Attachment_1_RFP_26-24_fee_spreadsheet.xlsx
XLSX spreadsheet 220 KB Posted
- Solicitation number
- RFP-26-24-CW
- Issued by
- Volusia County, Florida
About this file
This is a fee schedule attachment for Request for Proposal 26-24-CW issued by the City of Port Orange, Florida, for the elevation of eleven flood-prone single-family residential structures. The project encompasses comprehensive elevation work on homes located at 795 Biro Drive, 111 Fleming Avenue (two structures), 216 Grant Street, 5028 Palmetto Street, 5088 Palmetto Street, 894 Reservation Court, 5715 Riverside Drive, 5817 Riverside Drive, 5951 Riverside Drive, and 8 Venetian Circle. Respondents may bid on any number of structures from one to all eleven, with no preference given for bidding on all properties. The scope of work for each property includes boundary survey, structural assessment, geotechnical assessment, engineering and drawings, permits and bonds (with waived permit fees), mobilization and site preparation, demolition and removal of miscellaneous concrete and accessory structures, foundation construction, structure elevation using tunneling and support systems, installation of entry decks and stairs, utility elevation and disconnection/reconnection, site restoration and landscaping, project administration, and elevation certificates. Select properties include specialized work such as garage conversion to non-air-conditioned space, swimming pool protection, and lift platform installation.
The fee schedule is presented as a lump-sum basis for each line item across all eleven structures, with all unit costs and totals currently showing zero values, indicating this is a blank template for vendor completion. A bid alternate section addresses potential concrete slab reinforcement needs, allowing respondents to either include this cost in their base bid or propose separate pricing for any structures requiring additional structural support. The contract structure allows respondents to propose pricing for individual structures or combinations thereof within the required timeline. Vendors must provide total bid amounts combining base bid and bid alternate amounts for each structure, with final pricing to be entered by the responding contractor. No information regarding contract term, renewal options, funding sources, or award timeline is specified in this fee schedule document.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Untitled
| ATTACHMENT 1 SCHEDULE OF UNIT PRI+B2+A1+A1:F25 | |
| ERROR:#VALUE! | TITLE: RFP-26-24-CW - Elecvation |
| VENDOR NAME:_________________________________________________________ | |
| DATE:_________________________ |
| Modification to "Attachment 1" may cause your bid to be non-responsive | |||||
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 795 Biro Drive | |||||
| 1A | Boundary Survey, Structural Assessment, Geotechnical Assessment, Engineering, and Drawings | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1B | Permits and Bonds (permit fees are waived) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1C | Mobilization, Temporary Pole, and Site Preparation for Elevation | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1D | Dumpster / Trash Removal and Job Site Port-a-Potty | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1E | Erosion and Sediment Control | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1F | Demolition, Removal, and Disposal of Miscellaneous Concrete adjacent to home. There is a screen enclosure and carport to be demolished. | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1G | Foundation Construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1H | Elevate the Structure (tunnel, beams, cribbing, and jacks) and provide cementitious material or skim coat to the exposed concrete slab perimeter | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1I | Front Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1J | Rear Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1K | Elevate Utilities (Air Handler, Electric Outlets, etc.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1L | Utility Disconnects and Reconnects (Water, Sewer, Electric, Gas, and HVAC) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1M | Site Restoration / Final Grading, Sod, Irrigation, and Landscaping | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1N | Project Administration – General Coordination with City and Homeowner during construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 1O | 3 Elevation Certificates (for construction drawings, building under construction, and finished construction) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| TOTAL OF ALL LINES: | $ - 0 |
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 111 Fleming Avenue Structure 1 | |||||
| 2A | Boundary Survey, Structural Assessment, Geotechnical Assessment, Engineering, and Drawings | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2B | Permits and Bonds (permit fees are waived) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2C | Mobilization, Temporary Pole, and Site Preparation for Elevation | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2D | Dumpster / Trash Removal and Job Site Port-a-Potty | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2E | Erosion and Sediment Control | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2F | Demolition, Removal, and Disposal of Miscellaneous Concrete adjacent to home. There is a screen enclosure and carport to be demolished. | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2G | Foundation Construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2H | Elevate the Structure (tunnel, beams, cribbing, and jacks) and provide cementitious material or skim coat to the exposed concrete slab perimeter | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2I | Front Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2J | Rear Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2K | Elevate Utilities (Air Handler, Electric Outlets, etc.