Attachment 14 Key Personnel Resume Fillable.pdf

PDF 185 KB Posted

Attached to
USDA-FS GWJ NF Call for Quals Design-Build Virginia Creeper Bridge(s) /Trail(s) Reconstruction
Solicitation number
12445125R0002
Issued by

About this file

Attachment 14 is a Key Personnel Resume template designed for the USDA Forest Service's Virginia Creeper Trail Bridge and Trail Reconstruction Design-Build project. The form requires detailed documentation of an individual's professional background, including employment history for the past 10 years, education, license registrations, certifications, and relevant project experience. The template mandates listing up to five projects, with specific sections for project name, description, scope, size, and the individual's specific role, duration, and tasks performed.

The resume form is part of a larger solicitation (12445125R0002) for reconstructing an 18-mile section of the Virginia Creeper National Recreation Trail in Washington and Grayson Counties, Virginia. The project involves reconstructing trail trestles, treadway, and associated features damaged by Tropical Storm Helene, with an estimated contract value between $200-300 million. The solicitation is unrestricted with a small business subcontracting plan, uses a design-build approach, and has a Phase I qualifications submission deadline of 07/09/2025. Potential offerors must request access to detailed regulations and specifications via email to the provided contact.

View the file

Other files

File Type Posted
12445125R0002 0006 Phase II Q Asked and Site Visit QA FINAL 08272025.pdf PDF
12445125R0002 0005.pdf PDF
12445125R0002 Phase II Questions Asked 08082025.pdf PDF
12445125R0002 Virginia Creeper Site Visit Locations Read ahead.pdf PDF
12445125R0002 004.pdf PDF
12445125R0002 Phase I Selectee Notice SAM.GOV SIGNED.pdf PDF
12445125R0002 0003.pdf PDF
12445125R0002 0002 07102025.pdf PDF
12445125R0002 Questions Asked 07092025 REV7 FINAL PHASE I.doc DOC document
NEW 12445125R0002 0001 REV 4 06302025.pdf PDF
NEW Attachment 07 - Section L Submission Instructions 06302025 V2.pdf PDF
NEW Attachment 02 SECTION C SOW Version 06302025.pdf PDF
12445125R0002 Questions Asked 06302025 REV6.doc DOC document
NEW Attachment 08 - Section M Evaluations Factors 06302025 V2.pdf PDF
12445125R0002 VA Creeper Call for Quals Pre-Proposal Conference Number Two - Attendance report 6-09-25.xlsx XLSX spreadsheet
12445125R0002 VA Creeper Call for Quals Pre-Proposal Conference Number Two.docx DOCX document
Attachment 13 - Architect-Engineering Past Performance Questionnaire Fillable.pdf PDF
Attachment 08 - Section M Evaluations Factors 05212025.pdf PDF
12445125R0002 VA Creeper Pre-Proposal Conference One 6-02-25.docx DOCX document
Attachment 01 Schedule B Supplies or Services and Prices 03262025.pdf PDF
Attachment 04 NRM VA Creeper Trail Features.pdf PDF
Attachment 11 Architect- Engineering Experience Form.docx DOCX document
Attachment 03 Davis-Bacon Act WD GRAYSON AND WASHINGTON.pdf PDF
12445125R0002 VA Creeper Pre-Proposal Conference One Attendance report 6-02-25.xlsx XLSX spreadsheet
12445125R0002 Questions Asked 06062025 REV2.doc DOC document
VCT Preproposal Conference Presentation.pptx PPTX presentation
Attachment 10 Construction Experience Form.docx DOCX document
Attachment 15 Example-SMALL BUSINESS SUBCONTRACTING PLAN TEMPLATE.docx DOCX document
Attachment 09 12445125R0002 Subcontract Plan Evaluation.xls XLS spreadsheet
Attachment 05 VCT Dec 2024 Damage Map.pdf PDF
Attachment 16 PARTICIPATION GOALS FOR MINORITIES AND FEMALES.pdf PDF
Attachment 12 Construction Past Performance Questionnaire Fillable.pdf PDF
Attachment 06 VCNRT Restoration Map.pdf PDF
Attachment 07 - Section L Submission Instructions 05222025.pdf PDF
Attachment 02 SECTION C SOO Version 05052025 FINAL.pdf PDF
12445125R0002 SF1442 Complete without attachments 05222025.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 14 :Key Personnel Resume Name:

a. Title: b. Firm Name & Location:

c. Employment History: With this Firm Years With Other Firms Years Please list chronologically (most recent first) your employment history, position, and duration of employment for the last ten (10) years.

(NOTE: If you have less than 10 years of employment history, please list the history for those years you have worked. Project specific experience shall only be included in Section (g) below):

Firm Name Position with Firm Duration (mm/yy – mm/yy)

d. Education: Name & Location of Institution(s)/Degree(s)/Year/Specialization:

e. Active License Registration: Year First Registered/ VA Registration #:

f. Certifications: Certification Name/Certification Valid thru:

g. Relevant Project Experience (Document the extent and depth of your experience and qualifications including any specialty experience). The number of relevant projects shall be limited to no more than five (5).

1) Name of the Project:

Brief Project Description of the Project (Scope and size):

Project Experience (project specific role, duration on project, part time/full-time assignment, owner/contractor representative and specific tasks performed):

2) Name of the Project:

Brief Project Description of the Project (Scope and size):

Project Experience (project specific role, duration on project, part time/full-time assignment, owner/contractor representative and specific tasks performed):

3) Name of the Project:

Brief Project Description of the Project (Scope and size):

Project Experience (project specific role, duration on project, part time/full-time assignment, owner/contractor representative and specific tasks performed):

4) Name of the Project:

Brief Project Description of the Project (Scope and size):

Project Experience (project specific role, duration on project, part time/full-time assignment, owner/contractor representative and specific tasks performed):

5) Name of the Project:

Brief Project Description of the Project (Scope and size):

Project Experience (project specific role, duration on project, part time/full-time assignment, owner/contractor representative and specific tasks performed):

The format and appearance, including existing text, of the Key Personnel Resume Form should not be modified. If including less than five (5) projects, enter N/A after “Name of the Project.”

Name:
a Title:
b Firm Name Location:
Years With Other Firms:
Years:
Firm NameRow1:
Position with FirmRow1:
Duration mmyy mmyyRow1:
Firm NameRow2:
Position with FirmRow2:
Duration mmyy mmyyRow2:
Firm NameRow3:
Position with FirmRow3:
Duration mmyy mmyyRow3:
Firm NameRow4:
Position with FirmRow4:
Duration mmyy mmyyRow4:
Firm NameRow5:
Position with FirmRow5:
Duration mmyy mmyyRow5:
Firm NameRow6:
Position with FirmRow6:
Duration mmyy mmyyRow6:
d Education Name Location of InstitutionsDegreesYearSpecialization:
e Active License Registration Year First Registered VA Registration:
f Certifications Certification NameCertification Valid thru:
g Relevant Project Experience Document the extent and depth of your experience and qualifications including any specialty experience The number of relevant projects shall be limited to no more than five 5:
2 Name of the Project Brief Project Description of the Project Scope and size Project Experience project specific role duration on project part timefulltime assignment ownercontractor representative and specific tasks performed:
3 Name of the Project Brief Project Description of the Project Scope and size Project Experience project specific role duration on project part timefulltime assignment ownercontractor representative and specific tasks performed:
4 Name of the Project Brief Project Description of the Project Scope and size Project Experience project specific role duration on project part timefulltime assignment ownercontractor representative and specific tasks performed:

File details come from the government source that posted it. Updated .