FA850124R0001_FINAL_00_11092023.pdf

PDF 273 KB Posted

Attached to
Robins AFB Mechanical/Electrical II IDIQ Federal contract opportunity
Solicitation number
FA850124R0001
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This solicitation is for an indefinite-delivery, indefinite-quantity (IDIQ) multiple award contract for mechanical and electrical services at Robins Air Force Base in Georgia. The Air Force Sustainment Center will award up to five contracts for a five-year ordering period, with a minimum $5,000 guarantee and maximum $95 million ceiling across all contracts. Work will include maintenance, repair, alteration, and construction of mechanical, electrical, HVAC, and other systems. Offerors must submit a $3 million bid bond and performance/payment bonds within 10 days of task order award. Task orders will range between a $2,000 minimum and $5 million maximum. The solicitation includes details on fair opportunity to compete for orders, order ombudsman, progress payments, and other standard contract terms.

View the file

Other files for this federal contract opportunity

Other files attached to Robins AFB Mechanical/Electrical II IDIQ, newest first.
File Type Posted
RFI_230077.230101_Mech.Elec_FINAL_Rev01_01162024.xlsx XLSX spreadsheet
FA850124R00010001_01022024.pdf PDF
ATTACH19_AF3065_BLANK_SAMPLE.xlsx XLSX spreadsheet
RFI_230077.230101_Mech.Elec_FINAL_01022024.xlsx XLSX spreadsheet
ATTACH25_B670_Drawing_Floor Plan.pdf PDF
ATTACH01_SOW_MechElec_Rev03_12292023.pdf PDF
ATTACH24_B670_Fire Plan.pdf PDF
ATTACH18_AF3064_BLANK_SAMPLE.xlsx XLSX spreadsheet
Mech.Elec.2_site.visit.attendance_14Dec2023.pdf PDF
ATTACH19_AF3065_BLANK_SAMPLE.pdf PDF
ATTACH10_SUBMITTAL REGISTER.XLS XLS spreadsheet
ATTACH07_ICD705_Construction and Management_SCIF.PDF PDF
ATTACH04_AFMAN 31-116 Motor Vehicle Traffic Supervision.PDF PDF
ATTACH22_230101DEMO_Bid Schedule_BLANK.pdf PDF
ATTACH21_230101DEMO_SOW_07102023.pdf PDF
ATTACH12_Master Utility Outage.PDF PDF
ATTACH03_ProceduralGuide_DesignersAE_2023.PDF PDF
ATTACH01_SOW_MechElec_Rev02_08112023.pdf PDF
ATTACH23_230101DEMO_SubmittalRegister.xlsx XLSX spreadsheet
ATTACH20_WD_GA20230322_07212023.pdf PDF
ATTACH17_AF3052_BLANK_SAMPLE.XLS XLS spreadsheet
ATTACH14_DD1354(BLANK)_SAMPLE.PDF PDF
ATTACH13_Form 911 DesignDiscipline Review.docx DOCX document
ATTACH11_TEMPLATE_Schedule of Values_BLANK.PDF PDF
ATTACH08_AppC_Safety_053312023.PDF PDF
ATTACH06_Asbestos Management Plan_2015.PDF PDF
ATTACH18_AF3064_BLANK_SAMPLE.pdf PDF
ATTACH16_AF3000_MaterialSubmittal.PDF PDF
ATTACH15_AF2586 Flightline Driving Request.PDF PDF
ATTACH05_AFMAN 32-1084 Civil Engineering Facility Requirements.PDF PDF
ATTACH02_Robins BFS 2022.pdf PDF
ATTACH09_WR-ALC SAFE-T-GRAM.PDF PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

9. FOR INFORMATION

CALL:

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

12b. CALENDAR DAYS

YES NO

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

AMOUNTS

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

Section A - Solicitation/Contract Form

FY 2024 Mechanical and Electrical (MECH-ELEC) II IDIQ CONTRACT

Proposal Identifier: FA850124R0001 Date: 08 Nov 2023

FA850124R0001

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Preamble Information and Notes:

