This document contains a submittal list and federal contract opportunity. The submittal list outlines various preconstruction, shop drawing, product data, sample, design data, test report, certificate, manufacturer instruction, operation and maintenance data, and closeout submittal requirements for a construction project organized by specification section and subpart.

The federal contract opportunity is a solicitation to award a firm-fixed-price contract for the design-bid-build construction of a new 26,000 square foot administration building at the Malcom Randall VA Medical Center in Gainesville, Florida. The project scope involves architectural, site, structural, fire protection, HVAC, plumbing, electrical and other construction work, as well as demolition of existing systems. The contracting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--36C77621B0013 - Construct Administration Bldg. POD 1A (Minor) - Gainesville, newest first.
File Type Posted
36C77621B0013 0007.pdf PDF
Attachment 25 - Revised Specification Booklet.pdf PDF
36C77621B0013 0006.pdf PDF
Attachment 20 - Supplemental Drawings - MECH.pdf PDF
Attachment 21 - Supplemental Drawings - STR.pdf PDF
Attachment 17 - RFIs - Technical Questions and Responses.pdf PDF
Attachment 22 - 573-360 VA Admin Addendum 1.pdf PDF
Attachment 24 - Building T1B Floor Layout.pdf PDF
36C77621B0013 0005.pdf PDF
Attachment 18 - Supplemental Drawings - PLB.pdf PDF
Attachment 19 - Supplemental Drawings - ELE.pdf PDF
Attachment 23 - Site Visit Attendance Sheet.pdf PDF
36C77621B0013 0004.pdf PDF
36C77621B0013 0003.pdf PDF
Attachment 16 - Lead Survey Report.pdf PDF
Attachment 14 - Asbestos Survey Report.pdf PDF
Attachment 15 - Geotechnical Report.pdf PDF
36C77621B0013 0002.pdf PDF
36C77621B0013 0001.pdf PDF
Attachment 13 - Revised Specification Section 07 41 10.pdf PDF
Attachment 01 - Final Completed Specifications.pdf PDF
Attachment 02 - Drawings - 573-360 VA Admin vol 1 of 5.pdf PDF
Attachment 03 - Drawings - 573-360 VA Admin vol 2 of 5.pdf PDF
Attachment 10 - Contractor Core Work Hours.docx DOCX document
Attachment 08 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 04 - Drawings - 573-360 VA Admin vol 3 of 5.pdf PDF
Attachment 06 - Drawings - 573-360 VA Admin vol 5 of 5.pdf PDF
Attachment 07 - Wage Rates - Alachua County - 20210194 - 09032021.pdf PDF
Attachment 09 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 12 - Service Contract Wage Determination - 2015-4537.txt TXT text file
36C77621B0013_1.pdf PDF
Attachment 05 - Drawings - 573-360 VA Admin vol 4 of 5.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECSINTACT 573-360

June 14, 2021 9:39 AM

SUBMITTAL LIST

This report lists all the submittal numbers and descriptions found in the

Section Submittal Articles, along with the Section and subpart in which the descriptions appear.

SD-01 Preconstruction Submittals

[For Government approved division 01 preconstruction submittals that are required prior to or commencing with the start of work shall be submitted within 30 calendar days of contract award unless specified elsewhere in the specifications. For contractor approved division 01 submittals that are required prior to or commencing with the start of work shall be submitted within 45 calendar days of contract award unless specified elsewhere in the specifications.]

SECTION: 01 33 23 SUBPART: 1.2

SECTION: 01 35 26

SUBPART: 1.3

SECTION: 01 45 00 SUBPART: 1.2

SECTION: 01 45 35 SUBPART: 1.4

SECTION: 01 57 19 SUBPART: 1.3

SECTION: 01 74 19

SUBPART: 1.5

SECTION: 01 91 00 SUBPART: 1.7

SECTION: 02 41 00

SUBPART: 1.6

SECTION: 03 30 00

SUBPART: 1.3

SECTION: 05 12 00

SUBPART: 1.2

SECTION: 08 41 13

SUBPART: 1.3

SECTION: 21 13 13 SUBPART: 1.3

SECTION: 21 13 16 SUBPART: 1.3

SECTION: 23 09 23 SUBPART: 1.4

SECTION: 23 81 29

SUBPART: 1.3

SECTION: 26 05 19 SUBPART: 1.4

SECTION: 31 20 00 SUBPART: 1.7

SECTION: 31 63 16 SUBPART: 1.7

Submittal List

SPECSINTACT VAADMIN

SECTION: 32 90 00 SUBPART: 1.3

SD-02 Shop Drawings

Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.

