This room finish schedule and related federal contract opportunity document provide details for the EHRM Infrastructure Upgrades Construction Grand Island Project #636-21-701 being undertaken by the Department of Veterans Affairs. The solicitation seeks construction services to upgrade infrastructure at the Grand Island VAMC including finishes for various rooms as outlined in the schedule. Key areas to receive new finishes include medical/clinical spaces, offices, corridors, and mechanical/electrical rooms. The solicitation number is 36C77623B0002 with an anticipated award date of January 2023. Construction is to be completed in accordance with specifications covering materials, installation and workmanship.

View the file

Other files

File Type Posted
36C77623B0002 0004 Amendment - Bid Opening and Wage Rates.pdf PDF
Attachment 15 - Construction Wage Rates - Hall 01-13-2022.pdf PDF
ADD 1 - 01 Reports - 1947 Original Construction A2.pdf PDF
Alesia Addendum 1.pdf PDF
ADD 1 - 02 Project Manual - 07 40 00 - ROOFING AND SIDING PANELS - Addendum 1.pdf PDF
ADD 1 - 03 Architectural - A-701.pdf PDF
ADD 1 - 01 Reports - Geotechnical Report 20220114 TD2.pdf PDF
ADD 1 - 02 Project Manual - 09 06 00 - SCHEDULE FOR FINISHES - Addendum 1.pdf PDF
ADD 1 - 03 Architectural - 19-A-102.pdf PDF
ADD 1 - 02 Project Manual - 26 32 13 - ENGINE GENERATORS - Addendum 1.pdf PDF
36C77623B0002 Amendment 0003 - Addendum 1.pdf PDF
ADD 1 - 02 Project Manual - 00 01 10 - TABLE OF CONTENTS - Addendum 1.pdf PDF
ADD 1 - 01 Reports - HAZMAT Report GI VA EHRM 01-10-22.pdf PDF
SES Addendum 1.pdf PDF
ADD 1 - 03 General - GI002.pdf PDF
ADD 1 - 05 ME - ME Drawings Add 01.pdf PDF
ADD 1 - 03 Architectural - 19-A-201.pdf PDF
ADD 1 - 04 Civil - C3.0.pdf PDF
ADD 1 - 04 Civil - C2.0.pdf PDF
ADD 1 - 01 Reports - 1947 Original Construction S3.pdf PDF
36C77623B0002 Grand Island EHRM - Technical Questions and Answers.pdf PDF
36C77623B0002 0001 IFB Amendment - Grand Island.pdf PDF
Site Visit Sign-in Sheet - Grand Island.pdf PDF
Questions - 36C77623B0002 Grand Island.pdf PDF
Attachment 9 - Mechanical - Drawings.pdf PDF
Attachment 5 - Hazardous Materials - Drawings.pdf PDF
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 4 - Life Safety - Drawings.pdf PDF
Attachment 1 - Specifications 1.pdf PDF
Attachment 6 - Civil - Drawings.pdf PDF
Attachment 12 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 13 - Limitations on Subcontracting - Construction.pdf PDF
Attachment 15 - Construction Wage Rates - Hall 09-02-2022.pdf PDF
Attachment 11 - Technology - Drawings.pdf PDF
Attachment 2 - Specifications 2.pdf PDF
Attachment 14 - Contractor Safety - Environmental Form.pdf PDF
36C77623B0002_1.pdf PDF
Attachment 10 - Electrical - Drawings.pdf PDF
Attachment 7 - Structural - Drawings.pdf PDF
Attachment 8 - Architectural - Drawings.pdf PDF
Attachment 3 - Drawings Sheet Index.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES:

1. ANY FINISHES REQUIRED BUT NOT NOTED ON THIS SCHEDULE SHALL BE APPROVED BY THE ARCHITECT AND COR.

2. PAINT PLYWOOD NOTED ON TECHNOLOGY DRAWINGS P-6 (FIRE RETARDANT WHITE PAINT), REFER TO SPECIFICATIONS SECTION 09 91 00.

TELECOMMUNICATOIN ROOMS, SERVICE ENTRANCE ROOM, UPS ROOM AND MAIN COMPUTER ROOM.