The Mechanical Electrical IDIQ Program intends to award up to five (5) contracts at the time of initial award. In addition, up to three (3) of the remaining offerors whose proposals meet the requirements of the SSRs and were the next lowest price that were NOT selected for award will be identified at the time of award as Program Reserves and notified of potential future on ramping opportunities as described herein. If it is determined at any point within the period of contract performance by the Contracting Officer that it is in the best interest of the Government to increase the current pool of Mechanical Electrical IDIQ Program participants, the Government will offer contract(s) to the Program Reserves. The offer(s) will be presented to the Program Reserves in order of their established Total Evaluated Price (TEP) from their proposal to solicitation FA8501-23-R-0015 (lowest to highest price) until the Mechanical Electrical IDIQ Program participant pool is at a level deemed acceptable by the Contracting Officer.

The Contracting Officer has the sole and full discretion in determining the number of Program Reserve contracts to award based upon the need for increased competition, excessive workloads, poor performance, reduction in participant pool, and/or other bases deemed appropriate by the Contracting Officer. This process will be bilateral, requiring contractor acceptance for contract formation. The resulting contract will not exceed the remaining period of performance of this contract, will include the same terms and conditions of this contract, and will share in the aggregate ceiling of the Mechanical Electrical IDIQ Program. The award of a contract to a Program Reserve only entitles that contractor to the minimum award as outlined within this contract. The identification of a contractor as a Program Reserve does not create any obligation for the Government or the contractor and will not be basis for a claim of equitable adjustment. Likewise, the awarding of a contract to a Program Reserve contractor is a contemplated future action and not a basis for challenge, claim, or protest by the existing Mechanical Electrical IDIQ Program participants. No future Program Reserves will be identified after the time of initial award.

The resultant contract will have one Ordering Period that is not to exceed five (5) years or 1825 Calendar Days from the date of Award

Ordering Period one (CLIN 0001) will be 1 through 1825 days after contract award.

Contract Minimum/Maximum:

Contract Minimum- The Government shall purchase a minimum guaranteed quantity of $5,000 from each contract awarded as a result of this solicitation.

Contract Maximum- The Government shall not purchase more than $95 million as a result of all orders issued against all contracts awarded as a result of this solicitation.

The project that has been selected as the demonstration project is an active project that the Government intends to award under this contract. The Government may elect to award this project as minimum guarantee if it is determined to be in the best interest of the Government. The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation. Only the offerors selected for the FA8501-23-R-0015 Mechanical Electrical IDIQ will be awarded an initial task order of at least $5,000 (as a minimum) to fulfill the minimum guarantee. The Government will not be responsible for any costs incurred or associated with preparation and submission of task order proposals solicited under the Mechanical Electrical IDIQ (with the exception of Government ordered changes resulting in a new proposal in an already awarded effort). The proposed prices for the demonstration project must be held firm through award.

Bonds Requirements:

A. Each offeror shall submit a bid bond (Standard Form 24) in the amount of $3,000,000.

B. Any performance and payment bonds required hereunder must be furnished by the Contractor to the Government within 10 days after task order award, and prior to receiving a notice to proceed, or being allowed to start work.

1. Performance Bond (Standard Form 25). The penal sum of the performance bond shall equal one hundred percent (100%) of the applicable task order amount.

2. Payment Bond (Standard Form 25a). The penal sum of the payment bond shall equal one hundred percent (100%) of the applicable task order amount.

IAW DFARS 236.204 Project Magnitude for the overall IDIQ is $25,000,000 and $100,000,000. The project Magnitude for the Demonstration Project is $500,000 and $1,000,000.

Oral Direction/Authorization to Proceed:

If the Contracting Officer (CO) determines an imminent project to be of such an urgent or compelling nature to warrant immediate attention, the CO will provide oral direction/authorization to proceed with the project. Subsequently, the contractor will take appropriate action to compel project completion. All oral direction will be confirmed in writing within twenty-four hours. Failure by the contractor to respond to oral direction will be handled in accordance with 52.243-4 entitled "Changes", and/or 52.216-18 entitled "Ordering", and all other applicable terms and conditions of the contract. Absent written specification, the contractor will perform in accordance with master Construction Specification Institute (CSI) guidelines.

