ATTACH11_TEMPLATE_Schedule of Values_BLANK.PDF

PDF 120 KB Posted

Attached to
Robins AFB Mechanical/Electrical II IDIQ Federal contract opportunity
Solicitation number
FA850124R0001
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is a schedule of values template for a mechanical and electrical construction project at Robins Air Force Base. It provides line item costs and percentages for various construction divisions including general requirements, existing conditions, concrete, masonry, metals, wood and plastics, thermal and moisture protection, openings, finishes, specialties, special construction, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and closeout documents. The total estimated cost of all work is $43.72 million. The solicitation number and opportunity type indicate this template is related to an Indefinite Delivery Indefinite Quantity contract for mechanical and electrical construction projects at Robins Air Force Base to be awarded by the Department of the Air Force Materiel Command Air Force Sustainment Center.

View the file

Other files for this federal contract opportunity

Other files attached to Robins AFB Mechanical/Electrical II IDIQ, newest first.
File Type Posted
RFI_230077.230101_Mech.Elec_FINAL_Rev01_01162024.xlsx XLSX spreadsheet
FA850124R00010001_01022024.pdf PDF
ATTACH24_B670_Fire Plan.pdf PDF
ATTACH18_AF3064_BLANK_SAMPLE.xlsx XLSX spreadsheet
RFI_230077.230101_Mech.Elec_FINAL_01022024.xlsx XLSX spreadsheet
ATTACH25_B670_Drawing_Floor Plan.pdf PDF
ATTACH01_SOW_MechElec_Rev03_12292023.pdf PDF
ATTACH19_AF3065_BLANK_SAMPLE.xlsx XLSX spreadsheet
Mech.Elec.2_site.visit.attendance_14Dec2023.pdf PDF
ATTACH19_AF3065_BLANK_SAMPLE.pdf PDF
ATTACH10_SUBMITTAL REGISTER.XLS XLS spreadsheet
ATTACH07_ICD705_Construction and Management_SCIF.PDF PDF
ATTACH04_AFMAN 31-116 Motor Vehicle Traffic Supervision.PDF PDF
ATTACH18_AF3064_BLANK_SAMPLE.pdf PDF
ATTACH16_AF3000_MaterialSubmittal.PDF PDF
ATTACH15_AF2586 Flightline Driving Request.PDF PDF
ATTACH05_AFMAN 32-1084 Civil Engineering Facility Requirements.PDF PDF
ATTACH02_Robins BFS 2022.pdf PDF
FA850124R0001_FINAL_00_11092023.pdf PDF
ATTACH09_WR-ALC SAFE-T-GRAM.PDF PDF
ATTACH23_230101DEMO_SubmittalRegister.xlsx XLSX spreadsheet
ATTACH20_WD_GA20230322_07212023.pdf PDF
ATTACH17_AF3052_BLANK_SAMPLE.XLS XLS spreadsheet
ATTACH14_DD1354(BLANK)_SAMPLE.PDF PDF
ATTACH13_Form 911 DesignDiscipline Review.docx DOCX document
ATTACH08_AppC_Safety_053312023.PDF PDF
ATTACH06_Asbestos Management Plan_2015.PDF PDF
ATTACH22_230101DEMO_Bid Schedule_BLANK.pdf PDF
ATTACH21_230101DEMO_SOW_07102023.pdf PDF
ATTACH12_Master Utility Outage.PDF PDF
ATTACH03_ProceduralGuide_DesignersAE_2023.PDF PDF
ATTACH01_SOW_MechElec_Rev02_08112023.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION 01 - GENERAL REQUIREMENTS