3. ANY FLOORS TO RECEIVE NEW FINISHES SHALL BE PREPPED AS REQUIRED TO RECEIVE NEW FINISHES WITHOUT IMPERFECTIONS.

4. WHERE METAL COVER PLATES OCCUR IN OFFICES (NOT SWITCH PLATES) PAINT TO MATCH HOLLOW METAL FRAMES.

5. CONTRACTOR TO REMOVE AND PROTECT EXISTING WINDOW TREATMENTSAND FASCIA (IN AREAS DISTURBED) DURING CONSTRUCTION.

TECNOLOGY ROOM WINDOW TREATMENTS WHERE WINDOWS WILL BE INFILLED, ARE TO BE RELOCATED TO OFFICES THAT ARE

MISSING WINDOW TREATMENTS AND FASCIA.

REMARKS:

A. SEE GENERAL NOTE 2 FOR PLYWOOD FINISH REQUIREMENTS. PAINT INTERIOR SIDE OF DOOR FRAME P-20.

B. WHERE INFILLING FOR DOOR CONSTRUCTION PAINT GYPSUM WALL INFILL P-7 AND PATCH FLOOR VCT -1 TO MATCH EXISTING FLOORING IN AREA.

PROVIDE ONE FULL FLOOR TILE AT PEREMITER TO MATCH THE WIDTH OF AREA DISTURBED BY CONSTRUCTION. PAINT CORRIDOR SIDE OF DOOR FRAME P-8. PROVIDE RWC-2 AND TRIM TO MATCH BUILDING STANDARD HEIGHT AT INFILL AREA.

C. WHERE INFILLING FOR DOOR CONSTRUCTION PAINT GYPSUM WALL INFILL P-7 AND PATCH FLOOR VCT -2 TO MATCH EXISTING FLOORING IN AREA.

PROVIDE ONE FULL FLOOR TILE AT PEREMITER TO MATCH THE WIDTH OF AREA DISTURBED BY CONSTRUCTION. PAINT CORRIDOR SIDE OF DOOR FRAME P-8. PROVIDE RWC-2 AND TRIM TO MATCH BUILDING STANDARD HEIGHT AT INFILL AREA.

D. WHERE INFILLING FOR DOOR CONSTRUCTION PAINT GYPSUM WALL INFILL P-7 AND PATCH FLOOR VCT -3 TO MATCH EXISTING FLOORING IN AREA.

PROVIDE ONE FULL FLOOR TILE AT PEREMITER TO MATCH THE WIDTH OF AREA DISTURBED BY CONSTRUCTION. PAINT CORRIDOR SIDE OF DOOR FRAME P-8. PROVIDE RWC-2 AND TRIM TO MATCH BUILDING STANDARD HEIGHT AT INFILL AREA.

E. PROVIDE RB-2 WEST WALL ONLY. PAINT NEW CEILING GYPSUM DRYWALL SURFACE AT WEST WALL AND PORTION OF NORTH WALL

P-1. PAINT WEST WALL AND AND NORTHWEST CORNER OF NORTH WALL TO COLUMN P-3.

F. NEW WALL TO MATCH NORTH/EAST WING WALL IN LOBBY 1-001.

G. EXISTING WOOD WINDOW SILLS TO BE PAINTED P-4.

H. PROTECT AND REINSTALL EXISTING CORNER GUARDS DURING CONSTRUCTION.

I. FINISH EAST SIDE WALL AREA AS DISTURBED BY CONSTRUCTION P-11, PROVIDE RWC-1/TRIM TO MATCH HEIGHT OF EXISTING. PAINT CORRIDOR HOLLOW METAL FRAME P-9. PROVIDE CORNER GUARDS (2) AT OUTSIDE CORNERS OUTSIDE OF OFFICE 1-N115 TO MATCH EXISTING CORRIDOR HEIGHT (FIELD VERIFY). PROVIDE ONE FULL FLOOR TILE AT PEREMITER TO MATCH THE WIDTH OF AREA DISTURBED BY CONSTRUCTION.

MODIFY EXISTING HANDRAILS AS REQUIRED. PAINT SOFFIT P-1.

J. PAINT INTERIOR ROOM SIDE OF DOOR FRAMES P-9, PROVIDE RB-3 AT NEW WALL ONLY.

K. REMOVE EXISTING CORNER GUARDS AND TURN OVER TO COR.

L. FINISH AREA AS DISTURBED BY CONSTRUCTION P-11, PROVIDE RWC-1/TRIM TO MATCH HEIGHT OF EXISTING. PAINT CORRIDOR HOLLOW METAL FRAME P-9. PROVIDE ONE FULL FLOOR TILE AT PEREMITER TO MATCH THE WIDTH OF AREA DISTURBED BY CONSTRUCTION.

MODIFY EXISTING HANDRAILS AS REQUIRED.

M. INFILL FLOORING AND COVED BASE AT NORTH WALL AS DISTURBED BY CONSTRUCTION. MODIFY EXISTING CEILING GRID AND TILE AS REQUIRED.

INSTALL TOP CAP TO MATCH EXISTING CONDITION, HEAT WELD SEAMS.

N. WHERE WEST WALL IS DELETED PROVIDE CORNER GUARDS CG-1 ON ALL OUTSIDE CORNERS TO MATCH ADJACENT CONDITIONS.

PROVIDE RWC-1 ALL WALL TO MATCH HEIGHT OF ADJACENT AREAS. VERIFY HEIGHT OF BASE TO MATCH ADJACENT AREAS.

O. FINISH AREAS AS DISTURBED BY CONSTRUCTION P-11, PROVIDE RWC-1/TRIM TO MATCH HEIGHT OF EXISTING. PAINT CORRIDOR HOLLOW METAL FRAME P-9. PROVIDE ONE FULL FLOOR TILE AT PEREMITER TO MATCH THE WIDTH OF AREA DISTURBED BY CONSTRUCTION.

MODIFY EXISTING HANDRAILS AS REQUIRED.

P. SILL TO BE S-1.

Q. PROVIDE NEW BASE AT NEW WALLS ONLY. PAINT HOLLOW METAL FRAMES ROOM 3-2 SIDE P-16.

R. PROVIDE NEW BASE AT NEW WALLS ONLY. PAINT HOLLOW METAL FRAMES ROOM 4-2 SIDE P-18.

S. PAINT AREAS OF NEW CONSTRUCTION ONLY, PAINT HOLLOW METAL FRAMES P-20.

T. EXTERIOR DOOR FRAME TO BE PAINTED P-19.

U. ALL EXISTING CEILING DEVICES (GRILLES, DIFFUSERS, LIGHTS, AND SIGNAGE ETC.) TO REMAIN AND BE CLEANED.

V. WHERE INFILLING FOR DOOR CONSTRUCTION PAINT GYPSUM WALL INFILL P-7 AND PATCH FLOOR VCT -7 TO MATCH EXISTING FLOORING IN AREA.

PROVIDE ONE FULL FLOOR TILE AT PEREMITER TO MATCH THE WIDTH OF AREA DISTURBED BY CONSTRUCTION. PAINT CORRIDOR SIDE OF DOOR FRAME P-8. PROVIDE RWC-2 AND TRIM TO MATCH BUILDING STANDARD HEIGHT AT INFILL AREA.

W. PAINT CORRIDOR SIDE OF DOOR FRAME P-8.

X. PATCH CARPET AS REQUIRED WHERE CONSTRUCTION OCCURS. CARPET WILL BE A DIFFERENT THICKNESS DUE TO A DIFFERENT BACKING, FLOOR STONE TO MATCH EXISTING THICKNESS. MATCH PATTERN DIRECTION AT INFILL, PROVIDE PATCH TO MATCH FULL WIDTH OF

CONSTRUCTION. PAINT DOOR FRAME P-9.

Y. PROTECT EXISTING RIGID WALL COVERING WHERE INFILLING NEW DOOR OR REMOVE AND REINSTALL.

Z. VERIFY FINISHES TO MATCH EXISTING CONDITIONS AND FINISHES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

636A-21-701

09/01/2022

EHRM INFRASTRUCTURE

UPGRADES

CONSTRUCTION

DOCUMENTS

GRAND ISLAND, NE

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard Street Omaha, NE 68102 Phone: (402) 455-7698

Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520

IMEG Corp.

2882 106th Street Des Moines, IA 50322 Phone (515) 334-4324

Thompson, Dreessen & Dorner, Inc.

10836 Old Mill Rd Omaha, NE 68154 Phone: (402) 330-8860

AMI Environmental Inc 8802 S 135th Street Omaha, NE 68138 Phone: (402) 397-5001

B

IM

/2

-1 a -2

-7

V A

G ra n d I s la n d

E H

R M

/6

B ld g

.r v t

/5

/2

:1

:1

P M

A-601

ROOM FINISH SCHEDULE

JHH DL

ROOM FINISH SCHEDULE

REVIT STRIP

ROWS

ROOM NAME FLOOR BASE

WALLS CEILING

REMARKS

NORTH EAST SOUTH WEST MATERIAL

1-C01 MCR SD-1 RB-1 P-4 P-4 P-4 P-4 O.T.S. P-5 A.

1-C6 TR SD-1 P-4 P-4 P-4 P-4 P-4 O.T.S. P-5 A.

1-CGCOR.1 CORR -- / VCT-1 -- / RB-2 -- -- -- -- / P-7, RWC-2 AT-2 B, U.

1-CGCOR.2 CORR -- -- -- -- -- -- AT-2 U.

1-CGCOR.3 CORR -- -- -- -- -- -- AT-2 U.

1-CGCOR.4 CORR -- -- -- -- -- -- AT-2 U.

1-CGCOR.5 CORR --/VCT-7 -- / RB-2 -- / P-7, RWC-2 -- -- -- AT-2 V.

1-N02 UPS SD-1 RB-1 P-4 P-4 P-4 P-4 O.T.S. P-5 A, G.

1-N07 OFFICE -- -- -- -- -- -- --

1-N09A ENTRANCE ROOM SD-1 RB-1 P-4 P-4 P-4 P-4 O.T.S. P-5 A.

1-NE0 CANTEEN OFFICE CPT-1 RB-1 P-2 P-2 P-2 P-2 AT-1 J, K.

1-NE1 OFFICE CPT-1 RB-1 P-2 P-2 P-2 P-2 AT-1 J, K.

1-NE3 LAUNDRY -- RB-3 -- / P-3 -- -- P-3 EX / P-1 E.

1-NEGCOR.1 CORR -- / VCT-2 -- / RB-2 -- -- -- / P-7, RWC-2 -- AT-2 C, U.

1-NEGCOR.2 CORR -- / VCT-3 -- / RB-2 -- / P-7, RWC-2 -- -- -- AT-2 D.

1-NEGCOR.3 CORR VCT-2 RB-2 P-7 / RWC-2 P-7 / RWC-2 P-7 / RWC-2 -- / P-7, RWC-2 AT-2 W.

1-001 LOBBY -- RB-3 -- -- / P-10 -- -- -- F.

1-C1COR.1 CORR -- RB-3 -- -- -- -- / P-10 -- F.

1-N1COR.1 CORR -- / VCT-4 -- / RB-4 -- -- / P-11, RWC-1 -- -- AT-2/P-1 I, U.

1-N115 OFFICE -- RB-1 P-2 P-2 P-2 P-2 --

1-N116 CASHIER CPT-1 RB-1 P-2 P-2 P-2 P-2 AT-1 J.

1-N117 OFFICE CPT-1 RB-1 P-2 P-2 P-2 P-2 AT-1 J.

1-N118 TR SD-1 RB-1 P-4 P-4 P-4 P-4 O.T.S. P-5 A.

1-N121 VOLUNTEER AREA CPT-2 RB-4 VWC-1 VWC-1 VWC-1 VWC-1 -- H.

1-C2CO2.2 CORR -- -- -- -- -- -- AT-2 U.

1-C2CO2.3 CORR -- -- -- -- -- -- AT-2 U.

1-C2CO2.4 CORR -- -- -- -- -- -- AT-2 U.

