ATTACH19_AF3065_BLANK_SAMPLE.pdf

PDF 102 KB Posted

Attached to
Robins AFB Mechanical/Electrical II IDIQ Federal contract opportunity
Solicitation number
FA850124R0001
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is a template for a Contract Progress Report used by the Department of the Air Force to monitor completion percentages for line items and work elements on contracts. The template collects information on the contract number, project number, reporting period dates, contractor address, and line item numbers with spaces to record the percentage of each work element completed during the reporting period and cumulatively to date. At the bottom, the contractor and contracting officer must certify the percentage of contract completion according to the specifications. No information is provided about specific requirements, response dates, pricing terms, or set-asides for federal opportunities.

View the file

Other files for this federal contract opportunity

Other files attached to Robins AFB Mechanical/Electrical II IDIQ, newest first.
File Type Posted
RFI_230077.230101_Mech.Elec_FINAL_Rev01_01162024.xlsx XLSX spreadsheet
FA850124R00010001_01022024.pdf PDF
ATTACH19_AF3065_BLANK_SAMPLE.xlsx XLSX spreadsheet
ATTACH24_B670_Fire Plan.pdf PDF
ATTACH18_AF3064_BLANK_SAMPLE.xlsx XLSX spreadsheet
RFI_230077.230101_Mech.Elec_FINAL_01022024.xlsx XLSX spreadsheet
ATTACH25_B670_Drawing_Floor Plan.pdf PDF
ATTACH01_SOW_MechElec_Rev03_12292023.pdf PDF
Mech.Elec.2_site.visit.attendance_14Dec2023.pdf PDF
ATTACH10_SUBMITTAL REGISTER.XLS XLS spreadsheet
ATTACH07_ICD705_Construction and Management_SCIF.PDF PDF
ATTACH04_AFMAN 31-116 Motor Vehicle Traffic Supervision.PDF PDF
ATTACH22_230101DEMO_Bid Schedule_BLANK.pdf PDF
ATTACH21_230101DEMO_SOW_07102023.pdf PDF
ATTACH12_Master Utility Outage.PDF PDF
ATTACH03_ProceduralGuide_DesignersAE_2023.PDF PDF
ATTACH01_SOW_MechElec_Rev02_08112023.pdf PDF
ATTACH18_AF3064_BLANK_SAMPLE.pdf PDF
ATTACH16_AF3000_MaterialSubmittal.PDF PDF
ATTACH15_AF2586 Flightline Driving Request.PDF PDF
ATTACH05_AFMAN 32-1084 Civil Engineering Facility Requirements.PDF PDF
ATTACH02_Robins BFS 2022.pdf PDF
FA850124R0001_FINAL_00_11092023.pdf PDF
ATTACH09_WR-ALC SAFE-T-GRAM.PDF PDF
ATTACH23_230101DEMO_SubmittalRegister.xlsx XLSX spreadsheet
ATTACH20_WD_GA20230322_07212023.pdf PDF
ATTACH17_AF3052_BLANK_SAMPLE.XLS XLS spreadsheet
ATTACH14_DD1354(BLANK)_SAMPLE.PDF PDF
ATTACH13_Form 911 DesignDiscipline Review.docx DOCX document
ATTACH11_TEMPLATE_Schedule of Values_BLANK.PDF PDF
ATTACH08_AppC_Safety_053312023.PDF PDF
ATTACH06_Asbestos Management Plan_2015.PDF PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB NO. 0704-0188CONTRACT PROGRESS REPORT

Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO : SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060.

CONTRACTOR ADDRESS

REPORT NO. PERIOD COVERED

FROM:

PROJECT NO. CONTRACT NO. COMPLETION DATE

TO:

LINE

NO.

% OF

TOTAL JOB

% COMPLETED

THIS PERIOD

% COMPLETED

CUMULATIVE

WORK ELEMENT

TOTAL

REMARKS

At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.

PROGRESS OR COMPLETION CERTIFICATE

I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.

SUBMITTED BY OR FOR

CONTRACTOR BASE CIVIL ENGINEER

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

File details come from the government source that posted it. Updated .