This document is a Site Narrative for Final Bid Documents providing supplemental infrastructure upgrade information for the EHRM Upgrades Dallas, Texas project (VA Project Number 549-21-700). The narrative supplements pricing guidance for a design team and has been developed based on VA conversations, VA surveys, GIS data, and site reconnaissance.
The project scope includes infrastructure upgrades to 41 buildings on the VA Dallas campus: Buildings 1, 2, 2J, 3, 5, 6, 7, 8, 9, 11, 13, 43, 44, 45, 60, 69, 70, 71, 72, 74, 75, 77, 79, 80, 81, 82, 87, temporary structures TT46-TT55, and three buildings at Herzog, with all other campus buildings excluded from scope. The contractor is responsible for replacing all sidewalks, curbs, and pavement damaged during construction of new duct banks, installing new communication duct banks and communication manholes per plans (sheets GS004-GS005), and implementing erosion control measures to prevent sediment migration (sheets GS006-GS008). The project explicitly excludes subsurface exploration, sanitary sewer service extensions, storm sewer main extensions, water/fire/gas line extensions, and detention or water quality improvements. Technology plans reference additional information regarding communication duct bank rehabilitations that may be necessary.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA PROJECT NUMBER
PROJECT NAME
549-21-700 (2302) EHRM Upgrades Dallas, TX
SUBMITTAL Final Bid Documents SUBJECT Site Narrative
Project Overview and Background
This narrative provides supplemental information to further define the infrastructure upgrades for the EHRM Dallas, Texas project. This narrative is intended to provide additional guidance for Final Bid Documents level pricing to be provided by the design team. Also, these plans and narrative will be reviewed by the VA. The information provided herein was obtained from conversations with the VA, surveys provided by the VA, GIS data, and visual site reconnaissance. Buildings 1, 2, 2J, 3, 5, 6, 7, 8, 9, 11, 13, 43, 44, 45, 60, 69, 70, 71, 72, 74, 75, 77, 79, 80, 81, 82, 87, TT46, TT47, TT48, TT49, TT50, TT51, TT52, TT53, TT54, TT55, and 3 buildings at Herzog have been determined to be in scope of work. All other buildings on campus, at this time, are assumed to be excluded from the scope.
Geotechnical
No subsurface exploration has been completed, nor is planned to be completed, for this project.
Pavement
The contractor shall replace all sidewalks, curbs, and pavement damaged during construction of the new duct banks.
Sanitary Sewer
No sanitary sewer service or sanitary main extensions are required as part of this project.
Storm Drainage
No storm sewer service or storm sewer main extensions are required as part of this project.
General Utilities
There will not be any water, fire, or gas line extensions as part of this project. Refer to the plans for additional information. It was determined that new communication duct banks and communication manholes will be required as shown on sheet GS004-GS005. Reference Technology plans for additional information and communication duct bank rehabilitations that may be needed.
Detention and Water Quality and Sediment Basin
No Detention or Water Quality improvements are anticipated as a part of this project.
Contractor will be responsible for installing erosion control measures as needed to control sediment migration and sediment tracking off the site. See erosion control plans and details as shown on sheets GS006-GS008.