Insurance - Work on a Government Installation Reference clause 52.228-5 - In accordance with Para. ("A") therein, the minimum amounts of insurance required are as follows:

I. Employers Liability: $100,000

II. General Liability: Bodily injury liability coverage written on the comprehensive form of the policy: $500,000 per occurrence.

III. Automotive Liability: Automobile liability insurance written on the comprehensive form of the policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies shall include at least $200,000 per person and $500,000 per occurrence for bodily injury, and $25,000 per occurrence for property damage. The amount of the liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

Awarding Orders Under Multiple Award Contracts:

(a) All multiple award contractors shall be provided a fair opportunity to be considered for each order in excess of $3,000 pursuant to the procedures established in this section, unless the contracting officer determines that:

(1) The agency's need for the services or supplies is of such urgency that providing such opportunity to all such contractors would result in unacceptable delays;

(2) Only one such contractor is capable of providing the services or supplies at the level of quality required because the services or supplies ordered are unique or highly specialized;

(3) The task or delivery order should be issued on a sole source basis in the interest of economy or efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity pursuant to the procedures in this clause to be considered for the original order; or

(4) It is necessary to place an order to satisfy a minimum guarantee.

(b) Unless the procedures in paragraph (a) are used for awarding individual orders, multiple award contractors will be provided a fair opportunity to be considered for each order.

(c) Under provisions of the Federal Acquisition Streamlining Act of 1994, 10 U.S.C 2304 (c) (Public Law 103-355), a protest is not authorized in connection with the issuance or proposed issuance of an individual task or delivery order except for:

(1) A protest on the grounds that the order increases the scope, period, or maximum value of the contract under which the order is issued.

(2) A protest of an order valued in excess of $25 million. Protests of orders in excess of $25 million may only be filed with the Government Accountability Office, in accordance with the procedures at 33.104.

(d) For this contract, the designated task or delivery order ombudsman is Dr. Thomas G. Eller (thomas.eller.1@us.af.mil. AFSC/PK-R, Bldg. 301, Robins AFB, GA 31098-1611). The task or delivery order ombudsman is responsible for reviewing complaints from multiple award contractors and ensuring that all of the contractors are afforded a fair opportunity to be considered for task and delivery orders in excess of $2,000.00, consistent with procedures in the contract. However, it is not within the designated task or delivery order contract ombudsman's authority to prevent the issuance of an order or disturb an existing order.

(e) The rules in FAR 52.215-1(c) which apply to the submission, modification, revision, and withdrawal of proposals shall apply to the submission, modification, revision, and withdrawal of proposals for award of a task/delivery order under this IDIQ contract.

Government Obligation to Order:

Minimum: $5,000.00 Dollars, U.S.

Maximum: $95,000,000.00 Dollars, U.S.

Allowed Per Order:

Minimum: 2,000.00 Dollars, U.S.

Maximum: 5,000,000.00 Dollars, U.S.

Item Supplies/Service Estimated Quantity

Unit Unit Price Amount

MECH-ELEC II IDIQ Contract The contractor will furnish all design, labor, equipment, material, manufactured articles, transportation, supervision, and all else necessary to accomplish the design and/or repair/construction of each Task Orders written under this Mech/Elec II for all work that is defined for each project. Work will be accomplished at Robins AFB, GA. Task Orders will be completed as required per Mech/Elec II specifications, referenced documents, and as identified on any

1 Lot attached Task Orders project documents as applicable.

Product Service Code: Z2JZ Project Code: 230077 Pricing Arrangement: Firm Fixed Price

Section C - Description/Specifications/Statement of Work

See List of Attachments

Requirements Maintenance, repair, and alteration of mechanical, electrical and electrical sub-systems, demolition, asbestos remediation, HVAC repairs/renovations/upgrades, HVAC DDC controls, hot water/chilled water/steam underground distribution, fuel distribution systems (underground lines and tanks), gas/electric/oil-fired boiler repairs/replacement, primary and secondary electrical, electrical repair/upgrades, generators repairs /replacements, airfield/interior/exterior lighting repair/renovations/upgrades, lightning protection systems, fire suppression, and fire alarm/mass notification system repairs/renovations/upgrades.

