Attachment 18 - Supplemental Drawings - PLB.pdf
PDF 1 MB Posted
- Attached to
- Y1AZ--36C77621B0013 - Construct Administration Bldg. POD 1A (Minor) - Gainesville Federal contract opportunity
- Solicitation number
- 36C77621B0013
About this file
This solicitation package involves a firm-fixed-price construction contract for a new 26,000 square foot administration building at the Malcom Randall VA Medical Center in Gainesville, Florida. The project scope includes architectural, site work, structural, fire protection, HVAC, plumbing, electrical, earthwork, exterior utilities, and all other aspects of construction required by the contract drawings and specifications. The work also requires demolition of existing structures and systems. The Department of Veterans Affairs, through its Veterans Health Administration Program Contracting Activity Central, will award this single contract. The response due date and anticipated award date are not provided in this document.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
7370 Cabot Court, Ste. 103 Melbourne, FL 32940
COA #15 TLC NO:
Phone: 321-636-0274
Fax: 321-639-8986 www.tlc-engineers.com
Copyright 2021 TLC Engineering Solutions, Inc.c
P.O. Box 1296, Winter Park, FL 32790 Tel 407.467.8833 - Fax 407.926.0701 o n e e ig h t h i n c h o n e f o o t 16
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e ig h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08−6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
1 2 3 4 5 6 87 9
MALCOM RANDAL VA HOSPITAL
ADMINISTRATION BUILDING
VAWPBMC PLANNING AND ENGINEERING
IF THIS DRAWING IS LESS THAN 30" X
42" IT IS A REDUCED SIZE DRAWING
CONSTRUCTION DOCUMENTS
FLGAINESVILLE
BLDG #
573-360
JAHBKG
PLUMBING SCHEDULES
518056 06/18/2021
JAMES T. WAMSLEY, P.E.
Florida License #50343
06/18/2021
P601 # Revisions: Date:
1 ADDENDUM 1 10/18/21
UP
4" S
4" S
10" STORM SEWER 750 GPM
(APPROX I.E.=-4' B.F.F.)
SEE SITE CIVIL PLANS
6" SANITARY SEWER 264 D.F.U.
(APPROX I.E.=-3.5' B.F.F.)
CONN. TO LIFT STATION SEE SITE CIVIL PLANS
4" WASTE UP
6" ST
4" WASTE UP
4" WASTE UP TO WCO
4" WASTE UP
4" WASTE UP
6" WASTE UP TO ECO
(COORD TO AVOID
ENTRANCE WAY)
6" STORM UP TO ECO
3" ST UP FROM SUMP PUMP
(100 GPM)SEE DETAIL 8/P501
2" WASTE UP
TRAP PRIMER SEE
DETAIL 5/P501
4" WASTE UP
3" TRAPPED WASTE UP TO F.D.
2" STORM UP TO GOOSENECK
I.D.(50 GPM) TO HUB DRAIN
3" TRAPPED WASTE UP TO FD-E
W/ TRAP PRIMER SEE DETAIL 6/P501
3" STORM TO DISCHARGE THRU CURB
FACE IN PAVEMENT(100 GPM) NEAR
STORM INLET,SEE SHEET C-101,PROVIDE
BWV ACCESSIBLE IN WALKWAY ADJACENT
TO COLUMN ENCLOSURE
A B C D E
LOBBY
1-100
OFFICE
1-101
MECHANICAL
1-102
CORRIDOR
1-103
WOMEN
1-104
MEN
1-105
HAC ROOM
1-106
PUMP ROOM
1-107
STAIR B
1-108
BREAK ROOM
1-110
WOMEN
1-112
MEN
1-113
TELE/COM
1-115
VESTIBULE
1-114
STAIR A
1-118
RECEIVING
1-117
CORRIDOR
1-116
ELECTRICAL ROOM
1-109
COPIER
1-111
0.9
4" S
4" S
2" WASTE UP
2" VENT UP
2" WASTE UP
TO P-604
6" S
2" VENT UP
2" STORM UP FROM SP-1
SEE DETAIL 8/P501
4" S
4" S
4" S
4" S
2" VENT UP
3" ST
3" DOMESTIC WATER SERVICE
(APPROX I.E.=-1.75' B.F.F.)
SEE SITE CIVIL PLANS SHT. C101
BWV W/ ACCESS @ GRADE
6" C
N D
3" C
N D
3" CONDENSATE HUB
DRAIN SEE DETAIL 7/P501
4" WASTE UP
6" STORM CONDENSATE
(APPROX I.E.=-2.5' B.F.F.)
