This document appears to be a set of questions and answers (Q&A) related to Amendment 3 of Solicitation Number 697DCK-24-R-00133 for the design of a new Airport Traffic Control Tower (ATCT) with Administrative Base Building and Remote Transmitter Receiver (RTR) facility at the Miami Executive Airport (TMB) in Miami, FL.

The key details from the Q&A are:

  • The design calls for a square tower shaft with a segmented round flare at the occupied levels, and three levels below the console access level.
  • The design includes two stairs and two elevators, as the tower height exceeds 119 feet.
  • Wind tunnel results are not required prior to the Preliminary Project Design (PPD) submittal, but are required at the 45% design submission.
  • The project manager can be "dual-hatted" as the senior architect or engineer, but must be supported by at least a junior-level architect or engineer in that discipline.
  • Offerors can provide up to 5 pages each for project scope/deliverables and problems encountered/corrective actions, rather than the original 1 page limit, under Factor 1: Past Relevant Experience.

View the file

Other files

File Type Posted
Sol_697DCK-24-R-00333_Amd_0003.pdf PDF
Sol_697DCK-24-R-00333_Amd_0001.pdf PDF
Sol_697DCK-24-R-00333_Amd_0002.pdf PDF
697DCK-24-R-00333 - Miami TMB A-E Amendment 1 Questions.pdf PDF
AE SOW - TMB ATCT Replace FINAL rev04.pdf PDF
Attachment 15 - 2009 Const Drawings Matrix.xls XLS spreadsheet
Attachment 06 - TMB Min Wind Tunnel Testing Requirements.pdf PDF
Attachment 08 - Environmental Assessment - Proposed New ATCT Construction at Miami Executive Airport (TMB) 3-1-23 FINAL.pdf PDF
Attachment 02 - TMB ATCT RDWB Final 2022-07-07 V0-20_Redacted.pdf PDF
Attachment 13 - Option 1 - SOW TMB ATCT_ Const Support.pdf PDF
Attachment 03 - Terminal Facilities Design Standard V2.1.pdf PDF
Sol_697DCK-24-R-00333.pdf PDF
Attachment 16 - TMB ATCT Replace Design Price Proposal (Template for Bidders).xlsx XLSX spreadsheet
Attachment 12 - Communications Facility_RTR and RCAG Standard Design - 36 ft Shelter.pdf PDF
Attachment 14 - CPDS Type Radial Standard Electrical One-Line 6-16-23.pdf PDF
Attachment 17 - PAST PERF SURVEY _Template TMB ATCT Design.pdf PDF
Attachment 04 - TMB TFDS Supplement.pdf PDF
Attachment 11 - Communications Facility Replacement Standard Specifications.pdf PDF
Attachment 05 - FAA BIM Execution Plan_v1.0_Final.pdf PDF
Attachment 10 - Airport Cabling (FOTS).pdf PDF
Attachment 18 - CON243-SF 330 Blank.pdf PDF
Attachment 09 - TMB ATCT FONSI-ROD FINAL 3_7_2023_Signature Required -- RM Signed.pdf PDF
Attachment 07 - FLS standard _ June 2021.pdf PDF
Attachment 01 - TMB Siting Report_Final.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

697DCK-24-R-00133 - Miami TMB A-E Amendment 3 Questions:

Q&A

Q1. For design considerations noting that the cab is 8 sided, does the FAA anticipate a square tower shaft standard or segmented round standard?

A1. Square shaft, with segmented round flare segment at occupied levels.

Q2. For design considerations does the FAA anticipate one or two levels below the console access level?

A2. Three levels actually.

Q3. Since the tower height exceeds 119’ please confirm the design includes two elevators and dual egress (two separate stairs).

A3. Confirmed 2 stairs and 2 elevators.

Q4. To cover significant changes to the standard design floorplan for site adaptation as noted in the SOW, please verify that the wind tunnel results are not required prior to the PPD submittal as implied on the SOW DELIVERABLES page.?

A4. Wind Tunnel Results are not required prior to the PPD and shall be submitted according to the TFDS v2.1, which indicates its required at the 45% submission.

Q5. Can the key personnel be dual-hatted i.e. can the Project Manager be the same as the Senior Architect, (Senior [Discipline])?

A5. The project manager may be "dual hatted", however they shall only be over a single discipline and they must be supported by another engineer/architect for that discipline (at least junior level). For example, if the project manager is going to be the senior architect as well as the contractor, must also have a supporting architect. This would apply for any discipline.

Q6. Please clarify whether we can provide additional information, and pages to the project sheets in addition to the requested information in Factor 1: Past Relevant Experience

1. one page detailing the project scope and deliverables, and

2. one page outlining the problems encountered and the corrective actions taken.

A6. Updating from one page to five pages:

1. In five (5) pages or less, briefly describe the project's scope and the A/E firm's required deliverables for the task.

2. In five (5) pages or less, describe any problems encountered and corrective actions taken, if applicable.