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2L | Utility Disconnects and Reconnects (Water, Sewer, Electric, Gas, and HVAC) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2M | Site Restoration / Final Grading, Sod, Irrigation, and Landscaping | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2N | Project Administration – General Coordination with City and Homeowner during construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2O | 3 Elevation Certificates (for construction drawings, building under construction, and finished construction) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| TOTAL OF ALL LINES: | $ - 0 |
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 111 Fleming Avenue Structure 2 | |||||
| 3A | Boundary Survey, Structural Assessment, Geotechnical Assessment, Engineering, and Drawings | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3B | Permits and Bonds (permit fees are waived) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3C | Mobilization, Temporary Pole, and Site Preparation for Elevation | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3D | Dumpster / Trash Removal and Job Site Port-a-Potty | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3E | Erosion and Sediment Control | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3F | Demolition, Removal, and Disposal of Miscellaneous Concrete adjacent to home. There is a screen enclosure and carport to be demolished. | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3G | Foundation Construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3H | Elevate the Structure (tunnel, beams, cribbing, and jacks) and provide cementitious material or skim coat to the exposed concrete slab perimeter | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3I | Front Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3J | Rear Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3K | Elevate Utilities (Air Handler, Electric Outlets, etc.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3L | Utility Disconnects and Reconnects (Water, Sewer, Electric, Gas, and HVAC) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3M | Site Restoration / Final Grading, Sod, Irrigation, and Landscaping | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3N | Project Administration – General Coordination with City and Homeowner during construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3O | 3 Elevation Certificates (for construction drawings, building under construction, and finished construction) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| TOTAL OF ALL LINES: | $ - 0 |
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 216 Grant Street | |||||
| 4A | Boundary Survey, Structural Assessment, Geotechnical Assessment, Engineering, and Drawings | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4B | Permits and Bonds (permit fees are waived) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4C | Mobilization, Temporary Pole, and Site Preparation for Elevation | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4D | Dumpster / Trash Removal and Job Site Port-a-Potty | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4E | Erosion and Sediment Control | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4F | Demolition, Removal, and Disposal of Miscellaneous Concrete adjacent to home | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4G | Foundation Construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4H | Elevate the Structure (tunnel, beams, cribbing, and jacks) and provide cementitious material or skim coat to the exposed concrete slab perimeter | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4I | Front Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4J | Rear Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4K | Elevate Utilities (Air Handler, Electric Outlets, etc.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4L | Utility Disconnects and Reconnects (Water, Sewer, Electric, Gas, and HVAC) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4M | Site Restoration / Final Grading, Sod, Irrigation, and Landscaping | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4N | Project Administration – General Coordination with City and Homeowner during construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4O | 3 Elevation Certificates (for construction drawings, building under construction, and finished construction) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| TOTAL OF ALL LINES: | $ - 0 |
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 5028 Palmetto Street | |||||
| 5A | Boundary Survey, Structural Assessment, Geotechnical Assessment, Engineering, and Drawings | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5B | Permits and Bonds (permit fees are waived) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5C | Mobilization, Temporary Pole, and Site Preparation for Elevation | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5D | Dumpster / Trash Removal and Job Site Port-a-Potty | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5E | Erosion and Sediment Control | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5F | Demolition, Removal, and Disposal of Miscellaneous Concrete adjacent to home | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5G | Foundation Construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5H | Elevate the Structure (tunnel, beams, cribbing, and jacks) and provide cementitious material or skim coat to the exposed concrete slab perimeter | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5I | Front Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5J | Rear Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5K | Convert Existing Garage to Non-Air-Conditioned Space by removing garage doors and replacing with an exterior wall of same construction material and a hurricane rated window | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5L | Elevate Utilities (Air Handler, Electric Outlets, etc.