SECTION: 03 30 00 SUBPART: 1.3

SECTION: 04 20 00 SUBPART: 1.2

SECTION: 05 12 00 SUBPART: 1.2

SECTION: 05 36 00 SUBPART: 1.2

SECTION: 05 40 00 SUBPART: 1.2

SECTION: 05 50 00 SUBPART: 1.2

SECTION: 05 51 00 SUBPART: 1.2

SECTION: 06 10 00 SUBPART: 1.2

SECTION: 07 22 00 SUBPART: 1.2

SECTION: 07 54 23 SUBPART: 1.3

SECTION: 07 60 00 SUBPART: 1.3

SECTION: 07 84 00 SUBPART: 1.4

SECTION: 08 11 13 SUBPART: 1.2

SECTION: 08 14 00 SUBPART: 1.2

SECTION: 08 31 13 SUBPART: 1.2

SECTION: 08 41 13 SUBPART: 1.3

SECTION: 08 44 00 SUBPART: 1.2

SECTION: 08 71 00 SUBPART: 1.2

SECTION: 09 22 16 SUBPART: 1.2

SECTION: 09 30 13 SUBPART: 1.2

SECTION: 09 51 00 SUBPART: 1.2

SECTION: 09 65 19 SUBPART: 1.2

SPECSINTACT

June 14, 2021

VAADMIN

9:39 AM

SECTION: 09 91 00 SUBPART: 1.4

SECTION: 10 14 00

SUBPART: 1.2

SECTION: 10 21 13 SUBPART: 1.2

SECTION: 10 26 00 SUBPART: 1.2

SECTION: 10 28 00 SUBPART: 1.2

SECTION: 10 44 13 SUBPART: 1.2

SECTION: 14 21 00 SUBPART: 1.2

SECTION: 21 12 00 SUBPART: 1.5

SECTION: 21 13 13

SUBPART: 1.3

SECTION: 21 13 16 SUBPART: 1.3

SECTION: 22 14 29 SUBPART: 1.2

SECTION: 23 05 41 SUBPART: 1.3

SECTION: 23 09 23

SUBPART: 1.4

SECTION: 23 07 11 SUBPART: 1.3

SECTION: 23 81 29 SUBPART: 1.3

SECTION: 26 05 11 SUBPART: 1.3

SECTION: 26 05 19 SUBPART: 1.4

SECTION: 26 05 33

SUBPART: 1.4

SECTION: 26 09 23 SUBPART: 1.3

SECTION: 26 22 00 SUBPART: 1.4

SECTION: 26 51 00 SUBPART: 1.4

SECTION: 28 31 00 SUBPART: 1.4

SECTION: 31 63 16 SUBPART: 1.7

SECTION: 32 84 00

SUBPART: 1.4

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

SECTION: 03 30 00 SUBPART: 1.3

SECTION: 04 20 00 SUBPART: 1.2

SECTION: 05 12 00 SUBPART: 1.2

SECTION: 05 36 00 SUBPART: 1.2

SECTION: 05 40 00 SUBPART: 1.2

SECTION: 05 50 00 SUBPART: 1.2

SECTION: 05 51 00 SUBPART: 1.2

SECTION: 06 10 00 SUBPART: 1.2

SECTION: 07 21 13 SUBPART: 1.2

SECTION: 07 22 00 SUBPART: 1.2

SECTION: 07 54 23 SUBPART: 1.3

SECTION: 07 60 00 SUBPART: 1.3

SECTION: 07 81 00 SUBPART: 1.3

SECTION: 07 84 00 SUBPART: 1.4

SECTION: 07 92 00 SUBPART: 1.2

SECTION: 08 11 13 SUBPART: 1.2

SECTION: 08 14 00 SUBPART: 1.2

SECTION: 08 31 13 SUBPART: 1.2

SECTION: 08 41 13 SUBPART: 1.3

SECTION: 08 44 13 SUBPART: 1.2

SECTION: 08 71 00 SUBPART: 1.2

SECTION: 08 80 00 SUBPART: 1.2

SECTION: 09 22 16 SUBPART: 1.2

SECTION: 09 29 00 SUBPART: 1.2

SECTION: 09 30 13 SUBPART: 1.2

SECTION: 09 51 00 SUBPART: 1.2

SECTION: 09 65 19 SUBPART: 1.2

SECTION: 09 91 00 SUBPART: 1.4