Section D - Packaging and Marking

Not Applicable

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-12 Inspection of Construction. Aug 1996

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: N/A

DoDAAC: F3Q2AD CountryCode: USA

CIVIL ENGINEER GROUP CEG

AF BPN NO MILSBILLS PROCESSES, 775 MACON ST

ROBINS, GA 31098

UNITED STATES

Mr. Grant Ghesquire Email: grant.ghesquiere@us.af.mil Telephone: 478-468-3227

Section F - Deliveries or Performance

Overall Contract Delivery Period

From date of lead time event to beginning of performance 1 Calendar Days Date of Award Receipt

From date of lead time event to completion of performance 1825 Calendar Days Date of Award Receipt

Line Item Delivery Schedule Estimated Quantity

Address and POC

Delivery Schedule From date of lead time event to completion of performance 1825 Calendar Days Date of Award

1 Lot Ship To DoDAAC: F3Q2AD CountryCode: USA

CIVIL ENGINEER GROUP CEG

AF BPN NO MILSBILLS PROCESSES, 775

MACON ST

ROBINS, GA 31098

UNITED STATES

Mr. Grant Ghesquire Email: grant.ghesquiere@us.af.mil Telephone: 478-468-3227

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.247-34 F.o.b. Destination. Nov 1991

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.247-7023 Transportation of Supplies by Sea. Jan 2023

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

As prescribed in 232.7004(b), use the following clause:

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.

in WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Combo

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

2-in-1

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC TBD at Order level

Issue By DoDAAC TBD at Order level

Admin DoDAAC TBD at Order level

Inspect By DoDAAC TBD at Order level

Ship To Code TBD at Order level

Ship From Code TBD at Order level

Mark For Code TBD at Order level

Service Approver (DoDAAC) TBD at Order level

Service Acceptor (DoDAAC) TBD at Order level

Accept at Other DoDAAC TBD at Order level

LPO DoDAAC TBD at Order level

DCAA Auditor DoDAAC TBD at Order level

Other DoDAAC(s) TBD at Order level

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Not Applicable

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

None Required

Section I - Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.202-1 Definitions. Jun 2020 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.

Nov 2021

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

Nov 2021

52.204-27 Prohibition on a ByteDance Covered Application. Jun 2023 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.217-2 Cancellation Under Multi-year Contracts. Oct 1997 52.219-32 Orders Issued Directly Under Small Business Reserves Mar 2020 52.222-21 Prohibition of Segregated Facilities. Apr 2015 52.222-26 Equal Opportunity. Sep 2016 52.222-50 Combating Trafficking in Persons. Nov 2021 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. Jun 2020 52.223-21 Foams. Jun 2016 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021 52.228-2 Additional Bond Security. Oct 1997 52.228-11 Individual Surety-Pledge of Assets. Feb 2021 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.232-18 Availability of Funds. Apr 1984 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.236-2 Differing Site Conditions. Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984 52.236-5 Material and Workmanship. Apr 1984 52.236-6 Superintendence by the Contractor. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.236-8 Other Contracts. Apr 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. Apr 1984 52.236-10 Operations and Storage Areas. Apr 1984 52.236-11 Use and Possession Prior to Completion. Apr 1984 52.236-12 Cleaning Up. Apr 1984 52.236-13 Accident Prevention. Nov 1991 52.236-13 Accident Prevention. (Alternate I) Nov 1991 Alternate I Nov 1991 52.236-14 Availability and Use of Utility Services. Apr 1984 52.236-15 Schedules for Construction Contracts. Apr 1984 52.236-17 Layout of Work. Apr 1984 52.236-21 Specifications and Drawings for Construction. Feb 1997 52.236-21 Specifications and Drawings for Construction. (Alternate I) Feb 1997 Alternate I Apr 1984 52.242-14 Suspension of Work. Apr 1984 52.243-5 Changes and Changed Conditions. Apr 1984 52.244-6 Subcontracts for Commercial Products and Commercial Services. Jun 2023 52.249-4 Termination for Convenience of the Government (Services) (Short Form). Apr 1984

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. Jan 2023 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

Jan 2023

252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Jan 2023 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. Sep 2014 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.232-7010 Levies on Contract Payments. Dec 2006 252.236-7005 Airfield Safety Precautions. Dec 1991

252.236-7013 Requirement for Competition Opportunity for American Steel Producers, Fabricators, and Manufacturers.

