Attachment 01 Schedule B Supplies or Services and Prices 03262025.pdf
PDF 368 KB Posted
- Attached to
- USDA-FS GWJ NF Call for Quals Design-Build Virginia Creeper Bridge(s) /Trail(s) Reconstruction
- Solicitation number
- 12445125R0002
- Issued by
-
Department of Agriculture Forest Service
About this file
Attachment 001 Schedule B is a detailed pricing schedule for the USDA Forest Service's Virginia Creeper Trail Design-Build Reconstruction project. The document breaks down pricing for debris/cleanup/demolition and bridge and trail reconstruction across four mile marker segments (0-5, 5-10, 10-15, and 15-20), with estimated volumes ranging from 4,000-6,500 cubic yards. The schedule includes sections for design and construction of bridges and trails, with specific details on bridge types (steel truss, wooden trestle, steel girder) and their locations along the trail.
The document requires contractors to provide unit pricing for each segment, with a warning about proper disposal of creosote timbers as "special waste" in Virginia. Contractors must include a price breakdown excel spreadsheet and are expected to conduct all necessary analyses and studies, including geotechnical and hydrological assessments. The project stems from damage to the Virginia Creeper National Recreation Trail caused by Tropical Storm Helene, focusing on reconstructing approximately 18 miles of trail in its original footprint, including 31 trestles managed by the USDA Forest Service.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No: 12445125R0002 Project Name: Virginia Creeper Trail 2 Step D/B
FAC 2025-03; 17JAN2025
Attachment 001 Schedule B VA Creeper Trail Design-Build Reconstruction Debri/Cleanup/Demolition- Bridge and Trails
# ITEM DESCRIPTION Est Qty Unit Unit Price TOTALS
Debris/Cleanup/Demolition- Bridge and Trails; Includes any land survey for partner shared boundary Mile Marker 0 to 5
- Bridge/Trussell Est: 1,500CY
- Trail Est: 3,500CY
CONTRACTOR INTENDED POP: FROM TO
5,000 CY $ $
Debris/Cleanup/Demolition- Bridge and Trails; Includes any land survey for partner shared boundary Mile Marker 5 to 10
- Bridge/Trussell Est: 3,000CY
- Trail Est: 3,500CY
CONTRACTOR INTENDED POP: FROM TO
6,500 CY $ $
Debris/Cleanup/Demolition- Bridge and Trails; Includes any land survey for partner shared boundary Mile Marker 10 to 15
- Bridge/Trussell Est: 1,500CY
- Trail Est: 3,500CY
CONTRACTOR INTENDED POP: FROM TO
5,000 CY $ $
Debris/Cleanup/Demolition- Bridge and Trails; Includes any land survey for partner shared boundary Mile Marker 15 to 20
- Bridge/Trussell Est: 500CY
- Trail Est: 3,500CY
CONTRACTOR INTENDED POP: FROM TO
4,000 CY $ $
TOTAL ESTIMATE $
*Include price breakdown excel supporting data with price package
Overall period of performance for demo/cleanup from to
CONTRACTOR NAME:
SIGNATURE
**WARNING: it appears that Creosote timbers are considered "special waste" and not hazardous waste in Virginia according to the Virginia Department of Environmental Quality. That source indicates that that the timbers can only be taken to certain landfills if disposed of within Virginia. https://www.deq.virginia.gov/our-programs/land-waste/solid-hazardous-waste/special-waste https://www.deq.virginia.gov/our-programs/land-waste/solid-hazardous-waste/special-waste
DESIGN of BRIDGES Struct
Trail Mile Post
Pre-storm Trail Bridge Superstructure Type remove Y/N access Y/N
Debris
EST
CY
Notes UNIT PRICE MILE BLOCK TOTAL
16 0.04 Steel truss/wooden trestle approaches
N Y 0 SEE ATTACHMENT 002 $
17 0.44 Steel truss/wooden trestle approaches
N Y 0 SEE ATTACHMENT 002 $