SEE SITE CIVIL PLANS
6" STORM UP TO ECO
SEE DETAIL 12/P501
3" S
4" S
3" WASTE UP
3" S
DOMESTIC WATER
SERVICE RISER W/ SHUT-
OFF VALVE
FIRE SERVICE RISER
SEE F.P. DRAWINGS
6" STORM UP TO ECO
6" RWL (195 GPM)
6" RWL (248 GPM)
6" RWL(102 GPM)
6" RWL (205 GPM)
10" STORM SEWER 700 GPM
(APPROX I.E.=-4' B.F.F.)
SEE SITE CIVIL PLANS
3" CW
3" CW
10" STORM BWV(IN BOX)
ACCESSIBLE AT GRADE
4" S
4" S
4" S
4" S
2" S
6" STORM BWV(IN BOX)
ACCESSIBLE AT GRADE 6" FIRE SERVICE MAIN
SEE SITE/CIVIL & F.P. DRWGS
2" ST
(pumped)
4" STORM UP TO TD-1
4" STORM UP TO TD-1
4" STORM UP TO TD-1
3" STORM UP TO HD-1(50 GPM)
ACCESSIBLE BWV IN RISER
TRAPPED WASTE UP TO DRAIAIN(ABOVE)
w/TRAP PRIMER
FCO
CLEANOUT AT GRADE
PROVIDE LATERAL TRANSITION BOOT
AND CONNECT TO ARCH. DOWNSPOUT NEAR COLUMN
PROVIDE LATERAL TRANSITION BOOT AND CONNECT
TO ARCH. DOWNSPOUT (TYPICAL)
CLEANOUT AT GRADE
TRAP PRIMER
DRAIN(TYP.)
TRENCH DRAIN TD-1
TRENCH DRAIN TD-1
S
LO
P E
1/
8" /F
T
S
LO
P E
1/
8" /F
T
S
LO
P E
1/
8" /F
T
3" R.P.B.P. SEE DETAIL SHT P001
COORD. W/ F.P. BACKFLOW & CIVIL DRWGS.
6" STORM UP TO ECO
8" ST
8" ST
8" ST
8" ST
8" ST
8" ST8" ST8" ST8" ST8" ST8" ST
C.O.
3" ST
S
LO
P E
1/
8" /F
T S
LO
P
E
1/ 8"
/F T
S
LO
P E
1/
8" /F
T S
LO
P
E
1/ 8"
/F T
S
LO
P E
1/
8" /F
T
SLOPE=1/8"/FT
SLOPE=1/8"/FTSLOPE=1/8"/FTSLOPE=1/8"/FTSLOPE=1/8"/FT
SLOPE=1/8"/FT
SLOPE=1/8"/FT
SLO
PE=1
/8" /F
T
S
LO
P E
1/
8" /F
T
S
LO
P E
1/
8" /F
T
S
LO
P E
1/
8" /F
T
S
LO
P E
1/
8" /F
T S
LO
P
E
1/ 8"
/F T
2" S
T (p um p ed
TRENCH DRAIN TD-1
6" S 6" S
3" CW
3" C
W
SLOPE=1/8"/FT
S
LO
P E
1/
8" /F
T
6" S
T
6" ST
S
LO
P E
1/
8" /F
T
S T
S T
S
LO
P E
1/
8" /F
T S
LO
P
E
1/ 8"
/F T
SLOPE=1/8"/FT
SLOPE=1/8"/FT
SLOPE=1/8"/FT
S T
3" ST UP FROM SUMP PUMP
(100 GPM)SEE DETAIL 8/P501
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
7370 Cabot Court, Ste. 103 Melbourne, FL 32940
COA #15 TLC NO:
Phone: 321-636-0274
Fax: 321-639-8986 www.tlc-engineers.com
Copyright 2021 TLC Engineering Solutions, Inc.c
P.O. Box 1296, Winter Park, FL 32790 Tel 407.467.8833 - Fax 407.926.0701 o n e e ig h t h i n c h o n e f o o t 16
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e ig h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08−6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
1 2 3 4 5 6 87 9
MALCOM RANDAL VA HOSPITAL
ADMINISTRATION BUILDING
VAWPBMC PLANNING AND ENGINEERING
IF THIS DRAWING IS LESS THAN 30" X
42" IT IS A REDUCED SIZE DRAWING
CONSTRUCTION DOCUMENTS
FLGAINESVILLE
BLDG #
573-360
JAHBKG
FIRST FLOOR PLAN - UNDERSLAB
GRAVITY WASTE
518056 06/18/2021
JAMES T. WAMSLEY, P.E.