Jan 2023

252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Jan 2023 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations. Oct 2010

FAR Clauses Incorporated by Full Text

52.209-1 Qualification Requirements. (Feb 1995)

As prescribed in , insert the following clause:9.206-2

QUALIFICATION REQUIREMENTS (FEB 1995)

. "Qualification requirement," as used in this clause, means a Government requirement for testing or other quality assurance (a) Definition demonstration that must be completed before award.

One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring (b) qualification, whether the covered product or service is an end item under this contract or simply a component of an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.

(Name) Grant Ghesquire

(Address) grant.ghesquiere@us.af.mil

If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the (c) relevant information noted below should be provided.

Offeror's Name ____

Manufacturer's Name____

Source's Name ____

Item Name ____

Service Identification ____

Test Number (to the extent known)____

Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, (d) or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.

If an offeror, manufacturer, source, product or service has met the qualification requirement but is not yet on a qualified products list, qualified (e) manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.

Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires (f) reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.

(End of provision)

52.211-10 Commencement, Prosecution, and Completion of Work. (Apr 1984)

As prescribed in , insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The 11.404(b) clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.

COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within [Contracting Officer insert number] TBD at Task Order level calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than .* The time stated for completion shall include final cleanup of the premises.TBD at Task Order level

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

52.211-12 Liquidated Damages-Construction. (Sep 2000)

As prescribed in , insert the following clause in solicitations and contracts:11.503(b)

LIQUIDATED DAMAGES-CONSTRUCTION (SEPT 2000)

If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the (a) Government in the amount of [Contracting Officer insert amount] for TBD at Task Order; Project 230101 will be $372.19 for the first day and $300.70 each calendar day of delay until the work is completed or accepted.

If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These (b) liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.216-18 Ordering. (Aug 2020)

As prescribed in , insert the following clause:16.506(a)

ORDERING (AUG 2020)

Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or (a) activities designated in the Schedule. Such orders may be issued from through [insert dates].24 April 2024 24 April 2029

All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or (b) task order and this contract, the contract shall control.

A delivery order or task order is considered "issued" when-(c)

If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;(1)

If sent by fax, the Government transmits the order to the Contractor's fax number; or(2)

If sent electronically, the Government either-(3)

Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or(i)

Distributes the delivery order or task order via email to the Contractor's email address.(ii)

Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.(d)

(End of clause)

52.216-19 Order Limitations. (Oct 1995)

As prescribed in , insert a clause substantially the same as follows:16.506(b)

ORDER LIMITATIONS (OCT 1995)

. When the Government requires supplies or services covered by this contract in an amount of less than [insert dollar (a) Minimum order $2,000.00 figure or quantity], the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

. The Contractor is not obligated to honor-(b) Maximum order

Any order for a single item in excess of [insert dollar figure or quantity];(1) $5,000,000.00

Any order for a combination of items in excess of [insert dollar figure or quantity]; or(2) $95,000,000.00

A series of orders from the same ordering office within days that together call for quantities exceeding the limitation in paragraph (b)(1) or (3) 5

(2) of this section.

If this is a requirements contract ( includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), (c) i.e., the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in (d) paragraph (b), unless that order (or orders) is returned to the ordering office within days after issuance, with written notice stating the Contractor's 30 intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

52.216-22 Indefinite Quantity. (Oct 1995)

As prescribed in , insert the following clause:16.506(e)

INDEFINITE QUANTITY (OCT 1995)

This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities (a) of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall (b) furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."

Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be (c) issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within (d) the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; , that the Contractor shall not be required to make any provided deliveries under this contract after [insert date].24 April 2029

(End of clause)

52.216-32 Task-Order and Delivery-Order Ombudsman. (Sep 2019)

As prescribed in , insert the following clause:16.506(j)

TASK-ORDER AND DELIVERY-ORDER OMBUDSMAN (SEPT 2019)

In accordance with 41 U.S.C. 4106(g), the Agency has designated the following task-order and delivery-order Ombudsman for this contract. (a) The Ombudsman must review complaints from the Contractor concerning all task-order and delivery-order actions for this contract and ensure the Contractor is afforded a fair opportunity for consideration in the award of orders, consistent with the procedures in the contract. Dr. Thomas G. Eller, [Contracting Officer to insert name, address, telephone number, and email address for the Agency (478) 222-1088thomas.eller.1@us.af.mil Ombudsman or provide the URL address where this information may be found.]

Consulting an ombudsman does not alter or postpone the timeline for any other process (e.g., protests).(b)

Before consulting with the Ombudsman, the Contractor is encouraged to first address complaints with the Contracting Officer for resolution. (c) When requested by the Contractor, the Ombudsman may keep the identity of the concerned party or entity confidential, unless prohibited by law or agency procedure.

(End of clause)

52.219-14 Limitations on Subcontracting. (Oct 2022)

As prescribed in , insert the following clause:19.507(e)

LIMITATIONS ON SUBCONTRACTING (OCT 2022)

This clause does not apply to the unrestricted portion of a partial set-aside.(a)

, as used in this clause, means a first-tier subcontractor, including an independent contractor, that-(b) Definition. Similarly situated entity

Has the same small business program status as that which qualified the prime contractor for the award ( , for a small business set-aside (1) e.g.

contract, any small business concern, without regard to its socioeconomic status); and

Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned (2) to the subcontract.

This clause applies only to-(c) Applicability.

Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);(1)

Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);(2)

Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;(3)

Orders expected to exceed the simplified acquisition threshold and that are-(4)

Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or(i)

Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);(ii)

Orders, regardless of dollar value, that are-(5)

Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(i) (F); or

Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as (ii) described in 19.504(c)(1)(ii); and

Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the (6) evaluation preference.

An independent contractor shall be considered a subcontractor.(d) Independent contractors.

By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract (e) Limitations on subcontracting.

assigned a North American Industry Classification System (NAICS) code for-

Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to (1) subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;

Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the (2) Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost (3) of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or

Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, (4) excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.

The Contractor shall comply with the limitations on subcontracting as follows:(f)

For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause-(1)

[ ] Contracting Officer check as appropriate.

By the end of the base term of the contract and then by the end of each subsequent option period; or

By the end of the performance period for each order issued under the contract.

For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.(2)

A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be (g) performed by the aggregate of the joint venture participants.

In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business (1) protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.

In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by (2) the 8(a) participants in the joint venture must be more than administrative functions.

(End of clause)

52.225-9 Buy American-Construction Materials. (Oct 2022)

As prescribed in , insert the following clause:25.1102(a)

BUY AMERICAN-CONSTRUCTION MATERIALS (OCT 2022)

. As used in this clause-(a) Definitions

-Commercially available off-the-shelf (COTS) item

Means any item of supply (including construction material) that is-(1)

A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);(i)

Sold in substantial quantities in the commercial marketplace; and(ii)

Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the (iii) commercial marketplace; and

Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.(2)

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

-Cost of components means

For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the (1) construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as (2) described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. Critical component The list of critical components is at FAR 25.105.

means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of Critical item critical items is at FAR 25.105.

means-Domestic construction material

For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-(1)

An unmanufactured construction material mined or produced in the United States; or(i)

A construction material manufactured in the United States, if-(ii)

The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except (A) that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.

Components of unknown origin are treated as foreign; or

The construction material is a COTS item; or(B)

For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured (2) in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material.

The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, Fastener rivets, nails, clips, and screws.

means a construction material other than a domestic construction material.Foreign construction material means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing Foreign iron and steel processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

means that the cost of the iron and steel content exceeds 50 percent of the total cost of all Predominantly of iron or steel or a combination of both its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.Steel

"United States" means the 50 States, the District of Columbia, and outlying areas.

Domestic preference.(b) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction (1) material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

This requirement does not apply to information technology that is a commercial product or to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .