This amendment to a solicitation provides additional attachments for a federal construction contract. The Department of Veterans Affairs aims to award a firm-fixed-price contract to construct a new 26,000 square foot administration building at the Malcom Randall VA Medical Center in Gainesville, Florida. The project scope involves architectural, site, structural, fire protection, HVAC, plumbing, electrical and other construction work, as well as demolition of existing structures. The amendment adds three attachments to the solicitation: an asbestos survey report, geotechnical report, and lead survey report, bringing the total number of attachments to sixteen. Offerors must acknowledge receipt of the amendment by the specified date and time in order to be considered for award.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
573-360
36C776
Department of Veterans Affairs
Program Contracting Activity Central
6150 Oak Tree Blvd, Suite 300
Independence OH 44131
00076
6150 Oak Tree Blvd, Suite 300
Independence OH 44131
To all Offerors/Bidders
36C77621B0013
X
X X
"SEE CONTINUATION PAGE"
SEAN C. KAMINSKI
CONTRACTING OFFICER
PCAC14L3-69115
AMENDMENT OF SOLICITATION
DATE SIGNED PAGE OF PAGES
SEE BLOCK 16C 2 2
SOLICITATION NUMBER: 36C77621B0013
AMENDMENT NUMBER: 0003
CONTRACT TITLE: “CONSTRUCT ADMINISTRATION BUILDING POD 1A”
LOCATION: MALCOM RANDALL VA MEDICAL CENTER, 1601 SW ARCHER RD., GAINESVILLE, FL 32608
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Continued)
A. Additional Attachments
THE VA HEREBY PROVIDES THE FOLLOWING DOCUMENTS FOR CONSIDERATION
I. Attachment 14 – Asbestos Survey Report (Dated 6/20/2018)
II. Attachment 15 – Geotechnical Report (Dated 7/13/2018)
III. Attachment 16 – Lead Survey Report (Dated 6/20/2018)
A COMPREHENSIVE LIST OF CURRENT ATTACHMENTS TO THE SOLICITATION FOLLOWS:
1. Attachment 01 – Final Completed Specifications
2. Attachment 02 – Drawings – 573-36 VA Admin vol 1 of 5
3. Attachment 03 – Drawings – 573-36 VA Admin vol 2 of 5
4. Attachment 04 – Drawings – 573-36 VA Admin vol 3 of 5
5. Attachment 05 – Drawings – 573-36 VA Admin vol 4 of 5
6. Attachment 06 – Drawings – 573-36 VA Admin vol 5 of 5
7. Attachment 07 – Wage Rates – Alachua County
8. Attachment 08 – Limitations on Subcontracting – Construction
9. Attachment 09 – Contractor Safety Environmental Form
10. Attachment 10 – Contractor Core Work Hours
11. Attachment 11 – VA Submittal List
12. Attachment 12 – Service Contract Wage Determination 2015-4537
13. Attachment 13 – Revised Specification Section 07 41 10
14. Attachment 14 – Asbestos Survey Report
15. Attachment 15 – Geotechnical Report
16. Attachment 16 – Lead Survey Report
End of Document