SECTION: 10 14 00 SUBPART: 1.2

SECTION: 10 21 13

SUBPART: 1.2

SECTION: 10 26 00 SUBPART: 1.2

SECTION: 10 28 00 SUBPART: 1.2

SECTION: 10 44 13 SUBPART: 1.2

SECTION: 14 21 00 SUBPART: 1.2

SECTION: 21 12 00 SUBPART: 1.5

SECTION: 21 13 13 SUBPART: 1.3

SECTION: 21 13 16

SUBPART: 1.3

SECTION: 22 14 29 SUBPART: 1.2

SECTION: 23 05 41 SUBPART: 1.3

SECTION: 23 09 23 SUBPART: 1.4

SECTION: 23 07 11

SUBPART: 1.3

SECTION: 23 08 00 SUBPART: 1.3

SECTION: 23 81 29 SUBPART: 1.3

SECTION: 26 05 11 SUBPART: 1.3

SECTION: 26 05 19 SUBPART: 1.4

SECTION: 26 05 26 SUBPART: 1.2

SECTION: 26 05 33 SUBPART: 1.4

SECTION: 26 09 23 SUBPART: 1.3

SECTION: 26 22 00 SUBPART: 1.4

SECTION: 26 24 16 SUBPART: 1.2

SECTION: 26 51 00 SUBPART: 1.4

SECTION: 28 31 00 SUBPART: 1.4

SECTION: 31 20 00 SUBPART: 1.7

SECTION: 31 63 16 SUBPART: 1.7

SECTION: 32 84 00

SUBPART: 1.4

SECTION: 32 90 00 SUBPART: 1.3

SD-04 Samples

Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.

SECTION: 03 30 00

SUBPART: 1.3

SECTION: 04 20 00 SUBPART: 1.2

SECTION: 05 36 00

SUBPART: 1.2

SECTION: 05 50 13 SUBPART: 1.2

SECTION: 07 60 00 SUBPART: 1.3

SECTION: 07 81 00 SUBPART: 1.3

SECTION: 08 11 13

SUBPART: 1.2

SECTION: 08 14 00 SUBPART: 1.2

SECTION: 08 31 13

SUBPART: 1.2

SECTION: 08 41 13

SUBPART: 1.3

SECTION: 08 80 00

SUBPART: 1.2

SECTION: 09 29 00

SUBPART: 1.2

SECTION: 09 30 13 SUBPART: 1.2

SECTION: 09 51 00 SUBPART: 1.2

SECTION: 09 65 19 SUBPART: 1.2

SECTION: 09 68 00

SUBPART: 1.2

SECTION: 09 91 00 SUBPART: 1.4

SECTION: 10 14 00

SUBPART: 1.2

SECTION: 10 21 13

SUBPART: 1.2

SECTION: 10 26 00

SUBPART: 1.2

SECTION: 10 44 16

SUBPART: 1.2

SECTION: 23 07 11 SUBPART: 1.3

SECTION: 26 22 00 SUBPART: 1.4

SECTION: 26 51 00 SUBPART: 1.4

SECTION: 32 90 00

SUBPART: 1.3

SD-05 Design Data

Design calculations, mix designs, analyses or other data pertaining to a part of work.

SUBPART: 1.7

SUBPART: 1.2

SUBPART: 1.2

SUBPART: 1.2

SUBPART: 1.2

SUBPART: 1.2

SUBPART: 1.3

SUBPART: 1.2

SUBPART: 1.2

SUBPART: 1.3

SUBPART: 1.3

SUBPART: 1.3

SUBPART: 1.4

SUBPART: 1.4

SUBPART: 1.4

SECTION: 01 91 00

SECTION: 03 30 00

SECTION: 04 20 00

SECTION: 05 12 00

SECTION: 05 36 00

SECTION: 05 40 00

SECTION: 06 10 00

SECTION: 07 54 23

SECTION: 08 44 00

SECTION: 14 21 00

SECTION: 21 13 13

SECTION: 21 13 16

SECTION: 23 81 29

SECTION: 26 51 00

SECTION: 28 31 02.00 20

SECTION: 32 84 24

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.