1-C2CO2.5 CORR -- -- -- -- -- -- AT-2 U.

1-C2CO2.6 CORR -- -- -- -- -- -- AT-2 U.

1-C2CO2.7 CORR -- -- -- -- -- -- AT-2 U.

1-C2COR.1 CORR -- -- P-11, RWC-1 P-11, RWC-1 -- -- AT-2 O, U, Z

1-S2COR.1 CORR -- / VCT-5 RB-4 -- -- -- -- / P-11, RWC-1 AT-2 O, U.

1-S202 TR SD-1 RB-1 P-4 P-4 P-4 P-4 O.T.S. P-5 A.

1-S203 TREATMENT -- / WSF-1 WSF-1 (COVED) P-13 -- -- -- -- M.

1-S208 OFFICE CPT-1 RB-1 P-2 P-2 P-2 P-2 AT-1 J, K.

1-SE2COR.1 CORR -- -- -- -- -- -- AT-2 U.

1-S3COR.1 CORR -- -- -- -- -- -- AT-2 U.

1-S302 TR SD-1 RB-1 P-4 P-4 P-4 P-4 O.T.S. P-5 A, K.

1-SE3COR.1 CORR -- -- -- -- -- -- AT-2 U.

1-C4COR.1 CORR -- -- -- -- -- -- AT-2 U.

1-C4COR.2 CORR -- -- -- -- -- -- AT-2 U.

1-C4COR.3 CORR -- -- -- P-11, RWC-1 -- -- AT-2 O, U, Z

1-C4COR.4 CORR VCT-6 RB-4 P-11, RWC-1 P-11 P-11, RWC-1 P-11, RWC-1 AT-2 N.

1-C404A TR SD-1 RB-1 P-4 P-4 P-4 P-4 O.T.S. P-5 A.

1-C404B HOMELESS CLINIC -- RB-5 -- P-14 -- -- --

1-C404C EMS OFFICE CPT-1 RB-1 P-2 P-2 P-2 P-2 AT-1

1-C5COR.1 CORR -- / CPT-3 -- / RB-4 -- -- / P-11 -- -- AT-2 X, Y.

1-C5COR.2 CORR -- -- -- -- -- -- AT-2 U.

1-C5COR.3 CORR -- -- -- -- -- -- AT-2 U.

1-S5COR.1 CORR -- / CPT-3 -- / RB-4 -- -- -- / P-11 AT-2 X.

1-S502 TR SD-1 RB-1 P-4 P-4 P-4 P-4 O.T.S. P-5 A.

1-S517 CONF ROOM CPT-1 RB-1 P-2 P-2 P-2 P-2 AT-1/P-1 P.

1-SE5COR.1 CORR -- -- -- -- -- -- AT-2 U.

3-2 BASEMENT -- -- / RB-6 -- / P-15 -- / P-15 -- -- -- Q.

3-2C TR SD-1 RB-1 P-4 P-4 P-4 P-4 O.T.S. P-5 A.

4-2 BASEMENT -- -- / RB-7 -- -- P-17 P-17 -- R.

4-2C TR SD-1 RB-1 P-4 P-4 P-4 P-4 O.T.S. P-5 A.

5-1 TR SD-1 RB-1 P-4 P-4 P-4 P-4 O.T.S. P-5 A.

5-B3 WEIGHT ROOM -- -- -- -- -- P-4 -- S.

5-B4 STORAGE -- -- -- P-4 P-4 -- -- S.

6-1 TR SD-1 RB-1 P-4 P-4 P-4 P-4 O.T.S. P-5 A.

6-4 PASSAGE -- -- -- P-4 -- -- -- S.

6-6 STORAGE -- -- P-5 P-4 -- -- --

19-G01 GENERATOR ROOM CFS-ND -- P-5 P-5 P-5 P-5 P-5 S, T.

19-G02 SWITCHGEAR ROOM CFS-ND -- P-5 P-5 P-5 P-5 P-5 S.

Mark Revisions: Date:

1 ADDENDUM 1 03JAN23

Sheets
A-601 - ROOM FINISH SCHEDULE