Attachment 1 - V1_549-21-700_Final Bid Documents_Specifications.pdf

PDF 7 MB Posted

Attached to
Z2DA--549-21-700 EHRM Infrastructure Upgrades Construction Dallas VAMC
Solicitation number
36C77625R0093
Issued by

About this file

This is a comprehensive Specifications document for the EHRM Infrastructure Upgrades Construction project at the VA North Texas Health Care System in Dallas, Texas (Contract No. 549-21-700). The document establishes the technical requirements, general conditions, safety standards, quality control procedures, commissioning requirements, and detailed specifications for asbestos abatement work across multiple buildings.

The project encompasses extensive construction and renovation work including general requirements, site surveys, demolition, hazardous materials abatement (asbestos removal from duct insulation, roofing materials, floor tiles, and mastic), temporary environmental controls, waste management, safety protocols, and commissioning of HVAC, electrical, fire protection, and communications systems. Key specifications include: General Requirements addressing contract management, security, utility coordination, and phasing for occupied facilities; Site Surveys requiring professional land surveyor certification and comprehensive utility/structure documentation; Demolition procedures with environmental protections; Asbestos Abatement (Class I, II, and III work) requiring negative pressure containment, personnel decontamination facilities, air monitoring to 0.01 f/cc standards, and disposal at approved landfills; Quality Control requiring a three-phase control system (Preparatory, Initial, Follow-Up) with certified personnel and testing laboratory validation; and General Commissioning Requirements for HVAC, electrical, fire protection, and security systems including pre-functional checklists, systems functional performance testing, training, and operations manuals. The contractor must maintain full compliance with OSHA 29 CFR 1926.1101 asbestos standards, EPA regulations, state and local requirements, provide comprehensive safety planning with competent persons and site safety officers, maintain insurance coverage, and meet all submittals for approval prior to work commencement, including detailed schedules, qualifications documentation, and pre-construction safety conferences.

View the file

Other files

File Type Posted
36C77625R0093 0005.pdf PDF
Technical Questions Spreadsheet - Dallas - 4-10-2026.docx DOCX document
36C77625R0093 0004.pdf PDF
Technical Questions Spreadsheet - Dallas - 4-7-2026.docx DOCX document
36C77625R0093 0003.pdf PDF
Technical Questions Spreadsheet - Dallas - 4-2-2026.docx DOCX document
C - 852.204-72 PERSONNEL VETTING AND CREDENTIALING MAR 2026.docx DOCX document
36C77625R0093 0002.pdf PDF
Technical Questions Spreadsheet - Dallas.docx DOCX document
P - 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL - DEV NOV 2025.docx DOCX document
C - 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL - DEV MAR 2026.docx DOCX document
Electrical Narrative.pdf PDF
Environmental Narrative.pdf PDF
Phasing Narrative.pdf PDF
Security Design Narrative.pdf PDF
Sign-in Sheet - EHRM Dallas.pdf PDF
HVAC Narrative.pdf PDF
Structural Narrative.pdf PDF
36C77625R0093 0001.pdf PDF
Architecture Narrative.pdf PDF
Civil Narrative.pdf PDF
Fire Protection Narrative.pdf PDF
Telecommunications Design Narrative.pdf PDF
36C77625R0093.pdf PDF
Attachment 9 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 4 - 549-21-700 - Construction Bid Drawings_Volume 2.pdf PDF
Attachment 11 - Past Performance Questionnaire.docx DOCX document
Attachment 8 - Construction Wage Rates - Dallas - 01-02-26.pdf PDF
Attachment 6A - Addendum 01.pdf PDF
Attachment 5 - 549-21-700 - Construction Bid Drawings_Volume 3.pdf PDF
Attachment 2 - V2_549-21-700_Final Bid Documents_Specifications.pdf PDF
Attachment 10 - Site Visit Instructions.pdf PDF
Attachment 12 - Project Information Sheet for Contractors.docx DOCX document
Attachment 7 - PCRA and ICRA.zip ZIP file
Attachment 6B - Addendum 02.pdf PDF
Attachment 3 - 549-21-700 - Construction Bid Drawings_Volume 1.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

549-21-700 | EHRM INFRASTRUCTURE UPGRADES

Dallas VAMC – Dallas, TX

Final Bid Documents

March 17, 2025

Specifications Sign and Seal: 03/17/2025

Texas Architectural Registration

No. 32226

Texas Engineer (Civil) Registration No.

128869

Texas Engineer (Structural) Registration

No. 98068

Texas Engineer (Mechanical) Registration No. 136680

Texas Engineer (Electrical) Registration No.

144295

Texas Engineer (Fire Protection) Registration No. 135432

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com

549-21-700 | EHRM INFRASTRUCTURE UPGRADES

Dallas VAMC – Dallas, TX

Final Bid Documents

March 17, 2025

American Board of Industrial Hygiene

No. 8594 CP

Registered Communications Distribution Designer Registration No: BICSIID # 328601

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com

549-21-700 | EHRM Infrastructure Upgrades

VA North Texas Health Care System – Dallas, TX

Final Bid Documents

11-01-23

00 01 10-1

TABLE OF CONTENTS

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets TBD 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21

01 33 23 Shop Drawings, Product Data, and Samples 11-23

01 35 26 Safety Requirements 05-24

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 57 19 Temporary Environmental Controls 01-21

01 74 19 Construction Waste Management 04-22

01 91 00 General Commissioning Requirements 04-22

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 01-21

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 01-21

02 82 13.13 Glovebag Asbestos Abatement 01-21

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21

02 82 13.21 Asbestos Roofing Abatement 01-21

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE – NOT USED

DIVISION 04 – MASONRY – NOT USED

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES – NOT USED

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 04-22

07 95 13 Expansion Joint Cover Assemblies 01-21

Final Bid Documents

11-01-23

00 01 10-2

TABLE OF CONTENTS

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 31 13 Access Doors and Frames 04-22

08 71 00 Door Hardware 05-22

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 06 00 Schedule for Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 65 13 Resilient Base and Accessories 01-21

09 65 19 Resilient Tile Flooring 05-18

09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 22 13 Wire Mesh Partitions 01-21

10 26 00 Wall and Door Protection 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT – NOT USED

DIVISION 12 – FURNISHINGS – NOT USED

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

11-18

DIVISION 14– CONVEYING EQUIPEMENT – NOT USED

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING – NOT USED

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

03-23

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 03-23

23 09 23 Direct-Digital Control System for HVAC 03-23

Final Bid Documents

11-01-23

00 01 10-3

TABLE OF CONTENTS

SECTION NO DIVISION AND SECTION TITLES DATE

23 23 00 Refrigerant Piping 03-23

23 31 00 HVAC Ducts and Casings 03-23

23 37 00 Air Outlets and Inlets 03-23

23 81 00 Decentralized Unitary HVAC Equipment 03-23

DIVISION 25 – INTEGRATED AUTOMATION – NOT USED

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22

26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22

26 05 26 Grounding and Bonding for Electrical Systems 11-22

26 05 33 Raceway and Boxes for Electrical Systems 11-22

26 05 41 Underground Electrical Construction 11-22

26 05 73 Overcurrent Protective Device Coordination Study 11-22

26 08 00 Commissioning of Electrical Systems 11-22

26 22 00 Low-Voltage Transformers 11-22

26 24 16 Panelboards 11-22

26 27 26 Wiring Devices 11-22

26 29 21 Enclosed Switches and Circuit Breakers 11-22

26 41 00 Facility Lightning Protection 11-22

26 43 13 Surge Protective Devices 11-22

26 51 00 Interior Lighting 11-22

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Conduits and Backboxes for Communications Systems 10-18

