ATTACH13_Form 911 DesignDiscipline Review.docx
DOCX document 27 KB Posted
- Attached to
- Robins AFB Mechanical/Electrical II IDIQ Federal contract opportunity
- Solicitation number
- FA850124R0001
About this file
This document contains engineering review comments for project UHHZ xxxxxx at Robins Air Force Base. The review covers drawings, specifications, design analysis, and cost analysis. Comments reference details on pages and paragraphs requiring response from the contractor. The reviewing office and disciplines involved include architectural, mechanical, electrical, structural, corrosion, fire prevention, sanitary, and environmental.
The related federal contract opportunity is solicitation number FA850124R0001 for mechanical and electrical indefinite-delivery, indefinite-quantity contract services at Robins Air Force Base. The solicitation was issued by the Air Force Sustainment Center within the Department of the Air Force Materiel Command.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERING REVIEW COMMENTS PAGE 1 OF 1 PAGES
LEGEND:
A – APPROVED C – CHECK AND CORRECT D - DISAPPROVE E - EXCEPTION, SEE COMMENT N – NOTE X - DELETE COMMENT
ENGINEERING REVIEW COMMENTS (CONTINUATION SHEET) PAGE 2 OF 2 PAGES
LEGEND:
A – APPROVED C – CHECK AND CORRECT D - DISAPPROVE E - EXCEPTION, SEE COMMENT N – NOTE X - DELETE COMMENT
| DRWG OR PARA NO. |
| COMM. NO. |
| TECHNICAL COMMENTS |
(PRINT)
ACTION BY RVW OFC
BASE
REVIEW FORM - 16-Nov-04 REVIEW FORM - 16-Nov-04
PROJECT NUMBER AND DESCRIPTION:
UHHZ xxxxxx, xxx
DATE:
dd-mmm-yyyy
BASE AND LOCATION:
Robins AFB GA, xxx
| |_| | 30% Concept | |||
| |_| | 60% Preliminary | |||
| |_| | First Final | |||
| |_| | Checkset # | |||
| |_| | ||||
| REVIEWING OFFICE | ||||
| REVIEWER: | OFFICE: | PHONE: ( ) , Ext. -- | DSN: | |
| FAX: | ( ) | |||
| E-MAIL: |
REG. STATE: ____---------____ NO.: _____-----------____
| DISCIPLINES | ||
| |_| ARCHITECT | |_| MECHANICAL | |_| SURGEON |
| |_| CIVIL | |_| ELECTRICAL | |_| GROUND SAFETY |
| |_| STRUCTURAL | |_| CORROSION | |_| FIRE PREVENTION |
| |_| SANITARY | |_| PAVEMENTS | |_| ENVIRONMENTAL |
| |_| PLANNER | |_| UTILITIES | |_| OTHER: |
| DRWG OR PARA NO. |
| COMM. |
NO.
TECHNICAL COMMENTS
(PRINT)
ACTION BY RVW OFC BASE
DRAWINGS
| x-xxx |
| xx |
| Detail x/xxx – xxx. |
Response:
Govt. Comment:
SPECIFICATIONS
| xx xx xx |
| xx |
| Paragraph xx (name) – xxx. |
DESIGN ANALYSIS
| xx |
| xx |
| Paragraph xx (name) – xxx. |
COST ANALYSIS
| xx |
| xx |
| Line xx – xxx. |
END OF COMMENTS
File details come from the government source that posted it. Updated .