJECT AREA. THIS INCLUDES, BUT IS NOT LIMITED TO, RELOCATING PIPING TO ACCOMMODATE NEW CONSTRUCTION REQUIREMENTS, REVISING SPRINKLER HEAD LAYOUTS, AND COMPLYING WITH NFPA-13
AND DIVISION 21 SPECIFICATION REQUIREMENTS.
2. THIS PROJECT AREA IS WITHIN AN EXISTING FACILITY CONNECTED TO CITY DOMESTIC COLD WATER AND IS
PROTECTED BY AN EXISTING REDUCED PRESSURE BACKFLOW PREVENTER.
3. THE EXISTING DOMESTIC HOT WATER SYSTEM IS CONNECTED TO WATER HEATERS HEATING THE WATER TO 140 DEGREES, IT IS ROUTED TO AN ASSE 1017 THERMOSTATIC MIXING VALVE, DELIVERING THE HOT WATER PROVIDED TO THE PROJECT AREA PLUMBING FIXTURES AT 110 DEGREES. THE EXISTING HOT WATER SYSTEM
HAS A RECIRCULATING SYSTEM WITH A CIRCULATING PUMP.
4. THIS IS AN EXISTING BUILDING WITH AN EXISTING DOMESTIC WATER SYSTEM THAT IS BEING MODIFIED TO REPLACE AND/OR INSTALL NEW PLUMBING FIXTURES. HOT AND COLD WATER DEMANDS HAVE BEEN CALCULATED TO VERIFY THE EXISTING SYSTEM AND WATER HEATER EQUIPMENT IS ADEQUATE TO MEET THE NEEDS OF THE PLUMBING FIXTURES. THE USE OF A DIVERSITY FACTOR FOR CAPACITY HAS BEEN INCLUDED
IN THE DOMESTIC WATER DESIGN.
5. SEE ARCHITECTURAL SERIES SHEETS FOR OCCUPANT LOAD FOR PLUMBING FIXTURES.
PLUMBING GENERAL NOTES:
5 5 10 15 20 25 30 35 40 45
1/16" = 1'-0"
FEETSCALE
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
2 2 4 6 8 10
1/4" = 1'-0"
BFP
BFP
A
1 1
L
WC
MS
S
4" SAN
FS 1 1/2" DCW UP
1 1/2" V UP
1 1/2" V UP
1 1/2" UP
1 1/2" UP
2" SAN
4"
A B
1 1
2 2
UH-1
AC-2
AC-1
P-801
3/4" DCW
3/4" DCW
3/4" DCW
B23-P101
P-801
CORR 1
C-100
SERVER ROOM
CORR 3
C-102
GENERATORS
EMERGENCY ELECT.
ENTRANCE RM 2
CORR 4
C-103
ELECT.
OFFICE/EQUIPMENT STAGING
ENTRANCE RM 1
CORR 2
C-101
SPRLKR. RISER
110 STORAGE
AC-3
REMARKS:
1. REFER TO ARCHITECTURAL PLANS AND ELEVATIONS FOR ADDITIONAL REQUIREMENTS, ROUGH IN DIMENSIONS, AND COORDINATION OF ACCESSORIES. FIXTURE MOUNTING
LOCATIONS AND OPERATION OF FIXTURE SHALL NOT INTERFERE WITH ADJACENT ACCESSORIES OR THEIR OPERATION.
2. CONTRACTOR SHALL COORDINATE ALL FIXTURES WITH OTHER TRADES. ANY CONFLICTS OR ADJUSTMENTS SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ENGINEER.
3. COORDINATE SINK BASINS AND DRAIN OUTLETS WITH CASEWORK AND KNEE GUARDS. PROVIDE OFFSET TAILPIECES AS REQUIRED TO ACCOMMODATE INSTALLATION AND COMPLY
WITH ADA REQUIREMENTS.
4. COORDINATE FLUSH VALVE INSTALLATION WITH GRAB BARS IN ALL LOCATIONS.
5. COORDINATE MOUNTING OF FAUCET SPOUTS WITH BASINS. FAUCET SHALL NOT DISCHARGE DIRECTLY INTO BASIN DRAIN AND SHALL PROVIDE SUFFICIENT CLEARANCE BETWEEN
STREAM AND BASIN TO ALLOW FOR UNOBSTRUCTED HAND WASHING WITHOUT CONTACT WITH THE BASIN. CONTRACTOR SHALL OBTAIN AND COORDINATE WITH SHOP DRAWINGS
FROM COUNTER AND CASEWORK MANUFACTURERS.
6. COORDINATE DRAIN GRATE WITH FLOOR SLOPING AND FLOORING PATTERN FOR ALL FLOOR DRAINS, FLOOR SINKS, AND TRENCH DRAINS. DRAIN SHALL BE SET SUCH THAT DRAIN GRATE IS FLUSH WITH FINISHED FLOOR SURFACE AND COORDINATED WITH PATTERN. REFER TO ARCHITECTURAL PLANS AND DETAILS FOR ADDITIONAL INFORMATION.