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5M | Utility Disconnects and Reconnects (Water, Sewer, Electric, Gas, and HVAC) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5N | Site Restoration / Final Grading, Sod, Irrigation, and Landscaping | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5O | Project Administration – General Coordination with City and Homeowner during construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5P | 3 Elevation Certificates (for construction drawings, building under construction, and finished construction) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| TOTAL OF ALL LINES: | $ - 0 |
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 5088 Palmetto Street | |||||
| 6A | Boundary Survey, Structural Assessment, Geotechnical Assessment, Engineering, and Drawings | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6B | Permits and Bonds (permit fees are waived) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6C | Mobilization, Temporary Pole, and Site Preparation for Elevation | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6D | Dumpster / Trash Removal and Job Site Port-a-Potty | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6E | Erosion and Sediment Control | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6F | Demolition, Removal, and Disposal of Miscellaneous Concrete adjacent to home | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6G | Foundation Construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6H | Elevate the Structure (tunnel, beams, cribbing, and jacks) and provide cementitious material or skim coat to the exposed concrete slab perimeter | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6I | Front Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6J | Rear Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6K | Convert Existing Garage to Non-Air-Conditioned Space by removing garage doors and replacing with an exterior wall of same construction material and a hurricane rated window | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6L | Elevate Utilities (Air Handler, Electric Outlets, etc.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| LM | Utility Disconnects and Reconnects (Water, Sewer, Electric, Gas, and HVAC) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6N | Site Restoration / Final Grading, Sod, Irrigation, and Landscaping | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6O | Project Administration – General Coordination with City and Homeowner during construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6P | 3 Elevation Certificates (for construction drawings, building under construction, and finished construction) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| TOTAL OF ALL LINES: | $ - 0 |
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 894 Reservation Court | |||||
| 7A | Boundary Survey, Structural Assessment, Geotechnical Assessment, Engineering, and Drawings | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7B | Permits and Bonds (permit fees are waived) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7C | Mobilization, Temporary Pole, and Site Preparation for Elevation | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7D | Dumpster / Trash Removal and Job Site Port-a-Potty | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7E | Erosion and Sediment Control | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7F | Demolition, Removal, and Disposal of Miscellaneous Concrete adjacent to home. There is a screen enclosure protecting the existing swimming place which will be carefully separated from the structure. | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7G | Foundation Construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7H | Elevate the Structure (tunnel, beams, cribbing, and jacks) and provide cementitious material or skim coat to the exposed concrete slab perimeter. This property includes a swimming pool in close proximity to the rear wall of the structure. Pool and pertinent plumbing to remain unaffected by the elevation work. | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7I | Front Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7J | Rear Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7K | Convert Existing Garage to Non-Air-Conditioned Space by removing garage doors and replacing with an exterior wall of same construction material and a hurricane rated window | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7L | Elevate Utilities (Air Handler, Electric Outlets, etc.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7M | Utility Disconnects and Reconnects (Water, Sewer, Electric, Gas, and HVAC) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7N | Site Restoration / Final Grading, Sod, Irrigation, and Landscaping | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7O | Project Administration – General Coordination with City and Homeowner during construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7P | 3 Elevation Certificates (for construction drawings, building under construction, and finished construction) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| TOTAL OF ALL LINES: | $ - 0 |
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 5715 Riverside Drive | |||||