27 05 53 Identification for Communications Systems 12-22

27 05 36 Cable Trays for Communications Systems 12-22

27 10 00 Structured Cabling 06-15

27 11 00 Telecommunications Room Fittings 06-15

27 11 16 Communications Cabinets, Racks, Frames, and Enclosures 12-22

27 11 19 Communications Termination Blocks and Patch Panels 12-22

27 11 26 Communications Rack Mounted Power Protections and Power

Strips

12-22

27 13 13 Communications Copper Backbone Cabling 12-22

27 13 13.13 Communications Copper Cable Splicing and Terminations 12-22

27 13 23 Communications Optical Fiber Backbone Cabling 12-22

27 13 23.13 Communications Optical Fiber Splicing and Terminations 12-22

27 15 13 Communications Copper Horizontal Cabling 12-22

27 16 19 Communications Patch Cords, Station Cords, and Cross-

Connect Wire

12-22

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

Final Bid Documents

11-01-23

00 01 10-4

TABLE OF CONTENTS

SECTION NO DIVISION AND SECTION TITLES DATE

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 16 00 Intrusion Detection System 10-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK – NOT USED

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 90 00 Planting 08-16

DIVISION 33 – UTILITIES – NOT USED

DIVISION 34 – TRANSPORTATION – NOT USED

DIVISION 48 – Electrical Power Generation – NOT USED

Final Bid Documents 05-01-20

00 01 15 - 1

LIST OF DRAWINGS

SECTION 00 01 15

LIST OF DRAWINGS

The drawings listed below accompanying this specification form a part of the contract.