SECTION: 01 35 26

SUBPART: 1.3

SECTION: 01 45 35

SUBPART: 1.4

SECTION: 01 57 19 SUBPART: 1.3

SECTION: 01 74 19 SUBPART: 1.5

SECTION: 01 91 00 SUBPART: 1.7

SECTION: 03 30 00

SECTION: 04 20 00 SUBPART: 1.2

SECTION: 05 12 00 SUBPART: 1.2

SECTION: 06 10 00

SUBPART: 1.2

SECTION: 07 22 00 SUBPART: 1.2

SECTION: 07 81 00 SUBPART: 1.3

SECTION: 07 84 00 SUBPART: 1.4

SECTION: 08 14 00

SUBPART: 1.2

SECTION: 08 31 00 SUBPART: 1.2

SECTION: 08 41 13

SUBPART: 1.3

SECTION: 08 44 00 SUBPART: 1.2

SECTION: 09 29 00 SUBPART: 1.2

SECTION: 09 51 00 SUBPART: 1.2

SECTION: 09 65 00 SUBPART: 1.2

SECTION: 09 68 00

SUBPART: 1.2

SECTION: 10 26 00 SUBPART: 1.2

SECTION: 21 12 00

SUBPART: 1.5

SECTION: 21 13 13 SUBPART: 1.3

SECTION: 21 13 16 SUBPART: 1.3

SECTION: 22 14 29 SUBPART: 1.2

SECTION: 23 05 41 SUBPART: 1.3

SECTION: 23 09 23 SUBPART: 1.4

SECTION: 23 08 00 SUBPART: 1.3

SECTION: 23 81 29

SUBPART: 1.3

SECTION: 26 05 11 SUBPART: 1.3

SECTION: 26 05 19 SUBPART: 1.4

SECTION: 26 05 26 SUBPART: 1.2

SECTION: 26 05 33 SUBPART: 1.4

SECTION: 26 08 00 SUBPART: 1.3

SECTION: 26 09 23 SUBPART: 1.3

SECTION: 26 22 00 SUBPART: 1.4

SECTION: 26 24 16 SUBPART: 1.2

SECTION: 26 51 00 SUBPART: 1.4

SECTION: 28 31 00 SUBPART: 1.4

SECTION: 31 20 00

SUBPART: 1.7

SECTION: 31 63 16 SUBPART: 1.7

SECTION: 32 84 00

SUBPART: 1.4

SECTION: 32 90 00 SUBPART: 1.3

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

SECTION: 01 35 26 SUBPART: 1.3

SECTION: 01 45 35

SUBPART: 1.4

SECTION: 01 57 19 SUBPART: 1.3

SECTION: 01 91 00 SUBPART: 1.7

SECTION: 02 41 00

SUBPART: 1.6

SECTION: 03 30 00 SUBPART: 1.3

SECTION: 04 20 00

SUBPART: 1.2

SECTION: 05 12 00 SUBPART: 1.2

SECTION: 05 36 00 SUBPART: 1.2

SECTION: 05 40 00

SUBPART: 1.2

SECTION: 05 50 00

SUBPART: 1.2

SECTION: 05 51 00 SUBPART: 1.2

SECTION: 06 10 00 SUBPART: 1.2

SECTION: 07 21 13 SUBPART: 1.2

SECTION: 07 22 00 SUBPART: 1.2

SECTION: 07 54 23 SUBPART: 1.3

SECTION: 07 81 00 SUBPART: 1.3

SECTION: 07 84 00 SUBPART: 1.4

SECTION: 07 92 00 SUBPART: 1.2

SECTION: 08 14 00

SUBPART: 1.2

SECTION: 08 44 00 SUBPART: 1.2

SECTION: 08 81 00 SUBPART: 1.2

SECTION: 09 29 00 SUBPART: 1.2

SECTION: 09 30 13 SUBPART: 1.2

SECTION: 09 51 00 SUBPART: 1.2

SECTION: 09 65 00 SUBPART: 1.2

SECTION: 09 68 00

SUBPART: 1.2

SECTION: 09 91 00 SUBPART: 1.4

SECTION: 10 21 13

SUBPART: 1.2

SECTION: 10 26 00 SUBPART: 1.2

SECTION: 10 28 00

SUBPART: 1.2

SECTION: 10 44 13 SUBPART: 1.2

SECTION: 14 21 00 SUBPART: 1.2

SECTION: 21 12 00 SUBPART: 1.5

SECTION: 21 13 13 SUBPART: 1.3

SECTION: 21 13 16

SUBPART: 1.3

SECTION: 22 14 29 SUBPART: 1.2

SECTION: 23 05 93

SUBPART: 1.4

SECTION: 23 07 11 SUBPART: 1.3

SECTION: 23 81 29

SUBPART: 1.3

SECTION: 26 05 19 SUBPART: 1.4

SECTION: 26 05 26 SUBPART: 1.2

SECTION: 26 08 00 SUBPART: 1.3

SECTION: 26 51 00 SUBPART: 1.4

SECTION: 28 31 00 SUBPART: 1.4

SECTION: 31 20 00 SUBPART: 1.7

SECTION: 31 63 16 SUBPART: 1.7

SECTION: 32 84 00 SUBPART: 1.4

SECTION: 32 90 00 SUBPART: 1.3

SD-08 Manufacturer's Instructions

Preprinted material describing installation of a product, system or material, including special notices and (SDS)concerning impedances, hazards and safety precautions.