Florida License #50343
06/18/2021
PP101
1/8" = 1'-0"PP101
1 FIRST FLOOR PLAN - UNDERSLAB GRAVITY WASTE
# Revisions: Date:
1 ADDENDUM 1 10/18/21
UP
UP
P-401 P-401
P-413
P-413
3" C
W (s tr ee t)
3/4" CW
(street)
SHOCK ARRESTER w/
ACCESS SEE DETAIL 10/P501
P-802
30 GAL. ELECT. WATER HTR.
ON SHELF 208V, 1PH, 4500 W
SEE DETAIL 11/P501
ACCUMIX MT005240T 208V, 1 PH 3.6
KW
or EQUAL POINT OF USE WATER HTR.
(BACK TO BACK)SEE DETAIL 4/P501
PRESSURE ACTIVATED
TRAP PRIMER SEE DETAIL
6/P501
P-103(ADA)
P-203
SP-1 SEE 8/P501
SP-1(FUTURE)
P-524
EWH-1/ET-1/CP-1
WALL HYDRANT P-801
A B C D E
LOBBY
1-100
OFFICE
1-101
MECHANICAL
1-102
CORRIDOR
1-103
WOMEN
1-104
MEN
1-105
HAC ROOM
1-106
PUMP ROOM
1-107
STAIR B
1-108
BREAK ROOM
1-110
WOMEN
1-112
MEN
1-113
TELE/COM
1-115
VESTIBULE
1-114
STAIR A
1-118
RECEIVING
1-117
CORRIDOR
1-116
LOADING AREA
ELECTRICAL ROOM
1-109
COPIER
1-111
TRENCH DRAIN
FEC
V E
R
IF
Y
ELEVATOR B
FE
FE
FE
FE
FE
ELEVATOR A
CCU-4
ACC-1
ACC-2
CCU-3
T
M
C C
U -5
CCU-6
8 8
VERIFY
VERIFY
VERIFY
SEE SITE PLAN FOR CONT.
0.9
P-413
P-103
WALL HYDRANT P-801
2" C.W. UP & DN(FLOORS 1-2)
w/ ACCESS ABOVE CEILING
ON FIRST FLOOR
2" CW
3" C
W (s tr ee t)
P-604
GREY WATER TRAP PRIMER
SEE DETAIL 5/P501
BOOSTER PUMP
SUCTION(FUTURE)
BOOSTER PUMP
DISCHARGE(FUTURE
3/ 4"
H W
1/ 2"
H W
R
BUILDING DOMESTIC
WATER SERVICE W/ VALVE
3/4" CW
3/4" HW
1/2" HW
SHOCK ARRESTER w/
ACCESS SEE DETAIL 10 SHT.
P501 FUTURE DOMESTIC
BOOSTER PUMP
WALL HYDRANT P-801
WALL HYDRANT P-801
WALL HYDRANT P-801
WALL HYDRANT P-801
GREY WATER TRAP PRIMER
SEE DETAIL 5/P501
3/ 4"
C W
3/4" CW
3" CW
(street)
1" CW
(street)
3/4" CW
3/ 4"
C W
P-103(ADA)
P-103(ADA)
P-103(ADA)
DBL. CK BACKFLOW PREV.
PROVIDE 1/4" VALVED CONN.
TO CRAC UNIT-SEE HVAC FOR EQ..