LINE NO. DESCRIPTION VALUE PERCENTAGE

1.1 Project Management $0.73 1.67%

1.2 Supervision $0.97 2.22%

1.3 Project Trailer (including deliver & return) $0.05 0.11%

1.4 Roll-Off Dumpster $0.53 1.21%

1.5 Temporary Fence $0.53 1.21%

1.6 Bond $0.13 0.30%

1.7 Rental Equipment (Lull, Manlift, Boom Truck) $0.19 0.43%

1.8 Tools $0.19 0.43%

Division 01 Total $3.13 7.16%

DIVISION 02 - EXISTING CONDITIONS

LINE NO. DESCRIPTION VALUE PERCENTAGE

2.1 Demolition Interior (Electrical) $0.88 2.01%

2.2 Demolition Interior (Mechanical) $0.32 0.73%

2.3 Demolition (Plumbing) $0.15 0.34%

2.4 Demolition (Flooring) $0.15 0.34%

2.5 Demolition (Openings) $0.88 2.01%

2.6 Demolition (Concrete) $0.88 2.01%

2.7 Demolition (Ceilings) $0.88 2.01%

2.8 Demolition (Walls) $0.55 1.26%

2.9 Demolition (Fire Suppression) $0.88 2.01%

2.10 Demolition (Fire Alarm System) $0.68 1.56%

2.11 Demolition (Communications) $0.25 0.57%

Division 02 Total $6.50 14.87%

DIVISION 03 - CONCRETE

LINE NO. DESCRIPTION VALUE PERCENTAGE

3.1 Concrete Pad (Generator) $0.32 0.73%

3.2 Concrete Ceiling {Vault) $0.68 1.56%

3.3 Concrete Pad (Mechanical Yard} $0.87 1.99%

3.4 Concrete Pad (HVAC Units) $0.96 2.20%

3.5 Concrete Reinforcements $0.14 0.32%

3.6 Expansion Joints, Contraction Joinls $0.18 0.41%

3.7 Concrete Design Mix/Rebar Shop Drawings $0.10 0.23%

3.8 Concrete Testing and Reports $0.08 0.18%

Division 03 Total $3.15 7.20%

BLANK SAMPLE SCHEDULE OF VALUES

Contract No: FA8501-XX-X-XXXX Project No & Title: UHHZ XXXXXX Construct XXXXXXXXXXXXXXXXXXXXXXX