| 8A | Boundary Survey, Structural Assessment, Geotechnical Assessment, Engineering, and Drawings | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8B | Permits and Bonds (permit fees are waived) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8C | Mobilization, Temporary Pole, and Site Preparation for Elevation | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8D | Dumpster / Trash Removal and Job Site Port-a-Potty | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8E | Erosion and Sediment Control | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8F | Demolition, Removal, and Disposal of Miscellaneous Concrete adjacent to home | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8G | Foundation Construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8H | Elevate the Structure (tunnel, beams, cribbing, and jacks) and provide cementitious material or skim coat to the exposed concrete slab perimeter | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8I | Front Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8J | Rear Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8K | Convert Existing Garage to Non-Air-Conditioned Space by removing garage doors and replacing with an exterior wall of same construction material and a hurricane rated window | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8L | Elevate Utilities (Air Handler, Electric Outlets, etc.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8M | Utility Disconnects and Reconnects (Water, Sewer, Electric, Gas, and HVAC) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8N | Site Restoration / Final Grading, Sod, Irrigation, and Landscaping | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8O | Project Administration – General Coordination with City and Homeowner during construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8P | 3 Elevation Certificates (for construction drawings, building under construction, and finished construction) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| TOTAL OF ALL LINES: | $ - 0 |
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 5817 Riverside Drive | |||||
| 9A | Boundary Survey, Structural Assessment, Geotechnical Assessment, Engineering, and Drawings | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9B | Permits and Bonds (permit fees are waived) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9C | Mobilization, Temporary Pole, and Site Preparation for Elevation | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9D | Dumpster / Trash Removal and Job Site Port-a-Potty | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9E | Erosion and Sediment Control | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9F | Demolition, Removal, and Disposal of Miscellaneous Concrete adjacent to home | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9G | Foundation Construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9H | Elevate the Structure (tunnel, beams, cribbing, and jacks) and provide cementitious material or skim coat to the exposed concrete slab perimeter. This property includes a swimming pool in close proximity to the rear wall of the structure. Pool and pertinent plumbing to remain unaffected by the elevation work. | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9I | Front Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9J | Rear Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9K | Convert Existing Garage to Non-Air-Conditioned Space by removing garage doors and replacing with an exterior wall of same construction material and a hurricane rated window | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9L | Elevate Utilities (Air Handler, Electric Outlets, etc.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9M | Utility Disconnects and Reconnects (Water, Sewer, Electric, Gas, and HVAC) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9N | Site Restoration / Final Grading, Sod, Irrigation, and Landscaping | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9O | Project Administration – General Coordination with City and Homeowner during construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9P | 3 Elevation Certificates (for construction drawings, building under construction, and finished construction) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| TOTAL OF ALL LINES: | $ - 0 |
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 5951 Riverside Drive | |||||
| 10A | Boundary Survey, Structural Assessment, Geotechnical Assessment, Engineering, and Drawings | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10B | Permits and Bonds (permit fees are waived) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10C | Mobilization, Temporary Pole, and Site Preparation for Elevation | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10D | Dumpster / Trash Removal and Job Site Port-a-Potty | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10E | Erosion and Sediment Control | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10F | Demolition, Removal, and Disposal of Miscellaneous Concrete adjacent to home. (Existing open porch at the rear of the home to be carefully separated from the main structure. The covered porch and outdoor kitchen will remain on the ground. The roof shall be cut so the home can be elevated.