Attach_04_ScheduleOfItems_COSATB.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
USFS Colorado Springs Air Tanker Base
Solicitation number
1282BH20R0003
Issued by

About this file

This document contains a schedule of items for the USDA Forest Service Region Two Colorado Springs Airtanker Base project. The schedule lists 42 base items and 2 optional items required for construction of an operations building and retardant storage building at the airtanker base. Base items include site work such as earthwork, paving, and utilities installation as well as construction of the buildings and related features. Individual line items specify the type of work, unit of measure, estimated quantities, and total price. This project is being procured under solicitation number 1282BH20R0003 issued by the USDA Forest Service Rocky Mountain Region to support operations at the Colorado Springs Airtanker Base.

View the file

Other files

File Type Posted
AMEND006 Drawings 20200729.pdf PDF
AMEND006 Bidder Questions FINAL PART2.pdf PDF
1282BH20R0003 Amendment6 SF30.pdf PDF
AMEND006 Bidder Questions FINAL PART1.pdf PDF
AMEND006 ScheduleOfItems COSATB 20200729.xlsx XLSX spreadsheet
AMEND006 QandA Amendment Instructions 20200729.docx DOCX document
AMEND006 Specifications 20200729.pdf PDF
Amendment5 SF30.pdf PDF
Am4 Attach06 DEICE - CCD 02_COMBINED_SIGNED.pdf PDF
Am4 Attach05 DEICE - CCD 01 COMPLETE_SIGNED.pdf PDF
Am4 Attach11 05.28.20 Sewer Addendum #1 and #2.pdf PDF
Am4 Attach03 Technical Requirements Briefing by Lacie.docx DOCX document
Am4 Attach10 01a. COSA USFS Wastewater Plans - Addendum#1.pdf PDF
Am4 Attach08 05.28.20 Water Addendum #2.pdf PDF
Am4 Attach09 COSA USFS Wastewater Plans COMPLETE.pdf PDF
Am4 Attach07 COSA USFS Water Plans COMPLETE.pdf PDF
Amendment04 SF30.pdf PDF
Am4 Attach02 presolicitation attendees.docx DOCX document
Am4 Attach04 20200212 COS DEICE IFC PLANS.pdf PDF
Am4 Attach01 Preproposal Conference Agenda.docx DOCX document
Amendment3 SF30.pdf PDF
Amendment3 Attach_02_COSATB_SPECIFICATIONS COMBINED_20191023_20200430 v2.pdf PDF
AMENDMENT2 1282BH20R0003.pdf PDF
AMENDMENT1 1282BH20R0003.pdf PDF
Solicitation v2.pdf PDF
SF1442 Solicitation.pdf PDF
Attach_02_COSATB_SPECIFICATIONS COMBINED_20191023_20200430.pdf PDF
Attach_03_COS ATB Special Inspection Reqts.pdf PDF
Attach_01_COSATB_Final DWG w Cover Sheet 10-23-19.pdf PDF
Attach_07_Technical_Proposal_Submission_Aid.pdf PDF
Attach_05_EM_385_1_1_2014.pdf PDF
ATTACH_06_Wage_Determination.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COSATBschedule Schedule of Items

USFS Region 2
Pike & San Isabel National Forests
Cimarron & Comanche National Grasslands
Colorado Springs Airtanker Base
TypeItemDescriptionMethod of MeasureUnitQuantityUnit PriceTOTAL
(Base Item)#
BI1Mobilization, Bonding, Insurance, General ConditionsLSLump Sum1
BI2Concrete – Building FootingsAQCubic Yard88
BI3Concrete – Building Foundation WallsAQSquare Foot1701
BI4Concrete – Building Interior Slab on GradeAQSquare Foot9256
BI5Concrete – Shade Structure Footings and PiersAQCubic Yard13
BI6Concrete – Footings for Site WallsAQCubic Yard11
BI7Concrete – Foundation Walls for Site WallsAQCubic Yard11
BI8Metals - ArchitecturalLSLump Sum1
BI9Metals - StructuralLSLump Sum1
BI10Wood - Structural - Storage BuildingLSLump Sum1
BI11Thermal and Moisture ProtectionLSLump Sum1
BI12Doors and WindowsLSLump Sum1
BI13Finishes and Miscellaneous InteriorLSLump Sum1
BI14SpecialtiesLSLump Sum1
BI15Equipment (Elevator)LSLump Sum1
BI16Furnishings (FF&E Not Included)LSLump Sum1
BI17HVAC - Operations BuildingLSLump Sum1
BI18HVAC - Retardant Storage BuildingLSLump Sum1
BI19HVAC - Retardant Storage Building Heat Pumps & Electric HeatersAQEach3
BI20Plumbing - Operations BuildingLSLump Sum1
BI21Plumbing - Retardant Storage BuildingLSLump Sum1
BI22Electrical - Operations Building ServiceLSLump Sum1
BI23Electrical - Operations BuildingLSLump Sum1
BI24Lighting & Lighting Controls - Operations BuildingLSLump Sum1
BI25Electrical - Retardant Storage Building ServiceLSLump Sum1
BI26Electrical - Retardant Storage BuildingLSLump Sum1
BI27Lighting & Lighting Controls - Retardant Storage BuildingLSLump Sum1
BI28Data Communications Electronic Safety and SecurityLSLump Sum1
BI29Earthwork - Clear & Grade, Erosion ControlLSLump Sum1
BI30Earthwork - Excavation for Buildings and SiteAQCubic Yard2845
BI31Earthwork - Structural / Site Embankment and Backfill - Native MaterialAQCubic Yard985
BI32Earthwork - Spoils DisposalAQCubic Yard985
BI33Exterior - Concrete Pavement / SidewalksAQSquare Foot1810
BI34Exterior - Concrete Pavement Retardant Containment SlabAQSquare Yard1547
BI35Concrete Curb and GutterAQLineal Feet445
BI36Exterior - Asphalt PavementAQSquare Yard5330
BI37Site DrainageLSLump Sum1
BI38Water Services and MainsLSLump Sum1
BI39Sewer ServicesLSLump Sum1
BI40Gas, Electric, Telephone and Communication ServicesLSLump Sum1
BI41Miscellaneous Site ImprovementsLSLump Sum1
TOTAL BASE ITEMS$0.00
TypeDescriptionMethod of MeasureUnitQuantityUnit PriceTOTAL
(Optional Items)Item #
OI42Lightning Protection - Operations BuildingLSLump Sum1
OI43Lightning Protection - Retardant Storage BuildingLSLump Sum1
OI44Linear Wood Slat Ceiling in Lieu of Acoustical Panel CeilingAQSquare Foot1,100
TOTAL OPTIONAL ITEMS$0.00
TOTAL BASE PLUS OPTIONAL ITEMS$0.00