GENERAL INFORMATION

GI000 COVER SHEET

GI001 SHEET INDEX

GI002 GENERAL INFORMATION

GI003 ICRA CONSTRUCTION DETAILS

GI011 PHASING PLAN - SITE PLAN

GI012 DEPARTMENT PLAN - BUILDING 1

GI013 DEPARTMENT PLAN - BUILDING 2

GI014 DEPARTMENT PLAN - BUILDING 2

GI015 DEPARTMENT PLAN - BUILDING 2J

GI016 DEPARTMENT PLAN - BUILDING 2J

GI017 DEPARTMENT PLAN - BUILDING 2J

GI018 DEPARTMENT PLAN - BUILDINGS 3, 60, 72, 74, AND 87

ENVIRONMENTAL

H1001 BUILDING 1 - LEVEL 1 - HAZARDOUS MATERIALS ABATEMENT

H1002 BUILDING 1 - LEVEL 2 - HAZARDOUS MATERIALS ABATEMENT

H1003 BUILDING 1 - LEVEL 3 - HAZARDOUS MATERIALS ABATEMENT

H1004 BUILDING 1 - LEVEL 4 - HAZARDOUS MATERIALS ABATEMENT

H1005 BUILDING 1 - LEVEL 5 - HAZARDOUS MATERIALS ABATEMENT

H1006 BUILDING 1 - LEVEL 6 - HAZARDOUS MATERIALS ABATEMENT

H1007 BUILDING 2 - BASEMENT - HAZARDOUS MATERIALS ABATEMENT

H1008 BUILDING 2 - BASEMENT - KNOWN TSI LOCATIONS

H1009 BUILDING 2 - LEVEL 1 - HAZARDOUS MATERIALS ABATEMENT

H1010 BUILDING 2 - LEVEL 1 - KNOWN TSI LOCATIONS

H1011 BUILDING 2 - LEVEL 2 - HAZARDOUS MATERIALS ABATEMENT

H1012 BUILDING 2 - LEVEL 2 - KNOWN TSI LOCATIONS

H1013 BUILDING 2 - LEVEL 3 - HAZARDOUS MATERIALS ABATEMENT

H1014 BUILDING 2 - LEVEL 3 - KNOWN TSI LOCATIONS

H1015 BUILDING 2 - LEVEL 4 - HAZARDOUS MATERIALS ABATEMENT

H1016 BUILDING 2 - LEVEL 4 - KNOWN TSI LOCATIONS

H1017 BUILDING 2 - LEVEL 5 - HAZARDOUS MATERIALS ABATEMENT

Final Bid Documents 05-01-20

00 01 15 - 2

LIST OF DRAWINGS

H1018 BUILDING 2 - LEVEL 5 - KNOWN TSI LOCATIONS

H1019 BUILDING 2 - LEVEL 6 - KNOWN HAZARDOUS MATERIALS

H1020 BUILDING 2 - LEVEL 6 - KNOWN TSI LOCATIONS

H1021 BUILDING 2 - LEVEL 7 - KNOWN HAZARDOUS MATERIALS

H1022 BUILDING 2 - LEVEL 7 - KNOWN TSI LOCATIONS

H1023 BUILDING 2 - LEVEL 8 - HAZARDOUS MATERIALS ABATEMENT

H1024 BUILDING 2 - LEVEL 8 - KNOWN TSI LOCATIONS

H1025 BUILDING 2 - LEVEL 9 - HAZARDOUS MATERIALS ABATEMENT

H1026 BUILDING 2 - LEVEL 9 - KNOWN TSI LOCATIONS

H1027 BUILDING 2 - LEVEL 10 - HAZARDOUS MATERIALS ABATEMENT

H1028 BUILDING 2J - BASEMENT & LEVEL 1 - HAZARDOUS MATERIALS ABATEMENT

H1029 BUILDING 2J - LEVELS 3 & 5 - HAZARDOUS MATERIALS ABATEMENT

H1030 BUILDING 3 - BASEMENT - HAZARDOUS MATERIALS ABATEMENT

H1031 BUILDING 3 - LEVEL 1 - HAZARDOUS MATERIALS ABATEMENT

H1032 BUILDING 5 - HAZARDOUS MATERIALS ABATEMENT

H1033 BUILDING 6 - BASEMENT - HAZARDOUS MATERIALS ABATEMENT

H1034 BUILDING 6 - LEVEL 1 - HAZARDOUS MATERIALS ABATEMENT

H1035 BUILDING 6 - LEVEL 2 - HAZARDOUS MATERIALS ABATEMENT

H1036 BUILDING 7 - HAZARDOUS MATERIALS ABATEMENT

H1037 BUILDING 8 - HAZARDOUS MATERIALS ABATEMENT

H1038 BUILDING 9 - HAZARDOUS MATERIALS ABATEMENT

H1039 BUILDING 11 - HAZARDOUS MATERIALS ABATEMENT

H1040 BUILDING 13 - HAZARDOUS MATERIALS ABATEMENT

H1041 BUILDING 43 - HAZARDOUS MATERIALS ABATEMENT

H1042 BUILDING 44 - HAZARDOUS MATERIALS ABATEMENT

H1043 BUILDING 45 - HAZARDOUS MATERIALS ABATEMENT

H1044 BUILDING 60 - HAZARDOUS MATERIALS ABATEMENT

H1045 BUILDING 69 - HAZARDOUS MATERIALS ABATEMENT

H1046 BUILDING 70 - HAZARDOUS MATERIALS ABATEMENT

H1047 BUILDING 71 - HAZARDOUS MATERIALS ABATEMENT

H1048 BUILDING 72 - HAZARDOUS MATERIALS ABATEMENT

H1049 BUILDING 74 - HAZARDOUS MATERIALS ABATEMENT

H1050 BUILDING 75 - HAZARDOUS MATERIALS ABATEMENT

H1051 BUILDING 77 - HAZARDOUS MATERIALS ABATEMENT

H1052 BUILDING 80 - HAZARDOUS MATERIALS ABATEMENT

H1053 TT BUILDINGS - HAZARDOUS MATERIALS ABATEMENT

H1054 HERZOG CAMPUS - MDRT - HAZARDOUS MATERIALS ABATEMENT

Final Bid Documents 05-01-20

00 01 15 - 3

LIST OF DRAWINGS

H1055 HERZOG CAMPUS - MAIN LEVEL 1 - HAZARDOUS MATERIALS ABATEMENT

H1056 HERZOG CAMPUS - MAIN LEVEL 2 - HAZARDOUS MATERIALS ABATEMENT

H1057 BUILDING 1 AND 2J ROOFS - HAZARDOUS MATERIALS ABATEMENT

H1058 BUILDING 2 ROOFS - 1 - HAZARDOUS MATERIALS ABATEMENT

H1059 BUILDING 2 ROOFS 2 - HAZARDOUS MATERIALS ABATEMENT

H1060 BUILDINGS 3, 6, 43, 60, AND 72 ROOFS - HAZARDOUS MATERIALS

ABATEMENT

H1061 BUILDINGS 74, 75, AND 77 ROOFS - HAZARDOUS MATERIALS ABATEMENT

CIVIL

GS001 GENERAL LAYOUT PLAN

GS002 SITE AND DEMOLITION PLAN - 1 OF 2

GS003 SITE AND DEMOLITION PLAN - 2 OF 2

GS004 UTILITY PLAN - 1 OF 2

GS005 UTILITY PLAN - 2 OF 2

GS006 EROSION CONTROL PLAN - 1 OF 2

GS007 EROSION CONTROL PLAN - 2 OF 2

GS008 EROSION CONTROL DETAILS

GS009 DETAILS

STRUCTURAL

S-001 STRUCTURAL GENERAL NOTES AND DETAILS

S-101 REFERENCE PLANS - BUILDING 1, 2

S-103 REFERENCE PLANS - BUILDING 2

S-105 REFERENCE PLANS - BUILDING 2J, 6, 45, 75, 81, 82

S-201 ROOF PLANS - BUILDINGS 1,60,72,74,75,77

S-202 ROOF PLANS - BUILDING 2J

ARCHITECTURAL

AS001 ARCHITECTURAL SITE PLAN - MAIN CAMPUS

AS002 ARCHITECTURAL SITE PLAN - HERZOG

A-101 REFERENCE PLANS - BUILDING 1

A-102 REFERENCE PLANS - BUILDING 2

A-103 REFERENCE PLANS - BUILDING 2

A-104 REFERENCE PLANS - BUILDING 2J

A-105 REFERENCE PLANS - BUILDING 2J

A-106 REFERENCE PLANS - BUILDING 2J

Final Bid Documents 05-01-20

00 01 15 - 4

LIST OF DRAWINGS

A-107 REFERENCE PLANS - BUILDINGS 3, 4, 5, 6, 7, 8, 9, AND 11

A-108 REFERENCE PLANS - BUILDINGS 13, 43, 44, 45, 60, 68, 69, AND 70

A-109 REFERENCE PLANS - BUILDINGS 71, 72, 74, 75, 77, 79, 80, AND 81

A-110 REFERENCE PLANS - BUILDING 82

A-111 REFERENCE PLANS - BUILDINGS 87, TT46, TT47, TT48, TT49, TT50,

TT51, TT52, TT53, TT54, AND TT55

A-112 REFERENCE PLANS - BUILDINGS 1, MMRC HZ5, AND MDRT (OFF-SITE)

AE001 PARTITION TYPES

AE101 BUILDING 1 - ENLARGED PLANS - LEVELS 1 AND 2

AE102 BUILDING 1 - ENLARGED PLANS - LEVELS 3 AND 4

AE103 BUILDING 1 - ENLARGED PLANS - LEVELS 5 AND 6

AE104 BUILDING 2 - ENLARGED PLANS - BASEMENT

AE105 BUILDING 2 - ENLARGED PLANS - BASEMENT AND LEVEL 1

AE106 BUILDING 2 - ENLARGED PLANS - LEVEL 1

AE107 BUILDING 2 - ENLARGED PLANS - LEVELS 1 AND 2

AE108 BUILDING 2 - ENLARGED PLANS - LEVEL 2

AE109 BUILDING 2 - ENLARGED PLANS - LEVELS 2 AND 3

AE110 BUILDING 2 - ENLARGED PLANS - LEVELS 3 AND 4

AE111 BUILDING 2 - ENLARGED PLANS - LEVEL 4

AE112 BUILDING 2 - ENLARGED PLANS - LEVELS 4 AND 5

AE113 BUILDING 2 - ENLARGED PLANS - LEVELS 5 AND 6

AE114 BUILDING 2 - ENLARGED PLANS - LEVEL 7

AE115 BUILDING 2 - ENLARGED PLANS - LEVEL 8

AE116 BUILDING 2 - ENLARGED PLANS - LEVELS 9 AND 10

AE117 BUILDING 2J - ENLARGED PLANS - BASEMENT

AE118 BUILDING 2J - ENLARGED PLANS - BASEMENT

AE119 BUILDING 2J - ENLARGED PLANS - BASEMENT

AE120 BUILDING 2J - ENLARGED PLANS - BASEMENT AND LEVEL 1

AE121 BUILDING 2J - ENLARGED PLANS - LEVEL 1

AE122 BUILDING 2J - ENLARGED PLANS - LEVEL 1

AE123 BUILDING 2J - ENLARGED PLANS - LEVEL 3

AE124 BUILDING 2J - ENLARGED PLANS - LEVEL 3

AE125 BUILDING 2J - ENLARGED PLANS - LEVEL 5

AE126 BUILDING 2J - ENLARGED PLANS - LEVEL 5

AE127 BUILDING 2J - ENLARGED PLANS - LEVEL 5

AE128 BUILDING 2J - ENLARGED PLANS - PENTHOUSE

AE129 BUILDING 3, 5, AND 6 - ENLARGED PLANS - BASEMENT AND LEVEL 1

Final Bid Documents 05-01-20

00 01 15 - 5

LIST OF DRAWINGS

AE130 BUILDINGS 6, 7, 8, 9, AND 11 - ENLARGED PLANS - BASEMENT AND

LEVEL 1

AE131 BUILDINGS 11, 13, AND 43 - ENLARGED PLANS - LEVEL 1 AND LEVEL 2

AE132 BUILDINGS 44, 45 AND 60 - ENLARGED PLANS - LEVEL 1

AE133 BUILDING 60 - ENLARGED PLANS - LEVEL 1

AE134 BUILDINGS 60, 68, 69, & 70 - ENLARGED PLANS - LEVEL 1

AE135 BUILDINGS 70, 71, 72, AND 74 - ENLARGED PLANS - LEVEL 1 AND

LEVEL 2

AE136 BUILDINGS 74, 75, AND 77 - ENLARGED PLANS - LEVEL 1

AE137 BUILDINGS 79, 80, 81, AND 82 - ENLARGED PLANS - LEVEL 1

AE138 BUILDINGS 82, 87, TT46, TT47, AND TT48 - ENLARGED PLANS - LEVEL 1

AE139 BUILDINGS TT49, TT50, TT51, TT52, TT53, TT54, AND TT55 - ENLARGED

PLANS - LEVEL 1

AE140 BUILDINGS 1 AND MMRC-HZ5 (OFF-SITE) - ENLARGED PLANS - LEVEL 1

AND LEVEL 2

AE141 BUILDINGS 1 AND MMRC-HZ5 (OFF-SITE) - ENLARGED PLANS - LEVEL 2

AE601 DOOR SCHEDULE

AE611 DOOR & WINDOW DETAILS

AF711 FINISH SCHEDULES & DETAILS

FIRE PROTECTION

F-101 REFERENCE PLANS - BUILDING 1

F-102 REFERENCE PLANS - BUILDING 2

F-103 REFERENCE PLANS - BUILDING 2

F-104 REFERENCE PLANS - BUILDING 2J

F-105 REFERENCE PLANS - BUILDING 2J

F-106 REFERENCE PLANS - BUILDINGS 3, 5, 6, 7, 8, 9, 11

F-107 REFERENCE PLANS - BUILDINGS 12, 13, 43, 44, 45, 60, 69 & 70

F-108 REFERENCE PLANS - 71, 72, 74, 75, 77, 78, & 80

F-109 REFERENCE PLANS - BUILDING 82

F-110 REFERENCE PLANS - BUILDINGS TT46, TT47, TT48, TT49, TT50, TT51,

TT52, TT53, TT54, TT55, & 87

F-111 REFERENCE PLANS - BUILDINGS 1, MMRC HZ5, AND MORT (OFF-SITE)

FA001 FIRE ALARM NOTES MATRIX AND RISER DIAGRAM

FA401 BUILDING 1 - ENLARGED PLANS

FA402 BUILDING 2 - ENLARGED PLANS - BASEMENT AND LEVEL 1

FA403 BUILDING 2 - ENLARGED PLANS - LEVEL 2 AND LEVEL 3

FA404 BUILDING 2 - ENLARGED PLANS - LEVEL 4, LEVEL 5, AND LEVEL 6

Final Bid Documents 05-01-20

00 01 15 - 6

LIST OF DRAWINGS

FA405 BUILDING 2 - ENLARGED PLANS - LEVEL 7, LEVEL 8, AND LEVEL 9

FA406 BUILDING 2J - ENLARGED PLANS - BASEMENT

FA407 BUILDING 2J - ENLARGED PLANS - BASEMENT

FA408 BUILDING 2J - ENLARGED PLANS - LEVEL 1

FA409 BUILDING 2J - ENLARGED PLANS - LEVEL 3

FA410 BUILDING 2J - ENLARGED PLANS - LEVEL 5

FA411 BUILDINGS 3, 5, 6, 7, 8, 9, & 11 - ENLARGED PLANS

FA412 BUILDINGS 13, 43, 44, 45, 60, 69, & 70 - ENLARGED PLANS

FA413 BUILDINGS 71, 72, 74, 75, 77, 78, & 80 - ENLARGED PLANS

FA414 BUILDINGS TT46, TT47, TT48, TT49, TT50, TT51, TT52, TT53, TT54,

TT55, & 87 - ENLARGED PLANS

FA415 BUILDINGS 1 AND MMRC-HZ5 (OFF-SITE) - ENLARGED PLANS - LEVEL 1

AND LEVEL 2

FA501 FIRE ALARM DETAILS

FX001 FIRE SUPPRESSION GENERAL NOTES AND LEGEND

FX401 BUILDING 1 - ENLARGED PLANS

FX402 BUILDING 2 - ENLARGED PLANS - BASEMENT AND LEVEL 1

FX403 BUILDING 2 - ENLARGED PLANS - LEVEL 2 AND LEVEL 3

FX404 BUILDING 2 - ENLARGED PLANS - LEVEL 4, LEVEL 5, AND LEVEL 6

FX405 BUILDING 2 - ENLARGED PLANS - LEVEL 7, LEVEL 8, AND LEVEL 9

FX406 BUILDING 2J - ENLARGED PLANS - BASEMENT

FX408 BUILDING 2J - ENLARGED PLANS - BASEMENT

FX407 BUILDING 2J - ENLARGED PLANS - LEVEL 1

FX409 BUILDING 2J - ENLARGED PLANS - LEVEL 3

FX410 BUILDING 2J - ENLARGED PLANS - LEVEL 5

FX411 BUILDINGS 3, 5, 6, 7, 8, 9, & 11 - ENLARGED PLANS

FX412 BUILDINGS 12, 13, 43, 44, 45, 60, 69, & 70 - ENLARGED PLANS

FX413 BUILDINGS 71, 72, 74, 75, 77, 78, & 80 - ENLARGED PLANS

FX414 BUILDINGS TT46, TT47, TT48, TT49, TT50, TT51, TT52, TT53, TT54,

TT55, & 87 - ENLARGED PLANS

FX415 BUILDINGS 1 AND MMRC-HZ5 (OFF-SITE) - ENLARGED PLANS - LEVEL 1

AND LEVEL 2

FX501 FIRE SPRINKLER DETAILS

MECHANICAL

M-001 LEGEND AND ABBREVIATIONS

M-101 REFERENCE PLANS - BUILDING 1

M-102 REFERENCE PLANS - BUILDING 2

Final Bid Documents 05-01-20

00 01 15 - 7

LIST OF DRAWINGS

M-103 REFERENCE PLANS - BUILDING 2

M-104 REFERENCE PLANS - BUILDING 2J

M-105 REFERENCE PLANS - BUILDING 2J

M-106 REFERENCE PLANS - BUILDINGS 3, 5, 6, 7, 8, 9, AND 11

M-107 REFERENCE PLANS - BUILDINGS 13, 43, 44, 45, 60, 68, AND 69

M-108 REFERENCE PLANS - BUILDINGS 70, 71, 72, 74, 75, 77, 78/79, 80,

AND 81

M-109 REFERENCE PLANS - BUILDINGS 82 AND 87

M-110 REFERENCE PLANS - BUILDINGS TT46, TT47, TT48, TT49, TT50, TT51,

TT52, TT54, AND TT55

M-111 REFERENCE PLANS - BUILDINGS 1 OFF-SITE, MMRC HZ5, AND MDRT

M-201 ROOF PLANS - BUILDINGS 1 AND 2J

M-202 ROOF PLANS - BUILDINGS 3, 6, 43, 60, AND 72

M-203 ROOF PLANS - BUILDINGS 74, 75, AND 77

M-204 ROOF PLANS - BUILDING 1 OFF-SITE

M-401 ENLARGED PLANS - BUILDING 1 - LEVELS 1, 2, 3, 4, 5, AND 6

M-402 ENLARGED PLANS - BUILDING 2 - BASEMENT AND LEVEL 1

M-403 ENLARGED PLANS - BUILDING 2 - LEVELS 1, 2, 3, AND 4

M-404 ENLARGED PLANS - BUILDING 2 - LEVELS 4, 5, 6, AND 7

M-405 ENLARGED PLANS - BUILDING 2 - LEVELS 7, 8, 9, AND 10

M-406 ENLARGED PLANS - BUILDING 2J - BASEMENT

M-407 ENLARGED PLANS - BUILDING 2J - LEVEL 1

M-408 ENLARGED PLANS - BUILDING 2J - LEVELS 3, AND 5

M-409 ENLARGED PLANS - BUILDING 2J - LEVEL 5 AND PENTHOUSE

M-410 ENLARGED PLANS - BUILDINGS 3, 5, 6, 7, AND 8

M-411 ENLARGED PLANS - BUILDINGS 9, 11, 43, AND 44

M-412 ENLARGED PLANS - BUILDINGS 45, 60, 69, AND 70

M-413 ENLARGED PLANS - BUILDINGS 71, 72, 74, 75, AND 77

M-414 ENLARGED PLANS - BUILDINGS 78/79, 80, 81, AND 82

M-415 ENLARGED PLANS - BUILDINGS 87, TT46, TT47, TT48, TT49, AND TT50

M-416 ENLARGED PLANS - BUILDINGS TT52, TT53, TT54, AND TT55

M-417 ENLARGED PLANS - BUILDINGS 1 OFF-SITE, MDRT, AND MMRC HZ5

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-701 MECHANICAL CONTROLS

Final Bid Documents 05-01-20

00 01 15 - 8

LIST OF DRAWINGS

ELECTRICAL

E-001 ELECTRICAL LEGEND AND ABBREVIATIONS

E-101 REFERENCE PLANS - BUILDING 1

E-102 REFERENCE PLANS - BUILDING 2

E-103 REFERENCE PLANS - BUILDING 2

E-104 REFERENCE PLANS - BUILDING 2J

E-105 REFERENCE PLANS - BUILDING 2J

E-106 REFERENCE PLANS - BUILDING 2J

E-107 REFERENCE PLANS - BUILDINGS 3, 5, 6, 7, 8, 9, & 11

E-108 REFERENCE PLANS - BUILDINGS 13, 43, 44, 45, 60, 69, & 70

E-109 REFERENCE PLANS - BUILDINGS 71, 72, 74, 75, 77, & 80

E-110 REFERENCE PLANS - BUILDING 82

E-111 REFERENCE PLANS - BUILDINGS TT46, TT47, TT48, TT49, TT50, TT51,

TT52, TT54, TT55, & 87

E-112 REFERENCE PLANS - BUILDINGS 1, OFFSITE, MDRT, & MMRC-HZ5

E-201 EQUIPMENT PLANS - BUILDINGS 1 & 2J

E-202 EQUIPMENT PLANS - BUILDING 2

E-203 EQUIPMENT PLANS - BUILDINGS 3, 7, 43, 71 & 72

E-204 EQUIPMENT PLANS - BUILDINGS 60 & 74

E-205 EQUIPMENT PLANS - BUILDINGS 75, 77, HZG & 1 (OFFSITE)

