ATTACH10_SUBMITTAL REGISTER.XLS

XLS spreadsheet 62 KB Posted

Attached to
Robins AFB Mechanical/Electrical II IDIQ Federal contract opportunity
Solicitation number
FA850124R0001
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This submittal register sheet outlines 59 line items of material submittals required for the Robins AFB Mechanical/Electrical II IDIQ contract solicited by the Department of the Air Force Materiel Command Air Force Sustainment Center under solicitation number FA850124R0001. The register specifies the item or description, reference, type of required submittal such as shop drawings or samples, number of copies, and timing of submittals before or after construction as well as review and approval deadlines. It appears to be a template for contractors to organize and track compliance with submission requirements for the Robins AFB project.

View the file

Other files for this federal contract opportunity

Other files attached to Robins AFB Mechanical/Electrical II IDIQ, newest first.
File Type Posted
RFI_230077.230101_Mech.Elec_FINAL_Rev01_01162024.xlsx XLSX spreadsheet
FA850124R00010001_01022024.pdf PDF
ATTACH19_AF3065_BLANK_SAMPLE.xlsx XLSX spreadsheet
ATTACH24_B670_Fire Plan.pdf PDF
ATTACH18_AF3064_BLANK_SAMPLE.xlsx XLSX spreadsheet
RFI_230077.230101_Mech.Elec_FINAL_01022024.xlsx XLSX spreadsheet
ATTACH25_B670_Drawing_Floor Plan.pdf PDF
ATTACH01_SOW_MechElec_Rev03_12292023.pdf PDF
Mech.Elec.2_site.visit.attendance_14Dec2023.pdf PDF
ATTACH19_AF3065_BLANK_SAMPLE.pdf PDF
ATTACH07_ICD705_Construction and Management_SCIF.PDF PDF
ATTACH04_AFMAN 31-116 Motor Vehicle Traffic Supervision.PDF PDF
ATTACH22_230101DEMO_Bid Schedule_BLANK.pdf PDF
ATTACH21_230101DEMO_SOW_07102023.pdf PDF
ATTACH12_Master Utility Outage.PDF PDF
ATTACH03_ProceduralGuide_DesignersAE_2023.PDF PDF
ATTACH01_SOW_MechElec_Rev02_08112023.pdf PDF
ATTACH18_AF3064_BLANK_SAMPLE.pdf PDF
ATTACH16_AF3000_MaterialSubmittal.PDF PDF
ATTACH15_AF2586 Flightline Driving Request.PDF PDF
ATTACH05_AFMAN 32-1084 Civil Engineering Facility Requirements.PDF PDF
ATTACH02_Robins BFS 2022.pdf PDF
FA850124R0001_FINAL_00_11092023.pdf PDF
ATTACH09_WR-ALC SAFE-T-GRAM.PDF PDF
ATTACH23_230101DEMO_SubmittalRegister.xlsx XLSX spreadsheet
ATTACH20_WD_GA20230322_07212023.pdf PDF
ATTACH17_AF3052_BLANK_SAMPLE.XLS XLS spreadsheet
ATTACH14_DD1354(BLANK)_SAMPLE.PDF PDF
ATTACH13_Form 911 DesignDiscipline Review.docx DOCX document
ATTACH11_TEMPLATE_Schedule of Values_BLANK.PDF PDF
ATTACH08_AppC_Safety_053312023.PDF PDF
ATTACH06_Asbestos Management Plan_2015.PDF PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALS
ROBINS AFBPROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
BEFORE CONSTRAFTER CONSTR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSCATALOG DATAOTHER MATERIAL OR DATACERTIFICATION OF COMPLIANCE AND CLOSEOUTCLOSEOUTMANUFACTURER'S WARRANTYOPERATING INSTRUCTIONSREQUIRED SUBMITTAL
DATEDATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGR. RETURN

SUSPENSE

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
LEGEND:
A - Include with line 9 Operations and Maintenance Manual
B - Include with line 10 Warranty Book
C - Include with line 14 Color Samples

&LFA4600-11-B-0025

Attachment 3 Page &P &C1B-&P

File details come from the government source that posted it. Updated .