This document is a submittal register for a mechanical/electrical project at Robins Air Force Base. It outlines 49 submittal items required from the contractor, including progress reports, design submittals, material submittals, as-built drawings, warranties, and operation and maintenance manuals. Due dates are provided for each submittal item, with most items due 210 days after notice to proceed. The register will be used by the contractor to organize submissions to the government. It is related to solicitation number FA850124R0001 for mechanical/electrical indefinite-delivery/indefinite-quantity contract services at Robins AFB issued by the Department of the Air Force Materiel Command Air Force Sustainment Center. The solicitation provides for various construction and facility support services at Robins AFB.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| ROBINS AFB | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| UHHZ230101 | RPR/RPL HOT WATER HEATING SYSTEM, SHP ACFT GEN PURP, B670 | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| BEFORE CONSTR | AFTER CONSTR | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | CATALOG DATA | OTHER MATERIAL OR DATA | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | CLOSEOUT | MANUFACTURER'S WARRANTY | OPERATING INSTRUCTIONS |
REQUIRED SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGR. RETURN
SUSPENSE
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||
| APPROVAL | REMARKS | ||||||
| APPROVED | DISAPPROVED | ||||||
| 1 | time Schedule | NTP +210 | |||||
| 2 | Progress reports | Monthly | |||||
| 3 | List of Values | with first progress report | |||||
| 4 | Dailey reports | weekly | |||||
| 5 | Closeout Report | Before final inspection | |||||
| 6 | List of proposed subcontractos | NTP +180 | |||||
| 7 | List of proposed products | NTP +180 | |||||
| 8 | bid documents (Drawing and specs) | NTP +180 | |||||
| 9 | submittal reginster | NTP +180 | |||||
| 10 | health and safety plan | NTP +180 | |||||
| 11 | Work and Demolition plan | NTP +180 | |||||
| 12 | AF Form 3064 & 3065 & 3052 | NTP +180 | |||||
| 13 | Quality Control plan | NTP +180 | |||||
| 14 | Environmental protection plan | NTP +180 | |||||
| 15 | Storm water Pollution Prvention plan | NTP +180 | |||||
| 16 | Storm Water Notice of Intent | NTP +180 | |||||
| 17 | Existing Conditions( Photographs and field Verification Sign-off | NTP +180 | |||||
| 18 | 30% Design Submittal | NTP+45 | |||||
| 19 | 30% Design Submittal Meeting Minutes | NTP+73 | |||||
| 20 | 60% Design Submittal | NTP+90 | |||||
| 21 | 60% Design Submittal Meeting Mintues | NTP+118 | |||||
| 22 | 100% Design Submittal | NTP+135 | |||||
| 23 | 100% Design Submittal meeting Minutes | NTP+163 | |||||
| 24 | 100% Corrected Design Submittal | NTP+180 | |||||
| 25 | Material Submittals | NTP+210 | |||||
| 26 | As-builts | NTP+480 | |||||
| 27 | Warranties | NTP+480 | |||||
| 28 | Operations and Maintenance Manuals | NTP+480 | |||||
| 29 | Request for Final Inspection | NTP+450 | |||||
| 30 | Systems Functional Test Report | NTP+480 | |||||
| 31 | |||||||
| 32 | |||||||
| 33 | |||||||
| 34 | |||||||
| 35 | |||||||
| 36 | |||||||
| 37 | |||||||
| 38 | |||||||
| 39 | |||||||
| 40 | |||||||
| 41 | |||||||
| 42 | |||||||
| 43 | |||||||
| 44 | |||||||
| 45 | |||||||
| 46 | |||||||
| 47 | |||||||
| 48 | |||||||
| 49 | |||||||
| 50 | |||||||
| 51 | |||||||
| 52 | |||||||
| 53 | |||||||
| 54 | |||||||
| 55 | |||||||
| 56 | |||||||
| 57 | |||||||
| 58 | |||||||
| 59 | |||||||
| 60 | |||||||
| 61 | |||||||
| NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements. | |||||||
| LEGEND: | |||||||
| A - Include with line 9 Operations and Maintenance Manual | |||||||
| B - Include with line 10 Warranty Book | |||||||
| C - Include with line 14 Color Samples |
FA4600-11-B-0025
Attachment 3 Page &P
FA4600-11-B-0025
Attachment 3 Page &P
1B-&P