Attachment 16 - TMB ATCT Replace Design Price Proposal (Template for Bidders).xlsx

XLSX spreadsheet 30 KB Posted

Attached to
A-E DESIGN -MIAMI EXECUTIVE TMB - AIRPORT TRAFFIC CONTROL TOWER (ATCT) WITH ADMINISTRATIVE BASE BUILDING AND NEW REMOTE TRANSMITTER RECEIVER (RTR) FACILITY
Solicitation number
697DCK-24-N-00333
Issued by

About this file

This document appears to be a pricing template for an Architect-Engineer (A-E) firm to submit a design fee proposal for a federal contract opportunity. The contract opportunity is to design a new Airport Traffic Control Tower (ATCT) with Administrative Base Building and a new Remote Transmitter Receiver (RTR) facility at the Miami Executive Airport (TMB) in Miami, FL. The solicitation number is 697DCK-24-N-00333 and is being issued by the Department of Transportation Federal Aviation Administration Southwestern Region.

The pricing template includes labor categories, hourly rates, and estimated hours for the design services. It has three main sections: Task 1 for the ATCT design, Task 2 for the RTR design, and an optional Task 3 for construction support services. Offerors are to complete the pricing template with their proposed labor mix and costs. Questions on the opportunity are due by July 8, 2024.

View the file

Other files

File Type Posted
697DCK-24-R-00333 - Miami TMB A-E Amendment 3 Questions.pdf PDF
Sol_697DCK-24-R-00333_Amd_0003.pdf PDF
Sol_697DCK-24-R-00333_Amd_0001.pdf PDF
Sol_697DCK-24-R-00333_Amd_0002.pdf PDF
697DCK-24-R-00333 - Miami TMB A-E Amendment 1 Questions.pdf PDF
AE SOW - TMB ATCT Replace FINAL rev04.pdf PDF
Attachment 15 - 2009 Const Drawings Matrix.xls XLS spreadsheet
Attachment 06 - TMB Min Wind Tunnel Testing Requirements.pdf PDF
Attachment 08 - Environmental Assessment - Proposed New ATCT Construction at Miami Executive Airport (TMB) 3-1-23 FINAL.pdf PDF
Attachment 02 - TMB ATCT RDWB Final 2022-07-07 V0-20_Redacted.pdf PDF
Attachment 13 - Option 1 - SOW TMB ATCT_ Const Support.pdf PDF
Attachment 03 - Terminal Facilities Design Standard V2.1.pdf PDF
Sol_697DCK-24-R-00333.pdf PDF
Attachment 12 - Communications Facility_RTR and RCAG Standard Design - 36 ft Shelter.pdf PDF
Attachment 14 - CPDS Type Radial Standard Electrical One-Line 6-16-23.pdf PDF
Attachment 17 - PAST PERF SURVEY _Template TMB ATCT Design.pdf PDF
Attachment 04 - TMB TFDS Supplement.pdf PDF
Attachment 11 - Communications Facility Replacement Standard Specifications.pdf PDF
Attachment 05 - FAA BIM Execution Plan_v1.0_Final.pdf PDF
Attachment 10 - Airport Cabling (FOTS).pdf PDF
Attachment 18 - CON243-SF 330 Blank.pdf PDF
Attachment 09 - TMB ATCT FONSI-ROD FINAL 3_7_2023_Signature Required -- RM Signed.pdf PDF
Attachment 07 - FLS standard _ June 2021.pdf PDF
Attachment 01 - TMB Siting Report_Final.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task 1-TMB ATCT Design

ARCHITECT-ENGINEER SERVICES FEE
Project Title:Date:
Firm Name:Prepared By:
CLINDisciplinesHourly Labor RateEstimated Hours of ServiceTotal Cost
0001Architectural Engineering
0001Architect, Senior
0001Architect, Junior
0001Interior Designer, Senior
0001Interior Designer, Junior
0001Landscape Architect
0001Civil Engineering
0001Civil Engineer, Senior
0001Civil Engineer, Junior
0001Civil Engineer Technician
0001Structural Engineering
0001Structural Engineer, Senior
0001Structural Engineer, Junior
0001Mechanical Engineering
0001Mechanical Engineer, Senior
0001Mechanical Engineer, Junior
0001Electrical Engineering
0001Electrical Engineer, Senior
0001Electrical Engineer, Junior
0001Fire/Life Safety Engineering
0001Fire/Life Safety Engineer, Sr
0001Fire/Life Safety Engineer, Jr
0001Geotechnical Engineering
0001Geotechnical Engineer,