E-401 BUILDING 1 - ENLARGED PLANS - LEVELS 1 & 2

E-402 BUILDING 1 - ENLARGED PLANS - LEVELS 3 & 4

E-403 BUILDING 1 - ENLARGED PLANS - LEVELS 5 & 6

E-404 BUILDING 2 - ENLARGED PLANS - BASEMENT

E-405 BUILDING 2 - ENLARGED PLANS - BASEMENT & LEVEL 1

E-406 BUILDING 2 - ENLARGED PLANS - LEVEL 1

E-407 BUILDING 2 - ENLARGED PLANS - LEVELS 1 & 2

E-408 BUILDING 2 - ENLARGED PLANS - LEVEL 2

E-409 BUILDING 2 - ENLARGED PLANS - LEVELS 2 & 3

E-410 BUILDING 2 - ENLARGED PLANS - LEVELS 3 & 4

E-411 BUILDING 2 - ENLARGED PLANS - LEVEL 4

E-412 BUILDING 2 - ENLARGED PLANS - LEVELS 4 & 5

E-413 BUILDING 2 - ENLARGED PLANS - LEVEL 6

E-414 BUILDING 2 - ENLARGED PLANS - LEVEL 7

E-415 BUILDING 2 - ENLARGED PLANS - LEVEL 8

E-416 BUILDING 2 - ENLARGED PLANS - LEVELS 9 & 10

E-417 BUILDING 2J - ENLARGED PLANS - BASEMENT

Final Bid Documents 05-01-20

00 01 15 - 9

LIST OF DRAWINGS

E-418 BUILDING 2J - ENLARGED PLANS - BASEMENT

E-419 BUILDING 2J - ENLARGED PLANS - BASEMENT

E-420 BUILDING 2J - ENLARGED PLANS - BASEMENT & LEVEL 1

E-421 BUILDING 2J - ENLARGED PLANS - LEVEL 1

E-422 BUILDING 2J - ENLARGED PLANS - LEVEL 1

E-423 BUILDING 2J - ENLARGED PLANS - LEVEL 3

E-424 BUILDING 2J - ENLARGED PLANS - LEVEL 3

E-425 BUILDING 2J - ENLARGED PLANS - LEVEL 5

E-426 BUILDING 2J - ENLARGED PLANS - LEVEL 5

E-427 BUILDING 2J - ENLARGED PLANS - LEVEL 5

E-428 BUILDING 2J - ENLARGED PLANS - PENTHOUSE

E-429 BUILDING 3, 5, & 6 - ENLARGED PLANS - BASEMENT & LEVEL 1

E-430 BUILDINGS 6, 7, 8, 9, & 11 - ENLARGED PLANS - BASEMENT AND LEVEL

E-431 BUILDINGS 13, 43, ENLARGED PLANS – BASEMENT, LEVELS 1 & 2

E-432 BUILDINGS 44, 45 & 60 - ENLARGED PLANS - LEVEL 1

E-433 BUILDING 60, ENLARGED PLANS - LEVEL 1

E-434 BUILDINGS 60, 68, 69 & 70 - ENLARGED PLANS - LEVEL 1

E-435 BUILDINGS 70, 71 72 & 74 - ENLARGED PLANS - LEVELS 1 & 2

E-436 BUILDINGS 74, 75, & 77 - ENLARGED PLANS - LEVEL 1

E-437 BUILDINGS 79, 80, & 81 - ENLARGED PLANS - LEVEL 1

E-438 BUILDINGS 82, 87, TT46, TT47 & TT48 - ENLARGED PLANS - LEVEL 1

E-439 BUILDINGS TT49, TT50, TT51, TT52, TT53, TT54, & TT55 - ENLARGED

PLANS - LEVEL 1

E-440 BUILDINGS 1 OFFSITE, MDRT, & MMRC-HZ5 - ENLARGED PLANS - LEVELS 1

& 2

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DETAILS

E-503 ELECTRICAL DETAILS

E-601 ONE-LINE DIAGRAMS - BUILDING 1, 3, & 7

E-602 ONE-LINE DIAGRAMS - BUILDINGS 2, 2J, & 72

E-603 ONE-LINE DIAGRAMS - BUILDING 43, 60, & 70

E-604 ONE-LINE DIAGRAMS - BUILDING 45, 71, & 74

E-605 ONE-LINE DIAGRAMS - BUILDING 75, 77, & HZ5

E-701 ELECTRICAL PANEL SCHEDULES - BUILDING 1

E-702 ELECTRICAL PANEL SCHEDULES - BUILDING 2

E-703 ELECTRICAL PANEL SCHEDULES - BUILDING 2

E-704 ELECTRICAL PANEL SCHEDULES - BUILDING 2

Final Bid Documents 05-01-20

00 01 15 - 10

LIST OF DRAWINGS

E-705 ELECTRICAL PANEL SCHEDULES - BUILDING 2J

E-706 ELECTRICAL PANEL SCHEDULES - BUILDING 2J

E-707 ELECTRICAL PANEL SCHEDULES - BUILDINGS 3, 7, 43, & 45

E-708 ELECTRICAL PANEL SCHEDULES - BUILDINGS 60, 70, 71, 72, 74, & 75

E-709 ELECTRICAL PANEL SCHEDULES - BUILDING 77 & 1 (OFFSITE)

TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS COVER SHEET

TN001 TELECOMMUNICATIONS NEW SITE PLAN

TN002 TELECOMMUNICATIONS HERZOG SITE PLAN - REFERENCE

T-101 REFERENCE PLANS - BUILDING 1

T-102 REFERENCE PLANS - BUILDING 2

T-103 REFERENCE PLANS - BUILDING 2

T-104 REFERENCE PLANS - BUILDING 2J

T-105 REFERENCE PLANS - BUILDING 2J

T-106 REFERENCE PLANS - BUILDINGS 3, 4, 5, 6, 7, 8, 9, & 11

T-107 REFERENCE PLANS - BUILDINGS 13, 43, 44, 45, 60, 68, 69, & 70

T-108 REFERENCE PLANS - BUILDING 71, 72, 74, 75, 77, 79, 80, & 81

T-109 REFERENCE PLANS - BUILDING 82

T-110 REFERENCE PLANS - BUILDINGS TT46, 47, 48, 49, 50, 51, 52, 53, 54,

55, & 87

T-111 HERZOG CAMPUS (OFF SITE) - REFERENCE PLANS - BUILDINGS 1, MMRC,

HZ5, MDRT

TND101 B1 - LEVEL 1 & 2 - TELECOMMUNICATIONS FLOOR PLANS - DEMOLITION

TND102 B1 - LEVEL 3 & 4 - TELECOMMUNICATIONS FLOOR PLANS - DEMOLITION

TND103 B1 - LEVEL 5 & 6 - TELECOMMUNICATIONS FLOOR PLANS - DEMOLITION

TND104 B2 - BASEMENT - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND105 B2 - LEVEL 1 - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND106 B2 - LEVEL 2 - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND107 B2 - LEVEL 3 - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND108 B2 - LEVEL 4 - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND109 B2 - LEVEL 5 - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND110 B2 - LEVEL 6 - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND111 B2 - LEVEL 7 - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND112 B2 - LEVEL 8 - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND113 B2 - LEVEL 9, 10, & 11 - TELECOMMUNICATIONS FLOOR PLAN -

DEMOLITION

Final Bid Documents 05-01-20

00 01 15 - 11

LIST OF DRAWINGS

TND114 B2J - BASEMENT AND LEVEL 1 OVERALL - TELECOMMUNICATIONS FLOOR

PLANS - DEMOLITION

TND115 B2J - LEVEL 3 AND 5 OVERALL - TELECOMMUNICATIONS FLOOR PLANS -

DEMOLITION

TND116 B2J - BASEMENT AREA A - TELECOMMUNICATIONS FLOOR PLAN -

DEMOLITION

TND117 B2J - BASEMENT AREA B - TELECOMMUNICATIONS FLOOR PLAN -

DEMOLITION

TND118 B2J - BASEMENT AREA C - TELECOMMUNICATIONS FLOOR PLAN -

DEMOLITION

TND119 B2J - LEVEL 1 AREA A - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND120 B2J - LEVEL 1 AREA B - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND121 B2J - LEVEL 1 AREA C - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND122 B2J - LEVEL 3 AREA A - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND125 B2J - LEVEL 3 AREA B - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND126 B2J - LEVEL 3 AREA C - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND127 B2J - LEVEL 5 AREA A - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND128 B2J - LEVEL 5 AREA B - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND129 B2J - LEVEL 5 AREA C - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND130 BUILDING 2J - TELECOMMUNICATIONS FLOOR PLANS - DEMOLITION

TND131 B3 AND B4 - TELECOMMUNICATIONS FLOOR PLANS - DEMOLITION

TND132 B5, B6, AND B7 - TELECOMMUNICATIONS FLOOR PLANS - DEMOLITION

TND133 B8, B9, B11, AND B13 - TELECOMMUNICATIONS FLOOR PLANS -

DEMOLITION

TND134 B43 - TELECOMMUNICATIONS FLOOR PLANS - DEMOLITION

TND135 B44, B45, B68, AND B69 - TELECOMMUNICATIONS FLOOR PLANS -

DEMOLITION

TND136 B60 - LEVEL 1 - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND137 B70, B71, AND B72 - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND138 B74 - BASEMENT - TELECOMMUNICATIONS FLOOR PLANS - DEMOLITION