DIVISION 04 - MASONRY

LINE NO. DESCRIPTION VALUE PERCENTAGE

4.1 Mechanical Yard Masonrv Wall $0.31 0.71%

4.2 Generator Pad Masonry Wall $0.65 1.49%

4.3 Infill (Front Entry Area) $0.96 2.20%

4.4 Masonry Patch Work (Roll-up Door) $0.96 2.20%

4.5 Infill (Mechanical Louver Area) $0.20 0.46%

4.6 Vault $0.93 2.13%

Division 04 Total $4.01 9.17%

DIVISION 05 - METALS

LINE NO. DESCRIPTION VALUE PERCENTAGE

5.1 Metal Stud Framing (Interior) $0.78 1.78%

5.2 Metal Stud Framing Accessories $0.12 0.27%

5.3 0.00%

Division 05 Total $0.90 2.06%

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

LINE NO. DESCRIPTION VALUE PERCENTAGE

6.1 Casework (Women's Restroom) $0.34 0.78%

6.2 Casework (Men's Restroom) $0.34 0.78%

6.3 Casework (Break Room) 0.00%

Division 06 Total $0.68 1.56%

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

LINE NO. DESCRIPTION VALUE PERCENTAGE

7.1 Mineral Fiber Blanket lnsulation (Interior) $0.54 1.24%

7.2 Sound Attenuation Fire Blanket in rated walls $0.14 0.32%

7.3 Rigid (Polyisocyanurate) Insulation $0.04 0.09%

Division 07 Total $0.72 1.65%

DIVISION 08 - OPENINGS

LINE NO. DESCRIPTION VALUE PERCENTAGE

8.1 Steel Doors and Frames $0.03 0.07%

8.2 Prefinished Electric Insulated Overhead Coiling D $0.35 0.80%

8.3 Windows $0.39 0.89%

8.4 Door Hsrdware including door cylinders $0.21 0.48%

Division 08 Total $0.77 1.76%

DIVISION 09 - FINISHES

LINE NO. DESCRIPTION VALUE PERCENTAGE

9.1 Gypsum Board and mud, tape, corner beads $0.30 0.69%

9.2 Paints and Coatings $0.11 0.25%

9.3 Epoxy Flooring $0.06 0.14%

9.4 Acoustlcal Ceiling Tile and Grid $0.16 0.37%

9.5 Porcelain Tile $0.42 0.96%

9.6 Carpet Tiles $0.73 1.67%

9.7 Vinyl Composition Tile $0.24 0.55%

9.8 Rubber Base $0.11 0.25%

Division 09 Total $1.78 4.07%

DIVISION 10 - SPECIALTIES

LINE NO. DESCRIPTION VALUE PERCENTAGE

10.1 Toilet Accessories $0.15 0.34%

10.2 Interior Signage $0.86 1.97%

10.3 0.00%

Division 10 Total $1.01 2.31%

DIVISION 13 - SPECIAL CONSTRUCTION

LINE NO. DESCRIPTION VALUE PERCENTAGE

13.1 Steel Deck Vault $0.55 1.26%

13.2 Steel I-beam (Openings) $0.90 2.06%

13.3 Steel louvers (Mech Yard) $0.78 1.78%

13.4 Steel Gate (Generator) $0.58 1.33%

13.5 Steel Gate (Generator) $0.58 1.33%

13.6 Pre-engineered Metal Building $0.75 1.72%

13.7 Pre-engineered Metal Building Wall Roof panels $0.12 0.27%

13.8 Pre-engineered Metal Building Accessories $0.07 0.16%

Division 13 Total $4.14 9.47%

DIVISION 21 - FIRE SUPPRESSION

LINE NO. DESCRIPTION VALUE PERCENTAGE

21.1 Riser, Dbl Check Valves, Tamper & Flow Switches $0.02 0.05%

21.2 Wet Pipe Fire Sprinkler Piping $0.14 0.32%

21.3 Testing $0.78 1.78%

Division 21 Total $0.94 2.15%

DIVISION 22 - PLUMBING

LINE NO. DESCRIPTION VALUE PERCENTAGE

22.1 Plumbing (Fixtures) $0.09 0.21%

22.2 Plumbing Piping& Materials $0.73 1.67%

22.3 0.00%

Division 22 Total $0.82 1.88%

DIVISION 23 - HEATING, VENTILATION AND AIR CONDITIONING

LINE NO. DESCRIPTION VALUE PERCENTAGE

23.1 HVAC Air Handlers $0.11 0.25%

23.2 Acoustics Duct Silencers $0.18 0.41%

23.3 Exhaust & Supply Fans $0.35 0.80%

23.4 Boiler & Computer Room Units (CRAC) $0.58 1.33%

23.5 Variable Air Volume 0JAV) Boxes $0.74 1.69%

23.6 Fire Smoke Dampers & Louvers $0.35 0.80%

23.7 Testing, Adjusting & Balancing of HVAC Sys $0.11 0.25%

23.8 Thermal lnsulation for Mechanical Sys $0.35 0.80%

23.9 Duct Insulation $0.23 0.53%

23.10 Duct Work & Duct Work Accessories $0.50 1.14%

23.11 Diffusers, Registers & Grills $0.22 0.50%

23.12 HVAC Controls $0.70 1.60%

Division 23 Total $4.42 10.11%

DIVISION 26 - ELECTRICAL

LINE NO. DESCRIPTION VALUE PERCENTAGE

26.1 Electrical Conduit, Fillings, Boxes $0.24 0.55%

26.2 Electrical Wire & Cable $0.93 2.13%

26.3 Interior Distribution Systems $0.91 2.08%

26.4 Low Voltage SwitchQear $0.23 0.53%

26.5 Switchboards & Panel Boards $0.51 1.17%

26.6 Interior lighting $0.11 0.25%

26.7 Electrical Exterior Underground $0.75 1.72%

26.8 Electric Meter $0.07 0.16%

Division 26 Total $3.68 8.42%

DIVISION 27 - COMMUNICATIONS (IF REQUIRED AS A PART OF CONTRACT)

LINE NO. DESCRIPTION VALUE PERCENTAGE

27.1 Comm Piping, Fittings and Boxes $0.88 2.01%

27.2 Communications Wire $0.44 1.01%

27.3 Communications Cable Tray $0.80 1.83%

27.4 Testing $0.06 0.14%

Division 27 Total $2.18 4.99%

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

LINE NO. DESCRIPTION VALUE PERCENTAGE

28.1 Fire Alarm System Conduit & Fittings $0.17 0.39%

28.2 Fire Alarm Panel and Power Boosters $0.96 2.20%

28.3 Fire Alarm Programming & Testing $0.05 0.11%

28.4 MNS Conduit and Fittings $0.47 1.08%

28.5 MNS Panels $0.40 0.91%

28.6 FA/MNS Programming & Testing $0.29 0.66%

Division 28 Total $2.34 5.35%

DIVISION 31 - EARTHWORK

LINE NO. DESCRIPTION VALUE PERCENTAGE

31.1 Landscaping (Demo) $0.06 0.14%

31.2 Landscaping (Sod and Watering) $0.06 0.14%

31.3 Soii Compaction Test $0.15 0.34%

Division 31 Total $0.27 0.62%

DIVISION 32 - EXTERIOR IMPROVEMENTS

LINE NO. DESCRIPTION VALUE PERCENTAGE

32.1 Bollards $0.58 1.33%

32.2 Concrete Sidewalks $0.05 0.11%

32.3 Fog Seal (Parking Lot) $0.63 1.44%

32.4 Curb Stops (Parking Lot) $0.05 0.11%

32.5 Restnping (Parking Lot) $0.29 0.66%

Division 32 Total $1.60 3.66%

DIVISION 33 - UTILITIES

LINE NO. DESCRIPTION VALUE PERCENTAGE

33.1 Natural Gas $0.63 1.44%

33.2 Gas Meter $0.05 0.11%

33.3 0.00%

Division 33 Total $0.68 1.56%

CLOSE-OUT DOCUMENTS

LINE NO. DESCRIPTION VALUE PERCENTAGE

A As-Built Drawings 0.00% B Warranties C O&M Manuals (Paper Copy and CD/DVD's) 0.00% D Roof Inspection Reports 0.00%

Close-out Total $0.00 0.00%

BID TOTAL $43.72 100.00%

Sheet1

File details come from the government source that posted it. Updated .