SECTION: 03 30 00 SUBPART: 1.3

SECTION: 04 20 00 SUBPART: 1.2

SECTION: 05 51 00

SUBPART: 1.2

SECTION: 07 21 13 SUBPART: 1.2

SECTION: 07 22 00

SUBPART: 1.2

SECTION: 07 54 23 SUBPART: 1.3

SECTION: 07 60 00

SUBPART: 1.3

SECTION: 08 41 13 SUBPART: 1.3

SECTION: 08 44 00 SUBPART: 1.2

SECTION: 08 71 00 SUBPART: 1.2

SECTION: 08 80 00

SUBPART: 1.2

SECTION: 09 29 00

SUBPART: 1.2

SECTION: 09 30 30 SUBPART: 1.2

SECTION: 09 65 19

SUBPART: 1.2

SECTION: 09 68 00 SUBPART: 1.2

SECTION: 09 91 00

SUBPART: 1.4

SECTION: 22 14 29 SUBPART: 1.2

SECTION: 23 07 11 SUBPART: 1.3

SECTION: 23 81 29 SUBPART: 1.3

SECTION: 26 05 26 SUBPART: 1.3

SECTION: 26 05 19 SUBPART: 1.4

SECTION: 26 24 16 SUBPART: 1.2

SECTION: 32 84 00 SUBPART: 1.4

SD-09 Manufacturer's Field Reports

Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.

SECTION: 23 81 29 SUBPART: 1.3

SD-10 Operation and Maintenance Data

Data provided by the manufacturer, or the system provider, including manufacturer's help and product line documentation, necessary to maintain and install personnel.

equipment, for operating and maintenance use by facility

SECTION: 01 91 00 SUBPART: 1.7

SECTION: 04 20 00

SUBPART: 1.2

SECTION: 06 10 00 SUBPART: 1.2

SECTION: 07 60 00

SUBPART: 1.3

SECTION: 08 71 00

SUBPART: 1.2

SECTION: 09 29 00 SUBPART: 1.2

SECTION: 09 30 13

SUBPART: 1.2

SECTION: 09 65 13 SUBPART: 1.2

SECTION: 09 91 00

SUBPART: 1.4

SECTION: 10 14 00

SUBPART: 1.2

SECTION: 10 26 00 SUBPART: 1.2

SECTION: 10 28 00 SUBPART: 1.2

SECTION: 14 21 00 SUBPART: 1.2

SECTION: 21 12 00 SUBPART: 1.5

SECTION: 21 13 13 SUBPART: 1.3

SECTION: 21 13 16 SUBPART: 1.3

SECTION: 26 05 33 SUBPART: 1.4

SECTION: 26 09 23 SUBPART: 1.3

SECTION: 26 51 00 SUBPART: 1.4

SECTION: 28 31 00 SUBPART: 1.4

SECTION: 32 84 00 SUBPART: 1.4

SECTION: 32 90 00 SUBPART: 1.3

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

SECTION: 01 45 35 SUBPART: 1.4

SECTION: 01 57 19

SUBPART: 1.3

SECTION: 01 74 19 SUBPART: 1.5

SECTION: 01 91 00 SUBPART: 1.7

SECTION: 02 41 00 SUBPART: 1.6

SECTION: 04 20 00

SUBPART: 1.2

SECTION: 07 54 23 SUBPART: 1.3

SECTION: 08 14 00 SUBPART: 1.2

SECTION: 08 41 13 SUBPART: 1.3

SECTION: 08 44 13

SUBPART: 1.2

SECTION: 08 71 00

SUBPART: 1.2

SECTION: 08 80 00

SUBPART: 1.2

SECTION: 21 12 00 SUBPART: 1.5

SECTION: 21 13 13

SUBPART: 1.3

SECTION: 21 13 16 SUBPART: 1.3

SECTION: 23 81 29 SUBPART: 1.3

SECTION: 26 05 26 SUBPART: 1.2

SECTION: 28 31 00 SUBPART: 1.4

SECTION: 31 63 16

SUBPART: 1.7

SECTION: 32 84 00 SUBPART: 1.4

Page 13PECSINTACT VAADMIN

File details come from the government source that posted it. Updated .