1/2" HWR
1/2" CW
3/4" SOFT COPPER I.W. OUT THRU
WALL 6 " A.F.G.TO SPILL ON GRADE
2" C.W. VALVED & CAPPED
FOR FUTURE EXTENSION
3" C
W (s tr ee t)
3/4" CW
2" C
W
2" C
W (s tr ee t)
3" CW
(street)
3" C
W (s tr ee t)
3" CW
(street)
P-502
3/ 4"
C W
2" CW
SOV 1ST FLR
ON VERTICAL
RISER SOV's
3" CW
2 1/2" CW
2" CW
1/2" CW
1/2" HW
1/2" HWR
PWH-11
P-103(ADA) P-103(ADA)
P-401 P-401
P-413
P-103(ADA)
P-413
P-203
FD-E
SP-1 SUMP PUMP
4" WASTE UP/DN
4" WASTE DN
4" WASTE UP/DN
FD-C
3" TRAPPED WASTE
UP TO
DRAIN(ABOVE)
GREY WATER TRAP
PRIMER SEE DETAIL
5/P501
A B C D E
LOBBY
1-100
OFFICE
1-101
MECHANICAL
1-102
CORRIDOR
1-103
WOMEN
1-104
MEN
1-105
HAC ROOM
1-106
PUMP ROOM
1-107
STAIR B
1-108
BREAK ROOM
1-110
WOMEN
1-112
MEN
1-113
TELE/COM
1-115
VESTIBULE
1-114
STAIR A
1-118
RECEIVING
1-117
CORRIDOR
1-116
ELECTRICAL ROOM
1-109
COPIER
1-111
0.9
FD-C
SAN-ECO (AVOID ENTRYWAY)
3" UP TO WCO
4" WASTE UP/DN
4" WASTE DN
P-604
3" TRAPPED WASTE
UP
3" VENT UP
3" TRAPPED WASTE
UP TO
DRAIN(ABOVE)
3" V
3" VENT UP FROM BELOW
3" VENT UP TO ABOVE
2" VENT UP TO ABOVE
TRAP PRIMER
DRAIN(TYP.)
BWV ACCESS @ GRADE
3" CND
6" STORM CONDENSATE
RISER UP/DN
3" x 4" CONDENSATE
HUB DRAIN - SEE
DETAIL
7/P501
3" CONDENSATE UP TO
HUB DRAIN(ABOVE)
3" WASTE UP
STM C.O.
COORDINATE TRENCH DRAIN TO
LOW POINT BETWEEN EXIST.
AND NEW PAVEMENT
6" RWL (195 GPM)
6" RWL (248 GPM)
6" RWL (205 GPM)
2" SUMP PUMP DISCH
INDIRECT TO HD
TRAPPED WASTE
UP TO FLOOR
DRAIN(ABOVE) w/
TRAP PRIMER
FCO
3" S
3" V
P-103
P-103(ADA)
3" STORM TO DISCHARGE THRU CURB
FACE ON PAVEMENT(100 GPM)
CLEANOUT @ BASE OF STACK
EXPOSED IN RECEIVING
OFFSET UP TO 2ND FLOOR
FD-C
2" V
BOOT TO TO TRANSITION ARCH. DOWNSPOUTSTORM PIPE
BOOT TO TO TRANSITION ARCH. DOWNSPOUTSTORM PIPE
BOOT TO TO TRANSITION ARCH. DOWNSPOUTSTORM PIPE
BOOT TO TO TRANSITION ARCH. DOWNSPOUTSTORM PIPE
BOOT TO TO TRANSITION ARCH. DOWNSPOUTSTORM PIPE
10" STORM BWV(IN BOX)
ACCESSIBLE AT GRADE
GREY WATER TRAP
ORIMER SEE P501
P-524
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
7370 Cabot Court, Ste. 103 Melbourne, FL 32940
COA #15 TLC NO:
Phone: 321-636-0274
Fax: 321-639-8986 www.tlc-engineers.com
Copyright 2021 TLC Engineering Solutions, Inc.c
P.O. Box 1296, Winter Park, FL 32790 Tel 407.467.8833 - Fax 407.926.0701 o n e e ig h t h i n c h o n e f o o t 16
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e ig h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08−6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
1 2 3 4 5 6 87 9
MALCOM RANDAL VA HOSPITAL
ADMINISTRATION BUILDING
VAWPBMC PLANNING AND ENGINEERING
IF THIS DRAWING IS LESS THAN 30" X
42" IT IS A REDUCED SIZE DRAWING
CONSTRUCTION DOCUMENTS
FLGAINESVILLE
BLDG #
573-360
JAHBKG
FIRST FLOOR PLAN - PLUMBING
518056 06/18/2021
JAMES T. WAMSLEY, P.E.
Florida License #50343
06/18/2021
PP102
1/8" = 1'-0"PP102
1 FIRST FLOOR PLAN - SUPPLY
1/8" = 1'-0"PP102
2 FIRST FLOOR PLAN - WASTE
# Revisions: Date:
1 ADDENDUM 1 10/18/21
| Sheets |
| P601 - PLUMBING SCHEDULES |
| PP101 - FIRST FLOOR PLAN - UNDERSLAB GRAVITY WASTE |
| PP102 - FIRST FLOOR PLAN - PLUMBING |
File details come from the government source that posted it. Updated .