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10G | Foundation Construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10H | Elevate the Structure (tunnel, beams, cribbing, and jacks) and provide cementitious material or skim coat to the exposed concrete slab perimeter. This property includes a swimming pool in close proximity to the rear wall of the structure. Pool and pertinent plumbing to remain unaffected by the elevation work. | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10I | Front Entry Deck, Landing, Stairs, and Lift Platform | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10J | Rear Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10K | Convert Existing Garage to Non-Air-Conditioned Space by removing garage doors and replacing with an exterior wall of same construction material and a hurricane rated window | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10L | Elevate Utilities (Air Handler, Electric Outlets, etc.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10M | Utility Disconnects and Reconnects (Water, Sewer, Electric, Gas, and HVAC) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10N | Site Restoration / Final Grading, Sod, Irrigation, and Landscaping | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10O | Project Administration – General Coordination with City and Homeowner during construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10P | Elevation Certificates (before, during and after elevation work) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| TOTAL OF ALL LINES: | $ - 0 |
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 8 Venetian Circle | |||||
| 11A | Boundary Survey, Structural Assessment, Geotechnical Assessment, Engineering, and Drawings | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11B | Permits and Bonds (permit fees are waived) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11C | Mobilization, Temporary Pole, and Site Preparation for Elevation | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11D | Dumpster / Trash Removal and Job Site Port-a-Potty | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11E | Erosion and Sediment Control | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11F | Demolition, Removal, and Disposal of Miscellaneous Concrete adjacent to home | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11G | Foundation Construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11H | Elevate the Structure (tunnel, beams, cribbing, and jacks) and provide cementitious material or skim coat to the exposed concrete slab perimeter | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11I | Front Entry Deck, Landing, Stairs, and Lift Platform | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11J | Rear Entry Deck, Landing, and Stairs | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11K | Convert Existing Garage to Non-Air-Conditioned Space by removing garage doors and replacing with an exterior wall of same construction material and a hurricane rated window | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11L | Elevate Utilities (Air Handler, Electric Outlets, etc.) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11M | Utility Disconnects and Reconnects (Water, Sewer, Electric, Gas, and HVAC) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11N | Site Restoration / Final Grading, Sod, Irrigation, and Landscaping | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11O | Project Administration – General Coordination with City and Homeowner during construction | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11P | Elevation Certificates (before, during and after elevation work) | 1 | LUMP SUM | $ - 0 | $ - 0 |
| TOTAL OF ALL LINES: | $ - 0 | ||||
| BID ALTERNATE: CONCRETE SLAB REINFORCEMENT | |||||
| The City of Port Orange hereby requests a bid alternate to address the need for concrete slab reinforcement; in case it is determined that any or all of the homes require additional structural support to safely perform the elevation work. If the bidder will absorb the cost of the concrete slab reinforcement as part of the base bid amounts, please fill in the cells below with zeros. | |||||
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 1R | 795 Biro Drive | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 2R | 111 Fleming Avenue Structure #1 | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 3R | 111 Fleming Avenue Structure #2 | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 4R | 216 Grant Street | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 5R | 5028 Palmetto Street | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 6R | 5088 Palmetto Street | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 7R | 894 Reservation Court | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 8R | 5715 Riverside Drive | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 9R | 5817 Riverside Drive | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 10R | 5951 Riverside Drive | 1 | LUMP SUM | $ - 0 | $ - 0 |
| 11R | 8 Venetian Circle | 1 | LUMP SUM | $ - 0 | $ - 0 |
| Total of All Lines | $ - 0 |
| BID TOTAL FOR EACH STRUCTURE | ||||
| Respondents may propose any number of structures from one to all eleven that they can complete within the required timeline. No preference will be given if a Respondent bids on all structures. | ||||
| Line Item | Description | Base Bid Amount | Bid Alternate Amount | Total Bid Amount |
| 1T | 795 Biro Drive | $ - 0 | $ - 0 | $ - 0 |
| 2T | 111 Fleming Avenue Structure #1 | $ - 0 | $ - 0 | $ - 0 |
| 3T | 111 Fleming Avenue Structure #2 | $ - 0 | $ - 0 | $ - 0 |
| 4T | 216 Grant Street | $ - 0 | $ - 0 | $ - 0 |
| 5T | 5028 Palmetto Street | $ - 0 | $ - 0 | $ - 0 |
| 6T | 5088 Palmetto Street | $ - 0 | $ - 0 | $ - 0 |
| 7T | 894 Reservation Court | $ - 0 | $ - 0 | $ - 0 |
| 8T | 5715 Riverside Drive | $ - 0 | $ - 0 | $ - 0 |
| 9T | 5817 Riverside Drive | $ - 0 | $ - 0 | $ - 0 |
| 10T | 5951 Riverside Drive | $ - 0 | $ - 0 | $ - 0 |
| 11T | 8 Venetian Circle | $ - 0 | $ - 0 | $ - 0 |
| Total of All Lines |
File details come from the government source that posted it. Updated .