Senior

0001Geotechnical Engineer, Junior
0001Environmental Engineering
0001Environmental Engineer, Sr
0001Environmental Engineer, Jr
0001Supporting Services Disciplines
0001Principal
0001Project Manager
0001Specification Writer
0001CADD Technician, Senior
0001CADD Technician, Junior
0001Surveyor, Senior
0001Building Information Model Expert
0001Administration Support Staff
0001Clerical Support Staff
0001Sustainability Specialist, Senior
0001Cost Estimator
0001Insert Other as needed
SUBTOTALS
DIRECT COSTS
CLINDescriptionQtyCost/TripTotal
Other Costs
CLINDescriptionTotal

TOTAL DIRECT COSTS

INDIRECT COSTS
CLINPercent (%)Amount

TOTAL INDIRECT COSTS

Grand Total

Task 2 RTR Design

ARCHITECT-ENGINEER SERVICES FEE
Project Title:Date:
Firm Name:Prepared By:
DisciplinesHourly Labor RateEstimated Hours of ServiceTotal Cost
CLINArchitectural Engineering
1Architect, Senior
1Architect, Junior
1Interior Designer, Senior
1Interior Designer, Junior
1Landscape Architect
1Civil Engineering
1Civil Engineer, Senior
1Civil Engineer, Junior
1Civil Engineer Technician
1Structural Engineering
1Structural Engineer, Senior
1Structural Engineer, Junior
1Mechanical Engineering
1Mechanical Engineer, Senior
1Mechanical Engineer, Junior
1Electrical Engineering
1Electrical Engineer, Senior
1Electrical Engineer, Junior
1Fire/Life Safety Engineering
1Fire/Life Safety Engineer, Sr
1Fire/Life Safety Engineer, Jr
1Geotechnical Engineering
1Geotechnical Engineer,

Senior

1Geotechnical Engineer, Junior
1Environmental Engineering
1Environmental Engineer, Sr
1Environmental Engineer, Jr
1Supporting Services Disciplines
1Principal
1Project Manager
1Specification Writer
1CADD Technician, Senior
1CADD Technician, Junior
1Surveyor, Senior
1Building Information Model Expert
1Administration Support Staff
1Clerical Support Staff
1Sustainability Specialist, Senior
1Cost Estimator
1Insert Other as needed
SUBTOTALS
DIRECT COSTS
CLINDescriptionQtyCost/TripTotal
Other Costs
CLINDescriptionTotal

TOTAL DIRECT COSTS

INDIRECT COSTS
CLINPercent (%)Amount

TOTAL INDIRECT COSTS

Grand Total

Option 1- Construction Support

ARCHITECT-ENGINEER SERVICES FEE
Project Title:Date:
Firm Name:Prepared By:
DisciplinesHourly Labor RateEstimated Hours of ServiceTotal Cost
CLINArchitectural Engineering
2Architect, Senior
2Architect, Junior
2Interior Designer, Senior
2Interior Designer, Junior
2Landscape Architect
2Civil Engineering
2Civil Engineer, Senior
2Civil Engineer, Junior
2Civil Engineer Technician
2Structural Engineering
2Structural Engineer, Senior
2Structural Engineer, Junior
2Mechanical Engineering
2Mechanical Engineer, Senior
2Mechanical Engineer, Junior
2Electrical Engineering
2Electrical Engineer, Senior
2Electrical Engineer, Junior
2Fire/Life Safety Engineering
2Fire/Life Safety Engineer, Sr
2Fire/Life Safety Engineer, Jr
2Geotechnical Engineering
2Geotechnical Engineer,

Senior

2Geotechnical Engineer, Junior
2Environmental Engineering
2Environmental Engineer, Sr
2Environmental Engineer, Jr
2Supporting Services Disciplines
2Principal
2Project Manager
2Specification Writer
2CADD Technician, Senior
2CADD Technician, Junior
2Surveyor, Senior
2Building Information Model Expert
2Administration Support Staff
2Clerical Support Staff
2Sustainability Specialist, Senior
2Cost Estimator
2Insert Other as needed
SUBTOTALS
DIRECT COSTS
CLINDescriptionQtyCost/TripTotal
Other Costs
CLINDescriptionTotal

TOTAL DIRECT COSTS

INDIRECT COSTS
CLINPercent (%)Amount

TOTAL INDIRECT COSTS

Grand Total

File details come from the government source that posted it. Updated .