TND139 B74 - LEVEL 1 - TELECOMMUNICATIONS FLOOR PLAN - DEMOLITION

TND140 B75, B77, TT46, TT47, TT48, TT49 - TELECOMMUNICATIONS FLOOR PLANS

- DEMOLITION

TND141 TT50, TT51, TT52, TT53, TT54, TT55 AND TT87 - TELECOMMUNICATIONS

FLOOR PLANS - DEMOLITION

TND142 BUILDINGS 1, MMRC-HZ5, AND MDRT (OFF SITE) - TELECOMMUNICATIONS

FLOOR PLANS DEMOLITION

TND143 B80, B81, AND B82 - TELECOMMUNICATIONS FLOOR PLANS - DEMOLITION

TN101 B1 - LEVEL 1 & 2 - TELECOMMUNICATIONS FLOOR PLANS

TN102 B1 - LEVEL 3 & 4 - TELECOMMUNICATIONS FLOOR PLANS

Final Bid Documents 05-01-20

00 01 15 - 12

LIST OF DRAWINGS

TN103 B1 - LEVEL 5 & 6 - TELECOMMUNICATIONS FLOOR PLANS

TN104 B2 - BASEMENT - TELECOMMUNICATIONS FLOOR PLAN

TN105 B2 - LEVEL 1 - TELECOMMUNICATIONS FLOOR PLAN

TN106 B2 - LEVEL 2 - TELECOMMUNICATIONS FLOOR PLAN

TN107 B2 - LEVEL 3 - TELECOMMUNICATIONS FLOOR PLAN

TN108 B2 - LEVEL 4 - TELECOMMUNICATIONS FLOOR PLAN

TN109 B2 - LEVEL 5 - TELECOMMUNICATIONS FLOOR PLAN

TN110 B2 - LEVEL 6 - TELECOMMUNICATIONS FLOOR PLAN

TN111 B2 - LEVEL 7 - TELECOMMUNICATIONS FLOOR PLAN

TN112 B2 - LEVEL 8 - TELECOMMUNICATIONS FLOOR PLAN

TN113 B2 - LEVEL 9, 10, & 11 - TELECOMMUNICATIONS FLOOR PLAN

TN114 B2J - BASEMENT AND LEVEL 1 OVERALL - TELECOMMUNICATIONS FLOOR

PLANS

TN115 B2J - BASEMENT AREA A - TELECOMMUNICATIONS FLOOR PLAN

TN116 B2J - BASEMENT AREA B - TELECOMMUNICATIONS FLOOR PLAN

TN117 B2J - BASEMENT AREA C - TELECOMMUNICATIONS FLOOR PLAN

TN118 B2J - SUBBASEMENT INTERSTITIAL - TELECOMMUNICATIONS FLOOR PLAN

TN119 B2J - LEVEL 1 AREA A - TELECOMMUNICATIONS FLOOR PLAN

TN120 B2J - LEVEL 1 AREA B - TELECOMMUNICATIONS FLOOR PLAN

TN121 B2J - LEVEL 1 AREA C - TELECOMMUNICATIONS FLOOR PLAN

TN122 B2J - LEVEL 1 INTERSTITIAL - TELECOMMUNICATIONS FLOOR PLAN

TN123 B2J - LEVEL 3 AND 5 OVERALL - TELECOMMUNICATIONS FLOOR PLANS

TN124 B2J - LEVEL 3 AREA A - TELECOMMUNICATIONS FLOOR PLAN

TN125 B2J - LEVEL 3 AREA B - TELECOMMUNICATIONS FLOOR PLAN

TN126 B2J - LEVEL 3 AREA C - TELECOMMUNICATIONS FLOOR PLAN

TN127 B2J - LEVEL 3 INTERSTITIAL - TELECOMMUNICATIONS FLOOR PLAN

TN128 B2J - LEVEL 5 AREA A - TELECOMMUNICATIONS FLOOR PLAN

TN129 B2J - LEVEL 5 AREA B - TELECOMMUNICATIONS FLOOR PLAN

TN130 B2J - LEVEL 5 AREA C AND LEVEL 6 - TELECOMMUNICATIONS FLOOR PLAN

TN131 B2J - LEVEL 5 INTERSTITIAL - TELECOMMUNICATIONS FLOOR PLAN

TN133 B3 AND B4 - TELECOMMUNICATIONS FLOOR PLANS

TN134 B5, B6, AND B7 - TELECOMMUNICATIONS FLOOR PLANS

TN135 B8, B9, B11, AND B13 - TELECOMMUNICATIONS FLOOR PLANS

TN136 B43 - TELECOMMUNICATIONS FLOOR PLANS

TN137 B44, B45, B68, AND B69 - TELECOMMUNICATIONS FLOOR PLANS

TN138 B60 - LEVEL 1 - TELECOMMUNICATIONS FLOOR PLAN

TN139 B70, B71, AND B72 - TELECOMMUNICATIONS FLOOR PLAN

Final Bid Documents 05-01-20

00 01 15 - 13

LIST OF DRAWINGS

TN140 B74 - BASEMENT - TELECOMMUNICATIONS FLOOR PLANS

TN141 B74 - LEVEL 1 - TELECOMMUNICATIONS FLOOR PLAN

TN142 B75, B77, B79, TT46, TT47, TT48, TT49 - TELECOMMUNICATIONS FLOOR

PLANS

TN143 TT50, TT51, TT52, TT53, TT54, TT55 AND B87 - TELECOMMUNICATIONS

FLOOR PLANS

TN144 HERZOG CAMPUS (OFF SITE) - BUILDINGS B1, MMRC-HZ5, AND MDRT -

TELECOMMUNICATIONS FLOOR PLANS

TN401 BUILDING 1 - ENLARGED PLANS - LEVELS 1 AND 2

TN402 BUILDING 1 - ENLARGED PLANS - LEVELS 3 AND 4

TN403 BUILDING 1 - ENLARGED TELECOMMUNICATIONS PLANS - LEVELS 5 & 6

TN404 BUILDING 2 - ENLARGED TELECOMMUNICATIONS PLANS - BASEMENT

TN406 BUILDING 2 - ENLARGED TELECOMMUNICATIONS PLANS - BASEMENT

TN407 BUILDING 2 - ENLARGED TELECOMMUNICATIONS PLANS - LEVEL 1

TN408 BUILDING 2 - ENLARGED TELECOMMUNICATIONS PLANS - LEVEL 2

TN409 BUILDING 2 - ENLARGED TELECOMMUNICATIONS PLANS - LEVEL 3

TN410 BUILDING 2 - ENLARGED TELECOMMUNICATIONS PLANS - LEVELS 3 AND 4

TN411 BUILDING 2 - ENLARGED TELECOMMUNICATIONS PLANS - LEVELS 4 AND 5

TN412 BUILDING 2 - ENLARGED TELECOMMUNICATIONS PLAN - LEVEL 6

TN413 BUILDING 2 - ENLARGED TELECOMMUNICATIONS PLAN - LEVEL 7

TN414 BUILDING 2 - ENLARGED TELECOMMUNICATIONS PLANS - LEVEL 8

TN415 BUILDING 2 - ENLARGED TELECOMMUNICATIONS PLANS - LEVELS 9 AND 10

TN416 BUILDING 2J - ENLARGED TELECOMMUNICATIONS PLANS - BASEMENT

TN418 BUILDING 2J - ENLARGED TELECOMMUNICATIONS PLANS BASEMENT

TN419 BUILDING 2J - ENLARGED TELECOMMUNICATIONS PLANS - BASEMENT

TN420 BUILDING 2J - ENLARGED TELECOMMUNICATIONS PLANS - LEVEL 1

TN421 BUILDING 2J - ENLARGED TELECOMMUNICATIONS PLANS - LEVEL 1

TN422 BUILDING 2J - ENLARGED TELECOMMUNICATIONS PLANS - LEVEL 3

TN423 BUILDING 2J - ENLARGED TELECOMMUNICATIONS PLANS - LEVEL 3, 5

TN424 BUILDING 2J - ENLARGED TELECOMMUNICATIONS PLANS - LEVEL 5

TN425 BUILDING 2J - ENLARGED TELECOMMUNICATIONS PLANS - LEVEL 5, 6

PENTHOUSE

TN426 BUILDINGS 3, 5, AND 6 - ENLARGED TELECOMMUNICATIONS PLANS -

BASEMENT AND LEVEL 1

TN427 BUILDINGS 7, 8, 9, 11, AND 13 - ENLARGED TELECOMMUNICATIONS PLANS

TN428 BUILDINGS 43 AND 44 - ENLARGED TELECOMMUNICATIONS PLANS

TN429 BUILDINGS 45 AND 60 - ENLARGED TELECOMMUNICATIONS PLANS

TN430 BUILDING 60 - ENLARGED TELECOMMUNICATIONS PLANS

Final Bid Documents 05-01-20

00 01 15 - 14

LIST OF DRAWINGS

TN431 BUILDINGS 68, 69, AND 70 - ENLARGED TELECOMMUNICATIONS PLANS

TN432 BUILDINGS 71 AND 72 - ENLARGED TELECOMMUNICATIONS PLANS

TN433 BUILDINGS 74 - ENLARGED TELECOMMUNICATIONS PLANS

TN434 BUILDINGS 75 AND 77 - ENLARGED TELECOMMUNICATIONS PLANS