A
2 2
1 1/4" DCW
1/2" DCW
FD-H
P-101
P-401
P-501
P-528
3/4" DHW
3/4" DCW WH-1
2" V
1" UP 3
1" DCW
1 1/2" DCW DN 1 1/2" DN
1 1/2" DN
3" VTR
EXPANSION TANK (SUPPORT
INDEPENDENTLY FROM STRUCTURE)
DRAIN VALVE
FLOOR DRAIN WITH
FUNNEL SPOUT (OR FLOOR
SINK, AS REQUIRED)
FINISHED FLOOR
SEE DRAWING
FOR CONTINUATION
AND PIPE SIZES
HOUSEKEEPING
PAD
ELECTRIC
WATER
HEATER
HOT WATER SUPPLY
COLD WATER SUPPLY
REMARKS:
1. PROVIDE WITH RELIEF VALVE, DIELECTRIC CONNECTIONS, THERMOMETERS ON INLET / OUTLET, AND EXPANSION TANK.
2. MOUNT ON 4" HOUSEKEEPING PAD.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 T: 828.315.9962 F: 828.315.9964 www.atriaxgroup.com
03/31/23
B
IM
/2
V
A W e s t
P a lm B e a c h
E H
R M
I n fr a s tr u c tu re U p g ra d e s D e s ig n /5
-7
.B
.M T
R
.r v t
/3
/2
:1
:2
P
M
B23-P101
FLOOR PLANS - PLUMBING ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
WEST PALM BEACH, FL
548-22-700
B23
03/31/23 JWB NLC
PLAN NORTH
A. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.
B. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN DASHED, EXISTING
MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER PLANS, NEW
MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
C. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
D. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
GENERAL NOTES:
SHEET NOTES:
1. REFER TO CIVIL DRAWINGS FOR CONTINUATION.
2. MAINTAIN 10' SEPARATION BETWEEN VENT PENTRATION THROUGH ROOF AND OUTDOOR AIR INTAKE FOR
ROOFTOP UNIT.
3. ROUTE 1" DCW UP TO RH-1 ON ROOF. COORDINATE EXACT LOCATION OF ROOF HYDRANT WITH SCREEN WALL
AND ROOFTOP EQUIPMENT. PROVIDE DRAIN DOWN CONNECTION AND ROUTE TO MOP SINK.
1/4" = 1'-0"2
UNDERFLOOR LEVEL FLOOR PLAN - PLUMBING
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
1/8" = 1'-0"1
FIRST LEVEL FLOOR PLAN - PLUMBING
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
PLUMBING FIXTURE SCHEDULE
MARK TYPE DESCRIPTION
PIPING CONNECTIONS
COLD WATER HOT WATER WASTE VENT
FD-H FLOOR SINK REFER TO SPECIFICATION PER APPLICABLE
PLUMBING CODE
PER APPLICABLE
PLUMBING CODE
P-101 FLOOR MOUNTED
WATER CLOSET
REFER TO SPECIFICATION 1" - 4" 2"
P-401 LAVATORY REFER TO SPECIFICATION 1/2" 1/2" 2" 1 1/2"
P-501 MOP SINK REFER TO SPECIFICATION 3/4" 3/4" 3" 1 1/2"
P-528 SINK REFER TO SPECIFICATION 1/5" 1/2" 2" 1 1/2"
P-801 HOSE BIB REFER TO SPECIFICATION 3/4" - - -
RH-1 ROOF HYDRANT ROOF HYDRANT - FREEZELESS ROOF HYDRANT, SELF-DRAINING, DUAL
CHECK BACKFLOW PREVENTER INTEGRAL TO HYDRANT, 3/4" MALE HOSE
THREAD, GALVANIZED STEEL PIPE CASING. PROVIDE WITH CAST IRON
MOUNTING SYSTEM INCLUDING UNDERDECK FLANGE, EPDM COVER, AND
CAST IRON SUPPORT OF SUFFICIENT LENGTH TO CLEAR ROOF INSULATION
THICKNESS. ASSE 1052 LISTED AND APPROVED. WOODFORD MODEL
RHY2-MS OR APPROVED EQUAL.
1" - - -
1/4" = 1'-0"4
FIRST LEVEL FLOOR PLAN - PLUMBING ENLARGED
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
NO SCALE3
ELECTRIC WATER HEATER
ELECTRIC WATER HEATER SCHEDULE
MARK
STORAGE
CAPACITY
STORAGE WATER
TEMPERATURE
[°F]
RECOVERY
(@ 100°F RISE)
[GPH]
DISTRIBUTION
WATER
TEMPERATURE
[°F]
ELECTRICAL DATA
MANUFACTURER MODEL REMARKSKW FLA VOLTAGE PHASE DISCONNECT BY
WH-1 10 140 25 120 6 7.2 480 V 3 ELECTRICAL AO SMITH DSE-10A (1)(2)
| B01-P101F - FIRST LEVEL FLOOR PLAN -AREA F -PLUMBING |
| B01-P102A - SECOND LEVEL FLOOR PLAN -AREA A -PLUMBING |
| B01-P108A - EIGHTH LEVEL FLOOR PLAN -AREA A -PLUMBING |
| B01-P108C - EIGHTH LEVEL FLOOR PLAN -AREA C -PLUMBING |
| B01-P109A - NINTH LEVEL FLOOR PLAN -AREA A -PLUMBING |
| B01-P109C - NINTH LEVEL FLOOR PLAN -AREA C -PLUMBING |
| B23-P101 - FLOOR PLANS -PLUMBING |