This document outlines supplemental COVID-19 safety protocols for contractors performing work at Department of Veterans Affairs facilities. Contractors must ensure their employees comply with documentation requirements showing proof of full vaccination or a negative COVID-19 test result within three days prior to entry. Employees are also subject to daily screening, including temperature checks and questions from the COVID-19 screening tool, and may be denied entry if they do not pass. Contractors must notify the contracting officer if contract performance is impacted due to denied employee entry. The related federal contract opportunity is for construction of EHRM infrastructure upgrades at the Grand Island, Nebraska VA Medical Center for project number 636-21-701.

View the file

Other files

File Type Posted
36C77623B0002 0004 Amendment - Bid Opening and Wage Rates.pdf PDF
Attachment 15 - Construction Wage Rates - Hall 01-13-2022.pdf PDF
ADD 1 - 01 Reports - 1947 Original Construction A2.pdf PDF
Alesia Addendum 1.pdf PDF
ADD 1 - 02 Project Manual - 07 40 00 - ROOFING AND SIDING PANELS - Addendum 1.pdf PDF
ADD 1 - 03 Architectural - A-701.pdf PDF
ADD 1 - 01 Reports - Geotechnical Report 20220114 TD2.pdf PDF
ADD 1 - 02 Project Manual - 09 06 00 - SCHEDULE FOR FINISHES - Addendum 1.pdf PDF
ADD 1 - 03 Architectural - 19-A-102.pdf PDF
ADD 1 - 02 Project Manual - 26 32 13 - ENGINE GENERATORS - Addendum 1.pdf PDF
36C77623B0002 Amendment 0003 - Addendum 1.pdf PDF
ADD 1 - 02 Project Manual - 00 01 10 - TABLE OF CONTENTS - Addendum 1.pdf PDF
ADD 1 - 03 Architectural - A-601.pdf PDF
ADD 1 - 01 Reports - HAZMAT Report GI VA EHRM 01-10-22.pdf PDF
SES Addendum 1.pdf PDF
ADD 1 - 03 General - GI002.pdf PDF
ADD 1 - 05 ME - ME Drawings Add 01.pdf PDF
ADD 1 - 03 Architectural - 19-A-201.pdf PDF
ADD 1 - 04 Civil - C3.0.pdf PDF
ADD 1 - 04 Civil - C2.0.pdf PDF
ADD 1 - 01 Reports - 1947 Original Construction S3.pdf PDF
36C77623B0002 Grand Island EHRM - Technical Questions and Answers.pdf PDF
36C77623B0002 0001 IFB Amendment - Grand Island.pdf PDF
Site Visit Sign-in Sheet - Grand Island.pdf PDF
Questions - 36C77623B0002 Grand Island.pdf PDF
Attachment 9 - Mechanical - Drawings.pdf PDF
Attachment 5 - Hazardous Materials - Drawings.pdf PDF
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 4 - Life Safety - Drawings.pdf PDF
Attachment 1 - Specifications 1.pdf PDF
Attachment 6 - Civil - Drawings.pdf PDF
Attachment 13 - Limitations on Subcontracting - Construction.pdf PDF
Attachment 15 - Construction Wage Rates - Hall 09-02-2022.pdf PDF
Attachment 11 - Technology - Drawings.pdf PDF
Attachment 2 - Specifications 2.pdf PDF
Attachment 14 - Contractor Safety - Environmental Form.pdf PDF
36C77623B0002_1.pdf PDF
Attachment 10 - Electrical - Drawings.pdf PDF
Attachment 7 - Structural - Drawings.pdf PDF
Attachment 8 - Architectural - Drawings.pdf PDF
Attachment 3 - Drawings Sheet Index.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Last Updated on Tuesday December 14, 2021

VHA Supplemental Contract Requirements for Combatting COVID-19

1. Contractor employees who work in or travel to VHA locations must comply with the following:

a. Documentation requirements:

1) If fully vaccinated, contractors shall show proof of vaccination.

i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

2) If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test that includes an affiliated telehealth service.

3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.

a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.

https://www.va.gov/covid19screen/ https://www.va.gov/covid19screen/

Last Updated on Wednesday, December 15, 2021

4. For indefinite delivery contracts: Contractor agrees to comply with VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced.

File details come from the government source that posted it. Updated .