TN435 BUILDINGS 79, 80, 81, 82, AND 87 - ENLARGED TELECOMMUNICATIONS

PLANS

TN436 BUILDINGS TT46, 47, 48, 49, 50, AND 51 - ENLARGED

TELECOMMUNICATIONS PLANS

TN437 BUILDINGS TT52, 53, 54, AND 55 - ENLARGED TELECOMMUNICATIONS

PLANS

TN438 BUILDINGS 1, HZ5, MDRT (OFF SITE) ENLARGED TELECOMMUNICATIONS

PLANS

TN439 BUILDINGS 1, HZ5, MDRT (OFF SITE) ENLARGED TELECOMMUNICATIONS

PLANS

TN501 CABLE TRAY DETAILS

TN505 GROUNDING DETAILS

TN507 ELECTRONIC SECURITY SYSTEM DETAILS

TN601 EXISTING CAMPUS FIBER-OPTIC BACKBONE RISER

TN603 FIBER-OPTIC BACKBONE RISER - SOUTH

TN604 BUILDING 1 - FIBER-OPTIC BACKBONE RISER

TN605 BUILDING 1 - TELECOMMUNICATIONS GROUNDING RISER

TN606 BUILDING 2 - PARTIAL FIBER-OPTIC BACKBONE RISER - BASEMENT TO

LEVEL 4

TN607 BUILDING 2 - PARTIAL FIBER-OPTIC BACKBONE RISER - LEVEL 5 TO

LEVEL 11

TN608 BUILDING 2 - PARTIAL TELECOMMUNICATIONS GROUNDING RISER -

BASEMENT TO LEVEL 4

TN609 BUILDING 2 - PARTIAL TELECOMMUNICATIONS GROUNDING RISER - LEVEL 5

TO LEVEL 11

TN610 BUILDING 2J FIBER-OPTIC BACKBONE RISER

TN611 BUILDING 2J - TELECOMMUNICATIONS GROUNDING RISER - BASEMENT TO

LEVEL 5

TN612 BUILDINGS 3 - FIBER-OPTIC BACKBONE RISER AND TELECOMMUNICATIONS

GROUNDING RISER

TN613 TYPICAL 1-LEVEL, 1 & MULTI-TR BUILDINGS, AND BUILDINGS 5 AND 6 -

FIBER-OPTIC BACKBONE RISERS

TN614 BUILDINGS 8, 9, 43, & 75 - FIBER-OPTIC BACKBONE RISERS

TN615 BUILDINGS 60, 72, 74, & HERZOG B1 - FIBER-OPTIC BACKBONE RISERS

TN616 BUILDING 82 FIBER-OPTIC BACKBONE RISER

TN617 FIBER-OPTIC BACKBONE LOGICAL SCHEMATIC DIAGRAM

TY601 BUILDING 1 - ACCESS CONTROL RISERS

Final Bid Documents 05-01-20

00 01 15 - 15

LIST OF DRAWINGS

TY602 BUILDING 2 - ACCESS CONTROL RISERS

TY603 BUILDING 2J - ACCESS CONTROL RISERS

TY604 BUILDINGS 3, 5 ,6, 7, 8 AND 9 - ACCESS CONTROL RISERS

TY605 BUILDINGS 11, 13, 43, 44, 45 AND 60 - ACCESS CONTROL RISERS

TY606 BUILDINGS 68, 69, 70, 71, 72, 74, 75, 77 AND 79 - ACCESS CONTROL

RISERS

TY607 BUILDINGS 80, 81, 82, 87, TT46 AND TT47 - ACCESS CONTROL RISERS

TY608 BUILDINGS TT48, TT49, TT50, TT51, TT52, TT53, TT54 AND TT55 -

ACCESS CONTROL RISER

TY609 BUILDING HERZOG B1 AND MMRC - HZ5 - ACCESS CONTROL RISER

TY610 BUILDING 1 AND 2J - SECURITY SURVEILLANCE SYSTEM RISERS

TY611 BUILDING 2 - SECURITY SURVEILLANCE SYSTEM RISERS

TY612 BUILDING 3, 5, 6, 8, 9 AND 11 - SECURITY SURVEILLANCE SYSTEM

RISERS

TY613 BUILDING 7 AND 43 - SECURITY SURVEILLANCE SYSTEM RISERS

TY614 BUILDING 13, 44, 45, 60, 68, 69, 70, 71 AND 72 - SECURITY

SURVEILLANCE SYSTEM RISERS

TY615 BUILDING 74, 75, 77, 80, 81, 82, 87, TT46 AND TT47 - SECURITY

SURVEILLANCE SYSTEM RISERS

TY616 BUILDING TT48, TT49, TT50, TT51, TT52 AND TT53 - SECURITY

SURVEILLANCE SYSTEM RISERS

TY617 BUILDING TT54, TT55, HRZG, HRZG B1 AND MMRC-HZ5 - SECURITY

SURVEILLANCE SYSTEM RISERS

- - - E N D - - -

Final Bid Documents

11-01-21

01 00 00 -1

GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the EHRM Infrastructure

Upgrades at the VA North Texas Medical Center in Dallas, TX as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Medical Center Engineering Officer.

C. Offices of Spur Design, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by the Contractor, the Contractor shall notify the

COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Work includes installation of EHRM upgrades, general construction for areas affected by work, alterations, sitework, necessary removal of existing construction and certain other items.

Final Bid Documents

11-01-21

01 00 00 -2

GENERAL REQUIREMENTS

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

Final Bid Documents

11-01-21

01 00 00 -3

GENERAL REQUIREMENTS

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

Final Bid Documents

11-01-21

01 00 00 -4

GENERAL REQUIREMENTS

2. A limited number of permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility Manager.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

Final Bid Documents

11-01-21

01 00 00 -5

GENERAL REQUIREMENTS

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:

I. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in

Final Bid Documents

11-01-21

01 00 00 -6

GENERAL REQUIREMENTS

advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor.

J. Building(s) No.(s) 1, 2, 3, 4, 12, 16, 17, 25, 27, 28, 29, 37, 47 and

48 will be occupied during performance of work; but immediate areas of alterations will be vacated.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.

Coordinate alteration work in areas occupied by Department of

Veterans Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while alterations are performed.

K. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.

Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm

(one inch) above grade. Remove the fence when directed by COR.

L. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

Final Bid Documents

11-01-21

01 00 00 -7

GENERAL REQUIREMENTS

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

M. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

Final Bid Documents

11-01-21

01 00 00 -8

GENERAL REQUIREMENTS

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

N. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

O. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

This is the start of the file's text. The full file is on GovTribe.