18 2.35 Steel truss Y Y 350 SEE ATTACHMENT 002 $ 19 2.53 Steel girder Y Y 500 SEE ATTACHMENT 002 $ 20 2.63 Steel girder Y Y 0 SEE ATTACHMENT 002 $ 21 3.77 Steel truss Y Y 50 SEE ATTACHMENT 002 $ 22 4.78 Wooden trestle Y Y 100 SEE ATTACHMENT 002 $
23 5 Wooden trestle Y Y 200 SEE ATTACHMENT 002 $
24 5.21 Wooden trestle Y Y 200 SEE ATTACHMENT 002 $ 25 5.8 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 26 6.09 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 27 7.05 Wooden trestle Y N 250 SEE ATTACHMENT 002 $ 28 7.25 Wooden trestle N N 10 SEE ATTACHMENT 002 $ 29 7.89 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 30 8.09 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 31 8.69 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 32 9.12 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 33 9.52 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 34 9.8 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 35 9.9 Steel Truss N N 220 SEE ATTACHMENT 002 $
36 10.17 Steel Truss N N 30 SEE ATTACHMENT 002 $
37 10.21 Steel Girder Y N 260 SEE ATTACHMENT 002 $
38 10.75 Steel girder/wooden trestle approaches N N 0 SEE ATTACHMENT 002 $
39 11.45 Steel truss/wooden trestle approaches N N 0 SEE ATTACHMENT 002 $
40 11.51 Wooden Trestle N N 0 SEE ATTACHMENT 002 $ 41 12.16 Wooden Trestle Y Y 160 SEE ATTACHMENT 002 $ 42 12.49 Steel Truss N Y 0 SEE ATTACHMENT 002 $ 43 12.85 Steel Truss N Y 0 SEE ATTACHMENT 002 $ 44 12.94 Wooden Trestle Y Y 15 SEE ATTACHMENT 002 $ 45 13.92 Wooden Trestle N Y 15 SEE ATTACHMENT 002 $ 48 14.93 Steel Arch Culvert N N 0 SEE ATTACHMENT 002 $
46 16.95 Wooden Trestle N N 0 SEE ATTACHMENT 002 $
47 18.24 Wooden Trestle N N 0 SEE ATTACHMENT 002 $
TOTAL $
Price should include all analysis and studies required (Geotech/hydrology, etc)/ *Include price breakdown excel supporting data with price package
Vendor Name:
Unique SAM ID:
Period of Performance Date Available:
SIGNATURE:
DESIGN of TRAILS
Trail Mile Post
Essential Element to be Repaired Length Latitude Longitude Unit Price Mile Block Total
SEE ATTACHMENT 04 NRM TRAIL DETAILS
PRICE ALL ITEMS EXCEPT FOR BRIDGE DESIGN/REPLACEMENT
5.00
SEE ATTACHMENT 04 NRM TRAIL DETAILS
SEE ATTACHMENT 04 NRM TRAIL DETAILS
SEE ATTACHMENT 04 NRM TRAIL DETAILS
PRICE ALL ITEMS EXCEPT FOR BRIDGE DESIGN/REPLACEMENT
$ 20
TOTAL TRAIL DESIGN $
Price should include all analysis and studies required (Geotech/hydrology, etc)/ *Include price breakdown excel supporting data with price package
Vendor Name:
Unique SAM ID:
Period of Performance Date Available:
SIGNATURE:
CONSTRUCTION of BRIDGES Struct
Trail Mile Post
Pre-storm Trail Bridge Superstructure Type remove Y/N access Y/N
Debris
EST
CY
Notes UNIT PRICE MILE BLOCK TOTAL
16 0.04 Steel truss/wooden trestle approaches N Y 0 SEE ATTACHMENT 002 $
17 0.44 Steel truss/wooden trestle approaches N Y 0 SEE ATTACHMENT 002 $
18 2.35 Steel truss Y Y 350 SEE ATTACHMENT 002 $ 19 2.53 Steel girder Y Y 500 SEE ATTACHMENT 002 $ 20 2.63 Steel girder Y Y 0 SEE ATTACHMENT 002 $ 21 3.77 Steel truss Y Y 50 SEE ATTACHMENT 002 $ 22 4.78 Wooden trestle Y Y 100 SEE ATTACHMENT 002 $
23 5 Wooden trestle Y Y 200 SEE ATTACHMENT 002 $
24 5.21 Wooden trestle Y Y 200 SEE ATTACHMENT 002 $ 25 5.8 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 26 6.09 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 27 7.05 Wooden trestle Y N 250 SEE ATTACHMENT 002 $ 28 7.25 Wooden trestle N N 10 SEE ATTACHMENT 002 $ 29 7.89 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 30 8.09 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 31 8.69 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 32 9.12 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 33 9.52 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 34 9.8 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 35 9.9 Steel Truss N N 220 SEE ATTACHMENT 002 $
36 10.17 Steel Truss N N 30 SEE ATTACHMENT 002 $
37 10.21 Steel Girder Y N 260 SEE ATTACHMENT 002 $
38 10.75 Steel girder/wooden trestle approaches
N N 0 SEE ATTACHMENT 002 $
39 11.45 Steel truss/wooden trestle approaches
N N 0 SEE ATTACHMENT 002 $
40 11.51 Wooden Trestle N N 0 SEE ATTACHMENT 002 $ 41 12.16 Wooden Trestle Y Y 160 SEE ATTACHMENT 002 $ 42 12.49 Steel Truss N Y 0 SEE ATTACHMENT 002 $ 43 12.85 Steel Truss N Y 0 SEE ATTACHMENT 002 $ 44 12.94 Wooden Trestle Y Y 15 SEE ATTACHMENT 002 $ 45 13.92 Wooden Trestle N Y 15 SEE ATTACHMENT 002 $ 48 14.93 Steel Arch Culvert N N 0 SEE ATTACHMENT 002 $
46 16.95 Wooden Trestle N N 0 SEE ATTACHMENT 002 $
47 18.24 Wooden Trestle N N 0 SEE ATTACHMENT 002 $
TOTAL $
Price should include all analysis and studies required (Geotech/hydrology, etc)/ *Include price breakdown excel supporting data with price package
Vendor Name:
Unique SAM ID:
Period of Performance Date Available:
SIGNATURE:
**WARNING: it appears that Creosote timbers are considered "special waste" and not hazardous waste in Virginia according to the Virginia Department of Environmental Quality. That source indicates that that the timbers can only be taken to certain landfills if disposed of within
CONSTRUCTION of TRAILS – OTHER THAN BRIDGES
Trail Mile Post
Essential Element to be Repaired Length Latitude Longitude Unit Price Mile Block Total
SEE ATTACHMENT 04 NRM TRAIL DETAILS
5.00
SEE ATTACHMENT 04 NRM TRAIL DETAILS
SEE ATTACHMENT 04 NRM TRAIL DETAILS
SEE ATTACHMENT 04 NRM TRAIL DETAILS
PRICE ALL ITEMS EXCEPT FOR BRIDGE DESIGN/REPLACEMENT
$ 20
TOTAL TRAIL CONSTRUCTION $
Vendor Name:
Unique SAM ID:
Period of Performance Date Available:
SIGNATURE:
**WARNING: it appears that Creosote timbers are considered "special waste" and not hazardous waste in Virginia according to the Virginia Department of Environmental Quality. That source indicates that that the timbers can only be taken to certain landfills if disposed of within
| fill_1: |
| fill_2: |
| fill_3: |
| fill_4: |
| fill_5: |
| fill_6: |
| fill_7: |
| fill_8: |
| fill_9: |
| fill_1_2: |
| fill_3_2: |
| fill_4_2: |
| fill_5_2: |
| fill_6_2: |
| fill_7_2: |
| fill_8_2: |
| fill_2_2: |
| fill_9_2: |
| fill_11: |
| fill_12: |
| fill_13: |
| fill_14: |
| fill_15: |
| fill_16: |
| fill_17: |
| fill_18: |
| fill_19: |
| fill_20: |
| fill_21: |
| fill_22: |
| fill_10: |
| fill_23: |
| fill_25: |
| fill_26: |
| fill_27: |
| fill_28: |
| fill_29: |
| fill_30: |
| fill_31: |
| fill_32: |
| fill_33: |
| fill_34: |
| fill_24: |
| fill_35: |
| fill_37: |
| fill_36: |
| fill_38: |
| Length: |
| fill_28_2: |
| fill_30_2: |
| fill_32_2: |
| fill_36_2: |
| fill_38_2: |
| fill_1_3: |
| fill_3_3: |
| fill_4_3: |
| fill_5_3: |
| fill_6_3: |
| fill_7_3: |
| fill_8_3: |
| fill_2_3: |
| fill_9_3: |
| fill_11_2: |
| fill_12_2: |
| fill_13_2: |
| fill_14_2: |
| fill_15_2: |
| fill_16_2: |
| fill_17_2: |
| fill_18_2: |
| fill_19_2: |
| fill_20_2: |
| fill_21_2: |
| fill_22_2: |
| fill_10_2: |
| fill_23_2: |
| fill_25_2: |
| fill_26_2: |
| fill_27_2: |
| fill_28_3: |
| fill_29_2: |
| fill_30_3: |
| fill_31_2: |
| fill_32_3: |
| fill_33_2: |
| fill_34_2: |
| fill_24_2: |
| fill_35_2: |
| fill_37_2: |
| fill_36_3: |
| fill_38_3: |
| fill_28_4: |
| fill_30_4: |
| fill_32_4: |
| fill_36_4: |
| fill_38_4: |
| Date1_af_date: |
| Date2_af_date: |
| Date3_af_date: |
| Date4_af_date: |
| Date5_af_date: |
| Date6_af_date: |
| Date7_af_date: |
| Date8_af_date: |
| Date9_af_date: |
| Date10_af_date: |
| Text11: |
| Text14: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
File details come from the government source that posted it. Updated .